Technologies of the Future: Challenges for Ships and ... · Environmental Management:...
Transcript of Technologies of the Future: Challenges for Ships and ... · Environmental Management:...
![Page 1: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/1.jpg)
Global transport needs sustainable ports – LNG as part of greenports
Technologies of the Future: Challenges for Ships and Harbors regarding environmental Compliance
Robert Howe Managing Director bremenports GmbH & Co. KG
Hamburg, June 3rd 2015
![Page 2: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/2.jpg)
Global transport needs sustainable ports – LNG as part of greenports
Technologies of the Future: Challenges for Ships and Harbors regarding environmental Compliance
(1) No alternative to maritime transport (2) The need for reduction of impacts (3) greenports-Strategy as model-case of bremenports (4) Implementation of LNG: Challenging Task
Hamburg, June 3rd 2015
![Page 3: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/3.jpg)
(1) No Alternative to Maritime Transport
2010
90 % of international trade is seaborne !
❖ Necessary for rising transport volumes ❖ Highest energy-efficiency ❖ Lowest emission per transport-mile
2030
![Page 4: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/4.jpg)
(2) The need for reduction of impacts
Limited natural capacity: !➢ Emission ➢ Resource-availability ➢ Climate Change as a global disaster !!!
Economic reaction on growing population with higher consumption:
➢ Corporate social responsibility ➢ Efficiency strategies
![Page 5: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/5.jpg)
(3) greenports-Strategy as model-case of bremenports Purpose of sustainable strategy
port indus
Safeguard the future of the ports in Bremen & Bremerhaven !by developments, following the Principles of Sustainability, that means in an !» economic » ecological and » social !responsible way.
logisticsport area
port management
tran
spo
rt
valu
e ch
ain
as green-ports green gateways green logisticsingreen shipping for
![Page 6: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/6.jpg)
Pressure / Demand:
SOCIAL !» Resource consumption » Climate protection » Integrated management
concepts » Community involvement » Cooperation “German Ports”
ECOLOGICAL !» Land consumption » Loss of Bio-diversity » Water, Air, Noise, and
Light pollution » Dredging impacts
ECONOMIC » Possibilities to grow » Efficient & secure
procedures » service quality at its best » 100% port availability » Innovations
(3) greenports-Strategy as model-case of bremenports General impression of today’s port situation
![Page 7: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/7.jpg)
➢ Sustainability strategy “greenports“TM (2009) ➢ Sustainability Reports acc. GRI (2013 & 2014)
➢ Environmental Management: PERS-Certificates (2011 & 2014)
➢ Habitat creation & management (> 20% habitat infrastructure)
➢ Sustainable water-depth-management
➢ Implementation of alternative fuels (LNG-Hopper-Barge)
➢ ESI-discount on harbor dues (greenports Award)
➢ Carbon Footprint Studies
➢ Monitoring systems (e.g. Noise at the Container terminal)
➢ port future concept 2020/25 addresses also sustainability
!Long term objectives: ➢ CO2-neutral port / CO2-efficient port
➢ Supply chain concepts
➢ Renewable Hydrogen as fuel for maritime use
(3) greenports-Strategy as model-case of bremenports Steps of Sustainable Port Management
![Page 8: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/8.jpg)
Dimensions Propulsion
Length oa (ca)
Width oa (ca)
Draught max. Load. Capac.
70 m 10 m 2.9 m 840 cbm
SystemPower Tanks Rudder Prop. Speed max.
gas- (diesel-) elektric 2 x 300 kW (Gas), 1 x ca 150 kW (Diesel) 2 x 8 cbm (LNG, Typ C), 1 x 1,500 l (Diesel) 2 x 310 kW (max) 9 kn
L N GL N G
(4) Implementation of LNG: Challenging Task Pilot Project LNG-powered Hopper Barge
![Page 9: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/9.jpg)
I. Idea
II. Feasibility Study
III. Consultation
▪ ZSUK
▪ Shipyards
▪ Engine - &
▪ System Manufacturer
▪ Class Societies
2012 2013 2014 2015
▪ Conception
▪ Engineering
▪ HAZID
▪ CCNR:
application for
approval
▪ CCNR - Approval
▪ Tender
▪ Selected for EU-funding
▪ Acceptance of
Tender
▪ Construction
▪ Crew Training
(4) Implementation of LNG: Challenging Task Hopper Barge: Idea – Engineering - Construction
![Page 10: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/10.jpg)
!LNG filling station in the Port of Bremen
• scalable up to 4000 cbm • multi-modal:
rail + road + shipping 2012. Start of Planning
!2014 Selected for EU-funding !2015 Truck to Ship bunkering available !2016 Commissioning !!!
(4) Implementation of LNG: Challenging Task LNG Supply Infrastructure
First bunkering process of “MS Helgoland” in May 2015
![Page 11: Technologies of the Future: Challenges for Ships and ... · Environmental Management: PERS-Certificates (2011 & 2014) Habitat creation & management (> 20% habitat infrastructure)](https://reader033.fdocuments.us/reader033/viewer/2022050103/5f41de553698f35822045676/html5/thumbnails/11.jpg)
You are welcome on our homepages www.bremenports.de or www.greenports.de
Thanks for your attention ...
Robert HoweManaging Director
bremenports GmbH & Co. KG Am Strom 2 27568 Bremerhaven
Tel + 49 (0) 421 – 30901-0 [email protected] [email protected]