MWSS Corporate Office Katipunan Road, Balara, Diliman Quezon City 1100 Email address: [email protected] TERM OF REFERENCE Network and Information Technology Infrastructure Facilities (NITIF) 2019

Transcript of TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL,...

Page 1: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

MWSS Corporate Office Katipunan Road, Balara, Diliman Quezon City 1100 Email address: [email protected]

TERM OF REFERENCE

Network and Information Technology Infrastructure Facilities (NITIF)

2019

Page 2: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

1

TERMS OF REFERENCE

Supply and Delivery and Installation of

Network and Information Technology Infrastructure Facilities (NITIF) (Contract No. SDI-NITIF-2019)

A. BACKGROUND

A.1 PROCURING ENTITY

The MWSS Information System Strategic Plan (ISSP) serves as the road map of the Agency in maximizing the use of Information and Communications Technology (ICT) in pursuit of its mission and vision. The Agency acknowledge the use of ICT to improve productivity and provide an effective delivery of its mandated services. Thus, the ISSP will serve as the framework for the organization’s effort to computerize its operations as well as shows the organization’s intention to use ICT to help realize its vision, mission and goals. As part of the Water Legacy Plan of MWSS, the proposal for the 2013-2015 Information System Strategic Plan (ISSP) was developed in 2012 which was approved by the National Computer Center (NCC) in August of 2013. The ISSP illustrates the strategic plan for development and use of information systems. The first stage of the implementation of the 2013-2015 ISSP was done in the year 2015 to 2016, by procuring up-to-date computers to replace the aging units. However, implementation of the 2013-2015 ISSP came to a halt to give way to the infrastructure projects. Development and updating of the ISSP started in 2017. Through the initiative of the Office of the Administrator, the 2018-2020 ISSP was finalized and submitted to the Department of Information and Communications Technology (DICT). A.2 PROJECT OBJECTIVE and SCOPE OF WORK

The Establishment of Network and IT Infrastructure Facilities (NITIF) is seen as the starting point of MWSS in the process of moving to a digital business. MWSS network architecture and IT infrastructure must be, as envisioned in the 2018-2020 ISSP, designed to optimize resources, streamline operations, improve office productivity and support continued personnel professional career growth. The NITIF shall be designed to link all computers and all network related equipment in one

physical and virtual network. Construction of NITIF will include as minimum the following

equipment and services:

• Structured cabling

• Network Configuration

• IT Infrastructure Facility Civil Works

• Enterprise Network Switch

• Enterprise Firewall

• Storage Solutions

• Wireless Access Points

• Enterprise Router

• Server and Server Rack Cabinet

Page 3: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

2

• Data cabinet

• UPS for Servers and Network Devices

• Stand-by electric power

• Temperature, security access, humidity and air quality control, and fire protection systems

The NITIF will support the following operational provisions but not limited to:

• repository of data from fixed and movable assets and facilities

• linkage to disaster recovery systems

• data repository of business operations of MWSS

• deployment to local systems of MWSS

• control of MWSS monitoring systems on dams and MWSS facilities

• repository of MWSS engineering data for projects and facilities

B. TERMINOLOGIES

• “MWSS” refers to the Metropolitan Waterworks and Sewerage System

• “The PROJECT” refers to the establishment of the Network and IT Infrastructure Facility (NITIF) at the 3rd, 4th and 5th Floor of the MWSS Administration Building in Balara, Q.C.

• “BIDDER” refers to pre-qualified reputable and experience IT company who responded to this proposal invitation.

• “CONTRACTOR” refers to the winning BIDDER.

• “DATACENTER” refers to a dedicated and centralized space used to house computer systems and associated components such as telecommunications and storage systems, servers, precision air conditioning system, uninterrupted and stand by power systems, for processing, storing, and distribution of large amount of data.

C. PROJECT ESTIMATES

MWSS intends to apply the sum of THIRTY-EIGHT MILLION PESOS AND ZERO CENTAVOS (PhP 38,000,000.00) being the Approved Budget for the Contract (ABC) of the project inclusive of 12% VAT and other duties and taxes.

D. OBJECTIVE OF PROCUREMENT

MWSS shall engage the services of a qualified Contractor specializing in IT infrastructure

design and installation including commissioning and testing with a depth of experience in

data center construction and network cabling projects.

E. CONTRACTOR’s QUALIFICATIONS

• Contractor must have at least five (5) years of experience in the supply, delivery, installation, testing and commissioning of a DATACENTER, from the date of submission and receipt of bids.

• Contractor must have completed at least three (3) similar projects in supply, delivery, installation, testing and commissioning of a DATACENTER within the last 10 years. This should be supported by a Certificate of Completion and Acceptance by the client.

• Contractor must have certified personnel who will undertake the installation of major components such as network cable, server, PACU & stand by genset.

Page 4: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

3

• Contractor must have a Project Manager who is a regular employee of the company with at least 5 years’ experience in project management, design and implementation.

• The Contractor should have been operating in the Philippines for at least five (5) years and is registered with SEC and/or DTI.

F. DELIVERABLES

No PARTICULARS QTY UNIT

1 IT CIVIL and ARCHITECTURAL WORKS 1 lot

2 ELECTRICAL WORKS 1 lot

3 UNINTERUPTIBLE POWER SUPPLY (UPS) 2 units

4 GENERATOR SET, 100 KVA 1 unit

5 PRECISION AIR-CONDITIONING UNITS, 5 Tons 2 units

6 FIRE SUPPRESSION SYSTEM 1 lot

7 DATA RACK 6 units

8 AIR QUALITY MONITORING SYSTEM 1 lot

9 TEMPERATURE and HUMIDITY CONTROL SYSTEM 1 lot

10 WATER LEAK DETECTION SYSTEM 1 lot

11 ACCESS CONTROL SYSTEM 1 lot

12 SURVEILLANCE SYSTEM 1 lot

13 STRUCTURED CABLING SYSTEM 200 nodes

14 FIBER OPTIC BACKBONE 1 lot

15 MANAGED NETWORK SWITCH 6 units

16 Power on Ethernet (PoE) NETWORK SWITCH 1 unit

17 WIRELESS ACCESS POINTS (WAP) 12 units

18 FIREWALL 1 unit

19 SERVER 4 units

20 STORAGE 2 units

21 ENTERPRISE ROUTER 1 unit

22 WINDOWS SERVER 2019 SE 4 licenses

23 WINDOWS SERVER CAL 2019 130 licenses

24 Microsoft SQL SERVER 2017 SE (DATA BASE) 2 licenses

25 Microsoft SQL CAL (Database) 20 licenses

26 NETWORK & USER ACTIVITY MANAGEMENT SOLUTION (NMS) 100 licenses

G. TECHNICAL SPECIFICATIONS

ITEM DESCRIPTION QTY U/M

A

DATA CENTER CIVIL, ARCHITECTURAL WORKS

A1 WALL WORKS

Installation of dry wall partition (gypsum board) 4’x 8’ x 9mm on metal frame double wall partition

34.4 sqm

Installation of Tempered Glass wall (with zocalo) 16.8 sqm Painting with elastomeric paint (New walls) 44.8 sqm Painting with elastomeric paint (All other walls) 48 sqm A2 CEILING WORKS Ceiling Preparation 80 sqm Application of elastomeric paint 80 sqm Application black flat latex 32 sqm

Page 5: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

4

Dismantling of existing ceiling 32 sqm A3 FLOOR WORKS Installation of raised Flooring system at data center facility 32 sqm Perforated raised flooring (60X60) 12 pcs Installation of Polyolefin insulation 32 sqm Painting with elastomeric paint prior to installation of Raised flooring 32 sqm Installation of Vinyl Tiles (Staff Area) 48 sqm A4 DOOR WORKS

Installation swing type Aluminum Glass Door (2.52sqm) – with heavy duty Auto door closer (1.2mx2.1m) mechanism

1 pc

B DATA CENTER ELECTRICAL WORKS

B1 ELECTRICAL SYSTEM FOR DATA RACKS ELECTRICAL WIRE 5.5mm thhn wire for data racks circuit 1 600 mts 5.5mm thhn wire for data racks circuit 2 600 mts twist lock outlet female 12 pcs Power grounding system 1 lot B2 DATA CENTER LIGHTINGS ELECTRICAL WIRE 3.5mm thhn wire for data center lightings 300.0

0

mts lighting switch 2.00 pcs 60 x 60 led panel (3 LED per panel) 6 pcs Automatic Emergency Light (ordinary) 2 pcs ROUGHING INS 3/4 pvc pipe 10.00 pcs 3/4 pvc pipe connector with locknut 24.00 pcs Junction box, hangers and support 12.00 pcs hangers and support 30.00 pcs B3 UNINTERUPTIBLE POWER SUPPLY

20KVa Double-conversion Online Technology UPS w/ Network Card–MS Web/SNMP Card Minimum10 minutes system back-up time Input Voltage / Output Voltage 400 VAC, 3 Phase, 3W +N + Gnd Operating Frequency : 50/ 60Hz (55 – 65Hz) Including the necessary Isolation Transformers needed. Installation, Testing and commissioning, Mobilization and Demobilization.

2 units

Minimum10 minutes system back-up time Input Voltage / Output Voltage 400 VAC, 3 Phase, 3W +N + Gnd Operating Frequency : 50/ 60Hz (55 – 65Hz) Including the required step down transformers. Installation, testing and commissioning, Mobilization and Demobilization.

ACCESSORIES 1 Lot Wires and cables, Terminal lugs, Twist lock outlet, and Commando plugs Roughing in materials; such as cable trays, EMT pipes, connectors, junction boxes,

and hangers and support

Pedestal, Breakers, Static Paralleling Module, Manual Bypass Switch C GENERATOR SET 100 KVA

Genset, 100 KVA generator set 480VAC 3PH 60HZ 1 unit

Automatic Transfer Switch, 300Amps, 3Pole, NEMA 1 enclosure 1 unit

Delivery, Hauling, Rigging, Positioning of Genset & ATS at site. 1 lot CIVIL WORKS Gen set foundation works and set up 1 lot

Page 6: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

5

MECHANICAL WORKS 1 lot Supply and Installation of Extended Exhaust Muffler Pipe with proper supports for

1 Unit Genset with insulation and cladding

Radiator Ducting Genset Rubber Pad Consumables ELECTRICAL WORKS 1 lot Power Cable Grounding wires IMC Pipes, Conduits and fittings D DATA CENTER ELECTROMECHANICAL WORKS

D1 PRECISION AIR-CONDITIONING UNITS

65,000 BTU capacity Precision air-conditioning unit (bottom d ischarge) , 480

VAC, 3PH, 60HZ 2 units

Complete with Standard Scheduler, Fan speed controller, Standard Efficiency filter,

Condensing and humidifier drain pump, Modbus RTU protocol, (RS485), Standard

outdoor condensing unit

1 lot

ACCESSORIES 1 Lot Wires and cables, Terminal lugs electrical panel and breakers.

Roughing in materials; such as cable trays, EMT pipes, connectors, junction boxes, and hangers and support.

Pedestal

Mechanical pipes

D2 FIRE SUPPRESSION SYSTEM FM-200 Assembly to be filled with FM-200 agent (HFC227ea) (134.4 lbs) 1 lot

ACCESSORIES 1 lot

Electric Control Head, 24VDC Valve Outlet Adapter 360 degree Discharge nozzle Single Hazzard Releasing controll panel Backup battery, 12VDC, 7AH Smoke Detector Photoelectric Standard Base Two wire Manual Release station Abort toggle switch station 6" Dia Fire alarm bell Horn Strobe Nameplate 'warning check valve Electrical 1 Lot Wires, conduits (EMT), Boxes, fittings, wires and anchors and

necessary materials

Mechanical 1 Lot BI Pipe schedule 40 seamless, Fittings, Cylinder rack Brackets and Hangers, Manifold

Piping System,

D3 Comfort Aircon 2 tonner for the staff area, 220 VAC, 1PH, 60HZ 1 lot E DATA CENTER ELECTRONIC LOW VOLTAGE WORKS

E1 DATA RACKS

Page 7: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

6

DATA Enclosure, 42U, Sidewalls, Single Front Door, 6 units 19" standard opening systems Split Rear Doors (assemble) H = 42RU W = 600mm D = 1,000mm Two piece lockable side panels provide easy access to interior PDU 12 units Electrical cable tray 30 mts Electronic low voltage cable tray 28 mts cold aisle containment system 15 sqm

E2 Air Quality Monitoring 1 Lot

Air Quality Monitoring system inside the data center

E3 Temperature and Humidity sensor 1 Lot Base Unit: SensorGateway for up to 2 external probes sensor hub 8 ports Temperature and Humidity Sensor

E4 WATER LEAK DETECTION SYSTEM 1 Lot Base Unit: SensorGateway for up to 2 external probes Water Leak Sensor Probe 17ft / 5m extension cable for water & flooding sensor (3 units) poe switch 8 ports

E5 ACCESS CONTROL SYSTEM 1 Lot Key and Finger print standalone access control system with emergency exit button.

ACCESSORIES 1 Lot Power Supply 3A/12VDC with Battery Charger No Touch Exit Emergency Break Glass Green Electromagnetic lock 600lbs Surface mount L&Z Bracket for 600 lbs (inSwing Door) Relay board 12VDC Aleph White Mini Magnetic Contact Key Switch w/ 1 LED and Tamper

E6 SURVEILLANCE SYSTEM 3MP Indoor Dome with D/N, Adaptive IR, Basic WDR, Vari -focal lens,

f2.8- 12mm/F1.4 (HOV:70.5deg.-28.2deg), H.264, 1080p/30fps, DNR, Audio, MicroSDHC/MicroSDXC, Poe, lK09, DI/DO

4 unit

poe switch 24 ports 1 unit NVR 4-channel at least 4TB storage 1 unit cctv monitor (55") 1 unit 4GB RAM server with mouse and keyboard 1 set

F STRUCTURED CABLING COMPONENTS (3rd, 4th, and 5th Floor)

Cat6 UTP cable 1 Lot Information Outlet 200 units Faceplate, Duplex 200 units Patch panel cat6 24 port loaded with i/o 10 units Cable Manager 1 Lot Data Cabinet (2ftx19in) (to be used at 3rd Floor with 10 nodes) 2 units 600VA UPS 2 units

F1 FIBER OPTIC BACKBONE (5th Floor to 4th Floor) 1 Lot 4 core armored type fiber optic cable multimode 8 port fiber optic patch panel 1000 BASE-T Transceiver module fiber optic pigtails sc type

Page 8: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

7

2 meters sc to sc fiber optic patch cord Fiber optic termination kit ROUGHING INS Pull box 8x8x8 EMT Pipe 2" EMT Pipe 1" Moulding 1" Moulding 1/2" C-Channel

G NETWORK/SERVER EQUIPMENT

G1 Managed Network Switch

• 48 port Managed Network Switch 1RU/ 48 x 10/100/1000BASE-T Ethernet RJ45 with auto

• negotiation and crossover detection (auto-MDIX crossover)/4 x 1GbE SFP uplink/2 x

• stacking ports/RJ45 Management port/

• Layer 2 with Static Routes

6 units

G2 PoE Network Switch

• 24 port PoE Network Switch 1RU/

• Layer 2 with Static Routes/

• 24 x 10/100/1000BASE-T Ethernet RJ45 with auto negotiation and crossover detection

(auto-MDIX crossover)/4x 1GbE SFP uplink/2x stacking ports/ RJ45 Management port

1 unit

G3 Wireless Access Points

• Wireless Access Points with complete accessories

• Managed via the Web with the cloud management platform.

• License subscription, should be with license

• Quad-radio, cloud-managed 2x2:2 802.11ac Wave 2 access point with MU-MIMO support.

• Provides a maximum 1.3 Gbps* aggregate frame rate with concurrent 2.4 GHz and 5 GHz radios. A dedicated third radio provides real-time WIDS/WIPS with automated RF optimization. An integrated Bluetooth Low Energy (BLE) radio delivers beacon and scanning capabilities

• Maximal ratio combining (MRC) & Beamforming

• 20 and 40 MHz channels (802.11n), 20, 40, and 80 MHz channels (802.11ac)

• Up to 256 QAM on both 2.4 GHz and 5 GHz bands

12 units

G4 Firewall

Page 9: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

8

Firewall 1RU/Ports/Slots (Max Ports) 10/2 (26)/

• 1RU

• Ports/Slots (Max Ports) 10/2 (26)

• Swappable Components opt. ext. Power

• Firewall throughput 41 Gbps: o IMIX 14.5 Gbps o VPN 4.8 Gbps o IPS 9 Gbps o NGFW (IPS + App Ctrl) max 6 Gbps o Antivirus throughput (proxy) 6.5 Gbps o Concurrent connections 20,000,000 o New connections/sec 200,000

• Storage (local quarantine/logs) integrated SSD

• Ethernet interfaces (fixed) 8 GbE copper (incl. 2 bypass pairs) 2 10 GbE SFP+

• Expansion Port slots 2

• Support Expansion Port modules (optional): o GbE copper standard / or for bypass o GbE SFP or o 10GbE SFP+ or o 40GbE QSFP+ or GbE PoE or

1 Lot

G5 SERVER

• Must be (8*2.5inch HDD Chassis, With 2*GE and 2*10GE SFP+ (Without Optical Transceiver

• Intel Xeon Gold 6134(3.2GHz/8-core/24.75MB/130W) Processor (with heatsink) or equivalent 64bit processor

• DDR4 RDIMM Memory,16GB,2666MT/s,2Rank(1G*8bit),1.2V, ECC (3pcs/unit)

• HDD,600GB, SAS 12Gb/s,15K rpm,128MB, 2.5inch (2.5inch Drive Bay) (4pcs/unit)

• SAS/SATA RAID Card-RAID0,1,10-12Gb/s-no Cache

• PCIe Riser Card, RISER2,1*x16

• Optical Transceiver, SFP+,10G, Multi-mode Module (850nm,0.3km, LC)

• High Speed Cable, Internal Mini SAS HD Cable,0.85m, Internal Mini SAS HD R/A,8*(1P*30AWG+ 2*Drain) + 8C*30AWG, Internal Mini SAS HD STR, R/A-STR

• 9.5MM DVD-RW-CD 24X/DVD 8X-SATA DVD-RW Module.

• Installed with standard MS OS server and any top 3 rated anti-virus

4 units

G6 Storage

• Must be 2U, Dual Ctrl, AC, 32GB, 2*6*GE,25*2.5".

• With 4 port 1Gb ETH I/O module (Base-T)

• 1.2TB 10K RPM SAS Disk Unit (2.5")

• 10TB 7.2K RPM NL SAS Disk Unit (3.5")

• Disk Enclosure (2U, AC,2.5", Expanding Module,25 Disk Slots, without Disk Unit)

• Disk Enclosure (4U, AC,3.5", Expanding Module, 24 Disk Slots, without Disk Unit)

• High Speed Cable,48G Mini SAS HD Cable,3m, Indoor, SAS 3.0

• Basic Software License

• Must provide Device Management, Snapshot, Copy, Thin-provisioning, Motion, System Reporter, Ultra-path feature.

2 units

G7 Enterprise Router

Page 10: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

9

• Must come with 3GE, 3NIM, 2SM, 4G FLASH, 4G DRAM, IPB

• Aggregate Throughput 200 Mbps to 400 Mbps

• Total onboard WAN or LAN 10/100/1000 ports 3

• RJ-45-based ports 3

• SFP-based ports 3

• 4G Flash Memory (Soldered on motherboard)

• Blank faceplate for NIM slot/ Removable faceplate for SM slot/ Network Plug-n-Play License optional zero-touch device/ SD-WAN IOS XE Universal

• AC input voltage 100 to 240 VAC auto ranging/AC input frequency 50 to 60 Hz /AC input current range, AC power supply (maximum) 7.1 to 3.0A /AC input surge current 60 A peak and less than 12 Arms per half cycle /Typical power (no modules) (watts) 48 /Maximum power with AC power supply (watts) 430 /Maximum power with PoE power supply (platform only) (watts) 990

• 3 onboard GE, 3 NIM slots, 1 ISC slot, 2 SM slots, 4 GB flash memory default, 4 GB DRAM default

1 unit

G8 Database/Operating System

Windows Server 2019 SE Four (4) sets licenses 4 sets Windows Server CAL 2019 130 Lic. Microsoft SQL Server 2017 SE (Database) 2 sets Microsoft SQL CAL (Database) 20 Lic.

H NETWORK AND USER ACTIVITY MONITORING

I1 Network and user activity management solution 130 licenses 1 lot Network Performance Monitoring Device and Equipment Inventory User Activity Monitoring Help Desk Data Guard

Server: Dual core CPU 3.2 Ghz 8 GB RAM, 10 GB of free disk space, Windows Server operating system, version: 2012 or newer.

1 set

Keyboard 1 unit

Mouse 1 unit

55" LED monitor 1 unit

H. DELIVERY AND IMPLEMENTATION

1. The Contractor shall submit Project Implementation and Management Plan (PIMP) within ten (10) calendar days upon receipt of Notice to Proceed for the implementation of the proposed solution that is subject for review and approval of the MWSS. The PIMP shall include but not be limited to the following:

• Scope of Work

• Project Organization

• Implementation Methodology

• Project Timeline

• Communication and Deployment Strategy

2. The Contractor shall complete the delivery, installation, and testing of completed work within One Hundred Twenty (120) calendar days from the date of receipt of Notice to Proceed. A pre-construction conference shall be done 5 days upon receipt of Notice to Proceed and shall be scheduled by the assigned Project Manager of the contractor, to present how it intends to implement the project.

Page 11: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

10

I. SERVICE LEVEL AGREEMENT

The Contractor shall render support services within the warranty period as follows: a. Technical support will be provided through phone calls or email within regular working

hours from Monday to Friday, 8:00AM to 5:00PM. b. Minimum of one full time and on-site technical support staff for one (1) year or within

the warranty period. c. Support services shall be rendered within four (4) working hours after the problem has

been reported. For problems reported after 4PM, services shall be rendered at 8:00AM of the following working day.

d. If the supplied equipment is found defective and need to be pulled-out, the contractor shall provide a service unit with the similar or equivalent specifications within 24 hours, and as agreed upon with contractor support team.

J. WARRANTY AND AFTER-SALES SUPPORT

The Contractor shall guarantee one (1) year exclusive warranty on all installed materials and equipment against factory defects and workmanship. Warranty provision on upgrades and patches to be installed is free of charge during the warranty period. Conduct of an annual preventive maintenance during the warranty period for all the components of the solution. The Contractor shall be responsible for all costs related to the warranty period.

K. TRAINING AND TECHNOLOGY TRANSFER

1. The Contractor must provide basic training for at least seven (7) IT Personnel for the Network Equipment/switches, Server, Firewall and troubleshooting for the Structured Cabling and Management of Data Center for at least three (3) days per module.

2. To ensure that proper maintenance and sustainment an appropriate training shall be conducted by the Contractor as Essential part of Technology Transfer to prepare and equip MWSS and its personnel in the overall operations and maintenance of its Network Infrastructure and IT Facility.

3. The Contractor shall submit Program of Instruction (POI) detailing all the training activities to be conducted for review, evaluation and approval of MWSS. Hands-on training shall form part of the training program.

4. Operation and Training manuals shall be provided to each participant.

5. The Training shall be conducted and completed prior to the issuance of Certificate of Turnover and Acceptance.

6. All expenses related to training (e.g. venue, meals, equipment, certificate.) shall be borne by the contractor.

7. Venue of Training shall be determined by MWSS.

8. Certificate of Training/s shall be given by the contractor to all participants.

L. PROVISION OF DOCUMENTATION

1. The Contractor shall provide a complete documentation, one (1) soft copy and three (3) printed copies, for every deliverable and at every end of each development stage and milestone which must be submitted to the MWSS for approval. MWSS shall own any and all documents and shall reserve the right to reproduce at no additional cost.

Page 12: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

11

2. The documentation must be written in English with concise and high-quality presentation to include but not limited to the following:

• Technical Manuals - As built Document - Infrastructure Diagrams and Topology - Troubleshooting and Installation Guides - Single Line Diagram - System/Operation Manual

• Operations and Maintenance Manuals

M. PAYMENT SCHEME

The Contractor shall be compensated subject to the satisfactory completion and submission of the required deliverables.

Deliverables / Outputs Percentage of Contract Price

Review and Approvals Required

i. Network and IT Infrastructure Facility (NITIF) Civil Works

a. All materials, equipment and labor necessary for the construction of the IT Infrastructure facility including all civil works, walls, doors, partitions, flooring, security access pass, air-conditioning unit and other accessories/appurtenances as specified and as shown in the drawings.

20% IT Systems Division

ii. Delivery of equipment and materials, structured cabling, fixing, installation of cables, conduit, outlets racks ladders, and other components (active components)

b. All materials to be used in the installation and cabling. Installed cables, conduit, components and tested and working cable lines.

25% IT Systems Division

iii. Supply, delivery, installation, testing and commissioning of NITIF Equipment and Materials including associated components as specified herein

c. All network equipment and devices specified in the Technical Specifications.

50% IT Systems Division

iv. Training of Personnel

d. Training of personnel for the completed Network and IT Infrastructure Facility.

5% IT Systems Division

Note: To assure performance of the obligations in the Warranty clause, 10% will be deducted

from each billing pursuant to RA9184 section 62.1.

N. ANNEXES

Page 13: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

12

1. General Annexes

i. ANNEX A of the TOR: Estimated Work Breakdown Duration ii. ANNEX B of the TOR: Backbone iii. ANNEX C of the TOR: Network Infrastructure iv. ANNEX D of the TOR: Floor Plan

v. ANNEX E of the TOR: Perspective of Server Room

Annex A : TOR Estimated Work Breakdown Duration

ID Project Works Deliverables/Outputs Month

1 Month

2 Month

3 Month

4

1 NITIF Plan Approved Project Work Plan

2 NITIF Civil Works NITIF Construction

3 NITIF Structured Cabling

Delivery and placement of equipment and peripherals including structured cabling

4 NITIF NITIF Equipment

NITIF equipment delivery, installation and configuration

5 NITIF Training Training of personnel

Page 14: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

13

ANNEX B of the TOR: BACKBONE

5th Floor (Datacenter)

4th Floor

3rd Floor (10 nodes)

Fiber Optic backbone

Page 15: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

14

ANNEX C of the TOR: Network Infrastructure

Page 16: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

15

ANNEX D of the TOR: Floor Plan

Page 17: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

16

4th Floor

ANNEX D of the TOR: Floor Plan

Page 18: TERM OF REFERENCEmwss.gov.ph/wp-content/uploads/NITIF-TOR-FINAL.pdf · DATA CENTER CIVIL, ARCHITECTURAL WORKS A1 WALL WORKS Installation of dry wall partition (gypsum board) 4’x

17

5th Floor ANNEX E of the TOR: Server Room Perspective