Technical Challenges Involved in Managing Bulk Power System Operations with High Penetration of Renewables An Overview of Current Activities by the Midcontinent System Operator to Integrate Renewables Andrew Mills, Electricity Markets and Policy EAEI Journal Club Series October 25, 2019
Transcript of Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency...
![Page 1: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/1.jpg)
Technical Challenges Involved in Managing Bulk Power System Operations with High Penetration of Renewables
An Overview of Current Activities by the Midcontinent System Operator to Integrate Renewables
Andrew Mills, Electricity Markets and Policy
EAEI Journal Club Series
October 25, 2019
![Page 2: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/2.jpg)
Overview
•What did MISO study and why?•How did MISO conduct the study?•What did MISO find?
• Resource Adequacy • Energy Adequacy • Operating Reliability: Steady State • Operating Reliability: Dynamics
![Page 3: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/3.jpg)
What did MISO study and why?
![Page 4: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/4.jpg)
![Page 5: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/5.jpg)
![Page 6: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/6.jpg)
![Page 7: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/7.jpg)
![Page 8: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/8.jpg)
How did MISO conduct the study?
![Page 9: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/9.jpg)
![Page 10: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/10.jpg)
![Page 11: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/11.jpg)
What did MISO find?
![Page 12: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/12.jpg)
![Page 13: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/13.jpg)
![Page 14: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/14.jpg)
![Page 15: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/15.jpg)
![Page 16: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/16.jpg)
![Page 17: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/17.jpg)
![Page 18: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/18.jpg)
![Page 19: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/19.jpg)
![Page 20: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/20.jpg)
![Page 21: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/21.jpg)
![Page 22: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/22.jpg)
![Page 23: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/23.jpg)
![Page 24: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/24.jpg)
![Page 25: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/25.jpg)
![Page 26: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/26.jpg)
![Page 27: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/27.jpg)
![Page 28: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/28.jpg)
![Page 29: Technical Challenges Involved in Managing Bulk Power ... · Key metrics: Study area 1. Frequency response 2. Transient and voltage stability 3. Weak areas Performance metric Frequency](https://reader034.fdocuments.us/reader034/viewer/2022050605/5fac6b666efd3645403e18b7/html5/thumbnails/29.jpg)