Ten(d) To Zero
Derek Thomason – General Manager, Unipart Expert Practices
![Page 2: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/2.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
What I Will Cover
• Introduction to Unipart• Development of the Procurement / Supplier Management Function• Supplier Relationship Management – a One-night Stand?• Background and Benefits of TTZ• The Generic Approach• The Recession! – An Accelerated Approach• Summary• Q&A
![Page 3: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/3.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
10,000 people
Operating in 100 countries
worldwide£1.1b
turnover
Majority owned by employees
We takea long term
view
The Unipart Group – Key Facts
ContinuousImprovement
![Page 4: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/4.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
Third Party Logistics
Manage Demand Chains
Software Development& Licensing
Deliver Benefits for our Clients
Consult
Systems Integration
The Unipart Group – Core Services
![Page 5: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/5.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
The Unipart Way - a philosophy of working, underpinned by a set of tools and techniques that:
share best practice across teamsdrive continuous improvementimprove productivity and competitiveness
The Way We Work
![Page 6: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/6.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
Leading edge practices
Cost Out
Reactive Order PlacingPrice Drift
Proactive Tactical
Price Down
Strategic Procurement
Cost Down
The Four Stages of Development
![Page 7: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/7.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
Supplier Relationship ManagementA One-Night Stand?
Degree of strategic alignment and integrationLOW HIGH
One-night stand
Regular date
Going steady
Living together
Marriage
Competitive leverage
Ongoing bids, tenders and tactical negotiation
Preferred suppliers
Proven track record in quality, delivery and cost. Less frequent bidding
Performance partnerships
Benchmarking is applied to assess value, but there is joint improvement plans and priorities
Strategic alliances
Single sourcing and joint investment strategies. Interdependence is the driving force
Business integration
Total alignment of business competences. Each party plays to its strengths.
Source: Johnson, S., Tinsley Bridge Ltd, ‘Managing change through teamwork’, ISCAN, Sheffield
![Page 8: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/8.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
Background to Ten(d)-To-Zero
Mission Statement
“To develop and continuously improve the Group’s partnership with its suppliers, by jointly growing our business through removing waste,
improving quality and meeting customer requirements profitably in the shortest possible time”.
Supports Principle 8 of the Unipart Way
“We build constructive and challenging long term relationships through Ten(d) to Zero”.
![Page 9: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/9.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
A framework consisting of
‘elements’ and ‘levels’
A common way of working across
divisions and with suppliers
A method to make and deliver
a plan
How we work with suppliers to develop common
understanding
A Supplier Relationship
Management toolPart of the
“Unipart Way”
What is Ten(d) To Zero?
![Page 10: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/10.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
TTZ Typical Elements
• E1: Zero Waste• E2: Zero Cost Impact• E3: Zero Quality System Non Conformance• E4: Zero Quality Defects• E5: Zero Delivery Non Conformance• E6: Zero Delivery Failures• E7: Zero Supply Chain Logistics Impact• E8: Zero Business Transaction Costs• E9: Zero Commitment To Service Life Impact• E10: Zero Environmental Impact
Elements are defined according to the direction and needs of the business
![Page 11: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/11.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
TTZ Elements – Global Client
• Element One: Zero Waste• Element Two: Zero Cost Impact• Element Three: Zero Quality System Non Conformance• Element Four: Zero Quality Defects• Element Five: Zero Delivery Non Conformance• Element Six: Zero Delivery Failures• Element Seven: Zero Supply Chain Inventory Impact• Element Eight: Zero Business Transaction Costs• Element Nine: Zero Health, Safety, Security & Environmental Impact• Element Ten: Zero Legal and Trade Non-Compliance Issues
In this case the elements refer to suppliers of Global Freight services to one of our consulting clients
![Page 12: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/12.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
TTZ Levels – Global Client
• Objective– The desired condition for each element
• Approach– The rationale behind the element, the
reason for its inclusion, and the process to be used to achieve the objective
• Definitions– Key terms, tools & techniques used in the
element• The Standard Demonstrated
– The key steps - from ten to zero!!!• Guidelines For Scoring
– The detailed requirements / sources of information against each milestone
1.1.1 Element 6: Zero Delivery Failures
Objective: To achieve a consistent 100% conformance to Company XX delivery requirements. Approach: Success in this area is achieved by Company XX clearly communicating delivery requirements and regularly monitoring delivery performance against defined criteria. Areas of supplier non-conformance will be jointly analysed to identify and eliminate root causes of failure. Key problem-solving tools should be utilised and a formalised process should be developed to monitor corrective actions and subsequent improvements. Definitions Key terms used during this element. o Delivery Performance: Calculation is as follows: (Number of shipments not meeting
requirements / Total number of shipments made in the period) x 100 The Standard Demonstrated
Score Description Evidence (scoring guideline)
10 As an average of all shipments due to arrive in the period, less than 50% are compliant.
Verbal statement required.
9 As an average of all shipments due to arrive in the period, more than 50% but less than 60% compliance has been achieved.
Data required from supplier delivery performance monitoring system.
8 As an average of all shipments due to arrive in the period, more than 60% but less than 70% compliance has been achieved.
Data required from supplier delivery performance monitoring system.
7 As an average of all shipments due in the period, more than 70% but less than 80% compliance is achieved.
Data required from supplier delivery performance monitoring system.
6 As an average of all shipments due in the period, more than 80% but less than 90% compliance is achieved.
Data required from supplier delivery performance monitoring system.
5 As an average of all shipments due in the period, more than 90% but less than 92% compliance is achieved.
Data required from supplier delivery performance monitoring system.
Again, this refers to suppliers of Global Freight services to one of our consulting clients
![Page 13: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/13.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
Become the customer of
choice with the supplier
Remove ambiguity and facilitate emotion free discussion
Deliver business benefit for both
parties
Measure performance in a constructive way
Identify cost ‘out’opportunities
Strengthen relationships with
our preferred suppliers
Objectives of Ten(d)-To-Zero
![Page 14: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/14.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
Identification and removal of waste
Structured approach to
performance and contract reviews
Flexibility, modularity and tailored to need
Facilitates continuous
improvement
Consistent approach to relationship
management
Strengthens the two-way
relationships
Benefits of Ten(d)-To-Zero
![Page 15: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/15.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
To SummariseWe Use Ten(d)-To-Zero To …
To go from this to this
FewerOpportunities
Taken
MorePerformance
Problems
MoreOpportunities
Taken
FewerPerformance
Problems
![Page 16: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/16.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
Generic Process Approach
Identify current state
Set durations
and targets
Agree Strategy
Implement Action Plans
Make and Agree
Specific Action Plans
Reflect on Result
Evaluate Actual vs Expected
Impact
Cycle Repeats Until Target is
Achieved
Plan
Do
Check
Act
SelectStrategic Suppliers
Once Target is Achieved, Set
New Target and Repeat
Introducing New Suppliers Continuous Improvement with Existing Suppliers
The process is used to structure the approach and confirms if actions are having the desired effect
![Page 17: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/17.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
How the Relationship Functions
Quality
Logistics
Commercial
Marketing
Engineering
Supply chain
Quality
Logistics
Commercial
Marketing
Engineering
Supply chain
TTZ Programme
IncludingOverall
Facilitationand
Escalation of Concerns
Formal Communication Route at TTZ Review Meetings and Formal Escalation of IssuesInformal Communication Routes for Day to Day Business
Unipart
Unipart Facilitator(Procurement)
Supplier Facilitator
Supplier
![Page 18: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/18.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
Position & launch TTZ programme
Collaborate to problem solve and drive performance improvements
Initiate & manage own problem solving
Sustain performance levels
Use TTZ approach to identify new opportunities & challenges
duration is case by case
Customer-Supplier Relationship Growth+
Supplier Self Reliance
The Journey for our Suppliers
This helps the supplier to understand how their journey will evolve and where they are currently
![Page 19: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/19.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
The Recession!An Accelerated Approach Was Required
• Context– One of Unipart’s Business Units had an urgent requirement to:
• Improve revenue / profit• Reduce working capital• Increase supplier marketing investment
• Solution– Use Ten(d) To Zero principles - but assume starting at ‘zero’ rather than
progressive improvements from ‘ten’– The results and benefits are the same but the journey is quicker (and
not so smooth)
![Page 20: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/20.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
The Accelerated Approach
Identify current state
Set durations
and targets
Agree Strategy
Implement Action Plans
Make and Agree
Specific Action Plans
Reflect on Result
Evaluate Actual vs Expected
Impact
Cycle Repeats Until Target is
Achieved
Plan
Do
Check
Act
SelectStrategic Suppliers
Invite each supplier to achieve a score
of zero in 10 elements against a
series of statements in a
workbook
Using the Creative Problem Solving structure, agree
the actions required to move quickly to zero
Change pointChange
point
Generic Process Cycle Showing Change Points to Accelerate
X X X
![Page 21: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/21.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
Assess what zero looks like
Identify challenges to achieve
Identify solutions
Implement solutions
Confirm zero assessment = desired state
duration is 3 months maximum
Tactical and Immediateto achieve
improvements to revenue / profit, reduce working capital and increase supplier marketing investment
Change point
Change point
Change point
Change point
Change point
Change point
The Accelerated Supplier Journey
Changes: more direct and shorter in duration Starting goal is zero
![Page 22: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/22.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
What We’ve Achieved
• XX% improvement in supplier delivery performance
• YY% reduction in safety stocks
• ZZ% reduction in non value adding activities
• Significant time savings for suppliers in managing the Unipart account
• Improved service levels to the end customer
Plus accelerated approach now adopted across all Divisions
![Page 23: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/23.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved
Summary
• Ten(d) To Zero is part of “The Unipart Way”
• TTZ support our business by providing a structured framework forworking with our strategic suppliers
• Our aim is ‘cost out’ not ‘price down’
• The approach works across our businesses and those of our consulting and operational clients
• We believe the results speak for themselves but could not have been achieved without the proactive participation of our suppliers (Thank you)
![Page 24: Ten(d) To Zero - CIPS · – The key steps - from ten to zero!!! • Guidelines For Scoring – The detailed requirements / sources of information against each milestone 1.1.1 Element](https://reader033.fdocuments.us/reader033/viewer/2022042916/5f543d913e15a91fc800ac86/html5/thumbnails/24.jpg)
Copyright © 2010 Unipart Group Limited. All rights reserved