Terraprobe Consulting Geotechnical & Environmental Engineering
Construction Materials Inspection & Testing
Terraprobe Inc. Greater Toronto Hamilton – Niagara Central Ontario Northern Ontario 11 Indell Lane 903 Barton Street, Unit 22 220 Bayview Drive, Unit 25 1012 Kelly Lake Rd., Unit 1 Brampton, Ontario L6T 3Y3 Stoney Creek, Ontario L8E 5P5 Barrie, Ontario L4N 4Y8 Sudbury, Ontario P3E 5P4 (905) 796-2650 Fax: 796-2250 (905) 643-7560 Fax: 643-7559 (705) 739-8355 Fax: 739-8369 (705) 670-0460 Fax: 670-0558
www.terraprobe.ca
PRELIMINARY
GEOTECHNICAL INVESTIGATION LAKESIDE VILLAGE PLAZA
5353 LAKESHORE ROAD BURLINGTON, ONTARIO
Prepared For: United Burlington Retail Portfolio Inc. c/o Glanelm Property Management 3 Charles Street West, Suite 300 Toronto, Ontario, M4Y 1R4
Attention: Mr. Joe Elmelah
File No. 71-15-5010 March 23, 2015
© Terraprobe Inc.
Distribution:
1 copy: United Burlington Retail Portfolio Inc. c/o Glanelm Property Management (pdf) 1 copy: Cynthia Zahoruk Architect Inc. (pdf) 2 copies: Terraprobe Inc., Stoney Creek
United BurLakeside V
T
1.0 TH
2.0 SIT
2.1
2.2
2.3
3.0 PR
4.0 SU
4.1
4.2
5.0 DIS
5.1
5.2
5.3
5.4
5.5
5.6
6.0 DE
6.1
6.2
6.3
6.4
7.0 LIM
FIGURES
FIGURE 1FIGURE 2
APPEND
APPENDI
rlington Retail PVillage Plaza, 5
Terraprobe
HE PROJECT
TE AND PRO
EXISTING
2 SITE GEO
3 PROPOSE
ROCEDURE
UBSURFACE
SOIL CON
2 GROUND
SCUSSION
BUILDING
2 EARTHQU
3 EARTH P
4 SLAB ON
5 SITE SER
6 PAVEMEN
ESIGN CONS
EXCAVAT
2 SHORING
3 SITE WO
4 QUALITY
MITATIONS
S
1 SITE L2 BORE
DICES
IX A LOGS
Portfolio Inc. c/o5353 Lakeshore
e
T ................
OJECT DES
G SITE CONDI
OLOGY .........
ED DEVELOP
...................
E CONDITIO
NDITIONS .....
WATER .......
...................
G FOUNDATIO
UAKE DESIGN
RESSURE DE
GRADE DES
RVICING ........
NT DESIGN ...
SIDERATIO
TIONS ...........
G DESIGN .....
RK ...............
CONTROL ...
AND USE O
LOCATION PEHOLE LOCA
OF BOREHO
o Glanelm Proe Road, Burling
TABLE O
...................
SCRIPTION
ITIONS .........
...................
MENT ...........
...................
ONS ............
...................
...................
...................
ONS ..............
N PARAMETER
ESIGN CONSI
IGN PARAME
...................
...................
ONS FOR CO
...................
...................
...................
...................
OF REPORT
PLAN ATION PLAN
OLE
perty Managemgton, Ontario
OF CONTE
...................
..................
...................
...................
...................
...................
...................
...................
...................
...................
...................
RS ..............
DERATIONS .
TERS ..........
...................
...................
ONSTRUCT
...................
...................
...................
...................
T ................
ment
ENTS
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
TABILITY ....
...................
...................
...................
...................
...................
....................
....................
...................
...................
...................
....................
....................
...................
...................
....................
...................
...................
...................
...................
...................
...................
....................
...................
...................
...................
...................
....................
March 23File No. 71-14
Page
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
3, 20154-5010
No. i
...... 1
...... 2
...... 2
...... 2
...... 2
...... 3
...... 4
...... 4
...... 6
...... 7
...... 7
...... 8
...... 9
.... 10
.... 11
.... 12
.... 15
.... 15
.... 16
.... 17
.... 17
.... 19
United BurLakeside V
T
1.0 T
Terraprob
Portfolio
Lakeshore
estimate t
13, 2015)
behalf of
2015.
The purpo
conditions
respect to
floor slab
backfill an
influence
rlington Retail PVillage Plaza, 5
Terraprobe
THE PROJ
be Inc. was re
Inc. to carry
e Road in Bur
to carry out th
). Authorizat
United Burl
ose of the w
s in a series o
o the geotech
bs-on-grade a
nd temporary
the design.
Portfolio Inc. c/o5353 Lakeshore
e
JECT
etained by G
y out a geote
rlington, Onta
he investigatio
tion to procee
ington Retail
work was to in
of boreholes
hnical aspects
and pavement
y ground wate
o Glanelm Proe Road, Burling
Glanelm Prope
echnical inves
ario. A site lo
on were prov
ed with the w
l Portfolio In
nvestigate an
drilled at the
s of the prop
ts. The antici
er control are
perty Managemgton, Ontario
erty Managem
stigation at t
ocation plan i
vided in our le
work was prov
nc. and Glane
nd report on
e site. Based o
osed develop
ipated constr
e discussed al
ment
ment on beha
the Lakeside
is provided as
etter of Novem
vided by Cyn
elm Property
the subsurfac
on this inform
pment, includ
ruction condi
lso, but only w
alf of United
Village Plaz
s Figure 1. A
mber 6, 2014
nthia Zahoruk
y Managemen
ce soil, rock
mation, advic
ding the desig
itions pertain
with regard t
March 23File No. 71-14
Page N
d Burlington R
za located at
A proposal an
4 (revised Feb
k Architect In
nt on Februar
and ground
ce is provided
gn of founda
ning to excav
to how these
3, 20154-5010
No. 1
Retail
5353
d cost
bruary
nc. on
ry 10,
water
d with
ations,
vation,
might
United BurLakeside V
T
2.0 S
2.1 E
The prope
Heath Ro
topograph
At the tim
plaza. The
the perim
Hampton
however t
to south. T
2.2 S
Based on
soil at an
Formation
calcareou
beneath th
2.3 P
Specific d
based on
developm
that the b
parking.
2 P
3 B19
rlington Retail PVillage Plaza, 5
Terraprobe
SITE AND
Existing S
erty is locate
ad. The Site P
hic survey of t
me of this inv
e existing par
meter of the
Health Road
there is a fall
The high grou
Site Geolo
published ge
nd in the vicin
n.2 The Queen
s sandstone.
he site is with
Proposed
details regard
preliminary i
ment could inc
uildings are a
aleozoic Geolo
edrock Topogr964.
Portfolio Inc. c/o5353 Lakeshore
e
PROJECT
ite Condit
d on the nort
Plan, Figure
the site prepa
vestigation, d
rking lot is lo
parking lot.
d provide pri
of about 1.2
und was at ab
ogy
eological info
nity of the su
nston Format
The geologi
hin 1 to 3 metr
Developm
ding the prop
information p
clude 2 to 4 m
anticipated to
ogy, Hamilton A
raphy of the Ha
o Glanelm Proe Road, Burling
T DESCRI
tions
th side of La
2, presents th
ared by A.T. M
development
ocated on the
Asphalt driv
imary access
metre in elev
bout elevation
ormation for
ubject proper
tion consists o
ical mapping
res of existing
ment
posed develop
provided by C
multi-storey bu
o be approxim
Area, Southern
amilton Area, S
perty Managemgton, Ontario
PTION
akeshore Road
he general arr
McLaren Lim
on the prope
south and ea
veways from
to the prope
vation across
n 82.2 m and t
the general a
rty consists o
of a reddish b
g and region
g grade.3
pment and th
Cynthia Zaho
uildings with
mately 20 stor
n Ontario; Onta
Southern Ontar
ment
d, between K
rangement of
mited, OLS, da
erty included
ast sides of th
m Lakeshore
erty. The site
the 160 m tra
the lowest at
area of the sit
of glacial till
brown shale,
nal well recor
he like are no
oruk Architec
adjoining low
reys high, wi
rio Division of
rio; Ontario De
Kenwood Ave
f the property,
ated March 5
a multi-unit
he plaza. Conc
Road, Kenw
e topography
averse of the
81.0 m.
te, the near s
and bedrock
interbedded w
rds indicates
ot known at t
ct Inc., it is u
w rise podium
ith 2 to 3 leve
Mines; Map No
epartment of M
March 23File No. 71-14
Page N
enue and Ham
, as derived f
, 2015.
t commercial
crete curbs fo
wood Avenue
y is relatively
site from the
surface overb
k of the Quee
with limeston
s that the be
this time, how
understood th
ms. It is under
els of underg
o. 2336; 1976.
Mines; Map No.
3, 20154-5010
No. 2
mpton
from a
retail
ormed
e and
y flat;
north
burden
enston
ne and
edrock
wever
hat the
rstood
ground
2034;
United BurLakeside V
T
3.0 P
The field
twelve (12
The locat
boreholes
The boreh
drilling c
augers. St
boreholes
equipmen
auger cutt
a commer
The field
arranged
obtained.
on a site
elevations
understoo
Ground w
sampling.
All of th
laboratory
are plotte
part of thi
rlington Retail PVillage Plaza, 5
Terraprobe
PROCEDU
work for thi
2) boreholes w
tions of the b
s are shown on
holes were d
contractor. Th
tandard pene
s at regular in
nt. After the d
tings and ben
rcial grade co
work was ob
for the unde
The borehole
survey draw
s shown on a
od to have bee
water observa
No provision
he samples re
y for further e
d on the Log
is assignment
Portfolio Inc. c/o5353 Lakeshore
e
URE
is investigatio
were drilled t
boreholes are
n the Log of B
drilled using
he boreholes
etration testin
ntervals of de
drilling, samp
ntonite sealant
ld mix asphal
bserved throug
erground util
es were locate
wing. The gr
topographic
en referred to
ations were m
n was made fo
ecovered in t
examination a
g of Borehole
t.
o Glanelm Proe Road, Burling
on was carrie
to depths of a
shown on th
Borehole shee
a truck moun
were advan
ng and sampl
pth using con
pling, and log
t. The pavem
ltic concrete.
ghout by mem
ity clearance
ed in the field
round surface
survey of the
the geodetic
made in each
for long-term
the course o
and water con
e sheets in Ap
perty Managemgton, Ontario
ed out on Feb
about 3.1 to 4
he Borehole
ets presented
nted power a
nced using co
ing was carri
nventional 50
gging was com
ment surface a
mbers of our
es at the bor
d with respect
e elevations
e property pre
datum.
h borehole du
ground water
of the investi
ntent determin
ppendix A. S
ment
bruary 26 an
4.6 metres bel
Location Pla
in Appendix
auger supplie
onventional h
ried out withi
0 mm outside
mpleted, the
at the borehol
engineering s
rehole locatio
t to the existin
at the boreh
epared by A.T
uring and up
r monitoring a
igation were
nations. The r
Soil quality an
nd 27, 2015,
low the existi
an, Figure 2.
A.
ed and operat
hollow stem
in the overbu
e diameter sp
boreholes we
le locations w
staff who loca
ons and care
ng developm
holes were i
T. McLaren L
pon completi
at the site.
brought to
results of mo
nalyses were
March 23File No. 71-14
Page N
during which
ing ground su
The results o
ted by a spec
continuous
urden in all o
lit spoon sam
ere backfilled
were restored
ated the boreh
d for the sam
ment features s
nferred from
Limited, whic
on of drilling
our Stoney C
oisture conten
not carried o
3, 20154-5010
No. 3
h time
urface.
of the
cialist
flight
of the
mpling
d with
using
holes,
mples
shown
m spot
h was
g and
Creek
nt tests
out as
United BurLakeside V
T
4.0 S
The subsu
field and
abbreviati
noted tha
continuou
inferred to
the locatio
4.1 S
The follo
geotechni
and weath
4.1.1 A
All of the
asphaltic c
4.1.2 F
Fill was e
below exi
silt. Some
determine
100 blow
observed
content of
percent.
4.1.3 G
Most of t
below exi
embedme
overriding
water con
values de
content of
rlington Retail PVillage Plaza, 5
Terraprobe
SUBSURFA
urface soil, ro
laboratory t
ions and sym
at the bounda
us samples. Th
o represent ex
ons investigat
Soil Condi
owing discuss
ical design. In
hered shale be
Asphalt Pave
e boreholes w
concrete. Th
ill
encountered a
isting ground
e silty sand a
ed in the Stan
s per 0.3m, in
suggests that
f the samples
Glacial Till
he boreholes
isting ground
ent of fragme
g of the paren
ntent of the ti
etermined for
f the samples
Portfolio Inc. c/o5353 Lakeshore
e
ACE CON
ock and groun
testing, are
mbols are prov
aries between
hey generally
xact planes of
ted.
tions
sion has bee
n general, the
edrock.
ement
were drilled w
e asphalt was
at most boreh
surface. The
and gravel fill
ndard Penetra
nferring a loo
t the fill may
s of fill recov
penetrated a
d surface. The
ents of shale
nt (Queensto
ill was simila
the till rang
of till obtaine
o Glanelm Proe Road, Burling
NDITIONS
nd water cond
shown on th
vided to assis
n the strata h
y represent a t
f geological c
en simplified
boreholes en
within an exis
s underlain by
hole locations
fill was vari
l was encoun
ation testing c
ose to very de
y not have b
vered from th
a stratum of c
e till can gen
bedrock in
n Formation)
ar to the high
ged from 15 t
ed from the p
perty Managemgton, Ontario
ditions encoun
he Log of B
st in the inter
have been in
transition from
change. Furth
in terms of
ncountered asp
sting parking
y 300 to 500 m
s and was fou
able in nature
ntered at the l
carried out w
ense state of p
een construct
e standard pe
clayey silt to
nerally be des
a till matrix
) bedrock. In
hly weathered
to greater tha
penetration tes
ment
ntered in the b
Borehole shee
rpretation of
nferred from
m one soil ty
her, conditions
f the major s
phalt paveme
g lot and pene
mm of combin
und to vary i
e but generall
location of B
within the fill,
packing. The
ted as an eng
enetration tes
silt till to de
scribed, in ge
x, thought to
n most instanc
d zone of the
an 100 blows
sting ranged f
boreholes, an
ets in Appen
the borehole
drilling obse
ype to another
s will vary be
soil strata fo
ent and fill, ov
etrated about
ned granular
in depth from
ly consisted o
Borehole 15-8
, ranged from
e range in pen
gineered fill.
sting ranged f
epths of about
eological term
o have been
ces the consi
e Queenston
s per 0.3 m.
from about 8
March 23File No. 71-14
Page N
nd the results
ndix A. A l
logs. It shou
ervations and
r and should n
etween and be
or the purpos
verlying glac
t 75 to 100 m
base and sub
m 0.8 to 2.3 m
of mixed shal
. The N valu
m 8 to greater
netration resis
The in-situ
from about 6
t 1.5 to 2.3 m
ms, as an imb
formed by g
istency and n
Formation. T
The natural
to 16 percent
3, 20154-5010
No. 4
of the
list of
uld be
d non-
not be
eyond
ses of
ial till
mm of
base.
metres
le and
ues, as
r than
stance
water
to 18
metres
bricate
glacial
natural
The N
water
t.
United BurLakeside V
T
4.1.4 W
All of the
metres be
100 blow
penetratio
out as par
Formation
The shale
There is t
Formation
Communi
from Ske
characteri
Fully
Weathe
Partially
Weathe
Unweat
(Sound)
The auger
the interv
surface of
rlington Retail PVillage Plaza, 5
Terraprobe
Weathered S
e boreholes w
elow ground s
s per 0.3m. T
on testing ran
rt of this assig
n which is co
contains inte
ypically a ho
n and the
ications docu
empton, Dav
izes the shale
Zon
red
IVb
y
red
IVa
III
II
hered
)
I
red borehole
val sampling m
f the rock is w
Portfolio Inc. c/o5353 Lakeshore
e
Shale Bedro
were terminate
surface. The N
The natural w
ged from abo
gnment; howe
omprised of p
erbeds of gree
rizontal zone
glacial soil
ument RR229
vis and Chan
surface into t
ne Descrip
b soil like
a soil like
pellets o
dia.
soil like
angular
mm dia
angular
shale w
separat
weather
shale
method used
method does
weathered, w
o Glanelm Proe Road, Burling
ock
ed in weather
N values det
water content
out 4 to 8 per
ever the bedro
predominantly
en calcareous
of weatherin
l overburden
, Evaluation
ndler, a typ
three grades o
ption
matrix only
matrix with oc
of shale less th
matrix with fre
r shale particles
.
r blocks of unw
with virtually no
ted by weaker c
red but intact s
at this site is
not define th
weaker and ea
perty Managemgton, Ontario
red shale bedr
ermined in th
of the sampl
cent. Detailed
ock beneath t
y thinly bedd
shale, limesto
ng at the cont
n. In the O
of Shales for
ical weather
of weathering
casional
han 3 mm
equent
s up to 25
eathered
matrix
chemically
shale
f
s conventiona
he bedrock su
asily penetrate
ment
rock at depth
he shale bedr
les of the sha
d exploration
the site is kno
ded reddish b
one, sandston
tact between t
Ontario Min
r Constructio
ring profile
g and four zon
Notes
indistinguishab
slightly clayey,
little or no trace
matrix may con
moisture conte
shale particles
spheroidal che
pieces emanat
fissures, and b
regular fissurin
ally accepted
urface with p
ed by the aug
hs ranging fro
rock were typ
ale recovered
n of the bedro
own to consis
brown shale o
ne and siltston
the weak rock
nistry of Tr
on Projects, th
of low dura
nes described
ble from glacial
, may be fissur
e of rock struct
ntain relic fissu
ent of matrix gr
s
emical weather
ting from relic j
bedding planes
ng
investigative
precision, part
ger. The chan
March 23File No. 71-14
Page N
om about 3.1
pically greater
from the sta
ock was not c
st of the Quee
of Ordovician
ne.
k of the Quee
ransportation
here is reprod
ability shale
d as follows:
l drift deposits,
red
ture, although
ures
reater than the
ring of shale
oints and
s
e practise, how
ticularly whe
nge in resistan
3, 20154-5010
No. 5
to 4.6
r than
andard
arried
enston
n age.
enston
n and
duced
, that
wever
re the
nce to
United BurLakeside V
T
augering i
the Boreh
profile.
The phys
Transport
An Ontari
Average
Range
4.2 G
All of the
permeabil
ground w
It should
or the gro
will vary
rlington Retail PVillage Plaza, 5
Terraprobe
in between Z
hole Logs from
sical propert
tation and Co
io Shale Ratin
e
Ground Wa
e boreholes w
lity deposits
ater.
be noted that
ound water co
due to season
Portfolio Inc. c/o5353 Lakeshore
e
Zones III and
m this investi
ies of the Q
mmunication
ng System, M
Uniaxial CoStrength
8.7
7.2 to
ater
were dry dur
of glacial till
t the conditio
onditions whi
nal effects and
o Glanelm Proe Road, Burling
II in the shale
igation is to b
Queenston F
n publication
March 1983, as
mpressive h (MPa)
7
o 9.6
ring and upon
l and/or weat
ons reported a
ich will be en
d precipitation
perty Managemgton, Ontario
e profile is no
be consistentl
ormation we
RR229 - Eva
s follows:
Young’s M
0.5
n completion
thered shale
above may no
ncountered du
n conditions.
ment
ot profound.
ly interpreted
ere presented
aluation of Sh
odulus (GPa)
1.3
to 2.3
n of drilling.
which gener
ot necessarily
uring constru
The top of ro
as the surfac
d in the On
hales for Con
Pois
0.2
The borehol
rally preclude
y represent sta
uction. The gr
March 23File No. 71-14
Page N
ock as indicat
ce of Zone II
ntario Minist
struction Pro
son’s Ratio
0.32
28 to 0.35
les penetrated
es the free flo
abilized cond
round water
3, 20154-5010
No. 6
ted on
in the
try of
ojects-
d low
ow of
ditions
levels
United BurLakeside V
T
5.0 D
The follo
investigat
constructi
Contracto
investigat
own inter
equipmen
It is under
be underl
regarding
reason, th
5.1 B
Buildings
Formation
unsuitable
Where the
then they
the undist
States (U
settlement
be less tha
Spread fo
designed
design loa
purposes.
resistance
It is recom
width of
Footings s
Footings
frost prote
generally
rlington Retail PVillage Plaza, 5
Terraprobe
DISCUSSIO
owing discus
tion and is in
ion aspects a
ors bidding o
tion, satisfy th
rpretation of
nt capabilities
rstood that 2
ain by up to
the proposed
he geotechnica
Building F
s with at leas
n. Shallower
e for the supp
e undisturbed
can be suppo
turbed glacial
LS) of 300 k
t of spread fo
an 20 mm.
ooting founda
for a bearing
ading. The fa
Higher desi
e given above
mmended that
900 mm be
stepped from
exposed to fr
ection or equ
accepted pra
Portfolio Inc. c/o5353 Lakeshore
e
ON
ssion is base
ntended for t
are provided
n or undertak
hemselves as
the factual
, costs, seque
to 4 multi-sto
2 to 3 levels
d developmen
al aspects of t
oundation
t one baseme
foundations
port of buildin
d glacial till d
orted on conv
l till stratum
kPa and a be
ootings establ
ations bearing
reaction of 3
actored bearin
ign bearing r
should be dis
t the minimum
used for the
one level to a
reezing temp
uivalent insula
actice to prov
o Glanelm Proe Road, Burling
ed on our in
the use of th
only in as
king any wo
s to the adequ
data as it af
encing and the
orey building
s of undergro
nt were of a c
this project sh
ns
ent level stru
may be foun
ng foundation
deposit coinci
ventional spre
can be design
earing reactio
lished in the g
g on the weat
000 kPa (SLS
ng resistance a
resistances ar
scussed with
m footing wid
design of sp
another shoul
eratures must
ation. Where
vide a minimu
perty Managemgton, Ontario
nterpretation
e design eng
much as th
ork at the site
uacy of the i
ffects their p
e like.
gs are propose
ound parking.
conceptual na
hould be revie
ucture will pe
nded on the
ns.
ides with the
ead footing fo
ned using a f
on of 200 kP
glacial till at
thered shale b
S). The estima
at ULS can b
re feasible; h
our office.
dth for strip f
pread footings
ld be at a slop
t be provided
there are two
um of 450 m
ment
of the factu
gineer only. C
hey may imp
e should exa
information f
proposed con
ed for the site
It should be
ature when th
ewed by this
enetrate the s
undisturbed
foundation le
oundations. F
factored beari
a at Servicea
this design b
bedrock of th
ated settleme
be taken as at
however any
footings be 50
s, regardless
pe not exceed
d with at leas
o or more lev
mm earth cov
ual data obt
Comments m
pact on desig
amine the fac
for constructi
nstruction tech
e. The buildin
e noted that s
his report was
office at the f
hale bedrock
glacial till. T
evel appropri
Foundations d
ing resistance
ability Limit
bearing resista
he Queenston
ent is less than
least 4500 k
change to t
00 mm, and a
of the struct
ding 7 vertical
st 1.2 metres
vels of under
er for perime
March 23File No. 71-14
Page N
tained during
made regardin
gn considera
ctual results o
on and make
hniques, sche
ngs are expec
some of the d
s prepared. Fo
final design st
k of the Quee
The existing
iate for a stru
designed to be
e at Ultimate
States (SLS)
ance is expec
n Formation c
n 10 mm unde
kPa for limit d
the design be
a minimum fo
tural requirem
l to 10 horizo
of earth cov
rground space
eter footings
3, 20154-5010
No. 7
g this
ng the
ations.
of the
e their
edule,
cted to
details
or this
tage.
enston
fill is
ucture,
ear on
Limit
). The
cted to
can be
er full
design
earing
ooting
ments.
ntal.
ver for
e, it is
and a
United BurLakeside V
T
minimum
in the imm
5.2 E
The Ontar
in Subsec
structure,
of Site C
Code (20
top 30 m
Alternativ
(su) or pen
Based on
‘Site Clas
4.1.8.4.C.
Site Cla
C
Site Cla
C
It should
penetratio
stratigraph
the invest
Considera
(MASW)
stratigraph
rlington Retail PVillage Plaza, 5
Terraprobe
m of 900 mm o
mediate area o
Earthquak
rio Building
ction 4.1.8.7.
the spectral
lassification
12). The clas
eters of the s
vely, the class
netration resis
s avg
Shear wveloc
the above no
ss C’, as pe
of the same
ss
Sa(0.2
1
ss
Sa(1.0
1
be noted that
on resistance (
hy beyond th
tigation depth
ation may be
at this site
hy. An impro
Portfolio Inc. c/o5353 Lakeshore
e
of earth cover
of ventilation
e Design
Code (2012)
The determin
response acce
for Seismic S
ssification is b
site stratigrap
sification is e
stance (N-valu
d
d
ii
n
i
sii
n
1
1
wave city
oted informati
er Table 4.1.
code provide
2) ≤ 0.25
1.0
0) ≤ 0.1
1.0
t the seismic
(N-Values) o
he investigatio
h).
e given to co
to determine
oved seismic s
o Glanelm Proe Road, Burling
r for interior
shafts is 1.2
Paramete
stipulates the
nation of the
eleration and
Site Respons
based on the
phy, where sh
estimated on
ues).
S u avg
Unshea
ion, it is recom
8.4.A of the
the applicabl
Sa(0.2) = 0.50
1.0
Sa(1.0) = 0.20
1.0
site designati
bserved in th
on depth was
onducting a
e the average
site designatio
perty Managemgton, Ontario
column found
metres of ear
ers
e methodolog
e type of anal
d the site class
e are set out
determinatio
hear wave ve
the basis of r
g
i
n
i
n
1
1
ndrained ar strength
mmended tha
e Ontario Bu
le acceleration
Values o
Sa(0.2) =
1.0
Values
Sa(1.0) =
1.0
ion above is e
he boreholes (
similar to th
site specific
e shear wave
on (Site Class
ment
dations in “un
rth cover or eq
gy for earthqu
lysis is predi
sification. Th
t in Table 4.1
on of the aver
elocity (vs) m
rational analy
d
d
s
i
i
u i
at the site des
uilding Code
n and velocity
of Fa
= 0.75 Sa
0
of Fv
= 0.30 Sa
0
estimated on
(assuming the
hat of the low
Multichanne
e velocity in
s B) may be p
nheated” park
quivalent insu
uake design a
icated on the
he parameters
1.8.4A of the
rage shear wa
measurements
ysis of undrai
Navg
i
i
n
SPT N-valu
ignation for s
(2012). Tab
y based site c
a(0.2) = 1.00
1.0
a(1.0) = 0.40
1.0
the basis of r
e consistency
west soil strata
el Analysis o
the top 30
possible.
March 23File No. 71-14
Page N
king garages.
ulation used.
analysis, as s
importance o
s for determin
e Ontario Bu
ave velocity
s have been t
ined shear str
d
d
N
ii
n
i
i
n
1
1 ues
seismic analy
bles 4.1.8.4.B
coefficients.
Sa(0.2)≥ 1
1.0
Sa(1.0)≥ 0
1.0
rational analy
for the deepe
a penetrated w
of Surface W
metres of th
3, 20154-5010
No. 8
Only
et out
of the
nation
uilding
in the
taken.
rength
ysis be
B and
.25
0.50
ysis of
er soil
within
Waves
he site
United BurLakeside V
T
5.3 E
The param
Parame
φ
γ
Ka
Ko
Kp
The appro
are tabula
Compact
Granular
Clayey Si
Glacial Ti
Queensto
Walls sub
based on t
w
Where the
conjunctio
The facto
between t
contact (N
rlington Retail PVillage Plaza, 5
Terraprobe
Earth Pres
meters used in
eter
opriate values
ated as follow
Stratum/Para
Granular Fill
‘B’ (OPSS 101
ilt or Similar Fil
ll
on Formation
bject to unbal
the following
where,
e wall backfil
on with the ea
ored geotechn
the base of th
N) and the f
Portfolio Inc. c/o5353 Lakeshore
e
ssure Des
n the determin
active ea
at-rest e
passive e
s for use in th
ws:
ameter
0)
l
lanced earth p
g equation:
P = K [
P = theK = thehw = theγ = theγ’ = theq = the
ll can be drain
arth pressure,
P =
nical resistan
he footing an
frictional resi
o Glanelm Proe Road, Burling
ign Consi
nation of earth
Definit
internal angle
bulk unit weig
arth pressure c
arth pressure c
earth pressure
he design of st
φ
32
30
34
28
pressures mu
[γ (h-hw) + γ
e horizontal pre earth pressue depth belowe bulk unit wee submerged e complete su
ned effectivel
this equation
= K[γh +
nce to sliding
nd the soil. T
istance of th
perty Managemgton, Ontario
iderations
h pressures ac
tion
of friction
ght of soil
coefficient (Ran
coefficient (Ran
coefficient (Ra
tructures subj
γ
21.0
19.0
19.0
25
ust be designe
γ’hw + q] + γ
ressure at deure coefficient
w the ground wight of soil, ( kunit weight ofrcharge loadi
ly to eliminat
n can be simp
q]
g of earth re
This friction (
e soil (tan φ
ment
s
cting on retai
nkin)
nkin)
ankin)
ject to unbala
Ka
0 0.3
0 0.3
0 0.2
5 n/a
ed to resist a
γwhw
pth, h (m) t, water level (mkN/m3 ) f the exterior ing (kPa)
te hydrostatic
plified to:
etaining struc
(R) depends
φ) expressed
ining walls ar
d
d
d
anced earth pr
a K
31 0.4
33 0.5
28 0.4
a n/
pressure that
m)
soil, ( γ - 9.8
pressures on
ctures is dev
on the norma
as: R = N
March 23File No. 71-14
Page N
re defined bel
Units
degrees
kN / m3
dimensionless
dimensionless
dimensionless
ressures at th
o Kp
47 3.2
50 3.0
44 3.5
/a n/a
t can be calcu
kN/m3 )
n the wall, act
eloped by fr
al load on th
tan φ. This
3, 20154-5010
No. 9
ow.
his site
p
25
00
54
a
ulated
ting in
riction
he soil
is an
United BurLakeside V
T
unfactored
design wi
Special co
penetrate
structures
are zones
integrity,
If a struct
for the de
which is c
This appr
practical
building.
This appr
locked-in
sufficient
rock to de
Formation
the Georg
months w
footings, w
dependen
Where pit
major exc
to be cast
the rock a
5.4 S
Dependin
could con
which are
reaction a
• E• G• Q
rlington Retail PVillage Plaza, 5
Terraprobe
d resistance.
ll depend on
onsideration m
the bedrock.
, firstly becau
s of the Quee
the use of im
ture is made s
esign of foun
consistent wit
roach is likely
requirement
oach does no
horizontal str
time between
e-stress. Ther
n. It is know
gian Bay Form
when cut. If th
walls and the
t rock stress r
ts are made f
cavation, ther
t directly agai
and the concre
Slab on Gr
ng on the fina
nsist of existi
e capable of
appropriate fo
Existing Fill: Glacial Till: Queenston For
Portfolio Inc. c/o5353 Lakeshore
e
The factored
the rigidity o
must be given
Excavated b
use it is unlik
enston Forma
mported granul
such that it is
ndation walls
th the maxim
y conservativ
to have a fo
t recognize th
resses that are
n the cutting
e is not much
that there ar
mation, a sim
here is not suf
suspended sl
relief in the d
for sumps an
e must also b
inst the rock
ete or alternat
rade Desig
al design and
ng fill, glacia
supporting a
or slab on grad
rmation:
o Glanelm Proe Road, Burling
resistance at
f the wall.
n to structure
bedrock from
kely that it ca
ation that con
lar materials i
cast directly
below bedro
mum earth pre
ve in that the
oundation wal
he potential fo
e relieved wh
of the rock fa
h documented
e potentially
milar shale de
fficient time l
lab levels, the
esign of basem
nd elevators, o
be considerati
face. For suc
tively the loca
gn Param
d site grading
al till or weat
conventiona
de design on t
perty Managemgton, Ontario
ULS is Rf =
es with suffici
m the Queenst
an be compac
ntain Illite, an
is recommend
into an excav
ck level has
ssure calculat
rock is effec
ll of a consis
for pressures o
hen a rock cut
ace and const
d experience w
locked in ho
eposit, experie
lag between t
en special pro
ment walls of
or other such
ion of the pot
ch structures,
al structures c
eters
g, the subgrad
thered shale b
al lightly load
the aforement
15,0 30,0 80,0
ment
0.8 N tan φ.
ient depth tha
ton Formatio
cted adequate
n expansive
ded to backfil
vation in the b
been to use
ted for the lo
ctively self-su
stent width t
on the basem
t is made. It is
truction of the
with stress re
orizontal stres
ence stress re
the excavation
ovisions need
f structures.
h features wh
tential for roc
a compressib
can be over-e
de at the low
bedrock of th
ded slab on g
tioned soils o
00 kPa/m 00 kPa/m 00 kPa/m
The K value
at the below
on must not b
ely, and secon
clay material
ll the structur
bedrock, the e
a uniform pr
owest level of
upporting, bu
through the l
ent walls due
s expected tha
e building str
elief and swel
sses. Excavat
elief and swe
n and the sub
to be made w
hich are incor
ck squeeze ef
ble layer can
xcavated and
west floor leve
he Queenston
grade. The m
or rock are as
March 23File No. 71-14
Page N
e to be used f
grade space w
be used to ba
ndly, because
l. For better
res.
empirical app
ressure distrib
f soil in the pr
ut is recognize
lower reach o
e to the presen
at there would
ructure to allo
ll in the Quee
tions in Toron
ell for three to
bsequent placi
with respect to
rporated with
ffects if the pi
be placed bet
d backfilled.
el in the struc
n Formation,
moduli of sub
follows:
3, 20154-5010
o. 10
for the
would
ackfill
there
grade
proach
bution
rofile.
es the
of the
nce of
d be a
ow the
enston
nto in
o four
ing of
o time
in the
its are
tween
ctures
all of
bgrade
United BurLakeside V
T
Any subg
prior to th
for areas
otherwise
containing
excavated
minimum
Any build
drainage s
compacte
is expecte
that the
litres/minu
anticipate
building s
pump cap
excavation
All slabs
joints sho
bearing w
The soil
landscapin
care must
susceptibl
5.5 S
It is expec
shallow in
strata. Exc
The locat
proposed
5.5.1 P
The bedd
pipes. Pr
rlington Retail PVillage Plaza, 5
Terraprobe
grades consist
he placement
of undisturb
e competent
g excessive a
d and backfil
m of 96 percen
dings with be
system is ma
d by vibration
ed to provide
building stor
ute and that a
ed to be a sus
sump from th
pacity must b
n.
on grade sho
ould be incor
walls should n
at this site
ng adjacent t
t be taken in
le backfill to m
Site Servic
cted that site
nverts (less th
cavations for
tions and de
utilities shou
Pipe Beddin
ing materials
rovided the b
Portfolio Inc. c/o5353 Lakeshore
e
ing of existin
t of an aggreg
bed native so
soils. If any
amounts of d
lled with app
nt of standard
elow grade s
de by placing
n to a dense s
an adequate
rm sump sy
a duplex pum
tained flow b
he perimeter a
be reviewed
ould be struct
rporated into
ot be founded
is susceptibl
o the buildin
detailing the
maintain the
cing
services will
han 3 m). The
underground
epths of any
ld be identifie
g
s should be ad
base area for
o Glanelm Proe Road, Burling
ng fill must be
gate base. Su
oils as the co
y soft or wea
deleterious/or
proved clean
Proctor maxi
pace must ha
g the slab on
state. The nom
avenue for th
stems anticip
mping arrange
but could be a
and subfloor d
when the vo
turally separa
the slabs alo
d on the slab b
e to frost ef
g. At location
exterior slab
flush thresho
l consist of st
e invert eleva
d services shou
building fou
ed prior to co
dequately com
r the sewer p
perty Managemgton, Ontario
e proof-rolled
ubgrade comp
ompaction eff
ak subgrade
rganic materi
earth fill or
imum dry den
ave both peri
a minimum 2
minal spacing
he removal o
pate a flow
ement on eme
achievable un
drainage coul
olume of flo
ate from foun
ong column
but on spread
ffects which
ns where bui
bs / sidewalks
ld during free
torm and sani
ation may be
uld be made a
undations wh
ommencing th
mpacted to p
pipes and wat
ment
d and inspecte
paction or pro
forts will hav
areas are id
ial or moistu
Granular B
nsity.
imeter and su
200 mm laye
g of subdrains
f water benea
from the su
ergency powe
nder storm co
ld be as little
ow from the
ndation walls
lines and at
d footings as o
would have
ldings are ex
s, providing i
ezing weather
itary sewers a
within the gl
as outlined in
hich would p
he excavation
rovide suppo
atermain are f
ed by the geot
oof-rolling is
ve a tendenc
dentified, or
ure, they mu
(OPSS 1010
ubfloor drain
r of 19 mm s
s, in the orde
ath the slab. I
ubfloor drain
er be provide
onditions. Sus
as a few litre
site has bee
s and column
regular inter
outlined abov
e the potentia
xpected to hav
insulation / d
r conditions.
and watermai
lacial till or th
n Section 6.1 o
potentially b
.
ort and protec
free of all so
March 23File No. 71-14
Page N
technical eng
not recomme
cy to disturb
if there are
ust be locally
0) compacted
nage. The sub
stone (OPSS
r of 8 to 10 m
It is recomme
nage of up
d. This flow
stained flow
es per minute
en assessed d
ns. Saw cut co
rvals. Interior
ve.
al to deform
ve flush entra
drainage / non
ins, with rela
he weathered
of this report.
be affected b
ction to the se
oft and delete
3, 20154-5010
o. 11
gineer,
ended
these
areas
y sub-
d to a
bfloor
1004)
metres
ended
to 75
is not
to the
e. The
during
ontrol
r load
m hard
ances,
n-frost
atively
shale
.
by the
ervice
erious
United BurLakeside V
T
materials,
of OPSD
base has o
disturbed
water is p
and/or HL
provide st
All granu
density or
5.5.2 B
The exca
successfu
homogene
regardless
constructi
provide si
integrity o
If narrow
compacte
thick lifts
density. T
to 98 perc
5.6 P
All delete
new pave
disturbanc
preparatio
constructi
If fill is re
is free of
should be
uniformly
backfill b
Proctor m
rlington Retail PVillage Plaza, 5
Terraprobe
, the pipe bed
802.030 (rig
occurred, due
soils should
present in the
L6 clear ston
tabilization.
ular bedding m
r compacted b
Backfill
avated shale
lly because e
eous mass. I
s of the best e
ion and grade
ite grading in
of the finished
w trenches ar
d granular fil
s with each li
The upper 1 m
cent of standa
Pavement
erious soil sh
ements. It is
ce and be p
on of the su
ion.
equired to rai
f topsoil and
e placed in lar
y compacted t
beneath areas
maximum dry
Portfolio Inc. c/o5353 Lakeshore
e
dding should
gid pipe) and
e to the prese
be sub-excav
base of the se
ne wrapped in
must be comp
by vibration to
from the Q
even large com
It has been
efforts made i
e integrity w
n areas to be
d grade level
re constructed
ll is recomme
ift uniformly
metre of back
ard Proctor ma
Design
ould be stripp
s recommend
proof rolled w
ubgrade and
se the grade,
other deleter
rge areas whe
to at least 95
to be devel
density.
o Glanelm Proe Road, Burling
comply with
d/or OPSD 80
ence of soft f
vated and rep
ervice and wa
n geo-textile
pacted to a m
o a dense stat
Queenston Fo
mpaction equ
our experien
in constructio
would be achi
hard surfaced
is not import
d in areas w
ended for bac
compacted t
kfill beneath a
aximum dry d
ped and the e
ded that the
with a static
the compac
there may by
rious material
ere it can be u
percent of st
oped as pave
perty Managemgton, Ontario
a Class B be
02.010 (flexib
fine-grained s
placed with s
atermain trenc
may be adop
minimum of 9
te in the case
ormation is
uipment does
nce that com
on and contro
eved if or im
d. Use of exc
ant can be co
where the sub
ckfill. All bac
to at least 95
areas to be de
density.
existing asph
subgrade be
c roller to id
tion of all
y some select
l, and is at a
uniformly com
tandard Proct
ements shoul
ment
edding config
ble pipe). W
soils, groundw
suitably comp
ches then Hig
pted as bedd
6 percent of
of HPB or cl
extremely di
not necessar
mpacted shale
ol. In consider
mported fill is
cavated shale
onsidered.
ubgrade integ
ckfill materia
5 percent of s
eveloped as p
halt removed
e cut as cle
dentify any
fills should
on-site fill w
a suitable pla
mpacted in 3
tor maximum
ld be compac
guration as pe
Where disturb
water seepag
pacted granul
gh Performan
ding material
standard Proc
ear stone bed
ifficult to pl
rily break dow
e fills will i
ration of this,
s used to bac
in landscapin
grity is impo
als should be
standard Proc
pavements sho
from areas to
eanly as pos
loose or dis
be monitore
which could b
acement wate
00 mm thick
m dry density.
cted to 98 p
March 23File No. 71-14
Page N
er the requirem
ance of the t
ge and the lik
lar fill. If sta
nce Bedding (
below the pi
ctor maximum
dding.
lace and com
wn the shale
intrinsically
, a better qual
ckfill trenche
ng areas whe
rtant, then u
placed in 30
ctor maximum
ould be comp
o be develope
sible to min
sturbed areas
ed at the tim
be used, provi
er content. Th
k lifts with eac
The upper 1
ercent of sta
3, 20154-5010
o. 12
ments
trench
ke, the
anding
(HPB)
ipe to
m dry
mpact
into a
settle,
lity of
es and
ere the
use of
0 mm
m dry
pacted
ed for
nimize
. The
me of
ided it
he fill
ch lift
m of
andard
United BurLakeside V
T
The final
percent) t
achieved
locations
Terraprob
5.6.1 A
Two alter
provided,
rehabilitat
Paveme
Surface HL3 (OP
Base CoHL8 (OP
Base Co19mm C
SubbaseGranular50mm C
The cost
could be e
P
Surface HL3F (O
Base CoHL8 (OP
rlington Retail PVillage Plaza, 5
Terraprobe
subgrade sh
to promote su
by properly
and extent o
be at the final
Asphalt Con
rnative appro
which will
tion will be re
ent Layer
Course AsphPSS 1150)
ourse AsphaltPSS 1150)
ourse: Crusher Run L
e Course: r B Type II (O
Crusher Run L
of the minim
expected to la
Pavement Co
Course AsphOPSS 1150)
ourse AsphaltPSS 1150)
Portfolio Inc. c/o5353 Lakeshore
e
hould be free
ubgrade drain
filtered subg
of subgrade d
design stage
ncrete Pavem
oaches to pa
provide adeq
equired.
Minimal A
altic Concrete
ic Concrete
Limestone *
OPSS 1010) oLimestone
mal design sh
ast about twic
Performan
omponent
altic Concrete
ic Concrete
o Glanelm Proe Road, Burling
of depressio
nage. Effectiv
grade drains
drainage requ
and verified
ment Struct
avement desig
quate service
Asphaltic Co
CompRequ
e 93% Densi
93%
Densi
98% SMaxim(ASTM
or 98% SMaxim(ASTM
hould be com
ce as long befo
nce Asphaltic
R
e 93% MDensi
93% MDensi
perty Managemgton, Ontario
ons and slope
ve drainage o
at the catch
uired within t
during constr
ture
gn can be c
e for 8 to 10
oncrete Pav
paction irements
Maximum Rity (OPSS 310
Maximum R
ity (OPSS 310
Standard Promum Dry DenM-D698)
Standard Promum Dry DenM-D698)
mpared to a m
fore significan
c Concrete P
CompactionRequirement
Maximum Reity (OPSS 310
Maximum Reity (OPSS 310
ment
ed (preferabl
of the granul
basin locatio
the pavemen
ruction.
onsidered. A
0 years befor
vement Stru
CaMinCoTh
Relative 0)
Relative
0)
ctor nsity
ctor nsity
more substan
nt maintenanc
Pavement Str
n ts
L
lative 0)
lative 0)
ly at a minim
lar base and
ons and alon
nt areas shoul
A minimal pa
re significant
ucture
ar Parking nimum
omponent ickness
65 mm
N/A
150 mm
300 mm
ntial performa
ce and rehabil
ructure
ight Duty
40 mm
50 mm
March 23File No. 71-14
Page N
mum grade o
subbase shou
ng curb lines
ld be review
avement desi
t maintenanc
Truck TraMinimum ComponeThickness
40 mm
60 mm
150 mm
300 mm
ance design w
litation.
Heavy Du
40 mm
80 mm
3, 20154-5010
o. 13
of two
uld be
s. The
ed by
ign is
e and
affic
ent s
m
m
m
m
which
uty
m
m
United BurLakeside V
T
P
GranularGranular19 mm C
GranularGranular50 mm C
Some adj
condition
best asses
It is reco
constructi
service ba
and remed
rlington Retail PVillage Plaza, 5
Terraprobe
Pavement Co
r Base Courser ‘A’ (OPSS 1Crusher Run L
r Subbase Cor B Type II (OCrusher Run L
ustment to th
of the subgra
ssed by the ge
ommended th
ion of the bin
ackfill and the
dial work carr
Portfolio Inc. c/o5353 Lakeshore
e
omponent
e: 010) or Limestone
ourse: OPSS 1010) oLimestone
he thickness
ade at the tim
eotechnical en
hat the placem
nder course to
e like. Prior
ried out as req
o Glanelm Proe Road, Burling
R
98 peProctodensit
or 98 peProctodensit
of the granu
me of the pave
ngineer during
ment of the
o minimize th
to placing th
quired in prep
perty Managemgton, Ontario
CompactionRequirement
rcent of stanor maximum dty (ASTM-D6
rcent of stanor maximum dty (ASTM-D6
ular subbase m
ement constru
g construction
wearing surf
he effects of p
he wearing su
paration for fi
ment
n ts
L
ndard dry 98)
ndard dry 98)
material may
uction. The ne
n.
face be delay
post construc
urface, the bin
final construct
ight Duty
150 mm
400 mm
y be required
eed for such a
yed for at le
ction settleme
nder course sh
tion.
March 23File No. 71-14
Page N
Heavy Du
150 mm
400 mm
depending o
adjustments c
east one year
ent of underg
hould be eval
3, 20154-5010
o. 14
uty
m
m
on the
can be
r after
round
luated
United BurLakeside V
T
6.0 D
6.1 E
Excavatio
Regulatio
These reg
excavation
that effec
open exca
Where w
accordanc
regulation
S
Minimum
and 241 o
boxes.
Past expe
zone and
bedrock c
underlyin
and time c
similar to
are in clo
relative e
excavation
than form
‘pry’ up h
remove, b
these issu
contractor
rlington Retail PVillage Plaza, 5
Terraprobe
DESIGN CO
Excavation
ons must be c
n 213/91 (as
gulations desi
n safety. For
tive ground w
avations. The
orkers must
ce with the O
n stipulates sa
oil Type
1
2
3
4
m support syst
of the Act an
erience in bed
the underlyin
can be remo
g bedrock an
consuming, a
ols. Line dril
se proximity
ase/difficulty
n. For examp
ming large ope
hard layers.
but this is not
ues must be
rs.
Portfolio Inc. c/o5353 Lakeshore
e
ONSIDER
ns
carried out in
amended), C
ignate four (4
practical purp
water control
glacial till sh
enter a trenc
Occupational H
afe slopes of e
withi
withi
tem requireme
nd Regulation
drock belongi
ng rock can b
oved with po
nd the interbe
and will requi
lling may be
to existing st
y in excavatio
ple, excavatio
en cuts for st
Some of the
considered u
addressed in
o Glanelm Proe Road, Burling
RATIONS F
n accordance
onstruction P
4) broad clas
poses at this s
is achieved
hould be cons
ch or excava
Health and Sa
excavation by
Base of
n 1.2 metres o
n 1.2 metres o
from bottom
from bottom
ents for steep
ns and include
ing to the Qu
e removed w
owerful exca
edded limesto
ire specialized
required, but
tructures whe
on of bedrock
on of narrow
tructures in w
thicker “har
nusual for roc
n the contrac
perty Managemgton, Ontario
FOR CONS
e with the Oc
Projects, Part I
ssifications of
site, the existi
where requir
idered a Type
ation the soil
afety Act and
y soil type as f
f Slope
of bottom of tren
of bottom of tren
m of trench
m of trench
per excavation
e provisions
ueenston Form
without blastin
avators equip
one and siltst
d rock bucket
t likely only i
ere it is neces
k will also d
trenches into
which excavat
d” layers ma
ck excavation
ct documents
ment
STRUCTA
ccupational H
III – Excavat
f soils to stip
ing fill is con
red and surfac
e 2 Soil.
l must be su
d Regulations
follows:
nch
nch
ns are stipulat
for timbering
mation indica
ng. The upper
pped with ro
tone layers, h
ts, with the a
in sensitive a
ssary to limit
epend on the
o the shale w
tors can oper
ay require ad
ns in this area
s for founda
ABILITY
Health and S
tions, Section
pulate approp
nsidered a Typ
ce water is d
uitably sloped
s for Construc
Steepest Slo
1 horizonta
1 horizonta
1 horizonta
3 horizonta
ted in Section
g, shoring and
ates that the t
r weathered p
ck teeth. Th
however, will
assistance of h
areas such as
over-break a
e size (width)
will obviously
rate from the
dditional hoe-
a. The risk and
ations, excava
March 23File No. 71-14
Page N
afety Act, O
ns 222 through
priate measur
pe 3 Soil, pro
directed away
d and/or brac
ction Projects
ope Inclination
al to 1 vertical
al to 1 vertical
al to 1 vertical
al to 1 vertical
ns 235 throug
d moveable t
till-shale tran
portion of the
he removal o
l be more ard
hoe rams and
where excava
and vibrations
) and depth o
y be more dif
base of the
-ramming eff
d responsibili
ation, and sh
3, 20154-5010
o. 15
ntario
h 242.
es for
ovided
y from
ced in
s. The
n
gh 238
trench
nsition
shale
of the
duous
d other
ations
s. The
of the
fficult
cut to
fort to
ity for
horing
United BurLakeside V
T
Excavatio
excavation
is not pos
immediate
interbeds)
these frac
which wil
In the bed
and along
infiltration
of the exc
sometime
water.
During ex
from the b
It should b
site, will r
were carr
have aest
acceptanc
site for us
6.2 S
The depth
such, ther
the munic
occur. If a
soldier pil
Terraprob
Rock anch
without p
basis is re
of the ove
rlington Retail PVillage Plaza, 5
Terraprobe
ons into the sh
n must be sca
ssible, protec
ely beside th
) are transect
ctures may pr
ll require rem
drock, ground
g the more p
n by means o
cavation, as th
es a problem a
xcavation, gas
bedrock has b
be noted that
require chem
ried out as pa
thetic, or en
ce. Such requi
se at other loc
Shoring De
h of the overb
re is very littl
cipality will a
a straight edg
les and laggin
be can provide
horages are t
roof testing.
equired. The u
erburden char
Portfolio Inc. c/o5353 Lakeshore
e
hale bedrock
aled of any lo
ctive mesh ca
he cut rock
ed by sub-ve
referentially c
moval and can
d water seepag
pervious sand
of ditches and
he excavation
as is accumul
s monitoring s
been adequate
surplus exca
mical analyses
art of this ass
ngineering pr
irements are s
cations was be
esign
burden soil at
le soil to be r
llow sloping
ge excavation
ng pinned int
e shoring desi
ypically mad
Higher bond
use of soil an
racter changes
o Glanelm Proe Road, Burling
can be vertic
oose rock to p
an be draped
face. The sh
ertical fracture
cause the form
often lead to
ge is expected
dstone and li
d filtered sum
n progresses. B
lation of susp
should be car
ely vented and
avated soil res
to assess the
signment. It s
roperty requ
site specific,
eyond the sco
t this site vari
etained at the
of the soil at
n is required a
to the top of t
ign services f
de in the Quee
stresses are p
nchors establi
s in short dist
perty Managemgton, Ontario
cal to near-ve
protect the wo
d over the ro
hale (as well
es, typically
mation of slab
‘over-break’
d to occur con
imestone inte
mps, fitted wit
Be aware that
pended soil an
rried out to en
d dissipated.
sulting from t
e disposal site
should be not
uirements, as
so assessmen
ope of the inve
ies from abou
e edges of the
the edge of th
above the top
the rock and
for this projec
enston Forma
possible but p
ished in the o
tances.
ment
ertical, but no
orkers workin
ock face when
as the lime
oriented at ri
bs, wedges o
beyond the i
ntinuously thr
erbeds. It sho
th appropriate
t fouling of p
nd rock fine p
nsure that any
the constructi
e requirement
ted however
s well as ch
nt of the appro
estigation.
ut 0.8 to 2.3 m
e proposed ex
he site will di
p of the shale
anchored wo
ct if requested
ation using a
proof testing
overburden so
ot overhangin
ng in the exca
n work is re
estone, sands
ight angles to
or blocks of lo
intended exca
rough beddin
ould be poss
ely sized pum
pumps by pow
particles in th
y natural gas d
ion that is to b
ts. No chemic
that sites acc
hemical requ
opriateness o
metres below
xcavations. T
ictate whethe
bedrock, then
ould be the ap
d.
design bond
of anchorage
oil is not reco
March 23File No. 71-14
Page N
ng. The face
avation. Wher
equired in the
stone and silt
o one another
oose unstable
avation ‘cut li
g planes, frac
ible to handl
mps within the
wdery shale fi
he ponded se
detected eman
be disposed o
cal analyses o
cepting fill u
uirements for
f the soil from
existing grad
The extent to w
er any shoring
n a system of
ppropriate sol
stress of 620
es on a site b
ommended be
3, 20154-5010
o. 16
of the
re this
e area
tstone
r, and
e rock
ine’.
ctures,
le the
e base
ines is
epage
nating
of off-
of soil
sually
r soil
m this
de. As
which
g must
f steel
lution.
0 kPa,
by site
ecause
United BurLakeside V
T
6.3 S
The soil a
traffic. If
will be di
subgrade
disturbed
requireme
The timin
feasible to
time to co
The subgr
weather
Considera
context of
6.4 Q
The found
the found
engineer.
an integra
Building C
The long
dependen
maintaine
practically
capabilitie
final desig
monitored
adequate c
The requi
maximum
required t
operator
services fo
rlington Retail PVillage Plaza, 5
Terraprobe
Site Work
at this site is f
site work is c
isturbed unles
soils from co
soil and use
ents.
ng of the majo
o carry out fil
omplete the w
rade at this s
conditions, a
ation must be
f this particul
Quality Co
dation installa
ding soil and/o
The on-site r
al part of the
Code 2012.
term perfor
t upon the su
ed to ensure
y possible. Th
es as indicate
gn grades and
d by Terrapro
compaction.
irements for
m dry density
to demonstrat
of appropriat
for the project
Portfolio Inc. c/o5353 Lakeshore
e
fine-grained a
carried out du
ss an adequat
onstruction tra
of fill materi
or grading wo
ll operations d
work, allowing
site is conside
adequate tem
e given to fro
ar project dev
ontrol
ations must b
or rock expos
review of the
e geotechnica
rmance of th
ubgrade supp
that uniform
he design adv
ed by the bor
d therefore, th
obe at the tim
fill placemen
. In situ dete
te that the spe
te nuclear de
t as necessary
o Glanelm Proe Road, Burling
and may beco
uring periods
te granular w
affic. The dist
ial for site res
orks on the sit
during wet or
g for delays d
ered to be fr
mporary fros
st effects, suc
velopment.
be field review
sed is consist
condition of
al design fun
he pavement
port condition
subgrade mo
vice in this r
reholes. Thes
he preparation
me of construc
nt on this pr
erminations o
ecified placem
ensity gauges
y, with our qu
perty Managemgton, Ontario
me weakened
of wet weath
working surfac
turbance caus
storation or u
te is critical to
r freezing con
due to adverse
ost susceptib
st protection
ch as heave o
wed by Terra
tent with the
f the foundati
nction and is
structure an
ns. Stringent
oisture and d
eport is based
se conditions
n of the subgr
ction to confir
roject have b
f density dur
ment density
s for this wo
ualified techni
ment
d or loosened
her, then it ca
ce is provide
sed by the tra
underfloor fill
o the perform
nditions. The s
e weather.
ble. If constru
for the ex
or softening,
aprobe as they
design bearin
ion soil as the
required by
nd any slab-o
construction
density condi
d on an asses
may vary ac
rade and the
rm material q
been stipulate
ring fill and a
is achieved.
ork and can
ical staff.
d when subjec
an be expected
d to protect t
affic can resul
ls that is not
mance of the w
schedule mus
uction procee
xposed soil
on exposed s
y are constru
ng intended b
e foundations
Section 4.2.2
on-grade stru
n control pro
itions are ach
ssment of the
cross the site
compaction o
quality, thickn
ed relative to
asphaltic plac
Terraprobe is
provide sam
March 23File No. 71-14
Page N
cted to constru
d that the sub
the integrity o
lt in the remo
intrinsic to p
work. It may n
st provide ade
ds during fre
will be req
soil surfaces
ucted to ensur
by the geotech
s are construc
2.2 of the O
uctures are h
cedures shou
hieved as mu
e subgrade su
e depending o
of all fill shou
ness, and to e
o standard Pr
cement on si
s a CNSC cer
mpling and te
3, 20154-5010
o. 17
uction
bgrade
of the
val of
project
not be
equate
eezing
quired.
in the
re that
hnical
cted is
ntario
highly
uld be
uch as
upport
on the
uld be
ensure
roctor
ite are
rtified
esting
United BurLakeside V
T
Concrete
maintains
the projec
Terraprob
Steel, as
Terraprob
rlington Retail PVillage Plaza, 5
Terraprobe
will be speci
a CSA certif
ct as necessary
be staff can al
necessary, f
be is certified
Portfolio Inc. c/o5353 Lakeshore
e
ified in accor
fied concrete
y.
lso provide q
for the Struct
by the Canad
o Glanelm Proe Road, Burling
rdance with t
laboratory an
quality contro
tural and Ar
dian Welding
perty Managemgton, Ontario
the requireme
nd can provid
l services for
rchitectural q
Bureau unde
ment
ents of CAN
de concrete sa
r Building En
quality contro
er W178.1-14
3 - CSA A23
ampling and t
nvelope, Roof
ol requiremen
March 23File No. 71-14
Page N
3.1-09. Terra
testing servic
fing and Stru
nts of the pr
3, 20154-5010
o. 18
aprobe
ces for
uctural
roject.
United BurLakeside V
T
7.0 L
This inve
consistent
under sim
project. T
obtained f
It must b
interventi
should be
disturbanc
The desig
from this
retained d
all aspects
the projec
geotechni
control m
the implic
design dra
report onc
specifical
This repo
Property
copyright
without th
Property M
It is recog
Provincia
are expres
rlington Retail PVillage Plaza, 5
Terraprobe
LIMITATIO
stigation has
t with those
milar conditio
The discussio
from this inve
be recognized
on at or near
exercised in
ce of soils, an
gn parameters
investigation
design consult
s of the projec
ct scope and
ical design p
may not be rel
cations of cha
awings and sp
ce final build
ly addressed.
ort was prepa
Management
of Terraprob
he prior writte
Management
gnized that th
l statues, will
ssed and impl
Portfolio Inc. c/o5353 Lakeshore
e
ONS AND U
been carried
ordinarily ex
ons and subje
ns and recom
estigation.
d that the p
r the site hav
the considera
nd frost protec
provided and
n made at th
tants in the de
ct relative to t
development
parameters, ad
levant to the
anges with re
pecifications p
ding plans hav
ared for the e
t and their re
be Inc., and n
en permission
and their reta
he City of Bu
l make use of
lied.
o Glanelm Proe Road, Burling
USE OF R
out using in
xercised by T
ect to the tim
mmendations
assage of tim
ve the potent
ation of contr
ction.
d the enginee
e site by Ter
esign phase o
the subsurfac
t features the
dvice and co
revised proje
espect to the
prior to const
ve been estab
express use o
etained design
no part of thi
n of Terrapro
ained design c
urlington, in i
f and rely upo
perty Managemgton, Ontario
REPORT
vestigation te
Terraprobe an
me, financial
that have be
me, natural o
tial to alter s
actual respon
ring advice o
rraprobe and
of the project.
ce conditions
interpretatio
omments rela
ect or comple
contents of t
truction. It w
blished so tha
of the United
n consultants
is report may
obe Inc. Unit
consultants ar
its capacity a
on this report,
ment
echniques and
nd other eng
and physica
een presented
occurrences,
subsurface co
nsibilities as th
offered are ba
are intended
. Since the pr
cannot be ant
ons made of t
ating to cons
ete. Terraprob
this report an
would likely
at the excava
d Burlington
s. It is not fo
y be reproduc
ted Burlington
re authorized
as the plannin
, cognizant of
d engineering
gineering prac
al constraints
d are based o
and direct o
onditions. In
hey relate to c
ased on the fac
d for use by
roject is still i
ticipated. If th
the subsurfac
structability i
be should be
nd should be
be worthwh
ation requirem
Retail Portfo
or use by oth
ced by any m
n Retail Portf
users.
ng and buildin
f the limitatio
March 23File No. 71-14
Page N
g analysis me
ctitioners, wo
applicable t
on the factua
or indirect h
particular, ca
control of see
ctual data obt
the owner an
in the design
here are chan
ce informatio
issues and q
retained to re
retained to re
hile to redraf
ments can be
folio Inc., Gla
hers. This rep
means, in any
folio Inc., Gla
ng authority
ons thereof, bo
3, 20154-5010
o. 19
ethods
orking
o this
al data
human
aution
epage,
tained
nd its
stage,
ges to
n, the
quality
eview
eview
ft this
more
anelm
port is
form,
anelm
under
oth as
United BurLakeside V
T
We trust t
or if we ca
Terrapr
Patrick CaAssociate
rlington Retail PVillage Plaza, 5
Terraprobe
the foregoing
an be of furth
obe Inc.
annon, P. Enge
Portfolio Inc. c/o5353 Lakeshore
e
g information
her assistance
g.
o Glanelm Proe Road, Burling
is sufficient f
, please do no
perty Managemgton, Ontario
for your pres
ot hesitate to c
ment
ent requireme
contact us.
ents. If you h
March 23File No. 71-14
Page N
have any ques
3, 20154-5010
o. 20
stions,
FIGURES
Terraprobe Inc.
LOGS OF BOREHOLES
APPENDIX A
Terraprobe Inc.
Terraprobe ABBREVIATIONS AND TERMINOLOGY
Terraprobe Inc.Greater Toronto Hamilton – Niagara Central Ontario Northern Ontario 11 Indell Lane 903 Barton Street, Unit 22 220 Bayview Drive, Unit 25 1012 Kelly Lake Rd., Unit 1 Brampton, Ontario L6T 3Y3 Stoney Creek, Ontario L8E 5P5 Barrie, Ontario L4N 4Y8 Sudbury, Ontario P3E 5P4 (905) 796-2650 Fax: 796-2250 (905) 643-7560 Fax: 643-7559 (705) 739-8355 Fax: 739-8369 (705) 670-0460 Fax: 670-0558
www.terraprobe.ca
SAMPLING METHODS AS auger sample CORE cored sample DP direct push FV field vane GS grab sample SS split spoon ST shelby tube WS wash sample
PENETRATION RESISTANCE Standard Penetration Test (SPT) resistance ('N' values) is defined as the number of blows by a hammer weighing 63.6 kg (140 lb.) falling freely for a distance of 0.76 m (30 in.) required to advance a standard 50 mm (2 in.) diameter split spoon sampler for a distance of 0.3 m (12 in.). Dynamic Cone Test (DCT) resistance is defined as the number of blows by a hammer weighing 63.6 kg (140 lb.) falling freely for a distance of 0.76 m (30 in.) required to advance a conical steel point of 50 mm (2 in.) diameter and with 60° sides on 'A' size drill rods for a distance of 0.3 m (12 in.)."
COHESIONLESS SOILS
Compactness ‘N’ value
very loose < 4 loose 4 – 10 compact 10 – 30 dense 30 – 50 very dense > 50
COHESIVE SOILS
Consistency ‘N’ value Undrained Shear
Strength (kPa) very soft < 2 < 12 soft 2 – 4 12 – 25 firm 4 – 8 25 – 50 stiff 8 – 15 50 – 100 very stiff 15 – 30 100 – 200 hard > 30 > 200
COMPOSITION
Term (e.g) % by weight
trace silt < 10 some silt 10 – 20 silty 20 – 35 sand and silt > 35
TESTS AND SYMBOLS
MH mechanical sieve and hydrometer analysis
w, wc water content
wL, LL liquid limit
wP, PL plastic limit
IP, PI plasticity index
k coefficient of permeability
γ soil unit weight, bulk
φ’ internal friction angle
c’ effective cohesion
cu undrained shear strength
Unstabilized water level
1st water level measurement
2nd water level measurement
Most recent water level measurement
Undrained shear strength from field vane (with sensitivity)
Cc compression index
cv coefficient of consolidation
mv coefficient of compressibility
e void ratio
FIELD MOISTURE DESCRIPTIONS Damp refers to a soil sample that does not exhibit any observable pore water from field/hand inspection.
Moist refers to a soil sample that exhibits evidence of existing pore water (e.g. sample feels cool, cohesive soil is at plastic limit) but does not have visible pore water
Wet refers to a soil sample that has visible pore water
83.90.4
82.81.5
82.02.3
79.74.6
50 /125mm
8
50 /125mm
50 /50mm
50 /50mm
1
2
3
4
5
SS
SS
SS
SS
SS
100mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, very dense,reddish brown
FILL, shale, mixed silt, loose, reddishbrown
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
84
83
82
81
80
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
84.3
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602818, N: 4802457 (UTM 17T)
71-15-5010
February 26, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-1United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
80.90.5
80.31.1
79.12.3
76.84.6
50 /125mm
31
50 /75mm
50 /50mm
50 /50mm
1
2
3
4
5
SS
SS
SS
SS
SS
100mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, very dense,reddish brown
CLAYEY SILT to SILT, with grey shaleinterbeds, very dense, reddish brown(GLACIAL TILL)
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
78
77
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.4
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602785, N: 4802429 (UTM 17T)
71-15-5010
February 26, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-2United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
80.80.5
80.21.1
79.02.3
76.74.6
50 /75mm
84
50 /25mm
50 /25mm
50 /25mm
1
2
3
4
5
SS
SS
SS
SS
SS
100mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, very dense,reddish brown
CLAYEY SILT to SILT, with grey shaleinterbeds, very dense, reddish brown(GLACIAL TILL)
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
78
77
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.3
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602751, N: 4802412 (UTM 17T)
71-15-5010
February 26, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-3United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
81.30.6
80.81.1
79.62.3
77.34.6
47
15
50 /150mm
50 /75mm
50 /50mm
1
2
3
4
5
SS
SS
SS
SS
SS
100mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, very dense,reddish brown
CLAYEY SILT to SILT, with grey shaleinterbeds, very dense, reddish brown(GLACIAL TILL)
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
78
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.9
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602764, N: 4802471 (UTM 17T)
71-15-5010
February 26, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-4United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
80.80.5
79.81.5
79.02.3
76.74.6
17
36
50 /75mm
50 /50mm
50 /25mm
1
2
3
4
5
SS
SS
SS
SS
SS
100mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, compact, reddishbrown
CLAYEY SILT to SILT, with grey shaleinterbeds, very dense, reddish brown(GLACIAL TILL)
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
78
77
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.3
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602803, N: 4802485 (UTM 17T)
71-15-5010
February 26, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-5United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
81.20.6
80.90.9
80.31.5
77.24.6
22
50 /150mm
50 /125mm
50 /25mm
50 /25mm
1
2
3
4
5
SS
SS
SS
SS
SS
100mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, compact, reddishbrown
CLAYEY SILT to SILT, with grey shaleinterbeds, very dense, reddish brown(GLACIAL TILL)
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
78
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.8
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602692, N: 4802426 (UTM 17T)
71-15-5010
February 26, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-6United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
80.70.6
80.40.9
79.81.5
76.74.6
50 /150mm
50 /150mm
50 /25mm
50 /50mm
50 /25mm
1
2
3
4
5
SS
SS
SS
SS
SS
100mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, very dense,reddish brown
CLAYEY SILT to SILT, with grey shaleinterbeds, very dense, reddish brown(GLACIAL TILL)
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
78
77
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.3
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602713, N: 4802388 (UTM 17T)
71-15-5010
February 26, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-7United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
80.90.6
80.01.5
79.22.3
76.94.6
10
95
50 /50mm
50 /25mm
50 /50mm
1
2
3
4
5
SS
SS
SS
SS
SS
75mm ASPHALTIC CONCRETE
FILL, granular base
FILL, silty sand and gravel, compact,brown
CLAYEY SILT to SILT, with grey shaleinterbeds, very dense, reddish brown(GLACIAL TILL)
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
78
77
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.5
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602707, N: 4802478 (UTM 17T)
71-15-5010
February 27, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-8United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
80.70.5
80.30.9
78.92.3
76.64.6
63
67
50 /75mm
50 /50mm
50 /50mm
1
2
3
4
5
SS
SS
SS
SS
SS
75mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, very dense,reddish brown
CLAYEY SILT to SILT, with grey shaleinterbeds, very dense, reddish brown(GLACIAL TILL)
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
78
77
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.2
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602658, N: 4802363 (UTM 17T)
71-15-5010
February 27, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-9United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
81.10.5
80.80.8
78.53.1
50 /75mm
50 /50mm
50 /50mm
50 /50mm
1
2
3
4
SS
SS
SS
SS
75mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, very dense,reddish brown
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.6
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602590, N: 4802454 (UTM 17T)
71-15-5010
February 27, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-10United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
80.90.6
80.60.9
79.22.3
76.94.6
34
67 /275mm
50 /50mm
50 /25mm
50 /25mm
1
2
3
4
5
SS
SS
SS
SS
SS
75mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, dense, reddishbrown
CLAYEY SILT to SILT, with grey shaleinterbeds, very dense, reddish brown(GLACIAL TILL)
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
78
77
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.5
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602786, N: 4802562 (UTM 17T)
71-15-5010
February 27, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-11United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40
80.90.6
80.41.1
79.71.8
76.94.6
15
50 /75mm
50 /50mm
50 /50mm
1
2
3
4
5
SS
SS
SS
SS
SS
100mm ASPHALTIC CONCRETE
FILL, granular base
FILL, shale, mixed silt, compact, reddishbrown
CLAYEY SILT to SILT, with grey shaleinterbeds, very dense, reddish brown(GLACIAL TILL)
WEATHERED SHALE, reddish brownand grey
END OF BOREHOLE
Borehole was dry and open uponcompletion of drilling.
Ele
vatio
n S
cale
(m)
81
80
79
78
77
ElevDepth
(m)
SP
T 'N
' Val
ue
Moisture / Plasticity
10 20 30
PL LLMC Hea
dspa
ceV
apou
r
Lab Dataand
Comments
Inst
rum
ent
Det
ails
Gra
phic
Log
Num
ber Liquid
Limit
Uns
tabi
lized
Wat
er L
evel
Typ
e
Dep
th S
cale
(m
)
0
1
2
3
4
Unconfined Pocket Penetrometer
Field Vane Lab Vane
Undrained Shear Strength (kPa)
40 80 120 160
SOIL PROFILE
GROUND SURFACE
SAMPLES
PlasticLimit
Dynamic ConeNatural
Water Content
81.5
GRAIN SIZEDISTRIBUTION (%)
(MIT)
Description
SAGR SI CL
Project No.:
Date started :
Sheet No. :
Drilling Method : Solid stem augers
Position : E: 602816, N: 4802518 (UTM 17T)
71-15-5010
February 27, 2015
1 of 1
Client :
Project :
Location :
LOG OF BOREHOLE 15-12United Burlington Retail Portfolio Inc.
LAKESIDE
5353 LAKESHORE ROAD, BURLINGTON, ONTARIO
Elevation Datum : "Geodetic"
Rig type : CME 45, truck-mounted
lib
rary
: lib
rary
- t
erra
prob
e gi
nt.g
lb
rep
ort
: te
rrap
robe
soi
l log
fi
le:
71-1
5-50
10-5
353
lake
shor
e ro
ad.g
pjTerraprobe
Penetration Test Values(Blows / 0.3m)
10 20 30 40