Technical Proposal_EnMS.pdf

5
Doc Ref: RBH/WRK/COM/EI/GFC/02 1 RBH Solutions Private Limited Energy Metering & Management (ENMS) (For Rishabh Meters 3440 & Delta Energy on Modbus) Revision A: 09/10/2014 Presented by: Taranpreet

Transcript of Technical Proposal_EnMS.pdf

  • Doc Ref: RBH/WRK/COM/EI/GFC/02 1

    RBH Solutions Private Limited

    Energy Metering & Management (ENMS)

    (For Rishabh Meters 3440 & Delta Energy on Modbus)

    Revision A: 09/10/2014

    Presented by: Taranpreet

  • Doc Ref: RBH/WRK/COM/EI/GFC/01 2

    1. Objective

    1.1. Introduction

    The main purpose of this document is to explain the Energy Metering and Management System for the Switchboards in GFC Plant. The offered system interfaces with Rishabh make (3440) for Main & DG Incommer & Rishabh make (Delta Energy) for outgoing Feeders, Energy Meters and provide comprehensive energy management systems. All the meters will be networked to Energy Management System for reporting, archiving and performance benchmarking.

    1.2. Working Philosophy

    The scope includes Supply of Serial Converter (RS 485 to RS 232) and EnMS Software for Energy Management Platform.

    Serial Converter: Advantech make Serial converter ADAM 4520 is used to convert the Metering loop (RS 485 to RS 232) for integration in EnMS PC.

    EnMS: Energy Management System, can communicate with any make Energy Meter (over MODBUS), Easy Analysis of Generation & Consumption with inbuilt analytics, fully customizable LCD Display output to broadcast Energy Performance Data at various Boards

  • Doc Ref: RBH/WRK/COM/EI/GFC/01 3

    1.3. Architecture

    LEGENDS

    PA 330

    RS-485 to Rs-

    232 Converter

    Serial Network

    Rs-232

    Serial Network

    Rs-485

    RS-485 Link

    RS-232 Link

    Meters On

    MODBUS

  • Doc Ref: RBH/WRK/COM/EI/GFC/01 4

    2. Scope Of Supply / Services

    2.1. Scope of Supply

    As Per Architecture specified above, please find the comprehensive list of materials to be supplied:

    Serial Converters-RS 485 to RS 232. (2 Nos.)

    Computer for Energy Management Hosting is provided by customer (in customer scope)

    Meter Connectivity: Final supervision will be given for Network Assistance o Serial Communication: Data communication cable and Connectivity

    for looping the meters on RS 485 and further converting to RS 232 for integration in PC is in customer scope, only supervision is provided.

    EnMS Energy Management System

    Energy Meters: Supply & Installation of Energy Meters is in Customer scope, RBH shall provide the supervision.

    2.2. Performance

    EnMS License is for 20 Meters, maximum supported 20,000 Meters per installation.

    Data update time o Instantaneous Values (regular polling) o History Data (up to 1 Minutes Resolution for 6 Days) o History Data (up to 15 Minutes for 2 Years)

    Energy Meter o Rishabh Make (3440 & Delta Energy)

    2.3. Functionality

    o EnMS will connect meters and stat acquiring data from meters o All types of reports, hourly, daily, weekly, monthly, yearly, etc. are

    user configurable with Index repotting feature.

    2.4. Services

    Service offered under this project are mentioned below

    Supervision of installation of Energy Meters, Serial converters and Looping of Meters in field.

    Supply and Installation of Energy Management System

    Factory Acceptance Test & Site Acceptance Tests

    Warranty period will be of 1 year. The warranty period shall cover both the Hardware and software supplied under this project.

    Training and Assistance for preparing the reports is also given.

  • Doc Ref: RBH/WRK/COM/EI/GFC/01 5

    2.5. Assumptions / Clarifications/ Deviations

    The distance between the Serial converter from the location of Energy Management System Installation shall be within 15m ,Distance from serial converters to the Meter looping in switchboards not more than 1000m

    PC for the Installation of EnMS is provided by client.

    Serial Network cable and Inter panel looping of Meters is done by customer only, Supervision shall be provided before commissioning for field network.

    1.1. Introduction1.2. Working Philosophy1.3. Architecture2.1. Scope of Supply2.2. Performance2.3. Functionality2.4. Services2.5. Assumptions / Clarifications/ Deviations