ISQI CTAL_TM_001 CTAL-TM-001 : ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_001) 10 Q&A Version 3.0 http://www.testchief.com/ctal_tm_001.htm

description

Testchief offers ISQI CTAL_TM_001 questions and answers for your ISTQB Certified Tester Advanced Level - Test Manager exam preparation. Download CTAL_TM_001 free sample to check the quality.

Transcript of Testchief CTAL_TM_001 Exam - ISTQB Certified Tester Advanced Level - Test Manager

Page 1: Testchief CTAL_TM_001 Exam - ISTQB Certified Tester Advanced Level - Test Manager

ISQI CTAL_TM_001CTAL-TM-001 : ISTQB Certified Tester Advanced Level - Test Manager

(CTAL-TM_001)

10 Q&A

Version 3.0

http://www.testchief.com/ctal_tm_001.htm

Page 2: Testchief CTAL_TM_001 Exam - ISTQB Certified Tester Advanced Level - Test Manager

Leading the way in IT testing and certification tools, www.TestChief.com

- 2 -

Important Note, Please Read Carefully

Other TestChief productsA) Offline Testing engineUse the offline Testing engine product topractice the questions in an exam environment.

Build a foundation of knowledge which will be useful also after passing the exam.

Latest VersionWe are constantly reviewing our products. New material is added and old material isrevised. Free updates are available for 90 days after the purchase. You should check yourmember zone at TestChief and update 3-4 days before the scheduled exam date.

Here is the procedure to get the latest version:

1.Go towww.TestChief.com2.Click on Log in3.The latest versions of all purchased products are downloadable from here. Just click thelinks.For most updates,it is enough just to print the new questions at the end of the newversion, not the whole document.

FeedbackIf you spot a possible improvement then please let us know. We always interested inimproving product quality.Feedback should be send to [email protected]. You should include the following:Exam number, version, page number, question number, and your login Email.

Our experts will answer your mail promptly.

CopyrightEach iPAD file is a green exe file. if we find out that a particular iPAD Viewer file isbeing distributed by you, TestChief reserves the right to take legal action against youaccording to the International Copyright Laws.

ExplanationsThis product does not include explanations at the moment. If you are interested inproviding explanations for this exam, please contact [email protected].

Page 3: Testchief CTAL_TM_001 Exam - ISTQB Certified Tester Advanced Level - Test Manager

Leading the way in IT testing and certification tools, www.TestChief.com

- 3 -

www.TestChief.com Q: 1 Topic 1, Scenario 1 "Medical Domain"You are working as a test manager in the medical domain leading a team of systemtesters. You are currently working on a major release of the product which givescustomers many new features and resolves a number of problem reports fromprevious releases.You are about to release a test progress report to a senior manager, who is not a testspecialist. Which of the following topics should NOT be included in the test progressreport? 1 credit

A. Product risks which have been mitigated and those which are outstanding.

B. Recommendations for taking controlling actions

C. Status compared against the started exit criteria

D. Detailed overview of the risk-based test approach being used to ensure the exitcriteria to be achieved

Answer: D

www.TestChief.com Q: 2 Explain how the above mentioned report may differ froma report that you produce for the project manager, who is a test specialist SelectTWO items from the following options that can be used to report to the projectmanager and would not be included in a report to senior management. 1 credit

A. Show details on effort spent

B. List of all outstanding defects with their priority and severity

C. Give product risk status

D. Show trend analysis

E. State recommendations for release

Page 4: Testchief CTAL_TM_001 Exam - ISTQB Certified Tester Advanced Level - Test Manager

Leading the way in IT testing and certification tools, www.TestChief.com

- 4 -

Answer: A, B

www.TestChief.com Q: 3 Consider the typical objectives of testing. Which of thefollowing metrics can be used to measure the effectiveness of the testing process inachieving one of those objectives? 1 credit

A. Average number of days between defect discovery and resolution

B. Percentage of requirements covered

C. Lines of code written per developer per day

D. Percentage of test effort spent on regression testing

Answer: B

www.TestChief.com Q: 4 You have been given responsibility for the non-functionaltesting of a safety-critical monitoring & diagnostics package in the medical area.Which of the following would you least expect to see addressed in the test plan? 1credit

A. Availability

B. Safety

C. Portability

D. Reliability

Answer: C

Page 5: Testchief CTAL_TM_001 Exam - ISTQB Certified Tester Advanced Level - Test Manager

Leading the way in IT testing and certification tools, www.TestChief.com

- 5 -

www.TestChief.com Q: 5 Since the system is in the medical domain and thereforein the safety critical area, testing needs to be rigorous and evidence is required thatthe system has been adequately tested. Identify THREE measures that wouldtypically be part of the test approach in this domain and which are not alwaysapplicable in other domains! 1 credit

A. High level of documentation

B. Failure Mode and Effect Analysis (FMEA) sessions

C. Traceability to requirements

D. Non-functional testing

E. Master test planning

F. Test design techniques

G. Reviews

Answer: A, B, C

www.TestChief.com Q: 6 A test log is one of the documents that need to beproduced in this domain in order to provide evidence of testing. However, the levelof detail of test logs can vary. Which of the following is NOT an influencing factorfor the level of detail of the test logs being produced? 1 credit

A. Level of test execution automation

B. Test level

C. Regulatory requirements

D. Experience level of testers

Page 6: Testchief CTAL_TM_001 Exam - ISTQB Certified Tester Advanced Level - Test Manager

Leading the way in IT testing and certification tools, www.TestChief.com

- 6 -

Answer: D

www.TestChief.com Q: 7 What is the main reason why reviews are especiallybeneficial in the above-mentioned scenario? 2 credits

A. They ensure a common understanding of the product.

B. They find defects early.

C. They enhance project communication.

D. They can be performed without exercising the code.

Answer: D

www.TestChief.com Q: 8 The introduction of reviews and inspections has oftenfailed as a process improvement action. Identify the THREE most importantmeasures that should be taken to reduce the risk that this test process improvementwill fail. 2 Credits (for 2 out of 3 correct 1 credit)

A. Process ownership and experienced moderators who drive the inspection process.

B. Management support

C. Training of those involved

D. The availability of stands and processes

E. Usage of a more traditional software development lifecycle

F. Alignment with software process improvement

G. Using a reference model, e.g. TMMi

Answer: A, B, C

Page 7: Testchief CTAL_TM_001 Exam - ISTQB Certified Tester Advanced Level - Test Manager

Leading the way in IT testing and certification tools, www.TestChief.com

- 7 -

www.TestChief.com Q: 9 IEEE 1028 also defines ¡°management review¡± as a typeof review. What is the main purpose of a management review? 1 credit

A. Align technical concepts during the design phase

B. Establish a common understanding of requirements

C. Provide independent evaluation of compliance to processes, regulations, standardsetc.

D. To monitor progress, assess the status of a project, and make decisions about futureactions

Answer: D

www.TestChief.com Q: 10 Which of the following is an example of testing as part ofthe requirements specification phase? 1 credit

A. A requirements review meeting

B. A business analyst eliciting requirements

C. Performing acceptance tests against requirements

D. A test report showing requirements coverage

Answer: A