Technical Standards Profile
Enterprise Architecture Office Standards
Document Status: APPROVEDDocument Author: Michael Birmingham
EAO Approver: Mark DelaplaneCIO: Bob Lanouette
Version 8.0Publish Date 5/3/2017
Version 9
Technical Standards Profile 9
Table of Contents TECHNICAL STANDARDS PROFILE..................................................3
APPLICATIONS..................................................................................4
Workgroup Computing..................................................................15
DATA / DBMS..................................................................................19
ELECTRONIC COMMERCE..............................................................21
HARDWARE PLATFORMS...............................................................23
Mobile Computing..........................................................................27
INFRASTRUCTURE..........................................................................28
INTEGRATION (EAI)........................................................................35
SECURITY........................................................................................38
SYSTEMS MANAGEMENT...............................................................43
WIRELESS.......................................................................................49
Assistive Technologies..................................................................50
2
Technical Standards Profile 9
TECHNICAL STANDARDS PROFILE
Revised: 10/29/2012
Definitions(0-12 months) Target (12-24 months)
Currently approved protocol, product or service. Assures the best alignment with agency direction and architecture and provides the most efficient use of agency resources.
The agency has set a target to migrate to these technologies within the Tactical planning time frame, i.e. 12-24 months. If a technology is listed in this category, then an approved migration plan is in place. Once implemented, items in this category will shift to the "Current" column.
New projects may be able to use these technologies if migration plans coincide with project plans. Seek EAO guidance before making a commitment to using these technologies.
These are the emerging trends, products, services or strategies that the agency emerge as viable technologies within the horizon, i.e. 24-48 months. However, because these are generally immature technologies, their status is not certain and they may prove unacceptable for further investment.
These may be good candidates for R&D or non-production prototypes, but DO NOT plan to incorporate these technologies into production systems. Any technologies, even for R&D purposes, requires EAO approval.
An acceptable alternative to the standard under certain conditions. EAO approval is required before acquisition or use. A product or service currently in use but may be replaced in the near future. Should not be used for new system development. Any investments beyond routine maintenance must be approved by the EAO.Technology identified for replacement. No further investments will be approved.
Strategies, guidelines and best practices that provide further guidance for the appropriate use of the technology.
3
Technical Standards Profile 9
APPLICATIONS
Data ExchangeCurrent Target (12-24
months)Emerging (24-48
months)Standard: FTP and SFTP
(Tumble Weed) IBM Integration
Bus IBM Data Power
Gateway IBM Business
Process Management
WSFTP
Exception:Contain: Retire:Strategy XML is widely embraced as the industry standard. L&I has adopted
XML for data and content interchange and will implement this standard for all new systems.
Client Interface - Browser (Client Computing)Current Target (12-24
months)Emerging (24-
48 months)Standard: Primary Browser (W10):
Microsoft IE 11Secondary Browsers (W10): Google Chrome Microsoft EdgeCompanion Device (iOS): Safari
Exception: Windows Forms Applications
FireFoxContain:
Retire: MS IE 6 MS IE 8 MS IE 9 MS IE 10
Strategy: Internally, application interfaces are standardized across the agency using adaptive designs around HTML5 and CSS3. Applications are written to a browser interface and are as vendor independent as possible. Browser-based client is preferred but Windows Client (Win32) are acceptable in accordance with the Enterprise Application Non-Functional Requirements Checklist.
Externally, applications are written to a browser interface and are as vendor independent as possible. Applications are tested with browser version listed in the Web Presentation Standards.
4
Technical Standards Profile 9For supported agency browser clients, standardize on at least two different browsers. The primary browser will support all legacy applications as a priority and newly developed applications, if possible. The secondary browsers will support all newly developed applications as a priority and legacy applications, if possible.
Currently, Internet Explorer 11 is the agency’s primary browser until legacy dependencies within in applications are refactored. Google Chrome and Microsoft Edge are secondary browsers. Safari is the standard browser for iOS devices.
Business Tier LanguagesCurrent Target (12-24
months)Emerging (24-
48 months)Standard: COBOL (mainframe)
Natural (mainframe) C# Java 1.8
Exception:Contain: Visual Basic
Java 1.6 Java 1.7
Retire: DelphiStrategy Standardize the development environment to take advantage of
reusable code, leverage developer skills, and minimize support and training expenses. New web application projects (starting in July 2015) are to use C# as primary development language for .NET Applications.
Application Frameworks (AppDev & Client Computing)Current Target (12-24
months)Emerging (24-
48 months)Standard: .NET Framework 4.5.2
Java 1.8 .NET
Framework 4.6 .NET
Framework 4.6.1Exception:
Contain: .NET Framework 4.5 NET Framework 3.5, 4.0 Java 1.6 Java 1.7
Retire: NET Framework 2.0Strategy Distributed Application Framework Development is standardized
around the Microsoft .NET Framework and Java which is managed code programming model for building applications on Windows clients, servers, and mobile or embedded devices.
5
Technical Standards Profile 9
Web-centric ApplicationsCurrent Target (12-24
months)Emerging (24-
48 months)Standard: .NET Framework 4.5.2
Enterprise Library ASP.NET HTML5 CSS3 XML JavaScript ADA accessibility Web Facing Service -
Internal(see strategy below)
Java 1.8 .NET
Framework 4.6
.NET Framework 4.6.1
Exception: Contain: .NET Framework 4.5
XHTML 1.0 transitional CGI COM / COM+ ISAPI Java 1.6 Java 1.7 VBScript (server side) ActiveX (server side)
Retire:Strategy Write applications to work with all agency supported browsers and
to comply with ADA accessibility rules identified in the Web Presentation Standards.
Keep external applications as thin as possible with a minimal amount of client-side processing. Client-side scripting can be used to enhance the end-user’s experience and performance, i.e. client-side caching. However, if the end-user has disabled the browser script function, the application’s essential functions must continue to operate or gracefully notify the user of an alternative method of completing the action.
Java applets and plug-ins are strongly discouraged and client-side ActiveX is prohibited on external apps. Do not require external clients to download or install helper apps or other executable code beyond what is commonly available and supported by third-parties, e.g. Adobe Acrobat Reader. Pure HTML is the safest; Cascading Style Sheets should be used and should be thoroughly tested with all targeted browsers and the W3C CSS Validator. Business logic should be written as .NET assemblies. Business logic should not be coded in ASP script or SQL Stored Procedures.
6
Technical Standards Profile 9
Web User Interface DesignCurrent Target (12-24 months) Emerging (24-48
months)Standard: MS Visual
Studio .NET 2013 Ultimate Edition
WebSphere Portal Server Framework
Adobe Dreamweaver CS5
MS Expression Web 4.0
WS-RP 2.0 Portlets JSR-286 Portlets
Visual Studio 2015
Visual Studio "15"
Exception:Contain: MS Visual
Studio .NET 2008 and 2012 Ultimate Edition
Dreamweaver MX 2004 (Internet)
Contribute 2.0 (Internet)
Adobe Dreamweaver CS4
Retire: JSR-168 PortletsStrategy Standardize the development environment to take advantage of
reusable models and templates, leverage developer skills, and minimize support and training expenses. MS Expression Web Designer is used for web content development and application user interface development in accordance with development guidelines.
Application user interfaces are an architectural component subject to architectural review. Application user interface architecture and design must allow for integration with the agency’s portal framework for reusable delivery in accordance with the agency’s portal development standards and guidelines.
Disconnected Client-Server ApplicationsCurrent Target (12-24 months) Emerging (24-48
months)Standard: MS Visual Studio
Team System 2012 Ultimate Edition (for .NET)
Maxenso/Natclipse (for Natural)
Eclipse (for Java)
MS Visual Studio Team System 2015 Professional
Git
Exception: Contain: • MS Visual Studio
Team System 2008 Enterprise
Retire: Strategy Standardizing on a single architecture that integrates well with the
enterprise can reduce the complexities of disconnected application
7
Technical Standards Profile 9development. To function in the “occasionally connected computing” environment, message queuing, local data cache, and/or synchronization should be employed.
Application user interfaces are an architectural component subject to architectural review. Application user interface architecture and design must allow for integration with the agency’s portal framework for reusable delivery in accordance with the agency’s portal development standards and guidelines.
Software ComponentsCurrent Target (12-24 months) Emerging (24-48
months)Standard: .NET 4.5
Assemblies Java 1.6 (for SOA
Services)
.Net 4.5.2 Assemblies
Java 1.7 (for SOA Services
Java 1.8 (for SOA Services)
Exception: Contain: .Net 2.0, 3.5, 4.0
Assemblies .NET Enterprise
Services (COM+)Retire: DCOM (HTTP
Tunnel)Strategy Applications should be segmented into logical layers in order to
simplify maintenance and leverage reusable services. Business logic will be assessed as part of the agency’s SOA governance to determine if the business logic should be implemented as SOA services or built as application components. Business logic is not to be coded in ASP script, client side java script, or stored procedures.
Integrated Development EnvironmentCurrent Target (12-24 months) Emerging (24-48
months)Standard: MS Visual Studio
Team System 2013 Ultimate Edition
Eclipse Maxenso/Natclipse IBM Integration
Designer (IID) 8.5 Rational
Application Developer (RAD) 8.5
IBM Operational Decision Manager (ODM) 8.5
MS Visual Studio Team System 2015 Professional
Visual Studio in the Cloud
Visual Studio "15"
Exception: Contain: MS Visual Studio
2008, 2012 Ultimate Edition
Embarcadero Delphi
8
Technical Standards Profile 9Retire: WebSphere
Integration Developer (WID) for Business Processes for WebSphere Process Server
Strategy Standardize the development environment to take advantage of reusable models and templates, leverage developer skills, and minimize support and training expenses. Microsoft development tools are preferred for distributed application. Business logic will be assess according to the agency’s SOA Governance process to determine if the logic should be developed as an SOA service.
Software Source ControlCurrent Target (12-24 months) Emerging (24-48
months)Standard: MS Team
Foundation Server 2012
SubVersion Collabnet 4.0
MS Team Foundation Server 2015.
TFS in the Cloud Git
Exception: TortoiseSVNContain: MS Team
Foundation Server (TFS) 2008
Retire: Visual Source SafeStrategy TFS Source Code repository is used for source code control for .NET
applications. Java-based applications use Subversion (SVN). The guidance for using SVN can be found in the Java Development Environment Roadmap.
Enterprise Application Architecture Modeling (Client Computing)
Current Target (12-24 months) Emerging (24-48 months)
Standard: Visio 2016 (32bit) Visual Studio
(current version)
Visio 365
Exception: Visio 2016 (64bit)Contain: Retire: Rational Rose
Power Designer Visio 2010 Visio 2013
Strategy When publishing Visio drawings, distribute as .PDF to allow broad compatibility. Specific diagrams such as a technology component diagram, deployment view diagram, behavior view diagram, and sequence diagram are to be included in the solution architecture documentation for an enterprise application using Visio.
9
Technical Standards Profile 9
Enterprise Business Architecture Modeling (Client Computing)
Current Target (12-24 months) Emerging (24-48 months)
Standard: Visio 2016 (32bit) Visio 365Exception: Visio 2016 (64bit)Contain:Retire: Visio 2010
Visio 2013Strategy Microsoft Visio is the standard for Enterprise Business Architecture
Modeling.
Enterprise Technology Architecture Modeling (Client Computing)
Current Target (12-24 months) Emerging (24-48 months)
Standard: Visio 2016 (32bit) Visio 365Exception: Visio 2016 (64bit)Contain:Retire: Visio 2010
Visio 2013Strategy Microsoft Visio is the standard used Enterprise Technology
Architecture Modeling.
Defect TrackingCurrent Target (12-24 months) Emerging (24-48
months)Standard: MS Team
Foundation Server 2012
SubVersion Collabnet 4.0
MS Team Foundation Server 2015
Exception: TortoiseSVNContain:Retire: Strategy
Performance TestingCurrent Target (12-24 months) Emerging (24-48
months)Standard: Microfocus’
QALoad SOAPUI
Microfocus’ Silk Performer
Exception: Contain:Retire:Strategy QALoad is used for performance testing by comparing metrics
provided by QALoad’s performance monitoring capability for different runs of an application. It uses Vantage Agents in conjunction with QALoad. NOTE: The vendor has deprecated QALoad and will be replacing it with another product in the near future.
SOAP UI is used for web service testing. It provides a client testing
10
Technical Standards Profile 9harness to exercise web services. As a client testing harness is used as part of the testing suite to perform performance testing runs.
Load (stress) TestingCurrent Target (12-24 months) Emerging (24-48
months)Standard: Microfocus QALoad
Application Vantage SOAP UI Microfocus’ Silk
Performer Visual Studio
(current version) with Team Foundation Server (current version)
Exception: Contain:Retire:Strategy SOAP UI is used for web service testing. It provides a client testing
harness to exercise web services. As a client testing harness is used as part of the testing suite to perform load testing runs.
Functional (Unit) TestingCurrent Target (12-24 months) Emerging (24-48
months)Standard: Visual Studio
(current version) with Team Foundation Server (current version)
Exception:Contain:Retire:Strategy Visual Studio in conjunction with Team Foundation Server provides
the framework for performing test-driven development using Visual Studio’s logging, tracing, assertion, and unit test projects.
Business RulesCurrent Target (12-24 months) Emerging (24-48
months)Standard: IBM Operational
Decision Manager (ODM) 8.5
Exception:Contain:Retire: WebSphere ILOG
Business Rules Engine
Strategy Business Rules will be governed & used according the L&I Business Rules Governance guide.
11
Technical Standards Profile 9
Business Orchestration and Workflow (BPM)Current Target (12-24 months) Emerging (24-48
months)Standard: WebSphere
Business Process Manager (BPM)
Exception:Contain:Retire: WebSphere
Process Server (WPS)
Strategy Used to create automated business processes that span people, workflows, applications, systems and platforms. WPS provides service mediation and orchestration capabilities for web services.
Document WorkflowCurrent Target (12-24 months) Emerging (24-48
months)Standard: IBM FileNet P8
Case Foundation (“re-branded” from previous BPM product”
Exception:Contain:Retire:Strategy Current Enterprise IDM & ORION applications do not use workflow
software, relying on code frameworks, SQL stored procedures, & application system database tables for automated rules-based document & work item routing to work position & group roles.Applications that need to include a document workflow process as part of the application functionality will use FileNet P8 BPM to facilitate the document workflow. SILAS is an example of an application that is using this standard.Current IBM FileNet P8 server processing capacity is not sufficient for full agency enterprise support, P8 servers need additional CPU, memory, & storage plus major software version upgrades.
Enterprise Application Reporting Service(Service used by enterprise applications to meeting reporting requirements)
Current Target (12-24 months) Emerging (24-48 months)
Standard: Business Objects XI SQL ReportingException:Contain:Retire: Crystal Enterprise
Reporting ServiceStrategy
12
Technical Standards Profile 9
Integrated Document Management (IDM)Current Target (12-24 months) Emerging (24-48
months)Standard: IBM FileNet Image
Services IBM FileNet P8
Content Manager
Exception:Contain:Retire:Strategy Documents stored as part of an applications data set will store the
documents in one of the IBM FileNet IDM or ECM repositories.IBM FileNet Image Services support ORION for Workers Compensation business programs & Enterprise IDM for other & future programs.IBM FileNet Image Services provides a compliant electronic records management repository for static non-modifiable legal artifact documents, with appropriate performance & server capacity for online case file review response time. Current Image Services IDM applications use the following key products:
IBM FileNet Image Services (IDM repository) w/SQL Servero FileNet Integral SDS (document storage) with MSAR
(Magnetic Storage Archival & Retrieval using WaTech Shared SAN storage for fast online retrieval) & CSAR (Centera Storage Archival & Retrieval using WaTech EMC Centera storage for non-modifiable legal archival copy)
o FileNet HPII (High Performance Image Import for importing indexed IDM case file documents staged by Kofax Capture & custom IDM application services)
o FileNet IDM Web Services & Desktop (API, services, & ActiveX viewer plug-in for Image Services integration with custom IDM applications)* Proof-of-concept in progress to replace ActiveX viewer with Image Services licensed HTML5 web browser compliant IBM Daeja ViewONE Virtual viewer thru IBM WebSphere Application Server hosted IBM Content Navigator web client.
Custom IDM web applications & services using VB .NET plus Snowbound RasterMaster .NET 64-bit SDK for document file format conversion with TIFF, PDF, AFP mainframe, & Office/Outlook documents.
Kofax Capture & Kofax Transformation Module w/SQL Server & agency compatible paper & microfiche scanners (scan/import documents, QA & index to case file of primary system of record, & stage for import to Image Services)
Primera Bravo 4102 XRP Disc Publisher & PTBurn SDK (CD & DVD publishing burn & label media for IDM case file copy)
OpenText RightFax (now enterprise platform that continues to support inbound & outbound fax of IDM case file documents)
IBM FileNet P8 Content Manager provides an effective electronic records management repository for SILAS, ESCH documents, & Workers Compensation Structured Settlements, but is currently only set up for
13
Technical Standards Profile 9light use and not leveraging available Records Management component. Current IBM FileNet P8 server processing capacity is not sufficient for full agency enterprise support, P8 servers need additional CPU, memory, & storage plus major software version upgrades.Enterprise Service interfaces for use by applications are to be used for application to interact with one of the IBM FileNet platforms.
Service RepositoryCurrent Target (12-24 months) Emerging (24-48
months)Standard: WebSphere
Service Registry & Repository (WSRR)
Exception:Contain:Retire:Strategy Service Repository maintains records of all Business capabilities
identified for automation, service interface specifications, service interfaces, service schemas, service level definition artifacts and WSDLs. It is the repository to be interrogated by business analysts during strategic and tactical planning and cost estimation to determine services available for use in creating new applications.
Service RegistryCurrent Target (12-24 months) Emerging (24-48
months)Standard: WebSphere
Service Registry & Repository (WSRR)
Exception:Contain:Retire: WebSphere
Application Server native UDDI service
Strategy Used as the registry for deployed service end-point definitions to be use by consuming applications at run-time.
14
Technical Standards Profile 9
Workgroup Computing
Electronic MailCurrent Target (12-24 months) Emerging (24-48
months)Standard: CTS Shared Mail
Service (MS Exchange 2010)
CTS Shared Mail Service (MS Exchange 2016)
Cloud based – Office 365
Exception:Contain:Retire:Strategy CTS will manage our Enterprise Email servers with Exchange.
Calendaring and SchedulingCurrent Target (12-24 months) Emerging (24-48
months)Standard: CTS Shared Mail
Service (MS Exchange 2010)
CTS Shared Mail Service (MS Exchange 2016)
Cloud based – Office 365
Exception:Contain:Retire:Strategy CTS will manage our Enterprise Email servers with Exchange.
CollaborationCurrent Target (12-24 months) Emerging (24-48
months)Standard: SharePoint 2013 Microsoft
SharePoint Online
Exception:Contain:Retire:Strategy Move to Share SharePoint and deprecate all others. Push to
educate users to use links to documents in e-mail rather than sending documents themselves.
Document Centric WorkflowCurrent Target (12-24 months) Emerging (24-48
months)Standard: SharePoint 2013 Microsoft
SharePoint Online
Exception:Contain:Retire:Strategy Move to SharePoint and begin using SharePoint Workflow to
control document centric processes or workflow based on lists or status tracking.
15
Technical Standards Profile 9
Document PublishingCurrent Target (12-24 months) Emerging (24-48
months)Standard: SharePoint 2013 Microsoft
SharePoint Online
Exception: eGain – Knowledge Management platform replacing OLRS system used primarily for Industrial Insurance “knowledge content”
Contain:Retire:Strategy This should be a specific instance of a Document Centric Workflow.
SearchCurrent Target (12-24 months) Emerging (24-48
months)Standard: SharePoint 2010
(Collaboration Documents)
WCI Search for (Composite Application Search)
Google Search Appliance (Web Content and databases)
Exception:Contain:Retire:Strategy A federated search model is our desired direction. Further
assessment will be done after SharePoint is brought in to manage workgroup documents.
Records ManagementCurrent Target (12-24 months) Emerging (24-48
months)Standard: IBM FileNet P8 SharePoint 2013 Microsoft
SharePoint Online
Exception:Contain:Retire:Strategy Assessment will be done to determine if and when SharePoint can
be used for Records ManagementCurrent IBM FileNet P8 server processing capacity is not sufficient for full agency enterprise support, P8 servers need additional CPU, memory, & storage plus major software version upgrades. Also, although IBM FileNet P8 Records Management component installed, current business programs in P8 are not using it.
Technically, IDM & Document Management in regards to records management of static legal artifacts should be separate from “Workgroup Computing” ECM which primarily involves collaboration & publishing of agency information & knowledge with some potentially becoming a legal artifact tied to a specific record set. Proposed change in Applications section from “Document and Image Storage” to “Integrated Document Management/IDM”.
16
Technical Standards Profile 9
Document Management (for Workgroup Computing)
Current Target (12-24 months)
Emerging (24-48 months)
Standard: SharePoint
SharePoint 2013 Microsoft SharePoint OnlineException:
Contain:Retire:Strategy SharePoint is our target direction for Workgroup Computing
Document Management functions. Assessments will be done to determine which functionality and timing can be implemented.At this time, SharePoint does not look viable for IDM Applications until concerns for performance, operations, & governance are addressed.
Enterprise Reporting ServiceCurrent Target (12-24 months) Emerging (24-48
months)Standard: Microsoft
Business Intelligence (SSRS, and other SharePoint based functionality)
Exception: SAS for Fraud Detection
Contain: HyperionRetire:Strategy The desired direction is to deprecate Hyperion and migrate to the
Microsoft BI Suite.
Optical Character RecognitionCurrent Target (12-24 months) Emerging (24-48
months)Standard: Exception:Contain:Retire:Strategy No current standard. Eventually needed to support both
Workgroup Computing Document Management & Integrated Document Management (IDM) of digitized text image documents to capture, index, & retain for full text search of any document within the constraints of authorization & confidentiality.
Electronic Forms (Client Computing)Current Target (12-24
months)Emerging (24-48 months)
Standard: Adobe Acrobat Word
Exception:Contain: InfoPathRetire:
17
Technical Standards Profile 9Strategy (NOTE: January 31, 2014, Microsoft announced plans to discontinue
InfoPath)This strategy is based on the following classification system adopted by the E-Forms Subcommittee of the Customer Advisory Board (CAB).
LEVELS OF ELECTRONIC FORMS1. Print on demand2. Fill and print3. Interface with (lookup and update) a back-end database.4. Route the form to another user.5. Enable digital signature attachment or other legal
requirements6. E-commerce (secure financial transactions)
Levels 1: Adobe Acrobat is the industry defacto standard and is the recommended format for this level e-form.
Levels 2: Word is the agency defacto standard and is the recommended format for this level e-form.
Levels 3, 4 & 6: Agency Standard Web Development Tools are the approved choice. (Please see the “Applications” section of this document for more information.)
Office Automation Software (Client Computing)Current Target (12-24
months)Emerging (24-48 months)
Standard: Office 2016 (32bit) Office 365Exception: Office 2016 (64bit)Contain: Retire: Office 2010
Office 2013Strategy Office automation software will use an integrated suite in order to
leverage common training and support resources as well as take advantage of reduced licensing costs.
18
Technical Standards Profile 9
DATA / DBMS
Database Management SystemsCurrent Target (12-24 months) Emerging (24-48
months)Standard: SQL Server 2012
R2 Access 2010
(Single-user/local workstation)
SQL Server ?(not listing SQL Server in Target & Emerging might imply Access is agency target fro all database’s?)
Access 2013 MongoDB (for PC
laptop mobile applications)
Access 2016 MS Dynamics
Exception: SQL ExpressContain: ADABAS
(Mainframe)VSAM
FASTPlus DB2
Retire: SQL Server 2008 MSDE (Desktop)
Strategy: MS SQL Server is the agency’s strategic database management system and will be used for new development. MS Access is appropriate only for single-user desktop applications.
Contained products will continue in production for several more years, but plans are being made to migrate to a strategic platform. Products may continue to be used to maintain and enhance their respective applications, but significant new investments must be approved by I.S. management.
Data WarehouseCurrent Target (12-24 months) Emerging (24-48
months)Standard: SQL Server 2012 Exception:Contain:Retire: SQL 2008 R2Strategy:
MetaData RepositoryCurrent Target (12-24 months) Emerging (24-48
months)Standard: Rochade w/ WEB
Access and Rochade Browser
SQL Server 2012
Exception:Contain:Retire: ROAccessStrategy:
19
Technical Standards Profile 9
Data Extraction, Transformation and LoadCurrent Target (12-24 months) Emerging (24-48
months)Standard: SQL Server
Integration Services 2012
Exception:Contain:Retire:Strategy:
Business Data ReplicationCurrent Target (12-24 months) Emerging (24-48
months)Standard: Adabas Reptor Exception:Contain:Retire:Strategy: In general, data replication is not recommended unless it is for
caching purposes and the “owning” system maintains control over updates.
Data Hygiene (Cleansing)Current Target (12-24 months) Emerging (24-48
months)Standard: Exception:Contain:Retire:Strategy:
20
Technical Standards Profile 9
ELECTRONIC COMMERCE
Credit Card Verification and Payment ServicesCurrent Target (12-24 months) Emerging (24-48
months)Standard: Verifone
(FrontCounter Credit Card Processing)
Official Payments (Internet Payment Service)
Exception:Contain:Retire: TPI
CyberSource (shared DIS Service)
Strategy: A client solution using Verifone APIs was developed and deployed in 2011. This is to be used by any solution that requires “front counter” credit card support….the ability to process credit cards for walk-in customers to L&I field offices.
The Internet Payment Service was created with Official Payments and the backend processing service. All web-based solutions that require credit card processing capabilities use the Internet Payment Service. The service includes a user interface to present payment options for the client applications.
Data Interchange (EDI)Current Target (12-24 months) Emerging (24-48
months)Standard: Exception:Contain:Retire:Strategy: No formal EDI standard is currently being used. Data exchanges use
simple FTP transfers. XML and secure Internet access is being targeted for applications that have traditionally used EDI.
Electronic Funds TransferCurrent Target (12-24 months) Emerging (24-48
months)Standard: Internet Payment
ServiceException:Contain:Retire:Strategy: The in-house developed Internet Payment Service provides support
for electronic funds transfer.
21
Technical Standards Profile 9
Electronic ChecksCurrent Target (12-24 months) Emerging (24-48
months)Standard: Internet Payment
ServiceException:Contain:Retire:Strategy: The in-house developed Internet Payment Service provides support
for electronic checks.
22
Technical Standards Profile 9
HARDWARE PLATFORMS
MainframeCurrent Target (12-24
months)Emerging (24-48
months)Standard: IBM S/390Exception:Contain:Retire:Strategy: Mainframe services hosted by DIS. There are plans to migrate from a
mainframe based environment to a distributed server computing environment.
MidrangeCurrent Target (12-24
months)Emerging (24-48
months)Standard: Exception:Contain: Retire: Strategy: RISC based servers no longer exist within L&I
Network ServerCurrent Target (12-24
months)Emerging (24-48
months)Standard: X86 Intel Virtual Cloud
ServersException:Contain:Retire:Strategy: Consolidate servers as much as possible to simplify administration. Use
server hardware that is reliable, fault-tolerant and designed for multi-user network environments. Virtual Cloud Servers should be considered viable for future server acquisitions.
Primary Device - Desktop Computer (Client Computing)Current Target (12-24
months)Emerging (24-48
months)Standard: Dell Optiplex 7050 (2017)
7th Gen
processor 8th Gen
processorException: MacintoshContain: Dell Optiplex 7040 (2016)
Dell Optiplex 7030 Dell Optiplex 7020 Dell Optiplex 7010
Retire: Dell Optiplex 790 and earlier.
Strategy: The Desktop computer is for users or functions that have no mobility requirements (e.g. Training rooms, Front Counter PC’s, etc.). Desktop computers are considered a primary device and is replaced on a 4 yr. lease cycle.Desktop Standards: OS Support: Windows 10 64-bit OS
23
Technical Standards Profile 9 Processor: Intel i5 dual core processor (7th Generation) Memory: 8 GB RAM Storage: 500 Gb SSDAttachments Included: Built-in optical drive (DVD r/w): 24” Flat screen monitor (not touch) Microphone and Audio Jacks Min 4 USB 3.0 connectionsOther: Can support dual monitors Can support bluetooth Support VPro Can support WiDi Can support Discreet Graphics card Field Serviceable
Macintosh computers are allowed by exception for special purposes only.
Primary Device - Laptop Computer (Client Computing)Current Target (12-24
months)Emerging (24-48
months)Standard: Dell Lattitude 7470 7th Gen
processor 8th Gen
processorException: MacBookContain: Dell Lattitude 5450
Dell Lattitude 5440 Dell Lattitude 6430
Retire: Dell Lattitude 6420 Dell Lattitude 6410
Strategy: The Laptop computer is considered a primary device and is Intel based running Windows OS and replaced on a 3 yr. cycle. The Purpose for the Laptop computer is for users with mobility needs and sturdiness is more important than size (These devices meet hardening standards).
Laptop Standards: OS Support: Windows 10 64-bit OS Processor: Intel i5 dual core processor (7th Generation) Memory: 8 GB RAM Storage: 250 Gb SSDAttachments Included: 14” Flat screen monitor (touch enabled) Integrated WebCam Fingerprint Reader Microphone and Audio Jacks Min 4 USB connections (min 2 USB 3.0)Other: Field Serviceable Supports Bluetooth Supports WiFi Supports VPro Supports WiDi Mil-Std-810G rated Backlit Keyboard Docking Station that can support dual monitors
MacBook computers are allowed by exception for special purposes only.
24
Technical Standards Profile 9
Primary Device - Convertible Computer (Client Computing)Current Target (12-24
months)Emerging (24-48
months)Standard: HP Elitebook 7th Gen
processor 8th Gen
processorException:Contain:Retire:Strategy: The Convertible computer is considered a primary device and is Intel
based running Windows OS and replaced on a 3 yr. cycle. The Purpose for the Convertible computer is for users with mobility needs and size is more important than sturdiness.
Convertible Standards: OS Support: Windows 10 64-bit OS Processor: Intel i5 dual core processor (7th Generation) Memory: 8 GB RAM Storage: 250 Gb SSDAttachments Included: Converts to tablet mode 10-12”” Flat screen monitor (touch enabled) Integrated WebCam Fingerprint Reader SD Card Reader Microphone and Audio Jacks Min 4 USB connections (min 2 USB 3.0)Other: Field Serviceable Supports Bluetooth Supports WiFi Supports Cellular Mobile Broadband Supports VPro Supports WiDi Mil-Std-810G rated Docking Station that can support dual monitors
The Tablet/Convertible computer is currently considered a companion device. Develop this hardware platform as a primary device with the implementation of Windows 10. Continue to support iOS iPad as a companion device.
Mass StorageCurrent Target (12-24
months)Emerging (24-48
months)Standard: Server-based (LAN)
Storage Array, NAS, SAN.NetApp ( Network Appliance )
WaTech Storage – Hosted Services –
Storage Array, NAS, SAN.
NetApp
CTS Storage Managed Services
Solid State Cloud services
Exception: Centera (EMC) Contain:Retire:Strategy: Cloud Services (AWS, Azure) will play a bigger role in storage as storage
costs continue to decline. Disaster Recovery is using cloud based storage with SunGard in PA.
25
Technical Standards Profile 9
Operating Systems (NetOps/Client Computing)Current Target (12-24
months)Emerging (24-48
months)Standard: MVS (mainframe)
Windows 2008 Unified Data Storage (NAS)
Windows Server 2008 and 2012
Primary Devices: Windows 10 (64bit)
Companion Devices - iOS WADS Workstations: Windows
10 (64bit)
Windows Server -2016
Companion Devices – Windows 10 (64 bit)
Exception: OSXContain: Primary Devices: Windows 7
(32bit) WADS Workstations: Windows
7 (64bit) Retire: Windows 8.1Strategy: Operating systems for all networked devices are standardized across the
enterprise. Because of the rapid adoption of new client operating systems, a policy of “managed diversity” is practiced, i.e. operating systems will be maintained at compatible versions, but will not all be at the same revision level.
26
Technical Standards Profile 9
Mobile Computing
Mobile Device Management (Client Computing)Current Target (12-24
months)Emerging (24-48 months)
Standard: AirWatch (CTS Service)
MS InTune
Exception:Contain:Retire: McAfee EMMStrategy: Have all Mobile devices provisioned and controlled through a Central
service.
Mobile Application Development Platform (MADP)Current Target (12-24
months)Emerging (24-48 months)
Standard: Verivo TBDException:Contain:Retire: Visual StudioStrategy:
Mobile Multimedia Production Current Target (12-24
months)Emerging (24-48 months)
Standard: TBD Exception: iMovie (iPhone
and iPad) with tripod and microphone
Contain:Retire: Strategy: Limited use for eLearning, OHR, Public Affairs and Communications
projects
Smart Phone (Companion device) (Client Computing)Current Target (12-24
months)Emerging (24-48 months)
Standard: Apple iPhone (iOS) Windows 10 capable Smart PhoneException:
Contain:Retire:Strategy: The target audience for these devices is for employees requiring
Phone, Mail, and Calendar capabilities while away from their workstation. The Smart Phone is not a primary device and will not replace the primary device.
Continue to support Apple iPhones as a companion device for phone, mail, and calendaring.
27
Technical Standards Profile 9
INFRASTRUCTURE
Virtual Machine TechnologyCurrent Target (12-24 months) Emerging (24-48
months)Standard: VMware 6.0 Vmware
Supported
MS Hyper-V
Exception:Contain:Retire:Strategy:
Backup ServicesCurrent Target (12-24 months) Emerging (24-48
months)Standard: Commvault
Veeam Disk to Disk copy Replication CTS Backup
services Cloud services for
storage and or backup and Disaster Recovery
MS DPM 2012
Virtual Tape Libraries
Cloud Backup Services
Exception: Contain: Retire:
Strategy: Servers are increasingly being converted from physical to virtual servers. We are backing up virtual servers using Veeam and physical servers use Commvault.
28
Technical Standards Profile 9
BandwidthCurrent Target (12-24 months) Emerging (24-48
months)Standard: 1000Mb –
Desktop 100Mb – WAN
Node Sites to Remote
10Gb – Server 10Gb – Switch to
Switch 1Gig – HQ to
WaTech MPLS WAN 10Gb – Virtual
Host server and iSCSI storage arrays
1Gig WAN links for field offices
40 to 100 Gig core to core and to server
Exception:Contain:Retire:Strategy: New applications and technologies such as virtual servers, virtual
desktops, storage area networks (SAN), voice over IP, e-learning, video conferencing and virtual meetings will require higher bandwidth. Will need to increase bandwidth as needed.
Caching ServicesCurrent Target (12-24 months) Emerging (24-48
months)Standard: NoneException:Contain:Retire:Strategy:
Directory ServicesCurrent Target (12-24 months) Emerging (24-48
months)Standard: Microsoft
Active Directory IBM RACF
Exception:Contain:Retire:Strategy: Strategic Vendor = Microsoft - Consolidate network directories to a
single standards compliant directory service. Microsoft Active Directory will be the backbone of a statewide directory service, which will enhance inter-agency data sharing. LNI’s strategic direction is to standardize on Active Directory and to participate in the statewide directory service.
Active directory configuration is to be limited to LDAP standards compliant capabilities to ensure the broadest possible directory
29
Technical Standards Profile 9services integration across systems.
Firewall Services (ISSO/Client Computing)Current Target (12-24 months) Emerging (24-48
months)Standard: WaTech hosted
Fortinet solution Client – McAfee
HIPS Firewall
Web Application Firewall
Application firewalls
Exception:Contain:Retire: CheckpointStrategy: L&I will comply with all state and federal laws and regulations
concerning the privacy and security of medical and other personal information. The firewall secures and controls access to the L&I network, including intranet web content.
Full Disk Encryption (Client Computing)Current Target (12-24 months) Emerging (24-48
months)Standard: McAfee Endpoint
Encryption (Primary Devices)
iOS integrated disk encryption (Companion Devices)
Microsoft BitLocker Intel Disk Encryption
Exception: Microsoft BitLockerContain:Retire: SafebootStrategy: McAfee Endpoint Encryption is currently deployed as our Enterprise
disk encryption product. McAfee Endpoint Encryption standard is 128-bit AES.
Power Management – Workstation (Client Computing)Current Target (12-24 months) Emerging (24-48
months)Standard: System Center
Configuration Manager 2012
System Center Configuration Manager – Current Branch
Exception:Contain: Verdiem SurveyorRetire:Strategy: System Center Configuration Manager 2012 is the power management
product for agency workstations.
Load Balancing ServicesCurrent Target (12-24 months) Emerging (24-48
months)Standard: Procure Load
balancing product for the virtual sever environment
F5 equipmentException: Barracuda Load
BalancerContain:Retire:Strategy: High availability and 24/7 operation will require some type of web
balancing technology. Examples are DNS round robin or Cisco SLB
30
Technical Standards Profile 9(server load balancing) switching. Any load balancing service must be tightly integrated with the application development effort to ensure compatibility. Coordinate any new load balancing service with the EAO to request an ACP Exception request.
There are no requirements for LBS at the current time.
Local Area Network – including Wireless (Wi-Fi)Current Target (12-24 months) Emerging (24-48
months)Standard: Layer 2/3
Ethernet SwitchingCisco Chassis based (core)
Cisco Stackable based (access/closet switches)
Aerohive – Wi-Fi (Wi-Fi is an extension of Ethernet)
Policy-based intelligent networking
Research other commodity network vendors for Ethernet switching products (enhanced features, reduce costs etc).
Software Defined Networks (SDN)
Exception:Contain:Retire:Strategy: Strategic Vendor: Cisco. Standardize the infrastructure to improve
reliability and reduce integration problems. Cisco is the agency’s strategic networking partner. Aerohive (Wi-Fi wireless access points)
ProtocolsCurrent Target (12-24 months) Emerging (24-48
months)Standard: TCP/IP v4
EIGRP (Routing)SNMP
MPLS (Multi Protocol Label Switching) WAN routing
ICMP
TCP/IP V6 SIP for IP
communications
Exception:Contain:Retire: SDLC
HDLC SNA
Strategy: Standardize on a single routable internetworking protocol, i.e. TCP/IP, to facilitate interoperability and to reduce integration and problem solving.
31
Technical Standards Profile 9
Remote Access Current Target (12-24 months) Emerging (24-48
months)Standard: F5 VPN (DIS)
Citrix Metaframe /ICA
Explore Aerohive VPN Solution
Microsoft Direct Access
Exception:Contain:Retire: Juniper SSL VPNStrategy: Provide a secure remote access technology that allows our users to
perform the majority of their business needs from anywhere on any client.
Traffic ManagementCurrent Target (12-24 months) Emerging (24-48
months)Standard: QoS Layer 2
QoS (quality of service layer 3)
MPLS (multi protocol label switching) on the SGN
Review End-to-end QoS for all applications/services on the network (policy based networking)One to many video broadcast
Exception:Contain:Retire:Strategy: High bandwidth application delivery must be managed to prevent
overloading the network infrastructure and adversely impacting mission critical applications. IP Multicast has proven to be unreliable to field offices requiring new technologies to bypass our WAN service QoS ensures mission critical applications receive priority. The agency needs to start the process of reviewing all current and newly implemented applications and services for QoS settings (policy-based networking)
SSL Accelerator ServicesCurrent Target (12-24 months) Emerging (24-48
months)Standard: NoneException:Contain:Retire:Strategy: May be required if L&I develops a dedicated credit card processing
server.
32
Technical Standards Profile 9
Storage ServicesCurrent Target (12-24 months) Emerging (24-48
months)Standard: Server-based
(LAN) Storage System,
Ethernet, iSCSI, NFS, CIFS
Storage System, Ethernet, iSCSI, NFS, CIFS, Hyper converge infrastructure
WaTech Storage Managed Services for production applications
Solid State Cloud Service
ProvidersException: Centera (EMC)
(DIS)Contain: Retire:Strategy: LAN servers utilize NetApp and HP NAS or external storage. iSCSI
Network RAID 5 (across nodes) is now standard. ACP was completed.
We are using Network Appliance for our storage solution and HP NAS. The environment has tier one, two , and three type storage. Tier one is only flashpool for tier two and three storage type. SSD is tier one, SAS is tier two and SATA is tier three. We will look at tier one all flask filers for future high performance disk requirements.
TopologyCurrent Target (12-24 months) Emerging (24-48
months)Standard: Switched
Ethernet (LAN) (MPLS WAN)
Exception:Contain:Retire:Strategy: Continue using switched Ethernet for LAN technology, and MPLS for
WAN. Increase speeds (Bandwidth) when required by users and supported by equipment vendors.
33
Technical Standards Profile 9
Wide Area NetworkCurrent Target (12-24 months) Emerging (24-48
months)Standard: WaTech
Backbone (MPLS) for all WAN Connections
Cisco ASIC’s based Layer 2/3 Switches (L&I Tumwater HQ to CTS)
10 Mb Link (field offices)
100 Mb Link(field offices)
S-MON for connectivity from TumHQ to WaTech SGN
Cisco ASIC’s based Layer 2/3 Switches field offices to CTS backbone (MPLS)
40 – 100 Mb Links (field offices)
Wireless WAN connectivity (possibly for redundant circuits or production circuits)
Exception:Contain: T1 serial
connectivity from each field office to CTS Backbone (MPLS)
Retire:Strategy: Continue using Cisco & CTS as strategic vendors.
34
Technical Standards Profile 9
INTEGRATION (EAI)
Integration Broker (Message Broker)Current Target (12-24
months)Emerging (24-48
months)Standard: IBM WebSphere
Business Integration IBM Integration Bus IBM Transformation
ExtenderException:Contain: Microsoft
Transaction Server SAGA EntireX
(ADABAS)
Retire: MS BizTalkStrategy: Message brokering service is provided by IBM Websphere Business
Integration Message Broker (formerly MQ Integrator). The broker provides transformation and intelligent routing services and relies on WebSphere MQ (formerly MQ Series) for message transport.
SAGA EntireX is contained to supporting legacy ASP (web) and COM applications to ADABAS. Use will diminish as legacy applications are migrated to the standard environment.
Microsoft BizTalk will continue to be used as needed for specialized purposes, but will interface to the standard EAI services for integration with other internal systems.
Message FormatCurrent Target (12-24
months)Emerging (24-48
months)Standard: REST (JSON)
SOAP (XML)Exception: Contain:Retire:Strategy: XML messages (a.k.a. Web Services) use primarily canonical forms
and are transported and managed by the EAI infrastructure. This provides a robust, reliable and secure Web Services infrastructure internal to the L&I network.
** XML Web Services will be use for application integration external to the agency as standards mature, especially security.
Message TransportCurrent Target (12-24
months)Emerging (24-48
months)Standard: IBM MQ
Web Services (HTTP) EAI
Exception: Microsoft MSMQ
35
Technical Standards Profile 9Contain: Retire: RemotingStrategy: IBM MQ is the standard message transport product. Microsoft MQ will
be used within Microsoft server applications as required, but will interface to the standard EAI infrastructure for application integration.
Middleware – Data AccessCurrent Target (12-24
months)Emerging (24-48
months)Standard: ADO .NET
ODBC .NET OLE DB .NET JDBC Entity Framework
Exception:Contain: ODBC
OLE DB, Sybase Open Client, COM/DCOM, ADO
BDERetire:Strategy: Microsoft ADO .NET services will be used to access strategic DBMS
platforms. XML will play an important role as a standard data exchange format.
Work Flow - Business Process ManagementCurrent Target (12-24
months)Emerging (24-48
months)Standard: WebSphere Process
ServerException:Contain:Retire:Strategy:
Work Flow – Business Process Activity MonitoringCurrent Target (12-24
months)Emerging (24-48
months)Standard: IBM WebSphere
Business Integration Monitor
Exception:Contain:Retire:
Strategy: Business Process Activity Monitoring displays real-time information to allow decisive business performance management and optimization.
36
Technical Standards Profile 9
SECURITY
Authentication ServicesCurrent Target (12-24 months) Emerging (24-48
months)Standard: RACF - UID/PW
(mainframe) MS Windows –
UID/PW (LAN) UNIX - UID/PW
(mid-range) Sybase (mid-
range) Fortress – UID/PW
(Internet Standard Authentication)
Secure Access Washington (SAW)
Secure Agency Enabled Portal (SEAP) w/ MFA and KBA
SSL (server authentication)
Shiva VPN - Secure ID Token (Remote Access)
Citrix – Secure ID Token (Remote Access)
WAP/WTLS (Wireless)
WS-Security (Web Services)
CTS Hosted Internal Certificate Authority
S2ML (Internet XML)
AuthXML (Internet XML)
XKMS (Internet XML)
XML Signatures (Internet)
S2ML: Security Services Markup Language
XKMS: XML Management Key Services
Exception:Contain:Retire:Strategy: Utilize a single strong authentication (logon) mechanism per
application
Single Sign On
Digital Certificates / Non-RepudiationCurrent Target (12-24 months) Emerging (24-48
months)Standard: DST Digital
Certificate – X.509 v3
ID Certify Digital Certificate – X.509 v3
All WA State Certified CA’s – X.509 v3
Exception:
37
Technical Standards Profile 9Contain:Retire:Strategy: Strategic Vendors: Digital Signature Trust (DST), CTS. DST is the
only Certificate Authority authorized to provide digital certificates to state customers. Digital Certificates are required for authentication through the CTS Transact Washington service, which provides authentication and encryption for web applications.
Authorization/Access Control ServicesCurrent Target (12-24 months) Emerging (24-48
months)Standard: Shared Security
Service (Selected Web apps)
RACF (mainframe) Natural Security
(mainframe) LINIIS rules &
programs (mainframe)
SAGA Middleware (mainframe)
MS Windows ACLs (LAN)
Secure Access Washington – LDAP Directory (Internet)
WaTech SEAP Services
Fortress anonymous – LDAP Directory (Internet)
F5 remote access Fortinet Firewall
Expand Shared Security Service to all external and internal Web apps.
Tivoli Security Policy Manager is identified as the replacement for the Shared Security Service
Microsoft Network Policy Server (Radius)
Network Quarantine Service.
S2ML (Internet XML)
Exception:Contain:Retire: Sybase rules &
programs (mid-range) Fortress2 – LDAP
Directory (Internet)Strategy: Develop one model for file level access control (e.g. mid-range “Web
Security”)Build on the capability of Windows Active Directory to simplify and improve access control to internal applications
38
Technical Standards Profile 9
Data & Message IntegrityCurrent Target (12-24 months) Emerging (24-48
months)Standard: DST Digital
Certificate – X.509 v3 (Internet)
SSL Message Authentication Codes (Internet)
IPSec (network)Exception:Contain:Retire:Strategy: Currently using web-based mail interface encrypted with SSL. Will
most likely migrate to standard S/MIME system in next 12 months.
ConfidentialityCurrent Target (12-24 months) Emerging (24-48
months)Standard: DST Digital
Certificates – X.509 v3 (Internet)
SSL 2/3 Encryption (Internet)
Secure Computing Internet Content Filtering Proxy Server (Internet)
SSL 2/3 Encryption – 128 Bit minimum (Internet)
N2H2 Proxy Server (Internet)
WAP-WTLS (Wireless)
XML Encryption
Exception:Contain:Retire:Strategy: Use DIS Secure Access services. SSL encryption provided through
Transact Washington service or the Fortress reverse proxy server.
39
Technical Standards Profile 9
AuditingCurrent Target (12-24 months) Emerging (24-48
months)Standard: RACF Logs
(mainframe) CICS Logs
(mainframe) MS Windows
Event Logs (LAN) UNIX Event Logs
(mid-range) SQL Server Logs
(application) DataPower Shared
LogService WaTech hosted
RSA Security Analytics (SIEM)
Exception:Contain: AmberPointRetire: Axent ESM (mid-
range)Strategy:
Operational Integrity & Security AdministrationCurrent Target (12-24 months) Emerging (24-48
months)Standard: Trend Micro
ScanMail (Email virus detection)
McAfee ePolicy Orchestrator
Exception:Contain:Retire:Strategy: All desktop and laptop computers will be provided with virus
scanning software. Email is scanned at the server.
Monitoring & TestingCurrent Target (12-24 months) Emerging (24-48
months)Standard: Tripwire (Web
environment Intrusion Detection -CTS)
Intrusion Detection-Monitor Software (Network)
Network Vulnerability Scanner (Qualys)
Intrusion Prevention System
Vulnerability Management SystemException:
Contain:
40
Technical Standards Profile 9 Event Correlation
SystemRetire: Axent ESM (mid-
range)
Strategy: The network is actively monitored for intrusions. Vulnerabilities are proactively identified, tracked and remediated.
Transaction SecurityCurrent Target (12-24 months) Emerging (24-48
months)Standard: WS-Security Web
Services ProtocolException:Contain:Retire:Strategy:
41
Technical Standards Profile 9
SYSTEMS MANAGEMENT
Disaster RecoveryCurrent Target (12-24 months) Emerging (24-48
months)Standard: Cloud Service
CTS ServiceException:Contain:Retire:Strategy:
Help DeskCurrent Target (12-24 months) Emerging (24-48
months)Standard: Front Range
HEAT MS Service Desk
Exception:Contain:Retire:Strategy:
Operations ManagementCurrent Target (12-24 months) Emerging (24-48
months)Standard: System Center
Configuration Manager
Insight Manager
SCCM Ops Manager
Exception:Contain:Retire:Strategy:
Performance Monitoring and TuningCurrent Target (12-24 months) Emerging (24-48
months)Standard: Dynatrace APM
DataPower QA Load?
Dynatrace Products
Exception:Contain:Retire: AmberPointStrategy: Compuware was renamed to Dynatrace. Currently version 6.3
DataPower is used for runtime web service performance monitoring.
42
Technical Standards Profile 9
Storage ManagementCurrent Target (12-24 months) Emerging (24-48
months)Standard: NetApp Manager,
Veeam One NetApp Products Veeam One SolarwindsException:
Contain:Retire:Strategy:
TelecommunicationsCurrent Target (12-24 months) Emerging (24-48
months)Standard: Exception:Contain:Retire:Strategy:
43
Technical Standards Profile 9VOICE SERVICES
Voice Systems (PBX )Current Target (12-24 months) Emerging (24-48
months)Standard: AVAYA’s
Communication Manager
Avaya System Manager
Avaya Session Manager (SIP Protocol)
WAN/LAN Convergence (VoIP)
Avaya One X Communicator standard softphone for Teleworkers Only
CEBP (Communication Enabled Business Process)
Replace all TDM telephones in the Tumwater HQ building with physical IP phones and or IP softphones
Avaya oneX communicator Standard Softphones available agency wide (in office and Teleworkers)
Avaya one x agent softphone available agency wide for call center staff (internal office and Teleworker staff)
Move physical PBX servers to the virtual environment
Review feasibility of moving the agencies PSTN trunking from PRI to SIP
Review multiple cloud service vendors for telecommunications services
Move all telephone endpoints from H323 to SIP
Move all PSTN trunks from TDM/PRI to SIP
Exception:Contain:Retire: Avaya 4600 series
IP phones
Strategy: Stay with Avaya’s communication manager as the agencies enterprise voice call control application. All newly purchased Voice technologies should be IP based and utilize VoIP. Avoid the purchase of TDM voice equipment, purchases of this type of equipment is through the exception process only.
44
Technical Standards Profile 9
Automated Call Distribution systems (ACD) / Call Management System (CMS) (MIS)
Current Target (12-24 months) Emerging (24-48 months)
Standard Avaya Converged
ACD and MIS Systems
Continue deploying and using our strategic vendor’s (AVAYA) converged ACD and MIS systems with the possibility of migrating all L&I’s ACD and MIS to single vendor’s converged voice system.
Review multiple cloud service providers for ACD and CMS services
ExceptionContainRetire
Strategy: Continue deploying and using our strategic vendor’s (AVAYA) converged ACD and MIS systems.
VoicemailCurrent Target (12-24 months) Emerging (24-48
months)Standard:
Avaya Aura Messaging with SIP integration to the PBX
Application Servers are now on virtual servers
TCP/IP Integration Unified
Communication Review multiple
cloud service providers for voicemail services
Exception:Contain:Retire:Strategy: Upgrade current voice mail enterprise hardware and software as
needed to maintain supportability and compatibility.
45
Technical Standards Profile 9
Interactive Voice Response IVRCurrent Target (12-24 months) Emerging (24-48
months)Standard: Avaya’s Experience
Portal (EP) Avaya IDE for
development environment
VXML and CCXML SOAP and WSDL Proactive Outreach
Manager (POM) TTS Text to speech
Lumenvox
Speech recognition
Migrate the predictive dialer to the EP / POM
Use POM for texting and emailing (reminders for IME)
Video content in Experience Portal applications
Exception:Contain:Retire: Predictive DialerStrategy: All new IVR application will be deployed in the Experience Portal
environment. Migrate all existing IVR applications to Experience Portal, retire contained IVR environment.
Cabling infrastructure Voice & DataCurrent Target (12-24 months) Emerging (24-48
months)Standard: Voice & Data
converged cabling: CommScope
Systimax hardware UTP Cable CAT 6 Fiber cable 10G
speeds and above UTP Cable TIA/EIA
606 labeling standard
Exception: T1 Shielded cabling
Contain: Voice only CommScope
Systimax hardwareUTP CAT 5
Retire:Strategy: Follow Industry Voice and Data cabling standards through the EIA-
TIA. The EIA-TIA standards will be phased in for new building wiring installs. Existing building wiring additions will match what is already installed if possible. If not able to match existing cabling, new additions must have the same or better capabilities. Use fiber cabling for all connectivity when 10Gbps or above is needed
46
Technical Standards Profile 9
Video Conferencing/Multimedia ServicesCurrent Target (12-24 months) Emerging (24-48
months)Standard: Group Video
conferencing Skype for Business
L&I’s data network used as transport
Multimedia Kontiki webcaster
(live broadcasts) Kontiki MediaCenter
(internal VOD) YouTube (external
VOD)
No Change
Exception:Contain:Retire: Polycom IP
Viewstation Locally-stored VOD
instancesStrategy: Expand Webcaster services to more locations outside of auditorium.
Migrate all internal video content to MediaCenter for two years before moving to State Digital Archives.
Building paging systemsCurrent Target (12-24 months) Emerging (24-48
months)Standard: Valcom multizone
paging systems.Exception:Contain:Retire: BogenStrategy: Stay with Valcom as vendor for all paging components.
Telephone HeadsetsCurrent Target (12-24 months) Emerging (24-48
months)Standard: Plantronics PC
compatible Savi series
Exception:Contain:Retire: GN NetcomStrategy: Our Wired and Wireless headsets strategic partner is identified as
Plantronics. This vendor is able to meet our agencies headset needs. Having multiple headset vendors creates problems for troubleshooting and spare part inventory.
47
Technical Standards Profile 9
Softphone headsetsCurrent Target (12-24 months) Emerging (24-48
months)Standard: Plantronics wireless
USB 400 series headsets
Plantronics Hub client integration
Exception: Wired (UC)
Unified Communications Plantronics
Contain:Retire:Strategy: Our Wired and Wireless headsets strategic partner is identified as
Plantronics. This vendor is able to meet our agencies headset needs. Having multiple headset vendors creates problems for troubleshooting and spare part inventory.
WIRELESS
Wireless Application Development (see Mobile Application Development)
Wireless Application Gateway (WAG)Current Target (12-24 months) Emerging (24-48
months)Standard: Exception:Contain:Retire:Strategy:
Wireless Client (see Hardware Platforms)
Wireless Data ServiceCurrent Target (12-24 months) Emerging (24-48
months)Standard: GPRS (Cellular)
(e.g. AT&T, T-Mobile)
802.11x (WLAN/Wi-Fi)
GPRS/EDGE (Cellular)
W-CDMA (UMTS) Wi-Max (WLAN)
Exception: CDMA 2000(e.g. Verizon, Sprint)
48
Technical Standards Profile 9Contain:Retire: CDPD (AT&T)Strategy: GPRS is the current standard and is available through a DIS contract with
AT&T.
W-CDMA (Wideband Code-Division Multiple-Access) UMTS (Universal Mobile Telecommunications System) should eventually emerge as the third generation (3G) standard, but carriers are implementing different 2.5G technologies during the migration. AT&T is now offering 2.5G service in Washington State but coverage is very limited. GPRS (General Packet Radio Service) compatible equipment is required.
Identify all possible radio frequencies to use for Wireless technologies and reserve them for future use.
Do not deploy wireless technology without consulting with the EAO.
Assistive Technologies
Hearing impaired Current Target (12-24 months) Emerging (24-48
months)Standard: Washington Relay
Telecommunications Relay Service
Exception: TTY serviceContain:Retire:Strategy: Washington Relay which is a free service provided by the Washington
State Office of the Deaf and Hard of Hearing (ODHH) ensuring equal communication access to the telephone service for people who are deaf, deaf-blind, hard of hearing and speech disabled.
This service allows hearing callers to communicate with deaf, hard of hearing, deaf-blind and speech disabled relay users and vice versa through specially trained relay operators.
Calls can be made to anywhere in the world, 24 hours a day, 365 days a year with no restrictions on the number, length, or type of calls. All calls are strictly confidential and no records of any conversations are maintained. If TTY is needed by staff it can be implemented as an exception.
A Multilingual Solutions over the TelephoneCurrent Target (12-24 months) Emerging (24-48 months)
Standard: CTS Language Link
Exception:
49
Technical Standards Profile 9Contain:Retire:Strategy:
50