  SPECIFICATION NUMBER: TI/SPC/OHE/EXTHRMBOND/010(04/10) GOVERNMENT OF INDIA MINISTRY OF RAILWAYS TECHNICAL SPECIFICATION FOR Exothermic Welding connection for Bonding, Earthing/Grounding ISSUED BY TRACTION INSTALLATION DIRECTORATE RESEARCH DESIGN AND STANDARDS ORGANISATION MANAK NAGAR, LUCKNOW 226 011 (INDIA) (For official use only)

description

RDSO Specification for earthing and Bonding

Transcript of Technical Guide Exothrmic Welding in Railways

  • SPECIFICATION NUMBER: TI/SPC/OHE/EXTHRMBOND/010(04/10)

    GOVERNMENT OF INDIA MINISTRY OF RAILWAYS

    TECHNICAL SPECIFICATION FOR

    Exothermic Welding connection for Bonding, Earthing/Grounding

    ISSUED BY

    TRACTION INSTALLATION DIRECTORATE RESEARCH DESIGN AND STANDARDS ORGANISATION

    MANAK NAGAR, LUCKNOW 226 011 (INDIA)

    (For official use only)

  • Page 2 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    SPECIFICATION NUMBER: TI/SPC/OHE/EXOTHERMBOND/0100(4/10)

    FOR EXOTHERMIC WELDING CONNECTION FOR BONDING &

    GROUNDING

    Amendment Date of Amendment Total pages including drawings

    Amendment/Revision

    0 NA 17 First issue

    PREPARED CHECKED BY APPROVED BY SIGNATURE -Sd/- -Sd/- -Sd/-

    DATE 8.4.10 8.4.10 8.4.10 DESIGNATION ADE/OHE-D DTI-MRVC ED/TI-Co.

    COPY NUMBER

    ISSUED BY ---------------------- SIGNATURE -------------------- DATE -------------------

    ISSUED TO --------------------------------------------------------------------------------

    --------------------------------------------------------------------------------

    --------------------------------------------------------------------------------

    NOTE: This specification is property of RDSO. No reproduction shall be done

    without permission from DG (TI), RDSO. This specification is not for general use.

  • Page 2 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    SPECIFICATION NUMBER: TI/SPC/OHE/EXOTHERMBOND/0100(4/10)

    INDEX

    ITEM NO. HEADING PAGE 1 Forward 3 2 Scope 3 3 General and other requirement 3 4 Welding Material 5 5 Welding Tool 5 6 Marking 7 7 Packing 8 8 Acceptance Criterion 8 9 Training/Instruction Manual 9 10 Information to be supplied by the purchaser 9 11 Appendix-I(Sheet 1 to 2) 10 to 11 12 Appendix-II(Sheet 1 to 3) 12 to 14 13 Appendix-III(Sheet 1 to 3) 15 to 17

  • Page 3 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    Specification No. TI/SPC/OHE/EXOTHRMBOND/0100 (04/10)

    For Exothermic Welding Connection for Bonding & Grounding

    1.0 Forward

    This specification basically covers the technical provision & requirements and does not include all other necessary provisions for the contract.

    2.0 Scope 2.1 This specification covers the requirements and acceptance criterion for weld

    material, welding tool and tool kit, bonds/track bond wires for making permanent electrical bond connection between two conductors.

    2.2 The intent of this specification is to ensure the production of properly formulated

    and tested weld material for making traction bond connection to/between the traction rails/track and with OHE structure for electrical continuity with adequate bonding strength. The prime concern must be focussed on the necessary design and quality requirements to achieve adequately strong weld connection, which shall eliminate in service connection failure under severe climatic and adverse field conditions.

    2.3 These weld materials including tool kit shall be useful in following railway

    application on 25kV electric traction system.

    (a) Traction bond connection to rail & OHE structures route. (b) Traction rail continuity connection. (c) Earthing connections like at TSS, SP/SSPs, SCADA/RTU and other

    important electrical installations. (d) Bus bar connections etc. (e) Copper to copper, copper to steel connection. (f) Important bonds which are not disturbed during track relaying. (g) Sections where 90UTS rails have been provided. (h) Theft prone areas.

    3.0 General and other requirements 3.1 Manufacturers should have a good quality assurance system to guarantee the

    product e.g. ISO 9001 2000 assessed by authorised agency.

  • Page 4 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10) 3.2 Manufacturers should provide sales reference list that shows type, delivery,

    customer and address of customers, details of catalogue and type test reports & approvals of the product.

    3.3 Manufacturer should submit approval & test reports, both internal and external from authorised/reputed test houses as per National/ International Standard.

    3.4 The welded connection should pass the following parameters if tested as per

    IEEE-837:

    Mechanical Pullout, Electromagnetic force, Resistance, Freeze-thaw cycling, Salt Spray test, Corrosion-acid test and Fault current test.

    3.5 Welding material along with tool kit shall be capable of providing a permanent bonding connection involving copper or aluminium or steel as specified by the purchaser. The final bond shall be achieved in such a way that homogeneous molecular bonding of two involved metals takes place perfectly.

    3.6 Exothermic Welding process should be: A steady burn, No pops, No drastic colour

    changes (white hot colour during burn, turns orange as the reaction stops and the molten metal grows orange).

    3.7 Welding connections should be without voids or pinhole, and no porosity should

    be detected. The process shall be consistent and continuous. 3.8 It shall be permanent, solid metal, maintenance free connection and shall not be

    affected by high current surge. 3.9 It shall not loosen or corrode at the point of weld. There shall be no additional

    contact surface or mechanical pressures involved. 3.10 It shall be vibration proof and corrosion free electrical connection. 3.11 It shall not brittle with age and shall be able to sustain physical impacts, which

    may be experienced under the field conditions. 3.12 Electrical resistance and other properties shall not deteriorate with ageing and

    under severe Indian climatic conditions.

  • Page 5 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10) 3.13 It shall have a current carrying capacity equal to or greater than that of the

    conductors.

    3.14 Life of the joints itself shall not be less than 10 years irrespective of life of conductors, equi-potential earth bus bars or Ground Rods used.

    4. Welding Material

    4.1 The weld material shall be designed for two specific types of jointing application

    as mentioned above (a) rail welding application and (b) earthing & bonding application.

    4.2 It shall not contain phosphorous or any caustic, toxic or explosive substance. For

    rail welding application, the welding material should not contained tin besides the above cited elements. Its components shall not be volatile or sensitive to shock, nor shall they be capable of spontaneous ignition or ignition by friction.

    4.3 The reaction of the weld material shall be completed within 10 seconds and on

    completion of jointing & bonding process no un-reacted material shall remain. The resulting weld nugget shall be free of dissolved gases or low boiling point elements, e.g., small voids or blisters on the surface.

    4.4 Weld material shall provide a final bond with minimum tensile strengths of 40,000

    psi tested using ASTM ES-94a (Test Methods for Tension Testing of Metallic Material). As a guideline, 3 samples of diameter test specimen & 5 long of weld material shall be cast in the form of bars using 250 gms of weld metal powder and tested as cast for tensile strength or as per any other standards accepted by the purchaser on any tensile testing machine of adequate capacity.

    4.5 The weld material for traction bond and stud welding for rail application shall be

    free from tin. As presence of metallic tin allows for wetting of rail surface and provides for unnecessary penetration that can lead to metallurgical damage to the rail.

    4.6 The weld material for earthing & bonding application shall be UL listed and shall

    be tested as provision of IEEE-837 by NABL/ILAC Member labs. The manufacturer should have latest UL certification for their facilities and it should be regularly extended after the expiry of the certification to ensure genuineness.

    5. Welding Tool 5.1 It shall be suitable for bonding as per the sizes specified in Appendix-I to III for

    bonding Equi-potential Earth Bus Bars (EEBB) to ground rod, protective conductor etc.

  • Page 6 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10) 5.2 The tools shall be of lightweight and whole kit containing bonding material; weld

    materials and tools shall be easily portable by one person from one spot to another. 5.3 It shall be possible to remove it immediately after jointing or whenever required. 5.4 In-built protection shall be available against any flash generation during weld

    process, which is injurious to user. 5.5 Tools required for high temperature working shall be of graphite or suitable

    material so as to be capable of working at temperatures sufficiently higher than the temperature conditions achieved during jointing.

    5.6 Any ignition tool included in the tool kit shall be portable and easy to operate.

    Ignition time shall be very quick and shall work efficiently even under damped weather conditions.

    5.7 For quality and safety, moulds, bonds, weld material and other tools shall be

    supplied as one unit unless otherwise mentioned by the purchaser. 5.8 For integrity and safety of the connection, the weld metal, moulds and clamps

    should be of the same manufacturer. 5.9 Whole weld kit shall be light, portable, self contained, simple in working and shall

    require very little time and skill to make perfect connection every time. 5.10 Tool kit shall give consistent quality bond for at least 100 joints for non-tensioned

    joints. 5.11 Welding connection shall be completed within 10 second and in such a way that

    amount of heat (in calories or BTU) required for final connection causes no damage to conductors and its insulation and to metal surfaces.

    5.12 Power operated tools, if any, for carrying out weld work shall have the provisions

    for its working on 110/230V a.c. and portable battery. 5.13 Suitable means and guidance shall be provided to prevent equipment failures

    connected through rails due to flow of electric current during weld process. 5.14 Complete jointing process including preparatory work shall not take more than 2 to

    3 minutes per bond under normal working conditions, to avoid requirement of traffic line blocks.

  • Page 7 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10) 5.15 If any melting of metal is involved in the jointing process, it shall quickly solidify

    so that system is immediately available for charging. 5.16 Once ignition is started it shall not result in imperfect bond/joint. 5.17 Welding kit shall comprise of weld material, bonding material & tool kit. It shall be

    supplied in sufficiently strong carry-bag for easy transportation by the Maintenance people.

    5.18 Weld material shall not contain hazardous ingredients sufficient to constitute a

    hazard & weld process shall not result in any surface irregularities. 5.19 Welding material shall have a minimum shelf life of five years, when stored in a

    reasonable storage condition, so that material can be used without any testing within this period for optimum results.

    5.20 Detailed training manual including working instructions for the user for achieving

    best results shall be supplied along with each tool kit. Necessary instructions for protection of workers shall be incorporated if process is harmful to human beings. Whenever required, necessary guidance shall be given by manufacturer (or) manufacturers trained representative to user at site.

    5.21 In case of any mishandling or accidental situation, details of suggested first-aid

    measures shall be given.

    5. MARKING

    6.1 Each package/ box of welding material/bonds shall be properly marked for easy identification and shall be stamped with the lot number.

    6.2 Carton shall have part number printed, contents, size and weight shall also be

    marked. 6.3 To maintain traceability, batch and/or lot control identification shall be marked on

    packages prior to despatch of consignment. 6.4 Month and year of manufacture shall be marked on the container. 6.5 For materials having a limited shelf life, a clear expiry date shall be marked before

    which material is to be consumed for best results. 6.6 All the sizes, weight and other dimensions of packed items shall be marked with an

    accuracy of 5%. The marking shall be distinctively in indelible printing-cum-indented/embossed form.

  • Page 8 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    7. PACKING 7.1 The containers for weld material shall be moisture resistant and shall be packaged

    to prevent damage, separation or spillage during shipping. 7.2 The weld material including starting powder should packed in the waterproof

    transparent plastic. The starting powder should put on the bottom of the tube. 7.3 The weld material shall be pre-measured for specific applications suitably marked

    and packaged together in a non-absorbing container. 7.4 It shall be packed in such a way that it shall not loosen during transportation and

    normal handling. 7.5 Container and caps shall be marked with unit size and show item number,

    manufacturer, and manufacturing date. 7.6 All the contents like weld material, bonds, tools etc. shall be packed individually

    and then repacked in a bigger single pack. 8. ACCEPTANCE CRITERION

    Following shall be provided by manufacturer for evaluating the product before it is considered suitable for its applications on Indian Railways -

    8.1 Remarks/compliance shall be given for all provisions of this specification. 8.2 Details of welding process, properties and chemical composition of weld material,

    its energy content shall be provided. 8.3 Standards followed in manufacturing and testing of products including weld tools. 8.4 Details of analysis carried out by manufacturer, as a routine test on raw materials,

    final product and Quality Assurance Testing shall be made available for evaluation or as and when asked by the purchaser.

    8.5 Laboratory test results including field observations for verification and validation

    of all results of Quality Assurance Testing & Engineering specification. 8.6 UL listing certificate for the weld connection along with the test report as per the

    provisions of IEEE-837 by NABL/ILAC Member for welding material required for earthing and bonding other than track.

  • Page 9 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    8.7 Documents to ensure nil effect of weld process on EEBB or ground rod surface or

    on rail surfaces as the case may be. 8.8 Details of substances hazardous to health of workers and precautions to be taken

    during process. 8.9 Performance feedback and acceptability of same product on Indian Railways and/or

    other Railway system abroad/power transmission and distribution system etc. Product must have been in use for similar applications for at least 2-3 years.

    8.10 Manufacturer shall arrange for any other test and/or documents considered

    necessary by the purchaser to establish quality and performance of the product. 8.11 Two copies of training/instruction manual. 8.12 Guarantee for supply of spares and consumables for 10 years. 8.13 Suppliers/manufacturers with a new product complying the requirements of this

    specification except Clause-8.8 above may be considered for educational/ developmental orders only.

    9.0 Training /Instruction Manual

    The supplier shall impart adequate practical training to field staff to operate the exothermic welding kit at site. The training shall cover the procedures & safety measures to be adopted by the Railway staff while performing the welding process. Supplier shall also supply two copies of Training/Instruction Manual along with each exothermic welding kit.

    10.0 INFORMATION TO BE SUPPLIED BY THE PURCHASER 10.1 Type of applications. 10.2 Quantity (item-wise) for bonds, weld material (for different applications) and tools

    required. 10.3 Sizes and length of bonds, Equi-potential earth bus bar (EEBB), protective

    conductors & ground rods and dia of all the cross sections to be bonded and all relevant sizes to be used for jointing surface.

    10.4 Inspecting Agency for acceptance of material.

    ***

  • Page 10 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    Appendix-I (Sheet-1)

  • Page 11 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    Appendix-I (Sheet-2)

  • Page 12 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    Appendix-II (Sheet-1)

  • Page 13 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    Appendix-II (Sheet-2)

  • Page 14 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    Appendix-II (Sheet-3)

  • Page 15 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    Appendix-III (Sheet-1)

  • Page 16 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    Appendix-III (Sheet-2)

  • Page 17 of 17 pages Effective from 01.04.10 Spec No. TI/SPC/OHE/EXOTHRMBOND/0100(4/10)

    Appendix-III (Sheet-3)