Page 1: Technical Operations ATO-W   Air Traffic Control Facilities

Presented to:

By:

Date:

Federal AviationAdministration

Technical Operations ATO-W Air Traffic Control Facilities

ATCF

FAA National Small Business Conf.

Chauncey Woodland, ATO-W Engineering Technical Officer, Power Services

JUNE 16-19, 2008

Page 2: Technical Operations ATO-W   Air Traffic Control Facilities

04/12/23 2 2Federal AviationAdministration

Air Traffic Control Facilities

Corporate Benefits

• Subject Matter Experts on Staff• Full Product Integration and Support• Extensive Knowledge Based Organization

Page 3: Technical Operations ATO-W   Air Traffic Control Facilities

04/12/23 3 3Federal AviationAdministration

Air Traffic Control Facilities

POWER SERVICES GROUP ORGANIZATION

Joe MorganManager

Jay Rupp, Branch ManagerSystem Engineering

Ian AtkinsSr. System Engineer

Pedro Bracero, Program ManagerPower Cable

Loren Carvajal, Program ManagerLPGBS - Systems Engineer

Pamela Curry, Program ManagerBattery Replace/DC Bus

James Firestine, Program ManagerACEPS & Special Projects

Andy Guadiana, Program ManagerEG/UPS

Mike Paska, Program ManagerFuel Storage Tanks

Don Yardley, Program ManagerCPDS

Russell Green, Branch ManagerAcquisition, Transition & Integration

Gerald FerrantiAFSS Integration

Ralph LundContract Development

Peter MegnaCPDS Integration

Richard RochesterCPDS Integration

Business ManagerVacant

Mike VellucciPower Cable Integration

Chauncey Woodland Contract Admin/Power Cable/

ACEPS Integration

Mark Michaud, Branch ManagerOperations Engineering

Carol NewbySecretary

Anthony Messina, Team LeadCPDS/UPS/DC Bus/Battery Replace

Mark BaumgartnerEG

Nina AgrawalDC Bus/CPDS

Mark ChamberlinACEPS

Sam AquirreDC Bus/Battery Replace

Robert DiTusa, Team LeadACEPS

Gary RussellUPS/CPDS

Jim Dixon, Team LeadEG, LPGBS

Fred ZacheryUPS/CPDS

Chuck GravesLPGBS

Tim RileyEG

Paul MoyerCPDS

Bruce SanchezACEPS

Page 4: Technical Operations ATO-W   Air Traffic Control Facilities

04/12/23 4 4Federal AviationAdministration

Air Traffic Control Facilities

Our Values

• Safety is our passion. We are world leaders in aerospace safety.

• Quality is our trademark. We serve our country, our customers, and each other.

• Integrity is our character. We do the right thing, even if no one is looking.

• People are our strength. We treat each other as we want to be treated.

Page 5: Technical Operations ATO-W   Air Traffic Control Facilities

04/12/23 5 5Federal AviationAdministration

Air Traffic Control Facilities

Power Service

• Manage System Requirements, Design Acquisition, Integration & Implementation Activities

• System sustainment for all facilities • Engine Generators (EG)• ACEPS/UPS/Batteries/DC Systems• Lightning Protection, Grounding, • Bonding, Shielding (LPGBS)• Power-related Policies, Orders, Standards &

Specifications• Restoration Support• National Engineering

Page 6: Technical Operations ATO-W   Air Traffic Control Facilities

04/12/23 6 6Federal AviationAdministration

Air Traffic Control Facilities

Facility Security Service

• Enhance Physical Security (FSRM) at all FAA Facilities

• Requirements Design• Implementation Planning

Page 7: Technical Operations ATO-W   Air Traffic Control Facilities

04/12/23 7 7Federal AviationAdministration

Air Traffic Control Facilities

EEOSH Service

• Hazardous Materials• Personnel Safety• Radiation Hazard• Pollution Control• Compliance Audits• Fuel Storage Management• Clean-up (Superfund)• Fire/Life Safety• Decommissioning/Disposal• Energy Management

Page 8: Technical Operations ATO-W   Air Traffic Control Facilities

04/12/23 8 8Federal AviationAdministration

Air Traffic Control Facilities

Implementation Service

• National Implementation Support Contract (NISC)

• Technical Support Services Contract (TSSC)

Page 9: Technical Operations ATO-W   Air Traffic Control Facilities

04/12/23 9 9Federal AviationAdministration

Air Traffic Control Facilities

Facility Service

• Un-staffed Facilities Physical Infrastructure Sustainment

• Seismic Assessments & Education

• Execute AFSS Infrastructure Program

• Execute DoD Based Closure/Facility Transfer Program

Page 10: Technical Operations ATO-W   Air Traffic Control Facilities

04/12/23 10 10Federal AviationAdministration

Air Traffic Control Facilities

Operational Service

• Computer Aided Engineering Graphics• Electronic Drawing Management System

(eDMS)• RTP/NAP/RIMS• Cost Estimating Tool• Configuration Management (CM)• Web CM• Engineering Standards

Page 11: Technical Operations ATO-W   Air Traffic Control Facilities

04/12/23 11 11Federal AviationAdministration

Air Traffic Control Facilities

Anticipated Acquisitions for the Power Services Group through Fiscal Years 2008 and 2009

• GNAS BATTERY PROCUREMENT CONTRACT (Equipment) • ENGINEERING SERVICES CONTRACT (Services)• POWER EQUIPMENT INSTALLATION CONTRACT (Services)• TVSS/ Surge Protective Devices CONTRACT (Equipment)

• DC BUS CONTRACT (Equipment) • ACEPS BATTERY REPLACEMENT CONTRACT (Services)