![Page 1: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/1.jpg)
TELWIND: Evolved Spar combined with telescopic tower
Status: In Progress Preliminary Checked IssuedTELWIND-WP8-PPT-TD-002
TELWIND: funded by the European Union´s Horizon 2020 research and innovation programme under grant agreement No 654634
![Page 2: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/2.jpg)
Main Objectives
EERA Deepwind. Trondheim 2017 2
TELWIND BACKGROUND: THE TELESCOPIC TOWER
TELWIND TECHNOLOGY
MAJOR FINDINGS
![Page 3: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/3.jpg)
INDEX
3
1. ESTEYCO WHO WE ARE
2. BACKGROUND: THE TELESCOPIC TOWER TECHNOLOGY
3. TELWIND FUNDAMENTALS
4. SEAKEEPING & TANK TESTING
5. CHALLENGES & NEXT STEPS
![Page 4: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/4.jpg)
ESTEYCO: 46 years consulting engineering experience
4
ESTEYCO:WHO WE ARE
EERA Deepwind. Trondheim 2017
![Page 5: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/5.jpg)
Evolution to Renewable EnergyLeaders in civil works in wind energy sector
5
ESTEYCO:WHO WE ARE
EERA Deepwind. Trondheim 2017
![Page 6: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/6.jpg)
Pioneers in precast concrete towers
6
More than 10 years experience at wind turbine concrete towers
+400 WTG towers designed and built, in 6 countries
Designs from 80m up to 160m both for conventional and the disruptive self-lifting tower. Some of our designs WF:
WF AGUA DOCE – IMPSA. Brasil52 WTG 1,5MW HH100m
WF LES FORQUES – GAMESA. Spain2 WTG 2MW HH100m
WF TRAIRÍ – SIEMENS. Brasil50 WTG 2,3MW HH80m
WF COL DE PANISOT – ALSTOM. Spain3 WTG 3MW HH100m
WF GOSTYN – ACCIONA. Poland11 WTG 3MW HH120m
WF PEDRA GRANDE – WEG. Brasil180 WTG 2,1MW HH120m
ESTEYCO:WHO WE ARE
EERA Deepwind. Trondheim 2017
![Page 7: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/7.jpg)
INDEX
7
1. ESTEYCO WHO WE ARE
2. BACKGROUND: THE TELESCOPIC TOWER TECHNOLOGY
3. TELWIND FUNDAMENTALS
4. SEAKEEPING & TANK TESTING
5. CHALLENGES & NEXT STEPS
![Page 8: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/8.jpg)
8
THE TELESCOPIC TOWERVIDEO- CONSTRUCTIVE PROCESS FULL SCALE PROTOTYPE. MADRID. SPAIN. Mar – Oct 2014
EERA Deepwind. Trondheim 2017
![Page 9: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/9.jpg)
9
CONSTRUCTIVE PROCESS FULL SCALE PROTOTYPE. DAGANZO. SPAIN. Mar – Oct 2014 9
THE TELESCOPIC TOWERONSHORE-FULL SCALE PROTOTYPE OF THE TELESCOPIC TOWER
EERA Deepwind. Trondheim 2017
Section Tower T0
Strand jacks
Section Tower T1
Section Tower T2
Sections ready to be installed
![Page 10: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/10.jpg)
10
THE TELESCOPIC TOWERVIDEO-H2020 ELISA/ELICAN- 5MW GBS-TOWER ASSEMBLY JANUARY 2017
EERA Deepwind. Trondheim 2017
![Page 11: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/11.jpg)
11
DEMONSTRATION PROJECT IN PLOCAN. GRAN CANARIA. SPAIN. Sept15– May17 (Expected)
THE TELESCOPIC TOWERELISA/ELICAN 5MW GBS + TELESCOPIC TOWER
EERA Deepwind. Trondheim 2017
Section Tower T2
Section Tower T1
Vertical joints before and after grouting
![Page 12: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/12.jpg)
INDEX
12
1. ESTEYCO WHO WE ARE
2. BACKGROUND: THE TELESCOPIC TOWER TECHNOLOGY
3. TELWIND FUNDAMENTALS
4. SEAKEEPING & TANK TESTING
5. CHALLENGES & NEXT STEPS
![Page 13: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/13.jpg)
TELWIND FUNDAMENTALS
Telescopic Tower
Upper TankSuspension Tendons
Lower Tank
WTG
Mooring Lines
FUNDAMENTALS MAIN COMPONENTS
EERA Deepwind. Trondheim 2017
![Page 14: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/14.jpg)
TECHNOLOGY DEVELOPMENT & DEMONSTRATION
14
TELWIND TECHNOLOGY FOR FLOATING OFFSHORE WIND
EU Horizon 2020 – Low Carbon Energy Call LCE-2015Number of Proposals vs. Evaluation (Phase 1)
H2020 TELWIND PROJECT: Integrated telescopic tower and evolved spar floating substructure for low-cost deep offshore wind and next generation of 10MW+ turbines
EU Contribution: 3,498,530.00 €
Consortium: Esteyco, ALE Heavylift R&D, ACS-Cobra, CEDEX, Dywidag Systems International, Mecal WTD, TUM, UC-IHC.
JOINT INDUSTRY PROJECT (JIP)COUPLED ANALYSIS OF FLOATING WIND TURBINES
ESTEYCO is also currently collaborating with DNVGL in the project:
EERA Deepwind. Trondheim 2017
![Page 15: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/15.jpg)
MAIN OBJECTIVES
15
• Design a 5MW WTG from conceptual to detail-constructive engineering.
• Study the concept scalability for a 12 MW WTG.
• Build a fully coupled aero-hydro-servo-elastic Floating Wind Turbine
model and investigate coupling effects in the overall wind turbine
performance
• Model Basin Tests in operating, extreme and installation conditions
• Perform laboratory tests to study the performance of the suspension
tendons
• CapEx and OpEx estimate. Viability analysis of a single installation and
integration in a multi-megawatt floating wind farm
• Obtain the Certification of the design
• Project dissemination in general and technical forums and conferences
EERA Deepwind. Trondheim 2017
![Page 16: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/16.jpg)
PRELIMINARY DESIGN
16
Parameter Value
Overall Draft 60 m
Upper Tank draft 20.50 m
Upper Tank diameter 32.00 m
Lower Tank diameter 15.35 m
Metacentric height inplace (GM) >3m m
Metacentric height transport (GM) >2m m
Tilt static angle (θSTA) <10º ˚
Overall heave period (T3) >30s s
Overall pitch period (T5) >35s s
Parameter Value
Wind Turbine 5 MW
Water depth 80 m
Hub Height above MSL 86 m
Nacelle Weight 273 t
EERA Deepwind. Trondheim 2017
![Page 17: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/17.jpg)
PATENTED CONCEPT AND PROCEDURES
INSTALLATION STORYBOARD
17
Transport configuration. Preferred alternative-Multi tow configuration (work in progress)
EERA Deepwind. Trondheim 2017
Tower in folded condition
Multi-tow configuration
Messenger wiresTendonsLT partially solid ballasted
Mid size tugs required ~50BP
Fendering and towing lines
![Page 18: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/18.jpg)
PATENTED CONCEPT AND PROCEDURES
INSTALLATION STORYBOARD
18
Offshore Installation
LT CONTROLLED BALLASTING & SINKING
Messenger wiresTendons
Removable temporary
winches
![Page 19: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/19.jpg)
PATENTED CONCEPT AND PROCEDURES
INSTALLATION STORYBOARD
19
Offshore Installation
Final Pull in and fine adjustment of tendonsProgressive ballasting of LT internals
LT Fully flooded. Tendons in position
Solid Ballast Installation
![Page 20: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/20.jpg)
PATENTED CONCEPT AND PROCEDURES
INSTALLATION STORYBOARD
20
Offshore Installation
Mooring Installation
![Page 21: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/21.jpg)
PATENTED CONCEPT AND PROCEDURES
INSTALLATION STORYBOARD
21
Offshore Installation
UT ballasting until targeted position
Jacking up tower second section (T1)
Jacking up tower first section (T2)
![Page 22: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/22.jpg)
PATENTED CONCEPT AND PROCEDURES
INSTALLATION STORYBOARD
22
Offshore Installation
JOINTS termination. Removal of equipment (strand jacks, generators, power packs etc)
WTG Comissioning. Platform inplace
![Page 23: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/23.jpg)
INDEX
23
1. ESTEYCO WHO WE ARE
2. BACKGROUND: THE TELESCOPIC TOWER TECHNOLOGY
3. TELWIND FUNDAMENTALS
4. SEAKEEPING & TANK TESTING
5. CHALLENGES & NEXT STEPS
![Page 24: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/24.jpg)
• Two tank testing campaigns expected
• IHCANTABRIA has extensive experience onfloating platforms and singular floatingdevices
• http://www.ihcantabria.com/es/
• http://ccob.ihcantabria.com/
• https://vimeo.com/183657521
• OBJECTIVES• Proof of TELWIND fundamentals: solidary
motion between LT and UT
• To quantify Hydrodynamic Damping
• RAO´s
• Response in irregular waves
• First test for coupling wind (multifan) +waves
24
PROJECT TODAYIHCantabria tank testing facilities
EERA Deepwind. Trondheim 2017
![Page 25: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/25.jpg)
PROJECT TODAY
25
TELWIND SCALED MODEL
First set of results expected by end of Jan-2016
• Dry characterization tests
• Basin characterization tests
• Wave only tests
• Wind only tests
• Current only tests
• Wave + wind tests
• Wave + wind + current tests
Basin tests performed during first campaign
EERA Deepwind. Trondheim 2017
![Page 26: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/26.jpg)
FREE DECAY TESTS
26
Heave Pitch
Preliminary decay tests of pitch and heave DOFs with mooring
-14,00
-12,00
-10,00
-8,00
-6,00
-4,00
-2,00
0,00
2,00
4,00
6,00
8,00
0,00 100,00 200,00 300,00 400,00 500,00
He
ave
(m
)
t (s)
Heave decay test
-10,00
-8,00
-6,00
-4,00
-2,00
0,00
2,00
4,00
6,00
8,00
0 100 200 300 400 500 600 700
Pit
ch (
º)
t (s)
Pitch decay test38s
EERA Deepwind. Trondheim 2017
48s
![Page 27: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/27.jpg)
RESPONSE AMPLITUDE OPERATORS (RAO´s)
27
Preliminary RAOs of heave and pitch DOF´s
0,00
0,10
0,20
0,30
0,40
0,50
0,60
0,70
0,80
7,00 9,00 11,00 13,00 15,00 17,00 19,00 21,00 23,00 25,00
RA
O (
m/m
)
T (s)
RAO Heave
0,00
0,10
0,20
0,30
0,40
0,50
0,60
7,00 9,00 11,00 13,00 15,00 17,00 19,00 21,00 23,00 25,00
RA
O (
º/m
)
T (s)
RAO Pitch
Heave Pitch
EERA Deepwind. Trondheim 2017
![Page 28: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/28.jpg)
TIME DOMAIN SOLUTIONS
28
Preliminary pitch motion time series
-5,00
0,00
5,00
10,00
15,00
Pit
ch (
º)
t (s)
Pitch uw = 20 m/s Hs = 5.8 m Tp = 11.6 s
-3,00
-2,00
-1,00
0,00
1,00
2,00
3,00
Pit
ch (
º)
t (s)
Pitch uw = 42.5 m/s Hs = 6.4m Tp = 11.96 s
EERA Deepwind. Trondheim 2017
![Page 29: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/29.jpg)
TIME DOMAIN SOLUTIONS
29
Accelerations X-direction at the naccelle
-1,50
-1,00
-0,50
0,00
0,50
1,00
1,50
Acc
x (
m/s
2)
t (s)
Acceleration x at naccelle. 20 m/s Hs=5.8m Tp=11.6s
-1,50
-1,00
-0,50
0,00
0,50
1,00
1,50
Acc
x (
m/s
2)
t (s)
Acceleration x at naccelle. 42.5 m/s Hs=6.4m Tp=11.96s
EERA Deepwind. Trondheim 2017
![Page 30: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/30.jpg)
A FEW DEMONSTRATIVE VIDEOS
30
PARKEDPLOCAN 50 yr storm-ULS Hs = 6.4 m Tp = 11,96 m
OPERATINGPLOCAN extreme operating conditions
Uw = 20 m/s Hs = 5,8 m Tp = 11,6 s
Videos
EERA Deepwind. Trondheim 2017
![Page 31: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/31.jpg)
COMING SOON…
31
Next remarkable steps
EERA Deepwind. Trondheim 2017
WP2
ESTEYCO
• Design Basis Final Version
• Design certification
• Active Ballast system design
• Scalability to 12MW WTG
WP3
MEC-IHC
• Calibration of Numerical models based on tank testing results
• Ad hoc WTG control for TELWIND floating platform
WP4
ESTEYCO-DSI
• Laboratory tests campaign
• Detailed definition of connections and guides
• Tendon Fatigue design
WP5
IHC
•Optimization of mooring system
• Selection of anchoring
WP6
ESTEYCO-CEDEX
• Installation method statements
• Installation storyboards
WP7
IHC-CEDEX
• Installation tank tests
• Full implementation of software in the loop (SiL) strategy during the second test campaign
WP8
COBRA-ESTEYCO
•CapEx and OpEx estimate for a large scale wind farm
• Financial Model-Feasibility Analysis
• Set up a commercial business plan based on the feasibility analysis
![Page 32: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/32.jpg)
CONCLUSIONS
EERA Deepwind. Trondheim 2017 32
TELWIND BACKGROUND: THE TELESCOPIC TOWER
TELWIND TECHNOLOGY
MAIN FINDINGS
• Proven technology• WTG fully assembled onshore• No HLV and Jack up required
• Spar type solution• Solidary motions between LT
and UT• Cost savings: material and
installation
• Tank tests alligned with numerical models and telwindfundamentals
• Very good response in waves
![Page 33: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/33.jpg)
EERA Deepwind. Trondheim 2017 33
TELWIND: funded by the European Union´s Horizon 2020 research and innovation programme under grant agreement No 654634
![Page 34: TELWIND: Evolved Spar combined with telescopic tower€¦ · PRELIMINARY DESIGN 16 Parameter Value Overall Draft 60 m Upper Tank draft 20.50 m Upper Tank diameter 32.00 m ... INSTALLATION](https://reader034.fdocuments.us/reader034/viewer/2022051823/5fed08721ad04b135b103994/html5/thumbnails/34.jpg)
34
Bernardino Couñago, MSc Naval Architect ,
TELWIND Project Manager: [email protected]
Jose Serna, MSc Civil Engineer,
ESTEYCO CTO: [email protected]
More info: www.telwindoffshore.com