TENTATIVE FIVE YEAR WORK PROGRAMFISCAL YEARS 2021-2025
FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE
POLK COUNTY BARTOW OPERATIONSBARTOW MATERIALS
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
JULY 1, 2020 THROUGH JUNE 30, 2025DRAFT
The Department will provide a safe, interconnected statewide transportation system for Florida’s citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.
PHASE ADM - Administration • CAP - Capitol Improvement • CS - Construction • DSB - Design Build • ENV - Enviromental • INC - Contract Incentives • LAR - Local Government Reimbursement • MNT - Bridge/Rdway/Contract Maint CODES • MSC - Miscellaneous • OPS - Operations • PE - Prelim Engineering • PDE - Project Dev and Enviro • PLN - Planning • RES - Research • ROW - Right of Way • RRU - Railroad Utilities
Page: 1
MISSION STATEMENT
Brian RickCommunications SpecialistDistrict One Headquarters801 North Broadway AvenueBartow, FL 33830(863) 519-2828Email: [email protected]
Millie BrownCommunity LiaisonDistrict One Headquarters801 North Broadway AvenueBartow, FL 33830(863) 519-2394Email: [email protected]
For additional information, please visit our website at www.swflroads.com
POLK COUNTY
ACBR ADVANCE CONSTRUCTION (BRT)
ACBZ ADVANCE CONSTRUCTION (BRTZ)
ACCM ADVANCE CONSTRUCTION (CM)
ACER ADVANCE CONSTRUCTION (ER)
ACFP AC FREIGHT PROG (NFP)
ACID ADV CONSTRUCTION SAFETY (HSID)
ACNP ADVANCE CONSTRUCTION NHPP
ACSA ADVANCE CONSTRUCTION (SA)
ACSS ADVANCE CONSTRUCTION (SS,HSP)
ACSU ADVANCE CONSTRUCTION (SU)
BNDS BOND - STATE
BNIR INTRASTATE R/W & BRIDGE BONDS
BRRP STATE BRIDGE REPAIR & REHAB
CM CONGESTION MITIGATION - AQ
D UNRESTRICTED STATE PRIMARY
DDR DISTRICT DEDICATED REVENUE
DI ST. - S/W INTER/INTRASTATE HWY
DIH STATE IN-HOUSE PRODUCT SUPPORT
DIS STRATEGIC INTERMODAL SYSTEM
DITS STATEWIDE ITS - STATE 100%.
DPTO STATE - PTO
DS STATE PRIMARY HIGHWAYS & PTO
DU STATE PRIMARY/FEDERAL REIMB
EB EQUITY BONUS
FAA FEDERAL AVIATION ADMIN
FCO PRIMARY/FIXED CAPITAL OUTLAY
FTA FEDERAL TRANSIT ADMINISTRATION
FTAT FHWA TRANSFER TO FTA (NON-BUD)
GFSA GF STPBG ANY AREA
GFSU GF STPBG >200 (URBAN)
CURRENTLY REPORTED ACTIVE FUND CODES
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 2 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
GMR GROWTH MANAGEMENT FOR SIS
HPP HIGH PRIORITY PROJECTS
HSP SAFETY (HIWAY SAFETY PROGRAM)
LF LOCAL FUNDS
NHRE NAT HWY PERFORM - RESURFACING
PKOH TURNPIKE INDIRECT COSTS
PL METRO PLAN (85% FA; 15% OTHER)
SA STP, ANY AREA
SIWR 2015 SB2514A-STRATEGIC INT SYS
SL STP, AREAS <= 200K
SR2T SAFE ROUTES - TRANSFER
STED 2012 SB1998-STRATEGIC ECON COR
SU STP, URBAN AREAS > 200K
TALT TRANSPORTATION ALTS- ANY AREA
TALU TRANSPORTATION ALTS- >200K
TLWR 2015 SB2514A-TRAIL NETWORK
TRIP TRANS REGIONAL INCENTIVE PROGM
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 3 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FLP: TRANSIT
FPN : 4140631 Project/Location : LAKELAND AREA MASS TRANSIT (LAMTD)-OPERATING ASSISTANCE - CORRIDOR
Desc: URBAN CORRIDOR IMPROVEMENTS Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DPTO $818,945 $795,083 $795,083 $795,083 $756,000OPS LF $818,945 $795,083 $795,083 $795,083 $756,000Project Total: $1,637,890 $1,590,166 $1,590,166 $1,590,166 $1,512,000
FPN : 4402581 Project/Location : LAKELAND AREA MASS TRANSIT DISTRICT FTA SEC 5311 OPERATING ASSISTANCE
Desc: OPERATING/ADMIN. ASSISTANCE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DU $800,575 $800,575 $913,000 $838,938 $984,041OPS LF $800,575 $800,575 $913,000 $838,938 $984,041Project Total: $1,601,150 $1,601,150 $1,826,000 $1,677,876 $1,968,082
FPN : 4407571 Project/Location : LAKELAND AREA MASS TRANSIT FOR WH AND LKLD BLOCK GRANT OPER ASSISTANCE
Desc: OPERATING FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DDR $0 $1,608,304 $0 $0 $0OPS DPTO $1,531,718 $0 $1,688,719 $1,773,155 $1,786,454OPS LF $1,531,718 $1,608,304 $1,688,719 $1,773,155 $1,786,454Project Total: $3,063,436 $3,216,608 $3,377,438 $3,546,310 $3,572,908
FPN : 4101491 Project/Location : LAMTD FTA SECT 5307 CAPITAL ASSIST LKLD UZA
Desc: CAPITAL FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP FTA $640,085 $652,877 $620,313 $610,140 $600,916CAP LF $160,021 $163,219 $155,078 $152,535 $150,229Project Total: $800,106 $816,096 $775,391 $762,675 $751,145
FPN : 4101492 Project/Location : LAMTD FTA SECT 5307 OPERATING ASSIST LKLD UZA
Desc: OPERATING FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS FTA $1,920,254 $1,958,630 $1,860,938 $1,830,420 $1,802,606OPS LF $1,920,254 $1,958,630 $1,860,938 $1,830,420 $1,802,606Project Total: $3,840,508 $3,917,260 $3,721,876 $3,660,840 $3,605,212
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 4 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4101501 Project/Location : LAMTD FTA SECTION 5307 CAPITAL ASSISTANCE WINTER HAVEN UZA
Desc: CAPITAL FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP FTA $513,607 $536,840 $468,034 $444,752 $437,543CAP LF $128,402 $134,210 $117,009 $111,188 $109,386Project Total: $642,009 $671,050 $585,043 $555,940 $546,929
FPN : 4101502 Project/Location : LAMTD FTA SECTION 5307 OPERATING ASSISTANCE WINTER HAVEN UZA
Desc: OPERATING FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS FTA $1,540,821 $1,610,520 $1,404,104 $1,334,257 $1,312,628OPS LF $1,540,821 $1,610,520 $1,404,104 $1,334,257 $1,312,628Project Total: $3,081,642 $3,221,040 $2,808,208 $2,668,514 $2,625,256
FPN : 4357711 Project/Location : LAMTD/LKND-WH UZA FTA SECTION 5339 CAPITAL ASSISTANCE
Desc: CAPITAL FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP FTA $480,787 $449,094 $405,402 $512,162 $452,547CAP LF $120,197 $112,274 $101,351 $128,041 $113,137Project Total: $600,984 $561,368 $506,753 $640,203 $565,684
FPN : 4101161 Project/Location : POLK COUNTY TPO TRANSIT PLANNING - FTA SECTION 5305 (D)
Desc: MODAL SYSTEMS PLANNING Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PLN DPTO $14,656 $14,656 $14,656 $14,656 $15,660PLN DU $117,245 $117,245 $117,245 $117,245 $125,281PLN LF $14,656 $14,656 $14,656 $14,656 $15,660Project Total: $146,557 $146,557 $146,557 $146,557 $156,601
FLP: TRANSIT TOTAL 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
$15,414,282 $15,741,295 $15,337,432 $15,249,081 $15,303,817
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 5 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FLP:AVIATION
FPN : 4418511 Project/Location : BARTOW MUNICIPAL AIRPORT REHABILITATE TAXIWAY C
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $0 $0 $27,000 $0 $0CAP FAA $0 $0 $486,000 $0 $0CAP LF $0 $0 $27,000 $0 $0Project Total: $0 $0 $540,000 $0 $0
FPN : 4418521 Project/Location : BARTOW MUNICIPAL AIRPORT REHABILITATE RUNWAY 5-23
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DDR $0 $70,560 $0 $0 $0CAP FAA $0 $1,270,080 $0 $0 $0CAP LF $0 $70,560 $0 $0 $0Project Total: $0 $1,411,200 $0 $0 $0
FPN : 4399441 Project/Location : BARTOW MUNICIPAL AIRPORT T-HANGARS
Desc: AVIATION REVENUE/OPERATIONAL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $0 $0 $0 $1,494,176 $0CAP LF $0 $0 $0 $373,544 $0Project Total: $0 $0 $0 $1,867,720 $0
FPN : 4402261 Project/Location : BARTOW MUNICIPAL AIRPORT - IMPROVE AIRPORT DRAINAGE
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $27,600 $0 $0 $0 $0CAP FAA $496,800 $0 $0 $0 $0CAP LF $27,600 $0 $0 $0 $0Project Total: $552,000 $0 $0 $0 $0
FPN : 4409281 Project/Location : BARTOW MUNICIPAL AIRPORT REHAB RUNWAY 9R/27L
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DDR $0 $0 $0 $915,471 $0CAP DPTO $0 $0 $300,000 $1,484,529 $0CAP LF $0 $0 $75,000 $600,000 $0Project Total: $0 $0 $375,000 $3,000,000 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 6 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4418691 Project/Location : LAKE WALES ARPT T-HANGARS
Desc: AVIATION REVENUE/OPERATIONAL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DDR $0 $0 $0 $842,500 $0CAP LF $0 $0 $0 $134,000 $0Project Total: $0 $0 $0 $976,500 $0
FPN : 4431191 Project/Location : LAKE WALES MUNICIPAL AIRPORT TAXIWAY BRAVO SOUTH CONSTRUCTION
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $125,524 $0 $0 $0 $0CAP LF $31,381 $0 $0 $0 $0Project Total: $156,905 $0 $0 $0 $0
FPN : 4446161 Project/Location : LAKE WALES MUNICIPAL ARPT EAST APRON EXPANSION & TAXILANE
Desc: AVIATION SAFETY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $0 $0 $98,400 $700,000 $0CAP LF $0 $0 $24,600 $175,000 $0Project Total: $0 $0 $123,000 $875,000 $0
FPN : 4446171 Project/Location : LAKE WALES MUNICIPAL ARPT EAST APRON REHABILITATION
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $37,500 $0 $0 $0 $0CAP FAA $675,000 $0 $0 $0 $0CAP LF $37,500 $0 $0 $0 $0Project Total: $750,000 $0 $0 $0 $0
FPN : 4446751 Project/Location : LAKE WALES MUNICIPAL ARPT FUEL FARM
Desc: AVIATION REVENUE/OPERATIONAL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DDR $0 $0 $400,000 $200,000 $0CAP LF $0 $0 $100,000 $50,000 $0Project Total: $0 $0 $500,000 $250,000 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 7 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4457181 Project/Location : LAKELAND LINDER INTERNATIONAL AIRPORT UPGRADE ILS TO CATEGORY III
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DDR $0 $800,000 $1,600,000 $600,000 $0CAP DPTO $5,000,000 $0 $0 $0 $0CAP LF $5,000,000 $200,000 $400,000 $150,000 $0Project Total: $10,000,000 $1,000,000 $2,000,000 $750,000 $0
FPN : 4416831 Project/Location : LAKELAND LINDER REGIONAL AIRPORT REHABILITATE RUNWAY 9/27
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $445,481 $0 $0 $0 $0CAP FAA $8,018,663 $0 $0 $0 $0CAP LF $445,481 $0 $0 $0 $0Project Total: $8,909,625 $0 $0 $0 $0
FPN : 4416841 Project/Location : LAKELAND LINDER INTERNAL AIRPORT CONTRUCT PARALLEL RUNWAY 9R/27L
Desc: AVIATION CAPACITY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DDR $0 $0 $0 $0 $125,000CAP FAA $0 $0 $0 $0 $2,250,000CAP LF $0 $0 $0 $0 $125,000Project Total: $0 $0 $0 $0 $2,500,000
FPN : 4463111 Project/Location : LAKELAND LINDER INTERNATIONAL AIRPORT REHAB AND REALIGN TAXIWAY E
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $255,000 $0 $0 $0 $0CAP FAA $4,590,000 $0 $0 $0 $0CAP LF $255,000 $0 $0 $0 $0Project Total: $5,100,000 $0 $0 $0 $0
FPN : 4313701 Project/Location : LAL EXTEND RW 9-27 TW A & P, ENVIRONMENTAL ASSESSMENT
Desc: AVIATION CAPACITY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $0 $0 $0 $501,250 $0CAP FAA $0 $0 $0 $9,022,500 $0CAP LF $0 $0 $0 $501,250 $0Project Total: $0 $0 $0 $10,025,000 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 8 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4463821 Project/Location : WINTER HAVEN ARPT SECURITY GATES ACCESS CONTROL AND FENCING
Desc: AVIATION SECURITY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $1,000,000 $0 $0 $0 $0CAP LF $250,000 $0 $0 $0 $0Project Total: $1,250,000 $0 $0 $0 $0
FPN : 4461371 Project/Location : WITNER HAVEN MUNICIPAL ARPT TAXIWAY B REHAB
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CAP DPTO $17,940 $167,500 $0 $0 $0CAP FAA $322,920 $3,015,000 $0 $0 $0CAP LF $17,940 $167,500 $0 $0 $0Project Total: $358,800 $3,350,000 $0 $0 $0
FLP:AVIATION TOTAL 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
$27,077,330 $5,761,200 $3,538,000 $17,744,220 $2,500,000
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 9 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FLP:RAIL
FPN : 4366561 Project/Location : NEW YORK AVENUE PEDESTRIAN OVERPASS
Desc: RAIL CAPACITY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE DS $75,000 $0 $0 $0 $0ROW DS $24,401 $0 $0 $0 $0ROW TRIP $118,821 $0 $0 $0 $0ROW DIH $12,000 $0 $0 $0 $0Project Total: $230,222 $0 $0 $0 $0
FPN : 4365591 Project/Location : SR 60 GRADE SEPARATION OVER CSX RAILROAD
Desc: RAIL CAPACITY PROJECT Project Length : 1.196 Begin Mile Post : 24.849 End Mile Post: 26.045Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST GMR $0 $0 $0 $19,861,656 $0CST DIS $0 $0 $0 $19,423,076 $0ENV DIS $0 $75,000 $0 $0 $0RRU DIS $600,000 $0 $0 $0 $0Project Total: $600,000 $75,000 $0 $39,284,732 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 10 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4365601 Project/Location : SR655/RECKER HWY CONSTRUCT A BRIDGE SPANNING CSX RR TRACK IN POLK CO
Desc: RAIL CAPACITY PROJECT Project Length : 0.696 Begin Mile Post : 6.429 End Mile Post: 7.125Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DS $0 $0 $61,352 $0 $0CST GMR $0 $0 $20,591,972 $0 $0CST DIH $0 $0 $10,810 $0 $0ENV DIS $0 $0 $200,000 $0 $0ROW DIS $131,127 $0 $0 $0 $0ROW SIWR $2,209,187 $0 $0 $0 $0ROW TRIP $3,585,920 $0 $0 $0 $0RRU DDR $0 $600,000 $750,000 $0 $0RRU DIS $0 $600,000 $600,000 $0 $0Project Total: $5,926,234 $1,200,000 $22,214,134 $0 $0
FLP:RAIL TOTAL 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
$6,756,456 $1,275,000 $22,214,134 $39,284,732 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 11 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
HIGHWAYS
FPN : 4465601 Project/Location : 12TH ST SIDEWALK FROM MELBOURNE AVE TO SMITH RD
Desc: SIDEWALK Project Length : 1.260 Begin Mile Post : 0.000 End Mile Post: 1.260Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST LF $0 $0 $0 $0 $5,000CST SU $0 $0 $0 $0 $870,505PE SU $0 $0 $281,000 $0 $0PE LF $0 $0 $5,000 $0 $0
Project Total: $0 $0 $286,000 $0 $875,505
FPN : 4419061 Project/Location : AVE K NE COMPLETE ST FROM E. LAKE SILVER DR TO E LAKE MARTHA DR
Desc: BIKE LANE/SIDEWALK Project Length : 0.035 Begin Mile Post : 0.000 End Mile Post: 0.035Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $692,000 $0 $0 $0 $0Project Total: $692,000 $0 $0 $0 $0
FPN : 4464521 Project/Location : BOONE MIDDLE SW CONN 4 SIDEWALK SEGMENTS @ BOONE MIDDLE SCHOOL
Desc: SIDEWALK Project Length : 0.100 Begin Mile Post : 0.000 End Mile Post: 0.100Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $0 $0 $0 $238,646CST TALU $0 $0 $0 $0 $211,742CST LF $0 $0 $0 $0 $5,720PE LF $0 $0 $5,000 $0 $0PE SU $0 $0 $370,000 $0 $0
Project Total: $0 $0 $375,000 $0 $456,108
FPN : 4424011 Project/Location : BROADWAY BLVD TRAIL SR559 FROM LAKESHORE DR TO COMMONWEALTH AVE (SR33)
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $962,524 $0 $0 $0 $0CST TALU $217,221 $0 $0 $0 $0Project Total: $1,179,745 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 12 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4403191 Project/Location : CENTRAL LAKELAND SIGNAL PRIORITIZATION AT VARIOUS LOCATIONS
Desc: ITS COMMUNICATION SYSTEM Project Length : 7.690 Begin Mile Post : 0.747 End Mile Post: 28.693Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $401,906 $0 $0 $0Project Total: $0 $401,906 $0 $0 $0
FPN : 4463181 Project/Location : CHASE STREET TRAIL FROM STRAIN BLVD TO W. OF VETERANS AVE
Desc: BIKE PATH/TRAIL Project Length : 0.087 Begin Mile Post : 0.000 End Mile Post: 0.087Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST LF $0 $0 $0 $0 $50,000CST SU $0 $0 $0 $0 $536,000PE SU $0 $66,000 $0 $0 $0
Project Total: $0 $66,000 $0 $0 $586,000
FPN : 1976204 Project/Location : CITY OF LAKELAND LEASE OF FIBER OPTIC NETWORK
Desc: TRAFFIC CONTROL DEVICES/SYSTEMProject Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS SL $20,278 $20,278 $20,278 $20,278 $20,278Project Total: $20,278 $20,278 $20,278 $20,278 $20,278
FPN : 4465491 Project/Location : COMBEE ACADEMY - SRTS
Desc: SIDEWALK Project Length : 1.010 Begin Mile Post : 0.000 End Mile Post: 1.010Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE SR2T $0 $0 $0 $97,358 $0Project Total: $0 $0 $0 $97,358 $0
FPN : 4394411 Project/Location : COUNTYLINE RD OVER PEACE RIVER BRIDGE #160101
Desc: BRIDGE REPLACEMENT Project Length : 0.058 Begin Mile Post : 1.217 End Mile Post: 1.275Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST LF $0 $0 $2,367,667 $0 $0CST ACBR $0 $0 $2,545,652 $0 $0ENV ACBR $0 $11,250 $18,750 $0 $0ENV LF $0 $3,750 $6,250 $0 $0RRU LF $0 $0 $1,500,000 $0 $0Project Total: $0 $15,000 $6,438,319 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 13 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4451431 Project/Location : CR 557 FROM US 17 (SR 92) TO I-4
Desc: ADD LANES & RECONSTRUCT Project Length : 6.236 Begin Mile Post : 0.124 End Mile Post: 6.360Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
ROW CIGP $0 $0 $500,000 $0 $0ROW LF $0 $0 $4,500,000 $0 $0ROW TRIP $0 $0 $1,808,990 $0 $0ROW TRWR $0 $0 $2,191,010 $0 $0Project Total: $0 $0 $9,000,000 $0 $0
FPN : 4402781 Project/Location : CR 655 (RIFLE RANGE) FROM 12TH ST EAST TO DOLLY BEN CT
Desc: LIGHTING Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $849,247 $0 $0 $0 $0Project Total: $849,247 $0 $0 $0 $0
FPN : 4414811 Project/Location : CRYSTAL LAKE ELEMENTARY
Desc: SIDEWALK Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SR2T $0 $489,763 $0 $0 $0Project Total: $0 $489,763 $0 $0 $0
FPN : 4350941 Project/Location : DAVENPORT COMPLETE STREET PHASE I AND PHASE II
Desc: SIDEWALK Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $670,864 $0 $0 $0CST TALU $0 $246,505 $0 $0 $0ENV TALU $25,000 $0 $0 $0 $0ENV SU $0 $100,000 $0 $0 $0Project Total: $25,000 $1,017,369 $0 $0 $0
FPN : 4463691 Project/Location : DRAINAGE IMPROVEMENT PROJECT ON SR 17 AT HILLCREST AVE
Desc: DRAINAGE IMPROVEMENTS Project Length : 0.200 Begin Mile Post : 18.300 End Mile Post: 18.500Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $0 $0 $89,012 $0CST DDR $0 $0 $0 $679,479 $0
ROW DDR $0 $58,825 $0 $0 $0ROW DIH $0 $10,609 $0 $0 $0Project Total: $0 $69,434 $0 $768,491 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 14 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4136471 Project/Location : DUNDEE TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 1.065 Begin Mile Post : 28.850 End Mile Post: 29.915Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DDR $29,949 $36,000 $42,388 $43,659 $44,969Project Total: $29,949 $36,000 $42,388 $43,659 $44,969
FPN : 4403561 Project/Location : EDGEWOOD DRIVE N FROM US 98 TO 9TH STREET NE
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $1,212,166 $0 $0 $0CST TALU $0 $81,180 $0 $0 $0Project Total: $0 $1,293,346 $0 $0 $0
FPN : 4406031 Project/Location : FORT FRASER TRAIL EX FROM SR 540(WINTER LAKE RD) TO SR 659(COMBEE RD)
Desc: BIKE PATH/TRAIL Project Length : 0.940 Begin Mile Post : 3.410 End Mile Post: 4.350Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST TLWR $0 $0 $0 $2,000,000 $0Project Total: $0 $0 $0 $2,000,000 $0
FPN : 4424131 Project/Location : HAINES CITY TRAIL PH II GRACE AVE TO CR 544 & RIDGE SCENIC
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $0 $1,621,929 $0 $0CST TALU $0 $0 $246,411 $0 $0ENV SU $0 $50,000 $200,000 $0 $0PE SU $339,659 $0 $0 $0 $0
Project Total: $339,659 $50,000 $2,068,340 $0 $0
FPN : 4136511 Project/Location : HAINES CITY TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 1.270 Begin Mile Post : 21.500 End Mile Post: 22.770Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DDR $82,440 $90,066 $98,076 $101,018 $104,049Project Total: $82,440 $90,066 $98,076 $101,018 $104,049
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 15 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4301853 Project/Location : I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION
Desc: INTERCHANGE - ADD LANES Project Length : 1.939 Begin Mile Post : 11.450 End Mile Post: 13.389Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
ENV DDR $0 $0 $0 $0 $50,000ENV GFSU $400,000 $0 $0 $0 $0PE DDR $200,000 $0 $0 $0 $0
ROW DIH $70,737 $0 $0 $0 $0ROW DIS $373,472 $0 $0 $0 $0ROW ACNP $5,455,876 $0 $0 $0 $0ROW BNIR $0 $0 $2,904,205 $0 $0Project Total: $6,500,085 $0 $2,904,205 $0 $50,000
FPN : 2012178 Project/Location : I-4 (SR 400) AT CSX RAILROAD
Desc: BRIDGE REPLACEMENT Project Length : 0.004 Begin Mile Post : 4.887 End Mile Post: 4.891Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACNP $27,034,210 $0 $0 $0 $0CST STED $25,000 $0 $0 $0 $0ENV SIWR $50,000 $0 $0 $0 $0RRU ACNP $500,000 $0 $0 $0 $0RRU STED $3,000,000 $0 $0 $0 $0Project Total: $30,609,210 $0 $0 $0 $0
FPN : 4313761 Project/Location : I-4 (SR 400) FROM SR 33 TO CR 557 (OLD GRADE RD)
Desc: RESURFACING Project Length : 8.921 Begin Mile Post : 12.322 End Mile Post: 21.243Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACNP $36,547,853 $0 $0 $0 $0CST DDR $707,955 $0 $0 $0 $0CST SA $705,272 $0 $0 $0 $0ENV DDR $100,000 $0 $0 $0 $0Project Total: $38,061,080 $0 $0 $0 $0
FPN : 4301855 Project/Location : I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION - FGT
Desc: INTERCHANGE - ADD LANES Project Length : 0.650 Begin Mile Post : 12.032 End Mile Post: 12.682Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
RRU DDR $5,000,000 $0 $0 $0 $0RRU STED $5,000,000 $0 $0 $0 $0Project Total: $10,000,000 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 16 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4402411 Project/Location : I-4 (SR 400) AT SR 557 (OLD GRADE ROAD)
Desc: LANDSCAPING Project Length : 0.700 Begin Mile Post : 22.070 End Mile Post: 22.770Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $0 $0 $22,220 $0CST DDR $0 $0 $0 $830,340 $0PE DDR $160,000 $0 $0 $0 $0
Project Total: $160,000 $0 $0 $852,560 $0
FPN : 4418891 Project/Location : I-4 (SR 400) FROM SR 35 (US 98) TO SR 33
Desc: RESURFACING Project Length : 5.210 Begin Mile Post : 6.890 End Mile Post: 12.100Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACNP $19,131,353 $0 $0 $0 $0CST ACSA $1,134,108 $0 $0 $0 $0ENV DDR $50,000 $0 $0 $0 $0Project Total: $20,315,461 $0 $0 $0 $0
FPN : 4463451 Project/Location : I-4 (SR 400) FROM SR 557 TO OSCEOLA COUNTY LINE
Desc: RESURFACING Project Length : 9.796 Begin Mile Post : 22.226 End Mile Post: 32.022Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACNP $0 $0 $19,996,741 $0 $0PE ACNP $2,000,000 $0 $0 $0 $0
Project Total: $2,000,000 $0 $19,996,741 $0 $0
FPN : 4463461 Project/Location : I-4 (SR 400) FROM GALLOWAY RD TO SR 35
Desc: RESURFACING Project Length : 9.018 Begin Mile Post : 2.197 End Mile Post: 6.890Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACNP $0 $0 $11,959,939 $0 $0PE ACNP $1,000,000 $0 $0 $0 $0PE DIH $1,000 $0 $0 $0 $0
Project Total: $1,001,000 $0 $11,959,939 $0 $0
FPN : 4463471 Project/Location : I-4 (SR 400) FROM HILLSBOROUGH COUNTY LINE TO GALLOWAY RD
Desc: RESURFACING Project Length : 4.448 Begin Mile Post : 0.000 End Mile Post: 2.565Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACNP $0 $0 $6,355,789 $0 $0PE ACNP $600,000 $0 $0 $0 $0PE DIH $1,000 $0 $0 $0 $0
Project Total: $601,000 $0 $6,355,789 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 17 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4442751 Project/Location : INWOOD ELEMENTARY - SRTS
Desc: SIDEWALK Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SR2T $0 $0 $419,707 $0 $0CST SA $0 $0 $1,000 $0 $0PE SA $1,000 $0 $0 $0 $0PE SR2T $59,443 $0 $0 $0 $0
Project Total: $60,443 $0 $420,707 $0 $0
FPN : 4442091 Project/Location : JOSEPHINE ST S/W FROM CENTRAL AVE TO WESTGATE-CENTRAL TRL
Desc: SIDEWALK Project Length : 0.099 Begin Mile Post : 0.000 End Mile Post: 0.099Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $0 $381,001 $0 $0Project Total: $0 $0 $381,001 $0 $0
FPN : 4351091 Project/Location : LAKE HOWARD DR FROM AVE D SW TO 15TH ST SW
Desc: BIKE PATH/TRAIL Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $188,122 $0 $0 $0CST TALU $0 $240,403 $0 $0 $0Project Total: $0 $428,525 $0 $0 $0
FPN : 4136531 Project/Location : LAKE WALES TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 1.017 Begin Mile Post : 18.968 End Mile Post: 19.985Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DDR $71,988 $79,301 $86,988 $89,597 $92,285Project Total: $71,988 $79,301 $86,988 $89,597 $92,285
FPN : 4136541 Project/Location : LAKELAND TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 4.770 Begin Mile Post : 23.830 End Mile Post: 28.600Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DDR $0 $632,429 $656,709 $676,411 $696,703OPS DITS $609,006 $0 $0 $0 $0Project Total: $609,006 $632,429 $656,709 $676,411 $696,703
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 18 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4371071 Project/Location : LAKELAND TMC OPS FUND CITY WIDE
Desc: OTHER ITS Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DS $159,000 $159,000 $159,000 $159,000 $159,000Project Total: $159,000 $159,000 $159,000 $159,000 $159,000
FPN : 4466901 Project/Location : LINCOLN AVE FROM EAST ST TO A ST
Desc: RAIL SAFETY PROJECT Project Length : 0.500 Begin Mile Post : 0.000 End Mile Post: 0.500Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
RRU RHH $209,890 $0 $0 $0 $0Project Total: $209,890 $0 $0 $0 $0
FPN : 4462941 Project/Location : MAINE AVE SIDEWALK FROM COMBEE RD TO PARK ST & IOWA RD TO WANDA WAY
Desc: SIDEWALK Project Length : 0.120 Begin Mile Post : 0.000 End Mile Post: 0.120Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $0 $0 $0 $1,173,995PE SU $0 $183,848 $0 $0 $0
Project Total: $0 $183,848 $0 $0 $1,173,995
FPN : 4416791 Project/Location : N CRYSTAL LAKE DR FROM WILLOW POINT DR TO LONGFELLOW BLVD
Desc: SIDEWALK Project Length : 0.284 Begin Mile Post : 0.000 End Mile Post: 0.284Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $260,000 $0 $0 $0 $0Project Total: $260,000 $0 $0 $0 $0
FPN : 4421072 Project/Location : POLK COUNTY COMMUNICATIONS FROM POLK TMC TO US 17
Desc: ITS COMMUNICATION SYSTEM Project Length : 1.030 Begin Mile Post : 0.000 End Mile Post: 1.030Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SA $507,109 $0 $0 $0 $0Project Total: $507,109 $0 $0 $0 $0
FPN : 4126751 Project/Location : POLK COUNTY TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 12.175 Begin Mile Post : 2.300 End Mile Post: 14.475Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DDR $372,668 $936,121 $0 $998,597 $1,025,555OPS DITS $531,184 $0 $969,512 $0 $0Project Total: $903,852 $936,121 $969,512 $998,597 $1,025,555
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 19 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4125301 Project/Location : POLK TPO IDENTIFIED OPERATIONAL IMPROVEMENTS - FUNDING
Desc: TRAFFIC OPS IMPROVEMENT Project Length : Begin Mile Post : End Mile Post: Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $593,567 $1,058,001 $3,171 $5,463 $1,917,450CST TALU $19,768 $2,110 $2,121 $2,124 $323,222Project Total: $613,335 $1,060,111 $5,292 $7,587 $2,240,672
FPN : 4125302 Project/Location : POLK TPO IDENTIFIED OPERATIONAL IMPROVEMENTS - FUNDING
Desc: TRAFFIC OPS IMPROVEMENT Project Length : Begin Mile Post : End Mile Post: Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $545,078 $11,924 $518,507 $2,170,411 $1,939,699CST TALU $1,566 $1,618 $1,626 $131,363 $36,019Project Total: $546,644 $13,542 $520,133 $2,301,774 $1,975,718
FPN : 4463651 Project/Location : SIXTH ST SW FROM S OF AVE G SW TO US 17 (SR 555)
Desc: SIDEWALK Project Length : 0.200 Begin Mile Post : 0.000 End Mile Post: 0.200Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE SU $0 $0 $0 $116,000 $0Project Total: $0 $0 $0 $116,000 $0
FPN : 4403471 Project/Location : SR 17 (SCENIC HWY) FROM EAST CENTRAL PARK TO LAKE MARIE PARK
Desc: SIDEWALK Project Length : 1.080 Begin Mile Post : 27.458 End Mile Post: 28.538Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $300,725 $0 $0 $0 $0CST SU $230,982 $0 $0 $0 $0CST TALU $4,843 $0 $0 $0 $0Project Total: $536,550 $0 $0 $0 $0
FPN : 4252471 Project/Location : SR 17 FROM SOUTH OF MARTIN ROAD TO S OF MTN LAKE CUTOFF
Desc: RESURFACING Project Length : 3.507 Begin Mile Post : 17.497 End Mile Post: 21.004Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
ROW DDR $0 $58,825 $0 $0 $0ROW DIH $0 $10,609 $0 $0 $0Project Total: $0 $69,434 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 20 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4192432 Project/Location : SR 25 (US 27) FROM HIGHLANDS COUNTY LINE TO CR 630A
Desc: ADD LANES & RECONSTRUCT Project Length : 8.612 Begin Mile Post : 0.000 End Mile Post: 8.612Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACNP $0 $0 $0 $0 $0CST SIWR $0 $0 $0 $0 $0ENV ACFP $350,000 $0 $0 $50,000 $100,000PE ACFP $550,000 $0 $0 $0 $0PE LF $300,000 $0 $0 $0 $0
ROW ACNP $3,982,106 $3,169,369 $0 $0 $0RRU ACNP $0 $0 $0 $0 $400,000RRU LF $0 $0 $0 $0 $0RRU SIWR $0 $0 $0 $0 $0Project Total: $5,182,106 $3,169,369 $0 $50,000 $500,000
FPN : 4192433 Project/Location : SR 25 (US 27) FROM CR 630A TO PRESIDENTS DRIVE
Desc: ADD LANES & RECONSTRUCT Project Length : 4.920 Begin Mile Post : 8.758 End Mile Post: 13.678Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACNP $0 $0 $0 $0 $0CST GMR $0 $0 $0 $0 $0CST STED $0 $0 $0 $0 $0ENV ACFP $600,000 $0 $0 $20,000 $50,000ROW ACNP $3,178,808 $3,272,532 $0 $0 $0RRU DI $0 $0 $0 $0 $0Project Total: $3,778,808 $3,272,532 $0 $20,000 $50,000
FPN : 4192434 Project/Location : SR 25 (US 27) AT SR 60
Desc: INTERCHANGE - ADD LANES Project Length : 0.910 Begin Mile Post : 0.000 End Mile Post: 18.816Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
ROW BNIR $1,551,029 $0 $0 $0 $0Project Total: $1,551,029 $0 $0 $0 $0
FPN : 4421151 Project/Location : SR 25 (US 27) AT FLORENCE VILLA GROVE RD
Desc: LIGHTING Project Length : 0.500 Begin Mile Post : 29.946 End Mile Post: 30.446Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACSS $257,808 $0 $0 $0 $0CST SA $5,130 $0 $0 $0 $0Project Total: $262,938 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 21 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4421161 Project/Location : SR 25 (US 27) AT POLO PARK
Desc: LIGHTING Project Length : 0.500 Begin Mile Post : 31.085 End Mile Post: 31.585Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACSS $280,270 $0 $0 $0 $0CST SA $5,130 $0 $0 $0 $0Project Total: $285,400 $0 $0 $0 $0
FPN : 4421171 Project/Location : SR 25 (US 27) AT SANDMINE ROAD
Desc: LIGHTING Project Length : 0.500 Begin Mile Post : 29.194 End Mile Post: 29.694Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACSS $255,076 $0 $0 $0 $0CST SA $5,130 $0 $0 $0 $0Project Total: $260,206 $0 $0 $0 $0
FPN : 4415531 Project/Location : SR 25 (US 27) FROM BLUE HERON BAY TO HOLLY HILL CUTOFF
Desc: RESURFACING Project Length : 3.020 Begin Mile Post : 16.140 End Mile Post: 19.160Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $1,779,929 $0 $0 $0CST DIH $0 $52,650 $0 $0 $0CST DS $0 $8,051,382 $0 $0 $0ENV DDR $25,000 $75,000 $0 $0 $0Project Total: $25,000 $9,958,961 $0 $0 $0
FPN : 4462751 Project/Location : SR 25 (US 27) AT KOKOMO RD
Desc: SAFETY PROJECT Project Length : 0.004 Begin Mile Post : 11.286 End Mile Post: 11.290Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE ACSS $0 $0 $186,000 $0 $0Project Total: $0 $0 $186,000 $0 $0
FPN : 4404441 Project/Location : SR 33 (LAKELAND HILLS) FROM PARKVIEW PLACE TO GRANADA STREET
Desc: FLEXIBLE PAVEMENT RECONSTRUCT.Project Length : 0.504 Begin Mile Post : 1.275 End Mile Post: 1.779Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $0 $0 $2,307,627 $0CST SU $0 $0 $0 $3,433,176 $0ENV TALT $0 $0 $0 $80,000 $0INC SU $0 $0 $0 $0 $350,000Project Total: $0 $0 $0 $5,820,803 $350,000
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 22 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4419761 Project/Location : SR 33 AT SR 559
Desc: FLEXIBLE PAVEMENT RECONSTRUCT.Project Length : 0.119 Begin Mile Post : 14.392 End Mile Post: 14.511Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE DIH $0 $0 $10,000 $0 $0Project Total: $0 $0 $10,000 $0 $0
FPN : 4406841 Project/Location : SR 33 FROM VICTORIA BOULEVARD TO N FLORIDA AVENUE
Desc: INTERSECTION IMPROVEMENT Project Length : 0.504 Begin Mile Post : 3.094 End Mile Post: 3.598Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACSS $0 $369,162 $0 $0 $0CST DIH $0 $1,053 $0 $0 $0CST DS $0 $4,365 $0 $0 $0Project Total: $0 $374,580 $0 $0 $0
FPN : 4301854 Project/Location : SR 33 FROM OLD COMBEE RD TO S OF FIRSTPARK BLVD S
Desc: ADD LANES & REHABILITATE PVMNTProject Length : 2.525 Begin Mile Post : 4.990 End Mile Post: 7.518Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
ENV DDR $0 $370,000 $0 $0 $0ROW DDR $254,616 $0 $0 $0 $0ROW DIH $24,000 $0 $0 $0 $0Project Total: $278,616 $370,000 $0 $0 $0
FPN : 1975624 Project/Location : SR 35 (US 98) FROM EDGEWOOD DR TO E MAIN STREET
Desc: ADD LANES & RECONSTRUCT Project Length : 2.974 Begin Mile Post : 9.248 End Mile Post: 12.222Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE LF $200,000 $0 $0 $0 $0ROW DDR $0 $1,193,695 $4,340,312 $3,272,249 $0ROW DIH $0 $90,000 $0 $0 $0ROW DS $0 $0 $0 $200,000 $0Project Total: $200,000 $1,283,695 $4,340,312 $3,472,249 $0
FPN : 4366731 Project/Location : SR 35 (US 98) FROM N OF WEST SOCRUM LOOP RD TO SR 471
Desc: PD&E/EMO STUDY Project Length : 7.531 Begin Mile Post : 9.005 End Mile Post: 16.536Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PDE DDR $1,400,000 $0 $0 $0 $0PDE DIH $20,000 $0 $0 $0 $0Project Total: $1,420,000 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 23 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4420961 Project/Location : SR 35 (US 17) COMMUNICATIONS FROM MLK JR BLVD TO VAN FLEET DR
Desc: ITS COMMUNICATION SYSTEM Project Length : 0.869 Begin Mile Post : 0.000 End Mile Post: 17.918Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $153,139 $0 $0 $0 $0CST DIH $5,130 $0 $0 $0 $0CST DITS $384,750 $0 $0 $0 $0RRU DDR $20,000 $0 $0 $0 $0Project Total: $563,019 $0 $0 $0 $0
FPN : 4451421 Project/Location : SR 35 (US 17) FROM N OF CSX BRIDGE TO 9TH ST SW
Desc: RESURFACING Project Length : 3.650 Begin Mile Post : 3.160 End Mile Post: 6.810Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $0 $1,259,151 $0 $0CST DIH $0 $0 $1,081 $0 $0CST SA $0 $0 $5,085,989 $0 $0PE DIH $10,000 $0 $0 $0 $0
Project Total: $10,000 $0 $6,346,221 $0 $0
FPN : 4454061 Project/Location : SR 35 (US 17) FROM S OF LUNN ROAD TO N OF 9TH STREET NW
Desc: RESURFACING Project Length : 2.017 Begin Mile Post : 6.341 End Mile Post: 8.358Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $0 $1,679,202 $0 $0CST DIH $0 $0 $1,081 $0 $0CST DS $0 $0 $212,315 $0 $0Project Total: $0 $0 $1,892,598 $0 $0
FPN : 4459341 Project/Location : SR 35 FROM EDGEWOOD DRIVE TO BONNY PARK
Desc: RESURFACING Project Length : 1.929 Begin Mile Post : 9.351 End Mile Post: 11.280Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $0 $462,925 $0 $0CST DIH $0 $0 $1,081 $0 $0CST SA $0 $0 $4,379,292 $0 $0Project Total: $0 $0 $4,843,298 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 24 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4454381 Project/Location : SR 37 AT CR 640
Desc: RIGID PAVEMENT RECONSTRUCTION Project Length : 0.342 Begin Mile Post : 14.987 End Mile Post: 15.329Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $0 $0 $0 $629,902CST DIH $0 $0 $0 $0 $1,144CST SA $0 $0 $0 $0 $2,480,287CST ACNP $0 $0 $0 $0 $2,023,000PE ACSA $1,321,625 $0 $0 $0 $0PE SA $178,375 $0 $0 $0 $0
Project Total: $1,500,000 $0 $0 $0 $5,134,333
FPN : 4462681 Project/Location : SR 37 FROM LIME ST TO LEMON ST
Desc: TRAFFIC SIGNAL UPDATE Project Length : 0.264 Begin Mile Post : 28.385 End Mile Post: 28.649Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE ACSS $0 $0 $201,000 $0 $0Project Total: $0 $0 $201,000 $0 $0
FPN : 4394361 Project/Location : SR 37 FROM IMPERIAL BLVD TO GLENDALE ST
Desc: RESURFACING Project Length : 0.431 Begin Mile Post : 25.745 End Mile Post: 26.176Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACSS $171,698 $0 $0 $0 $0CST DDR $1,833,305 $0 $0 $0 $0CST DIH $30,780 $0 $0 $0 $0ENV DDR $100,000 $0 $0 $0 $0Project Total: $2,135,783 $0 $0 $0 $0
FPN : 4447791 Project/Location : SR 37 SIDEWALKS FROM CARTER ROAD TO FITZGERALD ROAD
Desc: SIDEWALK Project Length : 2.000 Begin Mile Post : 20.497 End Mile Post: 22.497Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $1,463,176 $0 $0 $0 $0CST TALU $233,450 $0 $0 $0 $0ENV TALU $71,137 $0 $0 $0 $0ENV ACTU $1,137 $0 $0 $0 $0Project Total: $1,768,900 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 25 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4415561 Project/Location : SR 517 (US 92) FROM US 92 (SR 600) TO SR 546
Desc: RESURFACING Project Length : 0.912 Begin Mile Post : 0.000 End Mile Post: 0.912Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $72,629 $0 $0 $0CST DDR $0 $4,430,740 $0 $0 $0ENV DDR $25,000 $50,000 $0 $0 $0Project Total: $25,000 $4,553,369 $0 $0 $0
FPN : 4440501 Project/Location : SR 540 FROM US 17 TO E OF 1ST STREET
Desc: INTERSECTION IMPROVEMENT Project Length : 0.769 Begin Mile Post : 0.000 End Mile Post: 27.814Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $130,523 $0 $0 $0CST LF $0 $368,550 $0 $0 $0CST DDR $0 $1,282,142 $0 $0 $0
ROW DDR $1,303,592 $0 $0 $0 $0Project Total: $1,303,592 $1,781,215 $0 $0 $0
FPN : 4394391 Project/Location : SR 540 FROM DECASTRO RD TO JIM KEENE BLVD
Desc: RESURFACING Project Length : 2.373 Begin Mile Post : 3.537 End Mile Post: 5.910Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACSA $102,600 $0 $0 $0 $0CST DDR $3,930,905 $0 $0 $0 $0CST DS $2,574,357 $0 $0 $0 $0CST SA $287,289 $0 $0 $0 $0Project Total: $6,895,151 $0 $0 $0 $0
FPN : 4106664 Project/Location : SR 542 FROM 1ST STREET TO BUCKEYE LOOP ROAD
Desc: LANDSCAPING Project Length : 2.476 Begin Mile Post : 0.000 End Mile Post: 2.476Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $232,592 $0 $0 $0 $0CST DIH $32,829 $0 $0 $0 $0Project Total: $265,421 $0 $0 $0 $0
FPN : 4106665 Project/Location : SR 542 FROM 1ST ST TO BUCKEYE LOOP RD
Desc: PUBLIC TRANSPORTATION SHELTER Project Length : 2.305 Begin Mile Post : 0.380 End Mile Post: 2.685Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $50,000 $0 $0 $0 $0Project Total: $50,000 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 26 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4402732 Project/Location : SR 544 (LUCERNE PARK) FROM MARTIN LUTHER KING BLVD TO LUCERNE LOOP RD
Desc: ADD LANES & RECONSTRUCT Project Length : 0.076 Begin Mile Post : 3.681 End Mile Post: 3.757Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE DDR $0 $0 $5,864,999 $0 $0Project Total: $0 $0 $5,864,999 $0 $0
FPN : 4402733 Project/Location : SR 544 (LUCERNE PARK) FROM LUCERNE LOOP RD TO SR 17
Desc: ADD LANES & RECONSTRUCT Project Length : 0.076 Begin Mile Post : 3.681 End Mile Post: 3.757Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE DDR $0 $0 $0 $0 $7,015,000Project Total: $0 $0 $0 $0 $7,015,000
FPN : 4465351 Project/Location : SR 544 FROM 42ND STREET NW TO 26TH ST NW
Desc: SIDEWALK Project Length : 1.119 Begin Mile Post : 0.517 End Mile Post: 1.636Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE SU $0 $0 $0 $256,000 $0Project Total: $0 $0 $0 $256,000 $0
FPN : 4403491 Project/Location : SR 549 (FIRST STREET) FROM CENTRAL AVENUE TO AVENUE O
Desc: SIDEWALK Project Length : 1.037 Begin Mile Post : 1.251 End Mile Post: 2.288Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DS $0 $0 $153,160 $0 $0CST SU $0 $0 $3,597,703 $0 $0CST DDR $0 $0 $43,101 $0 $0CST TALT $0 $0 $319,599 $0 $0CST TALU $0 $0 $321,461 $0 $0ENV SU $0 $25,000 $50,000 $0 $0ROW SU $358,280 $0 $0 $0 $0ROW DIH $125,000 $0 $0 $0 $0Project Total: $483,280 $25,000 $4,485,024 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 27 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4403391 Project/Location : SR 555 (US 17) FROM SR 544 (HAVENDALE) TO BRIGHAM RD
Desc: SIDEWALK Project Length : 1.425 Begin Mile Post : 30.637 End Mile Post: 32.062Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $363,638 $0 $0 $0CST SU $0 $994,453 $0 $0 $0ENV SU $25,000 $100,000 $0 $0 $0Project Total: $25,000 $1,458,091 $0 $0 $0
FPN : 4398261 Project/Location : SR 555 (US 17) / SOUTH OF SPIRIT LAKE / NORTH OF SPIRIT LAKE
Desc: INTERSECTION IMPROVEMENT Project Length : 1.100 Begin Mile Post : 22.600 End Mile Post: 23.700Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACNP $0 $4,824,845 $0 $0 $0CST DDR $0 $3,920,260 $0 $0 $0ENV DDR $0 $150,000 $0 $0 $0INC DDR $0 $0 $400,000 $0 $0RRU DDR $100,000 $0 $0 $0 $0Project Total: $100,000 $8,895,105 $400,000 $0 $0
FPN : 4421071 Project/Location : SR 555 (US 17) COMMUNICATIONS ERNEST SMITH BLVD TO SPIRIT LAKE RD
Desc: ITS COMMUNICATION SYSTEM Project Length : 3.250 Begin Mile Post : 19.893 End Mile Post: 23.143Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $61,560 $0 $0 $0 $0CST DITS $1,026,000 $0 $0 $0 $0CST DDR $148,009 $0 $0 $0 $0RRU DDR $20,000 $0 $0 $0 $0Project Total: $1,255,569 $0 $0 $0 $0
FPN : 4406731 Project/Location : SR 559 AT CR 557A/CAMP GILEAD DRIVE
Desc: INTERSECTION IMPROVEMENT Project Length : 0.001 Begin Mile Post : 8.236 End Mile Post: 8.237Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACSS $0 $2,498,490 $0 $0 $0CST DIH $0 $1,053 $0 $0 $0CST DS $0 $22,033 $0 $0 $0ENV DDR $10,000 $40,000 $0 $0 $0INC ACSS $0 $0 $75,000 $0 $0Project Total: $10,000 $2,561,576 $75,000 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 28 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4462741 Project/Location : SR 563 AT PEAR ST / PARKER ST
Desc: INTERSECTION IMPROVEMENT Project Length : 0.100 Begin Mile Post : 0.755 End Mile Post: 0.855Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE ACSS $0 $1,000 $130,000 $0 $0Project Total: $0 $1,000 $130,000 $0 $0
FPN : 4380271 Project/Location : SR 563 FROM S OF BEAKER ROAD TO FOREST PARK STREET
Desc: RESURFACING Project Length : 2.321 Begin Mile Post : 6.136 End Mile Post: 8.458Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $0 $54,050 $0 $0CST DDR $0 $0 $4,780,721 $0 $0ENV DDR $40,000 $0 $100,000 $0 $0Project Total: $40,000 $0 $4,934,771 $0 $0
FPN : 4449061 Project/Location : SR 572 (DRANE FIELD ROAD) AT WARING ROAD
Desc: ROUNDABOUT Project Length : 0.300 Begin Mile Post : 3.787 End Mile Post: 4.087Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $0 $0 $2,156,164 $0CST DIH $0 $0 $0 $54,535 $0INC DDR $0 $0 $0 $80,000 $0
ROW DDR $404,072 $0 $0 $0 $0ROW DIH $41,200 $0 $0 $0 $0Project Total: $445,272 $0 $0 $2,290,699 $0
FPN : 4442901 Project/Location : SR 572 (DRANE FIELD RD) AT DON EMERSON DR
Desc: ROUNDABOUT Project Length : 0.363 Begin Mile Post : 2.829 End Mile Post: 3.192Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $1,669,000 $0 $0 $0 $0ENV DDR $100,000 $0 $0 $0 $0Project Total: $1,769,000 $0 $0 $0 $0
FPN : 4380131 Project/Location : SR 572 FROM DRANE FIELD RD TO PIPKIN CREEK RD
Desc: RESURFACING Project Length : 1.934 Begin Mile Post : 2.739 End Mile Post: 4.674Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $749,560 $0 $0 $0CST DIH $0 $31,590 $0 $0 $0CST SA $0 $6,246,336 $0 $0 $0ENV DDR $0 $0 $50,000 $0 $0Project Total: $0 $7,027,486 $50,000 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 29 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4444841 Project/Location : SR 60 FROM W OF CAPPS RD TO E OF RATTLESNAKE RD
Desc: RESURFACING Project Length : 3.331 Begin Mile Post : 2.914 End Mile Post: 6.245Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $4,131,942 $0 $0 $0CST DIH $0 $10,530 $0 $0 $0CST DS $0 $727,321 $0 $0 $0Project Total: $0 $4,869,793 $0 $0 $0
FPN : 4454671 Project/Location : SR 60 FROM CR 555 TO BROADWAY AVE
Desc: RESURFACING Project Length : 1.304 Begin Mile Post : 0.000 End Mile Post: 1.160Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $0 $1,081 $0 $0CST DS $0 $0 $189,766 $0 $0CST SA $0 $0 $1,543,404 $0 $0Project Total: $0 $0 $1,734,251 $0 $0
FPN : 4446431 Project/Location : SR 60 OVER PEACE RIVER PAINTING BRIDGE # 160129 AND # 160130
Desc: BRIDGE-REPAIR/REHABILITATION Project Length : 0.110 Begin Mile Post : 15.526 End Mile Post: 15.636Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST BRRP $0 $0 $0 $1,760,761 $0CST DIH $0 $0 $0 $11,110 $0PE DIH $0 $0 $10,000 $0 $0PE BRRP $0 $0 $60,000 $0 $0
Project Total: $0 $0 $70,000 $1,771,871 $0
FPN : 4443931 Project/Location : SR 600 (US 92) FROM EAST OF SR 570 TO FLEA MARKET ENTRANCE
Desc: DRAINAGE IMPROVEMENTS Project Length : 0.362 Begin Mile Post : 7.934 End Mile Post: 8.296Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $181,717 $0 $0 $0CST DIH $0 $63,180 $0 $0 $0CST DS $0 $573,663 $0 $0 $0Project Total: $0 $818,560 $0 $0 $0
FPN : 4446252 Project/Location : SR 600 (US 17/92) FROM US 27 TO CR 54 WIDENING
Desc: PRELIMINARY ENGINEERING Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PDE DDR $0 $0 $0 $0 $4,000,000PDE DIH $0 $0 $0 $0 $1,000Project Total: $0 $0 $0 $0 $4,001,000
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 30 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4419831 Project/Location : SR 600 (US 92) FROM FISH HATCHERY ROAD TO REYNOLDS RD
Desc: RESURFACING Project Length : 0.505 Begin Mile Post : 3.845 End Mile Post: 4.350Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $0 $32,430 $0 $0CST DDR $0 $0 $1,444,777 $0 $0RRU DDR $0 $50,000 $0 $0 $0RRU LF $0 $0 $250,000 $0 $0Project Total: $0 $50,000 $1,727,207 $0 $0
FPN : 4424041 Project/Location : SR 600 (US 17/92) LAKE ALFRED AT SR 557 (E POMELO STREET)
Desc: PD&E/EMO STUDY Project Length : 0.200 Begin Mile Post : 15.604 End Mile Post: 15.804Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PDE DDR $0 $0 $749,999 $0 $0PDE DIH $0 $0 $50,000 $0 $0Project Total: $0 $0 $799,999 $0 $0
FPN : 4423331 Project/Location : SR 600 (US 17/92) SIDEWALK FROM S OF HINSON AVE TO JOHNSON AVE
Desc: SIDEWALK Project Length : 0.500 Begin Mile Post : 0.000 End Mile Post: 0.500Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $1,101,053 $0 $0 $0Project Total: $0 $1,101,053 $0 $0 $0
FPN : 4406721 Project/Location : SR 600 (US 92) AT SR 559 (MAIN STREET)
Desc: INTERSECTION IMPROVEMENT Project Length : 0.272 Begin Mile Post : 10.567 End Mile Post: 10.839Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
ENV DDR $95,000 $0 $0 $0 $0Project Total: $95,000 $0 $0 $0 $0
FPN : 4313512 Project/Location : SR 600 (US 17/92) HINSON AVE FROM SR 17 (10TH STREET) TO 17TH STREET
Desc: ADD LANES & RECONSTRUCT Project Length : 0.310 Begin Mile Post : 22.460 End Mile Post: 22.770Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PE DIH $0 $25,000 $0 $0 $0PE DS $0 $1,350,000 $0 $0 $0
Project Total: $0 $1,375,000 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 31 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4335582 Project/Location : SR 600 (US 92) FROM COUNTY LINE RD TO WABASH AVE
Desc: ADD LANES & RECONSTRUCT Project Length : 4.131 Begin Mile Post : 0.000 End Mile Post: 4.131Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
ENV DDR $0 $0 $0 $40,000 $0ROW DDR $0 $0 $2,253,607 $7,334,093 $9,703,912ROW DIH $0 $0 $131,400 $350,400 $394,200ROW DS $0 $0 $0 $319,254 $0Project Total: $0 $0 $2,385,007 $8,043,747 $10,098,112
FPN : 4446821 Project/Location : SR 600 FROM W OF 9TH ST TO 17TH ST
Desc: FLEXIBLE PAVEMENT RECONSTRUCT.Project Length : 0.596 Begin Mile Post : 22.460 End Mile Post: 22.770Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $0 $1,081 $0 $0CST DS $0 $0 $442,083 $0 $0Project Total: $0 $0 $443,164 $0 $0
FPN : 4454691 Project/Location : SR 655 FROM COLEMAN RD TO CR 542
Desc: RESURFACING Project Length : 1.455 Begin Mile Post : 2.285 End Mile Post: 3.740Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $0 $1,081 $0 $0CST DS $0 $0 $231,617 $0 $0CST SA $0 $0 $1,840,054 $0 $0Project Total: $0 $0 $2,072,752 $0 $0
FPN : 4446351 Project/Location : SR 655 FROM S OF WALLACE MANOR TO N OF 24TH STREET
Desc: RESURFACING Project Length : 0.236 Begin Mile Post : 1.760 End Mile Post: 1.996Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $0 $290,980 $0 $0CST DIH $0 $0 $1,081 $0 $0Project Total: $0 $0 $292,061 $0 $0
FPN : 4465611 Project/Location : SR 659 (COMBEE RD) FROM US 92 (MEMORIAL BLVD) TO MORGAN COMBEE RD
Desc: SIDEWALK Project Length : 1.008 Begin Mile Post : 2.732 End Mile Post: 3.740Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $0 $0 $674,925 $0CST TALU $0 $0 $0 $321,433 $0PE SU $0 $416,000 $0 $0 $0
Project Total: $0 $416,000 $0 $996,358 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 32 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4454681 Project/Location : SR 700 (US 98) FROM EAST OF NE 4TH AVE TO WEST OF NE 17TH AVE
Desc: RESURFACING Project Length : 1.299 Begin Mile Post : 2.678 End Mile Post: 3.390Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $0 $3,338,104 $0 $0CST DIH $0 $0 $1,081 $0 $0Project Total: $0 $0 $3,339,185 $0 $0
FPN : 4454701 Project/Location : SR 700 (US 98) FROM E OF MT ZION RD TO E OF OLD STOKES RD
Desc: RESURFACING Project Length : 2.430 Begin Mile Post : 11.250 End Mile Post: 13.680Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $0 $1,081 $0 $0CST DS $0 $0 $204,575 $0 $0CST SA $0 $0 $1,614,701 $0 $0Project Total: $0 $0 $1,820,357 $0 $0
FPN : 4454711 Project/Location : SR 700 (US 98) FROM KELLER RD TO W OF RIDGE RD
Desc: RESURFACING Project Length : 5.990 Begin Mile Post : 2.700 End Mile Post: 8.690Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $0 $4,404,711 $0 $0CST DIH $0 $0 $1,081 $0 $0Project Total: $0 $0 $4,405,792 $0 $0
FPN : 4348862 Project/Location : SR 700 (US 98) PEACE RIVER-FT MEADE AT BR # 0064 (JOHN SINGLETARY BR)
Desc: BRIDGE REPLACEMENT Project Length : 0.510 Begin Mile Post : 0.966 End Mile Post: 1.476Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
ROW DDR $176,110 $0 $0 $0 $0ROW DIH $48,000 $0 $0 $0 $0Project Total: $224,110 $0 $0 $0 $0
FPN : 4443131 Project/Location : SR17 FROM RAINBOW BLVD TO CROOKED LAKE DR
Desc: RESURFACING Project Length : 0.770 Begin Mile Post : 11.930 End Mile Post: 12.700Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DIH $0 $0 $64,860 $0 $0CST DS $0 $0 $86,733 $0 $0CST DDR $0 $0 $722,774 $0 $0ENV DDR $0 $0 $30,000 $0 $0Project Total: $0 $0 $904,367 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 33 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4398011 Project/Location : SR35/700(US98) POLK PARKWAY TO ILLINOIS AVENUE
Desc: DRAINAGE IMPROVEMENTS Project Length : 0.424 Begin Mile Post : 8.145 End Mile Post: 8.569Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $525,617 $0 $0 $0 $0CST DIH $1,026 $0 $0 $0 $0Project Total: $526,643 $0 $0 $0 $0
FPN : 4436061 Project/Location : TENOROC TRAIL SEG 2-6 FROM E OF LAKE CRAGO PARK TO BRADDOCK RD
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PDE TLWR $0 $0 $0 $2,000,000 $0Project Total: $0 $0 $0 $2,000,000 $0
FPN : 4418441 Project/Location : THREE PARKS TRAIL W FROM CLEVELAND HEIGHTS BLVD TO WESTOVER ST
Desc: BIKE PATH/TRAIL Project Length : 0.033 Begin Mile Post : 0.000 End Mile Post: 0.033Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $306,200 $0 $0 $0Project Total: $0 $306,200 $0 $0 $0
FPN : 4336571 Project/Location : US 27 (SR 25) AT SR 60 INTERCHANGE
Desc: LANDSCAPING Project Length : 0.105 Begin Mile Post : 0.040 End Mile Post: 0.145Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $355,594 $0 $0 $0CST DIH $0 $10,530 $0 $0 $0Project Total: $0 $366,124 $0 $0 $0
FPN : 4365602 Project/Location : US 92 FROM RECKER HWY TO KELLY LANE
Desc: INTERSECTION IMPROVEMENT Project Length : 0.220 Begin Mile Post : 9.180 End Mile Post: 9.400Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST DDR $0 $0 $1,034,666 $0 $0CST DIH $0 $0 $5,405 $0 $0Project Total: $0 $0 $1,040,071 $0 $0
FPN : 4468141 Project/Location : US 98 PED PLAZA FROM N FL AVE AT W 4TH ST TO W 5TH ST
Desc: PEDESTRIAN SAFETY IMPROVEMENT Project Length : 0.912 Begin Mile Post : 0.094 End Mile Post: 1.006Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST SU $0 $0 $0 $377,596 $0PE SU $0 $151,000 $0 $0 $0
Project Total: $0 $151,000 $0 $377,596 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 34 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
FPN : 4459301 Project/Location : US92 MEMORIAL BLVD FROM WALKER AVE TO SR33 LAKELAND HILLS BLVD
Desc: PD&E/EMO STUDY Project Length : 1.499 Begin Mile Post : 3.149 End Mile Post: 3.928Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PDE DIH $0 $0 $0 $50,000 $0PDE DS $0 $0 $0 $1,250,000 $0PE DS $0 $0 $0 $0 $1,500,000PE DIH $0 $0 $0 $0 $75,000
Project Total: $0 $0 $0 $1,300,000 $1,575,000
FPN : 4466891 Project/Location : W LAKE WALES RD FROM W LAKE WALES/ALTURAS TO FERRY ST
Desc: RAIL SAFETY PROJECT Project Length : 0.481 Begin Mile Post : 3.145 End Mile Post: 3.626Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
RRU RHH $185,602 $0 $0 $0 $0Project Total: $185,602 $0 $0 $0 $0
FPN : 4418471 Project/Location : WABASH AVE FROM ARIANA ST TO HICKORY ST
Desc: BIKE PATH/TRAIL Project Length : 1.300 Begin Mile Post : 0.000 End Mile Post: 1.300Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
CST ACSU $800,000 $0 $0 $0 $0CST SU $1,316,363 $0 $0 $0 $0CST TALT $60,637 $0 $0 $0 $0Project Total: $2,177,000 $0 $0 $0 $0
FPN : 4371081 Project/Location : WINTER HAVEN TMC OPS CITY WIDE
Desc: OTHER ITS Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DS $43,500 $43,500 $43,500 $43,500 $0Project Total: $43,500 $43,500 $43,500 $43,500 $0
FPN : 4136561 Project/Location : WINTER HAVEN TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 2.317 Begin Mile Post : 27.760 End Mile Post: 30.640Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
OPS DDR $172,574 $182,905 $193,699 $199,510 $205,496Project Total: $172,574 $182,905 $193,699 $199,510 $205,496
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 35 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
HIGHWAYS TOTAL 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
$152,257,490 $61,523,587 $117,775,052 $34,874,663 $38,429,778
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 36 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT
TRANSPORTATION PLANNING
FPN : 4393133 Project/Location : POLK COUNTY MPO FY 2020/2021-2021/2022 UPWP
Desc: TRANSPORTATION PLANNING Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PLN PL $696,853 $696,853 $0 $0 $0Project Total: $696,853 $696,853 $0 $0 $0
FPN : 4393134 Project/Location : POLK COUNTY MPO FY 2022/2023-2023/2024 UPWP
Desc: TRANSPORTATION PLANNING Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PLN PL $0 $0 $696,853 $696,853 $0Project Total: $0 $0 $696,853 $696,853 $0
FPN : 4393135 Project/Location : POLK COUNTY MPO FY 2024/2025-2025/2026 UPWP
Desc: TRANSPORTATION PLANNING Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
PLN PL $0 $0 $0 $0 $696,853Project Total: $0 $0 $0 $0 $696,853
TRANSPORTATION PLANNING TOTAL 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025
$696,853 $696,853 $696,853 $696,853 $696,853
POLK COUNTY TOTALS
Phase Fund 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 Total
COUNTY Total : $202,202,411 $84,997,935 $159,561,471 $107,849,549 $56,930,448 $611,541,814
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 37 Run Date:10/10/2019 SnapShot Date: 10/7/2019
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2020 Through June 30, 2025 POLK COUNTY
DRAFT