    DRIVE CONTROLPHILOSOPHY

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    2/39

    177

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    3/39

    178

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    4/39

    179

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    5/39

     

    DIAGRAM OF INTERFACINGWITH FIELD INSTRUMENTS

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    6/39

    181

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    7/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    8/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    9/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    10/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    11/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    12/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    13/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    14/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    15/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    16/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    17/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    18/39

    SPECIFICATIONFOR

    MOTORISED VALVE ACTUATOR

    SPECIFICATION NO.: PE-ID-401-145-I902

    VOLUME II B

    SECTION D

    REV. NO. 00 DATE: 25.03.14

    SHEET 2  OF 5

    Data Sheet A & B

    DATA SHEET-A(TO BE FILLED BY PURCHASER)

    DATA SHEET-B(TO BE FILLED-UP BY BIDDER)

       F   O   R   M    N

       O .   P   E   M  -   6   6   6   6  -   0

    GENERAL*

    * PROJECT 1 X 500 MW FGUTPP

    OFFER REFERENCE

    * TAG NO. SERVICE

    * DUTY  ON / OFF  INCHING

    * LINE SIZE (inlet/outlet): MATERIAL

    * VALVE TYPE GLOBE  GATE  REG. GLOBE BUTTERFLY

    * OPENING / CLOSING TIME

    * WORKING PRESSURE

     AMBIENT CONDITIONSHALL BE SUITABLE FOR CONTINUOUSOPERATION UNDER AN AMBIENT TEMP. OF 0-55DEG C AND RELATIVE HUMIDITY OF 0-95%

    VALVE SEAT TEST PRESS BIDDER TO SPECIFY

    REQUIRED VALVE TORQUE BIDDER TO SPECIFY

     ACTUATOR RATED TORQUE BIDDER TO SPECIFY

    CONSTRUCTION AND SIZING

    CONSTRUCTION TOTALLY ENCLOSED, WEATHER PROOF, IP:55

    MECHANICAL POSITION INDICATOR TO BE PROVIDED FOR 0-100% TRAVEL

    BEARINGSDOUBLE SHIELDED, GREASE LUBRICATED ANTI-FRICTION.

    GEAR TRAIN FORLIMIT SWITCH/TORQUE SWITCHOPERATION

    METAL (NOT FIBRE GEARS). SELF-LOCKING TOPREVENT DRIFT UNDER TORQUE SWITCHSPRING PRESSURE WHEN MOTOR IS DE-ENERGIZED.

    SIZING

    OPEN/CLOSE AT RATED SPEED AGAINSTDESIGNED DIFFERENTIAL PRESSURE AT 85% OF

    RATED VOLTAGE. FOR ISOLATING SERVICETHREE SUCCESSIVE OPEN-CLOSE OPERATIONSOR 15 MINS. WHICHEVER IS HIGHER. FORINCHING SERVICE - 150 STARTS/HR MINIMUM &FOR REGULATING SERVICE - 600 STARTS/HRMINIMUM.

    HANDWHEEL

    * REQUIRED  YES  NO

    * ORIENTATION  TOP MOUNTED  SIDE MOUNTED

    *TO DISENGAGE AUTOMATICALLY DURING MOTOR OPERATION.

    ELECTRIC ACTUATOR

     ACTUATOR MAKE/MODEL BIDDER TO SPECIFY

    MOTOR MAKE / MODEL / TYPE / RATING(KW)

    BIDDER TO SPECIFY

    @ MOTOR TYPESQUIRREL CAGE INDUCTION MOTOR SUITABLEFOR DOL STARTING

     ACTUATOR APPLICABLE WIRINGDIAGRAM

     ENCLOSED (BIDDER TO CONFIRM) A:  DRG. NO. 3-V-MISC-24227 R00B:  DRG. NO. 3-V-MISC-24550 R00C:  DRG. NO. 3-V-MISC-24283 R00D:  DRG. NO. 4-V-MISC-90271 R11E: For Thyristor based Integral starter,Bidder/Vendor to furnish wiring diagram

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    19/39

    SPECIFICATIONFOR

    MOTORISED VALVE ACTUATOR

    SPECIFICATION NO.: PE-ID-401-145-I902

    VOLUME II B

    SECTION D

    REV. NO. 00 DATE: 25.03.14

    SHEET 3  OF 5

    Data Sheet A & B

    DATA SHEET-A(TO BE FILLED BY PURCHASER)

    DATA SHEET-B(TO BE FILLED-UP BY BIDDER)

       F   O   R   M    N

       O .   P   E   M  -   6   6   6   6  -   0

    @ ENCLOSURE CLASS OF MOTORTOTALLY ENCLOSED, SELF VENTILATED IP-55DOP

    @ INSULATION CLASSCLASS B OR BETTER, TEMPERATURE RISE 70

    DEG C OVER 50 DEG C AMBIENT

    @ WINDING TEMP PROTECTION THERMOSTAT (3 Nos.,1 IN EACH PHASE)

    SINGLE PHASE / WRONG PHASESEQUENCE PROTECTION

    REQUIRED

    INTEGRALSTARTER

    INTEGRAL STARTER  REQUIRED  NOT REQUIRED

    TYPE OF SWITCHING DEVICE  CONTACTORS  THYRISTORS

    TYPE  CONVENTIONAL  SMART (NON-INTRUSIVE)

    IF SMART

    a) SERIAL LINK INTERFACE  INTEGRAL  FIELD MOUNTED

    b) SERIAL LINK PROTOCOL FOUNDATION FIELD-BUS  PROFI-BUS DEVICE NET  …………

    c) SERIAL LINK MEDIA  TWISTED PAIR Cu-CBL  CO-AXIAL Cu-CBL OFC

    d) HAND HELD PROGRAMMER  REQUIRED  NOT REQUIRED

    e) TYPE OF HAND HELDPROGRAMMER

     BLUETOOTH  INFRARED ..............

    f) MASTER STATION  REQUIRED  NOT REQUIRED

    g) MASTER STN INTRFACE WITH DCS  MODBUS  TCP/IP

    h) DETAILS OF SPECIAL CABLE  ENCLOSED  NOT REQUIRED

    STEP DOWN CONT. TRANSFORMER  REQUIRED

    OPEN / CLOSE PB  REQUIRED  NOT REQUIRED

    STOP PB  REQUIRED  NOT REQUIRED

    INDICATING LAMPS  REQUIRED  NOT REQUIRED

    LOCAL REMOTE S/S REQUIRED  NOT REQUIRED

    STATUS CONTACTS FOR MONITORING  REQUIRED  NOT REQUIRED

    INTEGRAL STARTER DISTURBEDSIGNAL

    REQUIRED (O/L RELAY OPERATED,CONT./POWER SUPPLY FAILED, S/S IN LOCAL,TORQUE SWITCH OPTD. MID WAY)

    INTERPOSINGRELAY/OPTOCOUPLER(Applicable forintegral Starter)

    TYPE OF ISOLATING DEVICE INTERPOSING RELAY  OPTO COUPLER EITHER

    QUANTITY  2 NOs.  3 NOs.

    DRIVING VOLTAGE  20.5 – 24V DC  _____________V DC

    DRIVING CURRENT  125mA MAX  _____________mA MAX

    LOAD RESISTANCE > 192 ohms - _______ohms - < __________ohms

    TORQUESWITCH

    (Not Applicable

    MFR & MODEL NO. BIDDER TO SPECIFY

    OPEN / CLOSE 1 No. 2Nos. / 1 No. 2Nos

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    20/39

    SPECIFICATIONFOR

    MOTORISED VALVE ACTUATOR

    SPECIFICATION NO.: PE-ID-401-145-I902

    VOLUME II B

    SECTION D

    REV. NO. 00 DATE: 25.03.14

    SHEET 4  OF 5

    Data Sheet A & B

    DATA SHEET-A(TO BE FILLED BY PURCHASER)

    DATA SHEET-B(TO BE FILLED-UP BY BIDDER)

       F   O   R   M    N

       O .   P   E   M  -   6   6   6   6  -   0

    POSITION

    TRANSMITTER

    POSITION TRANSMITTER (For inchingduty & other specific applications)

       REQUIRED  NOT REQUIRED

    MFR & MODEL NO. BIDDER TO SPECIFY

    TYPE ELECTRONIC (2 WIRE) R/I CONVERTER ELECTRONIC (2 WIRE) CONTACTLESS

    SUPPLY  24V DC  ………

    OUTPUT  4-20mA

     ACCURACY + 1% FS

    SPACEHEATER

    @SPACE HEATER REQUIRED

    @ POWER SUPPLY (NON INTEGRAL)  N.A

    @ POWER SUPPLY (INTEGRAL)  BIDDER TO SPECIFY

    @ RATING

    TERMINALBOX

     ACTUATOR/MOTOR TERMINAL BOX REQUIRED

    ENCL CLASS ACTUATOR/MOTOR T.B. @ IP 68 @IP 55

    @ EARTHING TERMINAL REQUIRED TWO

    PLUG & SOCKET(9 PIN)(FOR COMMD, LS/TS FEED BACK, PoT)

     REQUIRED  NOT REQUIRED 2 NOS.  ----------------

    CABLE GLANDS

    @ POWER CABLE GLANDSIZE:--TO BE PROVIDED DURING DETAILEDENGINEERING

    @ SPACE HEATER CABLE GLANDSIZE:----- TO BE PROVIDED DURING DETAILEDENGINEERING

    OTHER CONTROL CABLE GLANDS-1  1No. for BFV of CW PUMP

    OTHER CONTROL CABLE GLANDS-2QUANTITY & SIZE : TO BE PROVIDED DURINGDETAILED ENGINEERING

    WEIGHTTOTAL WEIGHT (ACTUATOR +

     ACCESSORIES)BIDDER TO SPECIFY _________________ Kg.

    NOTES:1. SCOPE: DESIGN, MANUFACTURE, INSPECTION, TESTING AND DELIVERY TO SITE OF ELECTRIC ACTUATOR FOR INCHING OR OPEN / CLOSE DUTY.

    2. CODES & STANDARDS: DESIGN AND MATERIALS USED SHALL COMPLY WITH THE RELEVANT LATEST NATIONAL AND INTERNATION STANDARD. AS A MINIMUM,THE FOLLOWING STANDARDS SHALL BE COMPLIED WITH:IS-9334, IS-2147, IS-2148, IS-325, IS-2959, IS-4691 AND IS-4722

    3. TEMPERATURE RISE SHALL BE RESTRICTED TO 70 DEG. C FOR AMBIENT TEMPERATURE OF 50 DEG C.

    4. CABLE GLANDS OF DOUBLE COMPRESSION TYPE, BRASS MATERIAL SHALL BE PROVIDED.

    5. THE TORQUE SWITCHES SHALL BE PROVIDED WITH MECHANICAL LATCHING DEVICE TO PREVENT OPERATION WHEN UNSEATING FROM THE END POSITIONS.

    THE LATCHING DEVICE SHALL UNLATCH AS SOON AS THE VALVE LEAVES THE END POSITION. IF SUCH PROVISION IS NOT POSSIBLE, THE TORQUE SWITCHESSHALL BE BYPASSED BY END-POSITION LIMIT SWITCHES WHICH OPENS ON VALVE LEAVING END POSITION.THESE LIMIT SWITCHES ARE ADDITIONAL TO THENUMBER OF LIMIT SWITCHES SPECIFIED ELSEWHERE.

    6. THE MOTOR SHALL OPERATE SATISFACTORILY UNDER THE +/- 10% SUPPLY VOLTAGE VARIATION AT RATED FREQUENCY, -5% TO +3% VARIATION INFREQUENCY AT RATED SUPPLY VOLTAGE, SIMULTANEOUS VARIATION IN VOLTAGE & FREQUENCY THE SUM OF ABSOLUTE PERCENTAGE NOT EXCEEDING 10%.

    7. THE MOTOR SHALL BE SUITABLE FOR DIRECT ON LINE STARTING.

    8. LIMIT SWITCH AND DISTURBANCE SIGNALS SHALL BE AVAILABLE TO DCS/PLC EVEN WHEN THE POWER SUPPLY TO THE ACTUATORS IS NOT AVAILABLE. 

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    21/39

    196

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    22/39

    STANDARD CHECK LIST FOR C&I INSTRUMENTS (for Maux Pkgs)

    Sl. Test / Checks Quantum Reference Doc. / Remarks

    No. of check Acceptance Norms M C B

    CHECK FOR

    TYPE

     MAKE

     MODEL No.

    2 MATERIAL (BODY.

    PLUNGER/TRIM)

    P W V

    3 PORT SIZE P W V

    4 CABLE CONNECTION SIZE P W V

    5 ENCLOSURE CLASS

    P W V TYPE TEST

    CERTIFICATE TO BE

    FURNISHED BY

    VENDOR

    6No. OF COILS & INSULATION

    CLASS

    P W V TEST CERTIFICATE TO

    BE FURNISHED FOR

    INSULATION CLASS BY

    VENDOR

    7 POWER SUPPLY CHECK P W V

    8IR / HV TEST

    P W V

    9 FUCTIONAL TEST P W V

    Legend :

     ** M = Manufacturer / Sub-contractor, C = Contractor / Nominated Inspecting Agency, B = BHEL,  P = Perform, W = Witness, V = Verification

    Note :

    1. Quantum of check shall be as below :

    100 % - By Manufacturer

    SEE NOTE-1

    BELOW

     APPROVED SPEC./

    DATA SHEETS

     Agency **

    1 P W V

    CHECK LIST FOR SOLENOID VALVES

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    23/39

    STANDARD CHECK LIST FOR C&I INSTRUMENTS (for Maux Pkgs)

    Sl. Test / Checks Quantum Reference Doc. / Remarks

    No. of check Acceptance Norms M C B

    CHECK FOR 100%

    TYPE

    RANGE

    MODEL / TAG No.END CONNECTION

    DIMENSIONS

    SIZE

    2  ACCURACY & REPEATABILITY

    (WET CALIBRATION)

    100% P W V

    3 HV / IR 100% P W V

    4 CONTACT RATING / No. OF

    CONTACTS

    RANDOM P W V

    5 MATERIAL TC FOR BODY, WET

    PARTS, SENSING ELEMENT

    ONE / LOT P W V

    6 ACCESSORIES AS APPLICABLE

    100% P W V

    7 DEGREE OF PROTECTION ONE / LOT P W V

    8 OVER PRESSURE TEST 100% P W V

    Legend :

     ** M = Manufacturer / Sub-contractor, C = Contractor / Nominated Inspecting Agency, B = BHEL,

      P = Perform, W = Witness, V = Verification

    Note :

    1. Quantum of check shall be as below :

      100 % - By Manufacturer 

    2. Manufacturer to maintain calibrated instrument having better accuracy than the item  under test. Inspecting engineer shall check the same.

    3. Manufacturer to carry out routine test for 100%

    4. Contractor to provide compliance certificate for tests/checks verifid by contractor and

    submit the same alongwith test certificates to be verified by BHEL.

     APPROVED SPEC./

    DATA SHEETS

     Agency **

    V1 P W

    CHECK LIST FOR FLOW SWITCH

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    24/39

     

    INSTALLATION DIAGRAMSOF MEASURING

    INSTRUMENTS

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    25/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    26/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    27/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    28/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    29/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    30/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    31/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    32/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    33/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    34/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    35/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    36/39

    211

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    37/39

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    38/39

    213

  • 8/16/2019 Technical Specification for Compressed Air System (Page No 176 to 214) 1406116390

    39/39

    214