Technology Trials: Experience &...
Transcript of Technology Trials: Experience &...
Technology Trials: Experience & Findings
© eircom
Brendan Kearns
Eircom, [email protected]
Wednesday 24th November
ETSI IMS Implementation Workshop
Contents of the Presentation
© eircom
Trials should find platforms / vendors that can be configured to support products that are relevant to
the current marketplace and are aligned with company strategy
© eircom
company strategy
Powerpoint cannot take us all the way
Deploy Relevant Products
Engineer CreatesProduct
The way it was The way it is
© eircom
CustomerHad Little Choice
But to Buy
Customer Choice Leads to Survival of the Most
Relevant Service
Difficult For Operator to Determine In Advance
Relevance of a Product
Trials Play A Part
Product Development & Trials
General drift of technology & customer expectations
Vendors & Operators Drive New Standards
vendors realise standards & pitch to operators
Commercial strategy informs CTO technology strategy
CTO evaluate technology platforms
© eircom
Operators enter RFP process
Operator choose vendor
Operator deploys new platform
Operator deploy new products
CTO evaluate technology platforms
Proof of Concept, Demonstration, Product Development
Commercial Pilot
Scope - Success Factors - People
Trial of the Platform
Hands On Experience
Prove Platform & Fit
Operator or Vendor Lab
Trial of the Product
Create Product in Lab
Platform Configuration
Tech Service Description
Commercial Pilot
Provisioning / Charging
Operating Fault Procedures
Deployment Procedures
Technology Strategy ValidatedTeam Capable of Evaluation
Tech Product DescriptionAugment Business Case
Validate Deployment StrategyValidate Processes
© eircom
Team Capable of Evaluation Augment Business Case Validate ProcessesPeople Training
Responsible for setting the architecture, picking the vendor and proving the platform
Network Architect
Could be company staff for a technology trial, friendly customers or paying customers for a commercial pilot.
Trialists
Responsible for configuring the platform to realise product and to add on provisioning, charging,
capabilities to build complete end to end product.
Product Development
Our ability to innovate is enhanced by working with external groups who bring another perspective.
Trial Partners
Responsible for operating and Maintaining the Product.
Operations
Responsible for picking trialists, structure of feedback, analysis of feedback, concluding on
the likely takup of the product.
Customer Insight
Case Study: Add if Required
© eircom
Eircom NGIN Tender
NGIN Case StudySummary
• Platform & Vendor Evaluation
• Hands On JAIN SLEE
• Demonstration of New Capabilities• Single JAIN SLEE Application triggered by Multiple Access Networks
• Integration With Web API’s
• Proof of Concept
© eircom
• Proof of Concept• Converged Application “Mobile Anywhere”
• Voice Call – IM – Calender Integration
• Voice Call – IM – Google Maps Integration
NGIN Case StudyWhat Was Done
Mgmt LAN
Provisioning / Cust. Care
NGINWeb Control
SOAP / XMLWeb 2.0 Applications
Buddy FinderPersonalised Call Back Network
Applications
INAP
SIP
© eircom
CAMEL
‘NGIN’ integrated to fixed, mobile and IMS plus Web 2.0
SSP
PSTN
Mobile
IMS / VoIP
Eircom / Meteor Live networks
Laboratory
INAP
NGIN Case StudyOutcome
• Commercial engagement from beginning
• Strong fundamental business case
• Demonstrations augmented business case
• Platform now in deployment
© eircom
Case Study
© eircom
Eircom RCS Trial
RCS Case Study: Objectives
© eircom
Address
BookPresence
Messaging Media
Share
Community & Social Networks Aggregator
[API Integration]
RCS Case StudyWhat Was Done
App Servers
Web Gateway
FB / G Integration
© eircom
IMS
MobileRCS
Client
RCS Web Client
RCS / Facebook
RCS / Google
3 Access Networks: RAN, Internet & Corporate WAN
BroadbandRCS
Client
Initial Filter Criteria
SBC
IP Firewalling
Client Config
Client XML
Client Rebuild
RAN
RCS Case Study: Team Cannot Configure Some elements
App Servers: Configured by IMS Vendor
Web Gateway: Configured by IMS Vendor
FaceBook / Google Integration: by Feedhenry & Solames
Could be configured by the team
Could not be configured
by the team:
© eircom
Initial Filter Criteria: Configured by ALU & Edited by eircom
SBC: Configured by ACME & Edited by eircom
IP Firewalling: Configured by other eircom groups
Client Config: 1st stop to resolve incompatibilities
Client XML: 2nd stop to resolve client incompatibilities
Client Rebuild
RAN: Configured by eircom but some functions not accessible
by the team: under
control of external
resources.This can
create delay.
Case Study: CommentsRich Communication Suite
• Some Technical Findings• IMS: Stable and Ready For Deployment
• Acceptance Testing: Manual test case implementation is cumbersome
• Client Side: Primacy of the User Interface
• Mobile and Broadband clients from the same vendor preferable
• Server Side: Layer 3/4 firewalling and session border control implementation should be combined
• Deployment Capability: Sweep of the technology makes this Technically Challenging
© eircom
Conclusion
© eircom
General Observations From Working on Trials
• Get Support & Participation from Commercial Colleagues
• Trial split into topics each with one person responsible
• Identify what cannot be configured by team members
• Innovation comes from 3rd parties
• Trial description document becomes the final report
Some General Conclusions
© eircom
• Formulate efficient testing strategy to include IOT with 3rd parties
• Demonstrations should have “WOW” factor
• Short high profile trials are more efficient
• Results of user trial is the dominant perspective on the full trial
• Align timing with market