PRIVATE AND NOT FOR PUBLICATION B . R . 3 1 2 6 2 NN TEMPORARY SPEEDRESTRICTIONS PERMANENTWAYOPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS,ETC. t - British Rail EASTERN REGION SATURDAY 20 JULY TO FRIDAY 26 JULY 1974 INCLUSIVE NOTICE Supplementary Operations Instructions Booklet is being re-issued. ND-220 must be retained and used together with ND-26D until this re-issue dated 27 July 1974 is received. No. 29 Trainmen must pay particular attention to works contained in this notice and keep a good look-out for [land signals, which will be exhibited at the various localities in accordance with the Rules and Regulations. Work at places other than those mentioned may be in progress, of which it may not have been possible to give previous notice, and drivers must be on the look-out and be prepared to stop or run at reduced speed when and where hand signals may be exhibited.

Transcript of TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... ·...

Page 1: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

PRIVATE AND NOT FOR PUBLICATION B . R . 3 1 2 6 2

NN

TEMPORARY SPEED RESTRICTIONSPERMANENT WAY OPERATIONS

SIGNAL ALTERATIONSAPPENDIX INSTRUCTIONS, ETC.

t-'114

British Rail

EASTERN REGION

SATURDAY 20 JULYTO

FRIDAY 26 JULY 1974INCLUSIVE

NOTICE

Supplementary Operations Instructions Booklet is being re-issued.

ND-220 must be retained and used together with ND-26D until this re-issue dated27 July 1974 is received.

No. 29

Trainmen must pay particular attention to works contained in this notice and keep a goodlook-out for [land signals, which will be exhibited at the various localities in accordancewith the Rules and Regulations. Work at places other than those mentioned may be inprogress, of which it may not have been possible to give previous notice, and drivers mustbe on the look-out and be prepared to stop or run at reduced speed when and where handsignals may be exhibited.

Page 2: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

SECTION A

Pi 'moor and Up Slow 10 40 9 60 20 Trackwork, 7 4 / 2 8Tollerton*Pilmoor and Up Fast 10 55 9 52 20 Trackwork. 7 4 / 2 9Tollerton Commencing 08 00

Thursday 25 July.*Pilmoor and Thirsk Down Slow 19 40 21 50 20 Trackwork. 74/21/22Northallertonand Thirsk

Up Slow 28 37 27 52 20 Trackwork. 7 4 / 2 8Until 03 30 Sunday 21July.

*Northal lertonand Thirsk

Up Slow 28 38 26 50 . 2 0 Trackwork. 7 4 / 2 9Commencing 03 30Sunday 21 July.-

tEryholme and Up Main 37- 50

37 24 20 Trackwork. 7 4 / 2 6Northallerton Until 16 00 Wednesday

24 July.

tEryholme andNorthallerton

Up Main 37 50 37 24 40 Trackwork. 7 4 / 2 9Commencing 16 00Wednesday 24 until16 00 Friday 26 July.

*tEryholme and Down Main 39 03 40 09 20 Trackwork. 74/29Darlington (South Jn.) Commencing 12 00

Sunday 21 July.Low Fell Up Slow 76 37 75 45 20 Trackwork. 7 4 / 2 5Station Jn. andOuston Jr).Benton and Up Main 4 40 4 20 60 Condition of track.Heaton North „In. 74/18Ki I I ingworth Down Main 5 73 5 75 20 Trackwork. 7 4 / 2 9

Commencing 11 00Sunday 21 July.

Killingworth Up Main 5 75 5 73 20 Trackwork. 7 4 / 2 8Until 11 00 Sunday 21July.

TEMPORARY SPEED RESTRICTIONS

(Until further notice unless otherwise stated)

Warning Boards and Indicators provided unless otherwise shown.

hi the case of items marked t The Warning Board(s) will be lit by propane gas.

In the case of items marked * the Warning Boards and Indicators will be moved as the work progressesand the restriction will not operate over more than ,A m i l e a t o n e t i m e .Where two speeds are shown for a restriction erg. 20 the Rule Book, Section T, Clause 21.2 applies.

Location of Workat or between

M. Chs. M . Chs . m . p . h .YORK (CHALONERS WHIN) TO BERWICK (MARSHALL MEADOWS) (REGIONAL BOUNDARY AT 69m. 66chs)VIA KING EDWARD BRIDGE OR HIGH LEVEL BRIDGE

•-•- •

NN-2

40

Lines M i l e a g eaffected a t or between

SpeedRestriction Remarks

Page 3: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-3SECTION A — TEMPORARY SPEED RESTRICTIONS — continuedLocation of Workat or between

Linesaffected

M. Chs. M. Chs. m . p . h .YORK (dIALONERS WHIN) TO BERWICK (MARSHALL MEADOWS) (REGIONAL BOUNDARY AT 69111.66chs.)1VIA KING ilDWARD BRIDGE OR HIGH LEVEL BRIDGE — continuedAyton and U p Ma in 6 7 70 6 7 28 2 0 T r a c k w o r k . 7 4 / 2 8Tweedmouth

DARLINGTON NORTH JN. TO BISHOP AUCKLAND EASTHeighington and D o w n Main 7 00 7 05Shildon

FERRYHILL (SOUTH WV.) TO NORTON ON TEES SOUTHSti I lington and D o w n Main 4 00 3 60Norton on Tees West

FERRYH ILL (TURSDALE JN.) TO PELAW VIA LEAMSIDEWhitwell and D o w n Main 9 10Fencehouses*Fencehouses and U p MainWhitwell

Fencehouses andWashington South

CONSETT NORTH TO OUSTON JUNCTIONCarr House East and D o w n and UpAnnfield M a i n

Up MainBeamish andAnnfield

Down and Up 1 4 10 1 5 10Main

SOUTH PELAW TO WASHINGTON CHEMICAL WORKSSouth Pelaw and D o w n Main 1 1 40 1 0 72Wash ington

Mileage S p e e dat or between Re s tr i c ti on Remarks

20 T r a c k w o r k . 7 4 / 2 8Until 15 00 Thursday 25July.

20 T r a c k w o r k . 7 4 / 2 9Commencing 10 00Monday 22 July.

9 40 2 0 T r a c k w o r k . 7 4 / 1 6

9 67 8 77 2 0 T r a c k w o r k . 7 4 / 2 4Until 16 00 Wednesday24 July.

20 T r a c k w o r k , bridgeworkand subsidence. 73/28

9 60 8 55 1 5 S u b s i d e n c e . 7 2 / 1

4 11 4 40 2 0 T r a c k w o r k . 7 4 / 2 3Until 16 00 Tuesday 23July.

NOKIHALLERION (BOROUGH BRIDGE ROAD) TO GATESHEAD (HIGH LEVEL BRIDGE) VIA HORDENGreatham and U p Main 6 4 40 6 3 70 2 0 T r a c k w o r k . 7 4 / 2 8BillinghamSeaham and D o w n and Up 8 5 15 8 5 58Ryhope Grange M a i nWearmouth and D o w n Main 9 1 2 9 9 2 12East BoldonWearmouth and D o w n and Up 9 2 22 9 3 06East Boldon M a i n

20 S u b s idence. 7 3 / 3 2 '

20 C o n d i t i o n of track. 74126

30 S u b s i d e n c e . 7 2 / 1

10 C o n d i t i o n of track.74/1

Page 4: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-4SECTION A — TEMPORARY SPEED RESTRICTIONS — continuedLocation of Workat or between

DARLINGTON (SOUTH) TO SALTBURNWhitehouse and D o w n Main and 1 6 20 1 6 40South Bank U p Goods

Whitehouse andSouth Bank

South Bank

Redcar andGrangetown

Linesaffected

Down Goods

Up Main

Up Main

Mileageat or between

M. Chs. M . Chs. m . p . h .

16 20 1 6 40

17 10 1 7 00

19 75 1 8 71

LONGBECK (SALTBURN WEST JN) TO BOULBY (CLEVELAND POTASH SIDINGS)Longbeck (SaltburnWest Jn.) andCraohall

Down GoodsLoop

27 20 2 7 70 2 0

SpeedRestriction Re ma rks

20 T r a c k w o r k . 7 4 / 2 8Until 16 00 Monday22 July.

20 T r a c k w o r k . 7 4 / 2 9Commencing 12 00Sunday 21 July.

20 C o n d i t i o n of track.73/41

20 T r a c k w o r k . 7 4 / 2 2

Trackwork. 7 4 / 2 9Commencing 22 00Tuesday 23 July

NEWCASTLE TO CARLISLE (PETTERIL BRIDGE JN.) EXCLUSIVE (REGIONAL BOUNDARY AT 58m. 60 chs.)Prudhoe and D o w n Main 1 3 05 1 3 20 2 0 P l a t f o r m work. 74/23Hexham U n t i l 14 00 Monday

22 July.Down Main 1 3 60 1 3 75 4 0 E m b a n k m e n t slip. 74/24Prudhoe and

HexhamHaydon Bridge

Bardon Mill andHaydon Bridge

Blaydon andNorwood

Down Main

Up Main

GATESHEAD (GREENSFIELD JN. DUNSTON LINES) TO BLAYDON VIA NORWOODNorwood Jn. and D o w n Blaydon 3 46 3 67 1 5Blaydon

Up Blaydon

HALTWHISTLE TO ALSTONHaltwhistle and S i n g l eAlston

28 30 2 8 40 2 0 T r a c k w o r k . 7 4 / 2 8Until 16 00 Wednesday24 July.

29 10 2 8 40 2 0 T r a c k w o r k . 7 4 / 2 8

Trackwork. 7 4 / 1 8Until 16 00 Wednesday24 July.

5 19 4 75 1 5 T r a c k w o r k . 7 4 1 2 4Until 16 00 Wednesday24 July.

12 56 1 2 67 1 0 C o n t r a c t o r s usingaccommodation crossing.

73/15

Page 5: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-5SECTION A — TEMPORARY SPEED RESTRICTIONS — continuedLocation of Workat or between

Linesaffected

Mileageat or between

SpeedRestriction Remarks

M. Chs.BACKWORTH JUNCTION TO MORPETH VIA SEGH ILL

M. Chs.

Newsham Southand Holywell

Up Main 11 24 9 20 20 Ira ckwork. 74/ 26

Holywell and Down Main 11 20 12 00 20 Condition of track.Newsham South 72/11

CAMBOIS BRANCHWinning and Down Main 0 45 1 22 20 Trackwork.

74/18Freemans

Page 6: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

SECTION B

(For Details of Signalling or Permanent Way Alterations See Section 'C')

Where any work involves fixing, removing or repairing of signals, or the protection of the runningline during renewals, repairs and obstructions, Handsighalmen will be provided by the Engineerto act in accordance with the Rules and Regulations.

Material may be lying about and disconnections may be made as required.

Unless otherwise shown, work will be carried out as traffic permits.

At or between

YORK (CHALONERS WHIN) TO BERWICK (MARSHALL MEADOWS) (REGIONAL BOUNDARY AT 69m. 66chs.)VIA KING EDWARD BRIDGE OR HIGH LEVEL BRIDGEDAILY UNTIL FURTHER NOTICEDarlington (South Jn. A l l Station Lines 0 8 00 to 17 00. Platform work.and North Jn.)

Parkgate ..1n. and D o w nFerryhill (South Jo.)Tursdate Jn. and D o w nDurham StationDurham Station and D o w n and UpOuston

Newcastle

Newcastle

TEMPORARY ENGINEERING WORKS

Lines affected R e m a r k s

East End Bay PlatformsBLOCKEDEast End BayPlatformsUp TynemouthHeaton South Jn. and

Manors Jn.Ki II ingworth D o w n and Up

Morpeth and D o w n and UpLonghirstAlnmouth D o w n Sidings

Tweedmouth and U p MainGoswickSATURDAY 20 JULYManors Jn and U p Tynemouth GoodsNewcastle

SATURDAY 20 to SUNDAY 21 JULY_Ki ingworth 0 9 00 Sat to 06 00 Sun

Down and UpBetween Trains06 03 to 11 15 ,SunDown and UpBLOCKED11 15 to 21 00 SunDown and UpBetween Trains

NN-6

07 00 to 17 00. Earthwork between 55m. 36chs. and55m. 55chs. Off track machines in use. 74/2507 30 to 16 30. Earthwork between 64m. 50chs.and 6 51/4m. o . O ff t ra ck mach ines in use.

07 00 to 17 00. Earthwork at 67m. 61chs. Offtrack machines in use.

22 00 Sun to Fri to 06 00 Mon to Sat. Platformwork. Crane and Off track machines in use.08 00 to 16 30 Sun to Fri. Platform work. Craneand Off track machines in use.08 00 to 17 00. Earthwork between mi. 4chs. and01/4m.p. Off track machines in use.

Level crossing work. Gates disconnected.Until 21 00 Sunday 21 July.

06 00 to 18 00. Earthwork at 17m. 64chs. Off trackmachines in use.

08 00 to 17 00. Trackwork. Off track machines inuse.

08 00 to 17 00. Earthwork between 61% and61m.p. Off track machines in use.

08 00 to 18 00. Erecting scaffolding on CastleKeep at OlArmo.

09 00 Sat to 21 00 Sun. Trackwork at Killingworthlevel crossing between 5m. 73chs. and 5m. 75chs.Crane and off track machines in use. Signallingalterations. (See Section C).

Page 7: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-7SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between L i n e s affected

YORK (CHALONERS WHIN) TO BERWICK (MARSHALL MEADOWS) (REGIONAL BOUNDARY AT 69m. 66chs)VIA KING EDWARD BRIDGE OR HIGH LEVEL BRIDGE — continuedSUNDAY 21 JULYChaloners Whin andHolgatePilmoor andTollerton

Pilmoor and Thirsk(T.K.31 Signal)

Northallerton and U p SlowThirsk (TIC22 Signal) B L O C K E D

Down Holgate LoopBLOCKED02 00 to 04 00Up SlowBLOCKED0400 to 12 30Up Fast and Up SlowBLOCKEDDown FastBetween Trains12 30 to 17 00Up SlowBLOCKEDDown SlowBLOCKED

Northallerton and D o w n and UpEryholme B L O C K E D

Eryholme andDarlington (South sin.)

Darlington

Parkgate Jn. andFerryhill (South sin.)

Tyne

Low Fell Station Jri.and K.E.B.Newcastle

03 30 to 12 15Down and UpBLOCKED12 15 to 1600DownBetween TrainsDown and Up Main

03 30 to 12 35UpBLOCKED03 45 to 12 35DownBLOCKED03 00 to 19 00Up SlowBLOCKEDbetween Points Nos.540A and 576B.04 00 to 13 00Down FastBLOCKED04 00 to 12 00Up FastBetween TrainsDownBLOCKEDPlatform Nos.4 & 5BLOCKED

Remarks

07 00 to 17 00 Bridgework No. 47. Scaffolding inuse,02 00 to 17 00. Trackwork between 12 and 10m.p.(See Section D)02 00 to 04 00 and 12 30 to 17 00. Up trains totravel on Up Fast04 00 to 12 30 Down trains to travel on DownSlow. Up trains to travel on Down Fast wheremore than one running line is available. Cranein use.

00 01 to 09 00. Trackwork between 19m.p. and21m. 50chs. Possession given up to pass 1N96,03 50 York to Newcastle. Other trains to travelon Down Fast. On track machines in use.

- 00 30 to 18 00. Trackwork between 28m. 37 chs.and 28m.p. Trains to travel on Up Fast.Cranes inuse,03 35 to 12 15. Trackwork between 37m. 24 chs.and 37m. 50 chs. Trains diverted via Picton andSti I I ington. Crane and on track machines in usebetween 37m. 45 chs. and 36m. 70 chs.03 30 to 16 00. Trackwork between 39'Am.p. and40m. 9 chs. Trains diverted via Picton andStill ington. 03 30 to 12 15. On track machines inuse.

07 30 to 16 30. S & I work on points Nos. 1104,1103B, 1096 and 1097B.03 30 to 12 35. Trackwork and earthwork between45 and 56 m.p. Trains diverted via Picton andStillington. Crane, on and off track machines inuse.

03 00 to 19 00. Trackwork between 75m. 45chs.and 76m. 37chs• 03 00 to 19 00. Up trains totravel on Up Fast. 04 00 to 13 00. Down trains totravel on Down Slow. Crane in use.

06 00 to 1115. Trackwork between 78 and 781Ano. Trains via Bensham Curve.07 30 to 17 00. Trackwork. Points No.458 affectec.

Page 8: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-8SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between

YORK (CHALONERS WHIN) TO BERWICK (MARSHALL MEADOWS) (REGIONAL BOUNDARY AT 69m. 66chs.)VIA KING EDWARD BRIDGE OR HIGH LEVEL BRIDGE—continued

SUNDAY 21 JULY — continuedHeaton South Jn. and D o w n Goods andNorth Jr'. D o w n Siding

BLOCKED

Stannington and 0 6 15 to 11 00 0 2 30 to 11 00. Earthwork at Clifton levelMorpeth D o w n • c r o s s i n g . Possession given Up to pass 1E51

BLOCKED 2 1 45 Sat. Inverness to York over Up.02 30 to 11 00UpBLOCKED

Longhirst D o w n and Up 0 2 3 0 to 11 00. Trackwork. On track machines inuse.

Longhirst and 0 2 30 to 11 15 0 2 30 to 1115. Trackwork between 201A a n dWiddrington North U p 2 31A m . p . P o s s e s s i on g i v e n U p t o p a ss 1 E 51

BLOCKED 2 1 45 Sat. Inverness to York on Up. Crane and02 30 to 06 45 o n track machines in use.Down

Christon Bank andChath ill

Chevington

Lines affected R e m a r k s

Between Trains06 45 to 11 15DownBLOCKEDAll

07 30 to 17 00. Earthwork between 21A a n d 23A m . p .

07 30 to 17 00. S and T work. Fallodon autobarriers manned.

Tweedmouth 0 5 00 to 17 30 0 5 00 to 17 30. Trackwork between 67m, 16chs.(Berwick Station) and U p Main and a n d 67m. 70chso 10 30 to 17 30. Single lineAyton U p Loop w o r k i n g over Down Main between Ayton and

BLOCKED B e r w i c k Station, South Crossover. Crane and05 00 to 07 15 o n track machines in use.Down MainBetween Trains07 15 to 10 30Down MainBLOCKED10 30 to 17 30Down MainBetween Trains

MONDAY 22 JULYPilmoor and Thirsk D o w n Slow 0 5 00 to 14 00. Trackwork between 181/2 a n d(IK.41 Signal) B L O C K E D 1 9 m . p . and between 19m.p. and 21m. 30chs. Trains

to travel on Down Fast. Crane and on trackmachines in use.

MONDAY 22 to FRIDAY 26 JULYManors Jn. and U p Tynemouth Goods 0 8 00 to 18 00 Daily. Erecting scaffolding onNewcastle C a s t l e Keep at lArrill

Down Loop 0 8 00 to 16 00 Daily. Trackwork. Trains to travelBLOCKED o n Down Main.

TUESDAY 23 JULYThirsk and U p Fast 1 3 30 to 15 00. Trackwork between 221/4 a n dPilmoor B L O C K E D 1 5,A m , p T r a i n s t o t r a v e l o n U p S l o w .

TUESDAY 23 and WEDNESDAY 24 JULYPilmoor and Thirsk D o w n Slow 0 5 00 to 12 00 Daily. Trackwork between 19 m.p.(TK.41 Signal) B L O C K E D a n d 21m. 30chs. Trains to travel on Down Fast. Ontrack machines in use.

Page 9: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-9SECTION B — TEMPORARY ENGINEERING WORKS — continued

At or between

YORK (CHALONERS WHIN) TO BERWICK (MARSHALL MEADOWS) (REGIONAL BOUNDARY AT 69m. 66chs. )VIA KING EDWARD BRIDGE OR HIGH LEVEL BRIDGE — continuedTUESDAY 23 and WEDNESDAY 24 JULY — continuedPi'moor andSkelton Bridge

WEDNESDAY 24 JULYOuston „In. andTyne

THURSDAY 25 JULYTyne

THURSDAY 25 and FRIDAYNortha I lerton andThirsk (TK.22 Signal)

FRIDAY 26 JULYSkelton Bridgeand Tollerton

Lines affected

Up SlowBLOCKED

Down FastBLOCKED

Up SlowBLOCKEDbetween Points Nos.540A and 576B

26 JULYUp SlowBLOCKED

Down SlowBLOCKED

NORTHALLERTON (CASTLE HILLS M.) TO REDMIRETUESDAY 23 JULYNortha I lerton and S i n g l eAinderby B L O C K E DWEDNESDAY 24 JULYNorthallerton and S i n g l eAinderby B L O C K E D

DARLINGTON NORTH JN. TO BISHOP AUCKLAND EASTDAILY UNTIL FURTHER NOTICEDarlington (Parkgate Jn.) Do wn and upand Hopetown Jn. B i s h o p Auckland and

Down and Up Goods

Remarks

03 30 to 10 30 Daily. Trackwork between 10%and 10 m.p. Trains to travel on Up Fast. On trackmachines in use.

04 30 to 08 30. Trackwork between 75m. 27chs.and 75m. 58chs. Trains to travel on Down Slow.On track machines in use.

03 30 to 08 30. Trackwork between 76m. 37chs.and 75m. 45chs. Through trains to travel on UpFast. On track machines in use.

03 30 to 10 30 Daily. Trackwork between 24 and22%rr.p. Trains to travel on Up Fast. On trackmachines in use.

05 00 to 12 00. Trackwork between 3% and 91/4m.p.Trains to travel on Down Fast. On track machinesin use.

15 00 to 21 00. Bridgework No.manned. On track machines in

15 00 to 21 00. Bridgework No.manned. On track machines in

06 00 to 20 00. Platform work.at North Road.

7. Crossingsuse.

11. Crossingsuse.

74/23

BISHOP AUCKLAND EAST TO EASIGATE (APCM) SIDINGSSUNDAY 21 JULYBishop Auckland East S i n g l eand Wolsingham B L O C K E DTUESDAY 23 to FRIDAY 26 JULYBishop Auckland East S i n g l e 0 0 Otto 06 00 Daily. Trackwork between 10M.p.and Eastgate B L O C K E D a n d 15m. 50chs• On track machines in use.THURSDAY 25 JULYWolsinghann A l l 0 8 00 to 16 00. S & I work.

08 00 to 15 30. Bridgework No.19. On trackmachines in use.

Page 10: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-10SECTION B - TEMPORARY ENGINEERING WORK - continuedAt or between L i n e s affected

FERRYHILL (SOUTH JN.) TO NORTON ON TEES SOUTHDAILY UNTIL FURTHER NOTICEBishop Middleham D o w n and Upand StillingtonMONDAY 22 to FRIDAY 26 JULYFerryhill (South Jn.) and Do wn and UpNorton on Tees West B L O C K E D

FERRYHILL (TURSDALE Jhl.) TO PELAW VIA LEAMSIDEDAILY UNTIL FURTHER NOTICEWhitwell and D o w n and UpFencehouses

Fencehouses and D o w n and UpPenshaw NorthWashington and D o w n and UpWardleySATURDAY 20 to SUNDAY 21 JULYUsworth and D o w n and UpWardlev B L O C K E DSUNDAY 21 JULYWhitwell and D o w n and UpFencehouses B L O C K E DFencehouses and D o w n and UpPenshaw North B L O C K E D

Down and UpBLOCKED

Washington andUsworth

Remarks

NEWCASTLE (MANORS Jhl.) TO TYNEMOUTH VIA BACKWORTHSUNDAY 21 JULYSouth Gosforth Station U p B &Jn. and Manors Jn.TUESDAY 23 to FRIDAY 26 JULYManors Jo. and D o w n B & ISouth Gosforth B L O C K E DStation Jn.

RIVERSIDE BRANCHDAILY UNTIL FURTHER NOTICERiverside Jn. and D o w n and UpSt. Peters

MONDAY 22 to RIDAY 26 JULYRiverside Jn. and A l lSt. Peters B L O C K E D

08 00 to 18 00. Earthwork at Sm. 23chs. Off-trackmachines in use.

23 30 Mon to Thu to 05 30 Tue to Fri. Trackworkbetween 4 and 33/ 4 m . p . a n d b e t we e n 9 m. 1 6 ch s . and

4m. 70chs. Possession given up to pass 6K63 and6K49, 23 40 and 02 40 Consett and Redcar on DownMain and 6K48 and 6K50 00 01 and 03 00 Redcar toConseil and 6M52 01 30 Redcar to Workington and6M71 03,40 Lackenby to Workington on Up Main.Other trailis diverted. Cranes and on trackmachines in use:

07 30 to 1630. Earthwork between 9m. 10 chs.and 9V2m.p. Off track machines in use.07 30 to 19 00. Bridgework No.52A. Offtrack machines in use.07 00 to 17 00. Bridgework No.64A. Offtrack machines in use..

14 00 Sat to 11 00 Sun. Overhead linemaintenance at 18m. 77chs.

08 00 to 18 00. Trackwork between 8m. 77chs. and9m. 67chs. Crane in use.04 00 to 22 00. Trackwork between 14m. 31chs.and 14m. 74chs. Crane and Off track machines inuse.13 00 to 18 00. Earthwork at 17m. 2chs. Off trackmachines in use.

07 30 to 17 00. Trackwork between lm. 26chs.and Om. 64chs.

01 00 to 05 00. Bridgework Nos. 3 and 5 at Om.14chs. and Om. 51chs. Empty sets from Newcastleto South Gosforth Car Sheds via Benton SouthWest Curve.

07 00 to 18 00. Work on bridge No.8. Crane andOff track machines in use. ( 7 4 / 2 6 )

16 00 Mon to Thu to 08 00 Tue to Fri. Bridgeworkat Om. 41chs. Crane and off track machines in use.

Page 11: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-11SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between

HEATON SOUTH JN. TO TYNEMOUTH VIA WALLSENDSUNDAY 21 JULYPercy Main Station

NORTHALLERTON (BOROUGHBRIDGE ROAD) TO GATESHEAD (HIGH LEVEL BRIDGE) VIA HORDENDAILY UNTIL FURTHER NOTICELong Lane and D o w nPictonCliff House

Ryhope Grange andHall Dene

Ryhope Grange U p 0 7 00 to 17 00. Trackwork between 88m.p. and87m. 54chs. Off track machines in use.

SATURDAY 20 to SUNDAY 21 JULYNorton on Tees Station D o w n and Upand Billingham B L O C K E D

Cliff House andGreatham

Easington andDawdon

SUNDAY 21 JULYLong Lane andPictonPicton andLow Gates

North ShoreBillingham andGreatham

Horden

Lines affected R e m a r k s

Up Main 0 7 30 to 17 00. S. & T. work on Points Nos.28 and32.

Down 0 8 00 to 16 00. Trackwork. Off track machines inuse.

Up

Up MainBLOCKED

UpBLOCKED

and Up Main 0 7 30 to 14 30. Trackwork between 52 and 52/2m.p.Off track machines in use. 7 4 / 2 4

23 00 Sat to 06 00 SunDownBLOCKED06 00 to 08 00 SunDownBetween Trains23 15 Sat to 08 00 SunUpBLOCKED

All

All00 01 to 16 00UpBLOCKED00 01 to 08 15DownBLOCKED08 15 to 16 00DownBetween TrainsAll

08 00 to 17 00. Earthwork between 8 63A m . p . a n d86m. 30chs. Off track machines in use.

23 45 Sat to 08 00 Sun. Trackwork between 63m.24chs, and 63m. 51chs. Down trains to travel onDown Goods under Absolute Block WorkingConditions. 07 00 and 07 45 Hartlepool toThrislington and Coxhoe to be retimed.23 45 to 08 15 Sun. Trackwork between 67m.51chs. and 68m. Bich& 07 00 and 07 45Hartlepool to Thrislington and Coxhoe to beretimed.23 00 Sat to 08 00 Sun. Trackwork between 82m.,4chs. and 82% rn.p. Crane in use.

07 30 to 16 30. S and T work.

14 00 to 22 00. Trackwork between 471/4m.p. and 45m.56chs. Possession given Up to pass 1A29 13 45Newcastle to Kings Cross and 1D05 18 35Newcastle to Doncaster. Brompton, We'bury andRounton Gates auto barriers manned. On trackmachines in use.07 30 to 16 30. S & I work.00 01 to 16 00. Trackwork between 63m. 70chs.and 64% m.p. Possession given up to pass 1N96,03 50 York to Newcastle and 1N01, 00 30 King'sCross to Newcastle on Down. 08 15 to 16 00Single line working on Down. 07 00 and 07 45Hartlepool to Thrislington and Coxhoe to beretimed. Crane and off track machines in use.

07 30 to 17 00. S. & T. work.

Page 12: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-12SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between

TUESDAY 23 JULYCliff House(Seaton Snook)

— continuedDown and UpPelaw MainBLOCKED

Up Main

BILLINGHAM BECK BRANCHDAILY UNTIL FURTHER NOTICENorth Shore and 0 8 00 to 16 00Haverton Hill South S i n g l e

BLOCKED16 00 to 22 00SingleBetween Trains

North Shore and S i n g l eHaverton Hill South

HENDON BRANCHDAILY UNTIL FURTHER NOTICEHendon Jn. A l l

LONDONDERRY BRANCHDAILY UNTIL FURTHER NOTICEHendon S i d i n g s

Londonderry

Murton Lane

Lines affected

Up Main

Down and UpMainAll

Remarks

NORTHALLERTON (BOROUGHBRIDGE RD.) TO GATESHEAD (HIGH LEVEL BRIDGE) VIA HORDEN —continuedSUNDAY 21 JULYPelaw andGateshead

BILLINGHAM-ON-TEES TO PORT CLARENCE (PHILLIPS SIDINGS G.F.)DAILY UNTIL FURTHER NOTICEBelasis Lane and A l lHaverton Hill Station

00 30 to 08 15. Trackvvork between 98m. lOchs.and 101 rn.p. Possession given up to pass 2N92,07 50 Newcastle to Redcar over Up Pelaw Main.All other trains to travel on Down and Up PelawGoods under Absolute block working (T.C.B.)conditions. Off track machines in use.

00 01 to 05 00. Trackwork between 68m. 64chs.and 68m. 56chs. On track machines in use.

08 00 to 22 00. Bridgework No.5B. Crane andoff track machines in use.

08 00 to 17 00. Earthwork between 6234 m . p . a n d63m. 5chs. Off track machines in use.

08 00 to 17 011 Earthwork between lm 19chs.and lm. 24chs. Off track machines in use

08 00 to 18 00. Demolition a t lm. 48chs.74/25

08 00 to 16 00. Trackwork. Off track machinesin use.

07 00 to 17 00. Trackwork between %and Om.p.Off track machines in use.

HAWTHORNE COMBINED MINE AND COKE PLANT (NORTH JR1.) TO RYHOPE GRANGESUNDAY 21 JULYRyhope Grangeand Seaton

07 30 to 16 30. Bridgework No.65.

07 30 to 17 00. S & I work.

Page 13: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-13SECTION B—TEMPORARY ENGINEERING WORKS—continuedAt or betweenPALLION YARD TO HENDON M.DAILY UNTIL FURTHER NOTICEPall ion Yard S i n g l eand HendonPallion Yard S i n g l eand HendonPallion Yard and S i n g l eHendonHendon Jn. A l l

FELAW TO SOUTH SHIELDSDAILY UNTIL FURTHER NOTICEPelaw and A l lHartonHarton

Lines affected

Down Main

SATURDAY 20 to SUNDAY 21 JULYPelaw H e b b u r n Down Siding

BLOCKED

DARLINGTON (SOUTH JN.) TO SALTBURNDAILY UNTIL FURTHER NOTICEUrlay Nook and D o w n and UpEaglescliffe (South Jn.)Thornaby East Jn_ andNowport East Jn.

Down and Up MainUp Goods No-1

SATURDAY 20 to SUNDAY 21 JULYWhitehouso and 1 4 00 to 23 30 SatSouth Bank D o w n Main and

Down and Up GoodsBetween Trains23 30 Sat to 06 45 SunDown MainBLOCKED23 30 Sat to 13 00 SunDown Goods No.2BLOCKED00 01 to 18 00 SunDown and Up GoodsBLOCKED06 45 to 18 00 SunDown MainBetween Trains09 00 to 13 00 SunShunt LineBLOCKED

Remarks

08 00 to 16 00. Trackwork. Off track machinesin use.08 00 to 16 00. Bridgework 21. Off track machinesin use.08 00 to 17 00. Earthwork at Om. 70chs. Crane andoff track machines in use. 7 4 / 2 608 00 to 18 00. Demolition at Om. 76chs. 74/25

07 00 to 17 00. Earthwork and Bridgework No.12Aand platform at Jarrow. Off track machines in use.08 00 to 18 00. Demolition between 5m. 7chs.and 5m. 25chs. Off track machines in use.

07 00 to 18 00 Daily. Earthwork and demolitionbetween lm. 50chs. and 1 m. 63chs.

07 00 to 17 00. Earthwork and cable laying atAllen's West. Off track machines in use.08 00 to 18 00. Bridgework No.28B. Crane andoff track machines in use.

14 00 Sat to 18 00 Sun. Trackwork between 161/4and 1 61/2 m . p. C ra ne and off track machines in use.

23 30 Sat to 09 30 Sun. Earthwork at 16m. 76 chs.07 00 to 17 00 Sun. Trackwork between 16m.55 chs. and 17m. 10 chs. 0600 to 15 00 Sun.Trackwork between 16 and 171A m . o . O n t r a c k

machines in use.

Page 14: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-14SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between

SUNDAY 21 to MONDAY 22Eaglescliffe North Jn.and Bowesfield

DARLINGTON (SOUTH M. ) TO SALTBURN — continuedSATURDAY 20 to SUNDAY 21 JULY — continuedRedcar 2 3 45 Sat to 09 00 Sun

Down LoopBLOCKED23 45 Sat to 07 00 SunDown MainBLOCKED07 00 to 09 00 SunDown MainBetween Trains

SUNDAY 21 JULYDarlington (South Jn.)

Redcar andGrangetownLongbeck (SaltburnStation Jn.)

Lines affected

All

Up MainBLOCKEDAll

MONDAY 22 to TUESDAY 23 JULYThornaby East Jn. and D o w n MainNewport East Jn, B L O C K E D

MONDAY 22 to FRIDAY 26 JULYSouth Bank D o w n and Up Main

BLOCKEDWEDNESDAY 24 and THURSDAY 25 JULYGrangetown and D o w n MainRedcarTHURSDAY 25 to FRIDAY 26 JULYThornaby East Jn. and D o w n and Up MainNewport East Jn B L O C K E D

Grangetown and U p MainSouth Bank B L O C K E D

JULY23 45 Sun to 03 00 MonDown Middlesbrough MainBLOCKED03 00 to 06 15 MonUp Middlesbrough MainBetween Trains

Remarks

TEES, THORNABY EAST M. TO GUISBOROUGH JN. (GOODS LINES)DAILY UNTIL FURTHER NOTICETees Yard A l l

23 45 Sat to 09 00 Sun. Trackwork between 23m.2chs. and 23m. 18chs. Points Nos. 591 and 593affected.

07 30 to 16 30. S & I work on points Nos. 1104,1103B, 1096 and 1097B.00 15 to 07 00. Trackwork between 20m. 70chs.and 20m. 29chs. On track machines in use.07 30 to 16 30. S & I work.

23 45 Sun to 06 15 Mon. Trackwork between 9m.4chs. and 10 m.p. On track machines in use.

23 15 Mon to 04 30 Tue. Trackwork between12m.p. and 13m. 66ch5. Trains to travel on DownGoods No.l. On track machines in use

23 30 Mon to Thu to 05 15 Tue to Fri. Platformwork. Trains to travel on Down and Up Goods.

00 01 to 05 00 Daily. Trackwork between 19 and22m.p. On track machines in use.

23 45 Thu to 04 30 Fri. Bridgework No.28B at13m. 30chs. Trains to travel on Down Goods Noland Up Goods No.2. Crane and off track machinesin use23 45 Thu to 05 30 Fri. Trackwork between 181/2and 17IAm.p Trains to travel on Up Goods. Ontrack machines in use.

08 00 to 18 00. Bridgework No.281 Craneand off track machines in use.

Page 15: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-15SECTION B — TEMPORARY ENGINEERING WORK — continuedAt or between Lines affected

TEES THORNABY EAST JN. TO GUISBOROUGH M. (GOODS LINES) — continuedSATURDAY 20 to MONDAY 22 JULYTees yard 1 9 00 Sat to 05 00 Mon

Down Goods No.1BLOCKEDSecondary SortingSidings and DownDepartures.BLOCKED(by local arrangements)07 30 to 14 00 SunErimus Siding andUp Staging DepartureLine.BLOCKED

TUESDAY 23 to WEDNESDAY 24 JULYTees yard D o w n Goods No.1

BLOCKEDWEDNESDAY 24 to THURSDAY 25 JULYTees Yard D o w n Goods No.2

Up Goods No.2and Engine LinesBLOCKEDUp Yard SidingsSecondary SortingSidingsBLOCKED

THURSDAY 25 to FRIDAY 26 JULYNewport East Jn. and U p Goods N0.1Thornaby East Jn, B L O C K E D

MIDDLESBROUGH (GUISBOROUGH JN.) TO WHITBYDAILY UNTIL FURTHER NOTICENorth Ormesby and D o w n and UpNunthorpe

DAILY UNTIL FURTHER NOTICESaltburn West _in. S i n g l eand Crag HallTUESDAY 23 to THURSDAY 25 JULYSaltburn West Jn. D o w n Goods Loopand Crag Hall B L O C K E D

SingleBetween Trains

TUESDAY 23 JULYCrag Hall A l l

Remarks

19 00 Sat to 05 00 Mon. Bridgework No. 28B at13m. 30 chs. Crane and off track machines in use.07 30 to 14 00 Sun. Removing water tank. Crane inuse.

22 00 Tue to 06 00 Wed. Bridgework No. 28B.Crane in use.

LONGBECK (SALTBURN WEST JN.) TO BOULBY (CLEVELAND POTASH SIDINGS)

22 00 Wed to 06 00 Thu. Bridgework No.28B. Cranein use.

23 45 Thu to 04 30 Fri. Bridgework No.28B. Cranein use.

Bridgework No. 13A. Crane and off track machinesin use.

08 00 to 16 00. Work on viaduct at 28m. 16chs.Off track machines in use.

21 00 -r u e a nd We d. to 05 00 Wed and Thu.

Trackwork between 27% rn.p. and 27m 70chs. Ontrack machines in use.

08 00 to 16 00. S I work.

Page 16: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-16SECTION B - TEMPORARY ENGINEERING WORKS - continuedAt or between

FRIDAY 26 JULYNorwood Jn andBlaydon

DUNSTON STAITHSDAILY UNTIL FURTHER NOTICEDunston Staiths S i d i n g s

Lines affected R e m a r k s

NEWCASTLE TO CARLISLE PETTERIL BRIDGE P . ) EXCLUSIVE.DAILY UNTIL FURTHER NOTICEPrudhoe and D o w nDilstonHexham and Warden D o w n and Up

08 00 to 16 00. Platform work at StocksfieldStation. (See Section 'D' )08 00 to 17 00. Bridgework No. 81A. Crane in use.Commencing Monday 22 July.

SUNDAY 21 JULYNewcastle P l a t f o r m s 0 8 00 to 1630. Platform work.Nos. 11 to 14

Wylam and Addison U p 0 7 30 to 16 30. Earthwork between 5% and 51/2 m . p .

Off track machine in use.Prudhoe D o w n 0 0 30 to 08 30. Bridgework No.47.

BLOCKEDHaydon Bridge and 0 0 30 to 16 30 0 0 30 to 16 30. Trackwork between 2 81/ 2 m . p . a n dBardon Mill U p 2 9 m . lOchs. Possession given up to pass 1E55,

BLOCKED 0 2 50 Carlisle to Newcastle on Down Under Single00 30 to 11 00 W o r k i n g Conditions.11 00 to 16 30 Single lineDown W o r k i n g on Down. Bardon Mill crossing manned.BLOCKED C r a n e and off track machines in use.11 00 to 16 00DownBetween Trains

TUESDAY 23 JULYPrudhoe and D o w n 0 0 45 to 04 45. Trackwork between 13m. 76chs. andHexham B L O C K E D 1 4 m . 25chs. Single Line Working on Up. Mickley

crossing manned. On track machines in use.WEDNESDAY 24 JULYCowens Crossing and D o w n 0 0 45 to 04 45. Trackvvork between 8m. 35chs. andPrudhoe B L O C K E D 8 m . 58chs. Single Line Working on Up. On track

machines in use.

GATESHEAD (GRENSFIELD JN. DUNSTON LINES) TO BLAYDON VIA NOR WOODDAILY UNTIL FURTHER NOTICENorwood Jn. D o w n and Up 0 8 00 to 18 00. Bridgework Nos.18A and 19. Off

Blaydon t r a c k machines in use.Norwood „in. A l l 0 7 00 to 17 00. Demolishing former signal box.Norwood Jn. D o w n and Up 0 8 00 to 17 00. Bridgework No.l. Off track

Blaydon m a c h i n e s in use.Norwood Jn. and D o w n and Up Blaydon 0 8 00 to 17 00. Bridgework No.33 and EarthworkBlaydon a t 4m. 64chs. Off track machines in use.Blaydon and U p Blaydon 0 8 00 to 18 00. Earthwork between 4m. 64chs. andNorwood Jn. 4 m . 51chs. Off track machines in use.THURSDAY 25 JULYBlaydon and U p Blaydon 0 0 01 to 05 00. Trackwork between 5m.19c. andNorwood Jn B L O C K E D 4 m . 7 5 c . Up trains diverted via Scotswood and

Newcastle. On track machines in use.

• Down Blaydon 0 0 01 to 05 00. Trackwork between 3m.7c. andBLOCKED 3 m . 4 6 c . Down trains diverted via Newcastle and

Scotswood. On track machines in use.

08 00 to 16 30. Trackwork. Off track machines inuse.

Page 17: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-17SECTION B — TEMPORARY ENGINEERING WORKS — continued

At or between L i n e s affectedHALTWHISTLE TO ALSTONDAILY UNTIL FURTHER NOTICEHaltwhistle and S i n g l eAlston

BACKWORTH JN TO MORPETH VIA SEGHILLSUNDAY 21 JULYHolywell and D o w n and UpNewsham South B L O C K E D

TUESDAY 23 JULYNewsham Southand Holywel I

Up

TUESDAY 23 to THURSDAY 25 JULYHolywell and D o w n and UpNewsham North

Bedlington South F u r n a c e Way Sidingsand North B L O C K E D

BEDLINGTON TO LYNEMOUTH COLLIERY (NCB)DAILY UNTIL FURTHER NOTICEAshington D o w n and Up

NEWSHAM TO ISABELLA COLLIERYDAILY UNTIL FURTHER NOTICENewsham South S i d i n g sand Isabella Colliery

CAMBOIS BRANCHDAILY UNTIL FURTHER NWinning andFreemansSUNDAY 21 JULYWinning andFreemansMONDAY 22 JULYCambois

OTICEDown and Up

Down and Up MainBLOCKED

North Blyth SidingsBLOCKED

Remarks

08 00 to 7 00. Earthwork at 12m. 16chs. Off-trackmachines 1 n use.

00 01 to 18 00. Trackwork between 91A m . p . a n d 1 1 m .

24c. Hartley Auto barriers manned. Crane, on andoff track machines in use.

08 00 to 14 00. Trackwork between 11m. 24chs.and 9% m.p. On track machines in use. HartleyAuto Barriers manned.

09 00 to 15 00 Daily. Trackwork between 7'/2m.p.and 12m. 76chs. On track machines in use.Hartley Auto Barriers manned,08 00 Tue to 16 00 Thu. Trackwork.

08 00 to 16 00. Trackwork. Crane in use.

08 00 to 17 00. Bridgework No.5 and buildingat 3m. lchs. Off track machines in use.

07 30 to 16 30. Trackwork. Off track machine linuse.

08 00 to 18 00. Bridgework No.1A. Off trackmachines in use.

08 00 to 16 00. Trackwork between Om. 45chs. andlm. 22chs. On track machines in use.

Page 18: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

SECTION CNN-18

SIGNALLING AND PERMANENT WAY ALTERATIONS* •

Items marked thus w i l l not appear in future issues and a note must be taken of them by al l concerned:

DETAILS OF WORK REFERRED TO IN SECTION B

SUNDAY 21 JULY KILLINGWORTHThe level crossing gates will be replaced by lifting barriers controlled from the signal box. ( 3 2 )

DETAILS OF WORK ALREADY CARRIED OUT

ADDISONThe level crossing gates have been replaced by lifting barriers controlled from the signal box. (3 1 )

**HEATONThe elevated position light shunting signal No. 102, applicable to down direction movements along theShunting line (adjacent to the Down Tynemouth) has been temporarily repositioned 4 yards further southand at ground level.In its new temporary position, the signal is less visible to Drivers, and extra care should be exercised.(29)

BELFORDThe facing Main to Main crossover at Sim. 38chs. has been temporarily secured out of use until furthernotice, pending replacement. ( U F N )

Page 19: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

SECTION DNN-19

GENERAL INSTRUCTIONS AND NOTICES

* D e n o t e s new or amended item

.11.I*, Items marked thus will not appear in future issues and a note must be taken of them by all concerned.

ALTERATIONS TO SECTIONAL APPENDIX (NORTHERN AREA)

P342 Working of Trains into Tees Dock Exchange SidingsAmend addit ional instructions shown on Page 6 2,o f N D N o t i c e 2 2 D :

Trains of potash wil l normally run to the Down Goods Line (facing direction) and come to a stand withthe locomotive opposite the notice board lettered "10".A loud sounding bell has been located alongside the line at this point, and also at various points alongthe Tees Dock Branch for the purpose of warning staff of the approach of trains.

PROTOTYPE MARK 11 VEHICLE EFK13252 FITTED WITH CHEMICAL TOILET"Eastern Region FK13252 working in the 07 58 Newcastle—Liverpool/15 10 Liverpool—Newcastle c ircuitis equipped with a prototype chemical toilet at one end of the vehicle. A blue lamp, situated in thetransverse corridor at head height on the toilet partit ion, is 'illuminated when the equipment is switched"ON". The switch is situated in a control panel adjacent to the pressure ventilation control switch panel."Arrangements have been made for the equipment to be switched "O N" and "OFF" daily at Newcastle.The switch has two "O N" posit ions and one "OFF" position. Either "ON" posit ion may be selected.""I f the blue lamp fails to illuminate the attention of the Carriage and Wagon Staff must be called. Lampfailure during the journey does not necessitate immediate attention, but the failure must be reported tothe Carriage and Wagon Staff on the train's return to Newcast le. "

MISCELLANEOUS NOTICES

*PILMOOR AND TOLLERTONFrom 02 00 Sunday 21 July until 17 00 Sunday 28 July the facing connection Up Fast to Up Slow between10m. 12chs. and 10m. 16chs. at Tollerton wil l be secured out of use.During this period trains required to detach vehicles in Tollerton Yard wil l be drawn forward on to theUp Fast and then set back behind T4 signal on the Up Slow, through the t railing Up Fast to Up Slowconnection situated near the signal box.The guard wil l be instructed by the signalman to pass the "LIMIT OF SHUNT' board on the Up Slowline for this purpose, where necessary.

HEATON SIDINGSThe following work is taking place between the hours of 08 00 and 17 00 Daily and until further notice,recovering redundant sidings and assets, demolishing redundant buildings, rerouting S. & T. cables andrewiring. Off track machine in use.

STOCKSFIELD STATIONThe East End of the Down Platform is being rebuilt. - - -Drivers of stopping trains to bring their trains to a stand at a marker board provided.

Page 20: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-20SECTION D GENERAL INSTRUCTIONS AND NOTICES — continued

MISCELLANEOUS NOTICES — continued

SOUTH BANK

The East end of the Up platform is being rebuilt.Drivers of stopping trains to bring their trains to a stand at the marker board provided.Until Saturday 20 July

SOUTH BANKThe West end of the Up Platform is being rebuilt.Drivers of stopping trains to bring their trains to a stand at the marker board provided.Comencing Sunday 21 July.

CROW HOUSE LEVEL CROSSING: THORNLEY COLLIERY BRANCHIncreased use is taking place of Crow House level crossing at lm. 07chs.

BILLINGH AM BECK BRANCHA temporary level crossing has been brought into use over the single line at 63m. 14chs. adjacent tobridge No. 5B.A crossing keeper will be in attendance.

HEATON CARRIAGESIDINGS •A temporary level crossing over the Up Benton Goods and Portobello Sidings has been brought into use.A lookout man is in attendance.

PENSHAW NORTH TO LAMBTON COKE WORKS — NCB ARRIVAL AND DEPARTURE LINESContractors will be carrying out Permanent Way alterations and constructing a new underbridge in thevicinity of the existing accommodation road crossing adjacent to the weighbridge office.In addition contractors will be constructing a new accommodation road crossing 50 yards South of theexisting crossing. All Drivers and Guards to exercise great care and keep a sharp lookout for hand-signalmen and lookoutmen in attendance.

PILMOOR AND THIRSKIn connection with high speed diesel tests, transpenders which are housed in a plastic case measuring10" x 8" x 4" have been installed in the four footway at 200 metre intervals between 19m. 38chs.and 20m. 76 chs.

NEVVCASTLE CENTRAL STATION (EAST END)Contractors will be working on roof above the Bay Platforms at the East End.

HEATON STATIONThe Down North platform has been damaged for approximately 40 yards at the West end. Drivers ofstopping trains to keep a sharp lookout and stop beyond marker provided.

PORT CLARENCE TO MONSANTO CHEMICAL SIDINGS BRANCHA temporary level crossing has been brought into use, over the single line in the vicinity of reclamationembankment.

MIDDLESBROUGH GOODS YARDTEMPORARY LEVEL CROSSING

An "Open" level crossing has been provided on the Marsh Branch side of Forty Foot Road open levelcrossing on the Cast Steel Bank line between the Middlesbrough Goods Yard and the Marsh Branch.Movements over the crossing must not exceed 5 m.p.h. and the shunter accompanying each movementmust precede the train on foot to safeguard the passage of the train over the level crossing.

Page 21: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

NN-21SECTION D GENERAL INSTRUCTIONS AND NOTICES — continuedMISCELLANEOUS NOTICES — continued

LOCOMOTIVE HAULED AIR BRAKED PASSENGER COACHING STOCKWORKING ON EAST COAST MAIN LINE SERVICES

Difficulties have been experienced due to dragging brakes on Air Brake Passenger Trains working on theEast Coast Main line. In an endeavour to identify the causes it has been decided that, until further notice,all passenger trains working over the East Coast Main Line route will be operated on a single pipe airbrake system.To operate the single pipe system the main reservoir pipe (yellow coupling head) WILL NOT be coupledas between the locomotive and the first vehicle. The main reservoir pipe on the locomotive and the firstvehicle must remain on the respective bracket-dummies and the cocks in the closed, position.The above instructions in no way alter the regulations for working the automatic air brake on locomotiveoperated trains as contained in the General Appendix.As, however, the main reservoir pipes are not connected it follows that the reading on the gauge in theGuard's brake for the main reservoir pipe will be zero.

Disabled Trains Requiring Assistance in the RearIn the event of a train requiring assistance in the rear it will be neceSsary to revert to the two pipesystem in order that assistance procedure as laid down in the General Appendix and drivers manualBR.33056/16 may be carried out.

Repairs in Motive Power Depots Carriage Sheds Wagon Repair Sheds and Warehouses — In connection wit['work being carried out at the undermentioned places, scaffolding or projections may be provided orunusual excavations may be made in the ground:—

Location N a t u r e of Work D u r a t i o n C o m m e n.o i n g d a t eThornaby MPD P a in t in g depot buildingsThornaby MPD. Contracto r providing roller shutter

doors on Nos.1 and 2 Straight ShedWest Roads, No.5 West Road repairshed, 5 and 6 Roads East and WestEnd Straight Shed and erectingScreen between 4 and 5 RoadStraight Shed.

Thornaby MPD G e n e ra l work in association withconversion of Roads 5 and 6Straight Shed to Wagon Repair Shop.Track alterations and building workin progress.

Cambois MPD Co n st ru ct in g car park adjacent toamenity block, machines unloadingspoil from rail wagons.

Until further noticeUntil further notice.

Until further notice.

U.F.N.

A copy of this notice must be supplied to all Drivers, Guards, Signalmen and others concerned.

M0.45/NN F . J . BURGEYork C h i e f Operating Manager9 JULY 1974

Receipt of this notice need not be acknowledged. t i t he NN Notice is not received by the normal timeadvise your Superior Officer by wire as fol lows:— "N ILE SIG. NOTICE NN NO:—"

•vm,

Page 22: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

Page 23: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

r'''..fW-57W771firPlf-P I

Page 24: TEMPORARY SPEED RESTRICTIONS PERMANENT WAY …filestore.limitofshunt.org.uk.s3.amazonaws.com/... · 22 00 Sun to Fri to 06 00 Mon to Sat. Platform work. Crane and Off track machines

FUEL ECONOMY

FUEL ECONOMY IS VITAL T h e price of traction fuel oil is up •300% in the past year — Eastern Region uses 1,500,000 gallonsa ,week !!

Diesel engines must be shut down whenever possible on mainline and shunting locomotives and DMU's to prevent use o f oil by

idling unnecessarily.

Spillage must be avoided by greater care at fuelling points.

Your co-operation is earnestly requested.