1 | Page Terms of Reference 1. Background The rural electrification program in Bangladesh has progressed significantly through a variety of initiatives. These initiatives have contributed to building the capacity of Bangladesh Rural Electrification Board (BREB) to plan, design, and construct distribution system according to international standards. The program has also contributed to developing the capacity of BREB to organize Palli Bidyut Samities (PBSs) for management, operation, and maintenance of distribution systems. Over the years, the distribution network in PBSs, the electric load, and consumers have grown dramatically to a very large size consisting of about 20 million consumers. This has also made the system technically complex. As a result, the service to consumers and other stakeholders are being affected. In order to provide a better service to its stakeholders BREB now proposes a number of initiatives such as automation of the network, developing modern O&M systems and use of technologies such as Geographic Information Systems (GISs) in order to improve the technological environment and enhance corporate capabilities. The main purpose of the current assignment is to introduce GIS based technologies to all areas of utility practice in BREB and PBSs. BREB has already commenced a program of securing GIS based information in a number of PBSs. However, establishing the data requirements to fully operationalize GIS practices in all PBSs will take considerable time. Hence the strategy to be adopted in the present exercise is to continue to carry out the routine work of data collection by the PBSs and to use the current consultancy assignment to develop this program in accordance with established best practices, train the PBS personnel in carrying out all related activities and to introduce GIS applications where possible as and when the data requirements are met. In this way, the effectiveness of the program will be better realized and there will be only a limited time lag between data collection and its usage. 2. Objective The objective of the assignment is to develop a GIS framework for use in BREB and the PBSs so as to modernize the planning, network operations and maintenance practices and consumer interactions. 3. Scope of Services The consultant’s scope of work will essentially consist of two parts: the first related to the development of best practices in GIS data collection and the second related to its applications for use in utility practice. Initially the consultant should review the current practice of GIS data collection and provide proposals for its improvement and modernization. Thereafter the consultant will carry out a pilot study in a selected PBS to demonstrate the best practice to be used in GPS data collection on a pole by pole survey.

Transcript of Terms of Reference 1. Background -...

Page 1: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

1 | P a g e

Terms of Reference

1. Background

The rural electrification program in Bangladesh has progressed significantly through a

variety of initiatives. These initiatives have contributed to building the capacity of

Bangladesh Rural Electrification Board (BREB) to plan, design, and construct distribution

system according to international standards. The program has also contributed to

developing the capacity of BREB to organize Palli Bidyut Samities (PBSs) for management,

operation, and maintenance of distribution systems. Over the years, the distribution

network in PBSs, the electric load, and consumers have grown dramatically to a very large

size consisting of about 20 million consumers. This has also made the system technically

complex. As a result, the service to consumers and other stakeholders are being affected. In

order to provide a better service to its stakeholders BREB now proposes a number of

initiatives such as automation of the network, developing modern O&M systems and use of

technologies such as Geographic Information Systems (GISs) in order to improve the

technological environment and enhance corporate capabilities. The main purpose of the

current assignment is to introduce GIS based technologies to all areas of utility practice in

BREB and PBSs.

BREB has already commenced a program of securing GIS based information in a number of

PBSs. However, establishing the data requirements to fully operationalize GIS practices in all

PBSs will take considerable time. Hence the strategy to be adopted in the present exercise is

to continue to carry out the routine work of data collection by the PBSs and to use the

current consultancy assignment to develop this program in accordance with established

best practices, train the PBS personnel in carrying out all related activities and to introduce

GIS applications where possible as and when the data requirements are met. In this way, the

effectiveness of the program will be better realized and there will be only a limited time lag

between data collection and its usage.

2. Objective

The objective of the assignment is to develop a GIS framework for use in BREB and the PBSs

so as to modernize the planning, network operations and maintenance practices and

consumer interactions.

3. Scope of Services

The consultant’s scope of work will essentially consist of two parts: the first related to the

development of best practices in GIS data collection and the second related to its

applications for use in utility practice. Initially the consultant should review the current

practice of GIS data collection and provide proposals for its improvement and

modernization. Thereafter the consultant will carry out a pilot study in a selected PBS to

demonstrate the best practice to be used in GPS data collection on a pole by pole survey.

Page 2: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

2 | P a g e

The pilot study will also be combined with a training exercise for PBS staff who will finally

carry out the work in each of the PBSs. In this manner with the work spread out over each of

the PBSs, it is envisaged that the conversion of all PBS utility practices to GPS based

programs will be carried out within a short period of time. The second part of the

consultant’s duties will consist of development of applications to utilize the GPS based data

for all forms of utility practice. For this purpose, the consultant will need to develop a well-

planned database system and a number of application software and programs. In some

instances, the consultant will assist BREB in securing commercially or open source available

software and link their application to the GIS based database.

The scope of the services of the consultant will include but not be limited by the following:

3.1 Review and recommendations on BREB procedures for GIS data collection

The consultant will review current procedures and techniques used in GIS data collection in

relation to securing of GPS coordinates and the equipment data input and storage and

recommend procedures to bring the practices up to acceptable international standards. The

activities to be done will include:.

� Update Existing Pole numbering system of HT (33 kV and 11/6.35 kV) and LT lines

� Update GIS inventory Sheet (Survey Form)

� Upgrade equipment record forms for items such as voltage regulator, power

transformer, distribution transformer etc.

� Update transformer unique numbering system. Transformers information should be

unique and linked up with pole numbering.

� Introducing of geo-location capturing in all kinds of survey forms and staking sheets

and build as digital format for software used.

3.2 Primary GIS data collection

Primary data collection is the base data collection for GIS development in a power system.

This consist of gathering electric distribution system information such as grid substations,

primary substations and their feeder wise data which include network data on a pole by

pole basis of both HT and LT lines. It also includes information on the electrical equipment

installed such as transformers, voltage regulators, ACRs/OCRs, capacitors, meters and line

conductors. Information on consumer characteristics and their connection to the network

(location and connection of the service pole) is also needed.

The main task of preliminary data collection for the entire BREB/PBS system will rest with

the respective PBSs. However, the consultant will carry out an exercise in the collection of

preliminary data at a selected PBS to serve as a model exercise. During this exercise the

consultant will train sufficient number of PBS personnel in the carrying out the related

duties and establish best practice methodologies in the collection of the primary data for a

utility GIS program. The activities to be carried out will include:

���� Collection of pole by pole data for HT and LT lines and recording the locations by a

Precise GPS receiver

���� On-site processing of GPS data and conversion to GIS data format

Page 3: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

3 | P a g e

���� Verifying accuracy (to less than 1 meter) of field data of geographical locations

���� Keeping records appropriately and correction of defective data (at every following

day)

���� Daily uploading/Digitizing the field data collected to the database

� Conductor information, equipment information and device information collection

during the pole by pole survey by GIS inventory sheets

� Collection of data related to grid substation, switching station, sub station

� Collection of data related to important land marks using appropriate forms

���� Collection of information of transformer and other equipment/devices from

‘Equipment Record Cards (ERCs)’ and related PBS documentation and integration of

the data with electric distribution system’s GIS Database. A computerized database

management program providing a suitable data assembly software will be needed

for this purpose

� Pole and Equipment information will be collected through Precise GPS Equipment or

Temporary Stations (TS) and a short questioner survey. A digital data input format

can also be used by applying some macros with the Precise GPS Equipment and

Tablet Mobile based questioner survey and data input. In this case the Existing

Equipment records card’s digital format can be used.

� Pole oriented consumer and equipment data is maintained at each PBS. Transformer

record cards as well as records of other equipment in the system are also

documented and updated regularly at each PBS. This data needs to be uploaded to

the database.

Information to be captured in a pole by pole uploading of data includes the following:

Electric Pole Unique pole number with feeder name/ID, Latitude, Longitude,

Pole Size, Pole Materials, Pole Type, Pole Fittings, Pole Environment, Conductor

Size/Type, Conductor Phase Sequence, Conductor Line Voltage (KV), Transformer

Capacity (KVA), Transformer Phase Connection, Guy unit, Jumper Size, Devices.

Electric Lines Capacity, type of all HT, LT, overhead and underground line from grid source to

consumer end.

utility

features

Power Station, Sub-station, Related PBS zonal office and complaint center,

Distribution system related infrastructure

Physical

Features

Type of terrain, roads, rivers and other physical features

3.3 Geo-referencing

The GIS Data must be geo-referenced in respect of Bangladesh’s coordinate system. For that

purpose data should maintain referencing GCP on Bench Mark.

3.4 Secondary data collection and Mapping

Secondary data is very important to develop the information needed for a variety of

applications to be used in a power utility. Thus, the primary data needs to be supplemented

Page 4: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

4 | P a g e

by numerous secondary data that deals with the geographic features of the land,

characteristics of the population served or to be served, important institutions located in

the service area etc. The consultant will be responsible for the collection of the relevant

secondary data not only related to the pilot PBS where detailed work is being conducted but

also for the country as a whole, for use in other PBSs. However, while overall country

related data collection shall be facilitated and arranged by the consultant the collecting

much of the secondary data may be focused on that of the pilot PBS. Information to be

obtained includes:

� Processed geo-referenced satellite images or Arial photography information.

Accuracy level of these images could be ±0.5 meter aAer post processing

� Base maps with cadastral boundaries such as local administrative districts (village,

union, upazilla, district, division etc.), linear features such as roads (primary,

secondary, tertiary and quaternary), rivers, lakes, canals etc.

� Preparation of the Base Map of PBSs with demarcation of PBS

boundary/Area/Location should be geo-referenced in Bangladesh reference system.

� Demographic and social data such as population, house hold / settlement type etc.

occupation, stakeholder type can be collected from the statistical year book of

Bangladesh bureau of Statistics (BBS). Such demographic and social data would be

used for assessing future growth and trends such as projection of population and

consumers, and service area demarcation.

3.5 GIS Database Establishment and Analysis

The consultant needs to develop a fully functional GIS database and a Data Base

Management System (DBMS) for data processing, inquiry and analysis by various

departments of BREB and the PBSs. The GIS platform will be the latest version of the

Environmental System Research Institute (ESRI)’s ARCGIS (latest version). The DBMS should

consist of a set of software programs that controls the organization, storage, management,

and retrieval of data in various databases established. DBMS should support the application

programs and enable the transfer of appropriate data to various users.

Initially the consultant will carry out a Business Area Analysis so as to design the GIS system

requirements to the needs of all intended users and determine the appropriate

functionalities to be incorporated within the GIS. Overall the database structure may include

the access database, survey database, electrical network and analysis database and the

billing database plus any others as per the requirements of users. The specific structure of

data storage and GIS system architecture should be determined after discussions with the

various users to meet their various needs. A set of interactive macros for query and access

between the databases will need to be developed.

The data received from the Precise GPS Equipment and equipment records need to be

verified and error checked for accuracy and consistency. For example, the network data can

be checked with reference to the single line diagrams and geo-referencing with geographic

maps.

Page 5: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

5 | P a g e

Basic analysis capabilities of the GIS shall include the following:

� Geospatial query and statically Analysis: this will include items such as geographical

queries like area and length calculations, details and quantification of various assets

and their physical locations, equipment status, computation of area served by

substations, feeders etc.

� Electrical query and analysis: some of the features will be processed with internally

developed software while items such as load flow analysis will be conducted using

commercially available software packages that will be linked to the GIS data base.

Internally generated query facility would include generation of single line diagrams

(SLD), connected kVA on feeders etc.

� Consumer related analysis: requirements would include features such as consumers

connected to each feeder and line section, energy consumed by feeder etc.

3.6 Web GIS Development, Analysis and Use

A Web GIS development is essential for quick and efficient service provided at consumer end.

Users within BREB and the PBSs will also have access to various Web based services such as

Google maps and can also enjoy access to the system without a WAN or LAN connection

using their own device such as mobile devices. The web GIS Database has two tires of users,

one for GIS development interactively at web and the other for consumer use and getting

service.

3.6.1 Web GIS Development at service provider end

• To edit, compile, add new features and related information while in the field with

access to the entire data controlled by BREB/PBS authority

• To query any spatial database related to the electric network database.

• To get physical images like satellite image or Google earth image for quick decision

making.

• To superimpose the collected electric network information on Google maps for

getting direction, interactive map, location etc.

• Ability to include geo-processing features to web mapping.

• Electrical analysis, geographical analysis, database analysis, statistical analysis,

financial analysis would be possible via Web access.

• To provide real time data support at consumer end after any work assignment such as

up gradation/extension/renovation of pole, equipment, line or substation.

3.6.2 Web GIS Development at service consumer end

• To find out the coverage of electric line and pole location from every household

• To reach complaints line instantly at proper authority

• To apply and evaluate the connection status of new line connections

• To inform the situation about any pole and equipment position through web at the

time of any hazard

• To realize the accessibility and condition of the present electrification network

Page 6: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

6 | P a g e

• To make online queries from the geo database

• To get an apps for data viewing

• To support android mobile/smart phone supported for getting service

• The consumer end database should be password protected only limited information

will be made available.

• There will be no editing, deleting, or alterations possible from the consumer end.

4 Equipment & Technology to be used

The following procedures and techniques will be used in carrying out the assignment:

• Precise GPS equipment will be used for taking coordinates of Pole.

• Field data must be downloaded and by the end of the each working day. Back up

copy of downloaded raw data along with copy of field book must be handed over to

the client for checking and preservation.

• The consultant may use geo-reference Satellite Image with Higher Accuracy not

more than 0.5 meter as a supporting document for detailed engineering survey.

• Consultant shall have sufficient equipment for conducting necessary utility, physical

feature and other related surveys. In case they do not have sufficient equipment,

these may be hired. Evidence of documents in support of necessary equipment (own

or hired survey firm) should be attached. Preference will be given to those who

possess these equipment.

• Data Processing and Mapping Software for GIS Data input and processing should be

user friendly and the latest available version.

• The following-accuracy levels will be maintained:

(i) Positional accuracy of any pole/ substation/ structure/establishment should be

within 0.5 meter (50 centimeters).

(ii) GPS: accuracy 0.5 meter

(iii) Digitizing (location accuracy) 0.5 meter

5 Desktop based and web based software functions

5.1 Desktop based GIS software functions

The desktop based GIS software should have the following facilities:

• The software must be windows/Linux/ Mac supportable.

• The software should be able to draw/ digitize point, line, polygon features with a lot

of information on any format.

• The software should be English and language read and write supported in case of

data entry and reporting.

• The software should have built in map creating technology with deferent interactive

layers for storing information.

• Geo-referencing, geo-processing, geo-editing must be enabled or built-in to the

software.

• Geo-database, Shape file, Relational database, access based database, Xml database/

Page 7: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

7 | P a g e

oracle database, PL/SQL, CAD file must be contained as a built in feature.

• The output files must be enabled for shape file, Geo-database, pdf format, jpeg

format, MS word, excel format and its own project format.

• The software should have the capacity to adapt new macros for different

applications.

• The software must be licensed and renewable.

• The software must have link up capability to use with other necessary software for

further analysis such as Equipment database software, Consumer database, Billing

Software, Electrical analysis software etc.

• The software must have query capability both database query and spatial query as

well as spatial analysis capability.

• The software must have self-report generating capability, interactive mapping

capability, statistical analysis, mathematical analysis capability.

• The software must have write protected and password protected capability.

• The software must be commercial, user friendly and with a simple interface.

• The metadata should be in conformity to ISO/IEC 11179/Global Standard.

5.2 Database software functions

The Database software should have the following facilities:

• To update/ modify the present Equipment Record Software.

• To incorporate the Geographical location (Latitude, Longitude)

• Capability for query able and statistical analytic software

• Ability to extend the range of data input and flexible for all types of editing

• The software must have write protected and password protected capability.

• The software must have capacity to adapt new macros for different applications.

• The software must be licensed and renewable.

• The software must have linked up capability with other necessary software for

further analysis such as Equipment database software, Consumer database, Billing

Software, Electrical analysis software etc.

• The language of the software could be a global simple language.

• The software must be commercial and user friendly with a simple interface.

• The software must be windows/Linux/ Mac supportable.

• The metadata should be in conformity to ISO/IEC 11179/Global Standard.

5.3 Web based software functions

The Web based software should have the following facilities:

• The software must be light, accessible and easy to operate.

• The software should be based on a global language like oracle, Java script, C#, Xml,

php, Ajax etc.

• The software should have the ability to edit and modify geo features.

• The software code should be ISO standard, and be GUI supportable.

Page 8: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

8 | P a g e

• The software should have built in map creating technology with deferent interactive

layers with information.

• Geo-referencing, geo-processing, geo-editing must be enabled or built-in this

software.

• The output file must enable Kml, xml, pdf format, jpeg format, MS word, excel

format and its own project format.

• The software must be windows/Linux/ Mac supportable.

• The software must have capacity to adapt new macros for different works.

• The software must have a renewable license.

• The software must have query capability both database query and spatial query.

Moreover, the software must have spatial analysis capability.

• The software must have self-report generating capability, interactive mapping

capability, statistical analysis, mathematical analysis capability.

• The software database should have copy right and password protected.

• The software must be commercial, user friendly and with a simple interface.

• The metadata should be in conformity to ISO/IEC 11179/ Global Standard .

5.4 Electrical network analysis through desktop and web based GIS software

The GIS system should have the capability of presenting network information for use in the

planning, maintenance and operational activities of BREB and the PBSs. A list of minimum

requirements in this connection is given below:

• Capability to prepare auto Single Line Diagrams from the finished GIS/Geo-database.

• Ability to present the load of every feeder as allocated load, forecasted load, and

generated load.

• Ability to identify the over loaded feeders and equipment depending on line ratings,

transformer capacity etc. If any item attain a danger level a signal should be

generated automatically.

• Spatial monitoring at the time of disaster and support to decision making.

5.5 Electrical Analysis through other application software

The GIS data base should be capable of usage in a number of applications some of which will

be developed by the consultant and others to be secured from commercially available third

party sources. Further, some of the third-party application software should be researched

and selected by the consultant for acceptance and approval by BREB. A separate allocation

will be provided for the purchase of such third party commercially available software. In

their offer the consultant may offer alternatives of provision of commercially available

software or from their own development. The electrical system analysis and some utility

operation software to be secured within the current assignment will consist of:

(1) Network Load Flow Software

This is one of the most important applications of GIS technology in BREB and the PBSs.

Page 9: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

9 | P a g e

The use of GIS capabilities will make the application of computerized load flow studies

mush more user-friendly and convenient to use. Since this software is complex and has a

number of additional features such as fault level and stability studies a well proven

commercially available software is needed for this application. The consultant will be

responsible to ensure that data transfer between the selected software (both uploading

and downloading) and the GIS database is accomplished. The software to be selected

should have the following features:

• Capability to do load flow analysis, system loss and voltage level calculations, Fault

analysis, stability studies for distributed generation, flagging of overloaded sections

and low voltage points, load balancing, computation of load centers etc.

• Capability to draw single line and geographic diagrams depicting the results of the

analysis.

• Capability for input-output linkages with GIS Based software and Database software

• The software must be windows/Linux/ Mac supportable.

• Capability for self-report generation and interactive mapping.

• The software should have write protected and password protected capability.

• The software must be in wide-scale commercial usage among utilities, user friendly

and with simple interface.

• The software must have a renewable license.

(2) GIS based Customer Information System

This software can be either from internal development or purchase from a third party.

The required information for this purpose shall partly be obtained automatically from

linkage with the billing system. This linkage shall be developed without compromising

the integrity and security of the billing system. The application shall map out the

consumers according to their geographic locations and network connections. It should

record consumption levels and prompt any irregularities which may signify meter

tampering. It should assist planning and maintenance staff in computing the probable

loading of network sections and estimating future load growth. The extracting of

information from the billing software should be done from an output file without

compromising the integrity of the billing system.

(3) Outage management and restoration system

This software can be either from internal development or purchase from a third party.

The application shall enable call centers to trace the location of an outage by the

analysis of outage calls received from consumers. It requires consumers to be mapped

into the power supply network chain so that the most probable location of the fault can

be identified by the common network section hierarchy related to the calls received. The

application should be capable of use by the call center and also by mobile fault

restoration teams. In addition, the software should be capable of recording the system

outages and serving as an aid to computing SAIDI and SAIFI.

Page 10: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

10 | P a g e

(4) Management of Work Orders

This software can be either from internal development or purchase from a third party.

The issue of work descriptions using GIS mapping can greatly enhance the processing of

construction activity. The work orders will contain a clear map indicating the location

and route of the proposed development. The application can also process the progress

of work orders and include a convenient report generation format. It will also be used

for updating the network configuration when the work is completed and when as-built

changes are indicated. The application can also be used for line patrol work and pole

equipment inspection.

5.6 Software Security

It is essential that the appropriate security arrangements are made to the software and data

security and the following should be taken care of:

• Data should have proper integrity and authenticity.

• Data have inherent characteristics for preventing misuse and hacking by external

sources.

• Have proper data abstraction for non-breaking characteristic.

• Security system have a three tire structure: one for control or administrative

functions, another for data edit, change, modify but not allow a delete the whole or

partial database and third one for the users who can only browse the data system

but cannot affect any change.

• Data or web site should have a distributed database system to enable assess to more

developers to edit, change, and modify the data.

• The site must be accessible to more and more users at a time to receive on spot/on

line service. It must include a functioning parallel database system.

• The web link need to be able to convert Apps like Facebook apps or google map apps

for easy access from any smart phone.

• The software database should have write protected and password protected

capability.

• The software must be visual verification system supported

• The software must have SSL, RSL security certificate.

6. Methodology for carrying out the services

Initially the consultant will review the work already carried out in developing a GIS data base

and provide an assessment of its appropriateness. Thereafter he will suggest any

modifications and/or updates needed and assist BREB and the PBSs in carrying out such

changes.

The focus of this assignment is the development of a GIS data base and related application

software to be used in all of BREB and PBS activities. Developing the pole by pole GPS

coordinates and populating the asset attributes will mainly be carried out by PBS staff or

separate consultants. Nevertheless, the consultant will undertake a pilot exercise to

demonstrate the best practice and methodologies to be used in collecting the GPS

Page 11: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

11 | P a g e

coordinates of network assets and attribute data. This pilot exercise will be carried out by a

team of experienced GPS specialists and will be used to train the PBS staff who will

eventually populate the data base in all PBSs. The pilot exercise and related training will be

carried out in one PBS. In parallel with the pilot exercise PBS staff or other consultants will

also carry out the collection of GPS coordinates and attribute data in this PBS under the

guidance of the consultant so as to populate the data base as quickly and as extensively as

possible. The GPS data collected in this PBS prior to the commencement of the assignment

will also be used in the analytical work that will be done in this PBS.

The consultant will use the data collected in the pilot PBS along with additional geographic

and other information that will also be developed to demonstrate the satisfactory operation

of all application software that will be developed in this assignment.

The selection of a suitable PBS to pilot the GIS development will be done after the

consultant commences duties by mutual discussions between BPDB and the consultant. The

selection will be based on the following characteristics:

1. A smaller area of service with less consumers

2. Where network lines and substation data are fully updated

3. Where equipment records are updated

4. Where Pole numbering is completed

5. An industrial Area could be preferable

6. A PBS with better transport/road facilities and more or less flat and high land terrain

7. More or Less Profitable and resourceful PBS

It is expected that the consultant’s GIS field team will be able to complete the needed pilot

field work in the PBS selected so as to demonstrate the use of all applications by the end of

the assignment. If this work can be completed before, the activity will be continued in

another PBS so as to enable continued training of PBS staff in completing the field data

collection work in a timely manner

7. Capacity Development and Training

A comprehensive training program shall be developed by the consultant on the GPS survey,

GIS development, Database Software, Electric Analysis Software, and Web GIS Software.

In addition the following training materials shall be provided:

Improvement of existing training programs: Currently there are Three GIS/GPS based

Training Programs being used in BREB for its staff development. The consultant will review

these training materials and update them to include the latest software and hardware

applications and usage and develop any additional training courses necessary. The currently

operating Training Programs are

1. Basic Geographic Information Systems (GIS) For Rural Electrification Program

This training program includes advance level GIS development works on GIS software. The

total Duration is 10 Days.

Page 12: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

12 | P a g e

2. Application of Global Positioning System (GPS) and Introductory Geographic

Information System (GIS)

This training program includes Basic GPS Survey works related training. It is developed for

the field survey on handheld GPS receiver and Pole to pole information collection. The total

Duration is 05 Days.

3. Fundamentals of Geographic Information System (GIS)

This is a short training program for the GIS mapping also including field survey activity. It

includes the very basics of ArcGIS Software and handheld GPS receiver operation. The total

Duration is 05 Days.

Additional training programs: Additional to updating and improving the above training

material the consultant will develop a number of additional training courses and prepare all

required training material and documentation. The new training programs to be developed

include the following:

1. Training programs on each of the new electrical analysis software introduced in this

assignment as described in sections 5.4 and 5.5 needs to be developed. These should

be training programs at user level and should be comprehensive so as to enable a

number of users to be trained in BREB and the PBSs to be competent in the use of

these programs. The duration of each of these training programs should be around

10-15 days and include hands on demonstrations so as to enable the users to

become fully professional in the applications. With reference to the load flow

analysis software if a decision is made to continue with the existing Windmil

software the current training program for this software should be updated and

improved to include the GIS linkage application.

2. Training programs for the use of all software linked to the database such as for

entering the Equipment Record Card (ERC).

3. Training programs in the application of the desktop and web based software. These

should contain modules for usage of the programs, operation of analysis and query

facilities and maintenance of the programs.

4. Training program on the usage of the newly buildup macros including their operation

and linking up the macros with other software.

Overall a program to train the trainers consisting at least 10 Personnel need also to be

developed to carryout future training activities.

8. Outputs to be submitted by the Consultant as deliverables

In keeping with the requirements of the TOR, the consultant will complete and establish a

fully functional GPS system and Database and the related operating software as specified in

this TOR. The related operation and maintenance manuals of all equipment and software

will also be provided. The relevant maps will also be provided in both digital and hard copy

need also to be supplied. The following table provides a list of some of the important

additional documentation to be provided:

Page 13: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

13 | P a g e

8.1 List of Reports to be submitted (Both Digital and Hard Copy)

Report Language

Number of

Copies to be

submitted

Period

Submission

Binding

Status

Draft Final Inception Report English

2 4 3 Weeks after

date of contract

Book

Binding

Interim Survey Report

Electrical Utility and Physical

Features

English

2 4

12 months after

date of contract

Book

Binding

Quarterly progress reports

detailing information on the

work carried out over the period

and the plans for the work to be

carried out in the future

English

4

Every quarter Book

Binding

Interim report on establishing

the GPS system/Database, and

analysis software/application

programs

English

2 4

12 months after

date of contract

Book

Binding

Final report on establishing the

GPS system/Database, and

analysis software/application

programs

English

2 4

22 months after

date of contract

Book

Binding for

Draft Reports

and Leather

Binding for

Final Reports

Training and Capacity building

documents as provided in the

TOR

English

2 4

In stages, as and

when prepared to

be completed by

22months

Book

Binding

User manuals for all software

and application programs

developed during the

assignment

English

4

In stages, as and

when prepared to

be completed by

22months

Book

Binding

Note: The acceptance of the reports/documents by the Project Director will signify the

completion of the task in accordance with the TOR.

Page 14: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

14 | P a g e

8.2 Format for Submission of Maps and Plans

SI.No. Description of map Scale Submission

Period

No copies to be

submitted

Draft Final

1 Base Map (for field survey) 1:10,000 12 months after date

of contract

1 copy

each

4 copy

each

2 Base map (Final) with all

Electrical Assets

1:10,000 18 months after date

of contract

1 copy

each

4 copy

each

3 Detail Maps of Electric

Network

1:1000 18 months after date

of contract

1 copy

each

4 copy

each

4 Key Master Map 1:10,00 20 months after date

of contract

1 copy

each set

4 copy

each set

5 Detail Master plan 1:10,000 20 months after date

of contract

1 copy

each set

4 copy

each set

Note:

• All survey maps head (5-10) to be submit with survey reports

• All maps to be submitted in Matt paper (120gm) and Sheet size 30"x40"

• All Final Maps to be submit in Matt laminating

• Digital copies for all reports and maps to be submitted in each submission (draft &

final)

8.3 Format for Submission of Soft copy

1. Maps: Shape file, coverage file with accurate attribute information &

PDF format 2. One set Maps Soft copy will submit in BTM/BUTM Projection

System

3. Reports: DOC & PDF (Maps in report in separately PDF format)

4. Image: IMG/JPEG/TIFF

5. Presentation: PPT/PPTX

6. Primary & Secondary Data: Excel, DOC

7. Drawing: Shape, DWG

8. Analysis: Access, Excel, DOC and Others (with graph/chart)

9. Data will submit on CD/DVD/Flash drive with marking contents and date

10. Web site and Mobile Apps

11. Electrical Analysis Data

8.4 Development of Dynamic Website of PBS

The PBS will develop a Dynamic Website. The Website will contain existing and proposed

details with text, graph, maps and photographs. Based on work progress website will be

updated by the consultant. Before entering the update the consultant will obtain the

necessary approval from the Project Director.

Page 15: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

15 | P a g e

Final GIS/Geo-Database, Web

Database, Web site, Macros, Source

code, Database Software, Server

administration privilege

English

6

Copies

At the completion of

Project work: 24

Months from date of

contract.

6 DVD and a

portable Hard

disk copy

8.5 Hardware and software requirements to be provided

The following hardware and software requirements will be provided as part of the

contract:

Hardware

• Precise GPS with accessories (1 set for BREB)/ Total Station with accessories (1 set

for BREB);

• Hand Held GPS (1 set for BREB);

• Plotter;

• Drum Scanner/ Scanner;

• Printer (A3 & A4);

• Computer/ Laptop (at least Core i7);

• GIS server

• Web Server;

• All related accessories

Note: The specifications of all equipment will be as agreed upon between the consultant

and BREB

Software

• GIS latest version or Related Software.

• CAD latest version.

• Statistical Software such as SPSS, Stata, R ;

• MS Office Package.

• Functional Database Software SQL, Dbase etc.

• Web based Software and database like Oracle, MySQL, Xml etc.

• Electrical Analysis Software (CYME/Bently, etc)

9 Consultant’s Manpower Requirements

The key manpower requirements and qualifications of the consultant’s personnel will be as

follows:

Local/National Consultant Man

Month No. of Consultants

i) Team Leader 18 1

Qualification required:

Education: Master’s in Urban and Regional/Rural Planning, Geography, Geo-informatics, PhD degree shall

be given preference.

Experience: At least 15 years’ Experience in Geo-database development, the person must have extensive

Page 16: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

16 | P a g e

Local/National Consultant Man

Month No. of Consultants

experience as a project manager and administration of large multi-disciplinary IT team.

ii) GIS Expert 24 1

Qualification required:

Education: Bachelors in Urban and Rural/Regional Planning/Geography, or related field with

specialization in GIS or post graduate degree in GIS.

Experience: 8-10 years working experience as GIS specialist in national and international agencies in

related field and have considerable knowledge in compilation of basic data for use in GIS at the utility

(Electricity Network/ Water network/ GAS network) service and should be well conversant with spatial

analysis, design and preparation of data using GIS software as proposed.

iii) Survey Expert (Topography) 24 1

Qualification required:

Education: 4 Year Diploma course in Surveying

Experience: At least 5 years’ experience in Topographic Surveying especially in Total station operating.

In addition to the key staff a minimum requirement of the following support staff is needed:

Local/National Consultant Man

Month No. of Consultant

i) Assistant GIS Specialist 24 1

Qualification required:

Education: Bachelor’s in Urban and Rural/Regional Planning/Geography, or related field with

specialization in GIS or post graduate degree in GIS.

Experience: Experience: 05 years working experience as GIS specialist in national and international

agencies in related field and have considerable knowledge in compilation of basic data for use in GIS at

the utility (Electricity Network/ Water network/ GAS network) service and should be well conversant with

spatial analysis, design and preparation of data using GIS software as proposed.

ii) Engineer (Electrical) 24 1

Qualification required:

Education: BSc. In Electrical and Electronics Engineering, Mechanical Engineer, Civil Engineering

Experience: 05 years working experience as utility (Electricity Network/ Water network/ GAS network)

service.

iii) Enterprise Web Architect

/Software Engineer

12 1

Qualification required:

Education: BSc. In Computer Science and Engineering, BSc in Information Communication Technology,

Experience: 05 years working experience on software and macro development.

iv) Surveyor (Topography) 12 6

Qualification required:

Education: 4 Year Diploma in Surveying or related field with specialization of surveying.

Experience: 2-3 years working experience on Utility network surveying.

v) GIS and CAD Operator 24 4

Qualification required:

Education: Diploma in Civil Engineering and having experience in GIS and CAD operational software

Experience: 01 years working experience on CAD/GIS.

Page 17: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

17 | P a g e

Annex-1

Various Registered Forms presently used by BREB for collection of Equipment data

BREB Instruction Series 100-29 (Front Side)

REB Form No. 100-29-01

REV. 3/87 Name of PBS ______________________

METER RECORD CARD

METER DATA - (By Meter Dept.)

Manufacturer ____________________ Type ______________ Serial

No.________________________

Test Amps________ Volts ________ Kh________ Full Scale Demand - KW ________ Multiplier ______

INSTALLATION AND REMOVAL DATA - (By Finance Dept. - From Customer Meter Order)

INSTALLATION REMOVAL

CUSTOMER NAME LOCATION/

ACCOUNTS NO. Date Reading Date Reading

Date Retired ______________________ Reason ___________________ Reference ________________

(Back Side)

Master Test Data - (From Meter Dept.)

Test

Date

Reason

for

Test

As Found As Left Type of

Repairs

Tested

By KWH

Reading FL LL

50%

PF

KWH

Reading FL LL

50%

PF

Page 18: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

18 | P a g e

(Front Side)

REB Form No. 100-29-02

Name of PBS ______________________

AUTOMATIC CIRCUIT RECLOSER (ACR) RECORD CARD

MANUFACTURER ___________ TYPE ______________ YEAR _____________ SERIAL NO. ________

PHASES ___________________ VOLTS _________________ CAT NO. __________________________

CONTINUOUS RATING AMPS _________________ INTER RATING AMPS __________________

DELIVERY DATE ___________________

INITIAL INSTALLATION DATE _______________________

DATE INSTALLED LOCATION CIRCUIT/RECLOSER

NUMBER

DATE REMOVED REASON

(Back Side)

INSPECTION & MAINTENANCE DATA

Maintenance

Schedule

Date

Inspections

Date

Counter

Reading

Oil Test

(KV)

All Check Repair & Maintenance Work

Performed O.K. Not O.K

Page 19: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

19 | P a g e

(Front Side)

REB Form No. 100-29-03 Date (Revision): 4.6.87

Name of PBS _______________________

VOLTAGE REGULATOR RECORD CARD

MANUFACTURER ___________________ TYPE _____________________ SERIAL NO. ___________

RATING ____________________ VOLTS _____________________ DELIVERY DATE _____________

DATE

INSTALLED LOCATION

REMOVED

DATE REASON

VOLTAGE LEVEL BANDWIDTH TIME

DELAY RESISTANCE RESISTANCE REACTANCE

POLARITY

SWITCH

COUNTER

READING

(Back Side)

INSPECTION AND MAINTENANCE DATA

DATE OF

INSPECTION

COUNTER

READING OIL TEST (KV)

CHECK

CONTACTS

REMARKS

(TEST, REPAIRS, OBSERVATION) SIGNATURE

Page 20: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

20 | P a g e

(Front Side)

REB Form No. 100-29-04 Code No. _______

Date of Revision: 4.6.87

Name of PBS _______________________

POWER TRANSFORMER RECORD CARD

Manufacturer ________________________________ Year _______________ Serial No.

_____________

KVA ______________________________________ Type ________________ Impedance

_____________

Primary Volts ___________________ Sec. Volts _____________ Sub Station Capacity

_______________

On Load Tap Changer: ٱ oN ٱ Yes

DATE

INSTALLED LOCATION

REMOVED

DATE REASON

* To be filled by Pencil

(Back Side)

INSPECTION AND MAINTENANCE DATA

Date &

Time

Inspected

Load (KW) Remarks

(Test, Repairs, Maintenance) Signature

Connected Actual*

*Load to be measured at Peak hours.

Page 21: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

21 | P a g e

(Front Side)

REB Form No. 100-29-05 Code No. _________

Name of the PBS _________________________

DIST. TRANSFORMER RECORD CARD

Manufacturer ________________________________ Year ________________ Serial no.

_____________

KVA _____________________________________ Type ______________ %Impedance ____________

No Load Loss _______________________________ Full Load Loss _____________________________

Cost of Transformer __________________________ Installation Cost __________ Total Cost

__________

Date

Installed

Location * No of Customer Remove

Station

No.

Pole No. Village Staked Served Date Reason

* To be updated and filled by pencil

(Back Side)

INSPECTION AND MAINTENANCE DATA

Date and

Time

Inspected

Load (KW) Remarks

(Test, Repairs, Maintenance) Signature

Connected Peak*

* Load to be measured at Peak hours.

Page 22: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

22 | P a g e

REB Form No. 100-29-06

STATION TRANSFORMER INFORMATION SHEET

Date ___________________________

Name of PBS __________________________________________________________________

Name of Substation _____________________________________________________________

Complete the following using the nameplate information obtained from the installed transformer.

Refer to the example nameplate below for information location.

NAMEPLATE DATA

Manufacturer: Imp. At 850C (%):

KVA Rating: Rated Voltage, HV (V):

Serial No.: Rated Voltage, LV (V):

Qty. of Oil (Gal.): Rated Current, HV (A):

Total Weight (KG): Rated Current, LV (A):

OBSERVATIONS:

Insulation Test:

Result _____________

Date ______________

Oil Test:

Job No. ____________

Result _____________

Date ______________

Page 23: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

23 | P a g e

REB Form No. 100-29-07

POWER TRANSFORMER INFORMATION SHEET

Date ___________________________

Name of PBS __________________________________________________________________

Name of Substation _____________________________________________________________

Complete the following using the nameplate information obtained from the installed transformer.

Refer to the example nameplate below for information location.

NAMEPLATE DATA

Manufacturer: Applied Standard:

KVA Rating: Rated Voltage, HV (V):

Serial No. Rated Voltage, LV (V):

Date of Manufacture: Rated Current, HV (A):

Imp. at 850C (%): Rated Current, LV (A):

Qty. of Oil (Gal.): Total Weight, KG:

Tap Position No.: Core & Coil, KG:

Max. Op. Pressure (PSI): Type of Cooling:

OBSERVATIONS:

Insulation Test:

Result _____________

Date ______________

Oil Test

Job No. ___________________

Result ___________________

Date _____________________

Page 24: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

24 | P a g e

REB Form No. 100-29-08

PT AND CT INFORMATION SHEET

DATE ___________________________

Name of PBS __________________________________________________________________

Name of Substation _____________________________________________________________

Complete the following using the nameplate information obtained from the installed CT/PT. Refer to

the example nameplate below for information location.

NAMEPLATE DATA

Particulars PT-1 PT-2 CT-1 CT-2

Serial No.

Accuracy Class:

Rated Burden (VA):

Rated Primary: V V A A

Rated Secondary: V V A A

Total Weight (KG):

Date of Manufacture:

Qty. of Oil (Gal.):

OBSERVATIONS:

Insulation Test:

Result _____________

Date ______________

Oil Test

Job No. ___________________

Result ___________________

Date _____________________

Page 25: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

25 | P a g e

REB Form No. 100-29-09

THREE PHASE ACR INFORMATION SHEET

Date ___________________________

Name of PBS __________________________________________________________________

Name of Substation ______________________________________ Feeder _____________

Complete the following using the nameplate control panel information obtained from the installed

3-phase ACR.

ACR NAMEPLATE DATA ACR CONTROL PANEL DATA

Manufacturer: Manufacturer:

Model: Model/Part No.:

Serial No.: Serial No,:

Date of Manufacture: Date of Manufacture:

Rated Voltage, KV:

Rated Cont. Current, Amp: PROTECTION SETTING DATA

Sh. Ckt. Making Curr., KA: Phase Trip Setting, Amp:

Sh. Ckt. Breaking Curr., KA: Ground Trip Setting, Amp

Duration of Sh. Ckt., Sec.: Trip to Lockout, No.

Basic Insulation Level, KV:

TRIP SETTING DATA

Phase Protection Trip Earth Protection Trip

Trip No. 1 2 3 4 1 2 3 4

Inverse Curve Type:

Instantaneous Multiplier:

Minimum Time (sec.)

Time Multiplier:

Additional Time:

OBSERVATIONS

Insulation Test:

Result _____________

Date ______________

Oil Test

Job No. ___________________

Result ___________________

Date _____________________

Page 26: Terms of Reference 1. Background - reb.portal.gov.bdreb.portal.gov.bd/sites/default/files/files/reb.portal.gov.bd... · programs will be carried out within a short period of ... etc.),

26 | P a g e

REB Form No. 100-29-10

VOLTAGE REGULATOR INFORMATION SHEET

Date _______________

Name of PBS __________________________________________________________________

Name of Substation _____________________________________________________________

Complete the following using the nameplate information obtained from the installed 1-phase

Voltage Regulators. Refer to the example nameplate below for information location.

NAMEPLATE DATA

Particulars Phase-R Phase-Y Phase-B

Manufacturer:

Model:

KVA Rating:

Load Amp:

Range of Regulation:

Rated Volts:

Man. CP Serial:

Man. Date:

BIL, (KV):

CT Ratio:

Untanking Weight, (KG):

Total Weight, (KG):

Qty. of Oil, (Gal.):

OBSERVATIONS

INSULATING TEST:

Result _____________

Date ______________

Oil Test

Job No. ___________________

Result __________________

Date _____________________