Temescal Canyon Stormwater Project
-
Upload
bill-rosendahl -
Category
Documents
-
view
530 -
download
2
description
Transcript of Temescal Canyon Stormwater Project
Bureau of EngineeringCity of Los Angeles
PROJECT INFORMATION REPORTDepartment of Public Works
Work Order:Lead Division:PM Phone:Project Mgr:
http://www.lacity.org/
http://eng.lacity.org/
http://navigatela.lacity.org/
http://navigatela.lacity.org/pwrsview/
http://eng.lacity.org/iuprs/
http://eng.lacity.org/docs/dpw/bids/consbids.pdf
Temescal Canyon Stormwater BMP Phase I (O/01-22e)Scope of Work
The purpose of this project is to achieve compliance with the Santa MonicaBay Beaches Wet Weather Bacteria Total Maximum Daily Load (TMDL)regulations. The project proposes to divert stormwater from an existingstorm drain to the Temescal Canyon Park for treatment through ahydrodynamic separator, underground detention tank and diversion to asanitary sewer for further treatment at the Hyperion Treatment Plant.
Current Phase
Project Status
Construction Information
Program Information
Council District(s)
Neighborhood Council(s)
Geographic Information
Information Resources
Project is the construction phase.
Construction
Expected Duration: from 7/16/2011 to 7/4/2013Construction Cost: $8,701,780Contractor: Los Angeles Engineering
Proposition OProgram:Iftekhar Ahmed
11 - Bill Rosendahl
Pacific Palisades NC
(213) 485-5875
EW40017A (Active)
Pg-Grid: 630-J6Planning Area:Address: 15733 Temescal Canyon Road
Thomas Guide:
Listed below are various resources available forfinding more information related to projects.
City of Los Angeles Internet Home Page
Bureau of Engineering Internet Home Page
BOE Mapping Application (Navigate LA)
Bureau of Engineering Project Information Reports
Bureau of Engineering Projects Out to Bid
West LA
Proposition O Group
City EngineerGary Lee Moore, P.E.
BOE Public Right of Way Reservation System