BTEC HND in QS & BE
Measuring, Tendering and Estimating for Construction International College of Business and Technology
Program BTEC HND in QS & BE
Unit / Module Tendering and Estimating
Assessment Assignment 1 Tender Procedures & Estimating
Lecturer Ms. S. Kavitha
Student Name ID HNDQS/MT/26/__
Date Handed Over 01st November 2013. Date Due To Be Informed
Initial Submission Date Re-Submission
Date
Stu
den
t to
Tic
k i
f
Att
emp
ted
Grading
Opportunity
Criteria Met?
Assessor Feedback Initially On Resubmission
P1.1
P1.2
P1.3
P2.1
P2.2
P2.3
P2.4
P3.1
P3.2
P3.3
P3.4
P4.1
P4.2
P4.3
-
BTEC HND in QS & BE
Measuring, Tendering and Estimating for Construction International College of Business and Technology
M1
M2
M3
D1
D2
D3
Final Grade Distinction (D) Merit (M) Pass (P)
Assessed by (name):
Signature: Date Assessed :
Student Signature & Comments
-
BTEC HND in QS & BE
Measuring, Tendering and Estimating for Construction International College of Business and Technology
Important Information for Students
The criteria each task relates to are shown against that task where possible.
Please note that plagiarism is treated as a serious offence and therefore the work you produce
must be individual and original although may work in groups in some instances (Please refer
to Student Handbook on Plagiarism & Cheating).
All sources of information must be referenced using Harvard referencing where a
reference list/Bibliography should be included at the end of the assignment.
Please note that the submission date given for this assignment is the final date that you can
hand over the assignment. A one week grace period maybe extended with prior approval
from the Program Manager Undergraduate.
Assignments returned to students for re-working must be re-submitted within 10 days (Please
refer to Student Handbook on Assignments Re-submission).
Failure to re-submit the previously marked assignment with the re-submitted assignment will
mean that results cannot be released for the respective unit.
Please read, follow and reference both the contents of the unit outline and the grading
criteria of the assignment before completing this assignment.
-
BTEC HND in QS & BE
Measuring, Tendering and Estimating for Construction International College of Business and Technology
Plagiarism:
While research and discussion are an essential part of an assignment, the deliberate copying of
someone elses work or unacknowledged copying from printed or electronic sources is NOT
permitted. You may be subject to disciplinary procedure if you do this. You should sign this sheet
to show that you comply with these regulations.
Students Signature: .. Date: .
Students Comments:
..
......
..
Internal Verifier
Name: Mr. Ramzan Rafeeek
Signature : Approved By: Mr. Ramzan
Rafeeek Date Verified : 31
st Oct 2013
-
BTEC HND in QS & BE
Measuring, Tendering and Estimating for Construction International College of Business and Technology
Assignment 01
A private investor is initiating a plan of building a large shopping mall named Buy in Lavania in
Mount Lavania. He wants to build a 10 storey building and make it a landmark of Mount Lavania,
adopting more new technology. He is in the process of developing the best design for his
construction and design will be completed by end of next month.
Discuss the following issues, regard this project.
1. Client plays a major role throughout the lifecycle of the project. Specify typical clients for
which tenders are required. (P1.1)
2. Once the design is developed, the contractor has to be chosen. The client wishes to go either
open or selective tendering. Before deciding on the tender type, describe the stages of open and
selective tendering. (P4.1)
3. Once the tender type is confirmed, the contract type for this project has to be decided. Select a
contract type for this project with reasons. (P4.3)
4. Since the client needs a very quality project, it is decided to go for selective tendering. In
selective tendering, the bidders will be short listed based on their pre-qualification. Specify the
factors that are used to create select lists of bidders. (P4.2)
5. In this tender, BOQ plays a vital role in contractors estimating. Demonstrate how the bill of
quantities format can be prepared by the consultant and how the contractor can use it to build
up estimates. (P3.1)
6. In an estimate buildup of this project, basic rates will be calculated initially and the top
management will decide on the overhead and profit margin of the project, before applying to
the tender.
6.1. The management has decided the profit margin as 8 % for this project. There are critical
factors used affected this decision. Determine the critical factors. (P3.2)
-
BTEC HND in QS & BE
Measuring, Tendering and Estimating for Construction International College of Business and Technology
6.2. Overheads of this project are identified below.
Item Cost in Rs.
Site access roads & maintenance 900,250.00
Accommodation of site labour 500,000.00
Head office utilities such as lights, telephone, stationery supplies,
furniture etc. 1,343,570.00
Salaries of Workshop & Yard store keepers, Drivers, Foreman, Mechanics
& Workmen 10,320,000.00
Fencing & protection 210,000.00
Cleaning Contractor & Consultant Site Offices 450,000.00
Setting out & measurements 500,000.00
Preparing samples for testing 650,000.00
Insurance, Interest and taxes on business 450,000.00
Insurance of work & workmen's compensation 800,000.00
6.2.1. Calculate the head office overhead and site overhead separately. (P3.4)
6.2.2. If the basic cost of the tender is Rs. 321, 315, 300.00. Calculate the head office
overhead margin and site overhead margin of this project.
7. Health, safety & welfare are important issues in the construction. Preplanning of these, will
avoid unwanted big expenditures. Evaluate how the health, safety and welfare plan affects this
tender (P3.3)
8. The client, consultant and the contractor might have several limitations when they are going
for a selective tender. Determine the constraints which may apply to this tender process. (P1.2)
9. Documentation is very important in the construction contracts. Any dispute arises, will be
resolved based on the documentation evidence. Describe the scope of contractual
documentation required to support the tender process (P1.3)
10. There some items of the shopping mall have been given for you to estimate. Calculate the rate
including overhead and profit margin. (P2.4)
-
BTEC HND in QS & BE
Measuring, Tendering and Estimating for Construction International College of Business and Technology
10.1. Grade 30 reinforced concrete for 225 x 225 mm columns in ground floor.
10.1.1. Find the rate per m3
10.1.2. Find the rate per m
10.2. 150mm block wall, Block of 150mm thick, 200 x 400 mm, on Stretcher Bond on 1:5
cement: sand mortar. Find the rate per m2.
10.3. Painting walls with two coats of weather shield paint. Find the rate per m2.
Note:
In order to do the each estimate, you have to do the following tasks,
a) Produce a method statement suitable for compiling unit cost for each. (P2.3)
b) This construction is based in Colombo. Collect quotations/ bills from suppliers in
Colombo, for Material, Plant & Labour. Attach them to the document to make it more
reliable. (P2.1) Use the overhead and profit margin you obtained from Task 6.
c) While calculating the prices, use NRM for the measurement systems. (P2.2)
You are allowed to refer BSR (Building Schedule of Rates) published by ICTAD, as guidance
with a proper reference.
-
BTEC HND in QS & BE
Measuring, Tendering and Estimating for Construction International College of Business and Technology
Merit Grade:
Performance Descriptors Indicative Characteristics Contextualized
evidence
In order to achieve a
Merit the leaner must
The Learners evidence shows. To achieve the
grade will need to
student.
M1 Identify and apply
strategies to find
appropriate solutions
Effective judgments have been made
Complex problems with more than one variable
have been explored
An effective approach to study and research has
been applied
Effective judgments
have been made on
deciding the
contract type in
Task 03.
M2 Select/design and
apply appropriate
methods/ techniques
Relevant theories and techniques have been applied
A range of methods and techniques have been
applied
A range of sources of information has been used
The selection of methods and techniques/sources
has been justified the design of methods/techniques
has been justified
Complex information/data has been synthesized
and processed appropriate learning
methods/techniques have been applied
Calculating the
overhead margins
with appropriate
technique, using the
data given in Task
6.2.2.
M3 Present and
communicate findings
The appropriate structure and approach has been
used
Coherent, logical development of
principles/concepts for the intended audience
A range of methods of presentation have been used
and technical language has been accurately used
Communication has taken place in familiar and
unfamiliar contexts
The communication is appropriate for familiar and
unfamiliar audiences and appropriate media have
been used
The overall
document should be
presented in a
professional report
structure.
-
BTEC HND in QS & BE
Measuring, Tendering and Estimating for Construction International College of Business and Technology
Distinction Grade:
Performance Descriptors Indicative Characteristics Contextualized
evidence
In order to achieve a
distinction the leaner
must
The Learners evidence shows. To achieve the
grade will need to
student.
D 1 Use critical reflection
to evaluate own work and
justify valid conclusions.
Conclusions have been arrived at through
synthesis of ideas and have been justified
The validity of results has been evaluated using
defined criteria
Self-criticism of approach has taken place
Realistic improvements have been proposed
against defined characteristics for success
Critically reflect your
own work and
evaluate with
supplementary
information building
up rates in Task 10.
D 2 Take responsibility
for managing and
organizing activities
Autonomy/independence has been demonstrated
Substantial activities, projects or investigations
have been planned, managed and organized
Activities have been managed
The unforeseen has been accommodated
The importance of interdependence has been
recognized and achieved
Use various methods
to plan, manage and
organize activities to
complete the report
and submit on time
with appropriate
structure.
D 3 Demonstrate
convergent/lateral/
creative thinking
Ideas have been generated and decisions taken
Self-evaluation has taken place
Convergent and lateral thinking have been applied
Problems have been solved
Innovation and creative thought have been applied
Receptiveness to new ideas is evident
Effective thinking has taken place in unfamiliar
contexts
Demonstration of
effective thinking
have been done
throughout the report
and finding solutions
for the scenario by
applying the theory.
-
BTEC HND in QS & BE
Measuring, Tendering and Estimating for Construction International College of Business and Technology
Grading Matrix
Grade code Assignment 1
P1.1
P1.2
P1.3
P2.1
P2.2
P2.3
P2.4
P3.1
P3.2
P3.3
P3.4
P4.1
P4.2
P4.3
M1
M2
M3
D1
D2
D3