Supported Scaffold Safety An Overview of Scaffold Safety May, 2011.
Tel: +97444214536 Doha, Qatar PO Box: 9507 E-mail:...
Transcript of Tel: +97444214536 Doha, Qatar PO Box: 9507 E-mail:...
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
1- About us
2- Quality Policy
3- Standard Product
4- SAFETY POLICY
5- Landmarks
6- Legal Documents & Certificates
7- Method of Statement
8- OUR TEAM
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
1. About us:
Cube House design contractor based in Qatar. It was founded by Mr. Mohamed N. Allouh four (4) years ago.
Cube House design has made an honest attempt to give value for money to its esteem and growing network of
clients, while offering wide variety of designs of Gypsum Ceiling, Dry wall Partitions, Wall Paneling, and
Decorative Paints. We offer professionally crafted finishing and Professional Qualified Engineers, Designers &
Craftsman.
Our workforce has broad based professional experience in their field and can deliver any product or design
compatible with the latest trend and styles of client's choice. We create ambiance that is impressive,
inspiring, and remarkable to all, weather it is Residential, Office, School or Palace. It would always be
fascinating décor to support the comforts of our client and value of his investment.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Vision:
The Middle East region is passing through its advanced development phase of the 21st Century. Particularly
our Beloved Country Qatar. It is located on the cross road of civilization and will be the most desirable
commercial hub of the world.
The architecture will be the blend of contemporary and conventional designs and life styles of East &West. In
this perspective, Cube House Designs would like to be the part of pioneers devoted to build this region.
Mission:
Moving with trends Cube House commits to offer the most modern, comfortable and cost Effective interiors
solutions to our clients. We believe in Quality as “Key to Existence". Thus we closely monitor the quality of
our products and services followed by exceptional after Sales Customer Care.
Our Mission is to be recognized as Trusted Fit out and interior Design Contractor in the region.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Company organization:
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Work Force:
Owner & Managing Director 1
General Manager 1
Project Manager 1
Production Manager 1
Finance Manager 1
Quantity Surveyor 1
Safety Officer 1
Procurement Assistant 1
Project Engineer 2
Accountant 1
Junior Designer 1
Draftsman 3
Site Forman 2
Production Forman 3
Site Skilled Labors 10
Production Skilled Labors 20
Site Helpers 40
Total Workforce 91
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Legal Status:
Legal Name: Cube House Decoration & Gypsum board
Type: Limited Liability Company (L.L.C.)
Office:
Tel: +974 -44214536
Fax: +974-44214536
Registered Address: P.O. BOX: 9507
Al Sad, Doha Qatar
Factory
Tel: +974-33994077
Registered Address: Al-Sailiya, Doha, Qatar
e-mail: [email protected]
Web site: www.cubehousedecoration.com
Year of establishment: 2013
Ownership:
1. Sheik Abdulla Saoud J A AL-THANI
2. Mohamed Allouh
Activities:
Interior Design, Suspended Ceiling works, GRG molding, Gypsum board ceilings,
Drywall Partitions, Gypsum Wall paneling. Decorative painting and Finishes.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
2. Quality Policy:
Cube house Interior is committed to comply with the requirements of BS EN ISO 9001:2008 and to meet or
exceed Customers contractual expectations. We demonstrate this trough quality audits and customer
satisfaction. We have established and maintain an effective Quality Management System, which has been
planned, developed to satisfy our clients and our growing ambition.
Cube house have progressively diversified to provide commercial and residential fit out projects.
Cube house aspire to be the best in our market sector and will, trough the implementation of the Quality
Management System, demonstrate our commitment and ability to consistently provide products and service
that meets Customer Requirement and Satisfaction.
The quality Management System has been implemented using a combination of policies, procedures and
objectives. These are communicated throughout the company and reviewed and evaluated on a regular basis.
All employees of Cube house are encouraged to actively seek continuous improvements in the quality of
service given to our fully committed to the Documented Quality Management System and will ensure its
effectiveness is closely monitored.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
3. Standard Products:
1- KNAUF
2- UNITED MINING INDUSTRIES
3- QATAR GYPSUM BOARD FACTORY
4- NATIONAL GYPSUM
5- GYPROC GYPSUM
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
4-Safety Policy:
ENVIRONMENTAL, HEALTH & SAFETY
1. Risk Assessment
1.1Emergency Procedures
Description for Emergency Procedure:
Fire Fighting
All flammables, i.e., paints, LP gas, etc. will be stored in separate, well-ventilated, designated flammable
storage areas and identified as flammable materials.
Flammables needed on work sites shall not exceed that amount needed for that day’s activities and shall, at
each workday’s end, be returned to the flammable storage.
Hoses providing pressurized gas shall be provided with a reverse flow preventer (Flashback Arrestor)
compressed gas cylinders will be stored according to applicable safety regulations. Fire watches shall
maintain surveillance for at least one hour following any hot work, or until the area affected by such hot
work has cooled to ambient temperature. On completion of the job or taking a break, bottles should be closed
and hoses purged, releasing gas in hoses. Bomb threats
In the event of the building or area receiving a bomb threat, take instruction from either Site Management
(whoever arrives first) or the Emergency Services.
If you are the person that is notified of the threat, do not tell anyone until you have notified Site Management
– whichever you can find first. In such an Event you are authorized to immediately interrupt any meeting or
discussion that may be taking place, no matter who may be involved in such a meeting. If you do enter such a
meeting, give the message quietly to the person you are looking for so they can decide what action to take
before causing alarm.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Suspect Packages
On discovering a suspect package:-
- Do not touch it
- Notify other personnel and vacate the area immediately
- Notify supervisor.
- DO NOT re-enter the area until told by your supervisor that it is safe to do so.
In case of emergency, please contact the Emergency Contacts included within this document.
1.2 Competencies / Training / Briefing
1. STARRT
2. Toolbox Meeting
3. Powered Tool Operating
List & Description of On-site requirements
1. Housekeeping Procedures
Housekeeping will be carried out on a regular basis, in order to maintain site tidiness and also to avoid slip,
trip, and fall and fire hazards. A separate team will be assigned for housekeeping activities. Construction /
HSE team will monitor housekeeping. .
2. Personal Protective Equipment (PPE)
Safety Helmets, High Visibility Vests, Safety Footwear & Safety glass (clear inside / dark outside) are
mandatory on site.
Operatives must wear additional Personal Protective Equipment where this has been specified.
Strictly follow the details of the approved method statements and STARRT briefing.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
All work forces will be provided with appropriate PPE.
Continuous monitoring by construction / HSE teams
3. Fall Protection
Fall protection system will be provided.
Only authorized and competent operatives should be permitted to work at height.
Only operatives who are physically and mentally fit should be authorized to work at height.
Where work is carried out above 2m full body safety harnesses should be worn and secured
to a suitable anchorage point above the operative.
4. Scaffolding
Must be erected inspected and maintained in accordance with Statutory and site requirements.
Mobile towers can only be erected or modified by approved erectors with appropriate instructions.
An incomplete or defective scaffold must not be used and must be clearly indicated.
Each scaffold shall be inspected and approved for working after erection and every time after inclement
weather and weekly by the approved competent scaffold inspector.
When the scaffold is certified safe it will be GREEN tagged.
Should the scaffold be found unsafe it shall be RED tagged
5. Barricades & Signs
All materials and work areas will be barricaded and appropriate signage will be displayed around all work
activities.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
6. Electrical Equipment
All temporary electrical wiring and other electrical wiring will be done as required by the applicable safety
regulations. According to applicable codes / standards GFCI will be provided for all 120V, single phase, 15
ampere receptacle outlets (or 240V, single phase 30 & 40 ampere as applicable). All materials and equipment
used in temporary electrical installations shall be of approved type and maintained in good condition. All
circuits serving electrical equipment shall be provided with ELCB of maximum 300MA tripping leakage
current.
7. Plant and Equipment
To operate plant & machines the operative must be authorized and hold an appropriate / valid
certificate.
Only trained and approved slinger / signaler may sling or receive slung loads.
Ensure the correct tools are selected for the relevant task to be carried out.
Ensure hand tools are stored in the correct manner and kept clean to prevent slipping or loss of grip.
Ensure all tools and equipment are checked before use and returned after use to prevent loss or
damage.
Ensure any defected equipment is returned, taken out of use & reported to your supervisor.
When using tools such as chisels ensure the heads are not damaged (or mushroomed).
Ensure that hammer shafts are in good condition and are free from splits, do not put tape around the
shafts of hammers as this will hide any damaged. Ensure that the relevant PPE are used.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
1.3 Environmental Receptors & Methods of Protection
Contractor shall be responsible for complying with the Environmental Safety & Health (ES&H) Requirement
contained in the Contract. In addition, Contractor shall fully comply with the following ES&H Assessments,
ES&H Orientation & Training, ES&H Pre-Task Briefing (STARRT), ES&H Incident Notification and Investigation,
ES&H Emergency Response.
In addition, contractor shall fully comply with the following ES&H requirements:
- HSE Plan
- MSDS to be submitted for any chemicals
Upon the failure of contractor to comply with any of the requirements set forth in these documents, Engineer
shall have the authority to stop any operations of the contractor affected by such failure until the condition is
remedied acceptable to the engineer.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
5. Landmarks: Selected example from Cube house major Iconic Projects Around Qatar
Completed Projects:
Project: American Academy
Scope of Work: CEILING + CORNICE + PARTITION
+ PAINTING Location : Thumama
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Project: SHIEKH HAMAD BIN ALI AL-THANI VILLA
SCOPE OF WORK: PARTITIONS & CEILING
LOCATION: AL NASAR
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
PROJECT: AL JAZERA COMPANY
SCOPE OF WORK: CEILING
LOCATION: MESHURIB
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
PROJECT: LEKHWIYA SACODECO (QD-CPC)
SCOPE OF WORK: CEILING & CORNICE
LOCATION: DUHAIL
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
PROJECT: SHIEKH ALI BIN FALEH
SCOPE OF WORK: PARTITION AND CEILING
LOCATION: AIN KHALED
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Ongoing Projects: Galleries Lafayette
Project: Galleries Lafayette
SCOPE OF WORK: DRY WALL PARTITION & BULKHEAD
LOCATION: KATARA
CONTRACTOR: ALEC FITOUT
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
CUBE HOUSE PROJECT LIST IN QATAR:
PROJECT/OWNER MAIN CONTRACTOR SCOPE OF WORK
GALLERIES LAFAYETTE
KATARA
ALEC FITOUT FALSE CEILING,DRYWALL
PARTITION &
BULKHEAD/CURSOR & WALL
CLADDING
LEKHWIYA SACODECO
(QD-CPC)
QATARI DIAR VINCI
COMPANY
CEILING & CORNICE
American Academy Al Najma Trading &
Contracting Est.
CEILING + CORNICE +
PARTITION + PAINTING
SHIEKH ALI BIN FALEH ALI BIN FALEH DESIGN - PARTITIONS &
CEILING
UNCERSAL GROUP CUBE HOUSE DECORATION
COMPANY
PARTITIONS & CEILING
SHIEKH HAMAD BIN ALI
AL-THANI
ARABIN UNIT
CONTRACTING COMPANY
PARTITIONS & CEILING
AL JAZERA COMPANY AL-SARF TRADING &
CONTRACTING COMPANY
CEILING
SHEIKH MOHAMED AL-
THANI
AL-SARF TRADING &
CONTRACTING COMPANY
CEILING
SHIEKH KHALIFA AL-
THANI
AL MANIA TRADING &
CONTRACTING COMPANY
CEILING
ALI BIN MOHAMED AL-
THANI & SONS
COMPANY
ALI BIN MOHAMED AL-
THANI & SONS COMPANY
CEILING & CORNICE
SHEIKH K.H. AL SARF TRADING &
CONTRACTING
ESTABLISHMENT
CEILING + CORNICE
SHEIKH ALI CUBE HOUSE
DECORATIONS
CEILING & PARTITION
&PAINTING
SAIED ABDULLA AL
AMER AL KABI
AL SARF TRADING &
CONTRACTING COMPANY
PARTITIONS & CEILING
MOHAMED ELYAN VILLA CUBE HOUSE
DECORATIONS
CEILING + PARTITION +
CORNICE + PAINTING
Mamoura Building Professional Contractors
Works
CEILING & BULKHEAD
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
PROJECT/OWNER MAIN CONTRACTOR SCOPE OF WORK
Shard Head Office Shard Projects Company CEILING AND CORNICE
Kafood Building/Villas Kafood CEILING AND CORNICE
Office Villa MARKIYA Rawafed Holding CEILING
Kafood Al Muntazah Kafood CEILING & BULKHEAD &
CLADDING
AL BADR BUILDING AL BADR GROUP CEILING
GHRAFA PROJECT INTERNATIONAL
CONTRACTING GROUP
CEILING AND CORNICE
SHARD VILLA SHARD CONTRACTING CEILING
57 VILLA AL BADR CEILING AND CORNICE
BIN MOHAMAD
TATWEER
Professional Contractors
Works
CEILING & BULKHEAD
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
6. LEGAL DOCUMENTS AND CERTIFICATES
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
7.Method of Statement:
Purpose:
The purpose of the method statement is to describe the sequence and methodology for the installation of
Gypsum Board Ceiling, And Gypsum Partitions and any other type of False Ceiling.
Scope:
Supply & Apply false ceiling, Partition
References:
Contract drawing reference as following:
Approved shop drawings as following:
Main Contract.
Definitions and abbreviations:
PM - Main Contractor Project Manager
CM - Main Contractor Construction Manager
PE - Main Contractor Project Engineer
SE - Main Contractor Section Engineer
QCE - Main Contractor Quality Control Engineer
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
SM - Main Contractor Safety Manager
SO - Main Contractor Safety Officer
SR - Main Contractor Surveyor
SF - Main Contractor Section Foreman
PM- Vancouver project Manager
CM- Vancouver Construction Manager
PE, v- Vancouver Project Engineer
QCP - Quality Control Procedure
ITP - Inspection and Test Plan
ITL - Independent Test Laboratory
MS - Method Statement
FM - Form
NCR - Non Conformance Report
ITR - Inspections and Test Request
WIR - Work Inspection Request
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Responsibilities:
The site operation activities and control are executed by the following with their corresponding roles and
supervision responsibilities:
The Project Manager and Construction Manager are responsible for the overall management of the work and
control of the staff in executing the work, as per relevant documents called for in this method statement.
The Project and Site Engineers shall be responsible for on-site activities and supervision of temporary
Scaffolding, required tools and related construction activities.
Competent QC Engineer/Inspector shall be responsible for checking and inspecting the execution of the works
in accordance with the approved materials, approved method statement and the inspection and test plan.
The QA/QC Manager is Responsible for ensuring the quality standards of the work activities, to ensure safe
system of work are followed, the required precautions implemented, i.e. Scaffolding system, and PPE tools
and related work practices.
Procedures:
General requirements for False Ceiling & Partition Installation.
All joints shall be filled a tape properly after using joint mesh. Partitions lay out should be inspected by Main
Contractor before starting truck fixation. Partition type should be identified before starting the work in each
area.
Partition work should be coordinated properly with M.E.P subcontractor specially after fixing our structural
framing and just before closing the second layer board.
Gypsum Board should be fixed staggering in same horizontal level.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
All joints tape shall be even and shall not exceed the level of board by removing paper from the edge which
doesn't have sloped edges but ot for chamfered edge which already to receive filling materials.
Where applicable, provide bulkhead as indicated on the approved shop drawing.
The tiles cut piece shall be carried out as per the approved shop drawing ad shall not be less than 30 cm (not
less than half tile).
The tiles cutting and formulation of cut piece shall be formed bu using suitable cutting machine to avoid any
irregular edges for the cut pieces.
All necessary coordination with the mechanical and electrical works shall be carried out in
three stages:
1) Before Starting suspended GI Furring ceiling system.
2) Before fixing Gypsum Board.
3) After fixing Gypsum Board.
Coordinate the finish Ceiling level with the adjacent levels, and adjacent window.
The installation of the tiles and the Gypsum Board shall be subjected to the construction drawing, the
approved shop drawing, and mock-up to be done.
Bulkhead edges and corners shall be provided with proprietary coved mesh accessories with nice finish
tapped.
All coordination process should be supported by formal clearance letter from M.E.P subcontractor in all
stages, main contractor and final approval from the consultant.
Any temporary opening required by M.E.P. should be by marking on gypsum board before finishing stages.
(Joint Treatment)
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Gypsum board false ceiling
Preparation prior to installation
Site survey by our engineer to assure the work is ready to start accordingly.
Obtain M.E.P. clearance formal from Main Contractor Coordinator.
Checked by our Engineer id the level of shop drawings is approved for matching with the site condition after
M.E.P. service had been installed.
Any materials at slab concrete soffit base incompatible with the support
Shall be removed by main contractor.
All block works, plaster, at least paint, to be completed till the slab soffit.
Fire sealant to be applied wherever applicable.
Fixation Suspension System
Fixing the wall angle by (Hilty Gun stell nail) to the wall matching the level which had been marked before
starting the fixation.
Submit first WIR-1 for approval.
Fix the Main channel supported from soffit of lab using Hilti Material fixation (X-CC DNI 27 p8) as approved in
our submittal from engineer.
Horizontal main channel fixing to dropped supported from top by using 1/2" white screw
Furring channel fixing to horizontal main channel perpendicularly by 1/2" white screw
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Approval for suspended system ceiling should be obtained from the engineer after inspected from Q/C
engineer, and the consultant.
AII MEP Access panels required to be marked on the slab soffit for the engineer's approvals.
Acceptance letter from M.E.P subcontractor to satisfy that all support should not object any M.E.P services in
future.
Fixation of Gypsum Board
After obtaining M.E.P clearance and engineer approval.
Fixing Gypsum board stagger on furring channel by 1" drywall gypsum screw using the required accessories
and metal angels as approved materials and shop drawings.
M.E.P. subcontractor should mark all M.E.P services which is need to cut with its tag for each opening.
Submit third WIR-3 for approval, Got formal approval for marking from engineer before start the cutting.
After cutting only, we can start joint treatment and assuring that the joint level should not exceed the board
level.
If required in joint area, paper should be removed and hanging the board before treatment with the joint
compound.
In same time of filling joint compound Joint mesh should be fixed and matching same level of Gypsum Board
Ceiling.
Gypsum Board Ceiling ready for engineer’s inspection.
Submit fourth WIR-4 for approval.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Gypsum Partition:
Preparation prior to installation.
Survey our engineer to assure the work is ready to start accordingly.
Partitions Lay out should be marked on the floor by our engineering team.
Any materials at slab concrete incompatible with the support truck should remove by main contractor.
Cleared approved shop drawings for partitions type's & partitions lay out should be available with our
construction manager and project engineer at site.
Fixation Suspension System
Submit first WIR-1 for lay out approval.
Fixing the truck to the floor matching the approved lay out on the floor which had been marked before
starting the fixation.
Fix the first and last vertical stud only for each expected wall partition in the same time fix the top truck also
for check alignment and vertically assurance.
Continue fixing stud channel 600 mm c/c fixing to top and bottom truck supported by using 1/2" white
screw and paralleled to basic stud which will be ad bench mark for it.
Horizontal truck channel fixing support for stud each 1200 mm as standard for two purposes, structural, and
to get Rockwool insulation.
Around opening doors and window should be taken in considerations for extra support channels, as
horizontal truck and vertical stud in position to receive flat faces, and to provide white wood fillet 50 mm as
required to receive support screws.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Approval for structure framing partition system should be obtained from the engineer after inspected from
Q/C engineer, and the consultant WIR-2.
Our site engineer team will give enough time and coordination for M.E.P Subcontractor to start his work in
this critical time to fix his pipes and conduits.
All M.E.P. Access panels which it might be required to be marked on the structural framing to give us chance
for sufficient support in this stage.
Acceptance letter from M.E.P subcontractor to satisfy that all support should not object any M.E.P service in
future.
Fixation of Gypsum Board
After obtaining M.E.P clearance and engineer approval.
Fixing one layer only Gypsum Board stagger on stud channel by using 1" drywall gypsum screw using the
required accessories and metal angles as approved materials and shop drawings.
M.E.P Subcontractor should mark all M.E.P services which it need to cut with its tag for each opening.
Submit Fourth WIR-4 for approval, Got formal approval for fix second layer gypsum board from engineer
before closing the partition.
After cutting only, we can start joint treatment and assuring that the joint level should not exceed the board
level.
If required in joint area, paper should be removed and hanging the board before treatment with the joint
compound.
In same time of filling joint compound Joint mesh, should be fixed and matching same level of Gypsum Board
Ceiling.
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
Gypsum ceiling ready for engineer inspection.
Submit fifth WIR-5 for approval
In case of double layers board, we can hold the second layer fixing up to final stage of works to avoid any
damages it might be happens.
So same procedures of finishing board we can go through and to do WIR as well.
Protection of finished works
After the final inspection for gypsum board ceiling, and Gypsum Partition walls just to care that nothing to
spoil the surfaces as much as possible especially from M.E.P subcontractor.
We recommend not starting final finish touch unless we ensure that M.E.P subcontractor had been
successfully finished his works.
For double layers gypsum partitions we recommend that to hold the second layer of board fixing up to final
stage.
Quality control:
Significant stages of works shall be ensured by Project Engineer and QA/QC Engineer to be conforming to
Engineer requirement and QA/QC procedures including the setting out and application of the recommended
materials mentioned in this method statement and as per inspection and test plan (ITP)
Inspection Request (WIR) shall be submitted for checking the different items stated in this method statement
as follows:
Tel: +97444214536 Doha, Qatar PO Box: 9507
E-mail: [email protected] www.cubehouedecoration .com
8. OUR TEAM