Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile....

65
Technical Standards Profile Enterprise Architecture Office Standards Document Status: APPROVED Document Author: Michael Birmingham EAO Approver: Mark Delaplane CIO: Bob Lanouette Version 8.0 Publish Date 5/3/2017 Version 9

Transcript of Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile....

Page 1: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile

Enterprise Architecture Office Standards

Document Status: APPROVEDDocument Author: Michael Birmingham

EAO Approver: Mark DelaplaneCIO: Bob Lanouette

Version 8.0Publish Date 5/3/2017

Version 9

Page 2: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Table of Contents TECHNICAL STANDARDS PROFILE..................................................3

APPLICATIONS..................................................................................4

Workgroup Computing..................................................................15

DATA / DBMS..................................................................................19

ELECTRONIC COMMERCE..............................................................21

HARDWARE PLATFORMS...............................................................23

Mobile Computing..........................................................................27

INFRASTRUCTURE..........................................................................28

INTEGRATION (EAI)........................................................................35

SECURITY........................................................................................38

SYSTEMS MANAGEMENT...............................................................43

WIRELESS.......................................................................................49

Assistive Technologies..................................................................50

2

Page 3: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

TECHNICAL STANDARDS PROFILE

Revised: 10/29/2012

Definitions(0-12 months) Target (12-24 months)

Currently approved protocol, product or service.  Assures the best alignment with agency direction and architecture and provides the most efficient use of agency resources.

The agency has set a target to migrate to these technologies within the Tactical planning time frame, i.e. 12-24 months.  If a technology is listed in this category, then an approved migration plan is in place. Once implemented, items in this category will shift to the "Current" column.

New projects may be able to use these technologies if migration plans coincide with project plans. Seek EAO guidance before making a commitment to using these technologies.

These are the emerging trends, products, services or strategies that the agency emerge as viable technologies within the horizon, i.e. 24-48 months. However, because these are generally immature technologies, their status is not certain and they may prove unacceptable for further investment.

These may be good candidates for R&D or non-production prototypes, but DO NOT plan to incorporate these technologies into production systems. Any technologies, even for R&D purposes, requires EAO approval.

An acceptable alternative to the standard under certain conditions.  EAO approval is required before acquisition or use. A product or service currently in use but may be replaced in the near future.  Should not be used for new system development. Any investments beyond routine maintenance must be approved by the EAO.Technology identified for replacement. No further investments will be approved.

Strategies, guidelines and best practices that provide further guidance for the appropriate use of the technology.

3

Page 4: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

APPLICATIONS

Data ExchangeCurrent Target (12-24

months)Emerging (24-48

months)Standard: FTP and SFTP

(Tumble Weed) IBM Integration

Bus IBM Data Power

Gateway IBM Business

Process Management

WSFTP

Exception:Contain: Retire:Strategy XML is widely embraced as the industry standard. L&I has adopted

XML for data and content interchange and will implement this standard for all new systems.

Client Interface - Browser (Client Computing)Current Target (12-24

months)Emerging (24-

48 months)Standard: Primary Browser (W10):

Microsoft IE 11Secondary Browsers (W10): Google Chrome Microsoft EdgeCompanion Device (iOS): Safari

Exception: Windows Forms Applications

FireFoxContain:

Retire: MS IE 6 MS IE 8 MS IE 9 MS IE 10

Strategy: Internally, application interfaces are standardized across the agency using adaptive designs around HTML5 and CSS3. Applications are written to a browser interface and are as vendor independent as possible. Browser-based client is preferred but Windows Client (Win32) are acceptable in accordance with the Enterprise Application Non-Functional Requirements Checklist.

Externally, applications are written to a browser interface and are as vendor independent as possible. Applications are tested with browser version listed in the Web Presentation Standards.

4

Page 5: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9For supported agency browser clients, standardize on at least two different browsers. The primary browser will support all legacy applications as a priority and newly developed applications, if possible. The secondary browsers will support all newly developed applications as a priority and legacy applications, if possible.

Currently, Internet Explorer 11 is the agency’s primary browser until legacy dependencies within in applications are refactored. Google Chrome and Microsoft Edge are secondary browsers. Safari is the standard browser for iOS devices.

Business Tier LanguagesCurrent Target (12-24

months)Emerging (24-

48 months)Standard: COBOL (mainframe)

Natural (mainframe) C# Java 1.8

Exception:Contain: Visual Basic

Java 1.6 Java 1.7

Retire: DelphiStrategy Standardize the development environment to take advantage of

reusable code, leverage developer skills, and minimize support and training expenses. New web application projects (starting in July 2015) are to use C# as primary development language for .NET Applications.

Application Frameworks (AppDev & Client Computing)Current Target (12-24

months)Emerging (24-

48 months)Standard: .NET Framework 4.5.2

Java 1.8 .NET

Framework 4.6 .NET

Framework 4.6.1Exception:

Contain: .NET Framework 4.5 NET Framework 3.5, 4.0 Java 1.6 Java 1.7

Retire: NET Framework 2.0Strategy Distributed Application Framework Development is standardized

around the Microsoft .NET Framework and Java which is managed code programming model for building applications on Windows clients, servers, and mobile or embedded devices.

5

Page 6: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Web-centric ApplicationsCurrent Target (12-24

months)Emerging (24-

48 months)Standard: .NET Framework 4.5.2

Enterprise Library ASP.NET HTML5 CSS3 XML JavaScript ADA accessibility Web Facing Service -

Internal(see strategy below)

Java 1.8 .NET

Framework 4.6

.NET Framework 4.6.1

Exception: Contain: .NET Framework 4.5

XHTML 1.0 transitional CGI COM / COM+ ISAPI Java 1.6 Java 1.7 VBScript (server side) ActiveX (server side)

Retire:Strategy Write applications to work with all agency supported browsers and

to comply with ADA accessibility rules identified in the Web Presentation Standards.

Keep external applications as thin as possible with a minimal amount of client-side processing. Client-side scripting can be used to enhance the end-user’s experience and performance, i.e. client-side caching. However, if the end-user has disabled the browser script function, the application’s essential functions must continue to operate or gracefully notify the user of an alternative method of completing the action.

Java applets and plug-ins are strongly discouraged and client-side ActiveX is prohibited on external apps. Do not require external clients to download or install helper apps or other executable code beyond what is commonly available and supported by third-parties, e.g. Adobe Acrobat Reader. Pure HTML is the safest; Cascading Style Sheets should be used and should be thoroughly tested with all targeted browsers and the W3C CSS Validator. Business logic should be written as .NET assemblies. Business logic should not be coded in ASP script or SQL Stored Procedures.

6

Page 7: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Web User Interface DesignCurrent Target (12-24 months) Emerging (24-48

months)Standard: MS Visual

Studio .NET 2013 Ultimate Edition

WebSphere Portal Server Framework

Adobe Dreamweaver CS5

MS Expression Web 4.0

WS-RP 2.0 Portlets JSR-286 Portlets

Visual Studio 2015

Visual Studio "15"

Exception:Contain: MS Visual

Studio .NET 2008 and 2012 Ultimate Edition

Dreamweaver MX 2004 (Internet)

Contribute 2.0 (Internet)

Adobe Dreamweaver CS4

Retire: JSR-168 PortletsStrategy Standardize the development environment to take advantage of

reusable models and templates, leverage developer skills, and minimize support and training expenses. MS Expression Web Designer is used for web content development and application user interface development in accordance with development guidelines.

Application user interfaces are an architectural component subject to architectural review. Application user interface architecture and design must allow for integration with the agency’s portal framework for reusable delivery in accordance with the agency’s portal development standards and guidelines.

Disconnected Client-Server ApplicationsCurrent Target (12-24 months) Emerging (24-48

months)Standard: MS Visual Studio

Team System 2012 Ultimate Edition (for .NET)

Maxenso/Natclipse (for Natural)

Eclipse (for Java)

MS Visual Studio Team System 2015 Professional

Git

Exception: Contain: • MS Visual Studio

Team System 2008 Enterprise

Retire: Strategy Standardizing on a single architecture that integrates well with the

enterprise can reduce the complexities of disconnected application

7

Page 8: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9development. To function in the “occasionally connected computing” environment, message queuing, local data cache, and/or synchronization should be employed.

Application user interfaces are an architectural component subject to architectural review. Application user interface architecture and design must allow for integration with the agency’s portal framework for reusable delivery in accordance with the agency’s portal development standards and guidelines.

Software ComponentsCurrent Target (12-24 months) Emerging (24-48

months)Standard: .NET 4.5

Assemblies Java 1.6 (for SOA

Services)

.Net 4.5.2 Assemblies

Java 1.7 (for SOA Services

Java 1.8 (for SOA Services)

Exception: Contain: .Net 2.0, 3.5, 4.0

Assemblies .NET Enterprise

Services (COM+)Retire: DCOM (HTTP

Tunnel)Strategy Applications should be segmented into logical layers in order to

simplify maintenance and leverage reusable services. Business logic will be assessed as part of the agency’s SOA governance to determine if the business logic should be implemented as SOA services or built as application components. Business logic is not to be coded in ASP script, client side java script, or stored procedures.

Integrated Development EnvironmentCurrent Target (12-24 months) Emerging (24-48

months)Standard: MS Visual Studio

Team System 2013 Ultimate Edition

Eclipse Maxenso/Natclipse IBM Integration

Designer (IID) 8.5 Rational

Application Developer (RAD) 8.5

IBM Operational Decision Manager (ODM) 8.5

MS Visual Studio Team System 2015 Professional

Visual Studio in the Cloud

Visual Studio "15"

Exception: Contain: MS Visual Studio

2008, 2012 Ultimate Edition

Embarcadero Delphi

8

Page 9: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9Retire: WebSphere

Integration Developer (WID) for Business Processes for WebSphere Process Server

Strategy Standardize the development environment to take advantage of reusable models and templates, leverage developer skills, and minimize support and training expenses. Microsoft development tools are preferred for distributed application. Business logic will be assess according to the agency’s SOA Governance process to determine if the logic should be developed as an SOA service.

Software Source ControlCurrent Target (12-24 months) Emerging (24-48

months)Standard: MS Team

Foundation Server 2012

SubVersion Collabnet 4.0

MS Team Foundation Server 2015.

TFS in the Cloud Git

Exception: TortoiseSVNContain: MS Team

Foundation Server (TFS) 2008

Retire: Visual Source SafeStrategy TFS Source Code repository is used for source code control for .NET

applications. Java-based applications use Subversion (SVN). The guidance for using SVN can be found in the Java Development Environment Roadmap.

Enterprise Application Architecture Modeling (Client Computing)

Current Target (12-24 months) Emerging (24-48 months)

Standard: Visio 2016 (32bit) Visual Studio

(current version)

Visio 365

Exception: Visio 2016 (64bit)Contain: Retire: Rational Rose

Power Designer Visio 2010 Visio 2013

Strategy When publishing Visio drawings, distribute as .PDF to allow broad compatibility. Specific diagrams such as a technology component diagram, deployment view diagram, behavior view diagram, and sequence diagram are to be included in the solution architecture documentation for an enterprise application using Visio.

9

Page 10: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Enterprise Business Architecture Modeling (Client Computing)

Current Target (12-24 months) Emerging (24-48 months)

Standard: Visio 2016 (32bit) Visio 365Exception: Visio 2016 (64bit)Contain:Retire: Visio 2010

Visio 2013Strategy Microsoft Visio is the standard for Enterprise Business Architecture

Modeling.

Enterprise Technology Architecture Modeling (Client Computing)

Current Target (12-24 months) Emerging (24-48 months)

Standard: Visio 2016 (32bit) Visio 365Exception: Visio 2016 (64bit)Contain:Retire: Visio 2010

Visio 2013Strategy Microsoft Visio is the standard used Enterprise Technology

Architecture Modeling.

Defect TrackingCurrent Target (12-24 months) Emerging (24-48

months)Standard: MS Team

Foundation Server 2012

SubVersion Collabnet 4.0

MS Team Foundation Server 2015

Exception: TortoiseSVNContain:Retire: Strategy

Performance TestingCurrent Target (12-24 months) Emerging (24-48

months)Standard: Microfocus’

QALoad SOAPUI

Microfocus’ Silk Performer

Exception: Contain:Retire:Strategy QALoad is used for performance testing by comparing metrics

provided by QALoad’s performance monitoring capability for different runs of an application. It uses Vantage Agents in conjunction with QALoad. NOTE: The vendor has deprecated QALoad and will be replacing it with another product in the near future.

SOAP UI is used for web service testing. It provides a client testing

10

Page 11: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9harness to exercise web services. As a client testing harness is used as part of the testing suite to perform performance testing runs.

Load (stress) TestingCurrent Target (12-24 months) Emerging (24-48

months)Standard: Microfocus QALoad

Application Vantage SOAP UI Microfocus’ Silk

Performer Visual Studio

(current version) with Team Foundation Server (current version)

Exception: Contain:Retire:Strategy SOAP UI is used for web service testing. It provides a client testing

harness to exercise web services. As a client testing harness is used as part of the testing suite to perform load testing runs.

Functional (Unit) TestingCurrent Target (12-24 months) Emerging (24-48

months)Standard: Visual Studio

(current version) with Team Foundation Server (current version)

Exception:Contain:Retire:Strategy Visual Studio in conjunction with Team Foundation Server provides

the framework for performing test-driven development using Visual Studio’s logging, tracing, assertion, and unit test projects.

Business RulesCurrent Target (12-24 months) Emerging (24-48

months)Standard: IBM Operational

Decision Manager (ODM) 8.5

Exception:Contain:Retire: WebSphere ILOG

Business Rules Engine

Strategy Business Rules will be governed & used according the L&I Business Rules Governance guide.

11

Page 12: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Business Orchestration and Workflow (BPM)Current Target (12-24 months) Emerging (24-48

months)Standard: WebSphere

Business Process Manager (BPM)

Exception:Contain:Retire: WebSphere

Process Server (WPS)

Strategy Used to create automated business processes that span people, workflows, applications, systems and platforms. WPS provides service mediation and orchestration capabilities for web services.

Document WorkflowCurrent Target (12-24 months) Emerging (24-48

months)Standard: IBM FileNet P8

Case Foundation (“re-branded” from previous BPM product”

Exception:Contain:Retire:Strategy Current Enterprise IDM & ORION applications do not use workflow

software, relying on code frameworks, SQL stored procedures, & application system database tables for automated rules-based document & work item routing to work position & group roles.Applications that need to include a document workflow process as part of the application functionality will use FileNet P8 BPM to facilitate the document workflow. SILAS is an example of an application that is using this standard.Current IBM FileNet P8 server processing capacity is not sufficient for full agency enterprise support, P8 servers need additional CPU, memory, & storage plus major software version upgrades.

Enterprise Application Reporting Service(Service used by enterprise applications to meeting reporting requirements)

Current Target (12-24 months) Emerging (24-48 months)

Standard: Business Objects XI SQL ReportingException:Contain:Retire: Crystal Enterprise

Reporting ServiceStrategy

12

Page 13: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Integrated Document Management (IDM)Current Target (12-24 months) Emerging (24-48

months)Standard: IBM FileNet Image

Services IBM FileNet P8

Content Manager

Exception:Contain:Retire:Strategy Documents stored as part of an applications data set will store the

documents in one of the IBM FileNet IDM or ECM repositories.IBM FileNet Image Services support ORION for Workers Compensation business programs & Enterprise IDM for other & future programs.IBM FileNet Image Services provides a compliant electronic records management repository for static non-modifiable legal artifact documents, with appropriate performance & server capacity for online case file review response time. Current Image Services IDM applications use the following key products:

IBM FileNet Image Services (IDM repository) w/SQL Servero FileNet Integral SDS (document storage) with MSAR

(Magnetic Storage Archival & Retrieval using WaTech Shared SAN storage for fast online retrieval) & CSAR (Centera Storage Archival & Retrieval using WaTech EMC Centera storage for non-modifiable legal archival copy)

o FileNet HPII (High Performance Image Import for importing indexed IDM case file documents staged by Kofax Capture & custom IDM application services)

o FileNet IDM Web Services & Desktop (API, services, & ActiveX viewer plug-in for Image Services integration with custom IDM applications)* Proof-of-concept in progress to replace ActiveX viewer with Image Services licensed HTML5 web browser compliant IBM Daeja ViewONE Virtual viewer thru IBM WebSphere Application Server hosted IBM Content Navigator web client.

Custom IDM web applications & services using VB .NET plus Snowbound RasterMaster .NET 64-bit SDK for document file format conversion with TIFF, PDF, AFP mainframe, & Office/Outlook documents.

Kofax Capture & Kofax Transformation Module w/SQL Server & agency compatible paper & microfiche scanners (scan/import documents, QA & index to case file of primary system of record, & stage for import to Image Services)

Primera Bravo 4102 XRP Disc Publisher & PTBurn SDK (CD & DVD publishing burn & label media for IDM case file copy)

OpenText RightFax (now enterprise platform that continues to support inbound & outbound fax of IDM case file documents)

IBM FileNet P8 Content Manager provides an effective electronic records management repository for SILAS, ESCH documents, & Workers Compensation Structured Settlements, but is currently only set up for

13

Page 14: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9light use and not leveraging available Records Management component. Current IBM FileNet P8 server processing capacity is not sufficient for full agency enterprise support, P8 servers need additional CPU, memory, & storage plus major software version upgrades.Enterprise Service interfaces for use by applications are to be used for application to interact with one of the IBM FileNet platforms.

Service RepositoryCurrent Target (12-24 months) Emerging (24-48

months)Standard: WebSphere

Service Registry & Repository (WSRR)

Exception:Contain:Retire:Strategy Service Repository maintains records of all Business capabilities

identified for automation, service interface specifications, service interfaces, service schemas, service level definition artifacts and WSDLs. It is the repository to be interrogated by business analysts during strategic and tactical planning and cost estimation to determine services available for use in creating new applications.

Service RegistryCurrent Target (12-24 months) Emerging (24-48

months)Standard: WebSphere

Service Registry & Repository (WSRR)

Exception:Contain:Retire: WebSphere

Application Server native UDDI service

Strategy Used as the registry for deployed service end-point definitions to be use by consuming applications at run-time.

14

Page 15: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Workgroup Computing

Electronic MailCurrent Target (12-24 months) Emerging (24-48

months)Standard: CTS Shared Mail

Service (MS Exchange 2010)

CTS Shared Mail Service (MS Exchange 2016)

Cloud based – Office 365

Exception:Contain:Retire:Strategy CTS will manage our Enterprise Email servers with Exchange.

Calendaring and SchedulingCurrent Target (12-24 months) Emerging (24-48

months)Standard: CTS Shared Mail

Service (MS Exchange 2010)

CTS Shared Mail Service (MS Exchange 2016)

Cloud based – Office 365

Exception:Contain:Retire:Strategy CTS will manage our Enterprise Email servers with Exchange.

CollaborationCurrent Target (12-24 months) Emerging (24-48

months)Standard: SharePoint 2013 Microsoft

SharePoint Online

Exception:Contain:Retire:Strategy Move to Share SharePoint and deprecate all others. Push to

educate users to use links to documents in e-mail rather than sending documents themselves.

Document Centric WorkflowCurrent Target (12-24 months) Emerging (24-48

months)Standard: SharePoint 2013 Microsoft

SharePoint Online

Exception:Contain:Retire:Strategy Move to SharePoint and begin using SharePoint Workflow to

control document centric processes or workflow based on lists or status tracking.

15

Page 16: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Document PublishingCurrent Target (12-24 months) Emerging (24-48

months)Standard: SharePoint 2013 Microsoft

SharePoint Online

Exception: eGain – Knowledge Management platform replacing OLRS system used primarily for Industrial Insurance “knowledge content”

Contain:Retire:Strategy This should be a specific instance of a Document Centric Workflow.

SearchCurrent Target (12-24 months) Emerging (24-48

months)Standard: SharePoint 2010

(Collaboration Documents)

WCI Search for (Composite Application Search)

Google Search Appliance (Web Content and databases)

Exception:Contain:Retire:Strategy A federated search model is our desired direction. Further

assessment will be done after SharePoint is brought in to manage workgroup documents.

Records ManagementCurrent Target (12-24 months) Emerging (24-48

months)Standard: IBM FileNet P8 SharePoint 2013 Microsoft

SharePoint Online

Exception:Contain:Retire:Strategy Assessment will be done to determine if and when SharePoint can

be used for Records ManagementCurrent IBM FileNet P8 server processing capacity is not sufficient for full agency enterprise support, P8 servers need additional CPU, memory, & storage plus major software version upgrades. Also, although IBM FileNet P8 Records Management component installed, current business programs in P8 are not using it.

Technically, IDM & Document Management in regards to records management of static legal artifacts should be separate from “Workgroup Computing” ECM which primarily involves collaboration & publishing of agency information & knowledge with some potentially becoming a legal artifact tied to a specific record set. Proposed change in Applications section from “Document and Image Storage” to “Integrated Document Management/IDM”.

16

Page 17: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Document Management (for Workgroup Computing)

Current Target (12-24 months)

Emerging (24-48 months)

Standard: SharePoint

SharePoint 2013 Microsoft SharePoint OnlineException:

Contain:Retire:Strategy SharePoint is our target direction for Workgroup Computing

Document Management functions. Assessments will be done to determine which functionality and timing can be implemented.At this time, SharePoint does not look viable for IDM Applications until concerns for performance, operations, & governance are addressed.

Enterprise Reporting ServiceCurrent Target (12-24 months) Emerging (24-48

months)Standard: Microsoft

Business Intelligence (SSRS, and other SharePoint based functionality)

Exception: SAS for Fraud Detection

Contain: HyperionRetire:Strategy The desired direction is to deprecate Hyperion and migrate to the

Microsoft BI Suite.

Optical Character RecognitionCurrent Target (12-24 months) Emerging (24-48

months)Standard: Exception:Contain:Retire:Strategy No current standard. Eventually needed to support both

Workgroup Computing Document Management & Integrated Document Management (IDM) of digitized text image documents to capture, index, & retain for full text search of any document within the constraints of authorization & confidentiality.

Electronic Forms (Client Computing)Current Target (12-24

months)Emerging (24-48 months)

Standard: Adobe Acrobat Word

Exception:Contain: InfoPathRetire:

17

Page 18: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9Strategy (NOTE: January 31, 2014, Microsoft announced plans to discontinue

InfoPath)This strategy is based on the following classification system adopted by the E-Forms Subcommittee of the Customer Advisory Board (CAB).

LEVELS OF ELECTRONIC FORMS1. Print on demand2. Fill and print3. Interface with (lookup and update) a back-end database.4. Route the form to another user.5. Enable digital signature attachment or other legal

requirements6. E-commerce (secure financial transactions)

Levels 1: Adobe Acrobat is the industry defacto standard and is the recommended format for this level e-form.

Levels 2: Word is the agency defacto standard and is the recommended format for this level e-form.

Levels 3, 4 & 6: Agency Standard Web Development Tools are the approved choice. (Please see the “Applications” section of this document for more information.)

Office Automation Software (Client Computing)Current Target (12-24

months)Emerging (24-48 months)

Standard: Office 2016 (32bit) Office 365Exception: Office 2016 (64bit)Contain: Retire: Office 2010

Office 2013Strategy Office automation software will use an integrated suite in order to

leverage common training and support resources as well as take advantage of reduced licensing costs.

18

Page 19: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

DATA / DBMS

Database Management SystemsCurrent Target (12-24 months) Emerging (24-48

months)Standard: SQL Server 2012

R2 Access 2010

(Single-user/local workstation)

SQL Server ?(not listing SQL Server in Target & Emerging might imply Access is agency target fro all database’s?)

Access 2013 MongoDB (for PC

laptop mobile applications)

Access 2016 MS Dynamics

Exception: SQL ExpressContain: ADABAS

(Mainframe)VSAM

FASTPlus DB2

Retire: SQL Server 2008 MSDE (Desktop)

Strategy: MS SQL Server is the agency’s strategic database management system and will be used for new development. MS Access is appropriate only for single-user desktop applications.

Contained products will continue in production for several more years, but plans are being made to migrate to a strategic platform. Products may continue to be used to maintain and enhance their respective applications, but significant new investments must be approved by I.S. management.

Data WarehouseCurrent Target (12-24 months) Emerging (24-48

months)Standard: SQL Server 2012 Exception:Contain:Retire: SQL 2008 R2Strategy:

MetaData RepositoryCurrent Target (12-24 months) Emerging (24-48

months)Standard: Rochade w/ WEB

Access and Rochade Browser

SQL Server 2012

Exception:Contain:Retire: ROAccessStrategy:

19

Page 20: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Data Extraction, Transformation and LoadCurrent Target (12-24 months) Emerging (24-48

months)Standard: SQL Server

Integration Services 2012

Exception:Contain:Retire:Strategy:

Business Data ReplicationCurrent Target (12-24 months) Emerging (24-48

months)Standard: Adabas Reptor Exception:Contain:Retire:Strategy: In general, data replication is not recommended unless it is for

caching purposes and the “owning” system maintains control over updates.

Data Hygiene (Cleansing)Current Target (12-24 months) Emerging (24-48

months)Standard: Exception:Contain:Retire:Strategy:

20

Page 21: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

ELECTRONIC COMMERCE

Credit Card Verification and Payment ServicesCurrent Target (12-24 months) Emerging (24-48

months)Standard: Verifone

(FrontCounter Credit Card Processing)

Official Payments (Internet Payment Service)

Exception:Contain:Retire: TPI

CyberSource (shared DIS Service)

Strategy: A client solution using Verifone APIs was developed and deployed in 2011. This is to be used by any solution that requires “front counter” credit card support….the ability to process credit cards for walk-in customers to L&I field offices.

The Internet Payment Service was created with Official Payments and the backend processing service. All web-based solutions that require credit card processing capabilities use the Internet Payment Service. The service includes a user interface to present payment options for the client applications.

Data Interchange (EDI)Current Target (12-24 months) Emerging (24-48

months)Standard: Exception:Contain:Retire:Strategy: No formal EDI standard is currently being used. Data exchanges use

simple FTP transfers. XML and secure Internet access is being targeted for applications that have traditionally used EDI.

Electronic Funds TransferCurrent Target (12-24 months) Emerging (24-48

months)Standard: Internet Payment

ServiceException:Contain:Retire:Strategy: The in-house developed Internet Payment Service provides support

for electronic funds transfer.

21

Page 22: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Electronic ChecksCurrent Target (12-24 months) Emerging (24-48

months)Standard: Internet Payment

ServiceException:Contain:Retire:Strategy: The in-house developed Internet Payment Service provides support

for electronic checks.

22

Page 23: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

HARDWARE PLATFORMS

MainframeCurrent Target (12-24

months)Emerging (24-48

months)Standard: IBM S/390Exception:Contain:Retire:Strategy: Mainframe services hosted by DIS. There are plans to migrate from a

mainframe based environment to a distributed server computing environment.

MidrangeCurrent Target (12-24

months)Emerging (24-48

months)Standard: Exception:Contain: Retire: Strategy: RISC based servers no longer exist within L&I

Network ServerCurrent Target (12-24

months)Emerging (24-48

months)Standard: X86 Intel Virtual Cloud

ServersException:Contain:Retire:Strategy: Consolidate servers as much as possible to simplify administration. Use

server hardware that is reliable, fault-tolerant and designed for multi-user network environments. Virtual Cloud Servers should be considered viable for future server acquisitions.

Primary Device - Desktop Computer (Client Computing)Current Target (12-24

months)Emerging (24-48

months)Standard: Dell Optiplex 7050 (2017)

7th Gen

processor 8th Gen

processorException: MacintoshContain: Dell Optiplex 7040 (2016)

Dell Optiplex 7030 Dell Optiplex 7020 Dell Optiplex 7010

Retire: Dell Optiplex 790 and earlier.

Strategy: The Desktop computer is for users or functions that have no mobility requirements (e.g. Training rooms, Front Counter PC’s, etc.). Desktop computers are considered a primary device and is replaced on a 4 yr. lease cycle.Desktop Standards: OS Support: Windows 10 64-bit OS

23

Page 24: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9 Processor: Intel i5 dual core processor (7th Generation) Memory: 8 GB RAM Storage: 500 Gb SSDAttachments Included: Built-in optical drive (DVD r/w): 24” Flat screen monitor (not touch) Microphone and Audio Jacks Min 4 USB 3.0 connectionsOther: Can support dual monitors Can support bluetooth Support VPro Can support WiDi Can support Discreet Graphics card Field Serviceable

Macintosh computers are allowed by exception for special purposes only.

Primary Device - Laptop Computer (Client Computing)Current Target (12-24

months)Emerging (24-48

months)Standard: Dell Lattitude 7470 7th Gen

processor 8th Gen

processorException: MacBookContain: Dell Lattitude 5450

Dell Lattitude 5440 Dell Lattitude 6430

Retire: Dell Lattitude 6420 Dell Lattitude 6410

Strategy: The Laptop computer is considered a primary device and is Intel based running Windows OS and replaced on a 3 yr. cycle. The Purpose for the Laptop computer is for users with mobility needs and sturdiness is more important than size (These devices meet hardening standards).

Laptop Standards: OS Support: Windows 10 64-bit OS Processor: Intel i5 dual core processor (7th Generation) Memory: 8 GB RAM Storage: 250 Gb SSDAttachments Included: 14” Flat screen monitor (touch enabled) Integrated WebCam Fingerprint Reader Microphone and Audio Jacks Min 4 USB connections (min 2 USB 3.0)Other: Field Serviceable Supports Bluetooth Supports WiFi Supports VPro Supports WiDi Mil-Std-810G rated Backlit Keyboard Docking Station that can support dual monitors

MacBook computers are allowed by exception for special purposes only.

24

Page 25: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Primary Device - Convertible Computer (Client Computing)Current Target (12-24

months)Emerging (24-48

months)Standard: HP Elitebook 7th Gen

processor 8th Gen

processorException:Contain:Retire:Strategy: The Convertible computer is considered a primary device and is Intel

based running Windows OS and replaced on a 3 yr. cycle. The Purpose for the Convertible computer is for users with mobility needs and size is more important than sturdiness.

Convertible Standards: OS Support: Windows 10 64-bit OS Processor: Intel i5 dual core processor (7th Generation) Memory: 8 GB RAM Storage: 250 Gb SSDAttachments Included: Converts to tablet mode 10-12”” Flat screen monitor (touch enabled) Integrated WebCam Fingerprint Reader SD Card Reader Microphone and Audio Jacks Min 4 USB connections (min 2 USB 3.0)Other: Field Serviceable Supports Bluetooth Supports WiFi Supports Cellular Mobile Broadband Supports VPro Supports WiDi Mil-Std-810G rated Docking Station that can support dual monitors

The Tablet/Convertible computer is currently considered a companion device. Develop this hardware platform as a primary device with the implementation of Windows 10. Continue to support iOS iPad as a companion device.

Mass StorageCurrent Target (12-24

months)Emerging (24-48

months)Standard: Server-based (LAN)

Storage Array, NAS, SAN.NetApp ( Network Appliance )

WaTech Storage – Hosted Services –

Storage Array, NAS, SAN.

NetApp

CTS Storage Managed Services

Solid State Cloud services

Exception: Centera (EMC) Contain:Retire:Strategy: Cloud Services (AWS, Azure) will play a bigger role in storage as storage

costs continue to decline. Disaster Recovery is using cloud based storage with SunGard in PA.

25

Page 26: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Operating Systems (NetOps/Client Computing)Current Target (12-24

months)Emerging (24-48

months)Standard: MVS (mainframe)

Windows 2008 Unified Data Storage (NAS)

Windows Server 2008 and 2012

Primary Devices: Windows 10 (64bit)

Companion Devices - iOS WADS Workstations: Windows

10 (64bit)

Windows Server -2016

Companion Devices – Windows 10 (64 bit)

Exception: OSXContain: Primary Devices: Windows 7

(32bit) WADS Workstations: Windows

7 (64bit) Retire: Windows 8.1Strategy: Operating systems for all networked devices are standardized across the

enterprise. Because of the rapid adoption of new client operating systems, a policy of “managed diversity” is practiced, i.e. operating systems will be maintained at compatible versions, but will not all be at the same revision level.

26

Page 27: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Mobile Computing

Mobile Device Management (Client Computing)Current Target (12-24

months)Emerging (24-48 months)

Standard: AirWatch (CTS Service)

MS InTune

Exception:Contain:Retire: McAfee EMMStrategy: Have all Mobile devices provisioned and controlled through a Central

service.

Mobile Application Development Platform (MADP)Current Target (12-24

months)Emerging (24-48 months)

Standard: Verivo TBDException:Contain:Retire: Visual StudioStrategy:

Mobile Multimedia Production Current Target (12-24

months)Emerging (24-48 months)

Standard: TBD Exception: iMovie (iPhone

and iPad) with tripod and microphone

Contain:Retire: Strategy: Limited use for eLearning, OHR, Public Affairs and Communications

projects

Smart Phone (Companion device) (Client Computing)Current Target (12-24

months)Emerging (24-48 months)

Standard: Apple iPhone (iOS) Windows 10 capable Smart PhoneException:

Contain:Retire:Strategy: The target audience for these devices is for employees requiring

Phone, Mail, and Calendar capabilities while away from their workstation. The Smart Phone is not a primary device and will not replace the primary device.

Continue to support Apple iPhones as a companion device for phone, mail, and calendaring.

27

Page 28: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

INFRASTRUCTURE

Virtual Machine TechnologyCurrent Target (12-24 months) Emerging (24-48

months)Standard: VMware 6.0 Vmware

Supported

MS Hyper-V

Exception:Contain:Retire:Strategy:

Backup ServicesCurrent Target (12-24 months) Emerging (24-48

months)Standard: Commvault

Veeam Disk to Disk copy Replication CTS Backup

services Cloud services for

storage and or backup and Disaster Recovery

MS DPM 2012

Virtual Tape Libraries

Cloud Backup Services

Exception: Contain: Retire:

Strategy: Servers are increasingly being converted from physical to virtual servers. We are backing up virtual servers using Veeam and physical servers use Commvault.

28

Page 29: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

BandwidthCurrent Target (12-24 months) Emerging (24-48

months)Standard: 1000Mb –

Desktop 100Mb – WAN

Node Sites to Remote

10Gb – Server 10Gb – Switch to

Switch 1Gig – HQ to

WaTech MPLS WAN 10Gb – Virtual

Host server and iSCSI storage arrays

1Gig WAN links for field offices

40 to 100 Gig core to core and to server

Exception:Contain:Retire:Strategy: New applications and technologies such as virtual servers, virtual

desktops, storage area networks (SAN), voice over IP, e-learning, video conferencing and virtual meetings will require higher bandwidth. Will need to increase bandwidth as needed.

Caching ServicesCurrent Target (12-24 months) Emerging (24-48

months)Standard: NoneException:Contain:Retire:Strategy:

Directory ServicesCurrent Target (12-24 months) Emerging (24-48

months)Standard: Microsoft

Active Directory IBM RACF

Exception:Contain:Retire:Strategy: Strategic Vendor = Microsoft - Consolidate network directories to a

single standards compliant directory service. Microsoft Active Directory will be the backbone of a statewide directory service, which will enhance inter-agency data sharing. LNI’s strategic direction is to standardize on Active Directory and to participate in the statewide directory service.

Active directory configuration is to be limited to LDAP standards compliant capabilities to ensure the broadest possible directory

29

Page 30: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9services integration across systems.

Firewall Services (ISSO/Client Computing)Current Target (12-24 months) Emerging (24-48

months)Standard: WaTech hosted

Fortinet solution Client – McAfee

HIPS Firewall

Web Application Firewall

Application firewalls

Exception:Contain:Retire: CheckpointStrategy: L&I will comply with all state and federal laws and regulations

concerning the privacy and security of medical and other personal information. The firewall secures and controls access to the L&I network, including intranet web content.

Full Disk Encryption (Client Computing)Current Target (12-24 months) Emerging (24-48

months)Standard: McAfee Endpoint

Encryption (Primary Devices)

iOS integrated disk encryption (Companion Devices)

Microsoft BitLocker Intel Disk Encryption

Exception: Microsoft BitLockerContain:Retire: SafebootStrategy: McAfee Endpoint Encryption is currently deployed as our Enterprise

disk encryption product. McAfee Endpoint Encryption standard is 128-bit AES.

Power Management – Workstation (Client Computing)Current Target (12-24 months) Emerging (24-48

months)Standard: System Center

Configuration Manager 2012

System Center Configuration Manager – Current Branch

Exception:Contain: Verdiem SurveyorRetire:Strategy: System Center Configuration Manager 2012 is the power management

product for agency workstations.

Load Balancing ServicesCurrent Target (12-24 months) Emerging (24-48

months)Standard: Procure Load

balancing product for the virtual sever environment

F5 equipmentException: Barracuda Load

BalancerContain:Retire:Strategy: High availability and 24/7 operation will require some type of web

balancing technology. Examples are DNS round robin or Cisco SLB

30

Page 31: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9(server load balancing) switching. Any load balancing service must be tightly integrated with the application development effort to ensure compatibility. Coordinate any new load balancing service with the EAO to request an ACP Exception request.

There are no requirements for LBS at the current time.

Local Area Network – including Wireless (Wi-Fi)Current Target (12-24 months) Emerging (24-48

months)Standard: Layer 2/3

Ethernet SwitchingCisco Chassis based (core)

Cisco Stackable based (access/closet switches)

Aerohive – Wi-Fi (Wi-Fi is an extension of Ethernet)

Policy-based intelligent networking

Research other commodity network vendors for Ethernet switching products (enhanced features, reduce costs etc).

Software Defined Networks (SDN)

Exception:Contain:Retire:Strategy: Strategic Vendor: Cisco. Standardize the infrastructure to improve

reliability and reduce integration problems. Cisco is the agency’s strategic networking partner. Aerohive (Wi-Fi wireless access points)

ProtocolsCurrent Target (12-24 months) Emerging (24-48

months)Standard: TCP/IP v4

EIGRP (Routing)SNMP

MPLS (Multi Protocol Label Switching) WAN routing

ICMP

TCP/IP V6 SIP for IP

communications

Exception:Contain:Retire: SDLC

HDLC SNA

Strategy: Standardize on a single routable internetworking protocol, i.e. TCP/IP, to facilitate interoperability and to reduce integration and problem solving.

31

Page 32: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Remote Access Current Target (12-24 months) Emerging (24-48

months)Standard: F5 VPN (DIS)

Citrix Metaframe /ICA

Explore Aerohive VPN Solution

Microsoft Direct Access

Exception:Contain:Retire: Juniper SSL VPNStrategy: Provide a secure remote access technology that allows our users to

perform the majority of their business needs from anywhere on any client.

Traffic ManagementCurrent Target (12-24 months) Emerging (24-48

months)Standard: QoS Layer 2

QoS (quality of service layer 3)

MPLS (multi protocol label switching) on the SGN

Review End-to-end QoS for all applications/services on the network (policy based networking)One to many video broadcast

Exception:Contain:Retire:Strategy: High bandwidth application delivery must be managed to prevent

overloading the network infrastructure and adversely impacting mission critical applications. IP Multicast has proven to be unreliable to field offices requiring new technologies to bypass our WAN service QoS ensures mission critical applications receive priority. The agency needs to start the process of reviewing all current and newly implemented applications and services for QoS settings (policy-based networking)

SSL Accelerator ServicesCurrent Target (12-24 months) Emerging (24-48

months)Standard: NoneException:Contain:Retire:Strategy: May be required if L&I develops a dedicated credit card processing

server.

32

Page 33: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Storage ServicesCurrent Target (12-24 months) Emerging (24-48

months)Standard: Server-based

(LAN) Storage System,

Ethernet, iSCSI, NFS, CIFS

Storage System, Ethernet, iSCSI, NFS, CIFS, Hyper converge infrastructure

WaTech Storage Managed Services for production applications

Solid State Cloud Service

ProvidersException: Centera (EMC)

(DIS)Contain: Retire:Strategy: LAN servers utilize NetApp and HP NAS or external storage. iSCSI

Network RAID 5 (across nodes) is now standard. ACP was completed.

We are using Network Appliance for our storage solution and HP NAS. The environment has tier one, two , and three type storage. Tier one is only flashpool for tier two and three storage type. SSD is tier one, SAS is tier two and SATA is tier three. We will look at tier one all flask filers for future high performance disk requirements.

TopologyCurrent Target (12-24 months) Emerging (24-48

months)Standard: Switched

Ethernet (LAN) (MPLS WAN)

Exception:Contain:Retire:Strategy: Continue using switched Ethernet for LAN technology, and MPLS for

WAN. Increase speeds (Bandwidth) when required by users and supported by equipment vendors.

33

Page 34: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Wide Area NetworkCurrent Target (12-24 months) Emerging (24-48

months)Standard: WaTech

Backbone (MPLS) for all WAN Connections

Cisco ASIC’s based Layer 2/3 Switches (L&I Tumwater HQ to CTS)

10 Mb Link (field offices)

100 Mb Link(field offices)

S-MON for connectivity from TumHQ to WaTech SGN

Cisco ASIC’s based Layer 2/3 Switches field offices to CTS backbone (MPLS)

40 – 100 Mb Links (field offices)

Wireless WAN connectivity (possibly for redundant circuits or production circuits)

Exception:Contain: T1 serial

connectivity from each field office to CTS Backbone (MPLS)

Retire:Strategy: Continue using Cisco & CTS as strategic vendors.

34

Page 35: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

INTEGRATION (EAI)

Integration Broker (Message Broker)Current Target (12-24

months)Emerging (24-48

months)Standard: IBM WebSphere

Business Integration IBM Integration Bus IBM Transformation

ExtenderException:Contain: Microsoft

Transaction Server SAGA EntireX

(ADABAS)

Retire: MS BizTalkStrategy: Message brokering service is provided by IBM Websphere Business

Integration Message Broker (formerly MQ Integrator). The broker provides transformation and intelligent routing services and relies on WebSphere MQ (formerly MQ Series) for message transport.

SAGA EntireX is contained to supporting legacy ASP (web) and COM applications to ADABAS. Use will diminish as legacy applications are migrated to the standard environment.

Microsoft BizTalk will continue to be used as needed for specialized purposes, but will interface to the standard EAI services for integration with other internal systems.

Message FormatCurrent Target (12-24

months)Emerging (24-48

months)Standard: REST (JSON)

SOAP (XML)Exception: Contain:Retire:Strategy: XML messages (a.k.a. Web Services) use primarily canonical forms

and are transported and managed by the EAI infrastructure. This provides a robust, reliable and secure Web Services infrastructure internal to the L&I network.

** XML Web Services will be use for application integration external to the agency as standards mature, especially security.

Message TransportCurrent Target (12-24

months)Emerging (24-48

months)Standard: IBM MQ

Web Services (HTTP) EAI

Exception: Microsoft MSMQ

35

Page 36: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9Contain: Retire: RemotingStrategy: IBM MQ is the standard message transport product. Microsoft MQ will

be used within Microsoft server applications as required, but will interface to the standard EAI infrastructure for application integration.

Middleware – Data AccessCurrent Target (12-24

months)Emerging (24-48

months)Standard: ADO .NET

ODBC .NET OLE DB .NET JDBC Entity Framework

Exception:Contain: ODBC

OLE DB, Sybase Open Client, COM/DCOM, ADO

BDERetire:Strategy: Microsoft ADO .NET services will be used to access strategic DBMS

platforms. XML will play an important role as a standard data exchange format.

Work Flow - Business Process ManagementCurrent Target (12-24

months)Emerging (24-48

months)Standard: WebSphere Process

ServerException:Contain:Retire:Strategy:

Work Flow – Business Process Activity MonitoringCurrent Target (12-24

months)Emerging (24-48

months)Standard: IBM WebSphere

Business Integration Monitor

Exception:Contain:Retire:

Strategy: Business Process Activity Monitoring displays real-time information to allow decisive business performance management and optimization.

36

Page 37: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

SECURITY

Authentication ServicesCurrent Target (12-24 months) Emerging (24-48

months)Standard: RACF - UID/PW

(mainframe) MS Windows –

UID/PW (LAN) UNIX - UID/PW

(mid-range) Sybase (mid-

range) Fortress – UID/PW

(Internet Standard Authentication)

Secure Access Washington (SAW)

Secure Agency Enabled Portal (SEAP) w/ MFA and KBA

SSL (server authentication)

Shiva VPN - Secure ID Token (Remote Access)

Citrix – Secure ID Token (Remote Access)

WAP/WTLS (Wireless)

WS-Security (Web Services)

CTS Hosted Internal Certificate Authority

S2ML (Internet XML)

AuthXML (Internet XML)

XKMS (Internet XML)

XML Signatures (Internet)

S2ML: Security Services Markup Language

XKMS: XML Management Key Services

Exception:Contain:Retire:Strategy: Utilize a single strong authentication (logon) mechanism per

application

Single Sign On

Digital Certificates / Non-RepudiationCurrent Target (12-24 months) Emerging (24-48

months)Standard: DST Digital

Certificate – X.509 v3

ID Certify Digital Certificate – X.509 v3

All WA State Certified CA’s – X.509 v3

Exception:

37

Page 38: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9Contain:Retire:Strategy: Strategic Vendors: Digital Signature Trust (DST), CTS. DST is the

only Certificate Authority authorized to provide digital certificates to state customers. Digital Certificates are required for authentication through the CTS Transact Washington service, which provides authentication and encryption for web applications.

Authorization/Access Control ServicesCurrent Target (12-24 months) Emerging (24-48

months)Standard: Shared Security

Service (Selected Web apps)

RACF (mainframe) Natural Security

(mainframe) LINIIS rules &

programs (mainframe)

SAGA Middleware (mainframe)

MS Windows ACLs (LAN)

Secure Access Washington – LDAP Directory (Internet)

WaTech SEAP Services

Fortress anonymous – LDAP Directory (Internet)

F5 remote access Fortinet Firewall

Expand Shared Security Service to all external and internal Web apps.

Tivoli Security Policy Manager is identified as the replacement for the Shared Security Service

Microsoft Network Policy Server (Radius)

Network Quarantine Service.

S2ML (Internet XML)

Exception:Contain:Retire: Sybase rules &

programs (mid-range) Fortress2 – LDAP

Directory (Internet)Strategy: Develop one model for file level access control (e.g. mid-range “Web

Security”)Build on the capability of Windows Active Directory to simplify and improve access control to internal applications

38

Page 39: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Data & Message IntegrityCurrent Target (12-24 months) Emerging (24-48

months)Standard: DST Digital

Certificate – X.509 v3 (Internet)

SSL Message Authentication Codes (Internet)

IPSec (network)Exception:Contain:Retire:Strategy: Currently using web-based mail interface encrypted with SSL. Will

most likely migrate to standard S/MIME system in next 12 months.

ConfidentialityCurrent Target (12-24 months) Emerging (24-48

months)Standard: DST Digital

Certificates – X.509 v3 (Internet)

SSL 2/3 Encryption (Internet)

Secure Computing Internet Content Filtering Proxy Server (Internet)

SSL 2/3 Encryption – 128 Bit minimum (Internet)

N2H2 Proxy Server (Internet)

WAP-WTLS (Wireless)

XML Encryption

Exception:Contain:Retire:Strategy: Use DIS Secure Access services. SSL encryption provided through

Transact Washington service or the Fortress reverse proxy server.

39

Page 40: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

AuditingCurrent Target (12-24 months) Emerging (24-48

months)Standard: RACF Logs

(mainframe) CICS Logs

(mainframe) MS Windows

Event Logs (LAN) UNIX Event Logs

(mid-range) SQL Server Logs

(application) DataPower Shared

LogService WaTech hosted

RSA Security Analytics (SIEM)

Exception:Contain: AmberPointRetire: Axent ESM (mid-

range)Strategy:

Operational Integrity & Security AdministrationCurrent Target (12-24 months) Emerging (24-48

months)Standard: Trend Micro

ScanMail (Email virus detection)

McAfee ePolicy Orchestrator

Exception:Contain:Retire:Strategy: All desktop and laptop computers will be provided with virus

scanning software. Email is scanned at the server.

Monitoring & TestingCurrent Target (12-24 months) Emerging (24-48

months)Standard: Tripwire (Web

environment Intrusion Detection -CTS)

Intrusion Detection-Monitor Software (Network)

Network Vulnerability Scanner (Qualys)

Intrusion Prevention System

Vulnerability Management SystemException:

Contain:

40

Page 41: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9 Event Correlation

SystemRetire: Axent ESM (mid-

range)

Strategy: The network is actively monitored for intrusions. Vulnerabilities are proactively identified, tracked and remediated.

Transaction SecurityCurrent Target (12-24 months) Emerging (24-48

months)Standard: WS-Security Web

Services ProtocolException:Contain:Retire:Strategy:

41

Page 42: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

SYSTEMS MANAGEMENT

Disaster RecoveryCurrent Target (12-24 months) Emerging (24-48

months)Standard: Cloud Service

CTS ServiceException:Contain:Retire:Strategy:

Help DeskCurrent Target (12-24 months) Emerging (24-48

months)Standard: Front Range

HEAT MS Service Desk

Exception:Contain:Retire:Strategy:

Operations ManagementCurrent Target (12-24 months) Emerging (24-48

months)Standard: System Center

Configuration Manager

Insight Manager

SCCM Ops Manager

Exception:Contain:Retire:Strategy:

Performance Monitoring and TuningCurrent Target (12-24 months) Emerging (24-48

months)Standard: Dynatrace APM

DataPower QA Load?

Dynatrace Products

Exception:Contain:Retire: AmberPointStrategy: Compuware was renamed to Dynatrace. Currently version 6.3

DataPower is used for runtime web service performance monitoring.

42

Page 43: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Storage ManagementCurrent Target (12-24 months) Emerging (24-48

months)Standard: NetApp Manager,

Veeam One NetApp Products Veeam One SolarwindsException:

Contain:Retire:Strategy:

TelecommunicationsCurrent Target (12-24 months) Emerging (24-48

months)Standard: Exception:Contain:Retire:Strategy:

43

Page 44: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9VOICE SERVICES

Voice Systems (PBX )Current Target (12-24 months) Emerging (24-48

months)Standard: AVAYA’s

Communication Manager

Avaya System Manager

Avaya Session Manager (SIP Protocol)

WAN/LAN Convergence (VoIP)

Avaya One X Communicator standard softphone for Teleworkers Only

CEBP (Communication Enabled Business Process)

Replace all TDM telephones in the Tumwater HQ building with physical IP phones and or IP softphones

Avaya oneX communicator Standard Softphones available agency wide (in office and Teleworkers)

Avaya one x agent softphone available agency wide for call center staff (internal office and Teleworker staff)

Move physical PBX servers to the virtual environment

Review feasibility of moving the agencies PSTN trunking from PRI to SIP

Review multiple cloud service vendors for telecommunications services

Move all telephone endpoints from H323 to SIP

Move all PSTN trunks from TDM/PRI to SIP

Exception:Contain:Retire: Avaya 4600 series

IP phones

Strategy: Stay with Avaya’s communication manager as the agencies enterprise voice call control application. All newly purchased Voice technologies should be IP based and utilize VoIP. Avoid the purchase of TDM voice equipment, purchases of this type of equipment is through the exception process only.

44

Page 45: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Automated Call Distribution systems (ACD) / Call Management System (CMS) (MIS)

Current Target (12-24 months) Emerging (24-48 months)

Standard Avaya Converged

ACD and MIS Systems

Continue deploying and using our strategic vendor’s (AVAYA) converged ACD and MIS systems with the possibility of migrating all L&I’s ACD and MIS to single vendor’s converged voice system.

Review multiple cloud service providers for ACD and CMS services

ExceptionContainRetire

Strategy: Continue deploying and using our strategic vendor’s (AVAYA) converged ACD and MIS systems.

VoicemailCurrent Target (12-24 months) Emerging (24-48

months)Standard:

Avaya Aura Messaging with SIP integration to the PBX

Application Servers are now on virtual servers

TCP/IP Integration Unified

Communication Review multiple

cloud service providers for voicemail services

Exception:Contain:Retire:Strategy: Upgrade current voice mail enterprise hardware and software as

needed to maintain supportability and compatibility.

45

Page 46: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Interactive Voice Response IVRCurrent Target (12-24 months) Emerging (24-48

months)Standard: Avaya’s Experience

Portal (EP) Avaya IDE for

development environment

VXML and CCXML SOAP and WSDL Proactive Outreach

Manager (POM) TTS Text to speech

Lumenvox

Speech recognition

Migrate the predictive dialer to the EP / POM

Use POM for texting and emailing (reminders for IME)

Video content in Experience Portal applications

Exception:Contain:Retire: Predictive DialerStrategy: All new IVR application will be deployed in the Experience Portal

environment. Migrate all existing IVR applications to Experience Portal, retire contained IVR environment.

Cabling infrastructure Voice & DataCurrent Target (12-24 months) Emerging (24-48

months)Standard: Voice & Data

converged cabling: CommScope

Systimax hardware UTP Cable CAT 6 Fiber cable 10G

speeds and above UTP Cable TIA/EIA

606 labeling standard

Exception: T1 Shielded cabling

Contain: Voice only CommScope

Systimax hardwareUTP CAT 5

Retire:Strategy: Follow Industry Voice and Data cabling standards through the EIA-

TIA. The EIA-TIA standards will be phased in for new building wiring installs. Existing building wiring additions will match what is already installed if possible. If not able to match existing cabling, new additions must have the same or better capabilities. Use fiber cabling for all connectivity when 10Gbps or above is needed

46

Page 47: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Video Conferencing/Multimedia ServicesCurrent Target (12-24 months) Emerging (24-48

months)Standard: Group Video

conferencing Skype for Business

L&I’s data network used as transport

Multimedia Kontiki webcaster

(live broadcasts) Kontiki MediaCenter

(internal VOD) YouTube (external

VOD)

No Change

Exception:Contain:Retire: Polycom IP

Viewstation Locally-stored VOD

instancesStrategy: Expand Webcaster services to more locations outside of auditorium.

Migrate all internal video content to MediaCenter for two years before moving to State Digital Archives.

Building paging systemsCurrent Target (12-24 months) Emerging (24-48

months)Standard: Valcom multizone

paging systems.Exception:Contain:Retire: BogenStrategy: Stay with Valcom as vendor for all paging components.

Telephone HeadsetsCurrent Target (12-24 months) Emerging (24-48

months)Standard: Plantronics PC

compatible Savi series

Exception:Contain:Retire: GN NetcomStrategy: Our Wired and Wireless headsets strategic partner is identified as

Plantronics. This vendor is able to meet our agencies headset needs. Having multiple headset vendors creates problems for troubleshooting and spare part inventory.

47

Page 48: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9

Softphone headsetsCurrent Target (12-24 months) Emerging (24-48

months)Standard: Plantronics wireless

USB 400 series headsets

Plantronics Hub client integration

Exception: Wired (UC)

Unified Communications Plantronics

Contain:Retire:Strategy: Our Wired and Wireless headsets strategic partner is identified as

Plantronics. This vendor is able to meet our agencies headset needs. Having multiple headset vendors creates problems for troubleshooting and spare part inventory.

WIRELESS

Wireless Application Development (see Mobile Application Development)

Wireless Application Gateway (WAG)Current Target (12-24 months) Emerging (24-48

months)Standard: Exception:Contain:Retire:Strategy:

Wireless Client (see Hardware Platforms)

Wireless Data ServiceCurrent Target (12-24 months) Emerging (24-48

months)Standard: GPRS (Cellular)

(e.g. AT&T, T-Mobile)

802.11x (WLAN/Wi-Fi)

GPRS/EDGE (Cellular)

W-CDMA (UMTS) Wi-Max (WLAN)

Exception: CDMA 2000(e.g. Verizon, Sprint)

48

Page 49: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9Contain:Retire: CDPD (AT&T)Strategy: GPRS is the current standard and is available through a DIS contract with

AT&T.

W-CDMA (Wideband Code-Division Multiple-Access) UMTS (Universal Mobile Telecommunications System) should eventually emerge as the third generation (3G) standard, but carriers are implementing different 2.5G technologies during the migration. AT&T is now offering 2.5G service in Washington State but coverage is very limited. GPRS (General Packet Radio Service) compatible equipment is required.

Identify all possible radio frequencies to use for Wireless technologies and reserve them for future use.

Do not deploy wireless technology without consulting with the EAO.

Assistive Technologies

Hearing impaired Current Target (12-24 months) Emerging (24-48

months)Standard: Washington Relay

Telecommunications Relay Service

Exception: TTY serviceContain:Retire:Strategy: Washington Relay which is a free service provided by the Washington

State Office of the Deaf and Hard of Hearing (ODHH) ensuring equal communication access to the telephone service for people who are deaf, deaf-blind, hard of hearing and speech disabled.

This service allows hearing callers to communicate with deaf, hard of hearing, deaf-blind and speech disabled relay users and vice versa through specially trained relay operators.

Calls can be made to anywhere in the world, 24 hours a day, 365 days a year with no restrictions on the number, length, or type of calls. All calls are strictly confidential and no records of any conversations are maintained. If TTY is needed by staff it can be implemented as an exception.

A Multilingual Solutions over the TelephoneCurrent Target (12-24 months) Emerging (24-48 months)

Standard: CTS Language Link

Exception:

49

Page 50: Technical Standards Profile -20100721 - bidnet.com  · Web viewTechnical Standards Profile. Enterprise Architecture Office Standards. Document Status: APPROVED Document Author: Michael

Technical Standards Profile 9Contain:Retire:Strategy: