Technological complex for production of petroleum pitch - LLL "TEXNOLOG"
-
Upload
texnolog -
Category
Small Business & Entrepreneurship
-
view
364 -
download
2
description
Transcript of Technological complex for production of petroleum pitch - LLL "TEXNOLOG"
Technological complex for production of
Petroleum pitch (PPD)
Limited Liability Company
«TECHNOLOG»
45 Gogol street, Irkutsk,
Irkutsk District 66409 Russia
Phone./fax 8(3952) 40-52-51
Cell phone.: +79246341235
e-mail: [email protected]
Alexander Gorokhov
Chief Executive Officer
LLC «Technolog»
Coal-tar pitch (CP) doesn’t meet the requirements:
• ecological;
• economical;
• technical.
The problem
Solution
Non-ferrous metallurgy
(aluminum industry)
«petroleum pitch (PPD)» «Processing Facility»
Name of the figure
coal-tar pitch
(grade А)
Marathon Ashland Petroleum
«Petroleum pitch»
Petroleum pitch
(PPD)
Mass fraction of water
in the solid pitch,% not
more than
4
None
None
Softening temperature,
С
70-80 65-105 95-120
α-fraction, % 19-21 21-27 18-25
Volatile-matter
content, %
53-63 68-78 50-58
Ash content,%, not
more than
1,2-4 0,09-0,1 0,08
Content of benzo(a)
pyrene, %
1,2-4 None None
Density 1,285-1,33 1,265-1,38 1,25-1,32
Basic figures
Petroleum and coal-tar pitch
Equipment layout plan
Unit for pitch production
Laboratory-scale
plant
Volume: 5 kg.
Experimental -
industrial plant
Capacity:
900 tons
Technological complex
with capacity of 50
thousand tons per
year
Increase production to
100 tons per year
Low cost;
Saving energy in the production;
Not toxic;
Minimum content of non-combustible residues.
Competitive advantages
Binder or impregnating material
«Self-baking anodes» «Anode mass» «Graphite electrodes»
Direct sales, trayvertayzing selling technology under a license agreement
Sale of petroleum pitch (IPA)
Consumer enterprises - Model - (B2B)
Creation of a technological complex (TC) - Plant:
Capacity of 900 tons per year to 100,000 tons per year
Business - model
Proposed site of the project
Angarsk
Tayshet
Zheleznogorsk (Krasnoyarsk Krai)
4
5 2
3
1
Tayshet
Ltd. "Rusal"
"Anode Factory"
Angarsk
JSC «APC»
Rosneft
6
Achinsk
JSC “APR"
Rosneft
Petroleum
pitch (PPD)
Angarsk
JSC «APC»
7
8
Anode mass
Petroleum pitch (PPD)
The raw stock
4
5 2
3
1
Tayshet
Ltd. "Rusal"
"Anode Factory"
Angarsk
JSC "APCC"
Rosneft
6
Achinsk
JSC “APR"
Rosneft Tayshet
ООО «Technolog»
Anode mass
Petroleum pitch (PPD)
The raw stock
Ltd. "RUSAL" seeking foreign
partners for the production of
petroleum pitch - Victor Mann - CTO
12
Market, consumers
* - Cost shown excluding logistics
0
5 000
10 000
15 000
20 000
25 000
30 000
Marathon Ashland
Petroleum (США)
Rutgers Chemicals
GmbH
(Германия)
Kyreha (Япония) ОАО
«Северсталь»
(Россия)
ООО "Технолог"
(Россия)
Каменноугольный пек
Нефтяной пек
Competitors' prices
Intellectual property
№ Name Rightholder
1
Patent:
«A method for producing oil sintering additive - a composite
material to the charge for coking»
Registration number FIPS: 2013147973 от 30.10.2013г.
ООО «Technolog»
2
Know how:
«A method for producing a sintering additive»
20.1-02/1-13/КТ (ноу-хау) от 20.10.2013 г.
ООО «Technolog»
Licensing agreement
№ Name Rightholder
1 № 2397276 - Anode mass to form self-baking anodes
aluminum electrolyzer
JSC "Angarsk polymer
plant" Rosneft
2 № 2415972 - Inhibitor for anode mass of self-baking
anodes aluminum electrolyzer
JSC "Angarsk polymer
plant" Rosneft
I stage (2012 -2013г.) - (Own funds);
- $ 60 000 (completion of R&D) – completed
II stage (2014-2015г.) - $ 330 000 – (900 t/year - capacity)
- RBK Funds 75% + private investor 25% - (anticipatorily)
- $ 300 тыс. (construction of "TK" and testing products);
- $ 30 тыс. (cost of "raw material" for testing);
III stage (2016-2020г.) - $ 23.5 millions - (construction of a factory); - Funds: Rusnano, Rosatom, LLC "Rusal" + private investor
- $ 8,5 millions (Plant construction: Volume - 50 thousand /t per year);
- $ 15 millions (Cost of "raw material": Volume - 50 thousand /t per year)
IV stage (2021-2022г.) - $ 5 millions (Own funds)
- increase production to 100 thousand /t per year.
Investment in the project
The project team
Chief engineer
(Chief Financial
Officer)
Alexander Gorokhov Oleg Doshlov
Eugeny Speshilov
project manager
(Director) Research project leader
Technology Department
(3 people)
Design Department
(2 people)
Finance department
(2 people)
Thank you for your attention!!