![Page 1: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/1.jpg)
Technology and market potential of energy performance
contracting for buildings
Conference on Pollution Prevention & Energy Efficiency (P2E2)U.S., Hong Kong, China Cooperation
9-10 May 2005
Dr. Sam C M HuiASHRAE Hong Kong Chapter &
Department of Mechanical EngineeringThe University of Hong Kong
E-mail: [email protected] Kong
![Page 2: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/2.jpg)
Agenda
• Introduction to EPC
• Market Potential
• Major Barriers and Risks
• Key Issues
• Conclusion
![Page 3: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/3.jpg)
Introduction to EPC
• Energy performance contracting (EPC)• = energy savings performance contracting• A financing technique to raise money for energy
efficiency investments based on future savings
• Energy service companies (ESCO)• Offer EPC services, without upfront capital on
building owners (e.g. by guaranteed saving)• Become an important trend in many countries like
USA and Japan
![Page 4: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/4.jpg)
Energy
+ O&M
costs $
Energy
+ O&M
costs $
Client’s benefits ESCO’s benefits
Recovered costs
Client’s benefits
Before EPC During EPC After EPC
契約終止後
Cost savings
Energy
+ O&M
costs $
Basic concept of energy performance contracting (EPC)
Before EPC During EPC After EPC
![Page 5: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/5.jpg)
Introduction to EPC
• Performance contract• Contract with payments based in performance• Can be used for energy conservation projects, to
mitigate indoor air quality concerns, to reduce water & sewage usage, or to implement renewable energy systems
• ESCO guarantees and takes the risk of not achieving savings; it is paid back out of the savings (around 4-10 years)
![Page 6: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/6.jpg)
Introduction to EPC
• Benefits of EPC for a business• Reduced risk (contractor guarantees)• Turnkey services (contractor provides all services)• The business needs less internal expertise• Project financing could be ‘off balance sheet’• Advanced products & services can be used• Savings can be much higher than done by itself• Additional improvements to built environment
![Page 7: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/7.jpg)
Introduction to EPC
• Typical saving measures include:• Energy reduction via equipment retrofitting
• Such as replace lighting equipment, chillers & boilers
• Fuel saving measures• Such as add window films, insulation or pool cover
• Load shifting• Such as by energy management control systems
• Modification of operating procedures• Water & resource efficiency measures
![Page 8: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/8.jpg)
Introduction to EPC
• Different ways of structuring such a contract• ‘Guaranteed savings’
• Most common; length 4-8 years• Allow extra measures to be added
• ‘Shared savings’• The Client & ESCO share the savings; up to 10 years• Actual cost not included in contract
• ‘Pay from savings’• Variation from shared savings; operates like a loan
• ‘Chauffage’ or full services (ESCO takes over)
![Page 9: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/9.jpg)
Market Potential
• External factors• Large stock of existing buildings (esp. commercial)
• Energy cost is a concern for developers/owners
• Savings not difficult to obtain from equipment optimization, retrofitting or retrocommissioning
• Potential ESCO market• In HK, potential market around US$100 million
• Air-conditioning & lighting are major areas
• ESCO prefer owner-occupied or single-tenant
![Page 10: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/10.jpg)
Building Newly Completed in 1968-2000
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
196
8
196
9
197
0
197
1
197
2
197
3
197
4
197
5
197
6
197
7
197
8
197
9
198
0
198
1
198
2
198
3
198
4
198
5
198
6
198
7
198
8
198
9
199
0
199
1
199
2
199
3
199
4
199
5
199
6
199
7
199
8
199
9
200
0
Year
Combined residential &non-residential
Non-residential
Residential
1977-1992 (10 to 25 years old, from 2002)
Total floor area ('000 sq.m)
Building completed in 1968-2000 in Hong Kong
![Page 11: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/11.jpg)
Market Potential
• Current EPC active players• Automatic control companies• Building services consultants/contractors• Semi-government bodies (e.g. HKPC)• Power companies (for demand side management)• Private energy/environmental consultants
• Government energy projects• Electrical & Mechanical Services Dept. (EMSD)
is active in promoting EPC
![Page 12: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/12.jpg)
Market Potential
• Prospects• Growing concern on energy & environment
• Achieving sustainable performance!
• Saving energy & operating costs
• Policy tools & programmes by government• Building energy codes (performance-based), energy
labels, pilot renewable energy projects
• Water-cooled air-conditioning systems (converting of air-cooled systems)
• Need to maintain & upgrade existing buildings
![Page 13: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/13.jpg)
Major Barriers & Risks
• Major barriers• Weak awareness & experience• Skepticism of stakeholders• Problems with conventional procurement process• Problems with measurement & verification
• Key factors for successful EPC• ESCO has the technical, financial & mgt. skills• Customer & ESCO have a partnership• Good understanding of project goals
![Page 14: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/14.jpg)
Major Barriers & Risks
• Typical EPC project stages• Stage 1: The opportunity assessment
• Stage 2: Preliminary energy services
• Stage 3: Develop detailed proposal
• Stage 4: Project implementation
• Stage 5: Performance assurance + M&V services
• Risks associated with EPC• Technical knowledge & management culture
• Financing risks & guarantees
• Argument on savings & responsibilities
![Page 15: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/15.jpg)
Key Issues
• Choosing a contractor• Equipment suppliers
• Best if their technologies are the main measures
• Fee-based ESCO• Best for a wide range of measures or long-term
facilities management
• Utility-based ESCO• Best if focus on electricity or gas technologies
• International energy companies• Best for international connection & overseas
technology transfer
![Page 16: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/16.jpg)
Key Issues
• Project financing• By the ESCO itself• As a loan from financial institution• By working together with the client
• Under adverse economy• The client may not have the project capital• ESCO need to negotiate with bankers to explore
creative financial tools
• Some clients may want to finance themselves
![Page 17: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/17.jpg)
ESCO (Project Developer)
Financier (Secured Party)
Customer (Project Owner)
Capital
Payments
Finance contract (lease or loan)
Energy services and savings
gurantee
Fees
Financial structure used by ESCO
![Page 18: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/18.jpg)
Key Issues
• Measurement & verification (M&V) methods• Deemed or stipulated savings
• Payments based on savings estimates, using measurements or audit + equipment characteristics
• Savings based on utility bills• Past energy bills determine baseline consumption
• Measured savings• Compare ‘before’ & ‘after’ measurements
• M&V options & techniques have matured• Guidelines e.g. IPMVP and ASHRAE 14-P
![Page 19: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/19.jpg)
M&V option Analysis techniques
Partially measured retrofit isolation
Engineering calculations using short term or continuous measurements
Retrofit isolation Engineering calculations using short term or continuous measurements
Whole facility Analysis of whole facility utility meter or sub-meter data using techniques from simple comparison to regression analysis.
Calibrated simulation Energy use simulation, calibrated with hourly or monthly utility billing data and/or endues metering.
M&V options and analysis techniques
![Page 20: Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.](https://reader036.fdocuments.us/reader036/viewer/2022081603/5697bfee1a28abf838cb9b5d/html5/thumbnails/20.jpg)
Conclusion
• EPC is a useful tool for promoting & delivering energy efficiency projects
• HK & Mainland China have market potential in existing & new buildings
• Some barriers need to be overcome & suitable skills should be developed locally