Telecom-Fort introduction · PDF fileSince 2005 we have received increasing number of orders...
Transcript of Telecom-Fort introduction · PDF fileSince 2005 we have received increasing number of orders...
TELECOM-FORT Ltd.
2092. Budakeszi, Szüret u. 4. [email protected]
+36-23-453-000
Expert of telecom installation
Budakeszi, 2010.
TELECOM-FORT Ltd . 2 ISO9001
Table of contents
VERIFICATION OF TECHNICAL SUITABILITY ................................................................ 3
Identification data of the venture (Telecom-Fort Ltd.)............................................................. 3
Principal activities of Telecom-Fort Ltd. .................................................................................. 4
Human resources of Telecom-Fort Ltd. ................................................................................... 4
Our main end-users and reference works are the following ..................................................... 4
Pannon/Telenor references in the last 5 years......................................................................... 5
APPENDIX 1 Range of activities of Telecom-Fort Ltd........................................................... 7
Designing, authorization...................................................................................................... 7
Installation, implementation ................................................................................................ 7
Implementation of infrastructure ......................................................................................... 8
Maintenance......................................................................................................................... 8
Service ................................................................................................................................. 8
Marketing and sales ............................................................................................................. 9
APPENDIX 2 Human resources of Telecom-Fort Ltd. ......................................................... 10
APPENDIX 3 Our main end-users and reference works are the following............................ 12
APPENDIX 4 Attestations...................................................................................................... 17
TELECOM-FORT Ltd . 3 ISO9001
VERIFICATION OF TECHNICAL SUITABILITY
Identification data of the venture (Telecom-Fort Ltd.)
Proper name of the company: TELECOM-FORT Szolgáltató Kft.
Corporate form: Limited Liability Company Form of the ownership: Hungarian private property
Seat and phone number: 2092 Budakeszi, Szüret u. 4. Phone: (+36 23) 453-000, 453-671
Fax: (+36 23) 452-790, 452-919 E-mail: [email protected] Name of company's representative: Ildikó MAGYAR
Allowed sphere of activity: Technological Installation of Equipment Telecommunication Primary Contracting and Maintenance Providing Technical Expertise
Professional Construction Works
Date of establishment: 7. November, 1990. Since when is carried out the telecom network installation activity: 1991.
Quality certificate: ISO 9001 - SGS, 3rd September 1996. Latest checking: 3. February, 2010 (ISO 9001:2008) Number of Certificate: HU/00/18216
TELECOM-FORT Ltd . 4 ISO9001
Principal activities of Telecom-Fort Ltd.
During our 20 year long operation, Telecom-Fort Ltd. has gained significant experience in the
below mentioned activities as a primary and subcontractor:
• Designing, authorization
• Installation, implementation
• Implementation of infrastructure
• Maintenance
• Service
• Marketing and sales
For these activites our colleagues possess every designing and engineering entitlement
required by the Hungarian regulations. Appendix 1 contains these activities in details.
Human resources of Telecom-Fort Ltd.
We ensure the above mentioned services by our employees and subcontractors, with whom
we have formal agreements for decades. You may find their qualification and role listed in
Appendix 2.
Our main end-users and reference works are the following
• Antenna Hungária Co., Antenna Távközlési Co.
• WESTEL Rádiótelefon Ltd.
• WESTEL 900 GSM Co.
• Magyar Telekom (T-Mobile)
• PANNON GSM
• Ericsson Telecommunications Hungary Ltd.
• Ministry of Home Affairs
• PRO-M (Professional Mobile Radio) Ltd.
• NOKIA HUNGARY Ltd.
• MATÁV Rt.:
TÁVBER
Miskolc, Szeged, Pécs Directorate
TIG
TELECOM-FORT Ltd . 5 ISO9001
SAT-NET
• MOL Co.
• GTS Hungary Ltd.
• PanTel
• OMSZ (Hungarian Meteorological Service)
• Kapsch Telecom Ltd.
• FORNAX Co.
• War Department EI Co.
• Ministry of Education
• Siemens Telephone Factory Ltd.
• CH2M HILL Ltd.
• Novofer Co.
• SAGEM Hungary Ltd.
• National Security Service
Please find the details in Appendix 3.
Pannon/Telenor references in the last 5 years
In the last 5 years we took an important part in the installation of UMTS systems mainly as
the subcontractor of Ericsson Telecommunications Hungary (ETH). According to detailed list
in Appendix 3 the liaison with ETH meant a fair amount of work, thanks to the high number
of locations.
In 2005-2006 we replaced Nokia BTS equipment with Ericsson BTS equipment in 125
Western-Hungarian 2G locations. Thanks to our good performance in 2005 we received 30
per cent of the total number of sites in the following year (96 sites). 2G SWAP required
thorough preparations and site surveys. We have always met the deadlines and quality
requirements as you can see in the reference list. Besides the equipment replacement, our task
was to measure the scope of service, before 2G SWAP, exclusively as the only one
subcontractor for every site.
Since 2005 we have received increasing number of orders for UMTS BTS implementation in
Pannon/Telenor’s network. Until now we have been installing 3G equipment in 322 sites,
which project usually comprises the following steps:
TELECOM-FORT Ltd . 6 ISO9001
• site survey,
• designing,
• making of infrastructure (production and installation of galvanized
equipment and antenna supporting structures, occasional reinforcement of
the tower or the extant supporting structures),
• installation of antennas, cables and radio equipment (macro, main-remote,
indoor-outdoor, feeders, MHAs, RRUs, diplexers, triplexers and splitters)
• measuring of feeders and MHAs
• create ‘as-built’ documentation
Pannon/Telenor ranks and evaluates its sub-contractors every year based on the failure points
given on site inspections. Telecom-Fort Ltd. has always occupied the 1st or 2nd place on this
list, which was the reason for increase in the number of orders.
Since 2008 Telecom-Fort Ltd. verifies and assesses every technical documentation made by
the subcontractors of Ericsson in Pannon/Telenor related UMTS projects. This assignment
demonstrates our expertise in UMTS BTS implementation. The assessment comprises the
verification of the completed radio plans and the initial cell data, the examination of
feasibility of antennas and equipment layout, and the contradictions comparing initial data
and site survey information. After the approval from Pannon/Telenor the equipment
configuration and equipment list is based on our assessment documentation. This task
developed trust in work relationship between project managers and cell design engineers of
Pannon/Telenor and Telecom-Fort Ltd.
TELECOM-FORT Ltd . 7 ISO9001
APPENDIX 1
Range of activities of Telecom-Fort Ltd.
The Telecom-Fort Ltd. has experience and references in the following fields:
Designing, authorization
• preparation of feasibility studies
• designing of microwave and radio networks
o preparation of frequency plans
o arrangement of the official authorization procedure
o preparation of system-engineering plans
• preparation of static studies
• preparation of lightning protection plans
• preparation of soil-mechanical studies
• designing of antenna console towers
• adaptation of antenna console tower plans
• designing of tower basement
• designing of antenna console masts
• management of the official authorization procedure of building and other activities
• architectural and steel construction designing
Installation, implementation
• installation and commissioning of microwave equipment
• installation and commissioning of GSM base stations
• installation and commissioning of DCS base stations
• installation of other wireless and radio-engineering equipment
o installation and measurement of antennas and antenna systems
o installation and measurement of radio cables
o installation and commissioning of microwave and radio units
TELECOM-FORT Ltd . 8 ISO9001
• measurement of wireless telecommunication equipment
• installation of structured networks
Implementation of infrastructure
• telecommunication architectural implementation
• establishment of telecommunication room
• production and installation of telecommunication container
• production and installation of antenna console towers (up to 80 m height)
• production and installation of antenna console masts
• establishment of primary and secondary lightning protection
• establishment of heavy-current power supply
• purchasing and installation of power supply equipment
Maintenance
• survey and supervision of existing telecommunication network
o preventive maintenance of network elements
o preventive maintenance of infrastructural network elements connected to the
telecommunication system
• provision of trouble-shooting surveillance in the area of Hungary within 4-6 hours
repairing time
• help desk service
• supervision of telecommunication network with local supervising terminal
Service
• complete arrangement of Tenders with foreign trade and project management support
• consultation and arrangement of change management and organization development
• technical expert activity
• training
TELECOM-FORT Ltd . 9 ISO9001
Marketing and sales (Earlier, marketing has been an important part of our profile.)
• preparation of market research reports
• representation of foreign telecommunication companies
• translation and interpretation in English and French
• organization of conferences and lectures related to telecommunication
TELECOM-FORT Ltd . 10 ISO9001
APPENDIX 2
Human resources of Telecom-Fort Ltd.
Manpower sources of the TELECOM-FORT ltd. (employees and subcontractors with whom
we have formal agreements for decades):
• 4 electrical engineers for direct organization, realization leading, technological
installation, commissioning, trouble-shooting, training
• 3 electrical engineers, wireless link designers
• 1 electrical engineer, working with electronic geographical database and wireless
designing program
• 3 electrical engineers for setting in, checking, retuning tunable units of the
microwave equipment
• 1 mechanical engineer, for structural constructions, realization
• 1 person for handling the Primavera project managing program, to assist the
realization)
• 4 architects, structural engineers
• 3 works engineers for technological and building realization and management,
commissioning, trouble-shooting, maintenance surveillance
• 21 mechanics, electronic - and radio engineering technician for the complex
realization
• 12 industrial alpinist
• 1 heavy current designer
• 5 heavy current technician with special training for the realization of heavy current
work, conducting and recording contact- and lightning protection measurements.
• 2 geodetic surveyors
• 4 mechanics with special training for installation of the air-conditioning units and the
realization of the air-conditioning- and ventilation system
TELECOM-FORT Ltd . 11 ISO9001
• 12 building workers with special training for carrying out the outside and inside
building work
• 10 persons with special and alpinist training for carrying out the steel construction
work
• 2 works engineers, fire protection experts for the designing and realization of the fire-
alarm and fire-fighting system
• 1 work safety expert for inspection of the sites regarding the suitability for safe
working.
TELECOM-FORT Ltd . 12 ISO9001
APPENDIX 3
Our main end-users and reference works are the following
• Antenna Hungária Co., Antenna Távközlési Co.:
− realization of Point to Point microwave links (114 pieces)
− realization of Point to Multipoint microwave links (143 end points)
− realization of 12 pieces Point to Multipoint base stations
− installs of NETMAN system
− designing and installation of microwave antenna holder (12 sites)
• WESTEL Rádiótelefon Ltd.:
− turn-key installation of NMT wireless base stations (143 stations)
− installation of 11, 13, 15, 23 and 38 GHz microwave equipment (186 connections)
− installation of microwave antenna holding towers (46 pieces)
− manufacturing and installation of containers (62 pieces)
− preparation of radio-engineering plans (122 pieces)
• WESTEL 900 GSM Co.:
− installation of turn-key GSM base stations (460 pieces)
− production of microwave antenna holding towers (32 pieces)
− architectural planning of base station infrastructure (210 pieces)
− planning of microwave connection (33 pieces)
• Magyar Telekom (T-Mobile):
− installation of GSM base station (66 pieces)
− installation of UMTS base station (340 pieces)
− installation of EDR base station (46 pieces)
− setting of routers (55 pieces)
− setting of WLAN equipment (63 pieces)
− configuration of translational way (48 pieces)
− planning of base station (129 pieces)
TELECOM-FORT Ltd . 13 ISO9001
− End-to end tests to the swap of HLR, MSC and BSC in the network of T-Mobile
(ordered by Ericsson Ltd.)
• PANNON GSM:
− architectural planning of base station infrastructure (12 pieces)
− preparation of base station infrastructure (18 pieces)
− technological installation of 15 pieces GSM base stations (contracted with NOKIA)
• Ericsson Telecommunications Hungary Ltd.:
− planning, licensing, designing of 210 pieces Point –Point microwave links
− setting training of MINI-LINK
− completion of End-to-End calling test for MSC and BSC software change (16 times)
− drive tests for Pannon GSM SWAP (942 stations)
− feasibility study plan of configuration microwave link (123 links)
− base station SWAP for Pannon mains (148 stations)
− setting of UMTS equipment on T-Mobile mains (96 stations)
− setting of UMTS equipment on Pannon/Telenor mains (332 stations)
• Ministry of Home Affairs:
− designing and installation of 15, 23, and 38 GHz- microwave links (29 links)
− installation of microwave antenna holding towers (4 pieces)
− designing and installation of 15, 23 and 38 GHz microwave links (contracted with
ERICSSON, in the investment of National Police Headquarters) (24 links)
− designing and installation of countrywide main network (77 links)
− expansion, planning, designing of countrywide main network (SA-67 project) (93
links)
• PRO-M (Professional Mobile Radio) Co.:
− designing of EDR base station (order by T-MOBILE) (46 pieces)
• NOKIA HUNGARY Ltd.:
− technical support, expertness
− installation of DCS base stations (Vodafone project) (97 stations)
TELECOM-FORT Ltd . 14 ISO9001
− installation of microwave links (18 links)
− site search, planning of base stations (86 )
− clean up works of located base stations (56 stations)
− designing of 23 GHz microwave links(3 plans)
• MATÁV Co.:
TÁVBER:
− realization of 45 microwave tower in 42 days
− realization of 56 new tower
− lightening of 19 tower in scope of RLL project
− production and installation of 18 pieces telecommunication containers in scope of
RLL project
Miskolc, Szeged and Pécs Directorate:
− planning of 15 and 23 GHz microwave links (33 items)
− designing and installation of 15 and 23 GHz microwave links (30 links)
− building of 19 pieces microwave antenna holding
− production and installation of 8 pieces telecommunication containers
TIG:
− 28 end points Wireless Local Loop project in Buda: installation of outdoor equipment
of RAS system (contracted with ERICSSON)
− installation of 13 pieces 23 GHz microwave links
SAT-NET:
− installation of IRT 2000 Point - Multipoint microwave system for data transmission in
Budapest (14 base stations, 87 end points)
• MOL Co.:
− designing and turn-key installation of IRT 1500 Point - Multipoint microwave system
(5 base stations, 28 end points)
TELECOM-FORT Ltd . 15 ISO9001
− designing and installation of 23, 38 GHz microwave links (19 links) (contracted with
ERICSSON)
− production of microwave antenna holding towers (8 pieces)
− designing and realization of country-wide microwave network with middle capacity
(17 stations)
• GTS Hungary Ltd.:
− designing and installation of IRT and Alcatel Point - Multipoint microwave system for
data transmission in Budapest and in the countryside (26 basic stations, 119 end
points)
− maintenance service, with non-stop surveillance system throughout the year, trouble
shooting within 4 hours in Budapest (6 years)
− designing and installation of point-to-point 15, 23 and 38 GHz microwave links (85
links)
− designing of point-to-point 15, 23 and 38 GHz microwave links (170 items)
− designing and infrastructure building of base stations (18 base stations)
• PanTel:
− preparation of feasibility studies for microwave links (point-to-point, point-to-
multipoint) (311 end points)
− realization and infrastructure of 175 point-to-point microwave links
− realization of Point Multipoint microwave links (120 end points)
− maintenance service, with non-stop surveillance system throughout the year, trouble-
shooting within 4 hours
• OMSZ (Hungarian Meteorological Service):
− supply and installation of the equipment for the thunder detection system (26 stations)
− handling the public acquisition regarding the meteorological radar system (cca: 1.200
m HUF as prime rate)
− designing and implementation of the necessary infrastructural modifications for
meteorological radar (architectural implementation, production and installation of
special antenna console towers) (3 stations)
TELECOM-FORT Ltd . 16 ISO9001
• Kapsch Telecom Ltd.:
− designing of WLAN base stations , measuring of LOS (63 stations)
− structure designing of MVM network (23 stations)
• FORNAX Co.:
− panning and designing of 3,5 GHz base stations (6 stations)
− designing of 3,5 GHz subscriber end points (39 end points)
• War Department EI Co.:
− planning and designing of Ministry of Home Affairs’ call centre heavy current renewal
(34 stations)
− lighting and touch protection supervision of Ministry of Home Affairs’
telecommunication stations (70 locations)
• Ministry of Education:
− planning, licensing and designing of 5 pieces microwave network
• Siemens Telephone factory Ltd.:
− designing of 16 pieces microwave links
• CH2M HILL Ltd.:
− designing of UMTS base stations (5 stations)
• Novofer Co.:
− planning and designing of 18 pieces microwave links
• SAGEM Hungary Ltd.:
− frequency planning and licensing of 8 pieces microwave links
• National Security Service:
− planning and designing of 14 pieces microwave links
TELECOM-FORT Ltd . 17 ISO9001
APPENDIX 4
Attestations
The most important attestations of Telecom-Fort Ltd. are listed below in reverse
chronological order (the newest appear first). You may find an English abstract before the
attestations written in Hungarian.
TELECOM-FORT Ltd. ISO9001
Magyar Telekom Nyrt.
June 28th, 2010
Attestation by Magyar Telekom Nyrt. confirms that in the last 7 years Telecom-Fort Ltd. has
performed the following works:
- installation of GSM/DCS base station (71 pieces)
- installation of UMTS base station (164 pieces)
- installation of LTE base station (7 pieces)
- installation of TETRA base station (48 pieces)
- setting of WLAN equipment (58 pieces)
- installation of microwave link (58 pieces)
- planning of base station (139 pieces)
- BTS sectorization (6 pieces)
- installation of repeater station (29 pieces)
- other installation work (140 pieces).
TELECOM-FORT Ltd. ISO9001
Ericsson Telecommunications Hungary Ltd.
June 29th, 2010
Attestation by Ericsson Telecommunications Hungary confirms that Telecom-Fort Ltd. has
been participating in BTS development projects for Pannon/Telenor as the subcontractor of
Ericsson since 2005. During these years we have performed the following works:
- 2G base station SWAP (125 pieces)
- drive tests for GSM SWAP
- designing and implementation of 3G station extension (355 stations)
- Ethernet extension (115 sites)
- providing technical expertise.
TELECOM-FORT Ltd. ISO9001
Ericsson Telecommunications Hungary Ltd.
June 24th, 2010
Attestation by Ericsson Telecommunications Hungary confirms that Telecom-Fort Ltd. has
been participating in Magyar Telekom Nyrt. (T-Mobile) turn-key projects as the subcontractor
of Ericsson since 2006. During these years we have accomplished more than 30 BTS
implementations successfully, some of them covered the whole scope of duties from planning
to commissioning.
TELECOM-FORT Ltd. ISO9001
Ericsson Telecommunications Hungary Ltd.
April 21st, 2006
Attestation by Ericsson Telecommunications Hungary declares that in 2005-2006 Telecom-
Fort Ltd. has succeeded in the installation of new RAU equipment and software updates of
MMU equipment in the microwave core network of Ministry of Home Affairs as the
subcontractor of Ericsson.
TELECOM-FORT Ltd. ISO9001
Ericsson Telecommunications Hungary Ltd.
October 7th, 2003
Attestation by Ericsson Telecommunications Hungary declares that Telecom-Fort Ltd.
successfully accomplished GSM BTS rack replacement on Westel mains in 2002.
TELECOM-FORT Ltd. ISO9001
Hungarian Meteorological Service
October 7th, 2003
Attestation by Hungarian Meteorological Service confirms that in 2003 Telecom-Fort Ltd.
completely arranged the recontruction project of meteorological radar system in Napkor.
Telecom-Fort Ltd. carried out significant demolition work (7,3 million HUF).
TELECOM-FORT Ltd. ISO9001
Antenna Hungária Co.
September 29th, 2003
Attestation by Antenna Hungária Co. confirms that in 2002-2003 Telecom-Fort Ltd. has
successfully participated in the implementation of Antenna Hungária Co.’s microwave
network. Telecom-Fort Ltd. carried out significant demolition work (3,4 million HUF).
TELECOM-FORT Ltd. ISO9001
Ministry of Home Affairs
April 13rd, 2000
Attestation by Ministry of Home Affairs confirms that since 1993 Telecom-Fort Ltd. has been
exclusively desinging, implementing and extending the microwave core network of Ministry
of Home Affairs.