37
TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal TSGENCO, Vidyut Soudha, Hyderabad-500 082 To The Member Secretary (Thermal Power) Indira Paryavaran Bhawan (New building), Jorbagh, New Delhi-110003 Lr. No: CE/C/Thermal/SE/C/TCD-I/F.KTPS-VII/D.No.123/14, Date: 03.02.2015 Dear Sir, Sub: TSGENCO-Expansion by Addition of (1x800) MW Supercritical Coal based Kothagudem Thermal Power Station-VII-Essential Details Sought Furnished- Reg. Ref: 1. Our Proposal No. IA/TG/THE/24790/2012, Submission dated: 19.09.2014; 2. File No. J-13012/24/2012-IA.II (T) 3. Your email on Essential Details sought, dated: 13.10.2014 With reference to your email dated 13.10.2014 related to our online application dated: 19.09.2014, for expansion of (addition of 1 x 800 MW Supercritical) Coal Based Kothagudem Thermal Power Station- (VII) for EC. We are here by submitting point wise replies for essential details sought in the email 3 rd cited. 1. Latest certified compliance report from Regional Office of MoEF&CC Dr. M.T. Karuppiah, Scientiest-C; Ministry of Environment, Forest & Climate Change, Regional Office (South Eastern Zone) - Chennai, visited the site and issued the compliance report on 28.11.2014. The same is attached as Annexure-I for your kind perusal. 2. Status of the Suliary Belwar Coal Block including EC & FC Originally, the requirement of coal for the project is envisaged from Suliary Belwar Coal Block, Madhya Pradesh being developed by State Mineral Development Corporation. The quality parameters, requirement in MTPA, etc., of the coal are furnished in EIA report. Contd… P-2

Transcript of TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA...

Page 1: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

TELANGANA STATE POWER GENERATION CORPORATION LIMITED

From

The Chief Engineer CivilThermal

TSGENCO Vidyut Soudha

Hyderabad-500 082

To

The Member Secretary (Thermal Power)

Indira Paryavaran Bhawan (New building)

Jorbagh New Delhi-110003

Lr No CECThermalSECTCD-IFKTPS-VIIDNo12314 Date 03022015

Dear Sir

Sub TSGENCO-Expansion by Addition of (1x800) MW Supercritical Coal based

Kothagudem Thermal Power Station-VII-Essential Details Sought ndashFurnished- Reg

Ref 1 Our Proposal No IATGTHE247902012 Submission dated 19092014

2 File No J-13012242012-IAII (T)

3 Your email on Essential Details sought dated 13102014

With reference to your email dated 13102014 related to our online application dated

19092014 for expansion of (addition of 1 x 800 MW Supercritical) Coal Based

Kothagudem Thermal Power Station- (VII) for EC We are here by submitting point wise

replies for essential details sought in the email 3rd

cited

1 Latest certified compliance report from Regional Office of MoEFampCC

Dr MT Karuppiah Scientiest-C Ministry of Environment Forest amp Climate Change

Regional Office (South Eastern Zone) - Chennai visited the site and issued the

compliance report on 28112014 The same is attached as Annexure-I for your kind

perusal

2 Status of the Suliary Belwar Coal Block including EC amp FC

Originally the requirement of coal for the project is envisaged from Suliary Belwar Coal

Block Madhya Pradesh being developed by State Mineral Development Corporation The

quality parameters requirement in MTPA etc of the coal are furnished in EIA report

Contdhellip P-2

SCCL Fuel Analysis Details

The coal requirement for the project is 395 MTPA based on GCV 3700 KcalKg Daily coal

requirement is 12023 Tonnes The coal will be sourced from SCCL Telangana State

The Indigenous coal (40 MTPA as per MoU) will be obtained from Ms SCCL a

Government of Telangana under taking An MOU has been signed with Ms SCCL for supply

of 40 MTPA coal and will be transported by rail to the proposed power station

The quality parameters of SCCL Indigenous coal are tabulated in below

Table Analysis of SCCL Coal

Item Indigenous G13

Grade Coal

Indigenous G11

Grade Coal Average grade of Coal

Fixed Carbon 25 30 27

Ash 40 36 38

Volatile matter 30 25 27

Total Moisture 12 10 11

Sulphur lt05 lt062 lt062

HGI 50 50 50

GCV (HHV) KcalKg 3400 4000 3700

The quality of coal offered by SCCL is similar to the quality of coal originally proposed from

Suliary Belwar Coal block

Table Stack and Emission Details

Details Units SCCL Coal

Plant Heat rate KcalKWH 2317

GCV Kcalkg 3700

Fuel consumption

TPH 501

TPD 12023

TPA 395

Flow rate Nm3s 847

Ash Content 38

Sulfur Content 062

PM Emissions gs 423

SO2 Emissions gs 1726

NOx Emissions gs 430

Ash TPD 4560

Fly ash TPD 3648

Bottom ash TPD 912

Note 1) The EIA report prepared based on 100 Indigenous coal (ie Suliary Belwar Coal Block)

2) Calculations based on Indigenous (SCCL) coal of GCV gt3700 Kcalkg

Model Inputs and Results

Based on MoU with SCCL coal the Inputs used to run the model are stack details emission

details and a twenty-four Hours mean meteorological data The stack amp emission details are

shown in the below

Stack and Emission Details

Details Units Proposed Plant

Plant Capacity MW 800

Boiler Capacity TPH 2600

Type of Fuel - Coal

Height of the Stack M 275

Internal Dia of Stack M 7

Temperature of Flue Gas degC 125

Ambient Temperature (mean) degC 318

Velocity of Flue Gas ms 22

Flow Nm3s 847

Fuel Consumption TPH 501

Ash Content (in coal used) 38

Sulfur Content 062

PM Emissions gs 423

SO2 Emissions gs 1726

NOX Emissions gs 430

24 Hour Mean Meteorological Data for Post Monsoon Season

Hr Speed

(ms)

Wind Direction

(Degrees)

Temperature Cloud Cover Relative Humidity

Celsius (OKTAS) ()

1 166 225 201 4 65

2 156 225 198 4 67

3 142 225 192 4 74

4 125 225 184 3 76

5 105 225 178 4 76

6 096 225 186 3 78

7 082 225 208 3 74

8 081 45 222 2 72

9 106 90 244 2 70

10 152 45 264 2 68

11 229 45 284 1 65

12 295 45 291 1 62

13 335 45 302 1 60

14 382 45 314 1 60

15 441 45 312 2 59

16 424 45 304 3 59

17 427 45 291 3 59

18 401 45 272 3 61

19 242 360 254 3 61

20 168 45 232 5 60

21 135 90 217 5 61

22 128 90 21 5 61

23 141 45 21 4 62

24 146 225 20 4 63

Post Project Scenario-Units microgm3

Particulars Particulate Matter

(PM10)

Sulfur Dioxide

(SO2)

Oxides of Nitrogen

(NOX)

Baseline Scenario (Max) 972 414 468

Predicted GLC (Max) 066 240 84

Overall Scenario

(Worst Case)

979 654 552

NAAQ Standards lsquorsquo 100 80 80

Source lsquorsquo MoEF Notification New Delhi 16th November 2009 Schedule VII

The Predicted maximum Ground level concentration of 24 Hour average PM10 SO2 and NOX

concentrations considering 24 hour mean meteorological data of study season are superimposed on the

maximum baseline concentrations obtained during the study period to estimate the post project

scenario which would prevail at the post operational phase The overall post project scenario is shown

in above Table

The isopleths of the predicted concentrations of the monitored pollutants are presented in Figures (A)

(B) (C)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Predicted 24-Hourly Average GLCs of PM (microgm3)

Figure (A)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)

3mCr~GOVERNMENT OF INDIA

q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE

CHANGERegional Office (South Eastern Zone)

1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034

TeINo044-2822 2325 E-mail roefcccgmaiIcom

ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003

FNoEP121511AP 1~2JDate 28112014

Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding

Ref (1)(2)(3)(4)

Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014

Madam

In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action

Encls As above

Copy to

1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003

2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO

I ~rtQ~o u (Dr MT Karuppiah)Scientist - C

(Dr MT Karup lah)Scientist - C

Naveen
Typewritten text
Annexure-I13Certified Compliance Report

GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change

(Regional Office Southern Eastern Zone)Chennai -600 034

MONITORING REPORTPART I

DATA SHEET

FNoEP121511AP

1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify

Thermal

2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)

No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad

3 Clearance leUer(s)OM No anddated

4 Locations

a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N

80deg4134 E

5 Address of correspondence

a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha

Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin

6 Salient features

a of the project Covered in EIAIEMP

Page 1of 19

b of the environmental managementplans

7 Break up of the project area

a Submergence area (forest amp nonshyforests)

bOthers

8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans

a SCSTAdivasisbOthers

9 Financial Details

a Project cost as originally plannedand subsequent revised estimatesand the years of price reference

b Allocations made for environmentalmanagement plans with item wiseand year wise breakup

c Benefit cost ratiointernal rate ofreturn and the years of assessment

d Whether (c) includes the cost ofenvironmental management asshown in (b) above

e Total expenditure on the Project so

Submitted to MoEF during projectappraisal

Nil

8970 Ha (including common areas ofStage-V)

NANA

1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)

1 Green belt Development Rs100 Cr2 Pollution monitoring

instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system

for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection

storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)

Rs 247096 Crores (As per project

Page 2 of 19

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 2: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

SCCL Fuel Analysis Details

The coal requirement for the project is 395 MTPA based on GCV 3700 KcalKg Daily coal

requirement is 12023 Tonnes The coal will be sourced from SCCL Telangana State

The Indigenous coal (40 MTPA as per MoU) will be obtained from Ms SCCL a

Government of Telangana under taking An MOU has been signed with Ms SCCL for supply

of 40 MTPA coal and will be transported by rail to the proposed power station

The quality parameters of SCCL Indigenous coal are tabulated in below

Table Analysis of SCCL Coal

Item Indigenous G13

Grade Coal

Indigenous G11

Grade Coal Average grade of Coal

Fixed Carbon 25 30 27

Ash 40 36 38

Volatile matter 30 25 27

Total Moisture 12 10 11

Sulphur lt05 lt062 lt062

HGI 50 50 50

GCV (HHV) KcalKg 3400 4000 3700

The quality of coal offered by SCCL is similar to the quality of coal originally proposed from

Suliary Belwar Coal block

Table Stack and Emission Details

Details Units SCCL Coal

Plant Heat rate KcalKWH 2317

GCV Kcalkg 3700

Fuel consumption

TPH 501

TPD 12023

TPA 395

Flow rate Nm3s 847

Ash Content 38

Sulfur Content 062

PM Emissions gs 423

SO2 Emissions gs 1726

NOx Emissions gs 430

Ash TPD 4560

Fly ash TPD 3648

Bottom ash TPD 912

Note 1) The EIA report prepared based on 100 Indigenous coal (ie Suliary Belwar Coal Block)

2) Calculations based on Indigenous (SCCL) coal of GCV gt3700 Kcalkg

Model Inputs and Results

Based on MoU with SCCL coal the Inputs used to run the model are stack details emission

details and a twenty-four Hours mean meteorological data The stack amp emission details are

shown in the below

Stack and Emission Details

Details Units Proposed Plant

Plant Capacity MW 800

Boiler Capacity TPH 2600

Type of Fuel - Coal

Height of the Stack M 275

Internal Dia of Stack M 7

Temperature of Flue Gas degC 125

Ambient Temperature (mean) degC 318

Velocity of Flue Gas ms 22

Flow Nm3s 847

Fuel Consumption TPH 501

Ash Content (in coal used) 38

Sulfur Content 062

PM Emissions gs 423

SO2 Emissions gs 1726

NOX Emissions gs 430

24 Hour Mean Meteorological Data for Post Monsoon Season

Hr Speed

(ms)

Wind Direction

(Degrees)

Temperature Cloud Cover Relative Humidity

Celsius (OKTAS) ()

1 166 225 201 4 65

2 156 225 198 4 67

3 142 225 192 4 74

4 125 225 184 3 76

5 105 225 178 4 76

6 096 225 186 3 78

7 082 225 208 3 74

8 081 45 222 2 72

9 106 90 244 2 70

10 152 45 264 2 68

11 229 45 284 1 65

12 295 45 291 1 62

13 335 45 302 1 60

14 382 45 314 1 60

15 441 45 312 2 59

16 424 45 304 3 59

17 427 45 291 3 59

18 401 45 272 3 61

19 242 360 254 3 61

20 168 45 232 5 60

21 135 90 217 5 61

22 128 90 21 5 61

23 141 45 21 4 62

24 146 225 20 4 63

Post Project Scenario-Units microgm3

Particulars Particulate Matter

(PM10)

Sulfur Dioxide

(SO2)

Oxides of Nitrogen

(NOX)

Baseline Scenario (Max) 972 414 468

Predicted GLC (Max) 066 240 84

Overall Scenario

(Worst Case)

979 654 552

NAAQ Standards lsquorsquo 100 80 80

Source lsquorsquo MoEF Notification New Delhi 16th November 2009 Schedule VII

The Predicted maximum Ground level concentration of 24 Hour average PM10 SO2 and NOX

concentrations considering 24 hour mean meteorological data of study season are superimposed on the

maximum baseline concentrations obtained during the study period to estimate the post project

scenario which would prevail at the post operational phase The overall post project scenario is shown

in above Table

The isopleths of the predicted concentrations of the monitored pollutants are presented in Figures (A)

(B) (C)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Predicted 24-Hourly Average GLCs of PM (microgm3)

Figure (A)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)

3mCr~GOVERNMENT OF INDIA

q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE

CHANGERegional Office (South Eastern Zone)

1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034

TeINo044-2822 2325 E-mail roefcccgmaiIcom

ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003

FNoEP121511AP 1~2JDate 28112014

Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding

Ref (1)(2)(3)(4)

Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014

Madam

In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action

Encls As above

Copy to

1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003

2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO

I ~rtQ~o u (Dr MT Karuppiah)Scientist - C

(Dr MT Karup lah)Scientist - C

Naveen
Typewritten text
Annexure-I13Certified Compliance Report

GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change

(Regional Office Southern Eastern Zone)Chennai -600 034

MONITORING REPORTPART I

DATA SHEET

FNoEP121511AP

1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify

Thermal

2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)

No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad

3 Clearance leUer(s)OM No anddated

4 Locations

a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N

80deg4134 E

5 Address of correspondence

a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha

Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin

6 Salient features

a of the project Covered in EIAIEMP

Page 1of 19

b of the environmental managementplans

7 Break up of the project area

a Submergence area (forest amp nonshyforests)

bOthers

8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans

a SCSTAdivasisbOthers

9 Financial Details

a Project cost as originally plannedand subsequent revised estimatesand the years of price reference

b Allocations made for environmentalmanagement plans with item wiseand year wise breakup

c Benefit cost ratiointernal rate ofreturn and the years of assessment

d Whether (c) includes the cost ofenvironmental management asshown in (b) above

e Total expenditure on the Project so

Submitted to MoEF during projectappraisal

Nil

8970 Ha (including common areas ofStage-V)

NANA

1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)

1 Green belt Development Rs100 Cr2 Pollution monitoring

instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system

for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection

storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)

Rs 247096 Crores (As per project

Page 2 of 19

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 3: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

Model Inputs and Results

Based on MoU with SCCL coal the Inputs used to run the model are stack details emission

details and a twenty-four Hours mean meteorological data The stack amp emission details are

shown in the below

Stack and Emission Details

Details Units Proposed Plant

Plant Capacity MW 800

Boiler Capacity TPH 2600

Type of Fuel - Coal

Height of the Stack M 275

Internal Dia of Stack M 7

Temperature of Flue Gas degC 125

Ambient Temperature (mean) degC 318

Velocity of Flue Gas ms 22

Flow Nm3s 847

Fuel Consumption TPH 501

Ash Content (in coal used) 38

Sulfur Content 062

PM Emissions gs 423

SO2 Emissions gs 1726

NOX Emissions gs 430

24 Hour Mean Meteorological Data for Post Monsoon Season

Hr Speed

(ms)

Wind Direction

(Degrees)

Temperature Cloud Cover Relative Humidity

Celsius (OKTAS) ()

1 166 225 201 4 65

2 156 225 198 4 67

3 142 225 192 4 74

4 125 225 184 3 76

5 105 225 178 4 76

6 096 225 186 3 78

7 082 225 208 3 74

8 081 45 222 2 72

9 106 90 244 2 70

10 152 45 264 2 68

11 229 45 284 1 65

12 295 45 291 1 62

13 335 45 302 1 60

14 382 45 314 1 60

15 441 45 312 2 59

16 424 45 304 3 59

17 427 45 291 3 59

18 401 45 272 3 61

19 242 360 254 3 61

20 168 45 232 5 60

21 135 90 217 5 61

22 128 90 21 5 61

23 141 45 21 4 62

24 146 225 20 4 63

Post Project Scenario-Units microgm3

Particulars Particulate Matter

(PM10)

Sulfur Dioxide

(SO2)

Oxides of Nitrogen

(NOX)

Baseline Scenario (Max) 972 414 468

Predicted GLC (Max) 066 240 84

Overall Scenario

(Worst Case)

979 654 552

NAAQ Standards lsquorsquo 100 80 80

Source lsquorsquo MoEF Notification New Delhi 16th November 2009 Schedule VII

The Predicted maximum Ground level concentration of 24 Hour average PM10 SO2 and NOX

concentrations considering 24 hour mean meteorological data of study season are superimposed on the

maximum baseline concentrations obtained during the study period to estimate the post project

scenario which would prevail at the post operational phase The overall post project scenario is shown

in above Table

The isopleths of the predicted concentrations of the monitored pollutants are presented in Figures (A)

(B) (C)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Predicted 24-Hourly Average GLCs of PM (microgm3)

Figure (A)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)

3mCr~GOVERNMENT OF INDIA

q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE

CHANGERegional Office (South Eastern Zone)

1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034

TeINo044-2822 2325 E-mail roefcccgmaiIcom

ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003

FNoEP121511AP 1~2JDate 28112014

Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding

Ref (1)(2)(3)(4)

Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014

Madam

In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action

Encls As above

Copy to

1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003

2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO

I ~rtQ~o u (Dr MT Karuppiah)Scientist - C

(Dr MT Karup lah)Scientist - C

Naveen
Typewritten text
Annexure-I13Certified Compliance Report

GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change

(Regional Office Southern Eastern Zone)Chennai -600 034

MONITORING REPORTPART I

DATA SHEET

FNoEP121511AP

1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify

Thermal

2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)

No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad

3 Clearance leUer(s)OM No anddated

4 Locations

a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N

80deg4134 E

5 Address of correspondence

a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha

Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin

6 Salient features

a of the project Covered in EIAIEMP

Page 1of 19

b of the environmental managementplans

7 Break up of the project area

a Submergence area (forest amp nonshyforests)

bOthers

8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans

a SCSTAdivasisbOthers

9 Financial Details

a Project cost as originally plannedand subsequent revised estimatesand the years of price reference

b Allocations made for environmentalmanagement plans with item wiseand year wise breakup

c Benefit cost ratiointernal rate ofreturn and the years of assessment

d Whether (c) includes the cost ofenvironmental management asshown in (b) above

e Total expenditure on the Project so

Submitted to MoEF during projectappraisal

Nil

8970 Ha (including common areas ofStage-V)

NANA

1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)

1 Green belt Development Rs100 Cr2 Pollution monitoring

instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system

for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection

storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)

Rs 247096 Crores (As per project

Page 2 of 19

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 4: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

Post Project Scenario-Units microgm3

Particulars Particulate Matter

(PM10)

Sulfur Dioxide

(SO2)

Oxides of Nitrogen

(NOX)

Baseline Scenario (Max) 972 414 468

Predicted GLC (Max) 066 240 84

Overall Scenario

(Worst Case)

979 654 552

NAAQ Standards lsquorsquo 100 80 80

Source lsquorsquo MoEF Notification New Delhi 16th November 2009 Schedule VII

The Predicted maximum Ground level concentration of 24 Hour average PM10 SO2 and NOX

concentrations considering 24 hour mean meteorological data of study season are superimposed on the

maximum baseline concentrations obtained during the study period to estimate the post project

scenario which would prevail at the post operational phase The overall post project scenario is shown

in above Table

The isopleths of the predicted concentrations of the monitored pollutants are presented in Figures (A)

(B) (C)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Predicted 24-Hourly Average GLCs of PM (microgm3)

Figure (A)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)

3mCr~GOVERNMENT OF INDIA

q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE

CHANGERegional Office (South Eastern Zone)

1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034

TeINo044-2822 2325 E-mail roefcccgmaiIcom

ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003

FNoEP121511AP 1~2JDate 28112014

Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding

Ref (1)(2)(3)(4)

Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014

Madam

In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action

Encls As above

Copy to

1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003

2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO

I ~rtQ~o u (Dr MT Karuppiah)Scientist - C

(Dr MT Karup lah)Scientist - C

Naveen
Typewritten text
Annexure-I13Certified Compliance Report

GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change

(Regional Office Southern Eastern Zone)Chennai -600 034

MONITORING REPORTPART I

DATA SHEET

FNoEP121511AP

1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify

Thermal

2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)

No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad

3 Clearance leUer(s)OM No anddated

4 Locations

a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N

80deg4134 E

5 Address of correspondence

a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha

Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin

6 Salient features

a of the project Covered in EIAIEMP

Page 1of 19

b of the environmental managementplans

7 Break up of the project area

a Submergence area (forest amp nonshyforests)

bOthers

8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans

a SCSTAdivasisbOthers

9 Financial Details

a Project cost as originally plannedand subsequent revised estimatesand the years of price reference

b Allocations made for environmentalmanagement plans with item wiseand year wise breakup

c Benefit cost ratiointernal rate ofreturn and the years of assessment

d Whether (c) includes the cost ofenvironmental management asshown in (b) above

e Total expenditure on the Project so

Submitted to MoEF during projectappraisal

Nil

8970 Ha (including common areas ofStage-V)

NANA

1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)

1 Green belt Development Rs100 Cr2 Pollution monitoring

instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system

for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection

storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)

Rs 247096 Crores (As per project

Page 2 of 19

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 5: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Predicted 24-Hourly Average GLCs of PM (microgm3)

Figure (A)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)

3mCr~GOVERNMENT OF INDIA

q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE

CHANGERegional Office (South Eastern Zone)

1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034

TeINo044-2822 2325 E-mail roefcccgmaiIcom

ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003

FNoEP121511AP 1~2JDate 28112014

Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding

Ref (1)(2)(3)(4)

Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014

Madam

In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action

Encls As above

Copy to

1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003

2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO

I ~rtQ~o u (Dr MT Karuppiah)Scientist - C

(Dr MT Karup lah)Scientist - C

Naveen
Typewritten text
Annexure-I13Certified Compliance Report

GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change

(Regional Office Southern Eastern Zone)Chennai -600 034

MONITORING REPORTPART I

DATA SHEET

FNoEP121511AP

1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify

Thermal

2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)

No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad

3 Clearance leUer(s)OM No anddated

4 Locations

a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N

80deg4134 E

5 Address of correspondence

a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha

Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin

6 Salient features

a of the project Covered in EIAIEMP

Page 1of 19

b of the environmental managementplans

7 Break up of the project area

a Submergence area (forest amp nonshyforests)

bOthers

8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans

a SCSTAdivasisbOthers

9 Financial Details

a Project cost as originally plannedand subsequent revised estimatesand the years of price reference

b Allocations made for environmentalmanagement plans with item wiseand year wise breakup

c Benefit cost ratiointernal rate ofreturn and the years of assessment

d Whether (c) includes the cost ofenvironmental management asshown in (b) above

e Total expenditure on the Project so

Submitted to MoEF during projectappraisal

Nil

8970 Ha (including common areas ofStage-V)

NANA

1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)

1 Green belt Development Rs100 Cr2 Pollution monitoring

instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system

for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection

storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)

Rs 247096 Crores (As per project

Page 2 of 19

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 6: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (B) Predicted 24-Hourly Average GLCs of SO2 (microgm3)

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)

3mCr~GOVERNMENT OF INDIA

q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE

CHANGERegional Office (South Eastern Zone)

1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034

TeINo044-2822 2325 E-mail roefcccgmaiIcom

ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003

FNoEP121511AP 1~2JDate 28112014

Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding

Ref (1)(2)(3)(4)

Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014

Madam

In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action

Encls As above

Copy to

1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003

2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO

I ~rtQ~o u (Dr MT Karuppiah)Scientist - C

(Dr MT Karup lah)Scientist - C

Naveen
Typewritten text
Annexure-I13Certified Compliance Report

GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change

(Regional Office Southern Eastern Zone)Chennai -600 034

MONITORING REPORTPART I

DATA SHEET

FNoEP121511AP

1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify

Thermal

2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)

No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad

3 Clearance leUer(s)OM No anddated

4 Locations

a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N

80deg4134 E

5 Address of correspondence

a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha

Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin

6 Salient features

a of the project Covered in EIAIEMP

Page 1of 19

b of the environmental managementplans

7 Break up of the project area

a Submergence area (forest amp nonshyforests)

bOthers

8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans

a SCSTAdivasisbOthers

9 Financial Details

a Project cost as originally plannedand subsequent revised estimatesand the years of price reference

b Allocations made for environmentalmanagement plans with item wiseand year wise breakup

c Benefit cost ratiointernal rate ofreturn and the years of assessment

d Whether (c) includes the cost ofenvironmental management asshown in (b) above

e Total expenditure on the Project so

Submitted to MoEF during projectappraisal

Nil

8970 Ha (including common areas ofStage-V)

NANA

1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)

1 Green belt Development Rs100 Cr2 Pollution monitoring

instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system

for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection

storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)

Rs 247096 Crores (As per project

Page 2 of 19

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 7: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

EIA Report 1times800 MW Supercritical Coal Based Kothagudem Thermal Power Station (Stage- VII)

at Paloncha (V) Paloncha (T) Khammam (Dt) Telangana

Figure (C) Predicted 24-Hourly Average GLCs of NOX (microgm3)

3mCr~GOVERNMENT OF INDIA

q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE

CHANGERegional Office (South Eastern Zone)

1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034

TeINo044-2822 2325 E-mail roefcccgmaiIcom

ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003

FNoEP121511AP 1~2JDate 28112014

Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding

Ref (1)(2)(3)(4)

Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014

Madam

In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action

Encls As above

Copy to

1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003

2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO

I ~rtQ~o u (Dr MT Karuppiah)Scientist - C

(Dr MT Karup lah)Scientist - C

Naveen
Typewritten text
Annexure-I13Certified Compliance Report

GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change

(Regional Office Southern Eastern Zone)Chennai -600 034

MONITORING REPORTPART I

DATA SHEET

FNoEP121511AP

1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify

Thermal

2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)

No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad

3 Clearance leUer(s)OM No anddated

4 Locations

a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N

80deg4134 E

5 Address of correspondence

a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha

Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin

6 Salient features

a of the project Covered in EIAIEMP

Page 1of 19

b of the environmental managementplans

7 Break up of the project area

a Submergence area (forest amp nonshyforests)

bOthers

8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans

a SCSTAdivasisbOthers

9 Financial Details

a Project cost as originally plannedand subsequent revised estimatesand the years of price reference

b Allocations made for environmentalmanagement plans with item wiseand year wise breakup

c Benefit cost ratiointernal rate ofreturn and the years of assessment

d Whether (c) includes the cost ofenvironmental management asshown in (b) above

e Total expenditure on the Project so

Submitted to MoEF during projectappraisal

Nil

8970 Ha (including common areas ofStage-V)

NANA

1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)

1 Green belt Development Rs100 Cr2 Pollution monitoring

instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system

for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection

storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)

Rs 247096 Crores (As per project

Page 2 of 19

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 8: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

3mCr~GOVERNMENT OF INDIA

q4~q(OIcrrvcfij(ijqI4 q~qdCii AliI(ij4~MINISTRY OF ENVIRONMENT FORESTS amp CLIMATE

CHANGERegional Office (South Eastern Zone)

1st amp 2ndfloor HEPC Building No34 Cathedral Garden RoadNungambakkam Chennai - 600034

TeINo044-2822 2325 E-mail roefcccgmaiIcom

ToDr (Mrs) SarojDirector (Thermal Power)IA DivisionIndira Paryavaran BhavanMinistry of Environment Forests amp Climate ChangeJorbagh Road AliganjNew Delhi - 110 003

FNoEP121511AP 1~2JDate 28112014

Subject 1 x 500 MW Kothagudem Thermal Power Station Stage - VI at PalonchaKhammam District AP by Mis Andhra Pradesh Power Generation CorporationLimited (Presently in the Telangana State by Mis Telangana State PowerGeneration Corporation Ltd) - Compliance certification regarding

Ref (1)(2)(3)(4)

Ministrys letter No J-13011202006-IAII(T) dated 5012007Order No 44PCBCFERO-KGMI HO2006-1248 dated 04102006 of APPCBMinistrys Circular No J-110116182010-IAII(I) dated 3052012TSGENCOs letter No CECivillTherITSGENCOFKTPSDNo 4114 dated18102014

Madam

In response to the letter dated 18102014 of TSGENCO the above said project wasmonitored on 18112014 amp 19112014 and certified compliance report of the above existingproject in connection with the proposed expansion of 1 x 800 MW Thermal Power Plant atKothagudemThermal Power Station is enclosed for perusal and further appropriate action

Encls As above

Copy to

1 Dr PB Rastogi Director Monitoring Cell IA Division Indira Paryavaran BhavanMinistry of Environment Forests amp Climate Change Jorbagh Road Aliganj NewDelhi - 110 003

2 SriM Siddaiah Chief EngineerOampMKTPS-V ampVI Stages Paloncha KhammamDistrict - 507115 Telangana State Phone 08744-255275 (Fax 08744-255272 Eshymail cektps5tgencotelanganagovin ) - for information with reference to the letterNo CECivillTherITSGENCOFKTPSDNo 4114 dated 18102014 of TSGENCO

I ~rtQ~o u (Dr MT Karuppiah)Scientist - C

(Dr MT Karup lah)Scientist - C

Naveen
Typewritten text
Annexure-I13Certified Compliance Report

GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change

(Regional Office Southern Eastern Zone)Chennai -600 034

MONITORING REPORTPART I

DATA SHEET

FNoEP121511AP

1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify

Thermal

2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)

No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad

3 Clearance leUer(s)OM No anddated

4 Locations

a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N

80deg4134 E

5 Address of correspondence

a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha

Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin

6 Salient features

a of the project Covered in EIAIEMP

Page 1of 19

b of the environmental managementplans

7 Break up of the project area

a Submergence area (forest amp nonshyforests)

bOthers

8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans

a SCSTAdivasisbOthers

9 Financial Details

a Project cost as originally plannedand subsequent revised estimatesand the years of price reference

b Allocations made for environmentalmanagement plans with item wiseand year wise breakup

c Benefit cost ratiointernal rate ofreturn and the years of assessment

d Whether (c) includes the cost ofenvironmental management asshown in (b) above

e Total expenditure on the Project so

Submitted to MoEF during projectappraisal

Nil

8970 Ha (including common areas ofStage-V)

NANA

1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)

1 Green belt Development Rs100 Cr2 Pollution monitoring

instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system

for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection

storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)

Rs 247096 Crores (As per project

Page 2 of 19

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 9: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

GOVERNMENT OF INDIAMinistry of Environment Forests amp Climate Change

(Regional Office Southern Eastern Zone)Chennai -600 034

MONITORING REPORTPART I

DATA SHEET

FNoEP121511AP

1 Project Type RivervalleyMininglndustrylThermalNuclearOtherSpecify

Thermal

2 Name of the project 1 x 500 MW Kothagudem ThermalPower Station Stage - VI at PalonchaKhammam District AP by Mis AndhraPradesh Power Generation CorporationLimited (Presently in the TelanganaState by Mis Telangana State PowerGeneration Corporation Ltd)

No J-13011202006-1AII(T) dated512007Order No 44PCBCFERO-KGMHO2006-1248 dated 04102006 ofAPPCB Hyderabad

3 Clearance leUer(s)OM No anddated

4 Locations

a District (s) Khammam District Paloncha (Mandai)b State (s) Telanganac Latitudes Longitudes 17deg3736 N

80deg4134 E

5 Address of correspondence

a Address of concerned project Chief SriM SiddaiahEngineer (with Pin Code amp Chief Engineerl OampMKTPS-V ampVI-telephonetelexfax numbers Stages Paloncha

Khammam District - 507115Telangana StatePhone 08744-255275Fax 08744-255272E-mailcektps5tgencotelanganagovin

6 Salient features

a of the project Covered in EIAIEMP

Page 1of 19

b of the environmental managementplans

7 Break up of the project area

a Submergence area (forest amp nonshyforests)

bOthers

8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans

a SCSTAdivasisbOthers

9 Financial Details

a Project cost as originally plannedand subsequent revised estimatesand the years of price reference

b Allocations made for environmentalmanagement plans with item wiseand year wise breakup

c Benefit cost ratiointernal rate ofreturn and the years of assessment

d Whether (c) includes the cost ofenvironmental management asshown in (b) above

e Total expenditure on the Project so

Submitted to MoEF during projectappraisal

Nil

8970 Ha (including common areas ofStage-V)

NANA

1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)

1 Green belt Development Rs100 Cr2 Pollution monitoring

instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system

for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection

storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)

Rs 247096 Crores (As per project

Page 2 of 19

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 10: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

b of the environmental managementplans

7 Break up of the project area

a Submergence area (forest amp nonshyforests)

bOthers

8 Break up of project affectedpopulation with enumeration of thoselosing housesdwelling units onlyagricultural land only both dwellingunits and agricultural land andlandless labourersartisans

a SCSTAdivasisbOthers

9 Financial Details

a Project cost as originally plannedand subsequent revised estimatesand the years of price reference

b Allocations made for environmentalmanagement plans with item wiseand year wise breakup

c Benefit cost ratiointernal rate ofreturn and the years of assessment

d Whether (c) includes the cost ofenvironmental management asshown in (b) above

e Total expenditure on the Project so

Submitted to MoEF during projectappraisal

Nil

8970 Ha (including common areas ofStage-V)

NANA

1) Rs212490 Crores ( Original) videGOONo 141Commercial2006Dated 060620062) Rs280100 Crore ( Revised) videGOONo 397CEITPC-12012Dated 01112012 (As per projectauthorities)

1 Green belt Development Rs100 Cr2 Pollution monitoring

instrumentequipment Rs2S0 Cr3 Air- ESP Dust suppression system

for coal handling- Rs8300 Cr4 RCC chimney - Rs2400 Cr5 Cooling tower- Rs7S00 Cr6 Bottom ash and fly as collection

storage amp disposal - Rs4900 Cr7 ETP amp STP - Rs SOOCr8 Others - RsSSOCrTotal 245 CroreRecurring cost Rs14 Crore (As perproject authorities)

Rs 247096 Crores (As per project

Page 2 of 19

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 11: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

far

f Actual expenditure incurred on theenvironmental management plansso far

10 Forest land requirement

a The status of approval for adiversion of forest land for nonshyforestry use

b The status of compensatoryafforestation if any

c The status of clear felling

d Comments on the viability andsustainability of compensatoryafforestation programme in the lightof actual field experience so far

11 The status of clear felling in nonshyforest area (such as submergencearea of reservoir approach road) ifany with quantitative information

12 Status of construction

a Date of commencementb Date of completion (actual andor

planned)

13 Reasons for the delay if the projectis yet to start

14 Date of site visit

a The dates on which the project wasmonitored by the Regional Office onprevious occasions if any

b Date of site visit for this monitoringreport

15 Details of correspondence withproject authorities for obtainingaction plans information and statusof compliance to safeguards

authorities)

Rs 245 Crore ( Capital)Rs 4150 Crores ( Recurring)(As per project authorities)

Nil

NA

NA

NA

NA

NA

Completed

22-02-200721-02-2010 (Planned)23-10-2011 ( COD)

NA

18112014 amp 19112014

PA submitted Half-yearly compliancereports vide their letter dated31012013 25072013 18022014 amp05082014 to MoEFampCC ROBangalore

Page 3 of 19

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 12: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

PRESENT STATUS

Ministry of Environment Forests amp Climate Change vide letter No J-13011202006-IAII(T)dated 5012007 granted environmental clearance for the expansion of 1 x 500 MWKothaguddem Thermal Power Station Stage - VI at Paloncha Khammam District AP byMis Andhra Pradesh Power Generation Corporation Ltd (Presently in the Telangana Stateby Mis Telangana State Power Generation Corporation Ltd) subject to the implementationof environmental conditions and safeguards The plant was commissioned on 23102011within the existing complex The land requirement for Stage VI is 897 Ha which includescommon area of Stage V No forest land lecologically sensitive area I RampR is involved Asper the EC water requirement for the stage VI is estimated as 34920 m3d which is beingmet from the Kinnersani Reservoir Coal is being transported through rail from the mines ofRudrampur Manuguru Manchiryal SCCL etc After bifurcation of the AP State theabove project is taken over by the Telangana State Power Generation Corporation LtdHowever name transfer of EC has not been done so far The details of the units withvarious stages in KTPS complex is furnished under

Stage Unit Unit Capacity Date of RemarksCommissioning1 60MW 040719662 60MW 27111966 Not having EC3 60MW 270519664 60MW 08071967

Stage IV 5 120MW 130819746 120 MW 191219747 120 MW 100319778 120MW 10011978

EC granted vide9 250MW 27031997 OM No J-Stage V 13011101993-10 250MW 28021998 lA-II dated

28101993EC granted videletter No J-Stage VI 11 500MW 23102011 13011202006-IAII(T) dated05012007

The above Stage V amp VI project was monitored on 18112014 amp 19112014 along withthe following Officers of the project

Shri M Siddaiah Chief EngineerOampMKTPSV ampVIShri B Lakshmaih Chief EngineerOampMKTPS I ampIVShri G Sivaji Rao Superintending Engineer Civil-llThermaINSHydShri GV Ramprasad Superintending Engineer Civil-II KTPS V ampVIShri K Yellaiah Superintending EngineerCool KTPS V ampVIShri K Ramakrishna Reddy Executive EngineerCivil ThermaINSHydShri S Yugapathy Executive EngineerCivilKTPS I to IVShri T Srinivasa Rao Assistant Executive EngineerCivill KTPS V ampVIShri BR Das Assistant Executive EngineerCivilEnviron KTPS V ampVIShri A Ravikumar Additional Assistant Engineerl Civill Environ KTPS V ampVI

Certified compliance report for Stage-V has been dealt separately The status ofcompliance on the stipulated EC conditions contained in the letter No J-13011202006-IAII(T) dated 5012007 for 1 x 500 MW Kothaguddem Thermal Power Station Stage _VI is furnished under

Page 4 of 19

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 13: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

Panoramic view of the KTPS Stage V amp VI

Page 5 of 19

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 14: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

Reference

PART-II

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aDmiddot t tAP by Mis Andhra Pradesh Power GenerationKhammam IS nc T I

Corporation Limited (Presently in the Telangana State by Mis e anganaState Power Generation Corporation Ltd)

(1) Ministrys EC letter No J-13011202006-1AII(T) dated 512007(2) APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

-------------------------------------------------------------------------------------------------------------------------3 Environmental Clearance Conditions

(i) Implementation of the conditions stipulated by the APPCB Refer Part III

(ii) No additional land for any facilitiesl activities shall be acquired Complied

(iii) Ash and Sulphur content in the coal shall not exceed34 amp 058 Refer Part III

(iv) Provision for single flue stack of (275 m) with continuous online Refer part IIImonitoring equipment Exit velocity of at least 22 msec

(v) Installation of High efficiency ESPs Complied

(vi) Installation of bag filters and water spray system in Coal Compliedand Ash handling area

(vii) Fly ash utilization and disposal Refer part III

(viii) Water consumption shall not exceed 34920 m3day amp Refer part IIIimplementation of rain water harvesting measures

(ix) Discharge of effluents Refer part III

(x) Rainwater harvesting measures Refer part III

(xi) Greenbelt Development Complied

(xii) First aid and sanitation arrangements during construction phase Refer part III

(xiii) Noise level monitoring and provision for personal protection devices Complied

(xiv) AAQ MonitoringPartly Complied

(xv) Paper Advertisement shall be given about the EC Complied

(xvi) Setting up of separate environment monitoring cell

(xvii) Submission of six monthly compliance report

Complied

Refer part III(xviii) Submission of EIA I EMP Report to the RO Complied

(xix) Separate fund allocation for implementation of environmentalprotection measures Complied

Page 6 of 19

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 15: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

---- __ -- _

(xx) Co-operation to monitoring officers from ROComplied(4) Ministry reserves the right to revoke the clearance Agreed upon

(5) EC accorded shall be valid for a period of 5 years Compliedto the start of production operations

(6) In case of any deviation or alteration a fresh reference Agreed uponshall be made to the MoEFampCC

(7) Compliance with various statutory requirements Partly Complied

Page 7 of 19

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 16: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

PART-III

1 x 500 MW Kothagudem Thermal Power Station Stage - VI at Palonc~aKhammam District AP by Mis Andhra Pradesh Power GenerationCorporation Limited (Presently in the Telangana State by Mis TelanganaState Power Generation Corporation Ltd)

1 Ministrys EC letter No J-13011202006-1AII(T)dated 5120072 APPCBs Order No 44PCBCFERO-KGMI HO2006-1248 dated

04102006

Subject

Reference

No EC Conditions

All the conditions stipulated by AndhraPradesh Pollution control Board vide theirletter no44 IPCB ICFERO-KGM IHOI2006-124 dtd 04102006 shall be strictlyimplemented

3 (i)

(ii) No additional land for any facilitieslactivities shall be acquired for the project

(iii) Ash and Sulphur content in the coal to beused in the project shall not exceed 34amp 058 respectively

Status of Compliance

Partly Complied with

As informed by the PA most of the conditionsstipulated by Andhra Pradesh Pollution ControlBoard are being complied with However STPhas not been installed Fly ash and bottom ashfrom the boilers needs to be dry collection andshall be disposed to Cement Units I brick unitsPresently around 70 of the Fly ash bottomash generated from the Stage VI is beingdisposed off in the form of slurry in the ash pondearmarked for Stage- V

Complied withThe project is constructed in the existing landwithout acquiring additional land

Complied withCoal is being sourced from the mines ofRudrampur Manuguru Manchiryal SCCL etcand transported through rail

PA informed that the coal having Ash content notexceeding 34 and Sulphur not exceeding058 is being used However it has beenobserved that ash content in the coal is varyingdepending upon grading of coal received

As per the project authority average coalconsumption during the year 2011 amp 2014 isfurnished under

Year Coal receipts Coal receipts Total Consumption11ndg_enous_lfMTs) (Im_Eorted)(MTs) (MTs)2011-2012 1087871 367479 14553512012-2013 2016301 580998 25972992013-2014 2200661 97141 2297803

Page 8 of 19

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 17: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

(iv)

Coal Storage Yard

A single flue stack of 275 m height shallbe provided with continuous onlinemonitoring equipments Exit velocity of atleast 22 msec shall be maintained

(v) High efficiency Electrostatic Precipitators(ESPs) with efficiency not less than999 shall be installed to ensure thatparticulate emission does not exceed 100mgNm3

(vi) Adequate dust extraction system such asbag filters and water spray system industy areas such as coal and ashhandling areas transfer areas and othervulnerable areas shall be providedFly ash shall be collected in dry form andash generated shall be used in a phasedmanner as per provrsrons of thenotification of Fly ash utilization issued bythe Ministry in September 1999 and itsamendment By the end of 9th year fullfly ash utilization should be ensuredUnutilized ash shall be disposed off in theash pond in the form of HighConcentration Slurry

(vii)

Complied withSingle flue stack of 275m height is provided withcontinuous online monitoring equipment which isconnected with the website of APPCB Flue gasExit velocity of at least 22 msec is beingmaintained Stack emissions are being monitoredby the third party and the records are maintainedDuring the site visit it has been observed fromthe online monitoring data that the stackemission levels are within the prescribed limitComplied withESPs designed for 100 mgNm3 with efficiencynot less than 999 are under operation

Complied withDust extraction systems such as bag filters andwater sprinkling system are provided at Ashhandling plant and Coal handling plant

Partly compliedAs provided by the PA the details regarding thefly ash utilization plan for the last 3 years isfurnished

StockQuantity Quantity avaiiable(MT)

Year produced transported Disposed to(MT) (MT) ash pond

2012- 954339 366636 587703132013- 653526 274120 379406142014- 405027 141719 101119215

Page 9 of 19

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 18: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

It is learnt that around 33 of the fly ash beingcollected in the dry form and supplied to thecement plants in nearby vicinity Around 70 ofthe fly ash I bottom ash is being sent to the Ashpond demarcated for Stage - V

PA informed that Action plan was prepared for100 utilization within 9 years Even thoughseveral efforts are made the ash utilization stoodat 33 due to the non availability of cementplants in the nearby vicinity The EFST DeptGovt AP constituted state level monitoringcommittee to implement and review provisions inthe Fly ash Notification dated 03112009Erstwhile APGENCO (TSGENCO) preparedaction plan for 100 utilization within 5 yearsRecently with active co-operation of SCCL coalmining company Hyderabad RampD of ashstowing project is in progress at KTPP once theproject become successful 100 bottom ashand part of Fly ash will be utilized for mine fill

PA should adhere the stipulation and achieve100 utilization as per the action plan Furtheras per the para No2 of EC letter dated5012007 no land is earmarked for ash pond

View of active ash pond pertains to Stage V wherein fly ash being disposed from Stage VI

Page 10 of 19

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 19: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

View of Ash pond water

(viii) Water consumption in the expansion Complied withproject shall not exceed 34920 m3day As informed by the PA the daily waterClosed cycle cooling system with natural consumption for various Stages aredraft cooling tower shall be providedMeasures shall also be adopted toreduce the water demand throughoptimization of COC and rain Waterharvesting

Stage Avg Waterrequirement(M3) day

STAGE I TO IV 68400STAGE V 50250STAGE VI 33400

The water requirement for the project is beingmet from Kinnersani Reservoir During the sitevisit it was enquired about NOC obtained fordrawal of water In this regard project authorityinformed that the Kinnersani Reservoir was takenover by erstwhile APSES (now TSGENCO) fromI amp CAD Department on 3131998 as per theinstructions issued in GO Ms No 60 of I amp CADDepartment dated 3051997 since then theKinnersani Reservoir is being maintained by theTSGENCO on its own Relevant records handing over notes are being maintained by the

Page 11of 19

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 20: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

PA

Natural draft cooling tower is under operationClarifloculator step down aeration system areprovided to treat the raw water before entering into cooling tower amp the COC of 2 to 25 is beingmaintained Rain water harvesting pitsconstructed The plant effluents are being treatedin Effluent Treatment Plant and treated water isbeing used for cooling tower makeup greenbeltdevelopment and floor wash through recyclingsystem provided in the ETP

Typical view of Rainwater harvesting Structure

Page 12 of 19

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 21: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

ETP Facilities for Stage VI(ix) The effluents to be discharged into the Complied with

nalla shall confirm to the State Pollution Construction of effluent treatment plant isControl Board and a copy of the same completed and is working Water is recycled ampshall be submitted within 3 months to the utilized and as such discharging of water into

Page 13of 19

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 22: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

(xi)

MinistryRainwater harvesting shall be prepared Adetailed scheme for rain water harvestingto recharge the ground water aquifershall be prepared in consultation withCGWA I State Ground Water Board anda copy of the same shall be submittedwithin three months to the MinistryGreen belt of 50 mtr Width shall bedeveloped all around the power plantboundary covering an area of 405 haThis shall be in addition to the existingarea of 38090 ha under greenbeltGreen belt development shall startsimultaneously with the constructionactivity

open nalla does not arisePartly CompliedRoof top rain water harvesting structures havebeen constructed However details regardingpreparation of scheme in consultation withCGWA and its submission to the Ministry has notbeen provided

(x)

Being CompliedEfforts have been made and developed goodgreen belt within the new residential colonyarea Green belt around the boundary of theplant also made However effort shall be madeto intensify the green belt within the plantpremises with suitable species in consultationwith local DFO rather than ornamental plants Asinformed by PA the details of the green beltdevelopment carried out during the last fouryears and the expenditure incurred and survivalrate of the lants are as under

Area No of SurvivalYear Covered plants rate

(ha) planted

3466Lakhs

2011- 2 2619 92122012- 4 3189 87132013- 6 14514 91142014- 5 3760 8615Total 17 24082

ExpenditureincurredRs616 Lakh

502 Lakh

998 Lakh

1350 Lakh

View of greenbelt development within the plant Premises

Page 14 of 19

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 23: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

(xiii)

(xiv)

(xii)View of greenbelt development within the Residential Colony

First aid and sanitation arrangementsshall be made for the drivers and othercontract workers during constructionphaseLeq of Noise level should be limited to 75dBA and regular maintenance ofequipment be under taken For peopleworking in the high noise areas personalprotection devices should be provided

Regular monitoring of the ambient airquality shall be carried out in and aroundthe power plant and records maintainedThe location of the monitoring stationsand frequency of monitoring shall bedecided in consultation with SpeBPeriodic reports shall be submitted to theRegional Office of this Ministry

Complied withPertains to construction phase PA informed thatfirst aid and sanitation arrangements wereprovided during construction phaseComplied withLeq values are being recorded for noise levels atvarious locations and records are beingmaintained Personal protection devices areprovided to the people working in the high noisearea

Partly Complied withAAQ is being monitored by third party (MoEFapproved laboratory) and records are beingmaintained The observed values are within thelimit Reports are being submitted to ROAPPCBand ROI MOEampF However frequency ofmonitoring and the parameters should conformthe CPCB guidelines

One online AAQ Monitoring station has beeninstalled within the old residential colony andlinked with State PCB website However duringthe visit it was found that the data was notreceived from the station Necessary correctiveaction needs to be taken Further it appearsthat the station is being connected with Stage _IV Adequate number of monitoring stationsincluding in the down wind direction needs to beinstalled and the frequency of monitoring andparameters should conform the latest NAAQStandards

Page 15of 19

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 24: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

(xv)

(xvi)

Online AAQMonitoring Station located within the old residential colony

The project proponent shall advertise inat least two local newspapers widelycirculated in the region around theproject one of which shall be in thevernacular language of the localityconcerned informing that the project hasbeen accorded environmental clearanceand copies of clearance letters areavailable with the State pollution controlBoard Committee and may also be seenat website of the Ministry of Environmentand Forests at httpenvfornicln

A separate environment monitoring cellwith suitable qualified staff should be setup for implementation of the stipulatedenvironmental safeguards

Complied withAdvertisement regarding grant of environmentalclearance had been published in THE HINDU(English daily) on 01-04-2007 amp in Andhra Jyothi(Telugu daily) on 01-04-2007

Complied withEnvironment management cell with qualified staffhas been set up and looking after theenvironment management activities

The following executives are working under thesupervision of Superintend Engineer

1 Ramanuja das - ADE Environment2 A Ravikrishna - MEEnvironment3 Smt K Sarvanthi Chemist

EnvironmentHowever environmental analysis is being carriedout by MoEF approved third party Full-fledgedlaboratory facilities with analytical instrumentsneed to be set up

Page 16 of 19

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 25: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

(xvii) ~alf yearly report on the status ofImpl~1entation of the stipulatedconditions and environmental safeguardsshould be submitted to thisMinistryRegional OfficeCPCBSPCB

(xviii) Regional office of the Ministry ofEnvironment amp Forests located atBangalore will monitor theimplementation of the stipulatedconditions Complete set ofEnvironmental Impact AssessmentReport and Environment plan shall beforwarded to the Regional office for theiruse during monitoringSeparate funds should be allocated forimplementation of environmentalprotection measures along with item-wisebreak up This cost should be includedas part of the project cost The fundsearmarked for the environment protectionmeasures should not be diverted forother purposes and year wiseexpenditure should be reported to theMinistry

(xix)

(xx) Full cooperation should be extended tothe ScientistsOfficers from the Ministry Regional office of the Ministry atBangalore the CPCB the SPCB whowould be monitoring the compliance ofthe environmental statusThe Ministry reserves the right to revokethe clearance if conditions stipulated arenot implemented to the satisfaction of theMinistryThe environmental clearance accordedshall be valid for a period of 5 years tothe start of production operations by thepower plant

4

5

6 In case of any deviation or alteration inthe proposed project from that submittedto this Ministry for clearance a freshreference shall be made to the Ministry toassess the adequacy of the conditionsimposed and to incorporate additionalenvironmental protection measuresrequired if any

Partly Complied withSix monthly monitoring reports are being sent tothe RO of MoEFampCC regularlyHowever as per the EIA Notification 2006 sixmonthly monitoring report needs to b~ submittedboth hard and soft copies along with monitoreddata The same needs to be uploaded in thewebsite of the company and periodicallyupdated

Complied withPA informed that the EIA Report and EMP weresubmitted to Regional Office of MoEampF in themonth of April 2007

Complied withAs informed PA the cost incurred towardspollution control measures is included in the totalproject cost and utilized for the purposementionedRs 245 Cr ( Capital)Rs 4150 Cr ( Recurring)(As per project authorities)

Complied withPA extended full cooperation during the duringplant visit

Ag reed to com plyIt was submitted that the condition is Noted andassured to abide by the condition

Complied withThe Power plant commissioned within thespecified period and the unit is under commercialoperation from 23-10-2011

Agreed to comply

Page 17 of 19

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 26: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

7b f d Partly Complied with

The above stipulations shall e en orce Project has renewed the Consent ampalong with others as under th~ Water Authorization from the State PCB which IS valid(Prevention and Contro1of Pollution) Act tmiddot11130920151974 the Air (Prevention and Control ofPollution) Act 1981 the Environmental Public Liability Insurance has not been obtained(Protection) Act 1986 and rules thereunder The Manufacture storage andimport of Hazardous chemical Rules1989 Hazardous Wastes (Managementand Handling) Rules 1989 the PublicLiability Insurance Act 1991 and rulesthere under

Remarks amp recommendation for corrective action

PA has obtained valid Consent from the APPCS The observed non-compliances whichinteralia include the following

1 STP has not been installed - Condition No i

2 As per the EC no land is earmarked for ash pond However around 70 of fly ash bottom ash generated from the Stage VI is being disposed off in the form of slurry inthe ash pond earmarked for Stage-V Fly ash utilization plan has not been effectivelyimplemented as per the stipulation rather it is being disposed off in the ash pondearmarked to the Stage V Further ash pond water is being discharged to the nearby agriculture filed without treatment - Condition No (i) amp (vii)

3 Frequency of AAQ Monitoring amp parameters have not been conformed with theCPCS guidelines - Condition No xiv

4 Hard copy of six monthly monitoring reports are being sent to the RO of MoEFampCCregularly However six monthly monitoring report needs to be submitted both hardand soft copies along with monitored data The same needs to be uploaded in thewebsite of the company and periodically updated - Condition No xvii

5 Public Liability Insurance has not been obtained - Condition No7

Other observations

1 Court cases PA has submitted that no court case filed under progress for the pastthree years

2 With regard to issuance of Showcause Notice I Closure direction PA hassubmitted that no Showcause Notice Closure direction was issued over last threeyears

3 House keeping It was found satisfactory

4 CSR activities amp Occupational health surveillance has been implemented andrecords are maintained )t~

(Dr MT Karuppiah)Scientist - C

Page 18 of 19

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 27: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

MEMORANDUM OF UNDERSTANDING

BETWEEN

TSGENCOANlgtSCCL

FORSUPPLYOF COAL toKTPS-VII Stage (lx800 MW) ~~ --~

Naveen
Typewritten text
Annexure-II13Copy of MoU - for Supply of Coal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 28: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

i

MEMORANDUM OF UNDERSTANDING i

~001 ~ie~d6~

U1iti- ~Jd62j2amp1S

~~~i_~~~~~~K~

This~ym()~itndumOfU~tlerstandingismadeonthis2Isi-day ofJ4~ 2015 (tliemiddotNlOIJ )atl1yqerabad BETWEEI~r

A~cent~Q~~C~~q~GpiuJYL~tedan ex~inIlCo~y urt~~ithbull

e8~pani~sAc~t~j3~hay~g it~regi~tereg()ffiqeat~th~gtl4elll CoHiexies (IrQ)571Ql~amm~Dj~trictmiddot felailganalthereimyenftcentrrefe~ed t6 ~ the ~Scentller whic~e)(pressionshal1middot Imless the contextothetWisespecifiesmean

and include its sucqessors and permittedassignsJofthe FIRSTPARf _

-

BTIl~1elallgaDaStatePowerGcncratioDCorp()ration LiD1ited(TSGE~CO) ~qQIllp~Ylleg~teredundertheCqinpaIli~sAct2013anl~avilg itsmiddot Registered

Officemiddota(Vi4YntS()udhaHyderabadrel~~giPa andhereinaftercalled11te PtJ~PHASER(whichexpression~h~t)middot ulessrepugn~ttothe context shali iI1C111d~ its 1eg~representatives and stic~es$()rs) on theOTtIE1f PART ~ - i -

~

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 29: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

-

(The Seller and the Purchaser are hereinafter collectively referred to as the

Parties)

Whereas the Seller is a Government Company engaged in mining and sale of coal

including coal exploration design construction project management

development operations and allied consultancy servic~s

Whereas the Purchaser is in requirement ofG111G13 grade coal for their proposed

800MW Super critical coal bas~d Thermal Power Station under Stage-vn of - c - bull bull bull

Kothagudem Thermal Power station aJlq request~d theSel~~r to supply coal to

meetthe generation r~uirementof this unit_

middotAnd whereas the Seller have agreed in principle to supply coal tothePurchaser

_ fromcostplus-mines-after necessaryappr~~middota~dCmiddotgyt4elinesmiddot~~r the ~- ~ ----- -

Millistry-of Coal GoVt ofIndiaappli~ablefor long termJinkage I LoA I cost

plusmi~esbull

NOW TIIEREFOREmiddot ipconsi~~ratioIlof the premisesandmutuai covenants

he~eiI1c()ri~ill~dthePartiesher~toagreea~ folloVs bull

10 The seller(SCCL) shall supply 4 Million Tonnes per Annum (4 MTPA) of

coal foropetation of K()th~~demThermalpower Station (lx800 MW) subjeCttot11e6Btamirlgmiddotmiddotn~iigemiddotfromiSLC(LT)ofMirtl~kYofc6~i~G6~_ of

-

India for such supplies as per lTCDP 2007andcostpluspolicy guidelines

2008

20 The Seller shall issue LoA llfter llPproval of applicati()nby SLC (LT) MOC

GoIQnsucc~ssfullyacbievingthcentmilestonesstipulatedJnLQA SCCL would

eXecute FSAWith the TSGENCO covering c()mme~cia1 arrangement for

2 ~

middotmiddotmiddotmiddotx I

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 30: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

- ------

supply of coal which shall include price and other details on mutually agreed

terms and conditions

30 SCCL shall open new cost plus mines for this power plant and the schedule of

opening of such mine shall link to the commissioning of TSGENCO power

plant which is expected to be commissioned by December-2017 The supply

of coal shall commence from October-2017 tentatively Upon delay in

commissioning of the cost plus mines due to force majeure reasons coal shall

be supplied from other sources on weighted average e-auction prices on best

effort basis

4~0 The Purchaser (TSGENCO) shall intimate exactdate of commissioning ofthe

plant to Seller( SCCL) inadvance(Le 3 months) so that SCCL shall initiate

proposal for enteringintoFSA whicih shall indicate the modalities for supply

ofcoal ~-----shy

50 The Purchaser (TSGENCO) shall furnish year wise requirement of coal to

Seller (SCCL) sufficiently in advaIlceto supply coal

6OScentttlelDent ofDi~putesTn theevent()fany disPilte ormiddotdiffer~IlcemiddottQUching the

MQU between the parties shall be settled inaecQrdance with thefoHowing

guidelines

ARBITRATION In the event of any difference or dispute between the parties

th~f~to such dispute ordifterence shall be resolved amicably by mutual consu]~tion Any difference or disputcarising between the parties under this agreementshall be

settled through Arbitration in accordance with the provisions urthe Arbitration and

Conciliation Act 1996 In such eventthe Tribunal shall consist ofthree Arbitrators

ofleeachto be nominated by the Seller and Purchaser and the Third Arbitrator shaH

be nominated by the two Arbitrators nominated by the Purchaser and the SeHer The

venue ofArbitration shall be decided mutually between the parties

3 1

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 31: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

70 Severability and Renegotiation In the event any part or provision of this Agreement

becomes for any reason unenforceable or is declared invalid by a Competent Court

of Law or Tribunal the rest of this agreement shall remain in full force and effect as if

the unenforceable or invalid portions had not been part of this agreement and in such

eventuality the parties agree to negotiate with a view to amend or modify this

agreement for achieving the original intent of the parties

80Termination of MOU The MOU shall stand terminated after payment of

consequential damages liable to SCCL or TSGENCO as the case may be

Such consequential damages shall be as per the decision of competent

authority of SCCL TSGENCO as the case may be

90 Eflective Date This MOU will be effective from the date of signing and can

beam~nded supplemented or replaced by another document signed by the

Parties

IN~-wIT~E~~BERE1lF~-~THERARTIES~THORUOIt-middot THEIRshyAUTHORiSED REPRSENTATIVES HAVE SET THEIR HANDS ON THE DAYMQNTH AND YEAR FIRST ABOVE WRITTEN

middotForalldonbebalfofmiddotSeller ltspdli)

K~ ~ ~ l~ -shy( bullbull J(1 lA5fltJJ6~ RfjgtTjmiddot

WcVmiddot 1( fgtlttIIVlv4J

~~l4 (H~rv4lt~ 1 )

4

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 32: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

lmluea page http environmentclearanceni cinUserEDS _Replyaspx

13 Oct 2014 161132 You have last login 13 Oct 2014 337 PMMinistry of EnvironmentForests and Climate Change

Government of India UclO LOIfOUI Ic~( thenna(20ihoD corn1

My Account Mil Prt)posals Hf

Essential Details Sought of EOSSno IlOltlsal No Ham

uigtmlioll Reply

onReply Date

fdsSno Proposal No Essential Details

(i) latest certified (ompliance report from Regional OffICe of MoEFampCC OJ)IATGTHE247902012 Status Of the Sulary BelwarCoal Block Including EC amp FCbull shy

Help I Sitlt Ndi fc(i i Cuiltt U$ ownedsupdated H fdintolned by lVDEFCC

Sought

-

f 1 10132014411 PM

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 33: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

CC

monitori ng-ecnicin To saroj-mefnicin Me

rameshmotipallinicin kksharma55nicin cmsharmanicin monitoringec(il)nicin Oct 9 at 1142 AM

Acknowledgement Slip for EC application

This is to acknowledge that the proposal has been successfully uploaded on the portal of the Ministry The proposal shall be examined in the Ministry to ensure that required information has been submitted An email will be sent seeking additional information if any within 20 working days Once verified an acceptance letter shall be issued to the project proponent

Following should be mentioned in further correspondence

1 Proposal No IATGTHE247902012

2 Category of the Proposal

Thermal Projects

3 Name of the Expansion by Addition of 800MW Supercritical Coal Basesd proposal Kothagudem Thermal Power Station (VII)

4 Date of Receipt of Proposal

19 Sep 2014

5 Date of TOR Granted

26 Sep 2012

6 Date of 19092014submission for EC

6 Name of the Project proponent along with contact details

a) Name of the proponent AAJAY

b) State Telangana

c) District Khammam

d) Pincode 500082

-ampmIY Reply All or Forward I More

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 34: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 12

Project Details1

i Proposal No IATGTHE247902012

ii MoEFCC File No IATGTHE247902012

iiiShort narrative of the project Expansion by Addition of 800MWSupercritical Coal Basesd Kothagudem Thermal Power Station (VII)

iv Project Sector Thermal Projects

v CompanyProponent AAJAY

viDetails of State of the project

Details of State of the project

Sno State Name District Name Tehsil Name

1 Telangana Khammam Palwancha

viiDate of TOR Granted 26 Sep 2012

viiiTOR letter issued by Ministry Annexure-TOR letter

Uploaded Documents of EIAEMPRiskAssessmentPublic Hearing2

iEIAEMP Annexure-EIAEMP

iiRisk Assessment Annexure-Risk Assessment

iiiPublic Hearing Annexure-Public Hearing

iv Date of Public Hearing 25 Jul 2014

vCertified Monitoring report by RoMoEF Annexure-UploadFile

Accredited Consultant Details3

i Accreditation status Yes

EC Report

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 35: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

9192014 Report Part 1

httpenvironmentclearancenicinUserECReportaspxpid=IATGTHE247902012ampstatus=Notfound 22

ii Accreditation No NABETEIARA005rev01010

iii Name of Consultant Ramky Enviro Engineers Ltd

iv Address Ramky House Somajiguda Rajbhavan Road Hyderabad-500082

v Mobile No 9000604455

vi Landline No 04023305726

vii Email Id cecthermal2yahoocom

viii Uploaded Additional ReportStudyDocument as desired byMinistryEAC None

ixRemarks Due to memory constraint to the extent of 20 MB some ofthe chapters in the document could not be uploaded The same will befurnished along with hard copies

Undertaking4

The aforesaid application and documents furnished herewith are true to my knowledge

i Name TELANGANA STATE POWER GENERATIONCORPORATION LIMITED

ii Designation CHIEF ENGINEERCIVILTHERMAL

iii Company AAJAY

iv Address ROOM NO 258 A BLOCK VIDYUT SOUDHAHYDERABAD

Print

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf
Page 36: TELANGANA STATE POWER GENERATION ...environmentclearance.nic.in/writereaddata/online/EC/...TELANGANA STATE POWER GENERATION CORPORATION LIMITED From: The Chief Engineer /Civil/Thermal

GOVERNMENT OF TElANGANA ABSTRACT

I amp CAD Department - TS GENCO - Establishment of 800 MW unit under stage VII at KTPS Complex Paloncha of Khammam District TS - Allocation of 25 Cusecs (08 TMC) of water throughout the year from Godavari river near Burgampahad - Permission - Accorded - Orders Issued

IRRIGATION AND CAD (REFORMS) DEPARTMENT

G0MsNo47 Dated 24122014 READ the following

1 From the Managing Director AP GENCO Hyderabad DO lrNo CCl 4321 KTPSDFVII stagelDNo1672012 Dated 15052012

2 From CMD TSGENCO DOlrNoCMDCEClThermaIKTPSDI FVII StagelDNo362014 Dt24062014

3 Govt MemoNo12941ReformsA22012 IampCAD Dated 06082014 4 From the Engineer-in-Chief(lrr IampCAD Dept Hyd letter NoENC(I)1

DCE-IOT2AEE3ITPGCU12941Khammam2014Dt28102014 5 G0MsNo124 1amp CADWWREFORMS) Deptt Dated15112010

ORDER

Under the circumstances reported in the references read above Government after careful examination of the matter hereby accord permission for drawl of 25 Cusecs of water throughout the year (Le 080 TMC) through existing pipeline laid from Godavari river near Burgampahad for proposed 800 MW Thermal Power station at KTPS Stage- VII Paloncha of Khammam Dist Telangana State by TS GENCO subject to payment of water charges and general conditions as detailed in G0MsNo124 Irrigation amp CAD (PWREFORMS) Department Dated 15 bull11201 O

2 The Engineer - in- Chief (lrr) Hyderabad shall take further necessary action accordingly

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TElANGANA)

Dr SHAllENDRA KUMAR JOSHI PRINCIPAL SECRETARY TO GOVERNMENT (FAC)

TO The Engineer-in-Chief (lrr) I amp CAD Hyderabad The Chief Engineer Irrigation Projects Khammam The CMD TS GENCO Hyderabad Copy to The Chief Engineer Hydrology Hyderabad The Managing Director TS Pollution Control Board Hyderabad The PS to PrlSecy to Govt( IampCAD) The PS to PrlSecy to Govt( Energy) The PS to Minister (Irr) The PS to Prl Secy to eM SfSc

IIFORWARDEDBY ORDERII

b~ SECTION OFFICER

  • For uploadpdf
    • 2 NABET-2014pdf
    • 2 NABET-2014pdf
    • 5 Chennai RO Compliance report for KTPS Stage V amp VIpdf
    • 5 KTPS coal MoUpdf
      • 2 Essntial Detailspdf
      • 3 Acknowledgement ECpdf
      • 4 EC upload Acknowledgementpdf
      • 6 Water Drawlpdf