Technical Assistance Consultant’s Report This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. Project Number: 46234-001 September 2016 Republic of the Philippines: Strengthening Knowledge-Based Economic and Social Development (Financed by the Republic of Korea e-Asia and Knowledge Partnership Fund) Prepared by Information Technology and Business Process Association of the Philippines Taguig City, Philippines For Department of Finance

Transcript of Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and...

Page 1: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Technical Assistance Consultant’s Report

This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents.

Project Number: 46234-001 September 2016

Republic of the Philippines: Strengthening Knowledge-Based Economic and Social Development (Financed by the Republic of Korea e-Asia and Knowledge

Partnership Fund)

Prepared by Information Technology and Business Process Association of the Philippines

Taguig City, Philippines

For Department of Finance

Page 2: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

COMPLETION REPORT

TA-8164 PHI: Strengthening Knowledge-Based Economic and Social Development – 1 BPAP (46234-001)

Prepared by

Information Technology and Business Process Association of the Philippines Consultant

(September 2016)

Asian Development Bank

Department of Finance Republic of the Philippines 

IT-BPM Ind ustry

Kno wle d g e Hub

Pro je c t

Asian Institute of Management Information Technology and Business Process Association of the Philippines 

University of the Philippines Open University 

Page 3: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 4: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Table of Contents

I. Description

1.1 Rationale . . . . . . . . 1 1.2 Background . . . . . . . . 2

II. Expected Result and Outputs

2.1 Expected Result . . . . . . . 3 2.2 Output 1 (Outcome, Output, Activities) . . . . . 3 2.3 Output 2 (Outcome, Output, Activities) . . . . 3 2.4 Output 3 (Outcome, Output, Activities) . . . . 4

III. Delivery of Inputs and Conduct of Activities 3.1 Terms of Reference of Consultants . . . . . 4 3.2 Detailed Accomplishments . . . . . . 4

3.2.1 Quarter 1 (Sep to Dec 2013) . . . . . 4 3.2.2 Quarter 2 (Jan to Mar 2014) . . . . . 7 3.2.3 Quarter 3 (Apr to Jun 2014) . . . . . 11 3.2.4 Quarter 4 (Jul to Sep 2014) . . . . . 14 3.2.5 Quarter 5 (Oct to Dec 2014) . . . . . 16 3.2.6 Quarter 6 and 7 (Jan to Jun 2015) . . . . 18 3.2.7 Quarter 7 and 8 (Jul to Dec 2015) . . . . 19 3.2.8 Quarter 9, 10, and 11 (Jan to Sep 2016) . . . 20

3.3 Changes Made During Implementation . . . . 21 3.3.1 Variation No. 1 . . . . . . 21 3.3.2 Variation No. 2 . . . . . . 22 3.3.3 Variation No. 3 . . . . . . 22

IV. Evaluation of Outputs and Achievement of Outcome 4.1 Evaluation of Outputs . . . . . . . 22 4.2 Reports and Deliverables of IBPAP . . . . . 24 4.3 Monitoring and Evaluation Framework . . . . 25

V. Overall Assessment and Rating . . . . . . 30 VI. Challenges Encountered. . . . . . . . 30 VII. Recommendations and Follow-Up Actions. . . . . 31

Page 5: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annexes

Annex 1 : ADB and IBPAP Contract

Annex 2 : Terms of Reference for Consultants

Annex 3 : IBPAP Inception Report

Annex 4 : AIM Thought Paper

Annex 5 : TOR - Deployment and Pilot of Knowledge Hubs

Annex 6 : TOR - Development and Implementation of MIS and Project Portal

Annex 7 : TOR - Design and Implementation of eSMP Courseware

Annex 8 : DOF Endorsement Letter to ADB

Annex 9 : AIM Case Studies

Annex 10-a : Contract Variation No. 1

Annex 10-b : Contract Variation No. 2

Annex 10-c : Contract Variation No. 3

Annex 11 : IBPAP Deliverable 1

Criteria for locating knowledge hubs and selecting beneficiary HEIs/SUCs Annex 12 : IBPAP Deliverable 2

Overall strategy and roadmap for enhancing curriculum and instruction in HEIs including incentives and management systems design for the continuous improvement of curriculum and instruction in HEIs

Annex 13 : IBPAP Deliverables 3 and 4

Deliverable 3: Models and best practices for university-industry linkages including recommendations to address constraints for improving quality of services and achieving closer university and industry linkage Deliverable 4: List of HEIs and international/regional institutions for twinning arrangements including a draft twinning arrangement or partnership agreement document

Anne 14 : IBPAP Deliverable 5

KH Business Case & Financial Model which was a deep dive of Deliverable 2

Page 6: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Acronyms and Abbreviations

ADB Asian Development Bank

AdEPT Advanced English Proficiency Training

AIM Asian Institute of Management

BEST Basic English Skills Training

BPO Business Process Outsourcing

CEO Chief Executive Officer

DOF Department of Finance

DOST Department of Science and Technology

GDP Gross Domestic Product

HEI Higher Educational Institution

HR Human Resource

IBPAP Information Technology and Business Process Association of the Philippines

ICT Information and Communications Technology

ICTO Information and Communications Technology Office

IT-BPM Information Technology and Business Process Management

KH Knowledge Hub

LMS Learning Management System

M&E Monitoring and Evaluation

NEDA National Economic Development Authority

PDP Philippine Development Plan

PDS Philippine Digital Strategy

PSC Project Steering Committee

SMP Service Management Program

SUC State University and College

TA Technical Assistance

TOR Terms of Reference

UPOU University of the Philippines Open University

Page 7: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 8: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

1 | P a g e

I. PROJECT DESCRIPTION

1.1 Rationale The Information Technology and Business Process Management (IT-BPM) industry in the Philippines has attained leadership in establishing a sizeable business process outsourcing (BPO) presence in Southeast Asia. Over the last ten years, the Philippine IT–BPM industry has grown at an impressive annual rate of about 30%. It is a major generator of jobs for skilled Filipinos contributing approximately 5% of GDP in 2011 and it is the Philippines’ third largest foreign exchange earner after tourism and remittances. In 2010, it has emerged as the number one provider of voice and the number two in non-voice related outsourced work in the BPM industry worldwide. In its Roadmap, the Information Technology–Business Process Association of the Philippines (IBPAP) is targeting to achieve revenues of $25 billion or about 10% of the global IT–BPM market1.This revenue figure is projected to account for about 8% of GDP, potentially making it the second largest source of foreign exchange for the country. Collectively, this goal translates to about 1.3 million direct employees by 2016 and approximately 3.2 million indirect jobs that include a sizeable number in the informal sector. Industry leaders are confident that its 2016 targets are within reach. The industry is embarking on a wide range of initiatives and strategies to sustain its competitiveness and success in the voice segment and consider expanding into non-voice services. To further drive the leadership, it will seriously consider diversifying in portfolio services and markets by focusing on higher value and more complex services including: software development and IT services, animation, game development, health care information management outsourcing, legal, financial and accounting services, and HR among others. The government continues to give high priority to the development of the IT–BPM industry. The Philippine Development Plan (PDP) 2011–20162 and the Philippine Digital Strategy (PDS) 2011–20163 have identified major strategies to support the industry including: (i) developing public-private partnerships to promote both backward and forward linkages in the Next Wave Cities, (ii) enhancing investment promotion and ICT policy, (iii) harmonizing the educational system to the needs of the industry, and (iv) infrastructure support to address connectivity deficit and increase broadband coverage. Government invested heavily to address the skills–job mismatch and is putting attention to developing and sustaining the growth of a quality talent pool. One of the key drivers for growth in the outsourcing industry, whether global or national is talent. It is acknowledged that the Philippine IT–BPM industry has been able to aggressively establish a solid position in the global IT–BPM market because of its service-oriented, English-speaking talent pool. The Philippines has the third largest talent availability among the world’s top IT-BPM centers, next to India and China, and leading Poland, Mexico, Egypt and Malaysia in annual tertiary graduates. _______________________

1Philippine IT–BPM Roadmap 2012–2016, © 2013 Information Technology Business Process Association of the Philippines and TeamAsia, published by the Department of Science and Technology–Information and Communications Technology Office (DOST–ICTO). 2 http://devplan.neda.gov.ph/index.php 3 http://www.icto.dost.gov.ph/index.php/philippine digital-strategy

Page 9: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

2 | P a g e

Major education reform measures are being instituted and supported including the K-12 program. While these educational reforms are designed to benefit the industry in the long run, it is expected that these will impact on the supply of talent in the short to medium term. The industry hires only an average of 5% to 10% of applicants largely because of inadequate education and training that is suitable to a career in the IT–BPM industry. The problem in recruitment continues to increase further as the global BPM composition is now evolving dramatically. New and more lucrative market settings such as health information management are bringing opportunities for expansion in voice—and more complex and emerging services are being required in non-voice that is putting additional pressure on availability of quality talent. Many small and medium BPO firms who wish to participate in the IT–BPM sector are constrained by their ability to invest in training programs that will allow them to scale-up and compete with the multinational BPOs who already have established training programs and a well-developed talent pool.

1.2 Background The Government of the Philippines requested through its Department of Finance (DOF) that the Asian Development Bank (ADB) provide capacity development technical assistance (TA) to address skills shortages in high growth industries such as the information technology – business processing management (IT-BPM) industry by aligning higher education curricula with international standards and labor market, while building on public and private initiatives. The TA Outcome is a replicable and sustainable system of ICT-enabled knowledge hubs for improved teaching and learning of IT–BPM industry-based curricula in higher education institutions (HEI). Three key Outputs will accomplish the Outcome of the TA:

i. Access to knowledge resources for teaching and learning IT-BPO courses, ii. Higher education curriculum and instruction enhanced, and iii. Partnerships with industries and academic institutions strengthened.

Three organizations have been identified and separately contracted by the ADB to work jointly for the implementation of the TA: IBPA – the umbrella organization of the IT–BPM industry that has pioneered in the development and delivery of industry-designed courses and plays a pivotal role in sustaining the rapid growth of the industry; the Asian Institute of Management (AIM) – that has a solid track record in development management and business management programs, and research; and the University of the Philippines – Open University (UPOU) – the only open university in the country, and the only distance education institution in Southeast Asia region that is offering 100% of its courses online. IBPAP is primarily responsible for managing the TA while ensuring closer university-industry linkage and sustainability of the TA benefits. UPOU is responsible for designing and deploying e-learning products for industry designed courses in HEIs and AIM will lead the TA knowledge management components (See Annex 1 for the Contract between ADB and IBPAP). The Impact of the ADB TA which is funded by the Republic of Korea e-Asia and Knowledge Partnership Fund is improved alignment of higher education with the needs of the economy. The TA would greatly assist the development of the IT–BPM industry by providing alternative business models and scale-up mechanisms to support the continuous supply of qualified talent that it needs—and more importantly, strengthen the higher education system by introducing innovative and creative education programs that are relevant to the country’s competitive advantage in economic sectors like the IT–BPM industry.

Page 10: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

3 | P a g e

II. EXPECTED RESULT AND OUTPUTS

2.1 Expected Result The overall impact of the TA is improved alignment of higher education with the needs of the economy. The outcome is a replicable and sustainable system of ICT-enabled knowledge hubs for improved teaching and learning of IT–BPM industry-based curriculum in the HEIs. Details of the Outputs are presented below. 2.2 Output 1 (Outcome, Output, and Activities) Access to knowledge resources for teaching and learning IT–BPM industry-based course increased. Access would be increased through the following initiatives and actions:

i. consultations with industry CEOs, HEIs and other stakeholders, ii. developing online learning modules and study guides, iii. courses for talent management development program, iv. developing the framework and business model for the pilot knowledge hubs, and v. identify and establish three (3) knowledge hubs.

2.3 Output 2 (Outcome, Output, and Activities) Higher education curricula and instruction enhanced. Higher education curricula and instruction will be enhanced through the following initiatives and actions:

i. run online IT–BPM courses for 900 faculty members and 3,000 students, ii. develop a certification and assessment framework, iii. certify/assess teachers and students who have completed the online courses, and iv. scale-up model for delivering IT–BPM courses documented.

The main Outputs from these initiatives would be: i. three (3) out of six (6) online service management program (SMP) courses

available for use in the UPOU learning management system (LMS), ii. entry-level middle management program designed and developed by AIM, iii. framework and replicable business models for developing the pilot knowledge

hubs prepared, and iv. three (3) pilot knowledge hubs established.

The main Outputs from these initiatives would be: i. three (3) online courses offered to 900 teachers and 3,000 students of

participating HEIs, and ii. teachers and students who have completed the courses availed of, or completed

certification /assessment.

Page 11: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

4 | P a g e

2.4 Output 3 (Outcome, Output, and Activities) Partnerships between industry and academic institutions strengthened through the following initiatives and actions:

i. prepare industry–academe partnerships and linkages framework, ii. prepare three (3) partnerships agreements between HEIs and industries, and iii. establish two (2) twinning arrangements between foreign or domestic HEIs.

III. DELIVERY OF INPUTS AND CONDUCT OF ACTIVITIES

3.1 Terms of Reference for Consultants The TA was delivered by one international and thirteen national consultants across the three partners. IBPAP, which was responsible for managing overall TA inputs and outputs including the sustainability of TA benefits, provided two person-months intermittent for the Lead Expert on Industry-Designed Education who worked closely with other TA consultants for the preparation of the strategy and roadmap for enhancing curriculum and instruction in the HEIs and other technical reports and five person-months intermittent for the Industry-based Education Specialist who were responsible for ensuring that the TA objectives and targets are met and overseeing and integrating all TA inputs and outputs. AIM, which was the partner leading the knowledge management components, provided one International Knowledge Management Expert for seven person-months intermittent and a Senior Researcher for seven person-months intermittent who assisted the Knowledge Management Expert in the preparation of the benchmarking study and in preparing policy notes and reports. UPOU was responsible for designing and deploying e-learning products for industry-designed courses in HEIs. It had the largest number of consultants and experts with a total of seventeen (17) person months. See Annex 2 for the TOR for Consultants. 3.2 Detailed Accomplishments

3.2.1 Quarter 1 Accomplishments (September to December 2013) The first quarter of implementation which was a start-up and mobilization period generally went smoothly. The implementation partners – IBPAP, AIM and UPOU commenced work on the TA with a kick-off meeting held on 24 September 2013. This meeting served to level off expectations, launch the inception phase and align individual implementing

The main Outputs from these initiatives would be: i. sustainable partnerships between industry and academe in the Next Wave Cities,

and ii. at least two (2) twinning arrangements between foreign or domestic HEIs

formalized for IT-BPM courses.

Page 12: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

5 | P a g e

partner workplans. Regular weekly partners and parallel internal team meetings were conducted during the mobilization phase to ensure coordination and synchronization of activities among the different partners and teams. The three implementing partners mobilized their respective resource teams, set up management/monitoring, financial and personnel systems and identified equipment for procurement. Key mobilization activities undertaken also included the immersion of the AIM and the UPOU teams to IBPAP and industry firm operations and the preparation of the Inception Mission Report. In addition, the partners began preparations for the conduct of the first Project Steering Committee (PSC) meeting. As outlined in the workplan, the majority of the activities undertaken in this reporting period were in support of Output 1 which is designed to increase access to knowledge resources for teaching and learning IT-BPM industry-based courses. Activities for Output 2 and 3 are planned to commence only in the succeeding quarters. IBPAP began developing the Criteria for Locating Knowledge Hubs and submitted the Consolidated Inception Report (See Annex 3). AIM drafted and submitted the IT-BPM Knowledge Hub Thought Paper (See Annex 4). UPOU commenced review of the first three courses of the Service Management Program (SMP) – BPO 101, Business Communications and Service Culture. The tables below summarize the actual accomplishments of each implementing partner from September to December 2013.

Table 1: IBPAP Accomplishments (September to December 2013)

Activities Accomplishments

1. Mobilization

Set up Office Systems Office systems, accounting systems, MIS and project management systems identified and set up.

Identify resources and equipment HR resources allocated and list of equipment finalized. Procurement Process initiated.

2. Conduct IT-BPM Industry Orientation/Immersion

Identify industry firm and coordinate for immersion, sign NDAs, Conduct immersion

IBPAP made arrangements to do immersion in Accenture-Eastwood, one of the largest BPO operations in non-voice. The immersion took place on 21 November 2013. A total of eight people from AIM and UPOU joined the program. Ten middle managers and staff joined in the discussion/People panel. An orientation workshop of ADB Project partners on IBPAP and SMP was conducted on 10 December 2013.

Provide research materials and courseware

Both AIM and UPOU were given access to GCAT, BEST, AdEPT and the SMP courses. In addition, the IBPAP Roadmap and Next Wave Cities documents were also provided.

3. General Project Management Activities

Liaison/Coordination work and stakeholder management

Liaised w/ ADB, IBPAP internal stakeholders and Industry Associations to brief on project and solicit inputs.

Provide technical, admin and coordination support to UPOU and AIM activities

Conducted regular weekly meetings w/ AIM and UPOU; participated in partners' briefing and workshops. A total of 20 meetings were conducted.

Page 13: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

6 | P a g e

Table 1: IBPAP Accomplishments (September to December 2013)

Activities Accomplishments

Consultation with IT-BPM CEOs, HEIs and Other stakeholders

IBPAP organized a consultation workshop for HEIs, selected government education related agencies, and private sector firms. The consultation was originally scheduled for the 3rd week of December but had to be pushed to the 1st week of January, 2014 because of the holiday season.

Set-up and convene PSC The PS Secretariat was organized and a long list of potential PSC members was identified.

Invite and finalize PSC members A short list of PSC candidates arrived and letters were prepared to invite the members.

4. Conduct of PSC meetings

Administrative and technical preparation for 1

st PSC

Venue selection and reservation, preparation of PSC materials, etc. commenced in December 2013.

5. Set-up and maintain Monitoring and Evaluation (M&E) process

Oversee, coordinate and integrate all inputs and outputs

Framework for the systematic collection of data and integration of inputs/outputs was designed. IT support for this process also defined.

6. Deliverable 1: Define Criteria for Knowledge Hubs

Prepare final draft Prepared the draft Criteria for Knowledge Hubs. 7. Deliverable 2: Inputs to overall strategy and roadmap for enhancing curriculum and instruction in HEIs

Preparation of final Draft Roadmap Scope for developing the overall strategy and roadmap paper finalized. Research phase commenced.

Table 2: AIM Accomplishments (September to December 2013)

Activities Accomplishments

1. Start-up

Project Mobilization Human resource capacity and management systems were organized.

Prepare Inception report and provide inputs to consolidated Inception Report

An overarching plan to achieve the AIM deliverables was agreed upon. The researchers reviewed the TOR and realigned the deliverables, dates, and budget with pragmatic considerations, as well as real needs of the IT-BPM industry. Realignments were based on ongoing discussion and meeting with IBPAP team and a deeper understanding of the context of the IT-BPM industry and IBPAP's talent initiatives.

Participate in immersion and other mobilization activities w/ other implementing partners

AIM researchers participated in activities initiated by IBPAP. Regular meetings and the other activities were crucial in deepening AIM team's knowledge and understanding of the IT-BPM industry. In addition, the activities enabled AIM team to build relationships with other stakeholders and implementing partners.

Table 3: UPOU Accomplishments (September to December 2013)

Activities Accomplishments

1. Start-up

Project Mobilization

Identified Support Staff and formed Project Management Support Team; Briefed the Project Management Support Team and mobilized the UPOU Team of consultants (activities and schedule of deliverables).

Page 14: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

7 | P a g e

Table 3: UPOU Accomplishments (September to December 2013)

Activities Accomplishments

Prepare Inputs for Inception Report Prepared and submitted the Inception report for UPOU. Provide inputs to Consolidated Inception Report

Provided inputs to the consolidated Inception Report.

Undertake immersion in IT-BPM firms Participated in the IBPAP-SMP briefing and Accenture immersion activities organized by IBPAP.

2. Review and enhance IT-BPO industry designed courses

Review of existing SMP courses

Coordinated with IBPAP the collection of existing course materials under the Service Management Program (SMP) and started the review the three courses covered in the project. The review framework was also developed based on the overall objective of the project which is to increase the rate of hiring in the BPO industry from the current rate of 5-7%. The results of the review will be inputs to the course enhancement process.

Review of existing materials

Coordinated with IBPAP for the collection of relevant materials for the enhancement of the current course package. Relevant information through interviews and FGDs were also considered.

Prepare target student profile

Developed the research plan to gather student profile; selected and mobilized research teams; finalized survey instrument based on the information gathered and the initial plan for learner support services provision in consideration of the other deliverables (number of trained students and teachers).

Provide IBPAP/AIM inputs for business model

Participated in the FGDs organized to discuss sustainability and business models.

3. Deliver online courses

Conduct process documentation

Planned how the process documentation as well as other research component of the project will be done (what exactly will be documented; what will be the focus of research).

Submit monthly interim reports Reviewed the ADB's policies on report submission; financial policies; etc.

3.2.2 Quarter 2 Accomplishments (January to March 2014) During this period, several deliverables were completed and progress achieved in each of the three components. The completion of the 1st draft of the AIM Thought paper and the IBPAP criteria for Selecting Knowledge Hubs are two of the key deliverables that provide essential pillars for the development of the Knowledge Hubs (KHs). Both outputs will impact on the achievement of the scale-up mechanism and the final design of the KH business model that will house the IT-BPM courses that are being prepared by UPOU. UPOU completed its Learning Profile Research and have commenced review of the existing IBPAP courseware. AIM on the other hand conducted CEO/stakeholder consultations with at least five different IT-BPM sectors and IBPAP also conducted a workshop-consultation process as part of the process for drafting the Criteria for Locating Knowledge Hubs

From a governance perspective, the 1st Project Steering Committee meeting was successfully organized and held on 30 January 2014. Regular weekly meetings were held to ensure alignment and synchronization of the different activities of each component.

Page 15: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

8 | P a g e

As defined in the workplan, a substantial portion of the activities undertaken in this reporting period continue to support Output 1 specifically in developing the Business Model for operating and sustaining the KHs and in digitizing teacher training materials and study modules that will be incorporated in the KHs.

The tables below summarize the actual accomplishments of each implementing partner from January to March 2014.

Table 1: IBPAP Accomplishments (January to March 2014)

Activities Accomplishments

1. Mobilization

Procure Project equipment 3 laptops procured this quarter

2. Conduct IT-BPM Industry Orientation/Immersion

Identify and request a homegrown IT-BPM company to host an orientation/immersion

Homegrown company identified (Pointwest Technologies Incorporated). Logistics and other arrangements in progress.

Coordinate for participation in IBPAP-HRCC monthly meeting

UPOU and AIM participated in discussions, UPOU able to distribute questionnaires for learners profile survey: UPOU able to discuss with HRCC members and get inputs for defining target student profile.

3. General Project Management Activities

Liaison/Coordination work and stakeholder management

Liaised w/ ADB, IBPAP internal stakeholders, Industry Associations and selected HEIs to brief on project and solicit inputs.

Provide technical, admin and coordination support to UPOU and AIM activities

Weekly management meetings jointly or individually were conducted with AIM and UPOU to discuss activity and deliverable status and issues.

Consultation with IT-BPM CEOs, HEIs and Other stakeholders

IBPAP organized consultation workshop for HEIs, selected government education related agencies, and private sector firms for the Criteria Selection was conducted on January 6th.

4. Conduct of PSC meetings

Set-up and convene PSC The PSC membership was finalized and invited for the 1

st PSC meeting. 1

st PSC meeting held on 30 January

2014 at F1 Hotel in Bonifacio Global City.

5. Set-up and maintain Monitoring and Evaluation (M&E) process

Oversee, coordinate and integrate all inputs and outputs

M&E work commenced. Outputs reflected in the design and monitoring framework that is included in this report.

6. Deliverable 1: Define Criteria for Knowledge Hubs

Prepare final draft Completed the 1st draft ready for submission to ADB

7. Deliverable 2: Inputs to overall strategy and roadmap for enhancing curriculum and instruction in HEIs

Preparation of final Draft Roadmap Started the research and consultations.

Table 2: AIM Accomplishments (January to March 2014)

Activities Accomplishments

1. Deliverable 1: Thought Paper articulating an initial framework and proposition for knowledge hubs for the Philippine IT-BPO industry

Developing the initial framework and propositions will entail reviewing the literature on industry-university partnerships, particularly the case of India, China, and the Philippines

Review of literature was concluded and integrated into the thought paper. Among the cases included was the example of the Leaders for Global Operations (LGO), a partnership between the Massachusetts Institute of Technology (MIT) School of Engineering and the

Page 16: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

9 | P a g e

Table 2: AIM Accomplishments (January to March 2014)

Activities Accomplishments

Sloan School of Management and American multinational companies. Examples of industry-academe partnerships for up-scaling talent in IT-BPM Association were also cited. Finally, a case study of call center and HEI partnerships in the Philippines was provided.

IBPAP lead education experts will be interviewed to gain an understanding of how the current partnerships operate

Partially accomplished. Discussions on IBPAP's past experiences with university partnerships have been initiated.

All documents and articles comprising the literature review will be analyzed in order to develop an initial framework for the knowledge hubs

Completed.

Integrate inputs from IBPAP and UPOU An extensive second revision was completed on the basis of lengthy comments by IBPAP and UPOU.

Revise the thought paper Completed.

Submit Final Draft Started the revision.

2. Deliverable 2: Case stories/studies represented by each IT-BPO sub-sector and final framework of knowledge hubs prepared

Benchmark Study: The output for this part will be case stories/studies represented by each IT-BPO sub -sector and a final framework of knowledge hubs based on interviews and archival data

A draft case study for the Gaming Industry has been completed. Data gathering is complete for Software Industry. Data gathering for the Call Center industry is next to begin. A Draft Framework for the Knowledge Hub has already been proposed/included within the Thought Paper.

Developing the final framework and propositions will entail conducting interviews with CEOs eliciting their insights and suggestions

Seven interviews have taken place. Site visits have also taken place.

In addition, interviews with HR managers and executives will also be conducted to elicit their insights and suggestions

Started.

The interviews will be analyzed and synthesized into case stories/studies

Started.

All interviews and archival data will be analyzed and synthesized in order to develop a final framework for the knowledge hubs

Interviews, data gathering, site visits to IT-BPM offices as well as training institutions have started and will serve to further refine the framework for the Knowledge Hubs that have already been described at length in the Thought Paper.

Submit Final Draft Started the revision.

3. Deliverable 3. Host CEO Conference: Discussion with IT-BPO CEOs on the initial framework of knowledge hubs, and gaining commitment and support on creating and sustaining the knowledge hubs, as well as refining the framework and propositions based on CEO input

CEO Conference: Discussion with IT-BPO CEOs on the initial framework of knowledge hubs, and gaining commitment and support on creating and sustaining the knowledge hubs, as well as refining the framework and propositions based on CEO input

The CEO Conference was redefined with the agreement of IBPAP and UPOU in order to maximize the potential results from the conference. In order to maximize the inputs from the CEO's, the conference was deferred to a later time which will allow better questions and better prepare the format.

Constant and regular consultation with industry based education experts on the development of knowledge hubs framework and the identified university partners

Consultations have started - during interviews with industry experts and aspects of industry need have partially been clarified through interviews.

Page 17: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

10 | P a g e

Table 3: UPOU Accomplishments (January to March 2014)

Activities Accomplishments

1. Review and enhance IT-BPO industry designed courses

Review of existing courses

The review of the existing SMP course materials on going and research/gathering of other relevant materials that will be useful I revising/enhancing the courses have started. A draft workplan on how to go about enhancing the existing course materials has been prepared.

Prepare target student profile

A survey research was conducted to determine the profile of the possible learners of the BPM courses being prepared. The survey was done online and offline. The online survey used google doc, the link for which was posted in the UPOU FB page. In the online survey, the purpose was to get respondents who will represent the following sectors/groups: undergraduate students who may be looking for a job while studying or after graduation; career switchers; and OFWs. The offline survey was done in selected HEI's in areas identified as NWCs. Write-up is submitted as part of this report for the results.

Finalize modular course outlines with learning objectives

Initial drafts of course outlines were prepared for the two courses: BPM101 and Business Communication during the writeshop held on 6-7 March 2014 in Tagaytay City. The multimedia materials to be integrated as lessons and assessment were also identified for discussion with the multimedia consultant.

Participate in immersion activities organized by IBPAP to gather more information/relevant enhancements of the course materials

Participated in weekly meetings and discussion. Attended the HRCC and the IBPAP consultation workshop for defining the Criteria for Knowledge Hubs.

2. Implement a program accreditation system

Mobilize HEIs

A preliminary list of HEIs was prepared for the purpose. Further discussion with the Project Team (IBPAP and AIM) will have to be done to come up with the final list of HEIs.

Review existing accrediting system

An initial thought/concept paper was developed for this for presentation to the rest of the Project Team members. Presentation, consultation and discussion is scheduled for next quarter.

3. Develop online learning modules and study guides

Finalize course module development plan Drafted the course module development plan for BPM101 and Business Communication.

Conduct research on content (cases)

Research on content for the courses BPM101 and Business Communication done. The research on content was matched with the observations and interviews/information gathered during immersion and project team meetings as well as the skills/competencies being considered when hiring. Assessment mechanisms (both formative and summative) were also initially planned as well as the accompanying multimedia materials.

Develop course materials (including learning activities) for 1st 3 courses

Started conceptualizing learning activities for BPM101 and Business Communication.

Design assessment tools Started conceptualizing assessment tools/mechanism for BPM101 and Business Communication.

Produce multimedia materials (i.e., video, animation, graphics, etc.)

Started conceptualizing the multimedia materials which will be included in BPM101 and Business Communication.

Page 18: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

11 | P a g e

Table 3: UPOU Accomplishments (January to March 2014)

Activities Accomplishments

Review course materials (instructional design, language editing, content review)

Reviewed the course materials for BPM101 and Business Communication from the instructional design perspective; content vis-à-vis the planned assessment mechanism.

Revise course materials as per review Started revising BPM101 and Business Communication course materials.

4. Deliver online courses

Conduct process documentation Discussions have started to define the scope of documentation.

Submission of Interim reports Progress reports submitted to IBPAP; and for PSC meeting.

3.2.3 Quarter 3 Accomplishments (April to June 2014) In this quarter, AIM prepared a revised Thought Paper and continues to develop the case

studies. UPOU commenced development of courseware for Business Communications

(BusCom) and BPM 101. UPOU launched eSMP on 19 June 2014. Part of the launching

ceremony was a press conference announcing the availability of the program. The

launching ceremony was followed by enlistment for the two courses. UPOU took

advantage of the opportunity brought about by the change in academic calendar

schedules to advance the timeline for launching eSMP. Consequently, a substantial

portion of the activities undertaken in this reporting period supported Output 2 specifically

in digitizing teacher training materials and study modules for BusCom and BPM 101. The

eSMP course site can be accessed at http://www.upoumodel.com/.

IBPAP lead the immersion of the project teams to a home grown company, identified and

prepared IT-BPM industry senior managers who served as technical resources in

delivering the course modules for the e-learning materials. IBPAP also continued to

develop the draft Roadmap for enhancing curricula and instruction in HEIs. During this

period, time was also spent to review and evaluate the framework for developing the

knowledge hubs. Time was also spent to draft the proposals for identified activities that will

add value to the existing scope of the project.

From a governance perspective, preparations were undertaken for the 2nd Project Steering

Committee meeting that was originally scheduled for May 2014. However, the 2nd PSC

meeting was postponed for July to accommodate the PS members’ schedules. The project partners utilized this time instead to get feedback and inputs from the PSC

members who were present. Regular weekly meetings were held to ensure alignment and

synchronization of the different activities of each component.

At the output level, activities leading to outputs 1 and 3 are on schedule with the exception of the preparation of the Business Model and the establishment of the knowledge hubs which are slightly delayed. Activities for Output 2 which covers the design and delivery of eSMP, however, are slightly ahead of schedule with two courses – Business Communications and BMP 101 ready for delivery in the next quarter.

Page 19: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

12 | P a g e

The tables below summarize the actual accomplishments of each implementing partner from April to June 2014.

Table 1: IBPAP Accomplishments (April to June 2014)

Activities Accomplishments

1. Conduct IT-BPM Industry Orientation/Immersion Identify and request a homegrown IT-BPM company to host an orientation/immersion

Orientation design, admin and logistical arrangements completed.

Conduct Immersion Immersion of UPOU and AIM consultants in homegrown company (Pointwest) conducted on 30 April 2014.

2. General project Management Activities

Courseware development inputs and QA for Courses 1(BusCom) and 2(BPM 101)

15 Industry resource persons identified; assisted in the setup, coordinated and facilitated the video shoots for BusCom and BPM 101. At least 4 shoot sessions conducted this quarter.

Provide technical, admin and coordination support to UPOU and AIM activities

At least 14 weekly management meetings jointly or individually were held with AIM and UPOU to discuss activity and deliverable status and issues;

Set-up and convene PSC

Coordinated with ADB/DOF and PSC members and participants. Date and agenda were finalized. Coordinated with ADB for venue and logistics. Briefing kits and materials prepared.

3. Conduct of PSC meetings

Administrative and technical preparation for 2

nd PSC

2nd

PSC meeting to be held on 21 July 2014 at ADB. All PSC members are anticipated to attend the meeting.

4. Set-up and maintain Monitoring and Evaluation (M&E) process

Oversee, coordinate and integrate all inputs and outputs

M&E work commenced. Outputs reflected in the design and monitoring framework that is included in this report.

5. Deliverable 2: Inputs to overall strategy and roadmap for enhancing curriculum and instruction in HEIs

Development of the Outline and data gathering Draft outline prepared; data gathering/research almost completed., one or two more consultation sessions with HEIs and Industry firms to be scheduled.

Table 2: AIM Accomplishments (April to June 2014)

Activities Accomplishments

1. Deliverable 1: Thought Paper articulating an initial framework and proposition for knowledge hubs for the Philippine IT-BPO industry

Revise the thought paper Completed the Thought Paper.

2. Deliverable 2: Case stories/studies represented by each IT-BPO sub-sector and final framework of knowledge hubs prepared

Prepare for interviews with CEOs, HR managers, university leaders, and university partnership director

Interviewed Mirshariff Tillah of PBed (April 7), Love Basillote of PBed (April 14), Jaideep Anil Pradhan of EXL on (May 22), Dan Reyes of GENPACT on (May 29), Jovy Hernandez of PLDT Alpha on (June 9), and Cynthia Maslian of GENPACT on (June 17). Additional interviews for academe respondents in the process of schedule finalizing

Conduct the interviews Started the interviews.

Analyze the interviews Analysis and synthesis of interviews have started.

Develop the case studies/stories per sub-sector or per company

Development of cases has started.

3. Deliverable 4. Establishing at least 3 industry-university Knowledge Hubs

Discussions and negotiations with identified potential university partners will be undertaken

Identified potential university partners which will discuss/review with IBPAP and UPOU in the next quarter.

Page 20: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

13 | P a g e

Table 3: UPOU Accomplishments (April to June 2014)

Activities Accomplishments

1. Review and enhance IT-BPO industry designed courses

Review of existing materials

Review and evaluation of BusCom and BPM 101 completed in early April 2014. This activity was originally scheduled to be completed in the 1

st quarter of the year.

Additional time was required for the review because of the scope of the curriculum.

Provide IBPAP and AIM inputs for Business Model/University-Industry Linkages and twinning arrangement framework

Participated in weekly meetings and workshop for discussing the frameworks for the business model, the linkages and twinning arrangements and certification and accreditation process.

Participate in immersion activities organized by IBPAP to gather more information relevant to the enhancement of the course materials

Participated in the immersion to Pointwest at the Ayala TechnoHub in Quezon City on 30 April 2014.

Participate in the ADB Inception Mission for the project

Participated in all meetings during the mission proper held on 2, 3 and 9 June 2014.

2. Implement a program accreditation system

Mobilize HEIs Data gathering has started. Discussions with project consultants have been initiated and will continue in the next quarter.

Review existing accrediting system Accrediting system development has started.

3. Develop online learning modules and study guides

Finalize course module development plan Drafted the course module development plan and multimedia development plan for BPM101 and Business Communication.

Deploy Course Module Development Plan Deployed for BPM101 and Business Communication

Conduct research on content Initial gathering of reference materials and cases undertaken.

Develop course materials (including learning activities) for 1st 3 courses

Conversion of IBPAP materials to e-learning materials completed for BusCom and BPM 101.

Design assessment tools Completed for BPM101 and Business Communication.

Produce multimedia materials (i.e., video, animation, graphics, etc.)

Production completed for BPM101 and Business Communication.

Review course materials (instructional design, language editing, content review)

Writeshops conducted to review course materials for BusCom and BPM 101.

Revise course materials as per review 1st phase of the revisions for BusCom and BPM

101 done Complete Online Materials 1

st 2 courses

(including study guides/e-tutors training) Completed for BusCom and BPM 101

4. Deliver online courses

Design learner support system Design of initial Learner Support System framework for BusCom and BPM 101 prepared

Set up and maintain Learning Management System

Learner Support System for BusCom and BPM 101 set and deployed as http://www.upoumodel.com/.

Training of Tutors for BusCom and BPM 101 Training conducted for 2 Industry tutors for BusCom and BPM 101.

Run Online Course as MOOCs (BusCom and BPM 101)

eSMP was launched on 19 June 2014. Enlistment commenced on that date. There were about 1,000 people who have responded and expressed interest to enroll. Classes for these two subjects are scheduled to start on 26 July 2014. The eSMP site is located at http://www.upoumodel.com/.

Conduct process documentation Started.

Submission of interim reports Progress reports submitted to IBPAP; and for PSC meeting.

Page 21: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

14 | P a g e

3.2.4 Quarter 4 Accomplishments (July to September 2014) During this period, the activities primarily focused on the launching of the first two eSMP

courses UPOU commenced offering of Business Communications (BusCom) and BPM

101 on July 26,2014. A total of 390 enrolled in BPM 101 and 425 enrolled in BusCom.

The pilot run for both course was planned for eight weeks.

IBPAP continued to develop the draft Roadmap for enhancing curricula and instruction in

HEIs. Significant time was also devoted to review and evaluate the framework for

developing the knowledge hubs. Internal and external stakeholder consultations were

undertaken. In addition, three draft proposals for the use of the additional ADB TA funds

were prepared by the IBPAP for new project activities which the consultants believed

could add greater value to the overall project impact and which were within the existing

project scope. These draft proposals will be presented to the PSC and the ADB during

PSC meeting next quarter.

From a governance perspective, two PSC meetings were held this quarter. The 2nd PSC

originally scheduled in June, 2014 was held on July 21, 2014. At that meeting, substantial

discussions on the Knowledge Hub Framework and the draft proposals for additional

project funding took place. The 3rd PSC meeting was held on August 29, 2014. At that

meeting there was a follow up discussion on the Knowledge Hub with an agreement to

have another meeting with AIM specifically to thresh out details and finalize the Business

Model. The implementing partners also briefed the PSC on the activities during the last

uarter. Regular implementing partners’ meetings were held to ensure alignment and

synchronization of the different activities of each component.

At the output level, activities leading to Outputs 1 and 2 are on schedule with the exception of the preparation of the Business Model and the establishment of the knowledge hubs that are slightly delayed. Activities leading to Output 3 have been deliberately delayed by a quarter pending the results of the Business Model and the pilot run of the eSMP. The tables below summarize the actual accomplishments of each implementing partner from July to September 2014.

Table 1: IBPAP Accomplishments (July to September 2014)

Activities Accomplishments

1. Conduct IT-BPM Industry Orientation/Immersion

Convene the Industry Council to review e-courseware of BusCom and BPM 101

Structure, process and scope of review have started.

2. General Project Management Activities

Consultation with IT-BPM CEOs, HEIs and Other stakeholders

At least three internal/external consultations supported and and/or conducted.

Courseware development inputs and QA for Courses 1(BusCom) and 2(BPM 101)

Fifteen industry resource persons were identified; assisted in the setting up, coordinated and facilitated the video shoots for BusCom and BPM 101. At least 4 shoot sessions conducted this quarter. An initial review by the IBPAP Internal Quality Assurance team was conducted for BPM 101 and half of BusCom.

Page 22: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

15 | P a g e

Table 1: IBPAP Accomplishments (July to September 2014)

Activities Accomplishments

The results of the review were very positive. The addition of the interviews with industry practitioners that were done through video shoots enhanced the technical content of the courseware. It addressed some of the existing courseware weaknesses.

Courseware development inputs for Course 3 (Service Culture)

Five industry resource persons identified; industry firms defined. Video shoot schedule was delayed for the first quarter (Q1) of 2015 together with the two other courses to achieve greater efficiency in production.

Provide technical, admin and coordination support to UPOU and AIM activities

At least 14 weekly management meetings jointly or individually were held with AIM and UPOU to discuss activity and deliverable status and issues.

Set-up and convene PSC

Coordinated with ADB/DOF and PSC members and participants. Date and agenda was finalized. Coordinated with ADB for venue and logistics. Briefing kits and materials were prepared.

3. Conduct of PSC meetings

Administrative and technical preparation for the 2

nd and 3

rd PSC meeting

2nd

and 3rd

PSC meeting was held on 21 July 2014 and 29 August 2014 respectively at the ADB.

4. Set-up and maintain Monitoring and Evaluation (M&E) process

Oversee, coordinate and integrate all inputs and outputs

M&E work commenced. Outputs reflected in the design and monitoring framework that is included in this report.

Prepare Consolidated Quarterly Progress Report

Q3 Progress report has been submitted to ADB.

Prepare draft concept paper for the use of the additional ADB funds

Three concept papers were drafted and submitted to PSC, DOF and ADB.

5. Deliverable 2: Inputs to overall strategy and roadmap for enhancing curriculum and instruction in HEIs

Development of the Outline and data gathering

Draft of the Roadmap has been finalized to include a proposed alternative KH Model .

Table 2: AIM Accomplishments (July to September 2014)

Activities Accomplishments

1. Deliverable 1: Strategic Policy Note: Thought Paper articulating an initial framework and proposition for knowledge hubs for the Philippine IT-BPM

Revise the thought paper Completed.

2. Deliverable 2: Case Studies/stories represented by each IT-BPO sub-sector and a final framework of knowledge hubs based on interviews and archival data

Conduct the interviews Completed.

Analyze the interviews Completed.

Develop the case studies/stories per sub-sector or per company

Started the development.

Develop the final framework of knowledge hubs based on interviews and case studies

Knowledge hub final framework has been drafted based on IBPAP requirements and guidelines to fit IBPAP needs but the draft is not yet presented to PSC, IBPAP and UPOU.

Table 3: UPOU Accomplishments (July to September 2014)

Activities Accomplishments

1. Review and Enhance IT-BPM Industry-designed courses

Review course materials (instructional design, language editing, content review)

Started.

Revise course materials as per review Started.

Complete Online Materials 1st 2 courses (including study guides/e-tutors training)

Materials are being reviewed and finalized.

Page 23: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

16 | P a g e

Table 3: UPOU Accomplishments (July to September 2014)

Activities Accomplishments

2. Deliver online courses

Set up and Maintain Learning Management System

Preparation of the LMS to include the various plug-ins as specified by the course faculty like YouTube anywhere to make possible students recording themselves when taking exams, uploading the answers to the exam questions to YouTube and setting it to private so that only the professors can see the material for marking purposes. A guide on this was developed including a practice session. A guide was also developed on the use of google hang out. Another tool, academics, was also integrated into the course site to facilitate learners to connect with one another, form study groups and learn through social interaction.

Offer/Run BusCom and BPM 101 as MOOCs

The two courses were initially offered: BPM101 and Business Communication. 2. Each of the 2 courses were divided into 2 parts: (Parts 1 and 2) with each component/part to be offered for 8 weeks).

Conduct evaluation/research on project model

Started.

Conduct process documentation Started.

Submission of Interim reports Progress reports submitted to IBPAP; and for PSC meeting.

3.2.5 Quarter 5 Accomplishments (October to December 2014) During this relatively short period, the activities primarily focused on completing the pilot run of the two eSMP courses - Business Communications (BusCom) and BPM 101- that were offered on 26 July 2014, reviewing these two courseware based on the delivery results, completing the KH Business Model and roadmap. Significant time was also devoted to review and evaluate the framework for developing the knowledge hubs. Extensive internal and external stakeholder consultations were undertaken. IBPAP developed the draft Roadmap for enhancing curricula and instruction in HEIs. From a governance perspective, the fourth PSC meeting was held on 11 December 2014. At that meeting, discussions focused on the Knowledge Hub Framework and Model and the results of the pilot run of the eSMP courses. The implementing partners briefed the PSC on the activities and challenges during the last quarter. Regular implementing partners’ meetings were also held to ensure alignment and synchronization of the different activities of each component. At the output level, activities leading to Outputs 1 and 2 are on schedule with the exception of the establishment of the KH which is delayed by two quarters. The project undertook preliminary activities leading to Output 3. The succeeding tables summarize the actual accomplishments of each implementing partner from October to December 2014.

Page 24: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

17 | P a g e

Table 1: IBPAP Accomplishments (October to December 2014)

Activities Accomplishments

1. Conduct IT-BPM Industry Orientation/Immersion

Prepare 3 Project Proposals for the use of the ADB TA additional funds

Proposals for i) finalizing the design of the KH and piloting on KH, ii) development and implementation of the MIS and Project Portal, and iii) design and development of 3 eSMP courses (Service culture, Systems thinking and Internship) were prepared and presented to the PSC . Copies of proposals are attached in Annexes 5 – 7.

Secure approvals for proposal

UPOU and IBPAP Project teams met with DOF to discuss proposal details after which the DOF endorsed the proposals to ADB for approval. The DOF endorsement to ADB is attached as Annex 8.

Consultations with IT-BPM CEOs, HEIs and other stakeholders

Internal and external consultations for the establishment of the KH conducted this quarter. Preparations for HEI and HRCC consultation for next quarter commenced this quarter.

Courseware development inputs and QA – Course BusCom, BPM 101

IBPAP internal QA team continue to do QA work on the 2 courses (BusCom and BPM 101).

2. Conduct of PSC meetings

Convene 4th PSC Meeting PSC meeting held on Dec 11, 2014

Administrative and technical preparation: 4th PSC meeting

Administrative and logistics for PSC meeting requirement of the different PSC members done .

3. Set-up and maintain Monitoring and Evaluation (M&E) process

Prepare Consolidated Quarterly Progress Report

Draft Quarterly Progress report for July-Sept 2014 has started.

Submit Jul-Sep 2014 Quarterly Progress Report and Workplan

Submission of Draft quarterly progress report was scheduled in January 2015 pending submission of Quarterly accomplishment report of UPOU.

4. Deliverable 2: Inputs to overall strategy and roadmap for enhancing curriculum and instruction in HEIs

Develop and finalize framework and Business Model for KH

IBPAP developed and finalized framework and business model for KH.

Preparation of draft roadmap Draft completed in November.

Submit Draft Roadmap Deliverable 2: Framework and Business Model for KH was submitted by IBPAP in November.

Table 2: AIM Accomplishments (October to December 2014)

Activities Accomplishments

1. Deliverable 1: Strategic Policy Note: Thought Paper articulating an initial framework and proposition for knowledge hubs for the Philippine IT-BPM

Conduct workshop with PSC members 1 workshop conducted at AIM.

2. Deliverable 2: Case Studies/stories represented by each IT-BPO sub-sector and a final framework of knowledge hubs based on interviews and archival data

Develop the case studies/stories per sub-sector or per company

1st draft of 6 ITBPM stakeholders submitted (Annex 9)

Note: Contract of AIM with ADB ended in September 2014 but deliverables have not been completed.

Table 3: UPOU Accomplishments (October to December 2014)

Activities Accomplishments

1. Implement a Program accreditation system Mobilize HEIs Preparations to mobilize HEIs undertaken

Page 25: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

18 | P a g e

Table 3: UPOU Accomplishments (October to December 2014)

Activities Accomplishments

Design appropriate accreditation system Started.

Finalize Accreditation System Started.

2. Develop online modules and study guides

Review course materials (instructional design, language editing, content review)

Started.

Complete Online Materials 1st 2 courses (including study guides/e-tutors training

Online Materials for BusCom and BPM 101 completed. eTutor concept being revisited due to sustainability and cost issues

3. Deliver online courses

Set up and maintain Learning Management system

Started.

Complete Part 2 of BusCom Completed.

Offer BusCom Part 2 and BPM 101 Part 2 Completed for the pilot batch.

Accredit/Certify those who will complete the BusCom and BPM 101

11 students certified this quarter

Conduct evaluation/research on pilot run and recalibrate to ensure higher enrollment and completion rates

Started.

Planning for the Training of Tutors/Training of Tutors

The mechanics for eTutors being reviewed. Draft TORs prepared.

Conduct Process Documentation Started.

3.2.6 Quarter 5 and 6 Accomplishments (January to June 2015) The key deliverables during this period were the submission of the 3 major reports and the enhancement and completion of BPM 101 and Business Communication courses. Since the contract of AIM and ADB ended in September 2014, IBPAP assumed the remaining responsibilities of AIM. The eSMP was also disseminated through the Community eCenters and public library, which is outside the ADB project scope. This will help address learners’ issues such as connectivity and completion rate as this are local facilities available for community enrichment. Accomplishments also include the completion of stakeholder analysis and consultation both on the industry and the academe counterparts. As UPOU builds the network in the supply side, IBPAP took charge on building the demand side organizing an Industry-Academe forum through its Human Resource Coordinating Council (HRCC) that provided UPOU a stage to bridge the raw talent resource that is available to the Industry that will require their involvement and participation which they- the industry HR representatives positively responded to. The succeeding tables summarize the actual accomplishments of each implementing partner from January to June 2015.

Table 1: IBPAP Accomplishments (January to June 2015)

Activities Accomplishments

1. Conduct IT-BPM Industry Orientation/Immersion Consultations with IT-BPM CEOs, HEIs and other stakeholders

Completed the Stakeholder Analysis and consultations both on IT-BPM Industry and Academe counterparts.

HEI Briefing Organized and conducted HEI briefing

Page 26: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

19 | P a g e

Table 1: IBPAP Accomplishments (January to June 2015)

Activities Accomplishments

Four (4) IT-BPM Industry-Academe Sessions

Completed in Manila, Cebu, Laguna, and Clark

2. Deliverable 2: Inputs to overall strategy and roadmap for enhancing curriculum and instruction in HEIs

Completion of the report Submitted the report to ADB .

3. Deliverable 3: Models and best practices for university-industry linkages

Completion of the report Submitted the report to ADB .

4. Deliverable 4: List of HEIs and international/regional institutions for twinning arrangements

Completion of the report Submitted the report to ADB.

2. Conduct of PSC meetings

Convene 5th PSC Meeting PSC meeting held on July 2, 2015

Table 2: UPOU Accomplishments (January to June 2015)

Activities Accomplishments

1. Implement a Program accreditation system Mobilize HEIs Preparations to mobilize HEIs undertaken

Design appropriate accreditation system Started.

Finalize Accreditation System Started.

2. Develop online modules and study guides

Review course materials (instructional design, language editing, content review)

BPM 101 and BusCom. SerCul enhancement has started.

Complete Online Materials 1st 2 courses (including study guides/e-tutors training

Online Materials for BusCom and BPM 101 completed. Repository of these materials has started.

Course Awareness eSMP was disseminated though Community eCenters and public library.

Marketing e-SMP Ad was released via UPOU website

3. Deliver online courses

Set up and maintain Learning Management system

Started.

Offer BusCom and BPM 101 BPM 101 and BusCom pilot completed.

Accredit/Certify those who will complete the BusCom and BPM 101

Started.

Conduct evaluation/research on pilot run and recalibrate to ensure higher enrollment and completion rates

Started.

Planning for the Training of Tutors/Training of Tutors

Developed the Teachers Module

3.2.7 Quarter 7 and 8 Accomplishments (July to December 2015) During this period, the deliverable originally assigned to AIM which IBPAP took was completed and submitted to ADB - Deliverable 5: KH Business Case & Financial Model which was a deep dive of Deliverable 2. Another key progress of the project was the exploratory work done with BPOCareerHub (owned by Teledev) on designing frames that will fill the content of a career hub website that presents the platform for the recruitment side of the Hub. Additional deliverables were given to UPOU – enhancement of the remaining 2 courses of SMP, Systems Thinking and BPM 102. Other courses such as BPPM 101 and BusCom, were offered on-line. A total of 53 teachers and 1,310 students were trained. The

Page 27: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

20 | P a g e

enhancement of Service Culture was almost complete. In addition, the report on the profiles of the Target Learners was submitted. It was also during this period that the project was almost complete as all minor activities were completed. See table below for the summary of accomplishment and remaining deliverables.

Summary of Accomplishment as of December 2015

Partner Deliverable Status Completion

UPOU

eSMP (3 courses: IT-BPM 101, Business Communication, Service Cullture)

IT-BPM 101 and Business Communication piloted and delivered, Service Culture under enhancement.

80%

eSMP (2 courses: Systems Thinking and BPM 102)

Systems Thinking and IT-BPM 102 under production.

50%

Certification and Assessment Framework

Certification and Assessment Framework drafted.

60%

IBPAP

Overall Project Management Reporting and Monitoring 80%

QA of Project Outputs QA for AIM and UP Outputs

80%

Deliverable 1: Criteria Submitted 100% Deliverable 2: Roadmap Submitted 100% Deliverable 3: Model and Best Practices

Submitted 100%

Deliverable 4: Twinning Design Submitted 100% Deliverable 5: Knowledge Hub Business Plan

Submitted 100%

Deployment of Pilot Hub Design and sustainability model drafted

80%

3.2.8 Quarter 9, 10, and 11 Accomplishments (January to September 2016) This period covered the completion of all pending deliverables and closing of the project. Integration of the KH organizational activities with the CHED Project closing to create continuity was done. Physical and on-line hubs were also completed. The on-line hub, which is currently live, included the MIS for the project. Several Industry-Academe partnerships were also finalized where HEIs will be tied with an Industry Partner and will actually deploy the eSMP courses. All the materials for the 5 courses of SMP were completed as well.

Summary of Accomplishment as of September 2016

Partner Deliverable Status Completion

UPOU

eSMP (3 courses: IT-BPM 101, Business Communication, Service Cullture)

IT-BPM 101 and Business Communication piloted and delivered, Service Culture enhanced.

100%

eSMP (2 courses: Systems Thinking and BPM 102)

Systems Thinking and IT-BPM 102 completed.

100%

Certification and Assessment Framework

Certification and Assessment Framework presented to HEIs.

100%

Page 28: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

21 | P a g e

Summary of Accomplishment as of September 2016

Partner Deliverable Status Completion

IBPAP

Overall Project Management Reporting and Monitoring 100%

QA of Project Outputs QA for AIM and UP Outputs

100%

Deliverable 1: Criteria Submitted 100% Deliverable 2: Roadmap Submitted 100% Deliverable 3: Model and Best Practices

Submitted 100%

Deliverable 4: Twinning Design Submitted 100% Deliverable 5: Knowledge Hub Business Plan

Submitted 100%

Deployment of Pilot Hub Completed 100%

3.3 Changes Made During Implementation In September 2014, the contract between AIM and ADB ended but not all deliverables were completed. The concept for the Knowledge Hubs and draft framework for developing the business model originally assigned to AIM was not completed. To address this, IBPAP made available project resource time for completing the KH components and exploring other strategies for the hubs (Deliverable 5 of IBPAP). Given this significant delay in finalizing the KH Model deliverable, it meant that there will be no time to refine and finalize the model, or to discuss and provide much needed technical inputs during the identification and deployment of the hubs or in forming the twinning arrangements. But IBPAP found other internal/external resources to help finalize the model and begin to deploy it given its limited technical expertise in this area and its budgetary constraint. There were also three (3) Contract Variations made during the implementation (See Annex 10-a, 10-b, and 10-c). Summary of Variations: 1. Variation No. 1 dated December 2, 2015

engaged the following new experts to render the tasks in the Terms of Reference;

Name Position Remuneration Rate Engagement Dates

Florentino Destajo Dulce MIS Officer Php75,000.00 17 Jun 2015 – 30 Sept 2015

Camille Rivera Basa Sr. Marketing Manager Php80,000.00 17 Jun 2015 – 30 Jun 2015

increased out-of-pocket expenses as needed in the project; changed the bank details in Clause 7(f) as follows:

For PHP Account Number : 0061-0543-16 Account Name : IT & Business Process Association of the Philippines, Inc Bank Name : Bank of the Philippine Islands Bank Address : G/F unit 1086 Glorietta Mall, Ayala Center, Makati City, Philippines

Page 29: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

22 | P a g e

Swift BIC/BEI : BOPIPHMM

extended the contract completion date from 21 November 2015 to 30 September 2016; and

increased the maximum amount contract payment by US$37,686 from US$127,313 to US$165,000 per revised Appendix C marked Variation No. 1 (2015-1222)

2. Variation No. 2 dated December 2, 2015

replaced Florexie F. Molina-Neo with Florentino Destajo Dulce, the current MIS Officer, for the Industry Education Association position at the same monthly remuneration rate of Mr. Dulce as MIS Officer;

engaged Ryan Hansen-Reeder as National Writer at a monthly remuneration rate of Php.44,500 to render the tasks in the Terms of Reference;

increased staff inputs to render the tasks in the Terms of Reference; increased the maximum contract payment by US$45,000 from US$165,000 to

US$210,000 per revised Appendix C marked Variation No. 2 (2015-2146).

3. Variation No. 3 dated August 31, 2016 changed the authorized representative of the firm from Ronald Arambulo to Benedict

Hernandez; replaced the Industry Education Specialist with Ana Maria Bongato, the current Lead

Expert on Industry Design Education at the same monthly remuneration rate of Ms. Bongato as Lead Expert on Industry Design Education;

engaged the following replacement National Experts from 01 August 2016 to 30 September 2016:

Name Position Remuneration Rate Jopat M. Lelay Industry Education Association Php75,000.00 Marizel A. Galapon Project Support Staff Php58,193.00

varied the contract per revised Cost Estimates marked Variation Order No. 3 (2016-

1711).

IV. EVALUATION OF OUTPUTS AND ACHIEVEMENT OF OUTCOME

4.1 Evaluation of Outputs

Output 1: Access to knowledge resources for teaching and learning IT-BPM Courses increased Creating the materials and digitizing the 5 eSMP courses were completed: BPM 101 BPM 102 Business Communication Service Culture Systems Thinking

Page 30: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

23 | P a g e

Business Communication and BPM 101 were offered on-line but the remaining 3 eSMP courses were not because of the pending process of certifying the participants electronically. The UPOU Networks which is the on-line resource repository hub has been redesigned to accommodate the materials for the 5 eSMP courses. With this, both teachers and students who are interested in teaching or learning the IT-BPM Industry- based courses may access the program thru the UPOU repository hub. To create an institutional framework for continuously designing, testing and rolling out talent programs such as the eSMP courses, make available to various stakeholders industry information or data including employment opportunities and research results, and development and dramatically align the higher education curriculum with both international standards and labor demand, a study on the Knowledge Hub (KH) business case and financial model was prepared and submitted to ADB (Deliverable 2 and 5 of IBPAP). The KH seeks to support improvement in the alignment of higher education with the needs of the IT-BPM industry. It will have a central role to play specifically in driving the continuous process for generating and sustaining talent development programs and courses. The first KH was developed and can now be accessed on-line thru the SMP website (http://servicemanagementprogram.ph). Following this, the physical hub was placed at the IBPAP office, Bonifacio Global City, Taguig. In general, Output 1 was accomplished successfully. Output 2: Higher Education Curricula and Instruction enhanced The framework/mechanism of the Accreditation system for the IT-BPM courses in HEIs/SUCs was developed and presented to the schools. It was then revised in coordination with some partner HEIs who are willing to try different models that UPOU has developed with the program.

As of January 2016, UPOU has conducted both face to face and on-line models where 53 teachers from 25 schools were trained and 1,310 students were able to complete the program. For the teachers’ certification, the module on Blended Teaching was conducted. It was a face to face training and allowed them to learn how to use the materials and teach the course and assess the learners. Currently, there are still several teachers and students taking the courses on-line and the numbers will be presented in a separate report. Taking everything into account, Output 2 was successfully achieved. Output 3: Partnership between Industry and Academic Institutions strengthened One of the key components identified under the TA to improve higher education curricula specifically for the IT-BPM sector is to build and support stronger industry-academe linkages so that the academe can better contribute to addressing the IT-BPM talent supply gap.

Page 31: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

24 | P a g e

To help achieve this output successfully, a partnership framework was developed which was specified in Deliverable 3 of IBPAP.

Many efforts in Industry-Academe partnerships in the Philippines have been initiated by both state and private universities. Majority of the partnerships were created primarily to secure training and employment for students and graduates, to increase the responsiveness of the schools’ curricular offerings to industry needs and to secure physical resources or technology

Several MOAs have been signed between the IT-BPM companies and the schools and some are still in review and in progress. Output 3 was successfully accomplished as well except for the twinning arrangement. On-going discussions relating to this are still in progress and schedule of actual deployment of this deliverable has not yet been determined.

4.2 Reports and Deliverables of IBPAP

A. IBPAP submitted the following Reports:

i. An Inception Report The purpose of Inception Report was to set out a clear strategy and way forward for the implementation of the TA and to specify various implementation activities, timeframes and outputs of specific tasks for the project. This inception report outlined: the approach and methodology, an organizational chart, consultant’s schedules, budgets, and the Terms of Reference (TOR) for the three implementing partners (Submitted by IBPAP to ADB on November 15, 2013).

i. Quarterly Reports

Quarterly reports were submitted to ADB on a regular basis. This reports allowed ADB to be updated on the status and progress of the project every quarter.

ii. A Summary Report of each Deliverable Summary Reports of each deliverable were already included in the actual Deliverables (See details below on each Deliverable)

iii. A Draft Completion Report This whole report serves as the draft completion report.

B. IBPAP completed the following Deliverables:

i. Deliverable 1: Criteria for locating knowledge hubs and selecting beneficiary HEIs/SUCs (Annex 11). From a project perspective, this study follows on from the AIM Thought Paper on the Knowledge Hubs. It will serve as an input for the preparation of the overall strategy and roadmap for enhancing curricula and instructions in HEIs/SUCs designed to meet the labor supply needs of the IT-BPM industry and other follow on studies intended to improving the quality of services and achieving closer university linkages, for example. It

Page 32: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

25 | P a g e

shall also provide direction for developing models and defining best practices for the continuous improvement of curriculum. More importantly, it will be used as the primary basis for identifying the three pilot Knowledge Hub sites for the project.

ii. Deliverable 2: Overall strategy and roadmap for enhancing curriculum and instruction in HEIs including incentives and management systems design for the continuous improvement of curriculum and instruction in HEIs (Annex 12).

This paper is designed to establish a KH framework that is suitable for the IT–BPM sector, and define a proposed road map and timeline for the establishment of the IT–BPM knowledge hub project. It identifies critical technical, organizational, financial and administrative requirements in the development, operation and management aspects that are necessary to support the initial implementation of a KH.

iii. Deliverable 3: Models and best practices for university-industry linkages including

recommendations to address constraints for improving quality of services and achieving closer university and industry linkage including an assessment of the capacity of HEIs to supply the BPM talent needs and;

iv. Deliverable 4: List of HEIs and international/regional institutions for twinning arrangements including a draft twinning arrangement or partnership agreement document (Annex 13).

Both deliverables 3 and 4 covered the overall framework for thinking strategically about Industry-Academe partnerships for improving the quality of services and achieving closer university and industry alliances for the IT-BPM sector, recognizes different factors that impact on different relationship stages from a strategic perspective and also considers the depth of collaboration and synergy taking into account factors in the environment, membership characteristics, process and structure, communication, purpose and resources.

v. Deliverable 5: KH Business Case & Financial Model which was a deep dive of

Deliverable 2 (Annex 14). This is the second part of Deliverable 2 which discusses at length the overall framework and technical model, organizational design and where the hub is envisioned to be between 3 -5 years after implementation. It serves as a roadmap for frameworks, models and activities starting from its development phase to full operation in the medium to long term. This document will present a snapshot of the developmental and organizational phases from startup through its 3rd year of operation.

4.3 Monitoring and Evaluation Framework

Monitoring and evaluation framework describes the indicators that are used to measure whether the project is a success. This increases the understanding of the goals and objectives and defines the relationship between factors key to implementation, and articulates the internal and external elements that affect the success of the project.

Page 33: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

26 | P a g e

Monitoring and Evaluation Framework (Design Summary)

Design Summary Performance Targets and Indicators with Baselines

Data Sources and Reporting Mechanisms

Assumptions and Risks

Outputs 1. Access to knowledge resources for teaching and learning IT-BPM industry-designed courses Increased. 2. Higher education curricula and instruction enhanced. 3. Partnerships between industry and academic institutions strengthened.

Business model for operating and sustaining the knowledge hubs developed by 2015. Digitized teacher training materials and study modules incorporated in the knowledge hubs by 2015. 900 faculty members from participating HEIs, of which at least 50% are women, completing online teacher training programs on IT-BPO industry designed courses by 2016. 3000 students, of which at least 50% are females, complete online learning modules and study guides on IT-BPO industry-designed courses by 2016.

At least three partnership agreements involving HEIs and industries signed by 2016. At least two twinning arrangements between foreign and domestic HEIs established by 2016.

Annual reports of partner industries Annual reports of participating HEIs TA progress report TA progress report

Assumptions HEIs and partner industries

providing continued institutional support.

Faculty members and students motivated to improve their knowledge and skills.

Risks (H) SMP is not integrated in the HEI curricula offering because recurring costs for e-learning materials are not budgeted. (H) SMP deployment may be disrupted because of poor bandwidth or IT access of the school. (M) Service Level and delivery timelines of the implementing partners are unsatisfactory or the working relationship between the implementing partners becomes difficult. (H) HEIs not amenable to or not aligned with integration of SMP or ITBPM courses in their system. (H) Non-acceptability of online courses and certification by large IT-BPM players.

Page 34: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

27 | P a g e

Monitoring and Evaluation Framework (Outputs)

Activities and Milestones Project Targets Consolidated Project Performance OUTPUT 1 1.1 5 IT-BPM on-line courses 1.2 Entry level middle management program 1.3 Business model of Knowledge Hub 1.4 Pilot hubs deployed

Develop materials for 5 IT-BPM courses and offer them on-line. Create a program for registration and enrollment. Deliver on-line courses Prepare strategic Policy Notes: Thought Paper articulating initial framework and propositions for knowledge hubs for the IT-BPM industry. Case studies/stories represented by each BPO sector. Preparing the criteria for locating knowledge hubs and selecting beneficiary HEIs/SUCs. Establishing industry-university knowledge hubs.

UPOU were able to complete and digitize all 5 IT-BPM courses: Business Communication, Service Culture, BPM 101, BPM 102, and Systems Thinking. UPOU designed the middle management program that will allow the teachers/students to register and enroll. UPOU offered the Business Communication and BPM 101 on-line. AIM unable to resubmit the revised and updated version of the Thought Paper. IBPAP conducted intensive research and consultation and prepared the Knowledge Hub framework and business model. Transcript of meetings with IT-BPM stakeholders presented. Draft case submitted by AIM. Criteria documents submitted by IBPAP in 2014. The on-line hub was designed and created by IBPAP and can be accessed at http://servicemanagementprogram.ph Physical hub is located at the IBPAP office.

Page 35: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

28 | P a g e

Monitoring and Evaluation Framework (Outputs)

Activities and Milestones Project Targets Consolidated Project Performance OUTPUT 2 2.1 Run eSMP courses 2.2 Certification and assessment framework 2.3 Certify and assess

Review and enhanced courses. eSMP courses offered on-line. Develop and complete certification process and assessment framework. Certify teachers and students who completed the on-line training.

UPOU completed the enhancement of all 5 eSMP courses. As of January 2016, 53 teachers and 1,310 students completed the program. There are still on-going classes as of this date. The framework/mechanism of the Accreditation system for the IT-BPM courses in HEIs/SUCs was developed and presented to the schools. It was then revised in coordination with some partner HEIs who are willing to try different models that UPOU has developed with the program. For the teachers’ certification, the module on Blended Teaching was conducted. It was a face to face training and allowed them to learn how to use the materials and teach the course and assess the learners.

Page 36: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

29 | P a g e

Monitoring and Evaluation Framework (Outputs)

Activities and Milestones Project Targets Consolidated Project Performance OUTPUT 3 3.1 Partnership framework 3.2 MOA signed 3.3. Twinning arrangement

Develop a partnership framework. At least 3 MOAs signed between the school and an IT-BPM company At least 2 twinning arrangements with foreign or local HEIs.

IBPAP submitted Deliverables 3 and 4 which covered the overall framework for thinking strategically about Industry-Academe partnerships for improving the quality of services and achieving closer university and industry alliances for the IT-BPM sector. There were several MOAs signed and are still in review and progress as of this moment. On-going discussions relating to this are still in progress and schedule of actual deployment of this deliverable has not yet been determined.

Page 37: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

30 | P a g e

V. OVERALL ASSESSMENT AND RATING

In general, the Knowledge Hub project was successful. UPOU was able to complete the materials and digitized the five (5) eSMP courses and were made partially available on-line. It has attracted mounting interest from local as well as overseas students. A repository hub for these courses was also developed by UPOU and was linked to the Knowledge Hub. On the other hand, IBPAP submitted the Knowledge Hub Framework and Business Model to ADB. Following this, IBPAP was able to deploy both on-line and physical knowledge hubs for these eSMP courses. Partnerships between the HEIs/SUCs were also accomplished to further strengthen the conduct of both e-SMP and SMP courses that will address the talent supply gap in the IT-BPM industry, which is the primary objective of the project. VI. CHALLENGES ENCOUNTERED

The project was originally intended to have been completed over a twenty six (26) – month period from September 2013 to November 2015. But challenges were encountered along the way that resulted to difficulties and delays such as the following: Additional Deliverable. A key contributor to the TA was not able to accomplish its deliverables, including Knowledge Hub Business Model and Framework. To address this, IBPAP assumed the responsibilities for this particular task. Financial Approvals. Requests for additional funds were made by IBPAP in order to address unanticipated additional work. Due to the nature of the funding of a Technical Assistance project, funds were released after due process, which was unfamiliar to IBPAP and exacerbated initial delays as mentioned in the Assessment Report.4 Limited Human Resources. In the beginning of the project, IBPAP was already challenged to assemble the team necessary to complete its own responsibilities and with the addition of the deliverables from AIM, it became more challenging as the team members needed to exert more effort to complete their tasks. Decision delays. Meetings with the Project Steering Committee (PSC), composed of Industry, Academe, Government, and ADB representatives, served as guidance in the implementation of the project. But since it was difficult to align the schedules of the various parties, there were some delays in the meetings which resulted to delay in decisions as well. Low demand. There were some challenges in achieving the enrollment target in the eSMP courses. Although all 5 courses have been digitized, the targets have not been met yet. _______________________

4Assessment Report on the IT-BPM Industry Knowledge Hub Project Prepared by Ryan Hansen-Reeder, May13, 2016

Page 38: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

31 | P a g e

VII. RECOMMENDATIONS AND FOLLOW-UP ACTIONS

To sustain the Knowledge Hub and ensure its efficiency will be maintained, it is recommended to establish an organization fully dedicated to the hub. It should have adequate human and financial resources as well as leadership support to continue achieving its objectives. It is also advised to re-engage stakeholders and expand efforts to market the program to industry, academe, and other consumers. The following are also recommended to sustain the initiatives for the IT-BPM industry: 1. The need to improve the quality of education has been identified as one of the priority areas through inputs from interviews with IT-BPM businesses. The issue of poor-quality graduates has been a long-term pain point and has, in the past, led to the development of initiatives such as SMP and TESDA vouchers aimed at training graduates just before they enter the workforce.

Recommendation: Accredit training providers that add value to the most effective skills as determined

by the IT-BPM industry. Maintain a positive list of skill development providers (public and private) which is

updated annually.

2. SMP was originally designed to train upcoming graduates with skills relevant for jobs in the local outsourcing industry. It aims to reinforce the skills and competence of students enrolled in traditional business administration and information technology courses. With the widening strategic focus of the IT-BPM industry toward high-value business activities, there is a need to expand the focus of the SMP program.

Recommendation: Establish four respective IT, Gaming, Animation Industry, and Healthcare Advisory

Boards to enhance SMP to be more specialized. Leverage capability of schools to partner with industry to enhance specific courses

and provide additional certifications for specialized curriculum. Roll-out mandatory tracer studies for SMP.

3. With the high turnover rate, over 50%, of employees in the IT-BPM industry, there is little motivation for the industry to invest in training the workforce, especially with the likelihood of employees leaving within a short period of time; it would be more cost effective to hire industry-ready graduates.

Recommendation: Roll-out mandatory tracer studies for all human capital interventions with IBPAP.

Page 39: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

32 | P a g e

4. While the English language competency of the Philippines is known as one of the key strengths of the nation and of the IT-BPM industry, there are growing concerns over the long-term sustainability of this competency.

Recommendation: Advocate for the inclusion of the English Language Proficiency Assessments for the

Philippines at secondary, tertiary public and private education. Fund and pilot the Academic Teaching Excellence Course for selected schools in the

Next Wave Cities. IBPAP and affiliate associations to participate in the development of English

Language course content. Create a near-hire certification and training module.

Page 40: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex 1:

Contract between

ADB and IBPAP (Not for Disclosure)

Page 41: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

1

Terms of Reference for Consultants

A. IBPAP BPAP will be mainly responsible for overall management of the TA, for coordinating the different component activities, including ensuring adequate industry participation, closer university-industry linkage and sustainability of TA benefits. A-1. Lead Industry-Based Education Expert will work closely with other TA consultants in performing the following tasks:

(i) Provide inputs for the preparation of the overall strategy and roadmap for

enhancing curriculum and instruction in HEIs to meet the labor supply needs of the IT-BPM industry.

(ii) Design the incentives and management systems for the continuous improvement of curriculum and instruction in HEIs.

(iii) Review higher education systems and practices and identify measure to address constraints for improving quality of services and achieving closer university and industry linkage.

(iv) Take responsibility for the satisfactory and timely submission of required reports under the TA.

A-2 Industry-Based Education Specialist will work closely with other TA consultants in performing the following tasks:

(i) Ensure that TA objectives and targets are achieved, all policies are

complied with, and appropriate standards and guidelines for managing and coordinating the TA are in place.

(ii) Oversee, coordinate and integrate all inputs and outputs under the TA in close consultation with industry players, concerned government agencies, HEIs, SUCs and ADB.

(iii) Coordinate with the lead expert in identifying the resource requirements for strengthening skills development programs in HEIs and SUCs.

(iv) Serve as the overall manager, coordinator and integrator for the different TA outputs and inputs including managing the PSC secretariat and the preparation of the TA progress reports to ADB.

(v) Assess the capacity development requirements of HEIs and SUCs to effectively address the talent supply needs of the IT-BPM industry.

(vi) Identify and recommend appropriate twinning arrangements or partnership agreements between foreign and local institutions to enhance HEI curriculum and instruction in the country.

(vii) Prepare draft twinning arrangements and/or partnership agreements for consideration of concerned institutions.

(viii) Assist the lead expert in undertaking the tasks and responsibilities

Page 42: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

2

A-3 Industry Education Associate – will work closely with other TA consultants in

performing the following tasks are:

(i) Support to the Industry Education Expert in the preparation of the

inception report and detailed work plan, Lead Organizer for events of Programs being implemented by the Industry Education Expert including liaising with partners, private and government institutions as necessary, including the different working groups and project teams.

(ii) Serve as the Project Steering Committee Secretariat Head including the preparation of presentations and technical materials for the PSC meetings, drafting minutes and liaising with PSC members as required

(iii) Support for Project Report Consolidation and Preparation, including the drafting of all project interim and final reports

(iv) Prepare technical materials, project-related researches pertinent to institutional, financial, economic analyses that may be required by the project particularly for the HEIs and SUCs in the proposed hubs.

(v) Assist the industry-based education specialist in undertaking the tasks and responsibilities

A-4. Project Support Staff shall support the overall project management and shall perform the following tasks:

(i) Provide all administrative and logistical support required by the project experts, including organizing special events such as consultation meetings, workshops etc.

(ii) Prepare project budgets, project financial reports for submission to ADB, including documenting and tracking expenses of the project within BPAP.

(iii) Assist in the reproductions of project technical reports, including building a repository and MIS system for tracking all project documents.

B. AIM AIM will lead the TA’s knowledge management components.It will work closely with BPAP and UPOU in preparing strategic policy notes, developing the business model and framework, identifying site locations, incorporating e-learning products, identifying resource requirements, and providing technical guidance and resources for the setting up and management of the IT-BPM industry-university knowledge hubs. B-1. The Knowledge Management Expert will work closely with other TA consultants in performing the following tasks:

(i) Conduct a study and prepare strategic policy notes for enhancing industry–university linkage to support key industries such as IT–BPM as well as a thought paper/industry note.

(ii) Develop the business model, institutional framework, management arrangements, and agreements for establishing, operating, expanding, and sustaining knowledge hubs in consultation with stakeholders.

(iii) Identify sites of industry-university knowledge hubs based on a sound and transparent set of criteria.

Page 43: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

3

(iv) Identify resource requirements for establishing and operating knowledge hubs (e.g., staffing, finances, program applications, furniture, hardware, and peripherals).

(v) Prepare inputs for the TA inception report, progress and annual reports to

be consolidated by BPAP.

B-2. The Senior Researcher will work closely with the Knowledge Management Expert in performing the following tasks:

(i) Assist the Knowledge Management Expert in conducting a benchmark study and preparing policy note, thought paper/industry note, and inputs to TA reports.

(ii) Collect data through interviews and focus group discussions and process this.

(iii) Contribute to the identification of sites of knowledge hubs. (iv) Assist in developing a business model, institutional framework,

management arrangements, and agreements for establishing, operating, expanding, and sustaining knowledge hubs.

(v) Assist the Knowledge Management Expert in identifying the resource requirements for establishing and operating knowledge hubs.

(vi) Organize consultation conference.

C. UPOU UP will be responsible for the design and deployment of e-learning products for teaching and learning of industry-designed courses in HEIs including developing a framework for certification and assessment. It will work in close coordination with IBPAP and the AIM to ensure that the development of elearning courses are based on industry needs and standards and that any resulting inputs for business model design, knowledge hub or educational policy developments resulting from the development, production and deployment of elearning courses are properly documented and shared. C-1. Education System Integration Expert will work closely with the expert on industry-designed education and other TA consultants in performing the following tasks:

(i) Determine the project schedule from evaluation to procurement, installation,

test run, and handover. (ii) Identify staff requirements. (iii) Propose annual budget requirements, including capital and operating

expenditures, to maintain the e-learning system, which will be made part of the envisaged knowledge hubs.

(iv) Monitor and evaluate the teaching and learning components of the courses, including the accreditation system, to ensure quality and relevance to industry needs.

(v) Coordinate the integration and implementation of research and training components of the project

(vi) Oversee the system installation, test run, and handover.

Page 44: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

4

C-2. OnlineCourse Development and Delivery Expert willwork closely with other TA consultants in performing the following tasks:

(i) Prepare the online course material development and delivery plan. (ii) Work with industry experts and the Instructional Design and Assessment Expert to convert the existing learning materials for online mode of delivering instruction. (iii) Organize and conduct online course development training for other course module writers and online course delivery training for course faculties (iv) Monitor and supervise the development of the online modules and its subsequent quality assessment by the Quality Circle and enhancement after the pilot runs. (v) Document the course development and delivery process.

C-3. Learner Support Expert willWork closely with other TA consultants in performing the following tasks:

(i) Assess student support requirements based on target student profile (ii) Coordinate the registration of students from participating educational

institutions (iii) Develop a system of providing learner support

C-4. Multimedia Production Expert will work closely with other TA consultants in performing the following tasks:

(i) Select media formats for the course content including the learning activities. (ii) Recommend multimedia learning activities or objects appropriate to the

courses. (iii) Supervise the design and production of multimedia materials (graphics,

animations, videos, Web interfaces for Web portals, and marketing and communications products).

(iv) Prepare a multimedia production evaluation report. C-5. Instructional Design and Assessment Expert will work closely with other TA consultants in performing the following tasks:

(i) Review and enhance the existing curriculum in the light of the target learner profiles, e-learning requirements, and professional trends. (ii) Review and recommend online teaching and learning approaches for the online courses to be developed. (iii) Review and refine formative and summative assessment in line with GCAT for each course.

Page 45: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

5

C-6. Research and Evaluation will work closely with other TA consultants in performing the following tasks:

(i) Coordinate the process documentation of the whole project. (ii) Coordinate and conduct research and evaluation studies on the courses

content and pedagogical approaches. (iii) Coordinate and conduct the monitoring and evaluation study of the project. (iv) Recommend appropriate sustainable models for subsequent scaling up of

the courses.

C-7. Learning Management System Expert will work closely with other TA consultants in performing the following tasks:

(i) Setup and manage a suitable e-learning system infrastructure. (ii) Troubleshoot LMS and other system issues. (iii) Design Tech support system for learners.

C-8. Education Technology Expert will work closely with other TA consultants in performing the following tasks:

(i) Coordinate with the Learning Management System Expert the setting of the e-learning system infrastructure. (ii) Design e-learning repositories in knowledge hubs in consultation with IBPAP and participating educational institutions. (iii) Recommend appropriate tools and technologies for e-learning.

Page 46: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

CONSOLIDATED INCEPTION REPORT

TA-8164 PHI: Strengthening Knowledge-Based Economic and Social Development – 1 BPAP (46234-001)*

Prepared by*

Information Technology-Business Process Association of the Philippines Consultant

15 November 2013

*This Inception Report is prepared in partnership with the Asian Institution of Management (AIM)

and the University of the Philippines–Open University (UPOU)

Page 47: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

ii

Acronyms and Abbreviations

AdEPT Advanced English Proficiency Training ADB Asian Development Bank AIM Asian Institute of Management BEST Basic English Skills Training BPO Business Process Outsourcing CEO Chief Executive Officer CHED Commission on Higher Education DOF Department of Finance DOST Department of Science and Technology GDP Gross Domestic Product GMAM General Membership Assembly Meetings HEI Higher Educational Institutions HR Human Resource IBPAP Information Technology–Business Process Association

of the Philippines ICT Information and Communication Technology ICTO Information and Communication Technology Office IT Information Technology IT–BPM Information Technology–Business Process

Management I-TWSP Industry-based Training for Work Scholarship Program LMS Learning Management Systems M&E Monitoring and Evaluation NEDA National Economic Development Authority PDP Philippine Development Plan PDS Philippine Digital Strategy PMF Project Management Framework PSC Project Steering Committee RBM Results-based Management SEI Science Education Institute SMP Service Management Program SUC State Universities and Colleges TA Technical Assistance TESDA Technical Education and Skills Development Authority TOR Terms of Reference UPOU University of the Philippines-Open University

Page 48: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

1

I. INTRODUCTION The purpose of this inception report is to set out a clear strategy and way forward for the implementation of the Technical Assistance (TA) and to specify various implementation activities, timeframes and outputs of specific tasks for the project. This inception report outlines: the approach and methodology, an organizational chart, consultant’s schedules, budgets, and the Terms of Reference (TOR) for the three partners. A. Objective of the TA The Impact of the ADB TA which is funded by the Republic of Korea e-Asia and Knowledge Partnership Fund is improved alignment of higher education with the needs of the economy. The TA would greatly assist the development of the Information Technology–Business Process Management (IT–BPM) industry by providing alternative business models and scale-up mechanisms to provide the continuous supply of qualified talent that it needs—and more importantly, strengthen the higher education system by introducing innovative and creative education programs that are relevant to the country’s competitive advantage in economic sectors like the IT–BPM industry. B. Organization of the Inception Report Section I : Introduction Section II : Project Background, Objectives, Outcomes Section III : Strategies, approach and methodology Section IV : Project description, outputs and activities Section V : Workplan and onsultant’s Schedule Section VI : Monitoring and evaluation Section VII : Financial and Budget Plan Section VIII : Risks and Potential Challenges

II. PROJECT BACKGROUND A. Rationale

The IT–BPM industry in the Philippines has attained leadership in establishing a sizeable business process outsourcing (BPO) presence in Southeast Asia. Over the last ten years, the Philippine IT–BPM industry has grown at an impressive annual rate of about 30%. It is a major generator of jobs for skilled Filipinos contributing approximately 5% of GDP in 2011 and it is the Philippines’ third largest foreign exchange earner after tourism and remittances. In 2010, it has emerged as the number one provider of voice and the number two in non-voice related outsourced work in the BPM industry worldwide. In its Roadmap, the Information Technology–Business Process Association of the Philippines (IBPAP) is targeting to achieve revenues of $25 billion or about 10% of the global IT–BPM market.1 This revenue figure is projected to account for about 8% of GDP, potentially making it the second largest source of foreign exchange for the country.

1 Philippine IT–BPM Roadmap 2012–2016, © 2013 Information Technology Business Process Association of

the Philippines and TeamAsia, published by the Department of Science and Technology–Information and Communications Technology Office (DOST–ICTO).

Page 49: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

2

Collectively, this goal translates to about 1.3 million direct employees by 2016 and approximately 3.2 million indirect jobs that include a sizeable number in the informal sector. Industry leaders are confident that its 2016 targets are within reach. The industry is embarking on a wide range of initiatives and strategies to sustain its competitiveness and success in the voice segment and consider expanding into non-voice services. To further drive the leadership, it will seriously consider diversifying in portfolio services and markets by focusing on higher value and more complex services including: software development and IT services, animation, game development, health care information management outsourcing, legal, financial and accounting services, and HR among others. The government continues to give high priority to the development of the IT–BPM industry. The Philippine Development Plan (PDP) 2011–20162 and the Philippine Digital Strategy (PDS) 2011–20163 have identified major strategies to support the industry including: (i) developing public-private partnerships to promote both backward and forward linkages in the Next Wave Cities, (ii) enhancing investment promotion and ICT policy, (iii) harmonizing the educational system to the needs of the industry, and (iv) infrastructure support to address connectivity deficit and increase broadband coverage. Government invested heavily to address the skills–job mismatch and is putting attention to developing and sustaining the growth of a quality talent pool. One of the key drivers for growth in the outsourcing industry, whether global or national is talent. It is acknowledged that the Philippine IT–BPM industry has been able to aggressively establish a solid position in the global IT–BPM market because of its service-oriented, English-speaking talent pool. The Philippines has the third largest talent availability among the world’s top IT-BPM centers, next to India and China, and leading Poland, Mexico, Egypt and Malaysia in annual tertiary graduates.4 Historically, talent supply in the industry was in excess of demand. The IT–BPM industry was able to attract its talent, in part, because of the limited scope for full employment in other sectors. However, since 2010, demand has consistently outpaced supply. IBPAP and the different education sector agencies have partnered in implementing talent development initiatives aimed at addressing the talent gap. These include the P450 million Industry-based Training for Work Scholarship Program (I-TWSP) funded by the Technical Education Skills Development Authority (TESDA) that is expected to add up to 250,000 people to the talent pool over a five year period, the P125 million Service Management Project funded by the Commission on Higher Education (CHED) to support seventeen state universities and colleges (SUC) in Next Wave Cities that is expected to generate up to 150,000 new talent over the next three years and the P8 million support from the Department of Science and Technology–Science and Education Institute (DOST–SEI) for the implementation of GCAT and AdEPT that will allow participation of a few thousand SEI scholars to particularly in more complex, technical fields in the IT–BPM sector. While these traditional programs have resulted in concrete gains, critical gaps and constraints have yet to be adequately addressed and many new ones are emerging. The country’s educational institutions who are well aware of the industry’s re uirements continue not to be able to provide a suitable number of graduates to meet the demand.

2 http://devplan.neda.gov.ph/index.php

3 http://www.icto.dost.gov.ph/index.php/philippine digital-strategy

4 Footnote 1, p. 11

Page 50: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

3 Major education reform measures are being instituted and supported including the K-12 program. While these educational reforms are designed to benefit the industry in the long run, it is expected that these will impact on the supply of talent in the short to medium term. The industry hires only an average of 5% to 10% of applicants largely because of inadequate education and training that is suitable to a career in the IT–BPM industry. The problem in recruitment continues to increase further as the global BPM composition is now evolving dramatically. New and more lucrative market settings such as health information management are bringing opportunities for expansion in voice—and more complex and emerging services are being required in non-voice that is putting additional pressure on availability of quality talent. Many small and medium BPO firms who wish to participate in the IT–BPM sector are constrained by their ability to invest in training programs that will allow them to scale-up and compete with the multinational BPOs who already have established training programs and a well-developed talent pool. B. Project Description, Objectives and Expected Outcomes The TA on Strengthening Knowledge-Based Economic and Social Development is designed to address the skills shortage in high growth industries such as the IT–BPM sector by aligning the higher education curriculum with both international standards and labor demand while building on public-private initiatives. The TA Outcome is a replicable and sustainable system of ICT-enabled knowledge hubs for improved teaching and learning of IT–BPM industry based curricula in higher education institutions (HEI). Three key Outputs will accomplish the Outcome of the TA:

(i) Access to knowledge resources for teaching and learning IT-BPO courses, (ii) Higher education curriculum and instruction enhanced, and (iii) Partnerships with industries and academic institutions strengthened.

Three organizations have been identified and contracted by ADB to work jointly for the implementation of the TA: IBPAP—the umbrella organization of the IT–BPM industry that has pioneered in the development and delivery of industry-designed courses and plays a pivotal role in sustaining the rapid growth of the industry; the Asian Institute of Management (AIM)—that has a solid track record in development management and business management programs, and research; and the University of the Philippines–Open University (UPOU)—the only open university in the country, and the only distance education institution in Southeast Asia region that is offering 100% of its courses online. C. Overall TA Strategy The TA is flexibly designed to support strategic investments in the development of sustainable business models for scaling-up the delivery of talent programs, and in piloting innovative mechanisms for building and sustaining industry–academe partnerships. It will focus on the establishment of knowledge hubs which will provide facilities for HEIs or SUCs to access e-learning products for teaching and learning IT–BPM industry-designed courses. The overall strategy is forward looking based on a Results Based Management (RBM) framework that incorporates a phased approach to implementation to ensure: quality of the different activities or outputs; minimized risks; and proper integration and sustainability of the outputs across stakeholders. At the activity level, the phased approach will allow initiatives to be modified at mid-year or after consultation with the different stakeholders; and will give the implementers the opportunity to recalibrate or immediately scale up.

Page 51: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

4

III. STRATEGIES, APPROACH AND METHODOLOGY A. Project Strategy Over a twenty six-month period, the project will design, develop and pilot knowledge hubs. The development and integration of online IT–BPM industry-designed courses including the industry assessment tools and an entry to middle management and leadership program both for scaling teaching and learning will be house in these hubs. The hubs aim to initiate international or national twinning arrangements and stronger industry–academe linkages. These activities are collectively designed to allow the scale deployment of cost effective models for strengthening and delivering HEI programs, sustaining the knowledge hubs and substantially contribute to addressing industry demands for talent. Central to the preparation of the consolidated project workplan is an approach emphasizing stakeholder participation (CEOs, Industry partners, HEI administrators, faculty), focusing on sustainability, and institutionalization. The systemic project design logic and management employed in establishing targets and M&E framework ensures synergy and linkage among the different activities, components and contractor/partners. For example, the deployment of the e-learning courses in the UPOU system and the middle management leadership program in AIM will serve as inputs to building models that can scale up delivery of the IT–BPM industry-designed courses for HEIs nationwide; and will contribute to sustaining existing demand and effectively addressing emerging demand for talent in the long term. The analysis will also serve as inputs for systematically enhancing higher education curriculum and instruction in the HEIs and in preparing models or addressing policy or operational constraints for effective industry–academe linkages. IBPAP and its implementation partners, AIM and UPOU, are aware that the successful implementation of the TA requires a holistic management approach including precise coordination in the execution of the different activities of the implementing partners so that all the different output components are efficiently completed and the project results are achieved. The project strategy must be situated within the larger national educational development and economic framework. Thus, cooperative efforts will serve to support information dissemination activities aimed at engaging with government education and industry leaders to strategically situate the TA and to obtain crucial support and commitment to the TA outputs both at the policy and operational levels. This management strategy is also anchored on IBPAP’s overall philosophy for talent development that recognizes the linkage among government, the industry partners and academic institutions like AIM and UPOU as central to the talent development process—and recognizes its role primarily as an enabling association. The chart below (Figure 1) summarizes IBPAP’s overall talent development framework.

Page 52: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

5

Figure 1: Project Framework: Industry–academe Linkage

ACPI = Animation Council of the Philippines CCAP = Call Center Association of the Philippines GDAP = Game Developers Association of the Philippines HEI = Higher Education Institution HIMOAP = Health Information Management Outsourcing Association of the Philippines IBPAP = Information Technology–Business Process Association of the Philippines OJT = On-the-Job Training PSIA = Philippine Software Industry Association QA = Quality Assurance

From a project management perspective, carefully constructed and orchestrated approaches to collaborative relationships will strengthen the management structure of the project and ultimately bring greater synergy. The implementation partners have defined clear roles and scope that will allow enhanced information and monitoring capacity, seamless and timely integration of individual outputs. B. Technical Approach and Methodology The methodology for achieving the TA outputs includes an emphasis on participatory approaches to planning, developing, designing and implementing the TA activities. All initiatives will be developed and delivered in consultation with industry and HEI partners, government education institutions and other stakeholders. The TA activities will utilize existing IBPAP support structures and mechanisms such as the CEO Forum, the Human Resource (HR) Council, the General Membership Assembly Meeting (GMAM) and the English Council among others to consult and solicit inputs for the development of new curriculum—for enhancing industry–academe partnerships, and for the design and establishment of the knowledge hubs. As the enabling industry association, IBPAP continues to drive stakeholder support for talent programs designed to reach industry goals. Thus, where there is a convergence in goals or direction, the TA activities will be designed and implemented to support IBPAP talent development and stakeholder programs as defined in its Roadmap 2012–2016.

Page 53: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

6

Figure 2: Stakeholder Objectives

ANZ = Australia and New Zealand BPM = Business Process Management CP = Creative Process CRM = Customer Relationship Management EU = European Union F&A = Finance and Accounting HIM = Health Information Management HR = Human Resources IT = Information Technology UK = United Kingdom Sources: IBPAP, Everest Group, Outsource2Philippines (2010-2012)

The TA components: particularly the development of the hubs, and the development and delivery of e-learning and management programs will serve as a building block for identifying alternative, pioneering business models that: (i) optimize and promote strong industry–academe partnerships, and (ii) scale the deployment of industry responsive curriculum and instruction in the HEIs. Both support the Talent and IBPAP Role objectives in the chart above (Figure 2). Consistent with the Terms of Reference (TOR) and the Technical Proposal, the approach and methodology will utilize a diverse range of analysis, research, consultation, and case studies and benchmarking to best practices, so that all components of the project are harmonized with and strategically impacting on producing the quantity and quality of talent required by the industry. Details of the Consultants and Resource Persons to be utilized under the TA are in Appendix 4. The TA will support the Philippine Government and ADB’s gender and development objectives. The TA will promote gender parity in participation and access to the e-learning

Page 54: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

7 training programs and other outputs of the TA. Gender and development considerations will be identified in the preparation of studies and researches on the knowledge hubs, case studies, policy papers and in the development of new curricula. The TA contributions are directed towards the achievement in three areas: increasing access to the industry-based courses and resources through the knowledge hubs, increased delivery of courses for teachers and students, and increased industry–academe partnerships. The core emphasis will be on strengthening IBPAPs existing courses by converting these to e-learning, open university standard, learning management system (LMS) modules, building the entry to middle management course, and creating sustainable, cutting-edge industry–academe partnerships that can continuously update and deliver these programs. The TA is founded on some key organizing and technical principles. First, all initiatives should be designed to help establish models that are replicable and sustainable. Second, all TA activities will be monitored within the context of assessing and improving strategic and operational policy and planning and implementation practices. This latter aspect requires effective feedback and consultative approaches to information gathering and a readiness to flexibly or proactively respond to requests of industry and academe during the implementation of the TA. Another fundamental principle is that the process of integrating gender sensitive, ICT-enables courses and the utilization of LMS must be implemented with a clear recognition that such a dramatic shift in the education delivery process requires a very supportive environment for academic administrators and managers. It also requires the recognition of the reality that: such a change may be gradual or may take time, that it will require a firm commitment to the use of ICT tools and systems as an integral part of a different delivery process, and that such shifts require technologically-equipped and managed work environments. The implementation of the TA will ensure that inputs are consistent with these principles. It will explore avenues that guarantee the establishment of performance standards and imbed performance management and accountability agreements based on roles and responsibilities. Identifying best practices, determining models that guarantee scalability, sustainability and institutionalization of the TA benefits will be critical in assuring the maximum development impact of the project. Integral to this is the need to acknowledge the realities faced at the HEI level and to modify and adjust approaches based on the findings.

Page 55: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

8

C. Financial Resources The total cost of the TA is estimated at $500,000 equivalent and will be financed on a grant basis by the Republic of Korea e-Asia and Knowledge Partnership Fund. The budget for the TA is distributed to the three implementing partners as follows (Table 1):

Table 1: TA Budget Distribution

Implementing Partner Amount

(US$)

IBPAP 127,313 AIM 68,750 UPOU 206,095

Total 402,158 AIM = Asian Institute of Management IBPAP = Information Technology–Business Process Association of the Philippines UPOU = University of the Philippines–Open University

The budget will be expended over a 26 month period beginning September 2013 to November 2015 based on the approved personnel schedule. D. Institutional and Implementation Arrangements The project organizational chart in Appendix 1 shows the institutional arrangements between IBPAP, AIM, UPOU, ADB, the government of the Philippines and the HEIs/SUCs as well as the organizational linkages, reporting structures and coordinating mechanisms. The Department of Finance (DOF) will be the executing agency to lead and implement the TA implementation. It shall char a project steering committee (PSC) composed of the Commission on Higher Education (CHED), the National Economic and Development Authority (NEDA), the Department of Science and Technology–Information and Communication Technology Office (DOST–ICTO), a private sector representative, an industry firm representative and a representative from the academe. The PSC shall provide quality assurance and ensure effective coordination among government agencies, development partners and stakeholders. IBPAP will have overall responsibility for the management of the TA, oversee and coordinate all TA inputs and outputs in close coordination with industry players, government institutions while ensuring closer university–industry linkages and sustainability of the TA benefits. UPOU will be responsible for design and deployment of e-learning products developed by the IBPAP for teaching and learning, and will develop the certification and assessment framework for the programs. AIM will lead the knowledge management component including developing the business models for the knowledge hubs, preparing strategic policy notes for scaling up the industry developed courses, and developing the middle management and leadership program for the IT-BPM sector. The Lead Industry-based Education Expert, supported by the Industry-based Education Specialist, will liaise closely with the ADB as well as with the AIM and UPOU and stakeholders to ensure smooth and timely implementation of the TA and that TA targets and objectives are achieved.

Page 56: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

9 A detailed consolidated workplan and implementation schedule has been developed for the duration of the 26 month implementation period from 23 September 2013 to 21 November 2015 (Appendix 2). This workplan will serve as an important tool for planning, implementing and monitoring TA activities for AIM, IBPAP and UPOU. It provides a detailed schedule for the implementing partners and all project stakeholders to better understand their respective roles. Each of the three implementing agencies will provide administrative and logistical support for their own individual TA activities with IBPAP providing the overall project management support for specific activities or whenever required.

IV. PROJECT DESCRIPTION A. Project Components and Expected Results The overall impact of the TA is improved alignment of higher education with the needs of the economy. The outcome is a replicable and sustainable system of ICT-enabled knowledge hubs for improved teaching and learning of IT–BPM industry-based curriculum in the HEIs. The major outputs and activities that will contribute to this outcome are detailed in the Consolidated Project Workplan in Appendix 2. Details of the Outputs are presented below (Section IV B). B. Output 1 (Outcomes, Outputs, Activities) Access to knowledge resources for teaching and learning IT–BPM industry-based course increased. Access would be increased through the following initiatives and actions:

(i) consultations with industry CEOs, HEIs and other stakeholders, (ii) developing online learning modules and study guides, (iii) courses for talent management development program, (iv) developing the framework and business model for the pilot knowledge hubs, and (v) identify and establish three (3) knowledge hubs.

The main Outputs from these initiatives would be:

(i) three (3) out of six (6) online service management program (SMP) courses available

for use in the UPOU learning management system (LMS), (ii) entry-level middle management program designed and developed by AIM, (iii) framework and replicable business models for developing the pilot knowledge hubs

prepared, and (iv) three (3) pilot knowledge hubs established.

Page 57: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

10

C. Output 2 (Outcomes, Outputs, Activities) Higher education curricula and instruction enhanced. Higher education curricula and instruction will be enhanced through the following initiatives and actions:

(i) run online IT–BPM courses for 900 faculty members and 3,000 students, (ii) develop a certification and assessment framework, (iii) certify/assess teachers and students who have completed the online courses, and (iv) scale-up model for delivering IT–BPM courses documented.

The main Outputs from these initiatives would be:

(i) three (3) online courses offered to 900 teachers and 3,000 students of participating

HEIs, and (ii) teachers and students who have completed the courses availed of, or completed

certification /assessment.

D. Output 3 (Outcomes, Outputs, Activities) Partnerships between industry and academic institutions strengthened through the following initiatives and actions:

(i) prepare industry–academe partnerships and linkages framework, (ii) prepare three (3) partnerships agreements between HEIs and industries, and (iii) establish two (2) twinning arrangements between foreign or domestic HEIs.

The main Outputs from these initiatives would be:

(i) sustainable partnerships between industry and academe in the Next Wave Cities,

and (ii) at least two (2) twinning arrangements between foreign or domestic HEIs formalized

for IT–BPM courses.

V. PROJECT WORK PLAN AND CONSULTANTS SCHEDULE A. Consultant’s Inputs and Schedules This TA will be delivered by one international and thirteen national consultants across the three partners. IBPAP which is responsible for managing overall TA inputs and outputs including the sustainability of TA benefits will provide two person-months intermittent for the Lead Expert on Industry-Designed Education who will work closely with other TA consultants for the preparation of the strategy and roadmap for enhancing curriculum and instruction in the HEIs and other technical reports and five person-months intermittent for the Industry-based Education Specialist who will be responsible for ensuring that the TA objectives and targets are met and overseeing and integrating all TA inputs and outputs.

Page 58: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

11 AIM which is the partner leading the knowledge management components will be expected to provide one International Knowledge Management Expert for seven person-months intermittent and a Senior Researcher for seven person-months intermittent who will assist the Knowledge Management Expert in the preparation of the benchmarking study and in preparing policy notes and reports. UPOU is responsible for designing and deploying e-learning products for industry-designed courses in HEIs. It has the largest number of consultants and experts with a total of seventeen (17) person months. The schedule of consultants, their inputs into the project and timelines are found in Appendix 3. B. Workplan The consolidated workplan for the implementation of the TA is outlined in the Gantt chart in Appendix 2. It presents the twenty six month summary of tasks, activity outputs, timeframes and responsibilities and is intended to guide all implementing partners so that all activities are coordinated, dependencies among the different components are clearly understood, and all necessary activities are implemented so that the planned outputs are achieved in accordance within agreed time schedules. The workplan will serve as a monitoring tool to ensure the achievement of outputs and progress towards outcomes. Monitoring and evaluation is part and parcel of the overall workplan which includes critical milestones at the activity and output levels that can readily serve as an indicator on whether the implementation is on or off target.

VI. MONITORING AND EVALUATION A. Monitoring and Evaluation Requirements One of the criteria for the success of any project would be extent and scope of monitoring and evaluation mechanisms that are built into the overall implementation strategy. A Performance Measurement Framework (using the ADB-prescribed Design and Monitoring Framework) outlined in Attachment 5 will be utilized by the project. The PMF, which was built around elements of the TA design and monitoring framework, will be used internally by the project implementing partners and stakeholders primarily to track performance and measure progress towards the achievement of the project results. The PMF identifies data sources, methods and techniques of data collection and analysis, and frequency of data collection. Responsibility for gender disaggregated data collection, analysis and report preparation are to be identified. The focal point of project monitoring efforts is comparing actual performance against what was planned. The monitoring and evaluation mechanisms will be undertaken at different levels to ensure that the project is implemented according to the activities defined in the workplan. The monitoring and evaluation framework has the following features:

(i) clear milestones and benchmarks established to guide implementation, (ii) structured and systematic monitoring system with clear and specific performance

indicators,

Page 59: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

12

(iii) systematic tracking and reporting of TA activities and outputs of each of the implementing partners, and

(iv) tracking, monitoring and reporting on specific performance results areas and performance benchmarks and indicators.

The table below (Table 2) summarizes the monitoring and evaluation schedule.

Table 2: Monitoring and Evaluation Schedule

Timeline Stages/

Locations Details Focus

Oct–Nov 2013 Mobilization Set-up Project M&E

Three Teams Total of Three

national consultants

Developing the Logical Framework Analysis

M&E reporting Structure M&E Policies, Process &

Procedures Forms & Templates tie-up with MIS for

programming

Nov–Dec 2013 Consultation on the M&E System

Consultation with IBPAP, AIM, UPOU

Dec 2014 Orientation of M&E System Policies & Procedures

conduct of workshop Integration of the

Workshop outputs Processing and Analysis

Jan 2014 Baseline data gathering

Baseline data gathering activities with partners

Jan–Feb 2014 Standardization of Reports

Q2 Reports and Quarterly reports thereafter

Feb 2014– Jun 2015

Implementation Progress and Financial Reporting

Monthly Reports (UPOU) Quarterly Reports Interim Reports

Jul–Sept 2015 Completion Draft the Project Completion Report

AIM = Asian Institute of Management IBPAP = Information Technology–Business Process Association of the Philippines M&E = Monitoring and Evaluation MIS = Management Information Systems UPOU = University of the Philippines–Open University

B. Project Reporting IBPAP through the Lead Expert on Industry-Designed Education will submit all consolidated reports on the implementation of the TA and its progress. These reports include: i) an inception report ii) quarterly report iii) summary report iv) draft completion report and v) the completion report. To assist IBPAP in preparing the reports, AIM and UPOU will collect performance data and prepare an assessment of their individual activities as part of the implementation of their respective components. A template format for reporting may be

Page 60: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

13 provided by IBPAP for ease of consolidating. The table below (Table 3) summarizes the project reporting requirements.

Table 3: Project Reporting Requirements

Report Timeline

Consolidated Inception Report 15 November 2013

Consolidated Quarterly Report 29 January 2014 and every 3 months after

Consolidated Summary Report After completion of each deliverable

Draft Completion Report 30 September 2015

Completion Report 15 November 2015

C. Project Evaluation The project will be subject to normal ADB evaluation requirements.

VII. FINANCIAL AND BUDGET PLAN The estimated budget for the TA activities is a total of $500,000 for the three implementing partners broken down in Table 1. The implementing partners will be responsible for managing their respective budgets and will report actual expenditure to ADB based on their approved workplan. Each partner will be responsible for preparing their financial report on a monthly basis and both AIM and UPOU will provide financial report summaries to IBPAP for the preparation of the consolidated quarterly report. Given the level of activities, some flexibility was built into the contracts through the provision of a small amount of contingency in the implementing partner’s budget. These amounts are foreseen to be utilized before the end of the project period.

VIII. RISKS AND POTENTIAL CHALLENGES Through continuous monitoring and analysis of project operational and development activities and their results—including formal and informal verbal and written inputs from IBPAP, AIM, UPOU, industry partners and other stakeholders, a flow of quantitative and qualitative information is expected to be generated to define risks and contribute to risk detection and mitigation solutions. The objective is to ensure transparency in information, participatory definition of risks and formulation of solutions that are in the best interest of successful TA implementation. The initial list of key risks have been identified in the design and monitoring framework in Appendix 6.

Page 61: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

14

APPENDICES

Appendix 1. Implementation Structure

Appendix 2. Project Workplan

Appendix 3. Consultants Schedule (September 2014–November 2015)

Appendix 4. Consultants and Other resources Responsibilities

Appendix 5. TOR for Consultants

Appendix 6. Design and Monitoring Framework

Page 62: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 1 15

Appendix 1. Implementation Structure

Page 63: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 2 16

Appendix 2. Project Workplan

Note: ██ IBPAP ██ AIM ██ UPOU

Page 64: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 2 17

Note: ██ IBPAP ██ AIM ██ UPOU

Page 65: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 2 18

Note: ██ IBPAP ██ AIM ██ UPOU

Page 66: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 2 19

Note: ██ IBPAP ██ AIM ██ UPOU

Page 67: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 2 20

Note: ██ IBPAP ██ AIM ██ UPOU

Page 68: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 3 21

Appendix 3. Consultants Schedule (September 2014–November 2015)

Year

Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Ana Maria Bongato

Lead Industry-Based Education Expert

Ronald Arambulo

Industry-Based Education Specialist

Florelixie Neo

Industry Education Associate

Rachelle Cagurungan

Project Support Staff

Robert Keitel

Knowledge Management Expert

Melissa Ledesma

Senior Researcher

Melinda Bandalaria

Education Systems Integration Expert

Primo Garcia

Online Course Development & Delivery Expert

Maria Fe Mendoza

Learner Support Expert

Grace Alfonso

Multimedia Expert

Patricia Arinto

Instructional Design & Assessment Expert

Melinda Lumanta

Research and Evlaution Expert

Roberto Figueroa

Learning Management System Expert

Reinald Adrian Pugoy

Educational Technology Expert

AIM

6 AIM

4 IBPAP

Local Consultants

Total

Months

12 UPOU

13 UPOU

14 UPOU

7 UPOU

8 UPOU

9 UPOU

IBPAP1

2 IBPAP

3 IBPAP

UPOU10

11 UPOU

5

-

--

- -- -- - - - -

-

- - - -- -- - - -

-

- - - -- -- - - -

-

- - - -- -

-

-- - - -

2013 2014 2015

- -

- - - -- -

- - - -- -

2

- - - - - -

- - -

- - - - - 5

- - - - - -

- - - - - -

- - - -- -- - - - 6- - - - - -

- - - - - -

- - -

- - - -- -- - - -

- -

- - - - - 6- - - - - -

- - 7- - - - - -

- - - - - -

- - -- - - - - -

- - - -- -- - - - - - - - 7- - - - - -

- - 3.5- - - - - -

- - -

- - -- - -

- - - -- -- - - - - 3.5- - - - - -1.5- - - - - -

- -

- -

-- - - 2.5- - - - - -3- - - - - -

- -

- - - -

- - - -- -- - - - - - 1- - - - - -1- - - - - - - -

- - - 1

Note: Time periods shown above are indicative only; adjustments may be made according to the progress of the TA and the requirements AIM = Asian Institute of Management IBPAP = Information Technology–Business Process Association of the Philippines UPOU = University of the Philippines–Open University

Page 69: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

22 Appendix 4

Appendix 4. Consultants and Other resources Responsibilities

Partner Consultant/

Resource Person Key Responsibility Area

IBPAP 1 Ana Maria Bongato Lead Industry-Based Education Expert/who will prepare overall framework, strategy & roadmap for enhancing curriculum and instructions in HEIs & be responsible for submission of technical reports in the project

IBPAP 2 Ronald Arambulo Industry-Based Education Specialist/who will oversee, coordinate and integrate all inputs and outputs under the TA

IBPAP 3 Florelixie Neo Industry Education Associate/support the Industry-based Education Specialist in the preparation of technical and management reports and in coordinating and managing the TA inputs and outputs

IBPAP 4 Rachelle Cagurungan Project Support Staff/provides all administrative & logistical support including building a repository and MIS system for tracking all documents and , prepares all project budgets and financial reports

AIM 5 Robert Keitel Knowledge Management Expert/who will prepare strategic policy notes, develop the knowledge hub business model, institutional framework, management arrangements, and agreements, identify sites and resource requirements for establishing and operating knowledge hubs, and prepare inputs for the reports.

AIM 6 Melissa Ledesma Senior Researcher/who will assist the Knowledge Management Expert in conducting a benchmark study and preparing policy notes and reports, collect data through interviews and focus group discussions, assist in developing the business model, institutional framework, management arrangements, and agreements, assist in identifying the resource requirements for establishing and operating knowledge hubs, and organize the consultation conference.

UPOU 7 Melinda Bandalaria Education System Integration Expert/ Over all management of the UPOU component, including monitoring, evaluation, and integration of the project systems from installation to hand over.

UPOU 8 Primo Garcia Online Course Development and Delivery Expert/ Coordination and development of online course materials and training of online tutors on online delivery.

UPOU 9 Maria Fe Mendoza Learner Support Expert/Design and implementation of support sysytem for learners.

UPOU 10 Grace Alfonso Multimedia Expert/Supervision and development of multimedia materials for the online courses.

UPOU 11 Patricia Arinto Instruction Designa nd Assessment Expert/Instructional design of the courses , inlcuding assessment tools

UPOU 12 Melinda Lumanta Research and Evaluation Expert/Process documentation of the project and development of farameworks/models for professional development through online learning.

UPOU 13 Roberto Figueroa Learning Management System Expert/Setting up of course delivery platform, trouble shooting, and tech support for learners

UPOU 14 Reinald Adrian Pugoy Educational Technology Expert/Recommendation on educational technology applications and design of online respository for online course materials.

Page 70: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 5 23

Appendix 5. TOR for Consultants

TERMS OF REFERENCE FOR CONSULTANTS

A. IBPAP BPAP will be mainly responsible for overall management of the TA, for coordinating the different component activities, including ensuring adequate industry participation, closer university-industry linkage and sustainability of TA benefits. A-1. Lead Industry-Based Education Expert will work closely with other TA consultants in performing the following tasks:

(i) Provide inputs for the preparation of the overall strategy and roadmap for

enhancing curriculum and instruction in HEIs to meet the labor supply needs of the IT-BPM industry.

(ii) Design the incentives and management systems for the continuous improvement of curriculum and instruction in HEIs.

(iii) Review higher education systems and practices and identify measure to address constraints for improving quality of services and achieving closer university and industry linkage.

(iv) Take responsibility for the satisfactory and timely submission of required reports under the TA.

A-2 Industry-Based Education Specialist will work closely with other TA consultants in performing the following tasks:

(i) Ensure that TA objectives and targets are achieved, all policies are

complied with, and appropriate standards and guidelines for managing and coordinating the TA are in place.

(ii) Oversee, coordinate and integrate all inputs and outputs under the TA in close consultation with industry players, concerned government agencies, HEIs, SUCs and ADB.

(iii) Coordinate with the lead expert in identifying the resource requirements for strengthening skills development programs in HEIs and SUCs.

(iv) Serve as the overall manager, coordinator and integrator for the different TA outputs and inputs including managing the PSC secretariat and the preparation of the TA progress reports to ADB.

(v) Assess the capacity development requirements of HEIs and SUCs to effectively address the talent supply needs of the IT-BPM industry.

(vi) Identify and recommend appropriate twinning arrangements or partnership agreements between foreign and local institutions to enhance HEI curriculum and instruction in the country.

(vii) Prepare draft twinning arrangements and/or partnership agreements for consideration of concerned institutions.

(viii) Assist the lead expert in undertaking the tasks and responsibilities

Page 71: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

24 Appendix 5

A-3 Industry Education Associate – will work closely with other TA consultants in

performing the following tasks are:

(i) Support to the Industry Education Expert in the preparation of the

inception report and detailed work plan, Lead Organizer for events of Programs being implemented by the Industry Education Expert including liaising with partners, private and government institutions as necessary, including the different working groups and project teams.

(ii) Serve as the Project Steering Committee Secretariat Head including the preparation of presentations and technical materials for the PSC meetings, drafting minutes and liaising with PSC members as required

(iii) Support for Project Report Consolidation and Preparation, including the drafting of all project interim and final reports

(iv) Prepare technical materials, project-related researches pertinent to institutional, financial, economic analyses that may be required by the project particularly for the HEIs and SUCs in the proposed hubs.

(v) Assist the industry-based education specialist in undertaking the tasks and responsibilities

A-4. Project Support Staff shall support the overall project management and shall perform the following tasks:

(i) Provide all administrative and logistical support required by the project experts, including organizing special events such as consultation meetings, workshops etc.

(ii) Prepare project budgets, project financial reports for submission to ADB, including documenting and tracking expenses of the project within BPAP.

(iii) Assist in the reproductions of project technical reports, including building a repository and MIS system for tracking all project documents.

B. AIM AIM will lead the TA’s knowledge management components.It will work closely with BPAP and UPOU in preparing strategic policy notes, developing the business model and framework, identifying site locations, incorporating e-learning products, identifying resource requirements, and providing technical guidance and resources for the setting up and management of the IT-BPM industry-university knowledge hubs. B-1. The Knowledge Management Expert will work closely with other TA consultants in performing the following tasks:

(i) Conduct a study and prepare strategic policy notes for enhancing industry–university linkage to support key industries such as IT–BPM as well as a thought paper/industry note.

(ii) Develop the business model, institutional framework, management arrangements, and agreements for establishing, operating, expanding, and sustaining knowledge hubs in consultation with stakeholders.

(iii) Identify sites of industry-university knowledge hubs based on a sound and transparent set of criteria.

Page 72: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 5 25

(iv) Identify resource requirements for establishing and operating knowledge hubs (e.g., staffing, finances, program applications, furniture, hardware, and peripherals).

(v) Prepare inputs for the TA inception report, progress and annual reports to

be consolidated by BPAP.

B-2. The Senior Researcher will work closely with the Knowledge Management Expert in performing the following tasks:

(i) Assist the Knowledge Management Expert in conducting a benchmark study and preparing policy note, thought paper/industry note, and inputs to TA reports.

(ii) Collect data through interviews and focus group discussions and process this.

(iii) Contribute to the identification of sites of knowledge hubs. (iv) Assist in developing a business model, institutional framework,

management arrangements, and agreements for establishing, operating, expanding, and sustaining knowledge hubs.

(v) Assist the Knowledge Management Expert in identifying the resource requirements for establishing and operating knowledge hubs.

(vi) Organize consultation conference.

C. UPOU UP will be responsible for the design and deployment of e-learning products for teaching and learning of industry-designed courses in HEIs including developing a framework for certification and assessment. It will work in close coordination with IBPAP and the AIM to ensure that the development of elearning courses are based on industry needs and standards and that any resulting inputs for business model design, knowledge hub or educational policy developments resulting from the development, production and deployment of elearning courses are properly documented and shared. C-1. Education System Integration Expert will work closely with the expert on industry-designed education and other TA consultants in performing the following tasks:

(i) Determine the project schedule from evaluation to procurement, installation,

test run, and handover. (ii) Identify staff requirements. (iii) Propose annual budget requirements, including capital and operating

expenditures, to maintain the e-learning system, which will be made part of the envisaged knowledge hubs.

(iv) Monitor and evaluate the teaching and learning components of the courses, including the accreditation system, to ensure quality and relevance to industry needs.

(v) Coordinate the integration and implementation of research and training components of the project

(vi) Oversee the system installation, test run, and handover.

Page 73: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

26 Appendix 5

C-2. OnlineCourse Development and Delivery Expert willwork closely with other TA consultants in performing the following tasks:

(i) Prepare the online course material development and delivery plan. (ii) Work with industry experts and the Instructional Design and Assessment Expert to convert the existing learning materials for online mode of delivering instruction. (iii) Organize and conduct online course development training for other course module writers and online course delivery training for course faculties (iv) Monitor and supervise the development of the online modules and its subsequent quality assessment by the Quality Circle and enhancement after the pilot runs. (v) Document the course development and delivery process.

C-3. Learner Support Expert willWork closely with other TA consultants in performing the following tasks:

(i) Assess student support requirements based on target student profile (ii) Coordinate the registration of students from participating educational

institutions (iii) Develop a system of providing learner support

C-4. Multimedia Production Expert will work closely with other TA consultants in performing the following tasks:

(i) Select media formats for the course content including the learning activities. (ii) Recommend multimedia learning activities or objects appropriate to the

courses. (iii) Supervise the design and production of multimedia materials (graphics,

animations, videos, Web interfaces for Web portals, and marketing and communications products).

(iv) Prepare a multimedia production evaluation report. C-5. Instructional Design and Assessment Expert will work closely with other TA consultants in performing the following tasks:

(i) Review and enhance the existing curriculum in the light of the target learner profiles, e-learning requirements, and professional trends. (ii) Review and recommend online teaching and learning approaches for the online courses to be developed. (iii) Review and refine formative and summative assessment in line with GCAT for each course.

Page 74: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 5 27

C-6. Research and Evaluation will work closely with other TA consultants in performing the following tasks:

(i) Coordinate the process documentation of the whole project. (ii) Coordinate and conduct research and evaluation studies on the courses

content and pedagogical approaches. (iii) Coordinate and conduct the monitoring and evaluation study of the project. (iv) Recommend appropriate sustainable models for subsequent scaling up of

the courses.

C-7. Learning Management System Expert will work closely with other TA consultants in performing the following tasks:

(i) Setup and manage a suitable e-learning system infrastructure. (ii) Troubleshoot LMS and other system issues. (iii) Design Tech support system for learners.

C-8. Education Technology Expert will work closely with other TA consultants in performing the following tasks:

(i) Coordinate with the Learning Management System Expert the setting of the e-learning system infrastructure. (ii) Design e-learning repositories in knowledge hubs in consultation with IBPAP and participating educational institutions. (iii) Recommend appropriate tools and technologies for e-learning.

Page 75: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 6 28

Appendix 6. Design and Monitoring Framework Design Summary

Performance Targets and Indicators with Baselines

Data Sources and Reporting Mechanisms

Assumptions and Risks

Impact Improved alignment of higher education programs with the needs of the economy

Philippine education system scoring at least 4.50 on the Institute for Management Development World Competitiveness Online Database by 2018, up from 4.03 in 2009

Institute for Management Development World Competitiveness Online Database

Assumption Global economic stability Risk (H-M-L) (M) Economic shocks (H) Natural Disasters

Outcome A replicable and sustainable system of ICT-enabled knowledge hubs developed for the improved teaching and learning of IT-BPO industry-designed curricula in HEIs

IT-BPO industry-designed courses adopted in at least 3 HEIs by Q3 2015 Adoption of GCAT in selected HEIs by Q3 2015

Annual reports of the Commission on Higher Education Annual reports of the Business Process Association of the Philippines TA Progress reports

Assumptions Sufficient Government support Cooperation and support of HEIs and

Industry firms Implementation is phased to

accommodate flexibility and realistic implementation timeframe

Risks (H) Teacher & student attrition (L) Cross-implementation partner activities

will not be completed on time because of a lack of internal cooperation

(L) Lack of support for public-private partnerships on both the government and private sector side.

(L) Students are not motivated or interested to enroll in IT-BPM courses. (H) Failure of the HEIs & Knowledge hubs to systematically address the IT infrastructure requirements for integrating ITBPM courses into their curriculum

(M) Sufficient project funding is not made available by ADB in a timely manner

Page 76: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 6 29

Design Summary

Performance Targets and Indicators with Baselines

Data Sources and Reporting Mechanisms

Assumptions and Risks

Outputs 1. Access to knowledge

resources for teaching and learning IT-BPO industry-designed courses increased

2. Higher education curricula

and instruction enhanced 3. Partnerships between

industry and academic institutions strengthened

Business model for operating and sustaining the knowledge hubs developed by Q4 2014 Digitized teacher training materials and study modules incorporated in the knowledge hubs by Q3 2014 900 faculty members from participating HEIs, of which at least 50% are women, completing online teacher training programs on IT-BPO industry designed courses by Q3 2015 3000 students, of which at least 50% are females, complete online learning modules and study guides on IT-BPO industry-designed courses by Q2 2015 At least 3 partnership agreements involving HEIs and industries signed by Q4 2012 At least 2 twinning arrangements between foreign and domestic HEIs established by Q2 2014

Annual reports of partner industries Annual reports of participating HEIs TA progress report TA progress report

Assumptions

HEIs and partner industries providing continued institutional support

Faculty members and students

motivated to improve their knowledge and skills

Risks (H) SMP is not integrated in the HEI

curricula offering because recurring costs for e-learning materials are not budgeted

(H)SMP deployment may be disrupted because of poor bandwidth or IT access of the school

(M) Service Level and delivery timelines of the implementing partners are unsatisfactory or the working relationship between the implementing partners becomes difficult

(H) HEIs not amenable to or not aligned with integration of SMP or ITBPM courses in their system.

(H) Non-acceptability of online courses and certification by large IT-BPM players

Page 77: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

30 Appendix 6

Appendix 6: Design and Monitoring Framework

Activities and Milestones 1.1 Drawing from best practice and

lessons regarding the management and operation of knowledge hubs, design a model and operational systems for knowledge hubs by Q4 2012.

1.2 Develop criteria for locating knowledge hubs and selecting beneficiaries by Q4 2012.

1.3 Set up three knowledge hubs by Q4 2013.

1.4 Develop capacity for managing and maintaining knowledge hubs from Q1 2013 to Q4 2013.

2.1 Develop and enhance IT-BPO

industry-deisgned courses by Q1 2013. 2.2 Implement a system for accrediting

courses by Q4 2013. 2.3 Develop online teacher training

programs and guides by Q2 2014. 3.1 Identify partner industries and HEIs by

Q3 2012. 3.2 Discuss and agree on partners’

responsibilities by Q3 2012. 3.3 Develop a partnership framework by

Q3 2012. 3.4 Develop a business model to sustain

the propagation and operation of knowledge hubs by Q4 2014.

Inputs Republic of Korea e-Asia and Knowledge Partnership Fund : $500,000

Amount Item ($’000) Consultants 355.2 Equipment 32.0 Training, seminars, and Conferences 55.8 Evaluation surveys and studies 15.0 Miscellaneous administration And support costs 13.0 Contingencies 29.0

Government The government will provide counterpart support in the form of remuneration of counterpart staff, office accommodation, utilities, and other in-kind contributions.

BPO = business process outsourcing HEIs = higher education institutions IT = information technology ICT = information and communication technology GCAT = Global Competitiveness Assessment Tool, Q = quarter TA = technical assistance. Source: Asian Development Bank

Page 78: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 1

IT-BPM Knowledge Hub Thought Paper

(Draft 1)

1. Objectives of the TA and purpose of the thought paper The Philippine Government sought the assistance of the Asian Development Bank through the Department of Finance to provide capacity development technical assistance (TA) in addressing skills shortages in the IT-BPM industry by aligning higher education curricula with international standards and labor market demand, simultaneously, developing and strengthening public and private partnerships. To achieve these goals, the TA will employ knowledge hubs to develop replicable models for strengthening relationships among the government, industry, and higher education institutions (HEIs) within the IT-BPM industry; sharing and learning regional knowledge and experiences; and supporting other high-growth industries.1 The TA envisions an improvement in the alignment of higher education with the needs of the economy. Such impact becomes tangible through a replicable and sustainable system of ICT-enabled knowledge hubs for the improved teaching and learning of IT-BPM industry design curricula in HEIs. The expected key specific outputs are increased access to knowledge resources for the IT-BPM designed courses, enhanced higher education curricula and instruction, and strengthened partnership between industries and academic institutions.2 This thought paper is the beginning phase in the process of formulating the operation and business model for the IT-BPM Knowledge Hub. The concepts, ideas, and propositions articulated in this thought paper were derived from review of literature, analysis of industry and government documents and presentations, dialogues and focus group discussions (FGDs) with partner institutions IBPAP and UPOU, as well as industry experts and practitioners. Data was generated and analyzed in a period of three months, beginning October 2013 through December 2013. Imbued within the concept of knowledge hub is the process called knowledge mapping.3 The formulation of this thought paper is conceived as the beginning of the knowledge mapping process. In the forthcoming months, the initial framework articulated in this thought paper may likely develop and evolve in complexity and detail as more data will be gathered and analyzed, ultimately, leading to the operation and business model of the IT-BPM Knowledge Hub.

1 Technical Assistance (TA) Report, Technical Assistance to the Philippines for Strengthening Knowledge-Based Economic and Social Development, ADB, 2012. 2 Ibid 1 3 Guidelines for Knowledge Partnerships, ADB, 2011.

Page 79: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 2

The following questions guide the knowledge mapping process:

1. How will knowledge hubs transform the learning pedagogy and student competencies to meet the talent demand of the agile ever-changing IT-BPM industry?

2. How will the knowledge hub improve access to knowledge resources for industry-designed courses specific to the IT-BPM?

3. How will the knowledge hub enhance higher education curriculum and instruction?

4. How will the knowledge hub strengthen industry-academe partnerships? 5. How will knowledge hub transform course delivery? 6. How will knowledge hub reach new talent diasporas (OFWs)? 7. Why will stakeholders commit to the knowledge hub?

2. Knowledge Hub Definition of a Knowledge Hub From the point of view of development practitioners on the level of transnational exchange, a knowledge hub has been defined as “an organization, or part of an organization, dedicated to sharing and exchanging development experiences and models.”4 A review of ADB’s “Guidelines for Knowledge Partnerships” 5 is useful in creating a working model for a knowledge hub. The guide was developed in order to guide ADB staff in the implementation and practice of applying knowledge solutions for development. ADB considers that “knowledge networks facilitate information exchange toward practice-related goals.”6 Six main functions describe the strategies and activities of networks:7 – filtering – amplifying – investing and providing

4 Choesni, Tubagus A. and Schulz, Nils-Sjard. “Knowledge ubs — Progress in Practice since the Bali ommuni u ,” p. . http://jica-ri.jica.go.jp/publication/assets/040_Chapter4.pdf and http://wbi.worldbank.org/sske/sske/knowledge_hub 5 Guidelines for Knowledge Partnerships, ADB, 2011. 6 Citing ADB. 2008. Creating and Running Partnerships. Manila. Available: www.adb.org/Documents/Information/Knowledge- Solutions/Creating-Running-Partnerships.pdf

7 citing Mendizabal, E. 2008. Supporting Networks: Ten Principles. Available: www.odi.org.uk/resources/download/1130.pdf

Page 80: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 3

– convening – community building – learning and facilitating Types of Knowledge The following definitions of knowledge are useful in drafting a working model for the IT-BPM Knowledge Hub. Citing the work of International Institute for Sustainable Development (IISD), three types of knowledge are identified: 8

Explicit knowledge is knowledge that can be written down, recorded, or codified in some manner.

Tacit knowledge is an understanding of how to do things (such as how to

develop new policy recommendations, how to run a community consultation, or how to negotiate a policy change with a decision maker). It is created by doing, and personal trial, error, reflection, and revision. It can be difficult, however, to articulate what that “how to” actually is. The transfer of tacit knowledge, therefore, is facilitated through shared processes (working together, mentoring, and so forth) in addition to the physical transmission of related written or recorded content.

Implicit knowledge refers to the inherent values and cultural considerations

that shape and influence the perceptions, choices, and actions of knowledge holders.

Knowledge Processes Several processes are identified in knowledge management practice. These key knowledge processes are:9 (1) knowledge mapping or the process of identifying knowledge needs and gaps, and sourcing knowledge accordingly; (2) generating or creating knowledge through original research and through refining, testing, and implementing new applications of existing knowledge; (3) storing and retrieving knowledge through appropriate information systems and protocols (such systems often sit at the heart of good knowledge management practice, although they are only one part of the full range of knowledge management activities); (4) sharing and applying knowledge through interactions with other stakeholders and broader communities of interest; and (5) engaging in cycles of learning and reflection leads to adaptation and progress against given objectives. Typologies of Knowledge Networks

8 citing Creech, H. 2005. The Terminology of Knowledge for Sustainable Development: Information, Knowledge, Collaboration and Communications. An International Institute for International Development Knowledge Communications Practice Note. Winnipeg: IISD

9 ADB, Guidelines for Knowledge Partnerships, 2011, p. 3-5

Page 81: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 4

Knowledge hubs can be operationalized in several ways. As “Point-to-Point exchange” or “strategic alliance,” the relationship can be between two institutions. As “information hub,” a “hub and spokes,” or a “networking hub,” the relationship can be between several institutions with one institution serving as primary driver and/or secretariat, holding the connection between members of the network, encouraging other institutions to engage and participate on the basis of formal or informal contracts and tools.10 Typologies of partnerships and networks can be organized in a number of ways—by level of formality and obligations of participants and by function, geographic distribution, and time.11

TYPOLOGY BASED ON FORMALITY AND OBLIGATIONS OF THE PARTNERS

Type of Partnership Characteristics

Formal, between organizations

Strategic Alliances In the private sector, these alliances are long-term purposeful

arrangements among distinct but related organizations that allow those firms to gain or sustain competitive advantage.

In the public or nonprofit sector, a strategic alliance is established

for a value exchange between the partners, governed typically

under the terms of a Memorandum of Understanding. ADB describes these as voluntary formal arrangements between two or

more entities with a common set of objectives to meet critical needs, which pool resources while remaining independent.

Public-private partnerships Contracts between a private sector entity and the government,

where the private partner delivers a desired service and assumes the associated risks. In return, the private partner receives

payment according to criteria specified in the contract and assumes the financial and administrative burden of providing the service,

while the government regulates and monitors performance.*

Tri-sector or cross-sector

partnerships

This type of partnership consists of private investment, public

objectives, and community participation.*

Less formal, between organizations

World Summit on

Sustainable Development

Multi-stakeholder Partnerships

These partnerships are voluntary, multi-stakeholder initiatives

aimed at implementing the sustainable development goals of

Agenda 22, Rio+5, and the Johannesburg Plan of Implementation. Such partnerships are considered to be a key mechanism for

translating political commitment into action. These may be long-term relationships or focused in specific project implementation.

Formal knowledge networks Knowledge networks among institutions focus in strengthening the

sharing of knowledge and generating new knowledge to have greater influence on policies and practices outside the network.

The knowledge is for use beyond the network; the network is

purpose driven, to create knowledge for application; and often time bound, in setting and achieving goals and objectives. Formal

10 ibid., 14-15. 11 Creech, H. 2005. The Terminology of Knowledge for Sustainable Development: Information, Knowledge, Collaboration and Communications. An Institutional Institute for International Development Knowledge Communications Practice Note, Winnepeg: IISD.

Page 82: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 5

TYPOLOGY BASED ON FORMALITY AND OBLIGATIONS OF THE PARTNERS

Type of Partnership Characteristics

knowledge networks have a greater degree of structure, bringing

together expert institutions for more specific research tasks, but retaining the focus on promoting the findings for use beyond the

network members.

Less formal, between individuals

Open source development communities

These communities are purpose driven in the development and testing of new ideas. They are open in that anyone wishing to

contribute to the purpose can join; structured in the expectation

that members will contribute actively to the purpose, with dedicated monitoring and reviewing of those contributions by the

originators of the community; and hierarchical in that the endorsement and adoption of new ideas is through the inner circle

of the original creators of the community. They are prone to regular branching off to new communities when the ideas are not

endorsed or adopted.

Network of experts These networks bring together individuals rather than organizations; the invitation to join is based on expertise in a

particular area. Their purpose can be either advisory or focused in

research and problem solving.

Communities of practice Two or more individuals can create a community of practice for conversation and information exchange, possibly even leading to

the development of new ideas and processes. Participation is purely voluntary and will wax and wane with the level of interests

of the participants. Communities of practice can exist within an organization, or be independent of any organization; they can be

face-to-face in person or virtual/online.

Communities of interest These are more loosely knit communities built around common characteristics or shared interests (youth activism, hobbies, etc.).

Participation is purely voluntary and will wax and wane with the

level of interest of the participants.

Information networks and portals

These networks provide access to information supplied by network members, occasionally with overlays of interpretative materials

that organize content thematically. However, they are fundamentally passive in nature. Users must come to the network-

physically or electronically- to benefit from the work of the network.

* Jarillo, C.J. 1993. Strategic Networks – Creating the Borderless Organization. Oxford:

Butterworth-Heinnmann. * Loew, J. and M. McLindon. 2002. A P3 Primer: Why Are Countries Interested in P3? Available

www.ip3.org/pub/publication002.htm

* Karpova, K. 2002. Public-Private Partnerships in the United States: A Snapshot of Recent Developments and New Directions. Available: www.ip3.org/pub/publication2002_010.htm

Source: Creech, H. 2005. The Terminology of Knowledge for Sustainable Development: Information. Knowledge, Collaboration and Communications. An International Institute for

Development Knowledge Communications Practice Note. Winniper: IISD.

Page 83: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 6

Overall, the preceding discussions on knowledge and partnerships are meant to provide the co-initiators (IBPAP, UPOU and AIM) and other partners in the TA an overview of how ADB and other development organizations define and conceptualize knowledge and knowledge hub. These conceptualizations will be utilized as guiding conceptual foundations in the development of the IT-BPM Knowledge Hub, and its overarching operations and business model. Detailed below are the expected outcomes of the IT-BPM Knowledge Hub as defined by the TA: 12

1. IT–BPO industry-designed courses adopted in at least 3 HEIs 2. Adoption of GCAT in selected HEIs 3. Business model for operating and sustaining the knowledge hubs developed 4. Digitized teacher training materials and study modules incorporated in the

knowledge hubs 5. 900 faculty members from participating HEIs, of which at least 50% are

women, completing online teacher training programs on IT–BPO industry- designed courses

6. 3,000 students, of which at least 50% are females, complete online learning modules and study guides on IT–BPO industry-designed courses

7. At least 3 partnership agreements involving HEIs and industries signed 8. At least 2 twinning arrangements between foreign and domestic HEIs

established Fusing together the grounding concepts on knowledge, knowledge processes, knowledge partnerships, the enumerated outcomes above, and the main objectives of the TA, a tentative framework of IT-BPM Knowledge Hub is developed.

12 Ibid 1

Page 84: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 7

3. Tentative framework of IT-BPM Knowledge Hub

Definition of the IT-BPM Knowledge Hub The initial conception of the IT-BPM Knowledge Hub is categorized into virtual and physical domains. Virtual Knowledge Hub (Diagram 1) can be appreciated at the conceptual level, because it an omnipresent vessel containing the different types of knowledge (tacit, implicit, and explicit) and utilizing the different knowledge processes (knowledge mapping, knowledge creation, knowledge storage and retrieval, knowledge sharing and application, and learning and reflection) in its quest to bring about change in the Philippine IT-BPM industry talent development and labor force supply chain. The External Environment is characterized as a gap between a qualified labor supply and industry demand. Companies seek talent with required competencies which they cannot acquire through their present training and recruitment process. Companies have formulated competency standards and work through their industry associations and IBPAP and are working with Government and academe to improve competencies in the labor supply. However, IBPAP

Page 85: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 8

recognized that the current practices lacked scalability to achieve the industry target of 770,000 new hirers. Thus, the TA has drawn on the experience of UPOU and AIM. UPOU has a strong track record in delivering online education through its virtual and physical education network. It is tasked with courseware curriculum development. AIM with its industry-academe consulting and research experience will apply its knowledge hub and partnership enabling processes through value propositions and business modeling to the IBPAP talent gap resulting in industry-academe partnerships to close the talent gap.

The hub is all encompassing, both global and national in breadth and scope. Globally, the Virtual Hub can partner with other organizations in enriching its knowledge and practices. Moreover, the hub can elevate the Philippine IT-BPM industry to the world stage, as well as raise IT-BPM careers to be aspirational careers. The global scope will also allow the hub to reach out to Filipinos living internationally. Nationally, the Virtual Hub draws on the strength of each of the core co-initiators (IBPAP, UPOU, and AIM), in supporting the needs of the regional hubs and industry-academe partnerships.

Finally, the Virtual Hub will be agile and flexible adjusting to the changing

needs of the stakeholders. 13 It shall inculcate the tenets of organizational development and organizational change. While the Virtual Knowledge hub tends to be conceptual, and not constrained by physical boundary, in contrast, the Physical Knowledge Hub (Diagram 2) is tangible and bounded by physical space and location. The Physical Knowledge Hubs will be located across the Philippines in Next Wave Cities. The intent is to target the whole nation, particularly those identified as Next Wave Cities. 14 The Physical Knowledge Hubs, which may be referred to as Regional Hubs, will primarily drive the knowledge partnerships and industry-academe partnerships. The Virtual Knowledge Hub will guide the Physical Knowledge Hubs in curriculum development, assessment, certification, teacher training, business and operation modeling, and best practices research. IBPAP has identified IT-BPM centers in Next Wave Cities which combine a conglomeration of population, educational institutions and IT BPM infrastructure appropriate for talent development scalability. Here best practices will develop a customized business model to meet local labor market needs. Academic Associations and pilot talent development academe leaders will work with Government to identify emerging location for partnerships. UPOU and AIM will facilitate the academe-industry partnership.

13 Cappelli, P. 2008. Talent on Demand, Managing Talent in an Age of Uncertainty. Harvard Business Press. Boston, Massachusetts. 14 Next Wave Cities.

Page 86: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 9

The Physical Knowledge Hubs may utilize the seven UPOU campuses as

education and assessment centers. The online course materials that will be developed by UPOU could be accessed in these centers. This is particularly crucial for potential students who, either do not own personal computers, nor have Internet connection. Centers may assess students GCAT progress and teacher training outcomes.

IT-BPM companies, industry associations, local government units, and

academic institutions will collaborate to target specific talent needs through industry-academe partnerships. Industry partners will provide support in terms of time, money, and effort. In addition, Industry partners will develop with academe internships, real-life learning experiences, and ultimately jobs for program graduates. Industry associations and academic institutions will align their curriculum to the needs of the industry from elementary, higher education, all through to executive development. Industry andacademe partners together with the LGUs and the community will work toward transforming the negative notion toward the industry into positive aspirations for careers in IT-BPM.

Page 87: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 10

The IT-BPM Global Knowledge Network (Diagram 3) tells the story of global collaboration in the development of best practices and the symbiotic relationship with the external world environment and the Philippines emerging leadership in the IT-BPM industry. Many of the multinational players have multiple locations around the world. Other research hubs share knowledge. Industry-academe research network develop best practices. There is a unique global challenge for the Philippines. How does it deliver the IT-BPM industry battlecry “work abroad, live here” to the overseas workers and Filipino diasporas around the world? Promoting online learning for professional development through the Internet may help bring talent home and narrow the talent gap. Essential Concepts for the IT-BPM Knowledge Hub

Organizational Development and Change. The TA addresses the issue of skills shortages in the IT-BPM industry with the apparent solution to align industry-academe competencies and scalability with job market demands. Achieving these goals will require rethinking this approach through the lens of organizational

Page 88: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 11

development and change at the company, industry, academe, and government level.

Burke (2002) emphasizes the importance of agility and flexibility for organizational survival in an environment that is, “changing more rapidly than the organizations themselves.” He thus urges the researcher-consultant to investigate organizational complexities in order to discover the organization’s capacity for change.

Given the highly dynamic nature of IT-BPM industry job requirements and the

manner through which they can be addressed, organizational development and change management theory and practice would be very helpful in developing the IT-BPM Knowledge Hubs.

Burke also distinguishes between content and process in organizational change. In the context of the TA, the IBPAP vision of addressing the talent shortage in the IT-BPM industry15 is considered content. IBPAP has begun to define this transformational vision through its Road Map 2016 and Next Wave Cities program.

The process is how change is planned for and achieved. The intricacies of

the processes in the change effort will include considerations on achieving scale and sustainability through the development of an operations and business model.

IBPAP, as an association of associations of allied industries, must lead all

stakeholders to achieve the collective industry vision. It must be clear on what lies in store for all who follow it into an unfamiliar future and what needs to be done to get there. Burke notes that “the kind of behaviors required for content differ from those re uired for process.” 16 To determine the content, vetting the thought paper propositions with industry CEOs through forums and interviews will help IBPAP achieve consensus on the end goal. Determining the process requires leadership that is participative, open, agile, and committed. First adaptive leaders exist in IBPAP, UPOU, AIM, the government, and the academe. The question will be how to motivate other leaders in industry, government, and the academe to commit to and participate in the change process? Resistance to change among the diverse IT-BPM industry stakeholders may exist. As part of the knowledge-mapping process through the thought paper, the researcher-consultants intend to identify issues that may feed this potential resistance.

15 Ibid 14 16 Ibid 15

Page 89: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 12

Co-Initiators of the IT-BPM Knowledge Hub

To reiterate the TA on the roles of the consultants, the discussion below is presented.17

Asian Development Bank (ADB). The Asian Development Bank facilitates the economic development of Asian countries. ADB and the Philippine Government agreed on a new country partnership strategy (CPS) 2011 – 2016, consistent with the Philippine Development Plan, 2011-2016. The strategic thrust includes, among others, an improved investment climate and private sector development and aims to drive broad based growth and poverty reduction efforts. The country operations business plan (COBP), 2014-2016, drawing on ADB’s Strategy 2020, further operationalizes the programs strategic focus on inclusive growth. The Technical Assistance to the Philippines for Strengthening Knowledge-Based Economic and Social Development aligns with the Philippine Government’s strategy and program and ADB’s knowledge management plan. This TA supports the establishing of knowledge hubs to address skills shortages in high growth economic sectors such as the IT-BPO. The Philippine Government. Studies show that the Philippines has the potential to attract large investments that can generate a significant number of new high-quality jobs in key sectors such as the IT-BPO industry. Thus, the Philippine Government is taking steps to improve competitiveness by pursuing efforts to move the economy into higher growth areas. However, the country’s education system’s output, its graduates, must be able to meet the labor demands in these high growth areas. The country’s schools are not providing the uantity and uality demands of the rapidly growing sectors. Through the Department of Finance, the Philippine Government requested the Asian Development Bank to provide development technical assistance, the intricacies of which were agreed upon during a fact-finding mission on April 26 to May 4, 2012, to focus on the identified deficiencies. In essence, the government must come up with a way to align higher education curricula with both high- growth sector labor requirements and international standards. The President has approved ADB administering technical assistance. The Department of Finance is the executing agency. University of the Philippines Open University (UPOU). The University of the Philippines (UP), the country’s state university and higher education pioneer, offers 240 undergraduate and 402 graduate programs, and has 14 campuses in the country, UP is one of the country’s leading EIs and has extensive experience in educational administration, curriculum design, knowledge management, and capacity development. The UP system includes the University of the Philippines Open University (UPOU), the only distance education institution in Southeast Asia 17 Ibid 1

Page 90: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 13

that offers most of its courses online. UPOU’s network consists of 10 learning centers, a virtual learning center, and its 19 testing centers are located here and abroad. UP boasts strong ties with industry players and has previously partnered with ADB in knowledge management initiatives. UP will be responsible for designing and deploying e-learning products for industry-designed courses in HEIs and will also manage the teacher development component of the TA. Asian Institute of Management (AIM). An Asian business school accredited with the AACSB, the Asian Institute of Management is a private, non-profit teaching and research institution. The W. SyCip Graduate School of Business and The Stephen Zuellig Graduate School of Development provide graduate education in business and development management. The school was established in partnership with Harvard Business School. AIM is the first private management education institution in the world to partner with the World Bank via the establishment of the AIM-World Bank Development Resource Center. AIM also collaborates with the ADB in delivering programs that cultivate progress in Asian societies. AIM has strong professional ties with business, and experience in operating and managing knowledge hubs such as the ADB-assisted knowledge hub for poverty reduction and the World Bank–supported Global Distance Learning Center. AIM will lead the TA knowledge management components. IBPAP. The Information Technology (IT) and Business Process Association of the Philippines (IBPAP), founded in 2004, is the enabling organization that supports and promotes the interest of its 300 firm members from the full range of IT and business process management (BPM) sectors. IBPAP undertakes industry-relevant research, develops programs to support the growth of the industry, and establishes partnerships with key stakeholders with the intent of making the Philippines the number one global destination for voice and non-voice BPM services.18 Since 2007 IBPAP, DOST-ICTO, and DTI, have jointly identified and promoted potential business growth sites, Next Wave Cities, where favorable conditions and stakeholder actions can spur increased employment opportunities for the public.19 Talent development, through industry public-private partnerships (IPPPs), has been identified as a means to take on the goal of more than one million talents in 5 years. Branding, marketing, and scaling of talent development programs are the current challenges. IBPAP Talent Initiatives

18 BPAP. 2012 19 IBPAP

Page 91: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 14

BPAP’s talent management programs are at various stages of deployment. Included in its 13 programs lineup is the Service Management Program, emerging services program, service technology management program, and its associate program. TESDA Industry Training for Work Scholarship (I-TWSP). The I-TWSP is a government subsidized, industry co-managed near-hire bridging program for the IT-BPM industry. The initiative’s objective is to create a ualified, globally competitive and job-ready labor pool for the IT-BPM industry. TESDA and IBPAP co-managed the project, providing monitoring and management oversight. IBPAP, along with its partner industry associations, allocated scholarship vouchers and worked with TESDA- accredited technical vocational institutions (TVIs). Of the 66,967 graduates of the program, 47,492 or 70.9% were employed. TESDA and IBPAP have demonstrated that the I-TWSP is an effective program for addressing the IT-BPM’s talent gap. It also has an efficient, transparent, and replicable business model for delivery. Service Management Program (SMP). The Service Management Program (SMP), approved by the Commission on Higher Education (CHED) for implementation in school year 2012-2013, is an industry-practitioner designed 21-unit minor degree that can be taken by any university or high school student who wishes to pursue a career in the IT-BPM industry. Advanced English Pre-employment Training (AdEPT). AdEPT was launched in 2008 as an industry-standard language training program. Its current version is delivered through a computer-based (CBT), e-learning platform. and is on its pilot run. Once fully tested, the CBT version will become a precursor to the AdEPT classroom program. AdEPT Train-the-Teachers Training (T3). T3 trains teachers in AdEPT content and methodology so that they can effectively teach English proficiency to their students. The teachers are required to take the GCAT (described below), an orientation on the e-learning platform, and the facilitation skills and teaching methods training. Basic English Skills Training (BEST). BEST, AdEPT’s e-learning precursor, is designed to increase the number of qualified applicants to the language-training program and includes such subjects as English Fundamentals, Listen and Type, Vocabulary Build up, Speech Lessons, and Reading Comprehension.

Page 92: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 15

Global Competitiveness Assessment Tool (GCAT). The Global Competitiveness Assessment Tool (GCAT), is an industry-developed online test to assess basic competencies requisites of entry-level employees.

4. International Models of Knowledge Hub and Knowledge Partnership The MIT Leaders for Global Operations (LGO) case is presented for the purpose of examining and analyzing a model of knowledge hub and knowledge partnership, where lessons and best practices on leadership and management can be drawn. The contents of the case had been extracted from a book chapter authored by three of the faculty leaders from Massachusetts Institute of Technology (MIT).20 The MIT LGO successful knowledge partnerships may provide a guide to the TA’s industry-academe partnerships that will be established in the Regional Hubs. USA – Leaders for Global Operations (FGO)

Sometime in the early 19 0’s, American manufacturing corporations were struggling because they were losing market share, most notably from the Japanese. The quality of American-made products deteriorated compared with Japanese made goods. This dilemma was shared by the nation as a whole and there was a clamor for answers. Massachusetts Institute of Technology (MIT) felt partly responsible for the problem. The institution felt accountable for not creating appropriate programs in manufacturing and not attracting the best and brightest students in manufacturing. The institution then decided to develop a broad program that weaves together the disciplines of engineering and management to attract top students. In the early phase of the program conceptualization, the school of engineering sought to establish an engineering research center for manufacturing and it sought funding from the National Science Foundation. The school of engineering believed that it needed the help of the Sloan School of Management to help American manufacturing corporations address their challenges and issues. There were a number of attempts in finding sponsors, but to no avail. Then, in 1987, William Weitz, then vice Chairman of Motorola, hosted a meeting for senior executives from 10 to 15 companies and MIT. In this meeting, Weitz delivered an impassioned speech about the proposed program, American manufacturing, and

20 Hanson, W., Magnanti, T., & Rosenfield, D. (1996). Industry and universities: New Partners on the Endless Frontier. In Johnson, S. & Kidwell, J. (eds). Reinventing the university. New York: John Wiley.

Page 93: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 16

the need for true partnership between industry and the university. This was the critical point for the beginning of the Leaders for Manufacturing Program (LFM).

Principles underlying LFM The First Principle: The Partnership LFM is centered on a partnership, that between MIT and industry, and within MIT, between the School of Engineering and the Sloan School of Management. The partnership demands strong and deep commitment from both MIT and the industry. First, the partners commit to engage in a long-term relationship. Second, the partners agree that within their organizations, people will devote significant amount of time and energy. Third, partners share scarce resources such as facilities, equipment, talent, and knowledge. Underlying the foregoing tenets, the partners acknowledged and agreed that they must not take on each other’s problems; that the program cannot jeopardize academic freedom; and that the participants cannot disregard commercial rights. All partners translated their tenets of commitment into a set of responsibilities: The industry responsibilities to the university are:

Educating the university about industrial current practices, problems, and needs.

Willingness to provide long-term support to the university in the form of time, energy, resources, and “living laboratories.”

Ability to test new knowledge quickly and provide timely feedback on its value and applicability.

MIT’s responsibilities to the industry partners are:

Willingness to listen to the needs of the industry and its customers. Help to ensure that new knowledge is effectively and efficiently converted

into innovations that meet customer needs. elp for industry’s education process. Continual improvement requires both

effective teaching on campus and effective on-site education of industry employees.

Letting industry have a voice in the educational process. Valuing its roles in improving economic competitiveness, responding to the

intellectual challenges of running a profitable industry, and helping to achieve national economic security.

Page 94: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 17

The second component of the partnership involved MIT’s School of Engineering and the Sloan School of Management. This entailed bringing together the expertise of both schools in developing the best engineers that understood good management, and mangers that had a deep understanding of the technical complexities of a modern corporation. LFM had to contend with bridging the differences between the two schools, as they have different value systems and educational philosophies. Second Principle: Adequate Support LFM needed $25 million in financial commitment from industry partners, as well as endowment funds to support its first five years of operation and to ensure its long-term viability. This vast amount of money was needed to provide full fellowships and six and one half month, fully supported internship, as well as fund manufacturing research projects, and the development of a new curriculum. The amount of financial commitment required from the industry partners were viewed as essential triggers for eliciting enduring, long-term corporate commitment to the partnership. It commanded top leadership commitment from corporations solely from the money it required to be in the partnership. Companies that wanted to participate, solely by contributing the financial commitment, but not the time and people were declined. Although the involvement in the partnership required a significant financial commitment, as well as time and personnel, companies were motivated for a variety of reasons. Some industry partners were interested in reshaping the landscape of higher education, particularly manufacturing education. Some wanted to attract the best managers and leaders in manufacturing. Some wished to raise the manufacturing’s prominence in the corporate world. Some were motivated to collaborate with other manufacturing companies. Some wanted to utilize MIT’s expertise, and finally, others wanted to undertake manufacturing research.

Page 95: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 18

The Third Principle: Enterprise-Wide Manufacturing LFM took on a much broader understanding of manufacturing, negating the narrow definition of the past to encompass the total enterprise that covers areas of human resources, technology, customers, suppliers, community, and government, in addition to manufacturing and production operations.

Replicating LFM in China Twenty years after the first fellows program started, partner companies requested that the program be replicated in China. This request arose from the desire of American partner companies to employ globally competent managers and leaders in their China operations. During this period, manufacturing operations have been mostly transported out of the US and into China. By this time, LFM has been renamed to Leaders for Global Operations (LGO).

MIT Industry Integration

Governing Board

Operating Committee

LFM Administration Faculty RAs

Company Supervisors of Internship

Fellows Program

Research Program

Company Research

Fellow –focused:

• Curriculum

• Leadership • Admissions

Workforce or company

focused:

• Extended

Education*

• Recruiting and

Placement

Program-focused:

• Research*

• Internships

STANDING COMMITTEES

The following is a partial list of standing committees. All committees have

members from MIT, industry partners, and students, except those marked with an asterisk (*), which have no student members.

Page 96: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 19

The program that was established in China was thus called, China Leaders for Global Operations (CLGO). This program is forged through the collaboration of LGO, Shanghai Jiao Tong University (SJTU), and partner companies with manufacturing operations in China. CLGO shares the characteristics and nuances of LGO, as the former was patterned after the latter. A few customizations were instituted to situate, contextualize, and articulate the needs and role of China.21

Relevance of LGO to IT-BPM Knowledge Hub We can begin to cull out lessons on the LGO knowledge partnership and knowledge hub through its drivers of success.

Commitment Strong commitment is one of the founding principles of the partnership. It is the core foundation that binds everybody and every facet of the partnership together. The financial obligation, particularly from the industry partners, is a factor that highlights this commitment. The significant amount of the initial funds raised for the LFM program attracted the attention and lead to outright manifestation of depth of commitment by the stakeholders. In addition, the partners’ long-term outlook demonstrated further commitment. Industry partners were required to commit not only funds but also time, effort, and other resources. Potential partners were not admitted into the program if they only made financial commitments. Partners felt safe and secure that they can rely on one another for the program to develop and meet their mutual needs. Top leadership involvement of industry partners is another important characteristic of the success of the partnership. It was through industry’s senior executives’ commitment and active participation that catalyzed the formation, maintenance, and expansion of the partnership.

21 Keitel, R. and Ledesma, M. (2010). China Leaders for Global Operations: A Partnership in the Manufacturing Industry. Presented at the 14th UNESCO-APEID International Conference, Education for Human Resource Development, 21-23 October 2010, Bangkok, Thailand.

Page 97: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 20

Shared Responsibilities The LGO knowledge partnership thrives on shared responsibilities between academe and industry partners. Palpable in the partnership is the sense of reciprocity in knowledge management. Both the academe and the industry partners take it upon themselves to be accountable for continuous learning through knowledge sharing and knowledge creation. The academe relies on industry for learning about the problems, needs, and advances in the manufacturing world, while industry depends on academe to help them with innovative solutions on their operation and leadership issues and challenges. Explicit is the recognition of each partner’s needs and priorities and ensuring that these are heard and addressed through collaboration and reciprocity.

Mutual Benefits Both academe and industry partners derive benefits from the partnership. The realization of benefits continually compels and motivates the partners to further sustain the partnership. The industry derives benefits by gaining recruiting access to graduates, gaining a provider of workforce continuing education through distance and leadership courses, and gaining huge savings and better operation processes resulting from learning via internships and theses. The academe derives benefits through continuous faculty development, curriculum development, refined research strategies, and research productivity.

Clear Direction Given the instituted operational framework and committees’ leadership allow for clear direction towards realization of goals. There is a formal structure to the partnership. The integration of the partners’ responsibilities was governed through the partnership Governing Board, Operating Committees which engaged in three (3) partnership processes: 1. Fellow-Focused: curriculum, leadership and admissions issues, 2. Program-focused: research and internships; and 3. Workforce or company focused: extended Education and Recruitment and Placement. Faculty and industry partners as well as students were engaged in relevant standing committees.

5. Global Knowledge Hubs and Research Networks LGO

Adding to the best practices in the IT-BPM global arena are global knowledge hubs and research network emerging from industry-academe partnerships. In the early years of the LGO development, both graduate student and

Page 98: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 21

faculty research projects led to impressive outcomes. Industry estimated $28 million in savings through implementation of innovations that evolved from internships and theses projects. LGO fellows, faculty, and industry personnel published more than 400 academic journal articles (1998) drawn from the LGO partnership. As on the Dec 31, 2013, MIT LGO has received about 21,000 citations on Google Scholar.22 The Polaroid Corporation is an example of the industry-academe partnership where significant changes in industry practices through knowledge sharing have been made. Polaroid desired to combine organizational development with change management in manufacturing. LGO faculty-student teams identified how the two functions could to be integrated drawing from another company’s quality system and applying the process to Polaroid. As a result several LGO graduates were employed at Polaroid to bring “best practices” and act as “change agents” in the implementation of this integration project. The Polaroid case demonstrated how students’ research projects lead to organizational change and employment of graduates further depending the academe industry partnership. The Offshoring Research Network Currently, there are a few IT-BPM global research centers that function as collaborative knowledge hubs linking academic scholarly research with industry based issues and challenges. Duke University’s partnership with Fuqua School of Business houses The Offshoring Research Network (ORN) as a global network of renowned research universities, top scholars, and industry practitioners that provides unparalleled data and insight into the globalization of services. ORN tracks more than 2000 companies and 700 service providers. Since 2004, ORN surveys have tracked offshoring practices at the function, industry, and implementation levels. ORN has become one of the most recognized international research network tracking the globalization of services. The university network extends to Australia, Korea, and Japan. The ORN creates partnership through an annual membership fee of $25,000. Companies join periodic round tables, receive research reports, and participate in international conferences. Members received invitations to join the Association of International Business (AIB) special meeting in Moscow and the Academy of Management’s 7 rd Annual Meeting in Orlando, Florida. These are opportunities for practitioners and academics to share interests and develop collaborative relations contributing to the knowledge hub.23 London School of Economics, The Outsourcing Unit

22 http://scholar.google.com.ph/scholar?q=MIT+leaders+for+Manufacuting &btnG=&hl=en&as_sdt=1%2C5 23 http://www.fuqua.duke.edu/offshoring/about/

Page 99: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 22

The Outsourcing Unit of the London School of Economics (LSE) and Political Science was founded to research at the international, governmental, and corporate levels global issues surrounding outsourcing. The Outsourcing Unit has three goals: (1) through research identify outsourcing best practices; (2) raise the standard of knowledge; and (3) working with government, organizations, and companies to influence policy. The Unit is housed in the LSE Systems Information Group with more than twenty full-time faculty, fifty doctoral degree students and one hundred fifty masters degree students. Its research focus is geared to five key drivers of effective outsourcing detailed below.24

Managing risk; Leveraging core capabilities; Delivering effective sourcing strategies; Streamlining cost and performance; Developing the innovation agenda.

The research reports and white papers drawn from academic industry partners are shared with The Outsourcing Unit’s stakeholders.

Relevance of Research Networks to IT-BPM Knowledge Hub

The review of literature on research networks conspicuously revealed the lack of citations on India or the Philippines. Absent are knowledge linkage with Indian or Philippine based academic research centers. More analysis is necessary to discover if linkages exist. The question is why Philippines and Indian industry-academe players are not included? Further research may reveal and understanding of this anomaly.

6. Summary

This thought paper presents the initial framework of the IT-BPM Knowledge Hub. In addition, propositions are herein presented which were derived from the framework and other essential concepts related to the knowledge hub. The foregoing discussions and ideas are intended to re-affirm the change that the IT-BPM industry seeks to pursue. Further, this thought paper is deemed to spark new inspirations and novel insights from co-initiators and stakeholders as we further engage in developing the IT-BPM Knowledge Hub and its business model.

24 http://www.outsourcingunit.org/

Page 100: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 23

Propositions:

1. The Virtual Knowledge Hub recognizes the complexity of the IT-BPM talent supply development. The TA should look beyond HEIs to include TVIs and K-12 programs. This concept of academe is more inclusive than HEIs alone as TVIs and K-12 pilot programs are developing talent for the IT-BPM sector. Therefore, there is a need to develop the talent supply qualified for industry beyond the HEI boundaries.

2. The assessment tool, GCAT, is the industry standard. What are the

complexities of this assessment? How can the GCAT be transformed into a professional license administered by the Department of Labor and Employment through its Professional Regulation Commission (PRC)? What are the advantages and disadvantages of this approach? How can a pre-GCAT test be developed by UPOU and administered on-line? How can the GCAT PRC license be confirmed on-line?

3. The Virtual Knowledge Hub draws on international and local best practices

forming research opportunities with faculty and industry personnel.

4. The academe-industry partnerships require strong support and leadership from the IT-BPM companies. Partnerships demand financial commitment, as well as commitment of effort, time, and other resources for success. Openness to change and a willingness to engage in the complexities of talent development are also required.

5. The evangelists and the first adapters both in the industry and academe,

must carry the message of change to other stakeholders. Current existing pilot programs may integrate on-line learning and assessment, thus, demonstrating scalability.

6. Internships must be real and lead to IT-BPM jobs. IT-BPM companies must provide meaningful internships that benefit the company, the academe, and the student.

7. Regional knowledge partnerships must be aligned with the labor market

needs.

8. Creating the IT-BPM aspirational career vision requires a campaign to reach students, career shifters, parents, academics, and the greater Philippine population. “Work abroad, live here,” needs to become a living mantra for inclusive growth.

9. The IT-BPM Knowledge Hub will drive the process to further enhance the Philippines’ position on the world stage for IT-BPM. As a global leader, The

Page 101: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Page 24

IT-BPM Knowledge Hub will promote industry-academe research to highlight the best practices and strategic issues.

7. Future Direction

The tentative IT-BPM Knowledge Hub framework, propositions, concepts, and best practices presented in this thought paper will continually evolve as the TA co-initiators engage in the knowledge-mapping process over the forthcoming months. More needs to be done as we seek to institute change. Other stakeholders need to be heard and their inputs integrated in the framework, as we develop the IT-BPM Knowledge Hub business model. It is foreseen that the following activities will be conducted: Discussions and Interviews with stakeholders (CEOs, HRs, Academe,

Associations) Reviews of other best practices in the Philippines and globally Discussions with knowledge management experts (Olivier Serrat of ADB) Development of the business model for operating and managing the knowledge

hubs

8. Further References

Keitel, R. & Ledesma, M. D. (forthcoming). The Government IT-BPO Industry Partnership for Inclusive Growth in the Philippines. International Journal of Development and Sustainability (IJDS), Japan. (ISSN: 2186-8662) Keitel, R. & Ledesma M.D. (2009). Night work prohibition on women workers in the Philippines. ILO Conference on Regulating for decent work, presented Geneva 8-10 July 2009. Keitel, R. (2008). A proposed model of higher education institution-call center industry partnership. The Asia-Pacific Education Researcher Journal. Vol 17, No 2. (ISSN 0119-5646X) Kumar, S. & Leonard, A. The Art of Knowledge Exchange, A Results-Focused Planning Guide For Development Practitioners. The World Bank. Serrat, O. (2012). Business Model Innovation, Knowledge Solutions. Asian Development Bank. Serrat, O. (2008). Creating and Running Partnerships, Knowledge Solutions. Asian Development Bank

Page 102: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

1

The Deployment and Pilot of Knowledge Hubs

Impementing Agency: IT-Business Process Association of the Philippines (IBPAP)

BACKGROUND/RATIONALE

In September 2013, the Asian Development Bank (ADB) contracted the IT-Business Processing Association (IBPAP), the Asian Institute of Management (AIM) and the University of the Philippines Open University (UPOU) to implement over a 26 month period TA-8164 PHI: Strengthening Knowledge-Based Economic and Social Development. The TA is designed to address the skills shortage in high growth industries such as the IT–BPM sector by aligning the higher education curriculum with both international standards and labor demand while building on public-private initiatives. The TA Outcome is a replicable and sustainable system of ICT-enabled knowledge hubs for improved teaching and learning of IT–BPM industry based curricula in higher education institutions (HEI). Three key Outputs will accomplish the Outcome of the TA:

(i) Access to knowledge resources for teaching and learning IT-BPO courses, (ii) Higher education curriculum and instruction enhanced, and (iii) Partnerships with industries and academic institutions strengthened.

The IBPAP, contracted by the ADB in September 2013, is principally responsible for the overall management of the TA, for coordinating the different component activities, including ensuring adequate industry participation, closer university-industry linkage, deployment of the pilot knowledge hubs and sustainability of TA benefits. It established a project management team that serves as the operations unit for the TA implementation. It also acts as the Secretariat for the project’s Project Steering Committee (PSC) that meets once a quarter. In the Consultant’s Inception Report, the IBPAP prepared its workplan for deploying the Knowledge Hubs using a very simple, theoretical approach that required minimal resources. Additionally, it was banking on the expertise of the Asian Institute of Management to work closely with IBPAP in providing technical guidance and resources for setting up the hubs as defined in the AIM TORs for the project. Following the initial consultations and discussions on the design of the knowledge hub and the criteria for selection, it was determined that these initial assumptions were no longer valid. Deploying the knowledge hub is a more complex process that will require a more pragmatic approach and where the deployment process needs to be right resourced in order to succeed. It will require consultation with many stakholders in the HEIs, local government, national government and the private sector firms and industry associations. It will also require a solid assessment of a number of shortlisted HEIs or institutions to determine capacity level and commitments to deliver the Knowledge Hub activities.

Page 103: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

2

ADDITIONAL TECHNICAL ASSISTANCE: Given the progress of the AIM in preparing the Business Model for the Knowledge Hubs, IBPAP realizes the need to provide internal technical resource time to complement the work being done by AIM so that critical business model design parameters are sufficiently identified and a suitable overall framework can be finalized and deployed within the project timelines. The IBPAP requests the ADB for additional technical assistance to facilitate the pilot of the Knowledge Hubs. This activity is within the scope of the overall TA design and is a vital component in strengthening the partnerships between industry and academic institutions. However, this initiative is not included in the list activities to be undertaken by IBPAP and therefore not part of the Consultant’s approved budget. The additional TA which is for new activities and will be implemented within the existing project timelines provided that approvals are secured within October-November, 2014. Objectives: The objective of this TA is to set up pilot knowledge hubs by Q2, 2015. The specific output of this TA is to identify and deploy one pilot hub and assist in developing the capacity for maintaining and managing the hubs.

Specific Scope: Task 1: To finalize the design of the business model for the knowledge hub and identify a shortlist of prospective knowledge hub sites. Task 2: To Set-up one knowledge hub Task 3: To Develop capacity for managing and maintaining knowledge hub Expected Activities & Outputs: This additional TA/work package will include the following: Task 1: To finalize knowledge hub design and business model.

Conduct consultation workshops with different stakeholders including industry associations, CEOs, HEIs, government education administrators & policy makers and other stakeholders.

Finalize business model, institutional arrangements, management arrangements, deployment of SMP e-learning courses, revenue/pricing structure and roles.

Identify/shortlist sites of for knowledge hubs based on a pre-defined criteria

Page 104: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

3

Task 2: To Set-up one knowledge hub.

Draft MOAs and other agreement for setting up the KH Negotiate with selected institution Prepare career advocacy and information campaigns Assist knowledge hub institutions in setting up facilities, staffing, program

applications, etc.

Conduct orientation, briefing, training on IT-BPM sector and knowledge hub functions, e-SMP courses and curriculum, protocols for management and operations, etc

Integrate eSMP program delivery Provide support during initial stage of deployment

Task 3: To Develop capacity for managing and maintaining knowledge hubs

Monitor initial operations and assist in defining adjustments or troubleshooting for the eSMP program activities, as required

Conduct training/coaching as required. Assist in linking knowledge hub with HEI’s and industry firms and associations in

the area.

Schedule of Implementation:

Task Task Description Schedule 2014 –2015

0 To complete administrative requirements to secure approval for additional TA

October-November 2014

1 To finalize the design of the business model for the knowledge hub and identify a shortlist of prospective knowledge hub sites.

December-January 2014

2 To Set-up one knowledge hub January-March 2015

3 To Develop capacity for managing and maintaining knowledge hubs

April-June 2015

Page 105: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

1

The Development and Implementation of a Management Information

System and Project Portal

Impementing Agency: IT-Business Process Association of the Philippines (IBPAP)

BACKGROUND/RATIONALE

In September 2013, the Asian Development Bank (ADB) contracted the IT-Business Processing Association (IBPAP), the Asian Institute of Management (AIM) and the University of the Philippines Open University (UPOU) to implement over a 26 month period TA-8164 PHI: Strengthening Knowledge-Based Economic and Social Development. The TA is designed to address the skills shortage in high growth industries such as the IT–BPM sector by aligning the higher education curriculum with both international standards and labor demand while building on public-private initiatives. The TA Outcome is a replicable and sustainable system of ICT-enabled knowledge hubs for improved teaching and learning of IT–BPM industry based curricula in higher education institutions (HEI). Three key Outputs will accomplish the Outcome of the TA:

(i) Access to knowledge resources for teaching and learning IT-BPO courses, (ii) Higher education curriculum and instruction enhanced, and (iii) Partnerships with industries and academic institutions strengthened.

The IBPAP, contracted by the ADB in September 2013, is principally responsble for the overall management of the TA, for coordinating the different component activities, including ensuring adequate industry participation, closer university-industry linkage and sustainability of TA benefits. It established a project management team that serves as the operations unit for the TA implementation. It also acts as the Secretariat for the project’s Project Steering Committee (PSC) that meets once a quarter. During the first PSC meeting held on January 30, 2014, the IBPAP presented an industry situationer including an update on industry developments related to talent development. Following that presentation and the briefing on project activities from the three project contractors, the PSC members realized the fast pace at which the industry is moving and saw the need to keep stakeholders, particularly the PSC members, updated both on industry developments and project activities. Consequently, the PSC required the project to set up a website/portal which could serve as the venue for updating the PSC, project implementers, potential or enrolled students and other stakeholders on developments in the IT-BPM sector. It will also serve as the tool for communicating with the project partners on a regular basis and for piecing together information from the different activities in a manner that will facilitate accomlishment of the overall projct goals. In addition to communicating to its stakeholders, IBPAP is also cognizant of the need for a system that can, at a program level, help systematically track and provide project

Page 106: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

2

stakeholders information on different activities including the knowledge hub and supporting enrollment through career advocacy and information campaigns/initiatives to boost participation. An important finding of the Learners’ Profile that was conducted by the UPOU prior to developing the first two eSMP courses shows that one of the factors limiting enrollment is the seeming unclear or lack of understanding of the kinds of careers in the IT-BPM sector. IBPAP is exploring several options and tools that will respond to ithe communication and management information needs and career advocacy and support initiatives to support the eSMP offering of UPOU, taking into consideration cost efficiency and the existing resources that are availble at IBPAP for these activities.

ADDITIONAL TECHNICAL ASSISTANCE:

The deployment of the MIS/Management Information tool and the additional career advocacy and suppport initiatives were not identified as part of the initial project cost because it was assumed that the existing IBPAP systems and activities in these areas would be sufficient. However, because of the expansive reach of the eSMP program and results of the Learning Profile, it is important that more resources be dedicated to these emerging needs so that the project can effectively address the project’s requirements in these areas. The IBPAP requests the ADB for additional technical assistance as part of its overall project management function, specifically in keeping the PSC members informed of the industry developments and updated on project activites, in strengthening its project monitoring and evaluation process and in setting the foundation for the establishment of the knowledge hubs. This activity falls within the original scope of the project design and will add value to and support the deployment of the eSMP and the establishment of the knowledge hub. This initiative was not part of the original list of activities to be undertaken by IBPAP and therefore not part of the original list of activities to be undertaken by IBPAP and therefore not part of the Consultant’s approved budget. The additional TA will fund new activities an will be implemented within the existing project timelines provided that approvals are secured within October-November, 2014. Objectives: The objective of this TA is to increase engagement of the different stakeholders through better communication and timely access to industry and project information. The specific output of this TA is to deploy and maintain the communication/MIS tool, provide supplementary career advocacy and information dissemenation initiatives directed at the offering of eSMP, supporting the internship process and provide mangement and governance documentation to the different stakeholders.

Page 107: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

3

Specific Scope: Task 1: To set up, deploy and maintain the tool for communicating with different stakeholders and the project MIS. Task 2: To conduct career advocay and information campaigns/activities for potential enrollees and teachers/HEIs. Expected Activities & Outputs: This additional TA/work package will include the following: Task 1: To set up, deploy and maintain the tool for communicating with different stakeholders and the project MIS.

Evaluate IT communication and MIS options Deploy communication tool and MIS Maintain communication tool and MIS

Task 2: To conduct career advocay and information campaigns/activities for potential student and teacher enrollees/HEI partners.

Review results of Learners’ profile & other feedback from stakeholders Conduct consultation sessions with HEIs, Industry Associations and Industry

Partners

Prepare Career Advocacy Campaign Prepare Information Campaign materials and collaterals Conduct Career Advocacy Campaign for eSMP partners and in Knowledge Hubs

Schedule of Implementation:

Task Task Description Schedule 2014 –2015

1 To set up, deploy and maintain the tool for communicating with different stakeholders and the project MIS.

October-November 2014

2 To conduct career advocacy and information campaigns/activities for potential student and teacher enrollees/HEI partners

December 2014

Page 108: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

The Design and Implementation of eSMP Courseware (Service Culture

& Systems Thinking)

Impementing Agency: University of the Philippiines Open University (UPOU)

BACKGROUND/RATIONALE

In September 2013, the Asian Development Bank (ADB) contracted the IT-Business Processing Association (IBPAP), the Asian Institute of Management (AIM) and the University of the Philippines Open University (UPOU) to implement over a 26 month

period TA-8164 PHI: Strengthening Knowledge-Based Economic and Social Development. The TA is designed to address the skills shortage in high

growth industries such as the IT–BPM sector by aligning the higher education

curriculum with both international standards and labor demand while building on public-private initiatives. The TA Outcome is a replicable and sustainable system

of ICT-enabled knowledge hubs for improved teaching and learning of IT–BPM industry based curricula in higher education institutions (HEI). Three key Outputs

will accomplish the Outcome of the TA:

(i) Access to knowledge resources for teaching and learning IT-BPO courses, (ii) Higher education curriculum and instruction enhanced, and (iii) Partnerships with industries and academic institutions strengthened.

The UPOU is the primary resource for developing and delivering distance e-learning courses. It is working closely with the IBPAP in converting the Service Management Program (SMP) courseware, an industry designed program prepared by IBPAP for entry and staff level positions, to e-learning materials/courseware which it will deliver as 100% masssive open distance e-learning (MODeL) courses beginning in late July 2014. UPOU shall also lead the teacher development component of the program. Based on approved funding levels and project workplan, UPOU is developing 3 of 5 subjects of SMP, namely BPM-101, Business Communications (BusCom) and Service Culture. The conversion process for BPM 101 and BusCom to e-learning mode are being completed in time for classes to commence on July 26, 2014. The Service Culture course will be completed in time for its offering sometime in late October. Since the SMP Program was launched on June 19th, the initial enlistment/enrollment has reached close to 600 applicants. Pre-class administrative and diagnostic activites are now underway to prepare them for classes. The UPOU has made substantial progress in converting the SMP and the initial response to the enlistment/enrollment call confirms that a strong demand exists for the program. While a profiling is still being completed, what is clear is that the SMP may now be accessed nationally and globally. A substantial number of these potential enrollees are composed of OFWs located in different parts around the world (London, Dubai,

Page 109: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Singapore, Malaysia, to name a few) and those from the Philippines come from as far as Mindanao. However, UPOU needs to complete conversion of the remaining two courses so that it can offer the full program to the public and fully meet the industry skillset requirements tht will allow these potential BPM workers to apply for jobs in the IT-BPM sector.

ADDITIONAL TECHNICAL ASSISTANCE:

The hard copy SMP courseware for five subjects was initially reviewed during the Inception period. One of the highlights of the Inception report was the conclusion that the UPOU approved budget for the development of the SMP to e-learning courseware will be sufficient to develop only three of the five courses. UPOU prioritized the development of BPM 101, BusCom and Service Culture based on the pedagogy for delivering the Program. It will require additional financial resources to complete the development of the two remaining courses – BPM 102 and Systems Thinking – before it can offer the full SMP program. The UPOU requests the ADB for additional technical assistance as part of the component for developing the e-learning courseware and delivering the eSMP online to develop the e-learning courseware for the remaining 2 SMP courses – BMP 102 and Systems Thinking. Objectives: This TA is essential for the project to achieve its overall objectives of “improving teaching and learning of IT-BPM industry based curricula and instruction in higher education institutions”. The additional two courses will be delivered to complete the 900 faculty members from participating HEIs and the 3000 students participating in the program. The specific output of this TA is to develop e-learning courseware and deliver BPM 102 and Systems Thinking online beginning 2nd semester of 2015.

Specific Scope: Task 1: Review existing course materials of BPM 102 and Systems Thinking courseware and other related materials . Task 2: Develop modules and study guides for BPM 102 and Systems Thinking for MODeL mode of instructional delivery. The TA will be used to finalize and deploy the courseware development plan, prepare cases to be used in the courses, develop additional course materials e.g. multimedia materials and learning activities, and design assessment for both courses. Task 3: Deliver BPM 102 and Systems Thinking under the Massive Online Distance eLearning (MODeL) framework

Page 110: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Expected Activities & Outputs: This additional TA/work package will include the following for BPM 102 and Systems Thinking) Task 1: Review and enhance IT-BPM Industry designed courses

Review of existing course materials based on course objectives and overall learning outcomes for the Service Management Program

Review of other related documents Finalize course outlines with learning objectives

Task 2: Develop learning modules and study guides for MODeL mode of instructional delivery

Finalize course module development plan Deploy course module development plan Conduct research on content (cases)

Develop course materials (including learning activities) for 2 courses (BPM102 & Systems Thinking)

Design and develop pedagogically sound assessment Produce multimedia materials (i.e. video, animation, podcasts etc,) Revise course materials to incorporate review inputs/comments

Submit revised course materials Complete onine materials for 2 courses including study guides/etutor training) Develop Teacher Guides for the Training of Teacher component

Task 3: Deliver online courses

Design learner support systems Set up and maintain necessary plug-ins to the Learning Mangement System Training of Tutors on e-learning (2 courses)/Training of Teachers Submit Onine course delivery report Run online course as Massive Open Online Distance eLearning courses (MOOCs

framework) (1st batch)

Certify those who completed the course and passed the Assessment for Certification

Accredit teachers who can teach the two courses Submit online course delivery report (2 courses) Conduct Process documentation Submit monthly interim report Write final report Submit closing report

Page 111: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex 8:  DOF Endorsement Letter  

to ADB  (Not for Disclosure) 

Page 112: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 113: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 114: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 115: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 116: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 117: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 118: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 119: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 120: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 121: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 122: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 123: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 124: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 125: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 126: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 127: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 128: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 129: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 130: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex 10 a-c:

Contract Variation 1-3 (Not for Disclosure)

Page 131: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

IT-BPO Industry

Knowledge Hub

Project

Asian Development Bank

Department of Finance Republic of the Philippines

Asian Institute of Management Information Technology and Business Process Association

of the Philippines

University of the Philippines Open University

Implementing Partners

Deliverable 1: Establishing the Criteria

for Locating Knowledge Hubs and

Selecting Beneficiary HEIs/SUCs

Page 132: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 133: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

DRAFT (Apr 4)

Deliverable 1: Establishing the Criteria for

Locating Knowledge Hubs and Selecting Beneficiary HEIs/SUCs

TA-8164 PHI: Strengthening Knowledge-Based Economic and Social Development – 1 BPAP (46234-001)*

Prepared by

Information Technology-Business Process Association of the Philippines Consultant

15 February 2014

Page 134: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

ii

Page 135: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

iii

Acronyms and Abbreviations AdEPT Advanced English Proficiency Training ACPI Animation Council of the Philippines, Inc. ADB Asian Development Bank AHP Analytic Hierarchy Process AIM Asian Institute of Management BEST Basic English Skills Training BPO Business Process Outsourcing CEO Chief Executive Officer BSBA Bachelor of Science in Business Administration BSIS/IM Bachelor of Science in Information Systems/Information

Management BSIT Bachelor of Science in Information Technology CCAP Call Center Association of the Philippines CHED Commission on Higher Education CMO CHED Memorandum Order COA Commission on Audit COD Center of Development COE Center of Excellence DBP Development Bank of the Philippines DMC Developing Member Countries DOF Department of Finance DOST Department of Science and Technology DOLE Department of Labor and Employment DSWD Department of Social Welfare and Development DTI Department of Trade and Industry FGD Focus Group Discussion GO Government Organization GDAP Game Developers Association of the Philippines GDP Gross Domestic Product GMAM General Membership Assembly Meetings HEI Higher Educational Institutions HIMOAP Healthcare Information Management Outsourcing

Association of the Philippines HR Human Resource IBPAP Information Technology–Business Process Association

of the Philippines ICT Information and Communication Technology ICTO Information and Communication Technology Office ILO International Labor Organization IT Information Technology IT–BPM Information Technology–Business Process

Management I-TWSP Industry-based Training for Work Scholarship Program K-12 Kindergarten to Grade 12 LGU Local Government Unit LMS Learning Management Systems LUC Local Universities and Colleges M&E Monitoring and Evaluation NEDA National Economic Development Authority

Page 136: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

iv

Acronyms and Abbreviations NGO Non-government Organization NRCO National Reintegration Center for OFWs OFW Overseas Filipino Worker OSY Out-of-School Youth OWWA Overseas Workers Welfare Administration PAGCOR Philippine Amusement and Gaming Corporation PDP Philippine Development Plan PDS Philippine Digital Strategy PKH Physical Knowledge Hub PMF Project Management Framework PNU Philippine Normal University PO People’s Organization PSC Project Steering Committee PSIA Philippine Software Industry Association PWD Persons with Disability RBM Results-based Management SEI Science Education Institute SME Small to Medium scale Enterprise SMP Service Management Program SUC State Universities and Colleges TA Technical Assistance TESDA Technical Education and Skills Development Authority TOR Terms of Reference TVI Technical and Vocational Institutions TULAY Tulong Alalay UNDP United Nations Development Program UPOU University of the Philippines-Open University VKH Virtual Knowledge Hub WB World Bank WHO World Health Organization

Page 137: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

v

TABLE OF CONTENTS

EXECUTIVE SUMMARY ...................................................................................................................... 1

INTRODUCTION ........................................................................................................................... 2 I.

BACKGROUND ............................................................................................................................ 3 II.

OBJECTIVES OF THE STUDY .................................................................................................... 5 III.

REVIEW OF RELATED LITERATURE AND SELECTED BEST PRACTICE ....................... 5 IV.

A. IBPAP’S NEXT WAVE CITIESTM

.................................................................................................... 5

B. LOCAL KNOWLEDGE HUB INITIATIVES ............................................................................................ 6

C. KNOWLEDGE HUB INITIATIVES IN THE ASIA PACIFIC REGION. .......................................................... 7

D. KNOWLEDGE HUBS IN OTHER PARTS OF THE WORLD .................................................................... 7

APPROACH AND METHODOLOGY ........................................................................................... 8 V.

CONCEPTUAL FRAMEWORK ................................................................................................ 9 VI.

A. WHAT IS A KNOWLEDGE HUB? ...................................................................................................... 9

B. KEY CHARACTERISTICS OF A HUB .............................................................................................. 11

DEFINING THE CHARACTERISTICS AND MEASURE OF POTENTIAL KNOWLEDGE VII.

HUBS USING THE ANALYTICAL HEIRARCHY PROCESS ............................................................ 13

A. PROCESS AND PROCEDURE ....................................................................................................... 14

B. CHARACTERISTIC 1: CONTENT.................................................................................................... 15

C. CHARACTERISTIC 2: DELIVERY METHOD ..................................................................................... 18

D. CHARACTERISTIC 3: AUDIENCE ................................................................................................... 21

E. CHARACTERISTIC 4: GEOGRAPHICAL LOCATION .......................................................................... 25

F. CHARACTERISTIC 5: CHAMPION/PRIMARY OWNER ....................................................................... 28

CONCLUSIONS AND RECOMMENDATIONS ...................................................................... 31 VIII.

OTHER CONSIDERATIONS FOR SELECTING KNOWLEDGE HUBS.................................... 33 IX.

APPENDIX 1. DISTRIBUTION OF HIGHER EDUCATION INSTITUTIONS ..................................... 35

APPENDIX 2. PHILIPPINE REGIONS AS OF 31 DECEMBER 2013 ............................................... 36

APPENDIX 3. SAMPLE QUESTIONNAIRE ...................................................................................... 40

ANNEX A. COMPUTATIONAL SPREADSHEET (SAMPLE FILE) ................................................. 46

Page 138: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 139: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

1

EXECUTIVE SUMMARY

The Information Technology and Business Process Management (IT-BPM) industry is one of the major contributors to the Philippine economy. IT is considered one of the top four sources of foreign exchange. The industry is projected to earn US$25 billion in revenues and generate 1.3 million direct and 3.2 million indirect jobs by 2016. To support the steady supply of talent, the Information Technology – Business Process Association of the Philippines (IBPAP) has been working with government education agencies and the academe to implementing various talent development programs. IBPAP is working closely with the Asian Institute of Management (AIM) and the University of the Philippines Open University (UPOU) to explore and develop new strategies for scaling up its talent development program in order to meet the 2016 labor demand. It will establish and implement three Knowledge Hubs primarily designed to deliver its Service Management Program (SMP) and other programs. A Knowledge Hub is defined as an institution, entity, network or group, typically with high connectedness and high internal and external networking and knowledge sharing capabilities that operates in a knowledge domain or activity and whose excellence is recognized by those who engage with or are supported by it. They are local innovation systems that are nodes in networks of knowledge production and knowledge sharing. Knowledge Hubs fulfill three major functions:

(i) to generate knowledge, (ii) to transfer knowledge to sites of application; and (iii) to transmit knowledge to other people through education and training.

Internationally and locally, knowledge hubs are being developed and implemented locally and internationally by many different sectors and have been found effective in attracting foreign investments, in providing access to high quality education and training and in creating a knowledge-based economy to name a few. This study aims to define the overall framework for defining a criteria and process for identifying knowledge hubs and selecting beneficiary Higher Education Institutions (HEI)/State Universities and Colleges (SUC). It shall define a criteria for the establishment of knowledge hubs. The study recommends that five key elements be present in the criteria:

(i) content, (ii) delivery method, (iii) audience, (iv) geographical location, and (v) champion/primary owner.

Facets of each element have been identified to define features and details that need consideration. For content, the facets are alignment to the overall objective, cost of delivery, demand from the audience, requirement by the industry, and urgency of the industry need. The facets for delivery method are availability, ease, effectiveness, maintenance, and quality. Employability, resources, support, sustainability, and volume are the facets for the audience. The associations, Center of Excellence/ Next Wave City rank, IBPAP members, partnerships, and schools are the facets for geographical location. Lastly, the facets for the champion/primary owner are physical accessibility, current infrastructure, local and

Page 140: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

2

international linkages, commitment of management and administration, and availability of capable personnel. The stakeholders, i.e. the members of the different associations under IBPAP, will determine the weight of each characteristic through the Analytic Hierarchy Process. Rating of the alternatives per characteristic will also be done. At the end of the exercise, both characteristics and alternatives will be ranked according to priority. In addition to the identified criteria, a second level – SMP specific criteria is also being proposed as an additional selection filter. The Analytical Hierarchy Process and the above-mentioned criteria are expected to help IBPAP in the selection of the three institutions that will serve as Knowledge Hubs.

INTRODUCTION I. In September 2013, the Information Technology-Business Processing Association of the Philippines, the Asian Institute of Management, and the University of the Philippines Open University were contracted by the Asian Development Bank (ADB) to implement the Technical Assistance (TA) for Strengthening Knowledge-Based Economic and Social Development (TA-8164 PHI). The project is designed to assist the development of the Information Technology-Business Process Management (IT-BPM) industry by providing alternative models and scale-up mechanisms to provide continuous supply of qualified talent that it needs and, more importantly, strengthen the higher education system by introducing innovative and creative education programs that are relevant to the country’s competitive advantage in economic sectors like the IT-BPM industry. As the lead agency for the TA, IBPAP is responsible for preparing a number of studies and papers. The first of these is the framework for defining the criteria for locating Knowledge Hubs and selecting beneficiary HEIs/SUCs (Deliverable 1). From a project perspective, this study follows on from the AIM Thought Paper on the Knowledge Hubs. It will serve as an input for the preparation of the overall strategy and roadmap for enhancing curricula and instructions in HEIs/SUCs designed to meet the labor supply needs of the IT-BPM industry and other follow on studies intended to improving the quality of services and achieving closer university linkages, for example. It shall also provide direction for developing models and defining best practices for the continuous improvement of curriculum. More importantly, it will be used as the primary basis for identifying the three pilot Knowledge Hub sites for the project. This study will benefit both the academe and the IT-BPM industry by defining the parameters within which institutional mechanisms such as the Knowledge Hubs can help bring more sustainable and effective academe-industry linkages, strengthen academic programs and increase productivity at the firm level. In particular, it can pave the way for creating greater access to relevant training/education to people anywhere especially in the countryside who wish to be employed or involved in the IT-BPM industry. Through the use of information or knowledge gained from the hubs, the Filipino workers in IT-BPO companies or those who are planning to join the IT-BPM industry can become more competent and competitive in delivering excellent service to their clients. Excellent customer and technical services can mean more investments, better employment opportunities and income for the employees, and increased economic activity for the country as a whole.

Page 141: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

3

Other high growth industries are also expected to benefit from this study as the knowledge hubs are intended to be developed using replicable models. Hence, policy and decision makers both the government and private education sectors considering scaling up educational programs will also find this study useful as this will give them a more rational and systematic blueprint for selecting HEIs that can serve as knowledge hubs.

BACKGROUND II. The Information Technology and Business Process Management (IT-BPM) industry is one of the fastest-growing industries in the Philippines. It is one of the top four sources of foreign exchange, along with electronics, remittance from Overseas Filipino Workers (OFWs), and tourism.1 The IT-BPM workforce grew at an average annual rate of 21% between 2007 and 2011. The industry is projected to earn US$25 billion in revenues by 2016. At this size, it could account for about 8% of Philippine Gross Domestic Product (GDP). This goal collectively translates to about 1.3 million direct employees and approximately 3.2 million indirect jobs that include a sizeable amount in the informal sector. Demand for talent has already outpaced supply, and meeting the 2016 requirement is a major concern. Historically, talent supply in the industry was in excess of demand. The IT-BPM industry was able to attract its talent, in part, because of the limited scope for full employment in other sectors. However, since 2010, demand has consistently outpaced supply. The industry hires only an average of 5% – 10% of applicants largely because of inadequate education and training that is suitable to a career in the IT-BPM industry.2 The country’s educational institutions who are well aware of the industry’s requirements continue not to be able to provide a steady, suitable number of qualified graduates to meet the demand. In addition, there are not enough entry to mid-level managers or senior executives in the industry to lead the growing pools of young employees. The problem in recruitment is further compounded as the global IT-BPM composition is now evolving dramatically. New and more lucrative market settings such as health information management and back office operations are bringing opportunities for expansion in voice and more complex emerging services are being required in non-voice that is putting tremendous pressure on availability of quality talent. At present there are 2,299 HEIs in the country. 656, or 28.53%, are public HEIs. 547 of these are State Universities and Colleges (SUCs), 95 are Local Universities and Colleges (LUCs), 1 is a CHED-Supervised Institution, 5 are classified as special HEIs, while the remaining 8 are considered as other government schools. Private HEIs accounts for 71.47% of the higher education system, with a total number of 1,643 institutions – 1,296 are non-sectarian private while 347 are sectarian HEIs. Close to 500,000 students complete their tertiary education and graduate from the HEIs annually.

1 Background of the BPO Industry (http://www.investphilippines.info/arangkada/seven-winners/business-process-outsourcing/background-bpo/) 2 IT-BPM Road Map 2012-2016

Page 142: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

4

IBPAP and the different education sector agencies have partnered in implementing talent development initiatives aimed at addressing the talent gap. Currently, IBPAP is implementing the Service Management Specialization Track or Service Management Program (SMP) for Business Process Outsourcing. This is a 21-unit program that aims to prepare tertiary-level students for employment in the IT-BPM industry. SMP includes five areas, namely:

(i) Business Communications, (ii) Service Culture, (iii) Principles of Systems Thinking, (iv) Fundamentals of Business Process Outsourcing 101 and 102, and (v) a full-time Internship program.

Commission on Higher Education (CHED) issued CHED Memorandum Order (CMO) No. 06, Series of 2012, which allows all higher education institutions (HEIs) with existing permit and recognition to offer a Bachelor of Science in Business Administration/Management (BSBA) with an SMP specialization track. Likewise, CMO No. 34, Series of 2012 also allows all HEIs with existing permit and recognition to offer the Bachelor of Science in Computer Science (BSCS), Bachelor of Science in Information Technology (BSIT) and Bachelor of Science in Information System/Management (BSIS/IM) to offer this specialization track. The other training programs under the talent development initiative of IBPAP are the Train-the-Teachers Training (T3), Basic English Skills Training (BEST), Advanced English Pre-employment Training (AdEPT), and Global Competitiveness Assessment Tool (GCAT), among others.3 While these traditional programs have resulted in concrete gains, critical gaps and constraints have yet to be adequately addressed and many new ones are emerging. The implementation of the K-12 program by the Department of Education (DepED) and the upcoming ASEAN integration by 2015 are two of the more pressing challenges that are expected to impact on the labor demand and supply. The latter is being viewed to potentially boost economic development prospects and competitiveness at an international level if a reliable labor supply chain is ensured. From an IT-BPM perspective, this could generally mean greater regional competition that would further increase the demand for talent. The IBPAP is working closely with AIM and UPOU to explore more comprehensive and innovative approaches to scale up the delivery of its training programs and improving alignment of HEIs with the needs of the IT-BPM industry. It will establish three knowledge hubs whose purpose is to provide greater access to knowledge resources for teaching and learning IT-BPM courses, enhance higher education curriculum and instruction and strengthen partnerships between the IT-BPM industry and academic institutions.

3 Initiatives should focus on four action areas (2112-2116 Philippine Information Technology and Business Process Management [IT-BPM] Road Map, Slide 31).

Page 143: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

5

OBJECTIVES OF THE STUDY III. For the Philippines’ education and IT-BPM sectors, developing and using knowledge hubs is a relatively new field of engagement and the actual solutions for scaling up delivery of IT-BPM designed courses using this mode are still unknown. This study shall define the overall framework for defining a criteria and the process for identifying knowledge hubs and selecting beneficiary HEIs/SUCs. In particular, it aims to determine the attributes and criteria for the establishment of virtual or physical knowledge hubs. The study will also look into the dynamics of the different attributes as it relates to the specific case of the Philippine IT-BPM industry and the education sector.

REVIEW OF RELATED LITERATURE AND SELECTED BEST PRACTICE IV.

A. IBPAP’s Next Wave CitiesTM

IBPAP and the Department of Science and Technology – Information and Communications Technology Office (DOST-ICTO) have identified the top 10 locations for the next wave of growth for the IT-BPM industry for 2012. Known as the Next Wave CitiesTM (NWC), these locations include Baguio City, Davao City, Dumaguete City, Iloilo City, Lipa City, Metro Bulacan (Baliuag, Calumpit, Malolos City, Marilao, and Meycauayan City), Metro Cavite (Bacoor City, Dasmariñas City, and Imus City), Metro Laguna (Calamba City, Los Baños, and Sta. Rosa City), Metro Naga (Naga City and Pili), and Metro Rizal (Antipolo City, Cainta, and Taytay). These Next Wave CitiesTM were chosen as the best current or potential IT-BPM hosts based on an established criteria. Metro Manila, Metro Cebu, Metro Clark, and Bacolod City have been identified as Centers of Excellence (COE) for being premiere IT-BPM hosts and high-density locations.4 A Center of Excellence is a city that has proven its capability of attracting and hosting major locators. The National Capital Region has only 24% of the country’s graduate population, but it has 77% of the IT-BPO jobs. This means that most of the employees in the IT-BPM industry come from the provinces. The Next Wave CitiesTM were identified to promote the IT-BPM industry in the countryside, which is a rich source of untapped talent. The criteria for the selection of the Next Wave Cities include:

(i) talent pool (considerable pool of generalist and specialist talent/ graduates; presence of higher education institutions that are Centers of Development (COD) and Centers of Excellence (COE); size of the labor force),

(ii) cost (manpower cost; rental/land cost; cost of utilities), infrastructure (connectivity by land/air; telecom/electrical/water infrastructure; real estate availability), and

(iii) business environment and risk management (national government/ local government unit support to the IT-BPM industry; special incentives for locators; regulatory framework; political/security risk; incidence of crime; natural risks like weather-related calamities; regulatory risk).

Aside from the Next Wave CitiesTM and Centers of Excellence, Emerging Locations were also identified in the 2012 report. The Emerging Locations were Batangas City, Cagayan de Oro City, Dagupan City, and Tagbilaran City. The 2012 report also included Special

4 DOST-ICTO, IBPAP announce Next Wave Cities

TM for 2012 (http://icto.dost.gov.ph/index.php/news-

events/current-news/104-dost-icto-ibpap-announce-next-wave-cities-for-2012)

Page 144: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

6

Awards. Metro Cavite got the Best in Talent award. Laoag City was given the Best in Infrastructure award. The Best in BERM award was given to Iloilo City. The Most Effective ICT Council and LGU were Legazpi City and its ICT Council.5 The Next Wave CitiesTM provide a blueprint not only for locating IT-BPM offices in the area but more importantly for systematically developing and sustaining inclusive growth in the locality. College graduates and skilled/semi-skilled local workers do not need to go to Metro Manila to get decent jobs, as the jobs will be brought closer to them through the investments generated in these Next Wave CitiesTM.6 As jobs are brought to the countryside, more residents will become economically productive and new business opportunities will also emerge and flourish. For the IT-BPM industry, this shift will create a greater need to train the local labor source for industry- specific skills requirements. The Tholons’ Top 100 Outsourcing Destinations for 2014 named Metro Manila as the second most preferred destination for outsourcing services. Number one in the list is Bangalore, India. Other Philippine cities included in the list are Cebu (8th); Davao City (69th); Sta. Rosa in Laguna (82nd); Bacolod (93rd); Iloilo (95th); and Baguio (99th). Tholons’ is a leading full-service Strategic Advisory firm for Global Outsourcing and Research.7 B. Local Knowledge Hub Initiatives

An example of a knowledge hub is the Academic Initiative of IBM. It is a no-charge program providing educators with the training materials, curriculum guides, software, and hardware needed to teach in-demand business and technology skills. IBM offers a wide range of products and solutions to those teaching computer science, information technology, business, or marketing courses for the enhancement of the curriculum and to help develop the students’ competitive skills on the latest industry-standard software, systems, and tools. The members of the Academic Initiative can get full-version software and professionally developed courseware at no charge.8 The Department of Education launched a brick and mortar Library Hub in 2003 aimed to address the lack of public libraries across the country. Financed by both public and private sectors, hubs have been set in 32 school divisions for a total of 145 hubs. Initial success was noted in 15 out of the 32 school divisions with hubs who registered an impressive 50% Mean Percentage score or higher in AY 2005-2006 and AY 2006-2007. The other schools still registered increases but substantially lower than 50%. Many challenges have been registered that have hampered the full time operations of the hub including the lack of trainers, lack of full-time staff, lack of trained staff to operate the hubs, and inadequate budgetary support.

5 Next Wave Cities

TM 2012 Report

6 DOST’s Next Wave Cities mean more jobs, biz prospects for the region

(http://dost.gov.ph/index.php?option=com_content&view=article&id=1281:dosts-next-wave-cities-mean-more-jobs-biz-prospects-in-the-regions&catid=1:latest&Itemid=150) 7 Metro Manila named 2

nd top site for outsourcing (http://business.inquirer.net/162259/metro-manila-named-2nd-

top-site-for-outsourcing#ixzz2rphDNlkS) 8 IBM Academic Initiative (http://www-03.ibm.com/ibm/university/academic/pub/page/academic_initiative)

Page 145: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

7

C. Knowledge Hub Initiatives in the Asia Pacific Region.

The Asian Development Outlook 2003, a publication of the Asian Development Bank, identified knowledge as the most important resource in maintaining the Asia and Pacific region’s competitiveness, given the rapid rate of change created by globalization and technological innovation. In light of the above, ADB must assume a more proactive role as catalyst of applied knowledge in the region, which is critical for the future development of its developing member countries (DMCs). While new knowledge and technologies are being developed successfully in different countries and regions, a key challenge facing DMCs is to capture and translate this international knowledge into locally useful knowledge. There is a need to develop knowledge hubs in the region to make available and disseminate identified new basic and applied knowledge of relevance to DMCs. These knowledge hubs should aim to mainstream new concepts in innovation, science, technology, management development, and related fields for the region. They should also promote improved exchange of data, information, and knowledge; and increase the capabilities of institutions and organizations in the region.9 Since 2006, ADB is supporting Tsinghua University in Beijing in establishing a regional knowledge hub on climate change. The hub is envisioned to be a center of excellence in the region to support and strengthen research and disseminate new and emerging concepts and technologies. Other centers are planned in Thailand and India, strengthening and supplementing the already existing Beijing knowledge hub.10 In Thailand, the E-Society is one of the strategic initiatives aimed to access knowledge and opportunities to all groups of people with its final goal of sustainable development. It has a community telecenter composed of 20 centers in 2007 and this has grown to 300 centers by 2009. The telecenter is an interactive hub used for development purposes by government organizations (GOs), non-government organizations (NGOs), business and people’s organizations (POs). The hub serves as the knowledge platforms for all rural communities especially rural women who are left behind in aspects such as ICT literacy, Small to Medium scale Enterprise (SME) skills, leadership skills etc.11 This model attributes its success to the mutual collaboration among different kinds of stakeholders from policy makers to community and a bottoms-up knowledge sharing and learning approach. D. Knowledge Hubs in Other Parts of the World

Multilateral and Bilateral development agencies including the World Bank (WB), ADB, World Health Organization (WHO), GIZ and other aid programs, the United Nations Development Program (UNDP), academic institutions and governments worldwide encourage and support the use of knowledge hubs for their development operations. These hubs perform different functions such as providing technical assistance, supporting technical resource networks, as a dedicated way of sharing development experience and models in peer-to-peer learning, to engage with national and international partners and stakeholders, to provide tools for making knowledge happen and to facilitate access to funding.12 Hubs are established at the local, national, regional and even globally levels for

9 Asian Development Bank (2005). Technical Assistance on the Establishment of Regional Knowledge Hubs.

10 Knowledge hubs and knowledge clusters: designing a knowledge architecture for development. Hans-Dieter

Evers, Center for Development Research, University of Bonn. 2008 11

Telecentre: Community Knowledge Hubs and Networks, Dr. Kamolrat Intarat, Sukhothai Thammathirat Open University, School of Communication Arts, Pakket District, Thailand. 12

World Bank support for Knowledge Hubs Institutions, Sanjay Pradham Keynote Speech-Bali Conference on Knowledge Hubs, 11 July 2012.

Page 146: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

8

a variety of objectives such as attracting foreign investments, providing access to high quality education, contributing to research and innovation, creating a knowledge-based economy, providing and disseminating information in health and other related areas among others. Knowledge hubs operate using different business models, have wide geographic coverage and cater to a vast number of audiences and stakeholders. Education Hubs are one of the newest development in the international higher education landscape. The objectives for setting up Educational hubs vary from one hub to another and may include:

(i) to attract foreign investment, (ii) retain local students, (iii) provide access to high-quality education and training for both domestic and

international students, and (iv) create a knowledge-based economy.

An educational hub can include different combinations of domestic or international institutions, branch campuses and foreign partnerships. In-depth studies in six country level education hubs – United Arab Emirates, Qatar, Malaysia, Hong Kong, Singapore and Botswana shows that “one size does not fit all.” Different factors influence the criteria for developing and setting up educational hubs including economic competitiveness, the demand for trained work force, a desire to move towards a knowledge or service-based economy, modernization of the tertiary education sector, cross-border education among others. These different motivations have influenced the development of three different types of education hubs, namely the student hub, the talent hub and the knowledge/innovation hub.13

APPROACH AND METHODOLOGY V.

The study recognizes the importance of engaging stakeholders in the academe, government (national and local) and the IT-BPM industry associations and firms in defining the attributes and criteria for knowledge hubs. A consultative process that included a Focus Group Discussion (FGD) and selected interviews and individual stakeholder consultation meetings were used to solicit and validate inputs in developing the criteria, and ensure buy-in and support during the establishment of the hubs. More importantly, the methodology recognizes the importance of consulting with the hub’s potential “clients” (i.e. the potential students, teachers, local communities and civil society), to better understand their needs and seek their insights so that the structure could be made more responsive and purposeful in it use. Selected stakeholder interviews in both the public, private and academe sectors were also undertaken. To complement the FGD and consultations, several data sources also gave substance to this paper. A review of literature was conducted. Secondary data from industry, academe, multilateral and bilateral development partner publications, websites, working papers and local IT-BPM published materials on knowledge management and knowledge hubs were reviewed. Appropriate analysis of both qualitative and quantitative information was done

13

Student, Talent, Knowledge-Innovation Models, Jane Knight (Ed), VIII. 2014.

Page 147: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

9

with the help of tools and models such as the Analytical Hierarchy Process, Hub and Spokes Model to name a few.

CONCEPTUAL FRAMEWORK VI.

A. What is a Knowledge Hub?

A knowledge hub is defined as an institution, entity, network or group, typically with high connectedness and high internal and external networking and knowledge sharing capabilities that operates in a knowledge domain or activity and whose excellence is recognized by those who engage with or are supported by it.14 They are local innovation systems that are nodes in networks of knowledge production and knowledge sharing. As meeting points of communities of knowledge and interest, knowledge hubs fulfill three major functions: to generate knowledge, to transfer knowledge to sites of application; and to transmit knowledge to other people through education and training.15 Knowledge hubs are a logical way to scale up learning and sharing of related information and experience by making information available to those who need it at that the time that they need it. For this study, it is assumed that a knowledge hub may be a virtual or physical knowledge hub (PKH) which can be an HEI or any entity that is connected to the virtual knowledge hub (VKH), located in an established geographical location (Metro area or Next Wave CitiesTM ) which will collaborate with other institutions (HEIs, Technical and Vocational Institutions (TVI), and K-12) and individuals (Out-of-School Youths (OSY), Overseas Filipino Workers (OFW), and Persons with Disabilities(PWD)) within its or surrounding regions for a blended (physical and online) implementation of the SMP, BEST, AdEPT and other programs of IBPAP to achieve the 2016 employment targets for the IT-BPM industry. One simple operating model that may be considered is the hub and spokes model. The collaboration between the hub (servicing institution or organization) and the spokes (beneficiary institutions or individuals) includes ICT access (phone, personal computer, internet), information, training, and knowledge. Initially, it is envisioned that there will be three (3) PKHs to be established by the project, where one each may be established for Luzon, Visayas, and Mindanao. A hub and spokes model has one institution serving as the primary driver and hosts a secretariat or coordination unit. There is less connection between the spokes; and the hub is administered typically through a series of agreements or contracts between the host institution and each participant, with little engagement among the spokes.

14

ADB Report: Technical Assistance to the Philippines for Strengthening Knowledge-Based Economic and Social Development 15

Knowledge hubs and knowledge clusters: Designing a knowledge architecture for development, Hans-Dieter Evers, Center for Development research (ZEF, University of Bonn, 2008.

Page 148: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

10

Figure 1 illustrates how the spokes relate to each other and to the hub.

Figure 1: Hub and Spokes Model

The transformation process from telecenters to knowledge hubs is indicated in the Figure 2 below. In this process, the Information and Communications Technology (ICT) access points with access to phones, computers and Internet are value added with knowledge, information, training and services. Many telecenters currently functioning in developing countries have successfully incorporated knowledge and information into their area of operations. A study on the assessment of the status of the implementation and use of ICT access points in Asia and the Pacific identified potential telecenters to be transformed into knowledge hubs. These telecenters have established necessary infrastructure and processes to facilitate creation and dissemination of development related information and promote active community participation. These telecenters could generate and disseminate information while benefiting from information generated by other telecenters in the region. Thus, they may qualify to be knowledge hubs in a potential knowledge network of telecenters.

Hub Primary Driver

Host Secretariat

Participants

Contracts and Agreements

Page 149: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

11

Figure 2: Transformation Process

B. Key Characteristics of a Hub Following the discussion on the functions of a knowledge hub, a set of characteristics were established which were considered necessary and sufficient to effectively implement its objectives for supporting talent in the IT-BPM industry. These characteristics will compose the criteria in rating and prioritizing the selection of the knowledge hubs. Figure 3 identifies the five key characteristics of an effective knowledge hub.

Figure 3: Knowledge Hub Key Characteristics

ICT Access (Phone, PC, Internet)

ICT Access (Phone, PC, Internet)

Information

Training

Knowledge

ICT Access Centers

ICT Access Centers

Knowledge Hubs

Transformation Process

Knowledge Hub

Content Delivery Method Audience

Geographical Location

Champion/ Primary Owner

Page 150: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

12

Content is information and experiences that may provide value for an end-user/audience in specific contexts. Delivery method is the medium that facilitates the transfer of content from the primary owner to the end-user/audience. This transfer may be done via the internet, television, and audio CDs, as well as live events such as conferences and stage performances. The word is used to identify and quantify various formats and genres of information as manageable value-adding components of useful media to the target audience. An audience is a group of people who participate in a program or encounter a work of art, literature (in which they are called "readers"), theatre, music (in which they are called "listeners"), video games (in which they are called "players"), or academics in any medium. Audience members participate in different ways in different kinds of art; some events invite overt audience participation and others allowing only modest clapping and criticism and reception. The terms location and place in geography are used to identify a point or an area on the Earth's surface or elsewhere. The term location generally implies a higher degree of certainty than place, which often indicates an entity with an ambiguous boundary, relying more on human/social attributes of place identity and sense of place than on geometry. The champion/primary owner is the organization or entity that will be ultimately responsible for the day-to-day activities of the knowledge hub, including but not limited to transactions with the audience and other stakeholders. The characteristics of a knowledge hub are listed in Table 1below, together with the corresponding facets, as determined during the FGD.

Table 1: Characteristics and Facets of Knowledge Hubs

Characteristic Facet

Content Alignment to the Overall Objective

Cost of Delivery Demand from the Audience

Requirement by the Industry

Urgency of the Industry Need

Delivery Method Availability Ease Effectiveness Maintenance Quality

Audience Employability Resources Support Sustainability Volume

Geographical Location

Associations Center of Excellence/ Next-Wave City (COE/NWC) Rank

IBPAP Members

Partnerships Schools

Champion/ Primary Owner

Physical Accessibility

Current Infrastructure

Local and International Linkages

Commitment of Management and Administration

Availability of Capable Personnel

The definition of each facet is discussed in the next section. The weight of each facet will be determined by the stakeholders, i.e. the members of the associations under IBPAP, through the Analytic Hierarchy Process.

Page 151: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

13

DEFINING THE CHARACTERISTICS AND MEASURE OF POTENTIAL VII.KNOWLEDGE HUBS USING THE ANALYTICAL HEIRARCHY PROCESS

Analytic Hierarchy Process (AHP) is a structured technique for organizing and analyzing complex decisions, based on mathematics and psychology. It was developed by Thomas L. Saaty in the 1970s and has been extensively studied and refined since then. It has particular application in group decision making and is used around the world in a wide variety of decision situations, in fields such as government, business, industry, healthcare, and education. Rather than prescribing a correct decision, the AHP helps decision makers find one that best suits their goal and their understanding of the problem. It provides a comprehensive and rational framework for structuring a decision problem, for representing and quantifying its elements, for relating those elements to overall goals, and for evaluating alternative solutions. To be able to establish the weight of each identified facet or alternative, a modified rating is used. Table 2 describes the ratings from the most preferred (9) to the least preferred (0).

Table 2: Standard Rates

Rate Definition

9 Most preferred

8

7

6

5

4

3

2

1

0 Least preferred

Table 3 describes the special ratings that may be used by the rater.

Table 3: Special Rates

Example Meaning

2.5 A rate between 2 and 3.

4 and another 4 Two items with equal rate.

9 followed by 7 Rate 8 may be skipped.

Blank is considered rate 0.

The following exercise in modified analytic hierarchy process is a result of a simulated exercise. The resulting information is used only for demonstration purposes and will be validated by the ratings of the identified stakeholders once the criteria is finalized and agreed to.

Page 152: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

14

A. Process and Procedure IBPAP, as the implementing institution/ project leader, will implement the steps in the Analytic Hierarchy Process, as shown below:

(i) IBPAP requests stakeholders (one or more representative from each of its five member associations of IBPAP) to answer the questionnaire.

(ii) IBPAP asks the stakeholders to rate the facet for the first characteristic from 0 to 9, 0 being the least preferred and 9 being the most preferred. The special ratings discussed earlier may also be used.

(iii) IBPAP then asks the stakeholders to rate the alternatives per facet, from 0 to 9, 0 being the least preferred and 9 being the most preferred. The special ratings discussed earlier may also be used.

(iv) IBPAP encodes the ratings per stakeholder using the Excel Worksheet (Table 6 Rating). The Excel Worksheet will automatically compute for the total (Table 7 Total) and product (Table 8 Product). The last column in Table 8 Product represents the ratings of a stakeholder for the alternatives. The Excel Worksheet will automatically summarize the stakeholder ratings (Table 9 Stakeholder Ratings). The ranking of alternatives is shown on the last column of Table 9 Stakeholder Ratings.

(v) IBPAP repeats Steps 2 to 4 for the rest of the characteristics. (vi) This process is expected to aid IBPAP in objectively and systematically determining

the priorities for selecting a knowledge hub in terms of content, delivery method, audience, geographical location, and champion/primary owner.

To select the institutions that will serve as knowledge hubs, IBPAP will pay particular attention to the rankings for the Geographical Location (Characteristic 4) and Champion/Primary Owner (Characteristic 5). To illustrate, if the exercise yields Metro Clark as the Number 1 priority in terms of Geographical Location and HEI/SUC as the Champion/Primary Owner, then IBPAP needs to generate the list of all HEIs and SUCs in Metro Clark. Using the same characteristic and rating per measure for the Champion/Primary Owner, the stakeholders will rate the alternatives (HEIs and SUCs), following the procedure below:

(i) IBPAP asks the stakeholders to rate the HEIs and SUCs, from 0 to 9, 0 being the least preferred and 9 being the most preferred. The special ratings discussed earlier may also be used.

(ii) IBPAP encodes the ratings per stakeholder using the Excel Worksheet (Table 24 Rating). The Excel Worksheet will automatically compute for the total (Table 25 Total) and product (Table 26 Product). The last column in Table 26 Product represents the ratings of a stakeholder for the alternatives. The Excel Worksheet will automatically summarize the stakeholder ratings (Table 27 Stakeholder Ratings). The ranking of alternatives is shown on the last column of Table 27 Stakeholder Ratings.

Page 153: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

15

B. Characteristic 1: Content Content is determined by the following facets as a result of the FGD earlier conducted as well as information gathered in the course of the study:

(i) Alignment to the Overall Objective (ii) Cost of Delivery (iii) Demand from the Audience (iv) Requirement by the Industry (v) Urgency of the Industry Need

Table 4 below shows the definition of each facet.

Table 4: Definition of Criteria (Content)

Facets Meaning

Alignment The content is aligned to the over-all objectives of the knowledge hub.

Cost The cost to deliver the content to its audience is minimal or nil.

Demand There is high demand from the audience for the delivery of the content.

Requirement There is high requirement by the industry for graduates of the content.

Urgency The need by the industry for graduates of the content is urgent.

Alternatives were also identified and shortlisted. The list is not exhaustive and stakeholders may expand or propose to change some alternatives as justified. The initial list includes:

(i) Assessment Tools (ii) Certification Courses (iii) Corporate Training (iv) English Courses (v) Foreign Languages (vi) Formal Education (vii) Skills Training

To address the competency gap in the country’s IT-BPM industry, IBPAP partnered with the academe to implement its two workforce English programs: Basic English Skills Training (BEST) and Advanced English Pre-Employment Training (AdEPT). Recently, 20 faculty participants and six teachers graduated from the BEST and AdEPT Teacher Training (T3) courses, respectively, in ceremonies held at the Philippine Normal University (PNU). The two English-proficiency programs have already been rolled out in five state universities and colleges and the recent T3 training held in PNU Manila is aimed at further spreading BEST and AdEPT instruction through our country’s future teachers.16

16

Industry talent development programs to assist teachers, increase competency of students in IT-BPM

http://www.teamasia.com/newsroom/read-client-news.aspx?id=503:industry-talent-devt-programs-to-assist-

teachers-increase-competency-of-students-in-it-bpm

Page 154: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

16

Table 5 below shows the definition of alternatives.

Table 5: Definition of Alternatives (Content)

Alternatives Meaning

Assessment Assessment tools (GCAT, etc.) can be accessed.

Certification Certification courses for faculty and trainers (T3, etc.) are delivered.

Corporate There are short courses for corporate employee/management training.

English English courses (BEST, AdEPT, etc.) are delivered.

Foreign Foreign language courses (Spanish, French, etc.) are delivered.

Formal There is content that leads to formal diploma education (SMP, etc.).

Skills There are short courses for technical skills training.

Table 6 below shows the simulated ratings of the facets and each alternative per facet.

Table 6: Rating (Content)

Rate

Facets

Alignment Cost Demand Requirement Urgency

7 1 4.5 9 5

Alternatives Alignment Cost Demand Requirement Urgency

Assessment 2 8 5 4.5 6

Certification 5 7 9 4 5

Corporate 4 9 7 3 4

English 7 4 4 8 7.5

Foreign 6 6 3 7 6

Formal 6 5 6 6 7

Skills 9 3.5 8 9 8

Table 7 below shows the total ratings.

Table 7: Sum of Ratings (Content)

Rate

Facets Total

Alignment Cost Demand Requirement Urgency

7 1 4.5 9 5 26.50

Alternatives Alignment Cost Demand Requirement Urgency

#

Assessment 2 8 5 4.5 6

Certification 5 7 9 4 5

Corporate 4 9 7 3 4

English 7 4 4 8 7.5

Foreign 6 6 3 7 6

Formal 6 5 6 6 7

Skills 9 3.5 8 9 8

Total 39.00 42.50 42.00 41.50 43.50

Page 155: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

17

Table 8 below shows the dominant alternative based on the ratings.

Table 8: Product of Ratings (Content)

Rate

Facets Total

Alignment Cost Demand Requirement Urgency

0.26 0.04 0.17 0.34 0.19 1.00

Alternatives Alignment Cost Demand Requirement Urgency Product

Assessment 0.05 0.19 0.12 0.11 0.14 0.10

Certification 0.13 0.16 0.21 0.10 0.11 0.13

Corporate 0.10 0.21 0.17 0.07 0.09 0.11

English 0.18 0.09 0.10 0.19 0.17 0.17

Foreign 0.15 0.14 0.07 0.17 0.14 0.14

Formal 0.15 0.12 0.14 0.14 0.16 0.15

Skills 0.23 0.08 0.19 0.22 0.18 0.20

Total 1.00 1.00 1.00 1.00 1.00 1.00

The result will have to be validated by asking various stakeholders from the IT-BPM industry to do pair-wise comparisons across member-organizations. Respondents from the following sectors may be asked to participate:

(i) Animation Council of the Philippines (ACPI) (ii) Contact Center Association of the Philippines (CCAP) (iii) Game Developers Association of the Philippines (GDAP) (iv) Healthcare Information Management Outsourcing Association of the Philippines

(HIMOAP) (v) Philippine Software Industry Association (PSIA)

Table 9 below shows the dominant alternative based on the ratings by the stakeholders.

Table 9: Stakeholder Ratings (Content)

Alternatives

Rating by Representatives Average Priority

ACPI CCAP GDAP HIMOAP PSIA

Assessment 0.10 0.21 0.12 0.13 0.08 0.13 7

Certification 0.13 0.15 0.17 0.09 0.12 0.13 5

Corporate 0.11 0.14 0.10 0.14 0.17 0.13 6

English 0.17 0.12 0.14 0.16 0.19 0.16 2

Foreign 0.14 0.12 0.15 0.17 0.13 0.14 4

Formal 0.15 0.14 0.16 0.17 0.12 0.15 3

Skills 0.20 0.12 0.16 0.14 0.19 0.16 1

Total 1.00 1.00 1.00 1.00 1.00 1.00 #

See Annex A for the spreadsheet file that details the flow of the computations.

Page 156: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

18

C. Characteristic 2: Delivery Method Delivery method is determined by the following facets as a result of the FGD earlier conducted as well as information gathered in the course of the study:

(i) Availability (ii) Ease (iii) Effectiveness (iv) Maintenance (v) Quality

Table 10 below shows the definition of each facet.

Table 10: Definition of Facets (Delivery Method)

Facets Meaning

Availability The delivery method is available everywhere and anytime.

Ease The delivery method is easy for the audience to use.

Effectiveness The method is effective in the delivery of the content.

Maintenance The cost for maintenance of the delivery method is minimal.

Quality Quality of graduates who used the delivery method is high.

Alternatives were also identified and shortlisted. The list is not exhaustive and stakeholders may expand or propose to change some alternatives as justified. The initial list includes:

(i) Classroom (ii) e-Mail (iii) Mail (iv) Mobile (v) Online (vi) Social Media (vii) VOIP (Voice Over Internet Protocol)

Table 11 below shows the definition of alternatives.

Table 11: Definition of Alternatives (Delivery Method)

Alternatives Meaning

Classroom The delivery method is classroom or face-to-face.

e-Mail The content is delivered through electronic mail.

Mail The content is delivered through traditional mail.

Mobile The content is delivered through mobile devices.

Online The content is delivered online.

Social The content is delivered through social media.

VOIP The content is delivered through voice over internet protocol.

Page 157: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

19

Table 12 below shows the simulated ratings of the facets and each alternative per facet.

Table 12: Rating (Delivery Method)

Rate

Facets

Availability Ease Effectiveness Maintenance Quality

6 5 9 2.5 8

Alternatives Availability Ease Effectiveness Maintenance Quality

Classroom 2 7 3 9 6.5

e-Mail 7 8 2.5 8 1

Mail 8 9 5 7.5 6.5

Mobile 5 3.5 6 6 7

Online 4.5 4 8 5 8

Social 9 6 7 5 6

VOIP 6 5 9 4 9

Table 13 shows the total ratings.

Table 13: Sum of Ratings (Delivery Method)

Rate

Facets Total

Availability Ease Effectiveness Maintenance Quality

6 5 9 2.5 8 30.50

Alternatives Availability Ease Effectiveness Maintenance Quality

#

Classroom 2 7 3 9 6.5

e-Mail 7 8 2.5 8 1

Mail 8 9 5 7.5 6.5

Mobile 5 3.5 6 6 7

Online 4.5 4 8 5 8

Social 9 6 7 5 6

VOIP 6 5 9 4 9

Total 41.50 42.50 40.50 44.50 44.00

Page 158: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

20

Table 14 below shows the dominant alternative based on the ratings.

Table 14: Product of Ratings (Delivery Method)

Rate

Facets Total

Availability Ease Effectiveness Maintenance Quality

0.20 0.16 0.30 0.08 0.26 1.00

Alternatives Availability Ease Effectiveness Maintenance Quality Product

Classroom 0.05 0.16 0.07 0.20 0.15 0.11

e-Mail 0.17 0.19 0.06 0.18 0.02 0.10

Mail 0.19 0.21 0.12 0.17 0.15 0.16

Mobile 0.12 0.08 0.15 0.13 0.16 0.13

Online 0.11 0.09 0.20 0.11 0.18 0.15

Social 0.22 0.14 0.17 0.11 0.14 0.16

VOIP 0.14 0.12 0.22 0.09 0.20 0.17

Total 1.00 1.00 1.00 1.00 1.00 1.00

The result will have to be validated by asking various stakeholders from the IT-BPM industry to do pair-wise comparisons across member-organizations. Respondents from the following sectors may be asked to participate:

(i) Animation Council of the Philippines (ACPI) (ii) Contact Center Association of the Philippines (CCAP) (iii) Game Developers Association of the Philippines (GDAP) (iv) Healthcare Information Management Outsourcing Association of the Philippines

(HIMOAP) (v) Philippine Software Industry Association (PSIA)

Table 15 below shows the dominant alternative after the ratings by the stakeholders.

Table 15: Stakeholder Ratings (Delivery Method)

Alternatives

Rating by Representatives Average Priority

ACPI CCAP GDAP HIMOAP PSIA

Classroom 0.11 0.15 0.13 0.13 0.09 0.12 7

e-Mail 0.10 0.15 0.17 0.09 0.12 0.13 6

Mail 0.16 0.14 0.15 0.14 0.18 0.15 2

Mobile 0.13 0.19 0.14 0.17 0.19 0.16 1

Online 0.15 0.12 0.15 0.17 0.13 0.14 4

Social 0.16 0.14 0.10 0.17 0.12 0.14 5

VOIP 0.17 0.11 0.16 0.13 0.17 0.15 3

Total 1.00 1.00 1.00 1.00 1.00 1.00 #

See Annex A for the spreadsheet file that details the flow of the computations.

Page 159: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

21

D. Characteristic 3: Audience Audience is determined by the following facets as a result of the FGD earlier conducted as well as information gathered in the course of the study:

(i) Employability (ii) Resources (iii) Support (iv) Sustainability (v) Volume

Table 16 below shows the definition of each facet.

Table 16: Definition of Facet (Audience)

Facets Meaning

Employability The audience are highly employable after the program.

Resources The audience have the resources to complete the program.

Support The audience is supported by private or public institutions.

Sustainability The partnership with the audience is sustainable in the long-run.

Volume There is high volume of participants from this audience-sector.

Alternatives were also identified and shortlisted. The list is not exhaustive and stakeholders may expand or propose to change some alternatives as justified. The initial list includes:

(i) HEI (ii) K-12 (iii) OFW (iv) OSY (v) PWD (vi) Career Shifters (vii) TVI

Technical vocational education, especially for the out-of-school youth, took center stage at the celebration of the International Year of the Youth, which gathered government agencies, international institutions and nongovernment organizations to promote youth welfare and empowerment. Technical Education and Skills Development Authority (TESDA) Director General Joel Villanueva joined other government agency heads in gracing various initiatives held at the SMX Convention Center to celebrate the event, which coincided with the signing of a partnership agreement with the International Labor Organization (ILO). The event also featured learning sessions that showcased TESDA’s Apprenticeship Program in partnership with Panasonic. Villanueva, together with representatives of the Department of Labor and Employment (DOLE) and the ILO, led the ceremonial signing of a Partner’s Agreement in Entrepreneurship and TechVoc Training. The agreement targets 2,000 youths from poor communities in four provinces, namely, Masbate, Antique, Agusan del Sur, and Maguindanao.17

17

An August 12, 2011 press release from the Technical Education and Skills Development Authority

(http://www.gov.ph/2011/08/12/tesda-promotes-entrep-techvoc-training-among-osys/)

Page 160: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

22

DOLE reports that since the launching of the P2-billion National Reintegration Program Fund for OFWs last year, the DOLE, Overseas Workers Welfare Administration (OWWA) and the National Reintegration Center for OFWs (NRCO)—continue to receive inquiries not only on what the program is all about, but also on how to avail of a reintegration loan. The P2-billion reintegration program is a special loan program of the OWWA in partnership with the Development Bank of the Philippines (DBP) and the Landbank of the Philippines to support enterprise development among OFWs and their families. This program is open to all active members of the OWWA and to those who have completed the Entrepreneurial Development Training conducted by the NRCO and the OWWA-Regional Welfare Officers in cooperation with the Department of Trade and Industry (DTI), Philippine Trade Training Center, and Bureau of Micro, Small and Medium Enterprise Development.18 The Department of Social Welfare and Development (DSWD), through its rehabilitation and vocational programs, has also provided continuing capability-building for individuals as well as self-help groups of PWDs. Rehabilitation services for the sector have three major components: social preparation, functional literacy and job placement. The main objective of this program is to develop self-reliance and socio economic independence. Together with the Tulong Alalay (TULAY) or Support and Maintenance Program of the DOLE, employment and livelihood trainings are provided. Grants for initial business capitals given or loaned to deserving trainees are included in the package. The expenses on training on chosen skills and management are provided as grants while capital outlays and operational supports are loaned with soft terms and conditions. For the deaf sector, the encoding jobs of NOVA Foundation receive financial supports in its training components from the Philippine Amusement and Gaming Corporation (PAGCOR).19 Table 2.16 below shows the definition of alternatives.

Table 17: Definition of Alternatives (Audience)

Alternatives Meaning

HEI The target audience are the higher education institutions.

K-12 The target audience are the K-12 (senior high school) institutions.

OFW The target audience are the overseas Filipino workers.

OSY The target audience are the out-of-school youth.

PWD The target audience are the persons with disability.

Shifters The target audience are the career shifters.

TVI The target audience are the technical and vocational institutions.

18

National Reintegration Program for OFWs (http://theofwcenter.blogspot.com/2012/03/national-reintegration-program-for-ofws.html) 19

Rehabilitation, Sheltered Workshop and Employment

(http://drpi.research.yorku.ca/AsiaPacific/resources/PhilippinesLPPRep/x)

Page 161: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

23

Table 18 shows the simulated ratings of the criteria and each alternative per criterion.

Table 18: Rating (Audience)

Rate

Facets

Employability Resources Support Sustainability Volume

3 7.5 8 5 7

Alternatives Employability Resources Support Sustainability Volume

HEI 2 7 4 6 6.5

K-12 9 5 2.5 8 3

OFW 8 9 5 8 6.5

OSY 5 3.5 7 6 2

PWD 4.5 4 8 2 8

Shifters 1 3 6.5 5 8.5

TVI 6 5 9 4 9

Table 19 shows the dominant alternative based on the summary of the ratings.

Table 19: Sum of Ratings (Audience)

Rate

Facets Total

Employability Resources Support Sustainability Volume

3 7.5 8 5 7 30.50

Alternatives Employability Resources Support Sustainability Volume

#

HEI 2 7 4 6 6.5

K-12 9 5 2.5 8 3

OFW 8 9 5 8 6.5

OSY 5 3.5 7 6 2

PWD 4.5 4 8 2 8

Shifters 1 3 6.5 5 8.5

TVI 6 5 9 4 9

Total 35.50 36.50 42.00 39.00 43.50

Page 162: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

24

Table 20 shows the product of the ratings.

Table 20: Product of Ratings (Audience)

Rate

Facets Total

Employability Resources Support Sustainability Volume

0.10 0.25 0.26 0.16 0.23 1.00

Alternatives Employability Resources Support Sustainability Volume Product

HEI 0.06 0.19 0.10 0.15 0.15 0.14

K-12 0.25 0.14 0.06 0.21 0.07 0.12

OFW 0.23 0.25 0.12 0.21 0.15 0.18

OSY 0.14 0.10 0.17 0.15 0.05 0.12

PWD 0.13 0.11 0.19 0.05 0.18 0.14

Shifters 0.03 0.08 0.15 0.13 0.20 0.13

TVI 0.17 0.14 0.21 0.10 0.21 0.17

Total 1.00 1.00 1.00 1.00 1.00 1.00

The result will be validated by asking various stakeholders from the IT-BPM industry to do pair-wise comparisons across member-organizations. Respondents from the following sectors may be asked to participate:

(i) Animation Council of the Philippines (ACPI) (ii) Contact Center Association of the Philippines (CCAP) (iii) Game Developers Association of the Philippines (GDAP) (iv) Healthcare Information Management Outsourcing Association of the Philippines

(HIMOAP) (v) Philippine Software Industry Association (PSIA)

Table 21 shows the dominant alternative based on the ratings by the stakeholders.

Table 21: Stakeholder Ratings (Audience)

Alternatives

Rating by Representatives Average Priority

ACPI CCAP GDAP HIMOAP PSIA

HEI 0.14 0.18 0.12 0.13 0.12 0.14 6

K-12 0.12 0.15 0.17 0.17 0.12 0.15 3

OFW 0.18 0.14 0.15 0.14 0.14 0.15 1

OSY 0.12 0.13 0.14 0.16 0.19 0.15 2

PWD 0.14 0.12 0.16 0.10 0.13 0.13 7

Shifters 0.13 0.14 0.16 0.16 0.12 0.14 5

TVI 0.17 0.14 0.10 0.14 0.18 0.15 4

Total 1.00 1.00 1.00 1.00 1.00 1.00 #

See Annex A for the spreadsheet file that details the flow of the computations.

Page 163: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

25

E. Characteristic 4: Geographical Location Geographical Location is determined by the following facets as a result of the FGD earlier conducted as well as information gathered in the course of the study:

(i) Associations (ii) Center of Excellence/Next-Wave City (COE/NWC) Rank (iii) IBPAP Members (iv) Partnerships (v) Schools

Table 22 shows the definition of each facet.

Table 22: Definition of Facet (Geographical Location)

Facets Meaning

Associations The location has professional and civic associations.

COE/NWC The location is ranked high as Center of Excellence or Next Wave City

TM (COE/NWC)

IBPAP The location has active IBPAP members.

Partnerships The location has existing private-public partnerships.

Schools The location has existing schools (HEI/SUC, TVI, K-12).

Alternatives were also identified and shortlisted. The list is not exhaustive and stakeholders may expand or propose to change some alternatives as justified. The initial list includes:

(i) Bacolod City (ii) Davao City (iii) Metro Cavite (iv) Metro Cebu (v) Metro Clark (vi) Metro Laguna (vii) Metro Manila

Table 23 shows the definition of alternatives.

Table 23: Definition of Alternatives (Geographical Location)

Alternatives Meaning

Bacolod City The geographical location is to be established in Bacolod City.

Davao City The geographical location is to be established in Davao City.

Metro Cavite The geographical location is to be established in Metro Cavite.

Metro Cebu The geographical location is to be established in Metro Cebu.

Metro Clark The geographical location is to be established in Metro Clark

Metro Laguna The geographical location is to be established in Metro Laguna.

Metro Manila The geographical location is to be established in Metro Manila.

Page 164: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

26

Table 24 shows the simulated ratings of the facet and each alternative per facet.

Table 24: Rating (Geographical Location)

Rate

Facets

Associations COE/NWC IBPAP Partnerships Schools

3.5 7 6 8 4

Alternatives Associations COE/NWC IBPAP Partnerships Schools

Bacolod City 1 7 3 8 4

Davao City 7 5.5 6 8 1

Metro Cavite 8 9 5 7.5 6.5

Metro Cebu 9 2 9 6 8

Metro Clark 4.5 4 8 2 6.5

Metro Laguna 3 7.5 7 5 6

Metro Manila 6 5 4 9 7

Table 25 below shows the total ratings.

Table 25: Sum of Ratings (Geographical Location)

Rate

Facets Total

Associations COE/NWC IBPAP Partnerships Schools

3.5 7 6 8 4 28.50

Alternatives Associations COE/NWC IBPAP Partnerships Schools

#

Bacolod City 1 7 3 8 4

Davao City 7 5.5 6 8 1

Metro Cavite 8 9 5 7.5 6.5

Metro Cebu 9 2 9 6 8

Metro Clark 4.5 4 8 2 6.5

Metro Laguna 3 7.5 7 5 6

Metro Manila 6 5 4 9 7

Total 38.50 40.00 42.00 45.50 39.00

Page 165: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

27

Table 26 below shows the dominant alternative based on the ratings.

Table 26: Product of Ratings (Geographical Location)

Rate

Facets Total

Associations COE/NWC IBPAP Partnerships Schools

0.12 0.25 0.21 0.28 0.14 1.00

Alternatives Associations COE/NWC IBPAP Partnerships Schools Product

Bacolod City 0.03 0.18 0.07 0.18 0.10 0.12

Davao City 0.18 0.14 0.14 0.18 0.03 0.14

Metro Cavite 0.21 0.23 0.12 0.16 0.17 0.18

Metro Cebu 0.23 0.05 0.21 0.13 0.21 0.15

Metro Clark 0.12 0.10 0.19 0.04 0.17 0.11

Metro Laguna 0.08 0.19 0.17 0.11 0.15 0.14

Metro Manila 0.16 0.13 0.10 0.20 0.18 0.15

Total 1.00 1.00 1.00 1.00 1.00 1.00

The result will have to be validated by asking various stakeholders from the IT-BPM industry to do pair-wise comparisons across member-organizations. Respondents from the following sectors may be asked to participate:

(i) Animation Council of the Philippines (ACPI) (ii) Contact Center Association of the Philippines (CCAP) (iii) Game Developers Association of the Philippines (GDAP) (iv) Healthcare Information Management Outsourcing Association of the Philippines

(HIMOAP) (v) Philippine Software Industry Association (PSIA)

Table 27 below shows the dominant alternative based on the ratings by the stakeholders.

Table 27: Stakeholder Ratings (Geographical Location)

Alternatives

Rating by Representatives Average Priority

ACPI CCAP GDAP HIMOAP PSIA

Bacolod City 0.12 0.19 0.12 0.13 0.15 0.14 4

Davao City 0.14 0.15 0.17 0.13 0.12 0.14 5

Metro Cavite 0.18 0.14 0.13 0.13 0.17 0.15 2

Metro Cebu 0.15 0.11 0.12 0.16 0.19 0.15 3

Metro Clark 0.11 0.12 0.15 0.14 0.13 0.13 7

Metro Laguna 0.14 0.14 0.19 0.17 0.11 0.15 1

Metro Manila 0.15 0.15 0.12 0.14 0.13 0.14 6

Total 1.00 1.00 1.00 1.00 1.00 1.00 #

See Annex A for the spreadsheet that details the flow of the computations.

Page 166: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

28

F. Characteristic 5: Champion/Primary Owner Champion/Primary Owner is determined by the following facets as a result of the FGD earlier conducted as well as information gathered in the course of the study:

(i) Physical Accessibility (ii) Current Infrastructure (iii) Local and International Linkages (iv) Commitment of Management and Administration (v) Availability of Capable Personnel

Table 28 below shows the definition of each facet.

Table 28: Definition of Facet (Champion/Primary Owner)

Facets Meaning

Accessibility The primary owner is physically accessible.

Infrastructure The primary owner has existing infrastructure.

Linkages The primary owner has existing local and international linkages.

Management The primary owner has a committed management or administration.

Personnel The primary owner has capable and willing personnel.

Alternatives were also identified and shortlisted. The list is not exhaustive and stakeholders may expand or propose to change some alternatives as justified. The initial list includes:

(i) AIM (ii) HEI/SUC (iii) BPAP/Industry Association (iv) ITBPM Company (v) LGU (vi) TVI (vii) UP Open University

Table 2.28 below shows the definition of alternatives.

Table 29: Definition of Alternatives (Champion/Primary Owner)

Alternatives Meaning

AIM The primary owner is Asian Institute of Management.

HEI/SUC The primary owner is an HEI or SUC.

IBPAP/IA The primary owner is IBPAP or an industry association.

ITBPM The primary owner is an IT-BPM company.

LGU The primary owner is a local government unit.

TVI The primary owner is a technical and vocational institution.

UPOU The primary owner is UP Open University.

Page 167: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

29

Table 30 below shows the simulated ratings of the facets and each alternative per facet.

Table 30: Rating (Champion/Primary Owner)

Rate

Facets

Accessibility Infrastructure Linkages Management Personnel

5 9 3.5 7 7.5

Alternatives Accessibility Infrastructure Linkages Management Personnel

AIM 2 8 3 2 7

HEI/SUC 5 4.5 5 8 1

IBPAP/IA 8 9 6.5 7.5 6.5

ITBPM 5 3.5 6 6 4.5

LGU 9 4 8 1 8

TVI 3 7 4 5 3

UPOU 6 5 9 4 9

Table 31 below shows the total ratings.

Table 31: Sum of Ratings (Champion/Primary Owner)

Rate

Facets Total

Accessibility Infrastructure Linkages Management Personnel

5 9 3.5 7 7.5 32.00

Alternatives Accessibility Infrastructure Linkages Management Personnel

#

AIM 2 8 3 2 7

HEI/SUC 5 4.5 5 8 1

IBPAP/IA 8 9 6.5 7.5 6.5

ITBPM 5 3.5 6 6 4.5

LGU 9 4 8 1 8

TVI 3 7 4 5 3

UPOU 6 5 9 4 9

Total 38.00 41.00 41.50 33.50 39.00

Page 168: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

30

Table 32 below shows the dominant alternative based on the ratings.

Table 32: Product of Ratings (Champion/Primary Owner)

Rate

Facets Total

Accessibility Infrastructure Linkages Management Personnel

0.16 0.28 0.11 0.22 0.23 1.00

Alternatives Accessibility Infrastructure Linkages Management Personnel Product

AIM 0.05 0.20 0.07 0.06 0.18 0.13

HEI/SUC 0.13 0.11 0.12 0.24 0.03 0.12

IBPAP/IA 0.21 0.22 0.16 0.22 0.17 0.20

ITBPM 0.13 0.09 0.14 0.18 0.12 0.13

LGU 0.24 0.10 0.19 0.03 0.21 0.14

TVI 0.08 0.17 0.10 0.15 0.08 0.12

UPOU 0.16 0.12 0.22 0.12 0.23 0.16

Total 1.00 1.00 1.00 1.00 1.00 1.00

The result needs to be validated by asking various stakeholders from the IT-BPM industry to do pair-wise comparisons across member-organizations. Respondents from the following sectors may be asked to participate:

(i) Animation Council of the Philippines (ACPI) (ii) Contact Center Association of the Philippines (CCAP) (iii) Game Developers Association of the Philippines (GDAP) (iv) Healthcare Information Management Outsourcing Association of the Philippines

(HIMOAP) (v) Philippine Software Industry Association (PSIA)

Table 33 below shows the dominant alternative after the ratings by the stakeholders.

Table 33: Stakeholder Ratings (Champion/Primary Owner)

Alternatives

Rating by Representatives Average Priority

ACPI CCAP GDAP HIMOAP PSIA

AIM 0.13 0.21 0.12 0.15 0.12 0.15 2

HEI/SUC 0.12 0.15 0.17 0.11 0.12 0.13 7

IBPAP/IA 0.20 0.16 0.14 0.12 0.15 0.15 1

ITBPM 0.13 0.10 0.14 0.16 0.19 0.14 3

LGU 0.14 0.12 0.15 0.17 0.13 0.14 5

TVI 0.12 0.14 0.16 0.17 0.12 0.14 4

UPOU 0.16 0.12 0.12 0.12 0.17 0.14 6

Total 1.00 1.00 1.00 1.00 1.00 1.00 #

See Annex A for the spreadsheet file that details the flow of the computations.

Page 169: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

31

CONCLUSIONS AND RECOMMENDATIONS VIII. Knowledge Hubs can serve many different purposes to different stakeholders. It can be a vehicle to learn systematically, it can be a venue for exchanging development or commercial experiences in order to accelerate economic growth, it can channel knowledge to and from stakeholders or serve as the venue for training and speeding up talent development. Knowledge hubs are used by a broad range of sectors and areas including agriculture, environment, public health, social protection, disaster and relief operations, IT, training, research, climate change, development cooperation programs, etc. Different models for establishing Knowledge hubs exist locally and globally. Because knowledge hub functions encompass a wide range of responsibilities, the criteria for establishing a hub varies from one hub to another. The criteria for selecting the hubs consider many elements and include many factors depending on its purpose and model. The table below summarizes the key characteristics that are considered necessary for locating the knowledge hubs and selecting the beneficiary HEIs/SUCs. The following characteristics which are deemed to be the minimum requirements to effectively implement the hubs objectives are recommended to be the core considerations for defining and selecting the knowledge hubs that will be created by IBPAP and its partners under the ADB funded project: Criteria Characteristics Description of the Characteristics

Factors to consider to determine score or weight of Characteristics

1. Content Is information and experiences that may provide value for an end-user/audience in specific contexts. Content may be delivered via any medium such as the internet, television, and audio CDs, as well as live events such as conferences and stage performances. The word is used to identify and quantify various formats and genres of information as manageable value-adding components of useful media to the target audience.

Is the content is aligned to the over-all objectives of the knowledge hub?

Is the cost to deliver the content to its audience minimal?

Is there is high demand from the audience for the delivery of the content?

Is there is high requirement/demand by the industry for graduates of the content?

Is the need for the graduates of the content urgent?

2. Audience Is a group of people who participate in a program or encounter a work of art, literature (in which they are called "readers"), theatre, music (in which they are called "listeners"), video games (in which they are called "players"), or academics in any medium. Audience members participate in different ways in different kinds of art; some events invite overt audience participation and others allowing only modest clapping and criticism and reception.

Is the audience highly employable after the program?

Does the audience have the resources to complete the program?

Is the audience supported by private or public institutions?

Is the partnership with the audience sustainable in the long-run?

Is there a high volume of participants from a particular audience-sector?

Page 170: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

32

Criteria Characteristics Description of the Characteristics

Factors to consider to determine score or weight of Characteristics

3. Geographical Location

The terms location and place in geography are used to identify a point or an area on the Earth's surface or elsewhere. The term location generally implies a higher degree of certainty than place, which often indicates an entity with an ambiguous boundary, relying more on human/social attributes of place identity and sense of place than on geometry.

Does the location have professional, industry or civic associations?

Is the location ranked high either as a Center of Excellence or Next Wave City?

Does the location have active IBPAP members?

Does the location have existing private-public partnerships?

Does the location have HEIs/SUCs?

4. Delivery Method

Delivery method is the medium that facilitates the transfer of content from the primary owner to the end-user/audience. This transfer may be done via the internet, television, and audio CDs, as well as live events such as conferences and stage performances.

Is the delivery method available everywhere and anytime?

Is the delivery method easy for the audience to use?

Is the method effective in the delivery of the content?

Is the cost for maintenance of the delivery method minimal?

Is the quality of graduates who used the delivery method high and does it meet industry standards?

5. Champion/ Primary Owner

The champion/primary owner is the organization or entity that will be ultimately responsible for the day-to-day activities of the knowledge hub, including but not limited to transactions with the audience and other stakeholders.

Is the champion/primary owner physically accessible or a resident of the area?

Does the champion/primary owner have sufficient and appropriate existing IT & physical infrastructure?

Does the champion/primary owner have existing short term or long term local, national or international linkages?

Does the champion/primary owner have demonstrated management and administration expertise?

Does the primary owner have sufficient, capable and willing personnel?

The weights of each characteristic will be determined by the stakeholders based on the application of the Analytic Hierarchy Process and on any other priority considerations that may be identified by IBPAP and its partners to be part of the criteria. At the end of the exercise, ratings in terms of content, delivery method, audience, geographical location, and champion/primary owner, will be determined. Ultimately, the exercise will facilitate the selection of the three institutions that will serve as knowledge hubs.

Page 171: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

33

OTHER CONSIDERATIONS FOR SELECTING KNOWLEDGE HUBS IX.

In addition to the core characteristics enumerated in the previous section, the selection criteria may also consider a second level SMP-specific criteria that would include the following:

(i) Considering that the knowledge hubs will potentially include a broader target group that will include the OSYs, OFWs, and PWDs, it is important that the hub is able to deliver the SMP in different modes based on the needs and capacity of these potential users. This would facilitate access of the SMP to more untapped talent all over the country, including the career-shifters who have already earned their baccalaureate degrees in the past. Limiting the delivery to a specialization track under the existing CHED-CMO for the BSBA, BSCS, BSIT, and BSIM programs may, to a certain extent, limit the scale up that is envisioned.

(ii) There is merit for the knowledge hub be made a one-stop shop for internship and employment, i.e. an intermediary between the industry and the talent pool. As a one-stop shop, the knowledge hub will facilitate the matching between demand and supply including placement during internship and recruitment after graduation. This strategy will allow students to acquire an education that balances practical learning experiences with knowledge and skills development to prepare them for the workforce. In addition, this rationale will ensure the sustained production of knowledge and innovation

(iii) A sustainable business model, including funding and organizational structure, must be created for the knowledge hub. The Champion/Primary Owner must treat the knowledge hub as a separate business unit that is able to generate sufficient revenues to fund its operations. It should also have its own dedicated personnel who will ensure that the knowledge hub will serve its purpose efficiently and effectively.

(iv) The IT infrastructure for operationalizing the hub, including the IT requirements for

students to access the hubs (or the knowledge) needs to be reviewed and made available if the hub is to function effectively. Two key factors need to be seriously evaluated in this regard. The ICT architecture of the hub should have the design to acquire, assimilate and adopt new knowledge while at the same time ensuring that its audience can easily access the knowledge in a cost effective manner. The ability to make available a sustainable structure for Knowledge flows and knowledge depositories should be a major consideration in selecting the hubs considering the current ICT constraints brought about by the uneven growth of ICT infrastructure in rural areas and knowing that knowledge hubs take time to develop.

(v) Knowledge hub is a relatively new term in the field of education even if a few

educational institutions have begun to develop and operate their hubs. It will be important to have strong political commitment (and even investment) from the government education sector and to ensure the other implementing institutions capacities to engage more systematically in developing, and sustaining hub components and programs. Because it is a new field of engagement, actual solutions for scaling up knowledge sharing, for example, are still largely unknown. A lot of effort and expertise need to be tapped to develop an effective hub.

Page 172: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

34

APPENDICES Appendix 1. Distribution of Higher Education Institutions

Appendix 2. Philippine Regions as of 31 December 2013 Appendix 3. Sample Questionnaire

Page 173: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 1 35

Appendix 1. Distribution of Higher Education Institutions

Figure 4: Distribution of Higher Education Institutions by Institution Type AY 2011 - 2012

Table 34: Distribution of Higher Education Institutions by Region and Sector Type: AY 2011 - 2012

Page 174: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

36 Appendix 2

Appendix 2. Philippine Regions as of 31 December 2013

Region: NCR - National Capital Region Code: 130000000

No. of Provinces

0 No. of Cities

16 No. of Municipalities

1 No. of Barangays

1,705

Registered Voters (2010): 5,999,706

Population (as of May 1, 2010): 11,855,975

Region: CAR - Cordillera Administrative Region Code: 140000000

No. of Provinces

6 No. of Cities

2 No. of Municipalities

75 No. of Barangays

1,176

Registered Voters (2010): 840,145

Population (as of May 1, 2010): 1,616,867

Region: REGION I (Ilocos Region) Code: 010000000

No. of Provinces

4 No. of Cities

9 No. of Municipalities

116 No. of Barangays

3,265

Registered Voters (2010): 2,627,045

Population (as of May 1, 2010): 4,748,372

Region: REGION II (Cagayan Valley) Code: 020000000

No. of Provinces

5 No. of Cities

3 No. of Municipalities

90 No. of Barangays

2,311

Registered Voters (2010): 1,735,564

Population (as of May 1, 2010): 3,229,163

Region: REGION III (Central Luzon) Code: 030000000

No. of Provinces

7 No. of Cities

13 No. of Municipalities

117 No. of Barangays

3,102

Registered Voters (2010): 5,472,593

Population (as of May 1, 2010): 10,137,737

Page 175: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 2 37

Region: REGION IV-A (CALABARZON) Code: 040000000

No. of Provinces

5 No. of Cities

16 No. of Municipalities

126 No. of Barangays

4,011

Registered Voters (2010): 6,178,557

Population (as of May 1, 2010): 12,609,803

Region: REGION IV-B (MIMAROPA) Code: 170000000

No. of Provinces

5 No. of Cities

2 No. of Municipalities

71 No. of Barangays

1,458

Registered Voters (2010): 1,375,320

Population (as of May 1, 2010): 2,744,671

Region: REGION V (Bicol Region) Code: 050000000

No. of Provinces

6 No. of Cities

7 No. of Municipalities

107 No. of Barangays

3,471

Registered Voters (2010): 2,774,327

Population (as of May 1, 2010): 5,420,411

Region: REGION VI (Western Visayas) Code: 060000000

No. of Provinces

6 No. of Cities

16 No. of Municipalities

117 No. of Barangays

4,051

Registered Voters (2010): 3,914,326

Population (as of May 1, 2010): 7,102,438

Region: REGION VII (Central Visayas) Code: 070000000

No. of Provinces

4 No. of Cities

16 No. of Municipalities

116 No. of Barangays

3,003

Registered Voters (2010): 3,655,441

Population (as of May 1, 2010): 6,800,180

Page 176: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

38 Appendix 2

Region: REGION VIII (Eastern Visayas) Code: 080000000

No. of Provinces

6 No. of Cities

7 No. of Municipalities

136 No. of Barangays

4,390

Registered Voters (2010): 2,337,185

Population (as of May 1, 2010): 4,101,322

Region: REGION IX (Zamboanga Peninsula) Code: 090000000

No. of Provinces

3 No. of Cities

5 No. of Municipalities

67 No. of Barangays

1,904

Registered Voters (2010): 1,804,278

Population (as of May 1, 2010): 3,407,353

Region: REGION X (Northern Mindanao) Code: 100000000

No. of Provinces

5 No. of Cities

9 No. of Municipalities

84 No. of Barangays

2,022

Registered Voters (2010): 2,230,538

Population (as of May 1, 2010): 4,297,323

Region: REGION XI (Davao Region) Code: 110000000

No. of Provinces

5 No. of Cities

6 No. of Municipalities

43 No. of Barangays

1,162

Registered Voters (2010): 2,433,932

Population (as of May 1, 2010): 4,468,563

Region: REGION XII (Soccsksargen) Code: 120000000

No. of Provinces

4 No. of Cities

5 No. of Municipalities

45 No. of Barangays

1,194

Registered Voters (2010): 1,896,772

Population (as of May 1, 2010): 4,109,571

Page 177: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 2 39

Region: REGION XIII (Caraga) Code: 160000000

No. of Provinces

5 No. of Cities

6 No. of Municipalities

67 No. of Barangays

1,311

Registered Voters (2010): 1,307,397

Population (as of May 1, 2010): 2,429,224

Region: ARMM - Autonomous Region in Muslim Mindanao

Code: 150000000

No. of Provinces

5 No. of Cities

2 No. of Municipalities

116 No. of Barangays

2,490

Registered Voters (2010): 1,692,468

Population (as of May 1, 2010): 3,256,140

PHILIPPINES ( REGIONS)

No. of Provinces

81 No. of Cities

140 No. of Municipalities

1494 No. of Barangays

42026

Registered Voters (2010): 48,275,594

Population (as of May 1, 2010): 92,335,113

Page 178: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

40 Appendix 3

Appendix 3. Sample Questionnaire Dear IBPAP member,

IBPAP is in the process of establishing three (3) knowledge hubs in the Philippines. The primary

purpose of these knowledge hubs is to address the gap between labor demand and supply in the IT-

BPM industry. We need your assistance in determining the institutions that will serve as knowledge

hubs. We would like to ask for a few minutes of your time to accomplish the questionnaire below.

Thank you very much.

IBPAP Research Team

Steps:

1. For each attribute, please rate each of the criteria from 0 to 9, 0 being the least preferred

and 9 being the most preferred. Example: For Attribute 1: Content, please rate Alignment (a

criterion) from 0 to 9.

2. Alternatives have been identified for each attribute. Please rate each alternative based on a

particular criterion. Example, please rate Assessment (an alternative) from 0 to 9 based on

alignment with the overall objectives of the knowledge hub.

3. Special rates, as shown below, may also be used.

Example

2.54 and another 49 followed by 7

A rate between 2 and 3.Two items with equal rate.Rate 8 may be skipped.

Meaning

Blank is considered rate 0.

Page 179: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 3 41

Characteristic 1: CONTENT

Rate

Criteria

Alignment Cost Demand Requirement Urgency

Alternatives Alignment Cost Demand Requirement Urgency

Assessment

Certification

Corporate

English

Foreign

Formal

Skills

Criteria

Alignment

Cost

DemandRequirement

Urgency

Meaning

The content is aligned to the over-all objectives of the knowledge hub.The cost to deliver the content to its audience is minimal.There is high demand from the audience for the delivery of the content.There is high requirement by the industry for graduates of the content.The need by the industry for graduates of the content is urgent.

Alternatives

Assessment

Certification

Corporate

EnglishForeign

Formal

Skills

English courses (BEST, AdEPT, etc.) are delivered.Foreign language courses (Spanish, French, etc.) are delivered.There is content that leads to formal diploma education (SMP, etc.).There are short courses for technical skills training.

There are short courses for corporate employee/management training.

Meaning

Assessment tools (GCAT, etc.) can be accessed.Certification courses for faculty and trainers (T3, etc.) are delivered.

Page 180: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

42 Appendix 3

ATTRIBUTE 2: METHOD OF DELIVERY

Rate

Criteria

Availability Ease Effectiveness Maintenance Quality

Alternatives Availability Ease Effectiveness Maintenance Quality

Classroom

e-Mail

Mail

Mobile

Online

Social

VOIP

Criteria

Availability

Ease

EffectivenessMaintenance

QualityThe cost for maintenance of the delivery method is minimal.

Meaning

The delivery method is available everywhere and anytime.The delivery method is easy for the audience to use.The method is effective in the delivery of the content.

Quality of graduates who used the delivery method is high.

Alternatives

Classroom

e-Mail

Mail

MobileOnline

Social

VOIP

Meaning

The delivery method is classroom or face-to-face.The content is delivered through electronic mail.The content is delivered through traditional mail.The content is delivered through mobile devices.The content is delivered online.The content is delivered through social media.The content is delivered through voice over internet protocol.

Page 181: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 3 43

ATTRIBUTE 3: AUDIENCE

Rate

Criteria

Employability Resources Support Sustainability Volume

Alternatives Employability Resources Support Sustainability Volume

HEI

K-12

OFW

OSY

PWD

Shifters

TVI

Criteria

Employability

Resources

SupportSustainability

VolumeThe partnership with the audience is sustainable in the long-run.

Meaning

The audience are highly employable after the program.The audience have the resources to complete the program.The audience is supported by private or public institutions.

There is high volume of participants from this audience-sector.

Alternatives

HEI

K-12

OFW

OSYPWD

Shifters

TVI

Meaning

The target audience are the higher education institutions.The target audience are the K-12 (senior high school) institutions.The target audience are the overseas Filipino workers.The target audience are the out-of-school youth.The target audience are the persons with disability.The target audience are the career shifters.The target audience are the technical and vocational institutions.

Page 182: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

44 Appendix 3

ATTRIBUTE 4: GEOGRAPHICAL LOCATION

Rate

Criteria

Associations COE/NWC IBPAP Partnerships Schools

Alternatives Associations COE/NWC IBPAP Partnerships Schools

Bacolod City

Davao City

Metro Cavite

Metro Cebu

Metro Clark

Metro Laguna

Metro Manila

Criteria

Associations

COE/NWC

IBPAPPartnerships

SchoolsThe location has existing private-public partnerships.

Meaning

The location has professional and civic associations.The location is ranked high as Center of Excellence or Nextwave City.The location has active IBPAP members.

The location has existing schools (HEI/SUC, TVI, K-12).

Alternatives

Bacolod City

Davao City

Metro Cavite

Metro CebuMetro Clark

Metro Laguna

Metro Manila

Meaning

The geographical location is to be established in Bacolod City.The geographical location is to be established in Davao City.The geographical location is to be established in Metro Cavite.The geographical location is to be established in Metro Cebu.The geographical location is to be established in Metro ClarkThe geographical location is to be established in Metro Laguna.The geographical location is to be established in Metro Manila.

Page 183: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Appendix 3 45

ATTRIBUTE 5: PRIMARY OWNER

Rate

Criteria

Accessibility Infrastructure Linkages Management Personnel

Alternatives Accessibility Infrastructure Linkages Management Personnel

AIM

HEI/SUC

IBPAP/IA

ITBPM

LGU

TVI

UPOU

Criteria

Accessibility

Infrastructure

LinkagesManagement

PersonnelThe primary owner has a committed management or administration.

Meaning

The primary owner is physically accessible.The primary owner has existing infrastructure.The primary owner has existing local and international linkages.

The primary owner has capable and willing personnel.

Alternatives

AIM

HEI/SUC

IBPAP/IA

ITBPMLGU

TVI

UPOU

The primary owner is IBPAP or an industry association.

The primary owner is Asian Institute of Management.

The primary owner is UP Open University.

Meaning

The primary owner is an HEI or SUC.

The primary owner is an ITBPM company.The primary owner is a local government unit.The primary owner is a technical and vocational institution.

Page 184: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A 46

Annex A. Computational Spreadsheet (Sample File) Knowledge Hub Knowledge Hub Knowledge Hub Knowledge Hub Knowledge Hub

Criteria Criteria Criteria Criteria Criteria

Respondent: Respondent: Respondent: Respondent: Respondent:

Characteristic: Characteristic: Attribute: Attribute: Attribute:

Table 2.3 Definition of Criteria Table 2.9 Definition of Criteria Table 2.15 Definition of Criteria Table 2.21 Definition of Criteria Table 2.27 Definition of Criteria

Facet Facet Criteria Criteria Criteria

Alignment Availability Employability Associations Accessibility

Cost Ease Resources COE/NWC Infrastructure

Demand Effectiveness Support IBPAP LinkagesRequirement Maintenance Sustainability Partnerships Management

Urgency Quality Volume Schools Personnel

Table 2.4 Definition of Alternatives Table 2.10 Definition of Alternatives Table 2.16 Definition of Alternatives Table 2.22 Definition of Alternatives Table 2.28 Definition of Alternatives

Alternatives Alternatives Alternatives Alternatives Alternatives

Assessment Classroom HEI Bacolod City AIM

Certification e-Mail K-12 Davao City HEI/SUC

Corporate Mail OFW Metro Cavite IBPAP/IA

English Mobile OSY Metro Cebu ITBPMForeign Online PWD Metro Clark LGU

Formal Social Shifters Metro Laguna TVI

Skills VOIP TVI Metro Manila UPOU

Table 2.5 Rating Table 2.11 Rating Table 2.17 Rating Table 2.23 Rating Table 2.29 Rating

Alignment Cost Demand Requirement Urgency Availability Ease Effectiveness Maintenance Quality Employability Resources Support Sustainability Volume Associations COE/NWC IBPAP Partnerships Schools Accessibility Infrastructure Linkages Management Personnel

Alternatives Alignment Cost Demand Requirement Urgency Alternatives Availability Ease Effectiveness Maintenance Quality Alternatives Employability Resources Support Sustainability Volume Alternatives Associations COE/NWC IBPAP Partnerships Schools Alternatives Accessibility Infrastructure Linkages Management Personnel

Assessment Classroom HEI Bacolod City AIMCertification e-Mail K-12 Davao City HEI/SUCCorporate Mail OFW Metro Cavite IBPAP/IA

English Mobile OSY Metro Cebu ITBPMForeign Online PWD Metro Clark LGUFormal Social Shifters Metro Laguna TVISkills VOIP TVI Metro Manila UPOU

Table 2.6 Total Table 2.12 Total Table 2.18 Total Table 2.24 Total Table 2.30 Total

Alignment Cost Demand Requirement Urgency Availability Ease Effectiveness Maintenance Quality Employability Resources Support Sustainability Volume Associations COE/NWC IBPAP Partnerships Schools Accessibility Infrastructure Linkages Management Personnel0 0 0 0 0 0.00 0 0 0 0 0 0.00 0 0 0 0 0 0.00 0 0 0 0 0 0.00 0 0 0 0 0 0.00

Alternatives Alignment Cost Demand Requirement Urgency Alternatives Availability Ease Effectiveness Maintenance Quality Alternatives Employability Resources Support Sustainability Volume Alternatives Associations COE/NWC IBPAP Partnerships Schools Alternatives Accessibility Infrastructure Linkages Management Personnel

Assessment 0 0 0 0 0 Classroom 0 0 0 0 0 HEI 0 0 0 0 0 Bacolod City 0 0 0 0 0 AIM 0 0 0 0 0Certification 0 0 0 0 0 e-Mail 0 0 0 0 0 K-12 0 0 0 0 0 Davao City 0 0 0 0 0 HEI/SUC 0 0 0 0 0Corporate 0 0 0 0 0 Mail 0 0 0 0 0 OFW 0 0 0 0 0 Metro Cavite 0 0 0 0 0 IBPAP/IA 0 0 0 0 0

English 0 0 0 0 0 Mobile 0 0 0 0 0 OSY 0 0 0 0 0 Metro Cebu 0 0 0 0 0 ITBPM 0 0 0 0 0Foreign 0 0 0 0 0 Online 0 0 0 0 0 PWD 0 0 0 0 0 Metro Clark 0 0 0 0 0 LGU 0 0 0 0 0Formal 0 0 0 0 0 Social 0 0 0 0 0 Shifters 0 0 0 0 0 Metro Laguna 0 0 0 0 0 TVI 0 0 0 0 0Skills 0 0 0 0 0 VOIP 0 0 0 0 0 TVI 0 0 0 0 0 Metro Manila 0 0 0 0 0 UPOU 0 0 0 0 0

Total 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 0.00 0.00 0.00

Table 2.7 Product Table 2.13 Product Table 2.19 Product Table 2.25 Product Table 2.31 Product

Alignment Cost Demand Requirement Urgency Availability Ease Effectiveness Maintenance Quality Employability Resources Support Sustainability Volume Associations COE/NWC IBPAP Partnerships Schools Accessibility Infrastructure Linkages Management Personnel#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Alternatives Alignment Cost Demand Requirement Urgency Product Alternatives Availability Ease Effectiveness Maintenance Quality Product Alternatives Employability Resources Support Sustainability Volume Product Alternatives Associations COE/NWC IBPAP Partnerships Schools Product Alternatives Accessibility Infrastructure Linkages Management Personnel Product

Assessment #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Classroom #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! HEI #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Bacolod City #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! AIM #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!Certification #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! e-Mail #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! K-12 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Davao City #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! HEI/SUC #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!Corporate #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Mail #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! OFW #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Metro Cavite #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! IBPAP/IA #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

English #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Mobile #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! OSY #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Metro Cebu #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! ITBPM #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!Foreign #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Online #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! PWD #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Metro Clark #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! LGU #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!Formal #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Social #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Shifters #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Metro Laguna #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! TVI #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!Skills #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! VOIP #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! TVI #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Metro Manila #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! UPOU #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Total #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Total #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Total #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Total #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Total #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Table 2.8 Stakeholder Ratings Table 2.14 Stakeholder Ratings Table 2.20 Stakeholder Ratings Table 2.26 Stakeholder Ratings Table 2.32 Stakeholder Ratings

ACPI CCAP GDAP HIMOAP PSIA ACPI CCAP GDAP HIMOAP PSIA ACPI CCAP GDAP HIMOAP PSIA ACPI CCAP GDAP HIMOAP PSIA ACPI CCAP GDAP HIMOAP PSIA

Assessment #DIV/0! #DIV/0! Classroom #DIV/0! #DIV/0! HEI #DIV/0! #DIV/0! Bacolod City #DIV/0! #DIV/0! AIM #DIV/0! #DIV/0!Certification #DIV/0! #DIV/0! e-Mail #DIV/0! #DIV/0! K-12 #DIV/0! #DIV/0! Davao City #DIV/0! #DIV/0! HEI/SUC #DIV/0! #DIV/0!Corporate #DIV/0! #DIV/0! Mail #DIV/0! #DIV/0! OFW #DIV/0! #DIV/0! Metro Cavite #DIV/0! #DIV/0! IBPAP/IA #DIV/0! #DIV/0!

English #DIV/0! #DIV/0! Mobile #DIV/0! #DIV/0! OSY #DIV/0! #DIV/0! Metro Cebu #DIV/0! #DIV/0! ITBPM #DIV/0! #DIV/0!Foreign #DIV/0! #DIV/0! Online #DIV/0! #DIV/0! PWD #DIV/0! #DIV/0! Metro Clark #DIV/0! #DIV/0! LGU #DIV/0! #DIV/0!Formal #DIV/0! #DIV/0! Social #DIV/0! #DIV/0! Shifters #DIV/0! #DIV/0! Metro Laguna #DIV/0! #DIV/0! TVI #DIV/0! #DIV/0!Skills #DIV/0! #DIV/0! VOIP #DIV/0! #DIV/0! TVI #DIV/0! #DIV/0! Metro Manila #DIV/0! #DIV/0! UPOU #DIV/0! #DIV/0!

Total #DIV/0! 0.00 0.00 0.00 0.00 # Total #DIV/0! 0.00 0.00 0.00 0.00 # Total #DIV/0! 0.00 0.00 0.00 0.00 # Total #DIV/0! 0.00 0.00 0.00 0.00 # Total #DIV/0! 0.00 0.00 0.00 0.00 #

Sample Sample Sample Sample Sample

#

Rate

CriteriaTotal

Rate

Criteria

Rate

CriteriaTotal

5 Primary Owner

Meaning

The primary owner is physically accessible.The primary owner has existing infrastructure.The primary owner has existing local and international linkages.The primary owner has a committed management or administration.

The geographical location is to be established in Metro Laguna.The geographical location is to be established in Metro Manila.

# #

AlternativesRating by Representatives

Rate

Criteria

Rate

CriteriaTotal

The primary owner has capable and willing personnel.

Meaning

The primary owner is Asian Institute of Management.The primary owner is an HEI or SUC.The primary owner is IBPAP or an industry association.The primary owner is an ITBPM company.The primary owner is a local government unit.The primary owner is a technical and vocational institution.The primary owner is UP Open University.

PriorityAlternativesRating by Representatives

Priority

The geographical location is to be established in Davao City.The geographical location is to be established in Metro Cavite.The geographical location is to be established in Metro Cebu.The geographical location is to be established in Metro Clark

Total

4 Geographical Location

Meaning

The location has professional and civic associations.The location is ranked high as Center of Excellence or Nextwave City.The location has active IBPAP members.The location has existing private-public partnerships.The location has existing schools (HEI/SUC, TVI, K-12).

Meaning

The geographical location is to be established in Bacolod City.

The target audience are the career shifters.The target audience are the technical and vocational institutions.

#

The content is delivered through traditional mail.The content is delivered through mobile devices.The content is delivered online.The content is delivered through social media.

Rate

Criteria

Rate

CriteriaTotal

3 Audience

Meaning

The audience are highly employable after the program.The audience have the resources to complete the program.The audience is supported by private or public institutions.The partnership with the audience is sustainable in the long-run.There is high volume of participants from this audience-sector.

Meaning

The target audience are the higher education institutions.

Meaning

The delivery method is classroom or face-to-face.The content is delivered through electronic mail.

2 Delivery Method

Meaning

The delivery method is available everywhere and anytime.The delivery method is easy for the audience to use.The method is effective in the delivery of the content.The cost for maintenance of the delivery method is minimal.Quality of graduates who used the delivery method is high.

The target audience are the K-12 (senior high school) institutions.The target audience are the overseas Filipino workers.The target audience are the out-of-school youth.The target audience are the persons with disability.

Rate

FacetTotal

AlternativesRating by Representatives

Rate

Facet

Rate

FacetTotal

Priority AlternativesRating by Representatives

Rate

Criteria

Rate

CriteriaTotal

Priority

The content is delivered through voice over internet protocol.

AlternativesRating by Representatives

Priority

Rate

FacetTotal

#

Rate

FacetTotal

Facet

Rate

English courses (BEST, AdEPT, etc.) are delivered.Foreign language courses (Spanish, French, etc.) are delivered.There is content that leads to formal diploma education (SMP, etc.).There are short courses for technical skills training.

There are short courses for corporate employee/management training.

1 Content

Meaning

The content is aligned to the over-all objectives of the knowledge hub.The cost to deliver the content to its audience is minimal.There is high demand from the audience for the delivery of the content.There is high requirement by the industry for graduates of the content.The need by the industry for graduates of the content is urgent.

Meaning

Assessment tools (GCAT, etc.) can be accessed.Certification courses for faculty and trainers (T3, etc.) are delivered.

Page 185: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

IT-BPO Industry

Knowledge Hub

Project

Asian Development Bank

Department of Finance Republic of the Philippines

Deliverable 2: Proposed IT-BPM

Knowledge Hub Business Model and

Roadmap

Information Technology and Business Process Association of the Philippines

Page 186: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 187: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

DRAFT (Dec 5)

Deliverable 2: Proposed IT_BPM

Knowledge Hub Business Model and Roadmap

TA-8164 PHI: Strengthening Knowledge-Based Economic and Social Development – 1 BPAP (46234-001)*

Prepared by

Information Technology-Business Process Association of the Philippines Consultant

5 December 2014

Page 188: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

ii

Page 189: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

iii

Acronyms and Abbreviations AdEPT Advanced English Proficiency Training ACPI Animation Council of the Philippines, Inc. ADB Asian Development Bank AHP Analytic Hierarchy Process AIM Asian Institute of Management ASEAN Association of Southeast Asian Nations BEST Basic English Skills Training BPO Business Process Outsourcing BSBA Bachelor of Science in Business Administration BSIS/IM Bachelor of Science in Information Systems/Information

Management BSIT Bachelor of Science in Information Technology CCAP Call Center Association of the Philippines CEO Chief Executive Officer CICT Commission on Information and Communication

Technology (currently DOST-ICTO) CHED Commission on Higher Education CMO CHED Memorandum Order COA Commission on Audit COP Community of Practice CSO Civil Society Organization DOF Department of Finance DOST Department of Science and Technology FGD Focus Group Discussion FTE Full-time Employee GIC Global In-house Center GO Government Organization GDAP Game Developers Association of the Philippines GDP Gross Domestic Product GMAM General Membership Assembly Meetings HEI Higher Educational Institutions HIMOAP Healthcare Information Management Outsourcing

Association of the Philippines HR Human Resource IBPAP Information Technology–Business Process Association

of the Philippines ICT Information and Communication Technology ICTO Information and Communication Technology Office

(formerly CICT) ILO International Labor Organization IT Information Technology IT–BPM Information Technology–Business Process

Management I-TWSP Industry-based Training for Work Scholarship Program K-12 Kindergarten to Grade 12 KH Knowledge Hub LGU Local Government Unit LMS Learning Management Systems LUC Local Universities and Colleges

Page 190: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

iv

Acronyms and Abbreviations M&E Monitoring and Evaluation NEDA National Economic Development Authority NG National Government NGO Non-government Organization OFW Overseas Filipino Worker OSY Out-of-School Youth PDP Philippine Development Plan PDS Philippine Digital Strategy PKH Physical Knowledge Hub PMF Project Management Framework PO People’s Organization PSC Project Steering Committee PSIA Philippine Software Industry Association PWD Persons with Disability RBM Results-based Management SEI Science Education Institute SME Small to Medium scale Enterprise SMP Service Management Program SUC State Universities and Colleges TA Technical Assistance T3 Train-the-Trainer (Program) TESDA Technical Education and Skills Development Authority TOR Terms of Reference TVI Technical and Vocational Institutions UPOU University of the Philippines-Open University VKH Virtual Knowledge Hub WB World Bank

Page 191: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

v

TABLE OF CONTENTS

EXECUTIVE SUMMARY ................................................................................................................. 1

INTRODUCTION ...................................................................................................................... 4 I.

THE PHILIPPINE IT–BPM SECTOR: A TRACK RECORD OF GROWTH & OPPORTUNITY . 5 II.

A. Sector Performance and Targets .......................................................................................... 5 Figure 1: Philippines’ IT–BPM and Global In-house Center (GIC) industry revenue targets for 2016....... 5 B. The IT–BPM Talent Challenge .............................................................................................. 6 Figure 2: Projected talent demand-supply gap for the IT–BPM industry .................................... 6 C. IBPAP’s Talent Development Framework ............................................................................. 8 Figure 3: The IT–BPM Learning Journey .................................................................................. 8 Figure 4: SMP/eSMP Implementations Framework .................................................................. 9

A NEW TALENT DEVELOPMENT STRATEGY TO SUSTAIN TALENT GROWTH: THE III.KNOWLEDGE HUB ....................................................................................................................... 10

KH BEST PRACTICES AND MODELS IN OTHER COUNTRIES AND SECTORS ............. 11 IV.

Table 1: Typology based on formality and obligations of the partners .................................... 11

PHILIPPINE GOVERNMENT SUPPORT FOR THE IT–BPM SECTOR AND E-LEARNING .. 14 V.

THE PROPOSED IT–BPM KNOWLEDGE HUB ................................................................ 15 VI.

A. Mission/Purpose ................................................................................................................. 15 B. Knowledge Hub Building Blocks.......................................................................................... 16 C. The Knowledge Hub Business Model .................................................................................. 17 Figure 5: Business Model Canvas .......................................................................................... 19 Figure 6: KH Interdependencies ............................................................................................. 20 Figure 7: KH Network Functionality and Flow ......................................................................... 21 Figure 8: KH Functional Chart ................................................................................................ 22 Figure 9: Governance Structure ............................................................................................. 23

BUILDING THE KNOWLEDGE HUB ................................................................................. 25 VII.

A. Design Considerations and Assumptions ............................................................................ 25 B. KH Development Phases .................................................................................................... 26 Figure 10: Conceptual Gantt Chart ....................................................................................... 27 C. Implementation Timeline ..................................................................................................... 30 Table 2: Implementation Timeline Summary ......................................................................... 31

ROLE OF IBPAP................................................................................................................ 32 VIII.

A. Role in the Industry ............................................................................................................. 32 B. Role with respect to the KH ................................................................................................ 32

PERCEIVED RISK AND RISK MITIGATING MEASURES ..................................................... 32 IX.

Table 3: Risk and Mitigation Measures .................................................................................. 33

FINANCIAL REQUIREMENTS OF THE KH ........................................................................... 34 X.

APPENDIX 1. KNOWLEDGE HUBS REVIEWED .......................................................................... 37

Page 192: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 193: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

1

EXECUTIVE SUMMARY

The IT–BPM industry in the Philippines has attained leadership in establishing a sizeable business process outsourcing (BPO) presence in Southeast Asia. Currently, it is the largest private sector job creator for skilled Filipinos contributing approximately 6.2% of GDP in 2014 and it is the Philippines’ third largest foreign exchange earner after tourism and remittances. Industry leaders and the results of the 2014 Tholons study commissioned by the IBPAP and the Commission on Information Communication Technology (CICT) confirm that its 2016 targets of $25 billion in revenues and 1.3 million full time employment (FTE)/jobs and are within very easy reach. The study also projects that by 2020, the industry will achieve $48 billion in revenues for the Philippine global outsourcing industry The single, most important issue facing the industry that will impact on the success of the IT–BPM sector in sustaining its growth is the availability of qualified talent. Historically, talent supply in the industry was in excess of demand. However, since 2010, demand has consistently outpaced supply given the faster growth being experienced by the industry. Many challenges have been cited including the lack of proficiency and skills, low IT literacy rates and poor access to computers of the larger sector of the population, relatively higher attrition rates and weak university–industry linkage have been cited as key issues impacting on the availability of qualified talent. To address these gaps, IBPAP and the different government education sector agencies have partnered in implementing traditional talent development initiatives, including the Service Management Program (SMP). While many concrete gains have been achieved by these projects at this time, there remain many critical gaps and constraints that have yet to be adequately addressed and many new ones are emerging. One of the solutions that have been identified to holistically address the skills shortage and support inclusive growth is a formally organized mechanism such as the Knowledge Hub (KH). The KH will create an institutional framework for continuously designing, testing and rolling out talent programs, make available to various stakeholders industry information or data including employment opportunities and research results and development and dramatically align the higher education curriculum with both international standards and labor demand. Hundreds of knowledge hubs or networks are used globally in many different sectors and for many different reasons. Governments invest in dedicated institutional and operational arrangements for peer-to-peer learning – what pitfalls to avoid, what practices to adopt. For many countries, sharing their knowledge and experience, especially those with interesting development experiences, is a way to develop meaningful international partnerships. In the private sector, knowledge hubs or portals are used to support different part of operations to disseminate information, quality standards, do knowledge transfers and training, communicate needs and issues, and announce employment opportunities that covers human resources, technology, customers, suppliers, community, and civil society groups.

Page 194: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

2

The proposed Knowledge Hub aims to support the following government, academic, IBPAP and IT–BPM sector goals and initiatives:

(i) address the skills shortage in the IT–BPM industry, (ii) serve as the gateway for knowledge sharing and networking among industry

members and other stakeholders, (iii) enable Public-Private Partnerships for Talent Development, (iv) build and sustain Industry-Academe Partnerships, (v) promote Industry Growth, (vi) reform initiatives in the higher education systems and programs to produce

suitable graduates to meet the labor demands of high growth industries such as IT-BPM industry, and

(vii) expand reach and scale IT-BPAP’s talent development programs The KH seeks to support improvement in the alignment of higher education with the needs of the economy. It will have a central role to play specifically in driving the continuous process for generating and implementing talent development programs and courses. The expected KH key specific outputs are increased access to knowledge resources for the IT–BPM designed courses, enhanced higher education curricula and instruction, and strengthened partnership between industries and academic institutions. The long term impact becomes tangible through a replicable and sustainable system of ICT-enabled knowledge hubs for the improved teaching and learning of IT–BPM industry designed curricula in HEIs. The KH is intended to house developed industry-designed courses and industry assessment tools including a middle management and leadership program that will be utilized by all HEIs and training institutions. The Knowledge Hub will also initiate international and national twinning arrangements and support stronger industry-academe linkages. These activities collectively aim to scale up the deployment of cost-effective models for strengthening and delivering HEI programs, improving the flow of talent to the industry, sustaining Knowledge Hub activities and substantially contribute to addressing industry demand for talent. The KH Business Model will offer services covering the following foundational areas:

(i) member’s competency promotion, (ii) assessment, certification, and accreditation delivery, (iii) curriculum development, (iv) opportunity matching, (v) talent development, and (vi) industry knowledge management.

It will employ a Hub and Spoke model to bring together the different stakeholder sectors and players. It is designed to be sustained through an identified number of revenue streams that include membership fees, project funds from multilateral, bilateral and other international agencies, sponsorships from the IT–BPM firms and fees for “services and knowledge products” such as certification and assessment fees, and cost of GCAT pins. A governance mechanism that includes representation from the industry and industry associations, academe, government, NGOs/CSOs and similar stakeholders is proposed.

Page 195: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

3

Four phases have been identified for the implementation of the Knowledge Hub: Organizational, Developmental, Operational and Innovational. The KH will require an initial PHP 10 million seed fund and an annual operating budget of about PHP 5-10 million. A workplan has been prepared for the establishment of the KH. IBPAP will work in partnership with the KH to achieve common IT–BPM talent development goals. It will continue to exercise and lead in strategically building and supporting talent development. IBPAP will identify and approve selection of the KH based on an established criteria, assist in creating it and be the lead resource to help build the Hub’s core capacity to manage and operate. During the early stages of organization and development as it builds some operational experience including building networks with the industry, IBPAP may serve as the virtual or physical base from which the KH will operate. To ensure its close ties and partnership with the IT–BPM sector, the IBPAP President shall sit as a permanent member of the KH Board of Trustees. As the KHs become operational and the HEIs are able to institutionalize SMP in their curriculum offering, IBPAP is seen to slowly divest from its existing course delivery and deployment function. The KH is envisioned to move towards being operationally independent as it strengthens its management and sustains its activities.

Page 196: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

4

INTRODUCTION I. The Philippine Government sought the assistance of the Asian Development Bank (ADB) through the Department of Finance (DOF) to provide capacity development technical assistance (TA) in addressing skills shortages in the IT–BPM industry by aligning higher education curricula with international standards and labor market demand, simultaneously, developing and strengthening public and private partnerships. To achieve these goals, the TA will employ knowledge hubs to develop replicable models for strengthening relationships among the government, industry, and higher education institutions (HEIs) within the IT–BPM industry; sharing and learning regional knowledge and experiences; and supporting other similar high-growth industries.1 The TA impact is improved alignment of higher education with the needs of the economy. The TA outcome is a replicable and sustainable system of ICT-enabled knowledge hub (KH) for improved teaching and learning of IT-BPO industry-based curriculum in HEIs. One of the key components identified under the TA to improve higher education curricula and support a stronger industry-university linkage specifically for the IT–BPM sector; vital to this is the establishment of a Knowledge Hub (KH). Initially, the KH is envisioned to provide online training to teachers and digitized learning modules and study guides to students. The project consultants reviewed different best practices and lessons learned on the management and operations of KHs, numerous consultations and discussions with different partners and stakeholders were conducted to solicit their views and inputs, and various literature, laws, and policies were also reviewed. These served as the basis for identifying a possible business models for establishing the KH that will primarily provide on-line training for the IT–BPM courses, potentially serve as the link to potential employers and serve as the forum for the IT–BPM community of practice (COP). This paper is designed to: (i) establish a KH framework that is suitable for the IT–BPM sector, and (ii) define a proposed road map and timeline for the establishment of the IT–BPM knowledge hub project. It identifies critical technical, organizational, financial and administrative requirements in the development, operation and management aspects that are necessary to support the initial implementation of a KH.

1 ADB. 2012. Technical Assistance (TA) Report, Technical Assistance to the Philippines for

Strengthening Knowledge-Based Economic and Social Development.

Page 197: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

5

THE PHILIPPINE IT–BPM SECTOR: A TRACK RECORD II.OF GROWTH & OPPORTUNITY

A. Sector Performance and Targets

The IT–BPM industry in the Philippines has attained leadership in establishing a sizeable

business process outsourcing (BPO) presence in Southeast Asia. Over the last ten years,

the Philippine IT–BPM industry has grown at an impressive annual rate of about 30%, the

fastest recorded growth of a global services location. During this ten year period, its global

business process management (BPM) market share increased from 4% to 12.3% while

employment grew ten times, reaching 1 million employees in 2014.2 It is the largest private

sector job creator for skilled Filipinos contributing approximately 6.2% of GDP in 2014 and it

is the Philippines’ third largest foreign exchange earner after tourism and remittances.

Since 2010, it has been the number one provider of voice and the number two in non-voice

related outsourced work in the BPM industry worldwide.

One of the reasons cited for its high level industry performance is an ambitious roadmap

that is targeting to achieve revenues of $25 billion or about 10% of the global IT–BPM

market.3 This revenue figure is projected to account for about 8% of GDP, potentially

making it the second largest source of foreign exchange for the country. Collectively, this

goal translates to about 1.3 million direct employees by 2016 and approximately 3.2 million

indirect jobs that include a sizeable number in the informal sector. Industry leaders and the

results of the 2014 Tholons study commissioned by IBPAP and the Commission on

Information Communication Technology (CICT) confirm that its 2016 targets are within very

easy reach. The study also projects that by 2020, the industry will achieve $48 billion in

revenues for the Philippine global outsourcing industry. Figure 1 shows the projected

growth of the industry in terms of revenue.

Figure 1: Philippines’ IT–BPM and Global In-house Center (GIC) industry revenue targets for 2016

2 Tholons Study 3 Philippine IT–BPM Roadmap 2012–2016, © 2013 Information Technology Business Process

Association of the Philippines and TeamAsia, published by the Department of Science and Technology–Information and Communications Technology Office (DOST–ICTO).

Page 198: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

6

The industry has embarked on a wide range of initiatives and strategies to sustain its competitiveness and success in the voice segment and consider expanding into non-voice services. It has identified key drivers of growth and the kind of strategies needed to reach its targets. Specifically, its strategies are concentrated on protecting and extending the right supply conditions and target a significant, differentiating degree of market share in order to leverage network effects and virtuous benefits of scale. To further drive the leadership, it seriously considered diversifying in portfolio services and markets by focusing on higher value and more complex services including: (i) software development and IT services, (ii) animation, (iii) game development, (iv) healthcare information management outsourcing, (v) legal, financial and accounting services, and HR among others. B. The IT–BPM Talent Challenge The single, most important issue facing the industry that will impact on the success of the IT–BPM sector in sustaining its growth is the availability of qualified talent. For the period 2007-2011 alone, the IT–BPM workforce grew at an annual average of 23% making the industry the largest private sector new-job creator. Historically, talent supply in the industry was in excess of demand. There exists a steady pipeline of talent in the educational system that is sufficient to support growth of about 15% annually with approximately 480,000 new tertiary graduates. However, since 2010, demand has consistently outpaced supply given the faster growth being experienced by the industry. In the International IT-BMP Summit held on 13-14 October 2014, participant CEOs confirm that talent continues to be the number one issue that needs to addressed for their firms to meet their targets in the next two years. Figure 2 shows the widening talent demand-supply gap for the IT–BPM industry.

Figure 2: Projected talent demand-supply gap for the IT–BPM industry

2016 Talent requirement with reverse the current demand-supply situation by 2012-2013

In addition, the recruitment funnel has also been a challenge. For every 100 applicants that are screened, only 5-8% actually qualify and are hired. Many college graduates lack proficiencies in English, Math, Science and Technology, and Service Culture – which are

Page 199: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

7

needed by the industry. Low IT literacy and poor access to computers of the larger segment of the population also hinder the development of suitable talent for the IT–BPM industry. With limited supply of talent, stiff competition among outsourcing suppliers and clients alike has led to high attrition rates and, consequently, increased spending on recruitment and training. IT–BPO companies are providing education and training to their prospective employees, which increases overhead costs and creates disincentives. In addition, there are not enough mid-level managers and senior executives within the industry to lead the large pools of young employees. Another challenge facing the IT–BPM sector is the weak university-industry linkage. Programs of HEIs are not directly related or complementary to the IT–BPM industry. The IBPAP Roadmap identified five complementary efforts to deliver the additional 300,000 to 600,000 full time employees (FTE) that the industry needs to grow faster:

(i) developing a comprehensive assessment and training program; (ii) creating awareness of career opportunities; (iii) training alternative talent pool; (iv) helping students to continue to fund their education; and (v) working with the education sector to find ways to make college and high school

curricula more directly related or complementary to the ITBPM industry. IBPAP and the different government education sector agencies have partnered in implementing traditional talent development initiatives, including the Service Management Program (SMP) as a foundation course, aimed both at increasing the quantity and addressing the quality of the graduates. While many concrete gains have been achieved by these projects at this time, there remain many critical gaps and constraints that have yet to be adequately addressed and many new ones are emerging. Moreover, as the BPM global composition becomes more and more diverse, the demand for more complex and emerging services is putting additional pressure on the skills requirements on talent. As a result, many small and medium BPO firms who wish to participate in the IT–BPM sector are being constrained by their ability to invest in training programs that will allow them to scale-up and compete with the multinational BPOs who already have established training programs and a well-developed talent pool. The country’s educational institutions that are well aware of the industry’s requirements continue not to be able to provide a suitable number of qualified graduates to meet the demand. Despite the creation of CHED Memorandum Orders number 6 and number 34 in 2012 that institutionalizes the SMP in its BA and IT Programs as a minor track, various conditions and issues including policy, teacher capability and lack of adequate physical IT infrastructure continue to be cited by the school as part of the challenges that need to be overcome before they can fully contribute to addressing these talent gaps. The industry’s current focus has been primarily in the areas around Metro Manila and the National Capital Region (NCR) and a few key cities such as Angeles, Bacolod and Cebu. IBPAP estimates that approximately 70% of IT–BPM jobs are currently located in these areas while 70% of the tertiary schools and graduates are located in other regions outside these areas. This inverse relationship of jobs and graduate locations is limiting the universe of talent, space and infrastructure, and creating pressure on costs. The development of the Next Wave Cities (NWC) as alternative locations is IBPAP’s strategy that will make

Page 200: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

8

accessible to the IT–BPM industry the larger number of graduates from tertiary education that are located in these areas. C. IBPAP’s Talent Development Framework

IBPAP plays a critical role in driving successful talent intervention programs in the industry. It leads major talent projects and programs and is the interface of the sector with government and multilateral and bilateral development agencies. The IBPAP Talent Development Framework utilizes an integrated approach with objectives that progressively lead to expanding the talent pool and addressing the talent supply gap primarily through public-private partnerships (PPP). It is designed to improve the flow of talent to the industry by finding solutions to a number of root causes that are lowering talent availability, impairing sustainability and willingness to work in the industry and limiting access to talent pools outside the NCR. The framework is also anchored on the five factors that drive recruitment in the industry namely, availability, suitability, willingness, accessibility and “stickiness.” The Talent Development Framework is anchored on the IT–BPM sector 2012-2016 Roadmap and is designed to (i) attract and train up to 1.1 million potential employees by 2016; and (ii) make the IT–BPM careers aspirational. Figure 3 below shows the IT-BPAP’s conceptual framework for developing its talent pool.

Figure 3: The IT–BPM Learning Journey

The framework recognizes that learning is a journey over a period of time. It defines the process, courses and providers that may direct one’s career path in the different IT–BPM sub-sectors from entry level position through mid-level managerial or supervisory career paths. Foundational capabilities that include communication skills, critical thinking and a

Page 201: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

9

strong service orientation form the base “building blocks” for joining the industry. These skills are then complemented by domain specialization including technology familiarization that is provided by the HEIs, state universities and colleges (SUC) and other training institutions. IT–BPM industry specific and work-related skills are then incorporated to form the third level capacity that provides an orientation to the industry, its distinct features and the required work ethics that will enable the talent to effectively contribute to the industry and build a sustainable career. Continuous learning programs are provided by the employer’s in-house learning and development programs to further increase efficiency and support career development. At the heart of this framework is the focus for specialization, innovation and sustainability that is required to drive performance and increase the capacity of the employee to add value in a highly competitive industry like the IT–BPM industry. These themes will also address low hiring and high turnover rates. The Service Management Program (SMP) and the eSMP courses have been identified in the IBPAP Talent Development Framework as the fundamental course for entry into the IT–BPM sector. These courses are designed to strengthen or develop key skillsets, namely, communication skills, service culture, systems thinking, basic industry knowledge and processes and build competencies in perceptual speed and accuracy, English proficiency (including workplace English), computer literacy, service orientation and learning ability. As a foundation course, SMP/eSMP may be accessed using different modalities at different stages of the potential talent pool’s learning and career journey as illustrated in Figure 4.

Figure 4: SMP/eSMP Implementations Framework

Page 202: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

10

A NEW TALENT DEVELOPMENT STRATEGY TO SUSTAIN TALENT GROWTH: III.THE KNOWLEDGE HUB

One of the solutions that have been identified to holistically address the skills shortage and support inclusive growth is a formally organized mechanism such as the Knowledge Hub. The KH will create an institutional framework for continuously designing, testing and rolling out talent programs and make available to various stakeholders industry information or data including employment opportunities and research results and development. The KH can bridge the different industry talent development stakeholders and in the process minimize the constraints brought about by distance, access and resource requirements. The establishment of the KH is also expected to dramatically align the higher education curriculum with both international standards and labor demand, provide access to IT–BPM knowledge resources and build on public-private initiatives. A knowledge hub is defined as an institution, entity, or group that operates in a knowledge domain or activity and whose excellence is recognized by those who engage with or are supported by it. The ultimate objective of the knowledge hub is to make information available to those who need it at the time they need it. Both a virtual and physical (brick-and-mortar) knowledge hub may be developed and operationalized for this purpose. From the point of view of development practitioners a knowledge hub has been defined as “an organization, or part of an organization, dedicated to sharing and exchanging development experiences and models.”4 Development practitioners also use the term “Knowledge Hub” to refer to networks that “facilitate information exchange toward practice-related goals.”5 From the point of view of development practitioners a knowledge hub has been defined as “an organization, or part of an organization, dedicated to sharing and exchanging development experiences and models.”6 Development practitioners use the term “Knowledge Hub” to refer to networks that “facilitate information exchange toward practice-related goals.”7 Information exchange here specifically refers to knowledge exchange for the purpose of achieving a development goal, to inform development policies and practices. In the field of management, the sharing of information among partners for the purpose of pursuing a common goal has also been present in the literature on organizational change. Here the term “communities of practice” has been used to refer to “groups of people informally bound together by shared expertise and passion for a joint enterprise” where “people…share their experiences and knowledge in free-flowing, creative ways that foster new approaches to problems”. As a change management strategy, “communities of practice can drive strategy, generate new lines of business, solve problems, promote the spread of best practices, develop people’s professional skills, and help companies recru it and retain talent.”8 Communities of practice, voluntary in nature, can be particularly well suited to coming up with innovative solutions to problems.

4 Choesni, T. A. and Schulz, N. Knowledge Hubs Progress in Practice since the Bali Communiqu,

p. 83. http://jicari.jica.go.jp/publication/assets/040_Chapter4.pdf, http://wbi.worldbank.org/sske/sske/knowledge_hub

5 ADB. 2008. Creating and Running Partnerships Manila. http:// www.adb.org/Documents/Information/Knowledge- Solutions/Creating-Running-Partnerships.pdf

6 footnote 4. 7 footnote 5. 8 Wenger, E.C. and Snyder, W.M. 2000. Communities of Practice: The Organizational Frontier.

Harvard Business Review.

Page 203: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

11

KH BEST PRACTICES AND MODELS IN OTHER COUNTRIES AND SECTORS IV.

Table 1 summarizes different models and typologies of KHs and networks found around the world.

Table 1: Typology based on formality and obligations of the partners

Formal, between organizations

Strategic Alliances

In the private sector, these alliances are “long-term purposeful arrangements among distinct but related organizations that allow those firms to gain or sustain competitive advantage.” In the public or nonprofit sector, a strategic alliance is established for a value exchange between the partners, governed typically under the terms of a Memorandum of Understanding. ADB describes these as voluntary formal arrangements between two or more entities with a common set of objectives to meet critical needs, which pool resources while remaining independent.

Public-private partnerships

Contracts between a private sector entity and the government, where the private partner delivers a desired service and assumes the associated risks. In return, the private partner receives payment according to criteria specified in the contract and assumes the financial and administrative burden of providing the service, while the government regulates and monitors performance.*

Tri-sector or cross-sector partnerships

This type of partnership consists of private investment, public objectives, and community participation.*

Less formal, between organizations

Knowledge networks

Knowledge networks among institutions focus in strengthening the sharing of knowledge and generating new knowledge to have greater influence on policies and practices outside the network. The knowledge is for use beyond the network; the network is purpose driven, to create knowledge for application; and often time bound, in setting and achieving goals and objectives. “Formal” knowledge networks have a greater degree of structure, bringing together expert institutions for more specific research tasks, but retaining the focus on promoting the findings for use beyond the network members.

Less formal, between individuals

Open source development communities

These communities are purpose driven in the development and testing of new ideas. They are open in that anyone wishing to contribute to the purpose can join; structured in the expectation that members will contribute actively to the purpose, with dedicated monitoring and reviewing of those contributions by the originators of the community; and hierarchical in that the endorsement and adoption of new ideas is through the inner circle of the original creators of the community. They are prone to regular branching off to new communities when the ideas are not endorsed or adopted.

Network of experts

These networks bring together individuals rather than organizations; the invitation to join is based on expertise in a particular area. Their purpose can be either advisory or focused in research and problem solving.

Communities of practice

Two or more individuals can create a community of practice for conversation and information exchange, possibly even leading to the development of new ideas and processes. Participation is purely voluntary and will wax and wane with the level of interests of the participants. Communities of practice can exist within an organization, or be independent of any organization; they can be face-to-face in person or virtual/online.

Page 204: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

12

Table 1: Typology based on formality and obligations of the partners

Less formal, between individuals

Communities of interest

These are more loosely knit communities built around common characteristics or shared interests (youth activism, hobbies, etc.). Participation is purely voluntary and will wax and wane with the level of interest of the participants.

Information networks and portals

These networks provide access to information supplied by network members, occasionally with overlays of interpretative materials that organize content thematically. However, they are fundamentally passive in nature. Users must come to the network-physically or electronically- to benefit from the work of the network.

Several processes are identified as standard in knowledge management practice and represent the breadth of activities that may be included in the IT–BPM Knowledge Hub. These key knowledge processes are:

(i) knowledge mapping or the process of identifying knowledge needs and gaps, and sourcing knowledge accordingly;

(ii) generating or creating knowledge through original research and through refining, testing, and implementing new applications of existing knowledge;

(iii) storing and retrieving knowledge through appropriate information systems and protocols;

(iv) sharing and applying knowledge through interactions with other stakeholders and broader communities of interest; and

(v) engaging in cycles of learning and reflection leads to adaptation and progress against given objectives.9

Hundreds of knowledge hubs or networks are used globally in many different sectors and for many different reasons. Governments invest in dedicated institutional and operational arrangements for peer-to-peer learning–what pitfalls to avoid, what practices to adopt. For many countries, sharing their knowledge and experience, especially those with interesting development experiences, is a way to develop meaningful international partnerships. As demand for the exchange of practical development experiences grows, countries are seeking better, more predictable ways to connect and scale up their knowledge sharing. In the private sector, knowledge hubs or portals are used to support different part of operations to disseminate information, quality standards, do knowledge transfers and training, communicate needs and issues, and announce employment opportunities that covers human resources, technology, customers, suppliers, community, and civil society groups. International organizations, including multilateral and bilateral agencies operating in many countries use knowledge hubs to drive all kinds of innovative changes, support disaster relief and rehabilitation programs and share development best practices and experiences among others. Professional organizations or bodies also serve as knowledge hubs to service their members and stakeholders–to provide continuing education, certification and accreditation, disseminate information, research results, employment opportunities and other information relevant to their community of practitioners. A list of the knowledge hubs reviewed under this project are presented in Appendix 1 9 footnote 5.

Page 205: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

13

Many best practices have been noted in the operation and management of knowledge hubs including the following:

(i) Hub partners commit to exercise leadership, engage in a long-term relationship and identify clear directions toward the realization of goals.

(ii) Organizational partners involved in operating or managing the hubs recognize shared responsibilities and agree that, within their organization, people will devout a significant amount of time and energy to the operation of the hub.

(iii) Organizational roles and accountability structures are clear and committed to. (iv) Partners share scarce but adequate resources including physical facilities,

equipment, talent and knowledge. (v) Partners acknowledge that the hub and any of its talent programs cannot

jeopardize academic freedom nor can the participants disregard the commercial prospects.

(vi) Partners recognize that their commitment and participation in the hub will translate into a set of shared responsibilities that they need to execute and be accountable for.

(vii) The use of appropriate information and communication technology is a key factor for the success of the hub.

(viii) Sustainability for the hub must be clearly defined at the start. Partners must be willing to provide or ensure long-term support. One underlying factor that will contribute to its sustainability is the mutual benefits that all partners will derive from this undertaking.

Page 206: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

14

PHILIPPINE GOVERNMENT SUPPORT FOR THE IT–BPM SECTOR V.AND E-LEARNING

The Philippines needs to improve its overall competitiveness by prioritizing sectors where the country has competitive advantages, while ensuring a reliable labor supply chain. Studies indicate that with its position within the Association of Southeast Asian Nations (ASEAN), its large, young, and well-educated workforce, and improved access to fast-growing markets, the Philippines is well situated to attract large investments that can generate significant number of new high-quality jobs in key sectors such as information technology (IT) and business process outsourcing (BPO). The Philippine Medium Term Development Plan and the Philippine Digital Strategy both aim to support a globally competitive service sector. Government is strengthening its system of education to meet the labor demands of innovative and growing industries such as the IT–BPM sector. In particular, it continues to implement programs such as the Commission on Higher Education (CHED) Developing State University and College Graduates Towards Global Competitiveness, National Productivity and Development Project, and the Technical Education and Skills Development Authority (TESDA) Industry Based Training for Work Scholarship Program (ITWSP) that are designed to provide market responsive education and training and ensuring that the supply side of the labor equation is addressed through quality education/training and effective assessment and certification system. The Department of Education (DepED) is implementing a major educational reform program under the K-12 Program that will include courses in service management for grades 11 and 12. The DOST-ICTO is also assisting the IT-BMP sector through a number of policy, advocacy and coordination initiatives including talent development. Congress is also seriously looking at what policies need to be put in place to contribute to the administration’s vision of inclusive national economic growth and development by producing qualified and competent human resource needed by priority growth sectors such as the business processing outsourcing (BPO) industry. At least nine bills have been consolidated into what is now House Bill 4553 that seeks to expand access to educational services by institutionalizing open distance learning in higher education. House Bill 4553 when passed into law will institutionalize distance education as a system of delivering quality higher educational services in the country. In this proposed law, UPOU will be able to provide expertise to CHED in the development of open learning and distance education expertise in the country and in the appropriate use of information and communications technologies in support of quality higher education and allow UPOU to design model curricular programs, which shall serve as prototypes for similar programs to be offered by other HEIs, among others.

Page 207: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

15

THE PROPOSED IT–BPM KNOWLEDGE HUB VI. The IT–BPM Knowledge Hub aims to support the following government, academic, IBPAP and IT–BPM sector goals and initiatives:

(i) address the skills shortage in the IT–BPM industry; (ii) serve as the gateway for knowledge sharing and networking among industry

members and other stakeholders; (iii) enable Public-Private Partnerships (PPP) for talent development; (iv) build and sustain industry-academe partnerships; (v) promote industry growth; (vi) reform initiatives in the higher education systems and programs to produce

suitable graduates to meet the labor demands of high growth industries such as IT–BPM industry; and

(vii) expand reach and scale IBPAP’s talent development programs. The IT–BPM Knowledge Hub seeks to support improvement in the alignment of higher education with the needs of the economy. It will have a central role to play specifically in driving the continuous process for generating and implementing talent development programs and courses. The expected KH key specific outputs are increased access to knowledge resources for the IT–BPM designed courses, enhanced higher education curricula and instruction, and strengthened partnership between industries and academic institutions. The long term impact becomes tangible through a replicable and sustainable system of ICT-enabled knowledge hubs for the improved teaching and learning of IT–BPM industry designed curricula in HEIs. The IT–BPM Knowledge Hub is intended to house developed industry-designed courses and industry assessment tools including a middle management and leadership program that will be utilized by all HEIs and training institutions. The Knowledge Hub will also initiate international and national twinning arrangements and support stronger industry-academe linkages. These activities collectively aim to scale up the deployment of cost-effective models for strengthening and delivering HEI programs, improving the flow of talent to the industry, sustaining Knowledge Hub activities and substantially contribute to addressing industry demand for talent.

A. Mission/Purpose

The specific roles of the proposed knowledge hub for the IT–BPM industry are:

(i) Provide opportunity for business, employment, education, and training to industry member organizations, partners, prospective and current industry talents, and other stakeholders

a. Employment, education, and training information to job seekers and/or

learners intending to work in the IT–BPM industry b. Serve as a key database for candidate or potential employees information to

potential employers c. Be a key touch point or source of reliable information for prospective

enrollees (or learners) data or statistics to IBPAP training partners and institutions

Page 208: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

16

d. Be a source of local business opportunities from prospective clients of industry to industry members and partners

e. Serve as a source and repository for related IT–BPM programs and industry information (e.g. company profiles, accreditations, certifications, research outcomes) to potential and current talents, employers, and other stakeholders

(ii) Direct prospective talents to prospective employers

(iii) Direct prospective and existing talents to educational and training programs and

providers

(iv) Provide assessment, certifications, and accreditation services to talents, industry members and partners

(v) Develop prospective and current talents’ potentials into purposeful and rewarding

careers

(vi) Promote the services of industry members and partners to the global and local business community

(vii) Support the advocacy campaign of the IT–BPM sector particularly as it relates to

IT–BPM career development, K-12 and its other talent development programs B. Knowledge Hub Building Blocks To achieve its mission, the following building blocks need to be developed to provide the backbone of the knowledge hub:

(i) Member’s Competency Promotion Mechanism

This pertains to the identification and development of strategies, policies and procedures on how industry members’ competency will be marketed to attract potential clients. This will feed into the development and operation for opportunity matching.

(ii) Assessment, Certification, and Accreditation Delivery Mechanism

This pertains to definition, identification, and/or development of standards and tools for assessment, certification, and accreditation of industry members (e.g. industry ratings and service competencies), potential and current industry talents (e.g. skill levels, aptitudes, knowledge, and employability), and industry partners (e.g. service competencies and ratings). This will include the design of strategies, policies, procedures, and technology pertaining to assessment, certification, and accreditation. This mechanism will feed into the development and operation for opportunity matching.

Page 209: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

17

(iii) Curriculum Development Mechanism

This pertains to the identification and development of required general and specific curriculum for each industry group (e.g. ITO, Contact Centers, Animation and Game Development, Knowledge Process Outsourcing (KPO), Healthcare, Engineering, GIC), its contents, and delivery using traditional and virtual approaches. This will include the design of strategies, policies, procedures and technology pertaining to curriculum development and maintenance, including the management and operation of the community of practice (COP) teams for each of the industry group to provide key inputs into courseware development and versioning. This mechanism will feed into the development and operation for both opportunity matching and talent development.

(iv) Opportunity Matching Mechanism

This pertains to the identification and development of strategies, policies, procedures, rules, and technology for acquiring and matching opportunity with competency of industry members and partners, potential and current talents. Opportunities will include, but is not limited to, business, employment, career advancement, education and training.

(v) Talent Development Mechanism

This pertains to the identification and development of strategies, policies, procedures, and technology for developing, managing and retaining industry talents to support career entry, shifting, and advancement opportunities. Approaches will include traditional and online degree and diploma programs for curriculum-based and specialized education and trainings, extending to cross-functional and re-tooling programs. It will also provide career monitoring and employment tracking mechanisms for industry talents. This activity will be done in support to the IBPAP Talent Development Program.

(vi) Industry Knowledge Management Mechanism

This pertains to the identification and development of strategies, policies, procedures, researches and technology for the acquisition, capture, storage, retrieval, and sharing of knowledge in each of the industry groups. This mechanism will feed into the development and operation for curriculum development.

C. The Knowledge Hub Business Model Based on the consultation, researches, the analysis of stakeholder benefits and costs, formulated concepts, and moving beyond its traditional objectives, a business model and value proposition chart is being presented to form part of the KH overall business strategy. The discussion below is intended to establish its position of value, identify potential revenues and benefits associated with the delivery of the KH “products or services”, geographical coverage, partners as well as the related costs. It will also help identify the economic risks associated within its “ecosystem”.

Page 210: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

18

(i) Key Business Model Design Principles

a. Global Access – The KH can be accessed worldwide particularly by OFWs

who are looking for opportunities in the IT–BPM sector or those who are wanting to return and establish a career in the Philippines. It must also be accessible to IT–BPM headquarters firms and stakeholders who may wish to directly participate in KH activities.

b. Self-sustaining – The KH will generate sufficient financial resources from its activities to sustain and grow its operations. It will charge membership fees to recover costs, not to make profit. It is also envisioned to be a recipient of multilateral, bilateral funding and research grants.

c. Well resourced – The KH must have the capacity to provide the leadership on strategy or on shaping the KH agenda for talent development delivery and driving deployment of IT–BPM courses. It should also be able to successfully deliver talent initiatives, develop a coherent organization and governance structure, clear service lines and ensure a viable funding mechanism.

d. Collaborative – The KH must serve as a catalyst to the different stakeholders to address talent supply-demand issues and build strong industry-academe partnerships. It must improve the level of cooperation and participation among the different stakeholders and more importantly engage these stakeholders so that they can deliver tangible results that will contribute to the achievement of the KH goals.

e. Stakeholders participate because of perceived value – Demand for the services of the KH is dependent on the kind of services and “products” that it will offer. The more quality and useful services, information, training, research data etc., is made available in the KH, the more members it will generate. The more quality information is provided, the more active the stakeholders are in participating in the KH.

f. Membership based (whether corporate or individual) – This structure will be critical for the sustainability of the KH. It will also ensure fair distribution of rights and responsibilities among the stakeholders

g. Online & Blended IT–BPM training programs available – The KH will be the main source of IT–BPM online and blended training content. It will include SMP, eSMP, BEST, AdEPT, GCAT and all other courses and programs that are still being developed.

(ii) Business Model Canvas and Value Proposition

The Business Model Canvass in Figure 5 was developed to define the KH business model.

Page 211: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

19

Figure 5: Business Model Canvas

KP KA VP CR CS Key Partner

Academe – DepEd, CHED, TESDA, HEIs, SUCs, TVIs

Industry Firms/Employers, Homegrown SMEs, Multinationals

IT-BPM Industry Associations/NGOs

IT-BPM Recruitment Companies

NG and LGUs, Policymakers with IT-BPM specific agendas

Multilaterals/Bilaterals looking for IT-BPM exposure

Key Activities

Training Marketing Advocacy Research Resource sharing Recruiting Courseware

maintenance and versioning

Accreditation & Assessment

Value Proposition

Access to Industry information, government agency partners and relevant legislation, roadmap and thought leadership

Access to Training and Employment opportunities, company specific information, career paths

Access to Recruitment, marketing channel, PPP, Investor opportunities

Sustainable partnership agreements, PPP

Customer Relationship

Career Marketing to students, influencers

Scholarships for teachers/trainers

Training programs, course access, certifications

Interviews, Internship coordination, and sector employment readiness

Customer Segments

Student members, Career shifters, OFWs interested in an IT-BPM career

Teachers/trainers wanting to upskill to include IT-BPM skillsets

Corporate members HEI/SUC/TVI members Local Communities/Civil

Society

KR CH Key Resources

Academe partnered with Industry direct – Internships and OJT

Contracts with Subscriber career portals, recruitment firms

Contracts with enablers and training vendors

Channel

HEIs and SUCs classrooms - partnered with Industry firms

MoDEL Subscriber career

portals

Page 212: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

20

(iii) Service Lines:

a. Offer/Deliver IT–BPM training Programs (SMP, eSMP, BEST, AdEPT and any other programs that may be developed);

b. Certify or accredit those students who have successfully completed the training courses;

c. Conduct the accreditation test and serve as an accreditation testing site for the IT–BPM industry;

d. Be a repository and source of industry training and IT–BPM employment related information, IT–BPM research and resource materials for its stakeholders;

e. Facilitate internships with industry firms; f. Develop and host the Community of Practice for the IT–BPM; and g. Serve as the link between potential employers and those who qualify and

are interested to join the IT–BPM industry

Figure 6 shows the relationships and interdependencies of the different value proposition and other variables and their impact on stakeholder roles.

Figure 6: KH Interdependencies

Page 213: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

21

(iv) KH Network Functionality and Flow

The KH will succeed only if all stakeholders are involved and provide support in multiple areas. The KH will leverage the resources and expertise of its stakeholders, including IBPAP, national government, civil society organizations (CSO), and local governments. It will drive talent development programs that it hosts, effectively facilitate, support and implement initiatives in designated IBPAP talent development related activities such as accreditation; and provide leadership with its different stakeholder groups to make sure that they are able to contribute effectively towards increasing and retaining the industry talent pool. It will utilize different formal and informal contractual mechanisms described in Chapter III that may be appropriate including building strategic alliances with schools, facilitating public-private partnerships between industry firms and schools, tri-sector or cross sector partnerships among local CSOs and local government etc. The key KH functionality that will materially make a huge difference in sustaining the relative competitive advantage of the Philippines’ IT–BPM sector will be its ability to ensure alignment of the talent supply side to industry so that qualified graduate continuously feed into the IT–BPM firms (demand side). It will use the Hub and Spoke model for building the different mechanisms as it sees fit. Figure 7 shows the envisioned main KH process flow from the supply side (education) to the demand (employment) side for Talent Development Management.

Figure 7: KH Network Functionality and Flow

Page 214: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

22

(v) Organizational Structure - Internal

For the KH to provide its users vital services and deliver its value proposition discussed above, it needs to be managed by a professional, highly competent, objective organization that has dedicated full-time staff. There will be teams responsible for the five key service lines: (i) Membership, (ii) Certification, Assessment and Accreditation, (iii) Curriculum Enhancement and Development, (iv) Career Opportunity Matching, and (v) Talent Development, Management, Monitoring and Career Tracking. The KH will be supported by a lean team for Finance and Shared Services, Technical Support, Industry Talent Development Relations and Research under the office of an Executive Director. The internal functional chart in Figure 8 outlines the flow of accountability and functional roles of each unit. The functions of each unit directly support the building blocks roles described in chapter V section B.

Figure 8: KH Functional Chart

(vi) Governance Structure

The KH is seen as a collaborative initiative among many stakeholders. Thus, at the governance level, it must maximize the level of collaboration and coordination among industry (and sub-industry) associations, industry players, academe and academe related institutions, government, professional organizations and other stakeholders. Along these lines, the KH will be guided initially by a Steering Committee which can shift to a more traditional governance body (e.g., Board of Trustees). It is expected that the role of the governing body will shift from a developmental role at the early stages to a more strategic and performance driven one as hub takes off. Whichever structure the governance body takes, it is important that the composition of the governance body ensures a strong IT–BPM industry representation and leadership. Further, it should include adequate representation from among its various stakeholders, including academe and the government

Page 215: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

23

education sectors. That being said, the governing body should remain small in order to facilitate decision making, particularly during the setting up stage of the KH. In addition, the governing body should constitute working committees to better oversee the performance of the KH (e.g., audit, quality assurance).

Figure 9: Governance Structure

(vii) Revenue and Budget Model

The KH will have a membership base open to all industry players and non-industry players who contribute to the development of the IT–BPM industry. The membership model is designed to draw contributions from members depending on the value that each member is able to derive or the ability of the member to contribute or both. It will adopt a tiered membership model based on the category of membership.

a. Industry players will be charged a tiered fixed annual membership fee with

corresponding “rights” or access to specific “products” e.g. access to the KH data base for graduating students that they can use for employment or access to schools offering SMP/eSMP and school information on these courses.

b. Students, graduates and communities of practitioners who wish to access the KH courses or are enrolled in these courses, want to be updated on IT–BPM information and research or wish to stay in touch with the industry practitioners will be charged a membership fee to avail of services (e.g., employment possibilities, use of physical facilities etc.)

c. Academic Institutions, CSOs, Industry Associations, sub-industries and similar organizations, providers and enablers who are interested to participate, engage or collaborate in certain activities of the KH.

Page 216: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

24

In addition to membership, the KH will also derive revenues for specific products and services such as those for conducting certification or assessment, administration of the GCAT tool, tuition fees for SMP classes and other IT–BPM course that it will conduct, research output materials, job matching fees etc. It will also look at soliciting sponsorships, grants and donations to fund some of its development oriented initiatives and scholarships. While the KH may be part of a much larger organization or academic endeavor or an independent organization e.g., an NGO, it is expected that resources still need to be made available for it to operate. The KH will require financial resources to cover organizational or set-up costs and operational/administrative costs. It is estimated that the KH will require a one-time PHP 10 million for its organizational costs (for cost of equipment, facility, office furniture etc.). It will require another PHP 8 million annually for its operational/administrative costs, including salaries and benefits, project costs, marketing, research, utilities and communication costs.10

10 Cost figures are based on the IBPAP set up and operating costs.

Page 217: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

25

BUILDING THE KNOWLEDGE HUB VII. A. Design Considerations and Assumptions The following principles and assumptions were used in formulating the IT–BPM industry knowledge hub roadmap:

(i) Continuity of Programs

IBPAP has the SMP/eSMP course in its pilot deployment stage. The learning and experience gained in its initial deployment are used as a foundation for the proposed knowledge hub. The online Service Management Program (eSMP) project will provide the base virtual knowledge hub model, which has the following key components:

a. The IBPAP website as the industry touch point for the eSMP portal; b. The eSMP portal, which is currently under development, and the UPOU

portal will provide access to learners for the online SMP course; c. The online SMP course will adopt the UPOU model as the SMP course

delivery mechanism; and d. Two portals will be linked to provide the employment channel: a freelancer

work portal and a subscriber career portal.

The Service Management Program (SMP), on the other hand, will provide the base physical (brick-and mortar) knowledge hub model. Under this model, IBPAP works with third party providers (e.g. SUC and HEI) for the supply of learners. While basically following a traditional brick-and-mortar approach, it may also deliver eSMP courses which is the online (or virtual) version. Employment channels in both models will be provided via a third-party job matching providers or directly with identified industry partners through Industry-academe partnerships. SMP and eSMP are assumed to be the base programs and models upon which the proposed knowledge hub will be developed. Both programs are assumed to be the foundation curriculum program in the industry. Thus, the proposed knowledge hub project will start as a more powerful and extensive version of SMP/eSMP.

(ii) Sustainability of Program

The knowledge hub project is assumed to have the full support of the industry member firms and partners–from conceptual, to operational, to maintenance and management stages of the project; including the provision for logistics and financial support. It is assumed to have a business model that will generate financial support through membership, subsidies, subscription, and grants. The physical (brick-and-mortar) knowledge hub is assumed to develop its own business models, to generate its financial revenues, above and beyond subscription and grant supports. IBPAP may consider developing a franchising model for it.

Page 218: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

26

(iii) Replicability/Scalability of the Program

The knowledge hub processes and contents will be designed to be scalable and adaptable for the teaching and learning of IT-BPO knowledge areas across HEIs and accessible to its different stakeholders globally.

a. Public-Private Partnership

IBPAP has piloted a number of public-private partnership models under its existing projects. This paper assumes that some of these pilot models will be replicated and others will be modified or enhanced depending on the partners and the nature of their involvement in the hub. The PPP model is organized along a continuum between public and private nodes and needs as they integrate normative, albeit separate and distinct, functions for the industry without diminishing either sector. Multisectoral, or collaborative, partnering is experienced on a continuum of private to public in varying degrees of implementation according to the need, time restraints, and the issue at hand. The unified partnership has immediate impact in the development of communities and the provision of public services.

b. Iterative, Incremental, Integrated, and Parallel Development

An iterative, incremental and integrated development, which pursues phases and develops “building blocks” rather than one-time delivery of service features over time, is assumed in the roadmap. This has the advantage of realizing benefits and institutionalizing mechanism faster as well as minimizing failure risks than if all features will be collectively delivered at the end of each project phase. Given that there are several industry sub-groups to be served, it is assumed that a parallel development will best serve their interests, compared to a sequential, prioritized basis. This will also have the advantage of realizing benefits faster for each industry sub-group and building a broader intranet of stakeholders, rather than being dependent on each sub-group whose interests may differ from each other.

B. KH Development Phases The KH will develop a range of information and development services to help the IT–BPM sector manage and attain its growth targets. For the KH to be effective in its role, it needs to systematically build its capacity, create critical information services and training programs, build and sustain its network of stakeholders and institutionalize its activities within the IT–BPM and academe sectors. This section establishes a blueprint of the key stages and outputs that will guide the development and operation of the KH. The proposed roadmap identifies four key phases: Organizational, Developmental, Operational, and Innovational. Figure 10 shows the conceptual Gantt chart for the proposed implementation, where certain phases may be performed in parallel with incremental and integrated delivery to address both the common and specific platforms to

Page 219: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

27

all industry sub-groups. The developmental stage may be implemented concurrently after a commitment has been obtained from each of the industry sub-groups (e.g. ACPI, CCAP, GDAP, HIMOAP, and PSIA) and the organization of the KH Management Office (MO). The charts below detail the specific activities and milestone outputs for each of the phases

Figure 10: Conceptual Gantt Chart

(i) Organizational Phase Activities Descriptions Output Milestone

1. Secure Commitment

Secure commitment to project from industry members

Secure commitment for investments Secure agreements with potential

Hubs/Spokes

MOA or similar form from Members signed

MOA or multilateral agreements for Investments signed

2. Organize and Set up the KH Management Office

Organize IBPAP PMO that will provide governance function to project

Formation of Project Teams and Leadership

Staffing PMO and Teams Design of standardized program and

management processes

KH leadership & staff identified and hired

KH Management Office set up

KH management & program systems designed and developed.

3. Prepare Strategic Direction & Workplan

Confirm the strategic direction defined in the roadmap and prepare the workplan

Prepare a marketing plan that is aligned to the IBPAP career development plan

Identify work packages; financial requirements & budgets for the next two years; identify risks

Strategic Plan and 2015 workplan drafted and presented to Board for approval

Finalized marketing plan/campaign ready for implementation

4. Service Provider Selections

Selection of Service Providers for Virtual Knowledge Hub (portal site design, development, and operators)

Selection of Service Providers for Physical (brick-and-mortar) Knowledge Hub (physical site design and development, and operators)

Service provider for virtual & brick & mortar KH identified and MOA signed

5. Selection and Formation of Content Providers

Creation of Community of Practice (COP) group for each industry group, who will provide knowledge content for curriculum development

Identify curriculum and content development service providers

Identified curriculum and content development service providers

Page 220: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

28

(ii) Developmental Phase Activities Descriptions Output Milestone

1. Business Process Design

Design of processes for the following (for each industry group) : • Assessment, Accreditation, and

Certifications • Curriculum Design, Development,

and Delivery • Industry Knowledge Acquisition,

Storage, Retrieval, and Sharing • Talent Development • Opportunity Matching • Competency Promotion

Design of an integrated business process for the knowledge hub

Design of physical (brick-and-mortar) knowledge hub business process and operations

Launch marketing campaign

Consultation sessions with industry experts/IBPAP talent dev. committees conducted

Business Processes defined and agreed upon with Industry & academe

Business Processes adopted and operationalized

Increased student awareness of the KH and the IT-BMP career opportunities

Increased stakeholder awareness and involvement in the hub.

2. Curriculum Content Design and Development

Identification of required curriculum (for each industry group)

Assist IBPAP in Design of contents by COP (for each industry group)

Assist IBPAP in Design and development of course materials

Assist IBPAP in Design and development of course delivery methods for traditional classroom-based training

Approved and deployable curriculum, content, and course materials (with delivery approach for traditional classroom training)

3. Virtual Knowledge Hub Portal Design and Development

Commissioning of selected provider for virtual knowledge hub portal design and development (for each industry group)

Design and development of selected virtual knowledge hub portal (for each industry group)

Update of Industry Touch Point portal (IBPAP website)

Shortlist of potential KHs

Signed MOAs w/ KH Approved and

deployable virtual knowledge hub portal

4. Physical (brick-and-mortar) Knowledge Hub Portal Design and development

Selection of pilot site location Commissioning of selected provider for

physical knowledge hub site design Commissioning of pilot site operator Design of selected pilot site Development (i.e. construction) of pilot

site location

Shortlist of potential KHs

Signed MOAs w/ KH Approved and operable

pilot brick-and-mortar knowledge hub

Page 221: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

29

(iii) Operational Phase Activities Descriptions Output Milestone

1. Deployment of Approved Curriculum

Selection of curriculum service providers (HEI, SUC, and others)

Train-the-Teachers (T3) program rollout for new curriculum

Course delivery to learners T3 program, curriculum and course

delivery reviews Inspection and Adaptation of T3

program, curriculum and course delivery

Commissioned and operational physical knowledge hub operations

Operational T3 program, curriculum, and course delivery

Marketing Plan/Career Development Program implemented in conjunction with IBPAP and HEIs

2. Deployment of Virtual Knowledge Hub

Commissioning of Virtual Knowledge Hub operators

Transition of Virtual Knowledge Hub to commissioned operators

Commissioning of Virtual Knowledge Hub

Virtual Knowledge Hub Operations review

Inspection and Adaptation of Virtual Knowledge Hub operations

Commissioned and operational virtual knowledge hub operation

Marketing Plan/Career Development Program implemented in conjunction with IBPAP and HEIs

eSMP courses offered Teachers/Students

trained in eSMP Membership base

reaches 100,000 after 12 months of operation

3. Deployment of Physical (Brick-and-Mortar) Knowledge Hub

Commissioning of Physical Knowledge Hub pilot site operator

Commissioning of Physical Knowledge Hub pilot site location

Physical Knowledge Hub pilot operations review

Inspection and Adaptation of Physical Knowledge Hub operations

Commissioning of Physical Knowledge Hub operator for other site locations

Construction of other Physical Knowledge Hub site locations

Commissioning of other Physical Knowledge Hub site locations

Commissioned and operational physical knowledge hub operations

Marketing Plan/Career Development Program implemented in conjunction with IBPAP and HEIs

SMP Courses offered Teachers/Students

trained in SMP Membership base

reaches 100,000 after 12 months of operation

Page 222: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

30

(iv) Innovational Phase Activities Descriptions Output Milestone

1. Opportunity Matching Full Automation

Design and develop fully automated opportunity matching mechanisms (job-matching, required education and training matching, business matching, etc.)

Update of virtual knowledge hub with fully automated matching mechanisms

Update of related business processes

Fully automated opportunity matching mechanisms installed and functioning

Industry able to access/mine database of SMP/eSMP graduates

Industry/academe able to share research results and new trends to COP

2. Continuous Improvements

Inspection and adaptation of existing knowledge hub processes

Review and updates to curriculum and training delivery

Inspection and adaptation of supporting organizational mechanisms (e.g. IBPAP-PMO role)

Improved (more efficient and effective) business processes

New/additional curriculum developed and deployed

Revenue streams from other services generated.

C. Implementation Timeline Table 2 summarizes the implementation timelines for the four phases.

Page 223: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

31

Table 2: Implementation Timeline Summary

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

PHASE I: ORGANIZATIONAL PHASE

1 Secure Commitment

2 Organize & set-up the KH Management

Office

3 Prepare strategic direction & Workplan

4 Service Provider selections

5 Selection and Formation of content

providers

PHASE II: DEVELOPMENTAL PHASE

1 Business Process Design

2 Curriculum Content Design and

Development

3 Virtual Knowledge Hub Portal Design &

Development

4 Physical (brick-and-mortar) Knowledge

Hub Portal Design and Development

PHASE III: OPERATIONAL PHASE

1 Deployment of Approved Curriculum

2 Deployment of Virtual Knowledge Hub

3 Deployment of Physical (brick-and-

mortar) Knowledge Hub

PHASE IV: INNOVATIONAL PHASE

1 Oppurtunity Matching Full Automation

2 Continous Improvements

Activities2015 2016

Page 224: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

32

ROLE OF IBPAP VIII. A. Role in the Industry As the enabling association for the information technology and business process management industry in the Philippines that services its approximately 300 industry and support-industry members, including sub-sector associations, IBPAP plays a pivotal role in sustaining the rapid growth of the industry and its members by working to address the talent supply gap, ensure an enduring supply of high quality labor and supporting service innovation. IBPAP will work in partnership with the KH to achieve common ITBPM talent development goals. Its strategic role in building and supporting talent development and the KH will concentrate on the following key areas:

(i) standard setting and quality assurance, (ii) curriculum development and versioning, (iii) accreditation and assessment, (iv) marketing and career development, (v) public-private partnership building, (vi) policy advocacy, and (vii) strategic talent development solutioning

B. Role with respect to the KH As part of its strategic talent development solutioning function, the IBPAP will identify and approve selection of the KH based on an established criteria, assist in creating it and be the lead resource to help build the hub’s core capacity to manage and operate. During the early stages of organization and development, as it builds some operational experience including building networks with the industry, IBPAP may serve as the virtual or physical base from which the KH will operate. To ensure its close ties and partnership with the IT–BPM sector, the IBPAP President shall sit as a permanent member of the KH Board of Trustees. As the KHs become operational and the HEIs are able to institutionalize SMP in their curriculum offering, IBPAP is seen to slowly divest from its existing course delivery and deployment function. The KH is envisioned to move towards being operationally independent as it strengthens its management and sustains its activities.

PERCEIVED RISK AND RISK MITIGATING MEASURES IX. Table 3 summarizes the perceived risk factors, possible impact on the KH and possible course of action to mitigate these factors.

Page 225: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

33

Table 3: Risk and Mitigation Measures

Perceived Risks Probability

(L,M,H): Possible Impact on

Project Implementation & Success Possible Courses of Action to Prevent or Mitigate Risks

The failure to create a KH strategic plan that is aligned with the IBPAP and the IT-BPM industry

Low Constrains the industry’s ability adequately address the supply gap and sustaining the supply of quality talent

IBPAP/KH Board of Trustees to ensure that the preparation of the KH strategic plan is done in consultation with IBPAP/industry

Sufficient funding for KH development and cooperation is not made available in a timely manner

Low to Medium

Project will have difficulty supporting the development and operations of the KH. Adequate technical and support staff may not be provided and quality of the KH service may be compromised.

Secure commitments for KH start-up and operational funding as early as possible. Set up revenue schemes and systems; solicit multilateral/bilateral funding.

Industry does not recognize SMP/ eSMP as a course that will address their entry training/recruitment requirements

Medium KH/SMP may lose credibility, students and industries may discontinue patronizing the KH/SMP if quality and impact of the program is an issue

KH with IBPAP should Intensify dialogue and marketing with industry partners to solidify commitment and support to SMP. Focus on the top 20 industry firms. Formalize industry commitments thru MOAs. Conduct studies to validate actual results of the SMP program

Students/enrollees do not have adequate access to ICT infrastructure, hardware and internet connection that is required by eSMP/SMP and IBPAP language programs.

Medium Use of the system is limited to those who have IT/Internet access. Limited number of students will enroll or complete the courses.

KH to coordinate with UPOU to ensure that eSMP MOOCs can be accessed through cellphones or tablets, convert language programs to run on similar MOOCs platform.

KH and HEIs are unable to make available quality SMP/eSMP and other IT–BPM training programs to students.

Low Students will not enroll; limited number of graduates, KH membership targets will not be met.

IBPAP to put in place a QA system that will review training programs to ensure that it is up to industry standard. Identify new methodologies & strategies to improve reach. IBPAP to define an accreditation/ assessment process that will ensure quality of graduates.

KHs not able to construct the backend MIS system/portal according to requirements/specs within the timeframes specified and not able to manage and operate the system efficiently 24/7

Medium KH capability to deliver service will be severely constrained, limiting its usability. Users expectations not met and may affect long term sustainability of the KH.

Major effort to monitor performance of the KH to ensure that construction and deployment of MIS meet schedules and technical specs..

SMP/eSMP is not integrated in all HEIs curriculum offering

Low KH mechanisms not fully utilized, membership targets not met

KH to Launch a strong “marketing”/ awareness campaign to create student awareness, collaborate with CHED and other government education agencies to put additional policy measures in place

Graduates of SMP/eSMP are not hired by the industry

Low Students will discontinue to enrol, KH will not be viable.

KH should ensure a good internship program, design communications program that meets the needs of the industry, provide industry/KH mechanism to calibrate according to industry standards.

Page 226: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

34

FINANCIAL REQUIREMENTS OF THE KH X.

The KH will require an initial seed capitalization of about PHP 10 million and funds to support its operation of about PHP 5–10 million annually, depending on its structure and functions. The KH will need funding to support start up costs and the initial one-year operations or up to the time that it is able to generate membership and sponsorship fees. It will also require funding to support researches and foras that it may initiate but funding for these latter activities can either be sourced individually or be taken from its revenue streams

Page 227: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

35

APPENDICES Appendix 1. Knowledge Hubs Reviewed

Page 228: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

36

Page 229: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A 37

Appendix 1. Knowledge Hubs Reviewed

A. Private Sector: Field: Information Technology Security in Development: The IBM Secure Engineering Framework http://www.redbooks.ibm.com/redpapers/pdfs/redp4641.pdf The Secure Engineering Framework (SEF) is intended to help ensure that software is secure by design, secure in implementation, and secure in deployment. The global nature of software development activities today necessitates the application of secure engineering principles across global development teams regardless of their physical location. The Secure Engineering Framework includes sections on education and awareness, project planning, risk assessment and threat modeling, security requirements, secure coding, test and vulnerability assessment, documentation, and incident response. The Secure Engineering Framework applies additional security-related elements to all development process stages, thus allowing teams to apply these techniques to the particular development processes that they are following. The Secure Engineering Framework also integrates with a common development process, which product teams should follow for product development. Field: Information Technology Research and Technology Knowledge Hub for “Link Development” http://www.linkdev.com/ Knowledge Management Framework as defined by LinkDev is comprised of the following pillars, (1) Knowledge Sources (both Internal and External), (2) Business Intelligence, (3) Collaboration tools (Communities, Wiki, RSS, Discussions, Forum, News,…) (4) Workflows Business Process Management, (5) Integration, (6) Documents and Record Management, (7) Symantic Search and Classification and (8) Enterprise Search.

Page 230: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

38 Appendix 1

B. Multilateral: Field: Health The Health Management Network Framework from “Health Information Systems Knowledge Hub” http://www.uq.edu.au/hishub/definition-of-health-information-systems http://www.who.int/healthmetrics/documents/hmn_framework200803.pdf The Health Metrics Network (HMN) by the World Health Organization was launched in 2005 to help countries and other partners improve global health by strengthening the systems that generate health-related information for evidence-based decision-making. Governed by defined set of policies within standard and compliant processes, data are collected from population based and institution based data sources. These data are then extracted and integrated into a Data Repository where dashboard, reports, queries, events and alerts are derived thus giving the Health Information System Actors Decision Making brought about by these actual data. The Implementation of the HMN Framework should be based upon a set of principles – empowerment, leadership and ownership; a focus on the needs of individual states; building upon what already exists; broad-based consensus-building; and an incremental approach to health information system development. These are the principles reflected in the Paris Declaration endorsed on 02 March 2005 by more than 100 ministers, agency heads and senior officials committing their countries and organization to increased efforts to harmonize, align and manage aid for results with a set of monitorable actions and indicators. Field: Environment Knowledge Hub for Climate Change Adaptation in Southeast Asia http://www.mrcmekong.org/ http://www.mrcmekong.org/assets/Events/2010_Climate_Environment/Theme0502-Knowledge-Hub-for-CCA-in-Asia-and-Pacific-Ahmad-NAHRIM.pdf http://www.apwf-knowledgehubs.net/ http://www.apwf-knowledgehubs.net/downloads/nahrim.pdf The Water Knowledge Hub for the Climate Change Adaptation (WKHCCA) is developed by the National Hydraulic Research Institute of Malaysia (NAHRIM). NAHRIM was established by the Government of Malaysia in response to the country’s increasing number of water-related challenges, including floods, drought events, deteriorating water quality in rivers and coastal bodies, competing users, erosion, accretion, sedimentation, and not least, the impending anticipated impacts of climate change on water. Operating under the direction of NAHRIM’s Research Centre for Water Resources, the regional water knowledge hub for water and climate change adaptation in Southeast Asia has building capacity in areas of water management impacted by climate change due to global warming as its goal. The NAHRIM, aiming to be a world premier research center for water and environment by year 2030 brought about the development of the WKHCCA that focusses on three objectives, (1) development of training modules and program, (2) research and development of policy initiatives, and (3) encouraging the development of hydro climate projection models, together with countries in the region and relevant regional organizations. The Hub provides services namely (1) Communication Strategy & partnership development, (2) Capacity building, (3) regional and river basin hydro climate projections and (4) Impact assessment & adaptation Strategy.

Page 231: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A 39

Field: Health Health Information System Knowledge Hub - Strengthening Health Information System in the Asia Pacific Region http://www.uq.edu.au/hishub http://www.uq.edu.au/hishub/docs/AMDIG_E%20Aung.pdf In 2008, AusAID established 4 Knowledge Hubs for health in leading Australian institutions, addressing different dimensions of the health system. The goal of the Knowledge Hub is to contribute to the quality and effectiveness of Australia’s engagement in the health sector in the Asia Pacific Region through expanded expertise and an expanded knowledge base that is of practical value and used by stakeholders in development. The aim is to (1) increase the critical, conceptual and strategic analysis of key health system issue, (2) expand convening powers and engagement between all the key stakeholders in development in the Asia-Pacific region, (3) effectively disseminate relevant and useful knowledge, and (4) expand the capacity of Australian and regional institutions and professionals. Field: Education ASEAN Quality Assurance Framework for Higher Education (AQAFHE) http://www.asean-qa.de/media/asean-qa.de/BKK_Conference/Day_2/3.ASEAN_Quality_Assurance_Framework_by_Zita_Mohd._Fahmi.pdf The ASEAN Quality Assurance Network (AQAN) developed a quality assurance framework for higher education (AQAFHE) for Southeast Asian Nations. The objectives of AQAFH are to (1) promote regional harmonization in higher education, (2) facilitate regional recognition of qualifications, (3) Encourage national QA systems to bench against the Framework, and (3) to serve as a common reference point for national QA systems to align and harmonize their systems. The Outcome of AQAFHE are 4 integrated Quadrants, the External Quality Assurance Body, External Quality Assurance Standards and Practices, Institutional Internal Quality System, and Quality Framework. Field: Education Accreditation Board for Engineering and Technology (ABET) http://www.abet.org/about-abet/ ABET serves the public globally through the promotion and advancement of education in applied science, computing, engineering, and engineering and technology. It is recognized as the worldwide leader in assuring quality and stimulating innovation in the fields of education mentioned. Originally named as Engineer’s Council for Professional Development (ECPD), It was renamed as ABET to more accurately describe its emphasis on accreditation. ABET helped in establishing the Computing Sciences Accreditation Board (CSAB) now having more than 300 accredited Programs. ABET is an organization currently with 33 member societies which are professional and technical organization that represents the fore mentioned fields of education. This member Societies collaborates to review and accredit degree programs in the fields they represent. These society also recruit and help train 2,000 volunteers who carry out ABET’s Accreditation activities.

Page 232: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

40 Appendix 1

Field: Education The Association of Chartered Certified Accountants (ACCA) http://www.accaglobal.com/gb/en.html ACCA is the global Body for professional Accountants. It is supporting 170k members and 436k students throughout their careers providing services through a network of 91 offices and active centers. Its Global structure is designed in a manner that exams and support are delivered at a local level directly benefiting stakeholders wherever they are based. The ACCA core values are opportunity, diversity, innovation, integrity and accountability. Its aim is to develop capacity in the Accounting profession and encourage the adoption of global standards. It is governed by a Council that ensures ACCA is operation in the public interest and delivers the objectives stated in its own Charter. This Council sets the overall direction of ACCA engaging its members to its strategic direction and providing an objective environment for the executive team to explore new ideas or challenges. ACCA works in Partnership with governments, international agencies and professional bodies to develop the global accountancy profession and to advance the public interest. It aims to create a transparent, global profession to build credibility in financial systems. Attract inward investment and contribute to economic development. Field: Education MIT Leaders for Global Operations Source: AIM Thought Paper In the early 1980’s, when the American manufacturers were losing market share to Japanese manufacturing corporations due to quality issues, MIT felt responsible and thus they have decided to develop broad program that integrates the disciplines of engineering and management that brought about the birth of “Leaders for Manufacturing Program (LFM). The MIT Leaders for Global Operation is running on the following principles: (1) partnership, (2) adequate support, and (3) enterprise-wide manufacturing. Its structure is built on the following pillars (1) Internships, (2) plant treks, (3) leadership seminars, (4) thought leadership, and (5) recruiting. LGO being centered on partnerships between MIT and Companies in the manufacturing industry are reaping benefits such as the opportunity to advance their industries and organization. INDIA: The CISCO NetAcad - Rajasthan Partnership Source: AIM Thought Paper In response to the global economic growth in Asia, India will require 500 million skilled workforces by 2022 to sustain the trend. CISCO Networking Academy (NetAcad) in partnership with the Rajasthan Ministry of Education (MOE) under the Rajasthan Education Initiative (REI) signed a Memorandum of Understanding (MoU) to support the introduction of ICT training for students and teachers at government secondary Schools. CISCO NetAcad and MOE implemented in 33 DCEC the IT Essentials curriculum ranging from certificate courses in hardware basics, advance courses in computer hardware and later, software applications were added. CISCO Academy Training Centre (CATC) trained selected Secondary teachers that would returned to their respective schools once the training has been completed. A regular weekly update and planning meeting is conducted by the REI Project director with the partner representatives including the government

Page 233: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A 41

representatives. This initiative has brought NetAcad designed courses to become available on 167 countries together with its presence in 185 local educational institutions across India. C. Regional Field: Health Philippines eHealth Strategic Framework and Plan 2013-2017 http://www.doh.gov.ph/ http://www.doh.gov.ph/sites/default/files/Philippines_eHealthStrategicFrameworkPlan_February02_2014_Release02.pdf The National Objectives for Health, 2005-2010 and the 2011-2016 prioritized the use of ICT in various reforms areas, critical health programs, and specific areas in health administration. Together with the national development plans, government-wide ICT plans, assessments of ICT programs and health information systems, and priorities of the health sector, the DOH has updated its e-health framework to support Universal Health Care or Kalusugan Pangkahalatan. The Philippines eHealth Strategic ramework and Plan (PeHSFP) is the result of comprehending what the Philippines needs to achieve in order to address its health goals and challenges. The key to keeping updated the PeHSFP, as well as success in implementing the national eHealth agenda, is the continuing collaboration and communication with the different stakeholders to gain their support, guidance, cooperation and commitment. Field: Environment Royal Government of Bhutan Ministry of Agriculture and Forests Environmental Management Framework http://www.ekh.unep.org/?q=node/2608 http://www.ekh.unep.org/files/document.pdf The Royal Government of Bhutan (RGoB) will be implementing the Improving Rural Livelihood Project (IRLP) with World Bank financing to support rural development activities based on the Dzongkhag plans formulated for the 10th Five Year Plan (July 2008 – June 2013). The project aims to enhance agriculture production systems and to create income generating opportunities for poor communities in the project area through improved access to rural infrastructure and introduction to better agricultural technologies. The proposed project has two components: Rural Infrastructures and Agricultural Productivity, and Project Management and Institutional Support. The key objectives of the proposed project are to enhance agricultural production systems and to create income generating opportunities for poor communities in the project area through improved access to rural infrastructure and introduction to better agricultural technologies. These objectives would be achieved by improving access to roads, irrigation and marketing infrastructure, stimulating agriculture productivity growth, improving community and social infrastructure and supporting development of employment opportunities in the selected Dzongkhags. Improvement in market access would be achieved by investments in marketing and road infrastructure. Social infrastructure of community demand would be improved based on set criteria. Agricultural productivity and rural incomes would increase through improved irrigation water supply, addressing issues related to production of essential commodities and farm land.

Page 234: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

42 Appendix 1

Field: Education The Philippine Qualifications Framework (PQF) http://www.acscu.com/system/application/sources/file/ched2.pdf The Philippine Qualifications Framework is a national policy that describes the level of educational qualifications and sets of the standards for qualification outcomes. It is a quality assured national system for the development and award of qualifications based on standards of knowledge, skills and values acquired in different ways and methods by learners and workers in the country. It is competency based and labor market driven and assessment based qualification recognition. The Objectives of the PQF are (1) to establish national standards and levels for outcomes of education and training, (2) to support the development and equivalencies which provide access to qualifications and assist people to move easily and readily between the different Educational Sectors and the labor market, and (3) to align the PQF with international qualifications framework to support the national and international mobility of workers thru increased recognition of the value and comparability of Philippine qualifications. Field: Education Cebu Educational Development Foundation for Information Technology (CEDFIT) http://cedfit.org/ CEDFIT is a consortium of industry, academe government and NGO’s that seeks to increase the quantity and improve the quality of professionals in the ICT and IT-Enabled Services Industry. CEDFIT was established as a result of the first CEBU IT Summit held Last March 29-30, 2001 in response to the identified need to enhance the quality and quantity of human resources in the IT industry. In order to uphold its mission to “Nurture a quality ICT education by establishing high industry standards” the organization has the following mandates: (1) to promote and support the development of IT education in the tertiary level and, therefore the quality and quantity of graduates of IT courses, (2) to enhance IT education in the tertiary level by assisting consortium member-schools in curriculum development, improvement of equipment, facilities and technology, and other related concerns; (3) to promote the early acquisition of relevant IT knowledge and skills in the primary and secondary school levels by assisting these schools integrate IT education within their curriculum, (4) TO assist in the promotion and provision of non-formal IT skills training through short-term certificate courses; (5) to guarantee the efficient absorption of qualified IT graduates by industry through an employment mechanism set up solely fro this purpose and (6) to serve as an advocacy group for the formulation of pertinent IT policies, beneficial national and local laws, and appropriate incentives program by the national and local government.

Page 235: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

IT-BPM Industry Knowledge Hub Project

Asian Development Bank

Department of Finance Republic of the Philippines

Deliverable 3: Models and Best Practices

for University-Industry Linkages

Deliverable 4: List of HEIs for University-

Industry Partnerships and Draft Partnership

Agreements

Information Technology and Business Process Association of the Philippines

Page 236: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 237: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

EXECUTIVE SUMMARY

One of the key components identified under the Technical Assistance (TA) to improve higher education curricula specifically for the Information Technology and Business Process Management (IT-BPM) sector is to build and support stronger industry-academe (I/A) linkages so that the academe can better contribute to addressing the IT-BPM talent supply gap. Many efforts in I/A partnerships in the Philippines have been initiated by both state and private universities. Majority of the partnerships were created primarily to secure training and employment for students and graduates, to increase the responsiveness of the schools’ curricular offerings to industry needs and to secure physical resources or technology. Many partnerships have been successful while others have failed. Many issues were experienced by both partners including sustainability, scaling up, security, intellectual property, internal policy, to name a few. HEIs still need to hurdle considerable challenges that affect their institutional economies and political or governance environments in supporting these linkages while private sector firms need to understand better how to guide the HEIs on methodologies and technologies that they are implementing in the workplace. This guidance from private sector is necessary for the HEIs to effectively mentor the students so that they can pass through recruitment faster and become better workforce when they join the industry. All of these I/A experiences serve as the foundation for building new partnership models and defining new research and extension priorities. It is widely recognized that universities play a crucial role in meeting the labor demands of innovative and high growth industries such as the IT-BPM sector because they are the main producers, managers and transmitters of knowledge. In this context, I/A partnerships are considered to be important across many stakeholders. Many argue that the collaboration between industry and academe should be a concern of industry because it will help provide them with properly trained employees, and it saves them valuable time and resources in making a fresh graduate productive. With a good industry-academe linkage, the new recruits can hit the ground running. On the other hand, the academe seeks strategic partnerships that are aligned to the fulfillment of their mission and inevitably add value to students, faculty, staff, and their local communities and industry. Partnerships are vital for universities and colleges to reduce their needs on physical resources, securing training and employment for students and graduates, increase the responsiveness of curricular offering to industry needs, all of which contribute to building a credible institutional image. Studies show that synergistic relationships between colleges and businesses, when successful, impact on economic development in the communities that the colleges serve. In addition, there are many other perceived advantages of academe and industry partnership for both students and faculty that economic developers in the US and in other developed economies visualized as a tool of for regional development. Over the years, the interface of industry and academe has taken different shapes and forms and has encompassed different themes over time. The most compelling driver from both industry and academe perspective are ensuring that fresh graduates have the necessary skills to join the workforce, improving employee skills and retraining employees. Knowledge exchange technology improvement and improving quality of teachers as part of institutional capacity building also appear to be strong motivators for partnerships. Some I/A partnerships have focused on taking innovative steps to strengthen or make effective their relationships. Many I/A Linkage researches have identified critical ingredients that contributed to the success of the partnerships. Interestingly, there are also studies that have identified constraints or barriers that have produced partnerships with disappointing results or failure.

Page 238: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

The rise of the global outsourcing economy and in particular, the development of a strong Philippine outsourcing industry has intensified the need for more innovative I/A partnerships that can shift from the conventional or “sponsorship” approach of funding projects or specific research activities to a “partnership” model that requires a more creative fusion of the efficiency driven environment of the industry and the instructional culture of the universities. Today, there is recognition that a strong, more organic I/A partnership that can adopt to the shifting needs of the IT-BPM sector is necessary for improving the quality of higher education and research and extension work that in turn impacts on the industry’s capacity to achieve diversity in portfolio services and markets that the IT-BPM companies in the Philippines serve worldwide. Intense collaboration efforts are required to address key talent issues so that jointly, the industry and academe can achieve development goals and enable the industry to continually refine its competitive advantage. The overall framework for thinking strategically about I/A partnerships for improving the quality of services and achieving closer university and industry alliances for the IT-BPM sector recognizes different factors that impact on different relationship stages from a strategic perspective and also considers the depth of collaboration and synergy taking into account factors in the environment, membership characteristics, process and structure, communication, purpose and resources. Initially, the deployment of its existing Service Management Programs (SMP/eSMP) will be the cornerstone for defining strategic partnership arrangements between industry and academe with the end goal of increasing the supply of qualified talent to and supporting industry growth over the long term. The knowledge hub (KH) will be utilized to help build the partnership networks, to improve access and flow of talent to the industry and to seek creative synergies that are necessary for the academe and other stakeholders to respond to the industries talent needs. Central to the development of the partnerships is the strategic role that IBPAP will play in providing direction and sustaining the partnerships through its participation in the KH. The partnership design recognizes that mutual benefits and incentives shall be shared by the partners, including building a more efficient and sustained recruitment process. This principle provides the justification for shaping the financial sustainability of the partnerships that is also reflected in the functional structure. Both university and industry firm needs to have incentives. Industry benefits from reduced recruitment and training costs, improve the quality of their HR pipeline and stabilize their employment flow. The universities, on the other hand, benefit from increased revenues from tuition, increased physical facilities and resources, better track record in research, better faculty training, relevant and dynamic curriculum and course offering. Financial models for any revenue sharing, fund generation or fund utilization will be established based on the value proposition and nature of the initiative (e.g. research, consulting, curriculum development, certification etc.) Clearly, if industry demands more from students, leading to increased costs, either government or the industry may have to finance. Universities on the other hand need to invest in overhauling their learning ecosystems if they want revenues to increase or be sustained. Key interrelated challenges and constraints that need to be overcome so that the partners can work better closely together include the current traditional approach to learning, marketing and communications, getting industry to actively “play” in the partnership and collecting and measuring employment data from partnership activities.

Page 239: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

TABLE OF CONTENTS

Deliverable 3: Models and Best Practices for University-Industry Linkages

INTRODUCTION ..................................................................................................................................... 1 I.

PHILIPPINE INDUSTRY-ACADEME PARTNERSHIPS ................................................................................. 2 II.

THE NEED FOR INDUSTRY-ACADEME LINKAGES FOR THE IT-BPM SECTOR ............................................. 4 III.

Figure 1: IT-BPM Industry Talent Resource Gap ...................................................................... 4

Figure 2: Estimated Addressable Supply for the IT-BPM Industry ............................................. 5

Figure 3: IT-BPM Industry Recruitment Funnel ......................................................................... 5

INDUSTRY-ACADEME LINKAGES – A STRATEGY FOR ADDRESSING THE TALENT GAP ......................... 6 IV.

DRIVERS AND MOTIVATORS FOR INDUSTRY-ACADEME LINKAGES/PARTNERSHIPS .............................. 7 V.

Table 1: Advantages from University-Industry Collaborations (Srevatsan 2011) ...................... 8

GATEWAY INITIATIVES FOR LINKAGES/PARTNERSHIPS .................................................................... 9 VI.

CONSTRAINTS AND BARRIERS TO SUCCESSFUL PARTNERSHIPS....................................................... 10 VII.

KEY PARTNERSHIP SUCCESS THEMES AND LESSONS LEARNED ........................................................ 11 VIII.

I/A LINKAGES MODEL FOR THE IT-BPM SECTOR .................................................................................. 14 IX.

A. Partnership Framework ...................................................................................................... 14

Table 2: Austin Model ........................................................................................................... 14

Table 3: Partnership Collaboration Continuum Model ............................................................ 15 B. Partnership Principles ......................................................................................................... 15

C. Partnership Construct and Structure ................................................................................... 17

Figure 4: Knowledge Hub Functionality .................................................................................. 18

.................................................................................................................................................. 18

D. Sustainability Mechanisms .................................................................................................. 18

Figure 5: Value and Participation ........................................................................................... 19

.................................................................................................................................................. 19

E. Overcoming Challenges and Constraints ............................................................................ 19 Deliverable 4: List of HEIs for University-Industry Partnerships and Draft Partnership Agreements

LIST OF POTENTIAL ACADEME PARTNERS............................................................................................ 21 I.

Table 4: Potential Academe Partners – Manila ...................................................................... 22

Table 5: Potential Academe Partners – Northern Luzon ........................................................ 26

Table 6: Potential Academe Partners – Southern Luzon........................................................ 28

Table 7: Potential Academe Partners – Visayas and Mindanao ............................................. 32

DRAFT TRIPARTITE AGREEMENT SCHOOL, IBPAP, UPOU ..................................................................... 36 II.

DRAFT BILATERAL AGREEMENT SCHOOL AND INDUSTRY PARTNER .................................................... 42 III.

DRAFT ENABLER AGREEMENT IBPAP AND BPO CAREER HUB .......................................................... 49 IV.

Page 240: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Acronyms and Abbreviations AdEPT Advanced English Proficiency Training ACPI Animation Council of the Philippines, Inc. ADB Asian Development Bank AIM Asian Institute of Management ASEAN Association of Southeast Asian Nations BEST Basic English Skills Training BPO Business Process Outsourcing BPM Business Process Management BSBA Bachelor of Science in Business Administration BSIS/IM Bachelor of Science in Information Systems/Information

Management BSIT Bachelor of Science in Information Technology CCAP Call Center Association of the Philippines CEO Chief Executive Officer CHED Commission on Higher Education CMO CHED Memorandum Order CSR Corporate Social Responsibility DOF Department of Finance DOST Department of Science and Technology EDCOM Congressional Commission on Education FTE Full-time Employee GIC Global In-house Center GDAP Game Developers Association of the Philippines HEI Higher Educational Institutions HIMOAP Healthcare Information Management Outsourcing

Association of the Philippines HR Human Resource I/A Industry-Academe IBPAP Information Technology–Business Process Association

of the Philippines ICT Information and Communication Technology ICTO Information and Communication Technology Office

(formerly CICT) IP Intellectual Property IT Information Technology IT–BPM Information Technology–Business Process

Management KH Knowledge Hub PPP Public-Private Partnership PSIA Philippine Software Industry Association PWD Persons with Disability S&T Science and Technology SMP/eSMP Service Management Program/SMP Online SUC State universities and Colleges TA Technical Assistance T3 Train-the-Trainer (Program) UPOU University of the Philippines-Open University

Page 241: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

DRAFT (Jan 30)

Deliverable 3: Models and Best Practices

for University-Industry Linkages

TA-8164 PHI: Strengthening Knowledge-Based Economic and Social Development – 1 BPAP (46234-001)*

Prepared by

Information Technology-Business Process Association of the Philippines Consultant

30 January 2015

Page 242: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 243: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Models and Best Practices for University-Industry Linkages 1

INTRODUCTION I.

The Philippine Government through the Department of Finance (DOF) is implementing a Technical Assistance (TA) project funded by the Asian Development Bank (ADB) to address skills shortages in the IT-BPM industry by aligning higher education curricula with international standards and labor market demand, simultaneously, developing and strengthening public and private partnerships. The TA will employ knowledge hubs (KH) to develop replicable models for strengthening relationships among the government, industry, and higher education institutions (HEIs) within the Information Technology and Business Process Management (IT-BPM) industry; sharing and learning regional knowledge and experiences; and supporting other similar high-growth industries. The TA impact is improved alignment of higher education with the needs of the economy. The TA outcome is a replicable and sustainable system of Information and Communication Technology (ICT) -enabled knowledge hub (KH) for improved teaching and learning of IT-BPM industry-based curriculum in HEIs. One of the key components identified under the TA to improve higher education curricula specifically for the IT-BPM sector is to build and support stronger industry-academe (I/A) linkages so that the academe can better contribute to addressing the IT-BPM talent supply gap. This paper is being prepared to review business models and best practices of I/A linkages and partnerships locally and internationally with the end goal of developing a sustainable and replicable I/A linkages model for the IT-BPM industry that can strengthen higher education programs and address the IT-BPM skills shortage. This paper is also being prepared to provide inputs to the KH Business Model that will be established under the project. The KH is expected to play a significant role in building and strengthen I/A linkages. The paper will identify constraints for improving quality linkages as well as offer recommendations to address these gaps. It will highlight best practices for achieving more cost effective I/A linkages that can better meet the needs of different learners, find more creative and efficient ways of utilizing different stakeholder resources for linkages and partnerships, identify ways to ensure the academe’s continuing relevance to the knowledge economy and building a broader base of community support.

Page 244: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

2 Deliverable 3

PHILIPPINE INDUSTRY-ACADEME PARTNERSHIPS II. In the Philippines, I/A partnership was introduced by the Department of Science and

Technology (DOST) over three decades ago. A large portion of the I/A partnerships began

for research in the agriculture sector and expanded to other fields with the expansion of

business and the growth of the economy.1 Today, majority of the partnership engagements

are in science and technology and for-profit businesses including those in the ICT,

education, medical sciences, engineering and other similar industry growth sectors. These

I/A partnerships have strong similarities to those I/A collaborations in China, Japan, Korea

and Singapore.2

Many efforts in I/A partnerships in the Philippines have been initiated by both state and

private universities. These included the University of the Philippines, University of Sto.

Tomas, Ateneo de Manila University, De la Salle University, technological University of the

Philippines, Polytechnic University of the Philippines, San Carlos University, Central

Philippine University, Mapua Institute of Technology, Adamson University, Ateneo de

Davao University; Xavier University, Mindanao State University-Iligan Institute of

Technology, Far Eastern University, Leyte State University, Mariano Marcos Memorial

State University, Bulacan State University to name a few.3 Majority of the partnerships

were created primarily to secure training and employment for students and graduates, to

increase the responsiveness of the schools’ curricular offerings to industry nee ds and to secure physical resources or technology. The more recent partnerships include:

(i) IBPAP (BEST, AdEPT and SMP programs) with 17 state universities and colleges nationwide

(ii) DLSU with Japan Science and Technology Corporation (iii) Ateneo de Manila University and Jollibee (iv) Don Bosco Technical College and Porsche and Toyota (v) Lyceum of the Philippines and Dusit Hotel (vi) Technological Institute of the Philippines (TIP) and IBM (vii) Jose Rizal University and LiveIt (for the Ayala group of companies - Professional

Employment Program (PEP)) - (viii) Source Asia Business (SAB) with United Philippine Lines (UPL) (ix) Society of Fellows in Supply Management, Inc. (SOFSM) and 2GO (x) PACSB and BAP Bank Immersion Programs (xi) On-the-Job Training Programs; Teach-the-Trainor and other Training programs

– East Asia, Asia Pacific

1 M. Villegas, Symbiosis Between Academe and Industry. Manila Bulletin, November 9, 2009. 2 World Intellectual Property Organization, Technology Transfer, Intellectual Property and effective

University-Industry Partnerships: The Experience of China, India, Japan, Philippines, the Republic of Korea, Singapore and Thailand. 2005.

3 Academe-Industry Partnerships in the Philippines: Nature, Benefits and Problems, Racidon P. Bernarte, Polytechnic University of the Philippines.

Page 245: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Models and Best Practices for University-Industry Linkages 3

A report of the Congressional Commission on Education (EDCOM) confirms that, despite

many partnerships and other policy measures to strengthen HEIs, higher education in the

Philippines continues to be characterized by:

(i) large enrollments, (ii) imbalanced distribution, (iii) underinvestment and poor quality, (iv) mismatch between programs and graduates and between employment and society

needs, and (v) limited and underdeveloped graduate education.

Many partnerships have been successful while others have failed. Many issues were

experienced by both partners including sustainability, scaling up, security, intellectual

property, internal policy, to name a few. HEIs still need to hurdle considerable challenges

that affect their institutional economies, and political or governance environments in

supporting these linkages while private sector firms need to understand better how to guide

the HEIs on methodologies and technologies that they are implementing in the workplace.

This guidance from private sector is necessary for the HEIs to effectively mentor the

students so that they can pass through recruitment faster and become better workforce

when they join the industry. All of these I/A experiences serve as the foundation for building

new partnership models and defining new research and extension priorities.4

4 Teresita P Medado, Industry-Academe Bridging Program Initiatives, 2008.

(http://www.apccenter.edu.ph/news/show/id/9)

Page 246: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

4 Deliverable 3

THE NEED FOR INDUSTRY-ACADEME LINKAGES FOR THE IT-BPM SECTOR III. The single, most important issue facing the industry that will impact on the success of the IT-BPM sector in sustaining its growth and remain competitive is the availability of qualified talent. Two key issues impact on the availability of qualified talent: the supply, and the quality of talent. Historically, talent supply in the industry was in excess of demand. However, since 2010, demand for talent which has been growing at an annual average of 23% and has consistently outpaced supply. To achieve the industry’s target of US$25 billion in revenues by 2016, the industry will require a talent pool of 1.3 million full time employees (FTE). The industry reached the 1 million employee mark in 2014, making the 1.3 million target hires for 2016 easily achievable. A 2014 Tholons’ study projects that the demand for qualified talent will continue to grow at double digit rates even beyond 2016. The Figure 1 below shows the widening talent resource gap in the IT-BPM industry.

Figure 1: IT-BPM Industry Talent Resource Gap

While the Philippines produces close to 500,000 college graduates annually, only a small fraction is able to land jobs that are appropriate to their academic training. Many cite the lack of job opportunities as the main reason for being unemployed or undermployed. Many talents find their way to work in other parts of the globe to perform roles that they have not been trained for. Oftentimes, the problem is caused by the fact that students obtain knowledge and competencies that are not what the industry needs. And this can be attributed to a variety of issues including outdated books, teaching methodologies, curricula and technology being used in the schools of higher learning; and the absence of or inadequate on-the-job training (OJT) exposure of the students. Only about 80,000 to 100,000 of these qualified graduates actually join the IT-BPM sector.

Page 247: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Models and Best Practices for University-Industry Linkages 5

Figure 2: Estimated Addressable Supply for the IT-BPM Industry

The recruitment funnel continues to be a challenge. For every 100 applicants that are screened, only 7-10% actually qualify and are hired. Many college graduates lack proficiencies in English, Math, Science and Technology (S&T) and Service Culture - which are needed by the industry. Low IT literacy and poor access to computers of the larger segment of the population also hinder the development of suitable talent for the IT-BPM industry.

Figure 3: IT-BPM Industry Recruitment Funnel

Many traditional solutions and policy directives have been implemented by government and Higher Education Institutions (HEIs). However, there remain many critical gaps that require more creative solutions including a more dynamic Industry-Academe Partnership model. All stakeholders also see the need for an integrated talent development approach with objectives that progressively lead to addressing the talent supply gap. A case study of I/A linkages finds that some BPM firms engage in actively embedding programs and develop linkages with higher education institutions. With the widening talent supply gap, I/A linkages

Page 248: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

6 Deliverable 3

for the IT-BPM sector are increasingly becoming more important and going beyond the traditional funding for recruitment or discrete research projects. One of the most recent IT-BPM I/A initiative that is being implemented is the Commission on Higher Education (CHED)-funded, IBPAP implemented Developing State University and College Graduates Towards Global Competitiveness, National Productivity and Development Project. At least ten I/A partnerships are being pursued by IT-BPM partners and state universities and colleges (SUC) in different regions in the Philippines. While still early in implementation, these initiatives are showing positive impact in better course offering for the school and increased hiring rates for the firms, both contributing to local economic development, inclusive growth and higher foreign direct investments in the sector. But there remain many challenges as it has not been replicated and there are many policy and operational issues that need to be resolved before it can get to a real collaborative and sustainable level

INDUSTRY-ACADEME LINKAGES – A STRATEGY FOR ADDRESSING THE IV.TALENT GAP

It is widely recognized that universities play a crucial role in meeting the labor demands of innovative and high growth industries such as the IT-BPM sector because they are the main producers, managers and transmitters of knowledge.5 In this context, I/A partnerships are considered to be important across many stakeholders. Many argue that the collaboration between industry and academe should be a concern of industry because it will help provide them with properly trained employees, and it saves them valuable time and resources in making a fresh graduate productive. With a good I/A linkage, the new recruits can hit the ground running.6 I/A linkage is crucial for the optimization of regional industrial structures and the improvement of regional economic competitive capacity in a country as they connect different single corporation requirements to a multi-enterprise industry chain.7 On the other hand, the academe seeks strategic partnerships that are aligned to the fulfillment of their mission and inevitably add value to students, faculty, staff, and their local communities and industry.8 Partnerships are vital for universities and colleges to reduce their needs on physical resources, securing training and employment for students and graduates, increase the responsiveness of curricular offering to industry needs, all of which contribute to building a credible institutional image. Historically, academe, government and the private sectors have been used to operating in separate domains and have realized the need to work closer together to create synergies in responding to changing management paradigms and intersecting, interdependent needs of these stakeholders brought about by increased market requirements and growing complexities in the industries.

5 Francis Narin, Kimberly Hamilton and Dominique Olivastro, The Increasing Linkage between US

Technology and Public Science, October 1997. 6 Evelio Echavez, The Importance of Industry-Academe Linkages, Managing for Society, The

Manila Times, February, 2009. 7 Liu Juanjuan and Li Shiming, Study on Effect of Industry Linkage to Regional Competitiveness – An

empirical Analysis based on Pengzhou City, Orient Academic Forum. 8 Ma. Teresita P. Medado, Towards Understanding of Academe-Industry Linkages, December 2014.

Page 249: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Models and Best Practices for University-Industry Linkages 7

DRIVERS AND MOTIVATORS FOR INDUSTRY-ACADEME V.LINKAGES/PARTNERSHIPS

There are a number of drivers and motivators that bind industry and academe together.

Below is a summary of key motivations and justification for having I/A linkages or similar

collaborative and interactive arrangements:9

(i) Increasing complexity in academia and business world and constantly changing needs of the industry;

(ii) Increasing criticality of human competence in creating and sustaining organizational competitiveness including effects of globalization;

(iii) Shifts in management paradigm of business schools from earlier academic models to revenue based models;

(iv) Growing competition for student placements and industry mind-share, with rapid increase in the number of business schools and hence, the management graduates;

(v) Growing pressure from industry to make their fresh inductees productive from day one to reduce subsequent training costs;

(vi) Increasing interdependence between academe and industry to satisfy the need for sustenance and innovation in their respective areas;

(vii) Impact of Internet and the World Wide Web (WWW) Technologies and applications;

(viii) Complexity of social problems, diminishing governmental budgets, devolution of responsibility from federal/national to local level, cost savings, economies of scope and scale, revenue enhancement, new demands in human resource management;

(ix) Access to new research, development of new products and patents, solving technical problems, funding and financial efficiency in resource requirements such as laboratory equipment; and

(x) Growth of a knowledge economy including consumer knowledge and community relations.

The trend in partnerships is influenced by major socio-economic change and milestones.

From 1988 to 2006, a period of 18 years, studies on I/A collaboration show that these tend

to align with major societal shifts. For instance, towards the end of the 1990’s, progress in technology surged and it was at this time when Silicon Valley was generally considered to

have been the center of the dot-com bubble, which started in the mid-1990s and collapsed

after the NASDAQ stock market began to decline dramatically in April 2000.10

At that time, the motivations were about social problems, government policies, and the

need for new human capital. It was the year of the "Y2K" (the "Y" stands for "year", and the

"K" stands for "kilo" which means "thousand") fear, popularly known as the Millennium bug:

computers would not shift from 1999 to 2000 correctly. The impact of the “bug” before the

turn of the Century was the upsurge of software development, vigilance of the financial

9 Irfan Rizvi and Ashita Aggarwal, Making Academia-Industry Interface Work, Insttute for Integrated

Learning in Management, New Delhi, India 10 Ma. Teresita P. Medado, Towards Understanding of Academe-Industry Linkages, December

2014.

Page 250: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

8 Deliverable 3

sector in protecting their business and customers, at the same time, massive recruitment of

IT experts to fix the bug, and just about every automated utility service. A dense network of

long-running collaboration gave rise to new technologies that transformed industries while

modernizing the role of the university. And of course, the impact of the Internet during the

first few years of year 2000, changed the playing field in just about all aspects of society

and business. Similarly, it is expected that the significant growth in global outsourcing

market over the last ten years will influence and impact on the development of I/A

partnerships and the role of the universities.

Studies show that synergistic relationships between colleges and business when

successful, impact on economic development in the communities that the colleges serve. In

addition, there are many other perceived advantages of academe and industry partnership

for both students and faculty that economic developers in the US and in other developed

economies visualized as a tool of for regional development. The Table 1 lists the

advantages of I/A partnerships for all key stakeholders.

Table 1: Advantages from University-Industry Collaborations (Srevatsan 2011) universities’ Advantage Industry Advantage

Faculty Access to industrial facilities and equipment University researchers and firm employees

publishing together Revenue through R&D with Industry Join in startup business Update curriculum and program in

accordance with the market

Human Capital Access to skilled human

resources Improving skills for employees

through education and training Innovation and S&T development Research and development for

products and processes Regular acquisition of university

research Permanent or temporary transfer

of knowledge from universities to industries

Purchase of successful university research such as patents.

Student Improve skills in working with real world problems at industries

Finding jobs after graduation Business incubation Students’ doctoral and master’s theses are

sometimes directed by university and sponsoring industry jointly

Resources and funding Investment in university facility University researchers and firm employees

publishing together Creation of business incubators and

research centers

Note: Reprinted from “The Role Of University-Industry Collaboration In Regional Economic Development,” by R. Srevatsan, 2012, A Dissertation Submitted to the Graduate School of The University of Southern Mississippi, p. 40. Copyright 2011 by ProQuest LLC.

Page 251: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Models and Best Practices for University-Industry Linkages 9

GATEWAY INITIATIVES FOR LINKAGES/PARTNERSHIPS VI. Over the years, the interface of industry and academe have taken different shapes and forms and have encompassed different themes over time. The most compelling driver from both industry and academe perspective are ensuring that fresh graduates have the necessary skills to join the workforce, improving employee skills and retraining employees. Knowledge exchange technology improvement and improving quality of teachers as part of institutional capacity building also appear to be strong motivators for partnerships. Some I/A partnerships have focused on taking innovative steps to strengthen or make effective their relationships. The following is a summary list of specific successful areas for collaboration:

(i) Integration of employer’s needs in curriculum and content design in the academe’s

programs; (ii) Involvement with industry to allow students to gain valuable practical experience

and facilitate employment; (iii) Improvement of programs by including real workplace application of the theories

that can only be done by industry representatives as guest lecturers in the programs;

(iv) Joint seminars by industry and academe to discuss or build knowledge on common issues and concerns (e.g, recruitment requirements, applied research etc);

(v) Participation of both industry and academe in governing councils or other similar educational policy making body;

(vi) Development of new leadership and management or technical programs to respond to emerging business demands;

(vii) Academic and applied research; (viii) Collaboration to strengthen the capacity of academic staff to keep their skills

updated, for practical consultancy or similar activities; (ix) Resource sharing including funding student scholarships or faculty researches

and practical consultancy that can potentially generate new ideas or serve as incubators for new business;

(x) Joint initiatives such as supporting community development services that support socio-economic development; and

(xi) Innovation and technology.

Page 252: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

10 Deliverable 3

CONSTRAINTS AND BARRIERS TO SUCCESSFUL PARTNERSHIPS VII. Many I/A linkage researches have identified critical ingredients that contributed to the success of the partnerships. Interestingly, there are also studies that have identified constraints or barriers that have produced partnerships with disappointing results or failure. The list below summarizes key interrelated barriers and stumbling blocks that need to be overcome when forging substantial partnerships:

(i) Lack of clearly defined goals, objectives and commitment for the partnerships; (ii) Changes in personnel during the implementation of the partnership. New staff may

have a different appreciation on what the collaboration is about and what goals it should pursue;

(iii) Intellectual property (IP) is important but should not be viewed as the centerpiece of industry-academe relations. In cases where goals are broad and social or national in scope, success may depend on dropping claims to IP. This is an area that has a lot of tensions;

(iv) Threat to academic freedom; (v) Internal/political issues of each partner; (vi) Security and confidentiality issues; (vii) Changing priorities of each partner; (viii) Cultural differences; (ix) Capacity to meet agreed upon timetables, accountability and reliability/

competence issues; (x) Lack of equity in partnerships – There is a difference between a contractual

/sponsorship arrangement and a partnership. Power imbalance that is not negated and trust/transparency that is not built between the partners is likely to produce disappointing results;

(xi) Lack of, or unclear administrative/governance and funding framework for both partners; and

(xii) Lack of partnership champions and leaders.

Page 253: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Models and Best Practices for University-Industry Linkages 11

KEY PARTNERSHIP SUCCESS THEMES AND LESSONS LEARNED VIII. There are many insights from studying the experiences and cases11 of industry and academe collaboration over the last century, including those partnerships in the Philippines and with the IT-BPM industry. What makes for a seamless relationship between university and industry? Why do partnerships relationships succeed or fail? How have industry and academe overcome the challenges or difficulties and successfully moved to a more strategic alliance? Listed below are key success themes and lessons learned:

(i) The most productive collaborations are strategic and long term with built-in flexibility. Strategic partnerships deliver greater and often transformational benefits to both parties through constant interaction and updating. Narrow collaboration to high impact initiatives that can receive greater funding and last longer is important. It’s about collaboration rather than sponsorship. (IBM-Swiss Federation Institute of Technology Partnership, Source Asia Business with United Philippine Lines)

(ii) A shared vision and strategy is the essential driving force that fosters better

understanding of the three possible levels of partnerships (strategic, operational or transactional) on both sides of the partnership, establishes deep professional ties, trust and shared benefits that may bridge the cultural divide between industry and academe. Successful partnerships have shared decision-making and are always based on a win-win situation. Encourage a two-way exchange. (SKF Group-University of Cambridge, GE Global Research, Munich)

(iii) Sustainable partnerships build the human capital needed to make the I/A

collaboration work. Over time, the partnership produces a growing number of both teachers and graduates who can think and connect across the cultural divide, and work harmoniously to develop and implement common strategic projects and programs that are attuned to the changing business demands. (IBM-Imperial College London)

(iv) University Leadership is a vital ingredient to the success of the I/A collaboration –

a leadership that recognizes the importance of communicating the partnership purpose, goals, benefits and results to the entire academic community, involving a team of senior academicians, providing incentives and engaging different stakeholders within the academic community. Engage university leaders so that they can widen their local business network to include those who can help then develop the value proposition for institutional change and collaboration. (NOKIA-Aalto University, University of California Berkley)

(v) Putting the right people in charge especially those who can cross boundaries –

Collaborations works only when they are managed by multidisciplinary people capable of building and managing partnerships, who have a deep understanding of the two different cultures involved in the collaboration and who can cross borders easily. It boils down to interpersonal relationship, trust and appreciating

11 Making Industry-University Partnerships Work, Lessons from Successful Collaboration,

Science/Business Innovation Board AISBL 2012

Page 254: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

12 Deliverable 3

the differences between what academe does and what industry does. Maintain different cultures while being prepared to work together. (University of California’s Industry-University Cooperative Research Program)

(vi) Promote a culture of multidisciplinary approach and teams – Successful

partnerships depends on the ability of academe and industry partners to be engaged in the partnership so that together they can innovate, design or reengineer. Multidisciplinary teams can easily break down traditional academic silos and drive a new multidisciplinary culture and curricula. (Energy Biosciences Institute-University of California-Berkley and the university of Illinois Partnerships)

(vii) Build partnerships based on a set of principles anchored on understanding each

other. Meet and talk regularly to talk about successes and failures of the partnership. Spend time to understand the agenda and interest of each partner. Know your partner’s needs. Ensure equity in the partnership – a partnership should deliver mutual benefit. (Microsoft-CISCO-INTEL University of Melbourne Partnership)

(viii) Develop student communities to overcome “silo” thinking - this will encourage

greater support for the partnership and help them understand better how they can participate and benefit from the activities. (Aalto University–Helsinki School of Economics–Helsinki University of Technology Partnership)

(ix) I/A Partnership collaboration work best with a big framework agreement based on

broad principles and sensible, pragmatic approaches. Don’t get hung up on intellectual property (IP) instead of the outcome or the incentives and rewards. More importantly, universities are not well suited for doing research that business immediately needs. Generally, the strength of universities are “blue-sky discovery” and proof-of-concept where it is an early stage of innovation and there is still a lot of work to be done to bring a “product” to market. (IBM-ETH Zurich)

(x) Develop a pool of academicians (teachers and administrators) with a deep

understanding of industry and business experience. Break down academic silos and involve academicians who cross boundaries. Identify “bridge builders” who can make change happen. (Aalto University Forms Partnerships with Industry to transform Teaching and Learning)

(xi) Develop student communities that can overcome silo thinking while maintaining

their unique differences. Understanding and appreciating differences in how others think is key to innovation. Embedding students in industry such as in internship or OJT make them attractive recruits and can seed them as future managers/leaders. On the other hand, industry practitioners can teach students what it is like to work with the industry. (Karolinska Insitutet – Innovation Office, Karolinska Development and the Unit for Bioentrepreneurship Strategy for Fostering Innovation, SAP-University of the Cordilleras Alliance Program )

(xii) Long-term partnerships generate the largest benefit. Long-term partnerships are

the ideal platform for impact on teaching and learning. While many partnerships with industry have been organized, continuity (stickiness) persists to be a serious

Page 255: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Models and Best Practices for University-Industry Linkages 13

challenge12. Many reasons have been cited for this problem including changing partnership leaders, poor communication, unclear goals and objectives of the partnership, lack of capacity for planning, insufficient resources among others. In addition, most faculty are engaged in full time academic work and therefore have no time to acquire industrial work experience. Junior faculty have a well-known lack of incentives for working with industry as partners (because tenure decisions normally made by conservative members of the faculty do not recognize or reward such work.) Hence, the alliances between industry and academe is relatively limited and normally focused on transactional activity relating to their individual tasks with very little opportunity to learn and stay connected. Develop and design strategic partnerships with sustainability and continuity as part of the industry’s and the academic institution’s goals. (De LaSalle University with Japan Science and Technology, LiveIT and the Ayala group of Companies)

(xiii) Make sure everyone understands, IP, security and confidentiality standards and

similar rules or procedures. These can often be obstacles to building partnerships. Communicate and come to a common understanding on these terms and how it will be dealt with by the partnership. (TECHNICOM Program13 of the Department of Science and Technology, California Institute for Telecommunications and Information Technology Project, Taiwan University’s Tjing-Ling Industrial Research Institute (TLIRI) and Tze-Chiang Foundation of Science and Technology (TCFST) Project)

12 The Future of Academic-Industry Collaboration, Consumer Experience Design, Motorola 13 TECHNICOM is a “comprehensive and unified strategy to enhance technology development for

commercialization and to fast-track the transfer and commercialization of promising R&R results of government R&D institutes, academe and private sector.

Page 256: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

14 Deliverable 3

I/A LINKAGES MODEL FOR THE IT-BPM SECTOR IX.

The rise of the global outsourcing economy and in particular, the development of a strong Philippine outsourcing industry has intensified the need for more innovative I/A partnerships that can shift from the conventional or “sponsorship” approach of funding projects or specific research activities to a “partnership” model that requires a more creative fusion of the efficiency driven environment of the industry and the instructional culture of the universities. The business landscape is constantly changing, emerging verticals and geographies are driving growth and new organizational models are being developed. Today, there is recognition that a strong, more organic I/A partnership that can adopt to the shifting needs of the IT-BPM sector is necessary for improving the quality of higher education and research and extension work that in turn impacts on the industry’s capacity to achieve diversity in portfolio services and markets that the IT-BPM companies in the Philippines serve worldwide. Intense collaboration efforts are required to address key talent issues so that jointly, the industry and academe can achieve development goals and enable the industry to continually refine its competitive advantage. A. Partnership Framework The Austin model in Table 2 is being employed as the overall framework for thinking strategically about I/A partnerships for improving the quality of services and achieving closer university and industry alliances for the IT-BPM sector.14

Table 2: Austin Model

Relationship One Two Three

Philanthropic Transactional Integrative

Level of Engagement Low High

Importance to Mission Peripheral Strategic

Magnitude of Resources Small Big

Scope of Activities Narrow Broad

Interaction Level Infrequent Intensive

Managerial Complexity Simple Complex

Strategic Value Modest Major

In addition, the Partnership Collaboration Continuum Model in Table 3 will also be used specifically in defining the depth of collaboration, relationship and synergy and will consider factors in the following six categories:

(i) environment, (ii) membership characteristics, (iii) process and structure, (iv) communication, (v) purpose, and (vi) resources.15

14 “Strategic Collaborations Between Non-profits and Business, by J.E. Austin, 2000, Nonprofit and

Voluntary Sector Quarterly, 29, p. 72. Copyright 2000 by the Association for Research on Nonprofit Organizations and Voluntary Action.

Page 257: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Models and Best Practices for University-Industry Linkages 15

Key best practices from the local I/A partnership experiences and the global partnerships discussed in this paper are also incorporated.

Table 3: Partnership Collaboration Continuum Model

Cooperation Coordination Collaboration/Partnerships

Lower intensity Higher intensity

Short term, informal relationships

Lower effort around a project or task

More durable and pervasive relationship

Shared information only

Some planning and division of roles

New structure with commitment to common goals

Separate goals, resources and structures

Some shared resources, rewards and risks

All partners contribute resources and share rewards and leadership

B. Partnership Principles The following principles will be given emphasis to make the partnership succeed in achieving greater alignment in the goals of the partnership institutions, to increase and transform teaching-learning-employment practices, and to achieve the right synergy for the I/A partnership. These elements ensure that the I/A partnerships are designed for sustainability.

(i) continuous improvement – Due to the rapidly changing industry needs and the growing requirement for industry-ready talent, it is important that both industry and academe bridge the gap between classroom and the marketplace reality. Continuous improvement in the curriculum, in the course content and delivery, and in research is critical for knowledge, experience and technology transfer. Most university teachers have no idea what the workplace is about. Constant communication and interaction with industry experts need to be programmed and incentives must be in place for this to happen. University professors are normally measured by publication and it is difficult to manage or be involved with I/A programs which do not relate directly to their measurement metrics.

(ii) adaptability and flexibility - It is not a must that I/A partnerships are equally

beneficial to all business school. What is important is developing or evolving a “differential relationship” mechanism over time that addresses the needs of both industry and academe equitably and therefore contributes to the growth of both entities.

(iii) innovation – In a very competitive industry like the IT-BPM, I/A partnerships in

case writing, applied research and problem-based consulting are only some of the

15 Infopeople online learning, Reading 1: The Partnership Continuum, printed by Admin Nancy

Nerenberg, 2011

Page 258: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

16 Deliverable 3

value adding reasons for the partnerships that lead to innovation and progressive change. These areas need to be exploited so that they can have significant and relevant impact on management education and the industry’s continuing competitiveness.

(iv) maintaining close ties with industry - HEI have collaborated with industry to

provide training and internship to students. This is seen as one of the best methods of giving students both the theoretical concepts and their application, including enhancing their ability to relate the two for decision making purposes. On the other hand, Leadership and Management programs are two important areas that trigger industry’s interest to collaborate by assisting them to collaborate in developing and training their potential pool of managers, hence increasing the mind-share and the image of the HEI. Other areas for maintaining close ties include guest lecturers by industry representatives, teachers as consultants in the industry, inclusion of industry experts and academic personnel in governing councils, technical panels or similar education committees for the industry and joint conferences and similar activities.

(v) financial sustainability – Financial stability is a key component for I/A

sustainability. Partnership initiatives require regular project budgets. Partners normally participate in activities where each one derives a value that can translate to some operational or financial reward for both partners. Government funding and investment must prioritize support for priority and high growth industries and support the development of hubs and other public-private partnership (PPP) models that can serve as partnership centers for knowledge sharing and exchange. Similarly, industry must have an investment if it wants to sustain its pipeline for qualified talent.

(vi) strategic and business planning – The first step to a healthy partnership is

assessing the core strengths of both partners and identifying promising opportunities for collaboration. Both partners should engage in high level information exchange and brainstorming to elicit common areas of interest for partnerships. There has to be a commitment on both sides to break down barriers within their respective organizations in order to facilitate the partnership. Partners should always strive for a partnership of equals with shared decision-making and a win-win approach to all situations.

(vii) consistent engagement with partners - Strong, productive partnerships with

industry require a degree of structure that academics may find uncomfortable. The right structures help nurture successful partnerships. Establish clear goals and identify a single point of contact for both the academe and the industry partner who will serve as the link between the university and the company and manage the respective internal relationships with the different personnel who will be involved on both sides. Recognize that both universities and companies are complex, unrelated systems that need to be understood. Linkage mechanisms have to be properly set up and linkage programs have to be properly managed within established and clearly understood management mechanisms.

(viii) continuity among staff members – The key issue is to have people who “cross

boundaries”, people who are multidisciplinary individuals who can devote time to continuously follow industry collaboration and commit to building deep

Page 259: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Models and Best Practices for University-Industry Linkages 17

partnership ties over the long term. Both the academic and industry staff will be bridge-builders who can engage the different people who will be involved in different phases or activities.

(ix) creating synergy - The success or failure of the partnership is largely dependent

on the synergy of intent or motivation, the reaping of mutual benefits by partners, and the ability to sustain and deepen the partnership towards a potential permanence, longevity and depth. Without synergy among partners, it may likely be that goals are not met, benefits are not harnessed and partnership becomes short-term and transitory.

C. Partnership Construct and Structure

Initially, the deployment of its existing Service Management Programs (SMP/eSMP) will be the cornerstone for defining strategic partnership arrangements between industry and academe with the end goal of increasing the supply of qualified talent to and supporting industry growth over the long term. It is envisioned that other industry courses will be

developed as the partnership deepens and matures.

Structure - Given the complexity and competitive nature of the industry, the knowledge hub will be utilized to help build the partnership networks, to improve access and flow of talent to the industry and to seek creative synergies that are necessary for the academe and other stakeholders to respond to the pressing need for qualified talent. Several partnerships “nodes” will be created to imbed the SMP/eSMP in higher education institutions nationwide to support as many universities in effectively and systemically contributing to addressing the talent gap regardless of location. The KH therefore is seen as the integrating structure and agreements between universities and industry will include the KH as the support entity. The KH will ensure synergy and complementation of benefits to partners and stakeholders and its appreciation and recognition of the same. The KH will serve as the backbone for

sustaining I/A partnerships.

Similar to the Austin model, the Partnership collaboration Continuum Model will allow time for both the academe and the industry to ensure that key I/A champions are identified and involved, policies are developed, key partnership areas for collaboration are scoped out and managerial and financial resources are made available to build the partnership over the

long term.

Central to the development of the partnerships is the strategic role that IBPAP will play in providing direction and sustaining the partnerships through its participation in the KH.

Figure 4 illustrates the functional process for building the IT-BPM I/A partnership networks.

Page 260: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

18 Deliverable 3

Figure 4: Knowledge Hub Functionality

This functional process provides a practical approach for developing the industry-academe partnerships. It defines better the nature and mechanisms of the partnership, set the expectation on the depth of engagement and provide for the sustainability framework of the partnership and its potential for long-term collaboration or “stickiness”. D. Sustainability Mechanisms The partnership design recognizes that mutual benefits and incentives shall be shared by the partners, including building a more efficient and sustained recruitment process. This principle provides the justification for shaping the financial sustainability of the partnerships that is also reflected in the functional structure. Both university and industry firm need to have incentives. Industry benefits from reduced recruitment and training costs, improve the quality of their HR pipeline and stabilize their employment flow. The universities, on the other hand, benefit from increased revenues from tuition, increased physical facilities and resources, better track record in research, better faculty training, relevant and dynamic curriculum and course offering. Financial models for any revenue sharing, fund generation or fund utilization will be established based on the value proposition and nature of the initiative (e.g. research, consulting, curriculum development, certification etc.) Clearly, if industry demands more from students, leading to increased costs, either government or the industry will have to finance. universities on the other hand need to invest in overhauling their learning ecosystems if they want revenues to increase or be sustained. Figure 5 defines “what’s in it for the stakeholders” and defines the flow of benefits and investments. The partnerships will work iteratively to define its actual costs as they jointly identify and implement partnership activities.

Page 261: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Models and Best Practices for University-Industry Linkages 19

Figure 5: Value and Participation

The process will also ensures that, on a program level, the potential impact to the knowledge economy as a tangible benefit is recognized (including building the community of practice for teachers, students and alumni) and short term-impediments to the partnerships are proactively identified and dealt with.

E. Overcoming Challenges and Constraints

Despite the many results and benefits derived from successful partnerships, partnering does not come easy for most universities and industry firms. Below are key interrelated challenges and constraints that need to be overcome so that the partners can work better

closely together.

(i) Current approach to learning is an issue - Schools teach technical competencies directly, but technical competencies are not the only thing IT-BPM firms are looking for. Moreover, the classroom learning experience does not mirror the work environment. The curricula needs more dynamic environments. The universities need to change how students are learning. This problem is compounded by the fact that government technical panels take a long time to develop curricula. And, even with good curricula, schools do not adopt them fast enough too meet industry needs. The IT-BPM industry need the skills today, not tomorrow.

Page 262: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

20 Deliverable 3

(ii) Marketing and communications – Because of the fast paced and competitive nature

of the industry, marketing and communications will be very important. Both partners have to intensify marketing efforts to generate enrollment, to promote aspirational career possibilities in the IT-BPM sector or even to secure stakeholder support. Provide easy access to industry and academic information through websites so that stakeholders are fully informed.

(iii) Getting industry to play – Industry must be willing to invest in the partnership and look beyond the short term gains. There is a need to build deeper relationships with universities. They need to engage students more deeply- Build a presence on campus (like building IT laboratories), conduct information sessions, portfolio review, mentorship etc. If the relationship between school and the industry becomes meaningful, brand ambassadors on campus will be created in the process and awareness and acceptance will be hastened. Understand that Industry mechanisms and process differ from that of the universities. Critical to securing industry commitment and support is understanding how they work so that partnership mechanisms can also be imbedded in their systems and processes instead of just branding it as part of their corporate social responsibility (CSR) initiatives which often times are short term, one-time activities.

(iv) Measuring employment – collecting and making information available on the partnership that is easy to access through websites and portals will be key to stakeholder participation and decision making. Information needs to be shared across stakeholders. At this time, there is limited employment data whether from the recruitment or retention side. Existing data does not capture the totality of the educational process. The KH will be the ideal portal to store and access data for all IT-BPM-University partnerships.

Page 263: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 21

DRAFT (Jan 30)

Deliverable 4: List of HEIs for University-

Industry Partnerships and Draft Partnership Agreements

TA-8164 PHI: Strengthening Knowledge-Based Economic and Social Development – 1 BPAP (46234-001)*

Prepared by

Information Technology-Business Process Association of the Philippines Consultant

30 January 2015

Page 264: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the
Page 265: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 21

LIST OF POTENTIAL ACADEME PARTNERS I.

This document presents a long list of universities and Colleges nationwide who can potentially be partners of the IT-BPM industry in helping address the talent supply gap. A total of 250 universities and colleges were initially selected. These institutions were selected based on a set of criteria that includes location (proximity to a Next Wave City), Centers of Excellence (e.g, Cebu and Manila), school population and academic programs, among others. All of these institutions are being invited to participate in an Industry-Academe workshops scheduled in April 2015 to discuss potential partnerships for the implementation of eSMP/SMP in their respective schools. A short list of potential partnerships will be prepared based on the results of the workshop and the expression of willingness and commitment of the schools to participate in offering eSMP/SMP. A final list of partnerships will be developed based on the results of the readiness assessment that will be done jointly by the UPOU, IBPAP and the school. This final process will help identify roles, strategies and timelines for deploying eSMP/SMP in their respective schools and will be the basis for preparing the draft Partnership or Twinning arrangements.

Page 266: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Deliverable 4 22

Table 4: Potential Academe Partners – Manila

Name of Institution Address Head

Adamson University 900 San Marcelino St., Ermita, City of Manila, NCR 1000 Rev. Fr. Gregorio L. Bañaga, Jr., C.M.

AMA Computer University Maximina St., Villa Arca Subdivision, Project 8, Quezon City, NCR 1106

Dr. Amable R. Aguiluz V

Arellano University-Manila 2600 Legarda St., Sampaloc, City of Manila, NCR 1008 Mr. Francisco P. Cayco

Arellano University-Pasay 3058 Taft Avenue, Pasay City, NCR 1300 Mr. Francisco P. Cayco

Asia Pacific College # 03 Humabon Place, Magallanes Village, City of Makati, NCR 1232

Dr. Paulino Y. Tan

Ateneo de Manila University - QC Loyola Heights, Katipunan Avenue, Quezon City Fr. Jose Ramon T. Villarin, SJ

Bestlink College of the Philippines #1044 Brgy. Sta. Monica, Quirino Hi-Way, Novaliches, Quezon City, NCR 1117

Dr. Maria M. Vicente

Central Colleges of the Philippines 52 Aurora Blvd., Brgy. Doña Imelda, Quezon City, NCR 1100

Atty. Crispino P. Reyes

Centro Escolar University-Makati 259 Gil Puyat Ave., City of Makati, NCR 1200 Dr. Maria Cristina D. Padolina

Centro Escolar University-Manila #9 Mendiola St., San Miguel, City of Manila, NCR 1005 Dr. Maria Cristina D. Padolina

City of Malabon University Maya-maya cor. Pampano St., Dagat-Dagatan, Malabon City, NCR 1470

Atty. Ramon M. Maronillo

Colegio de San Juan de Letran 151 Muralla St., Intramuros, City of Manila, NCR 1002 Rev. Fr. Tamerlane R. Lana, O.P.

College of the Holy Spirit of Manila 163 E. Mendiola St., San Miguel, City of Manila, NCR 1005

Dr. Felina Co-Young, DBA

Concordia College 1739 Pedro Gil St., Paco, City of Manila, NCR 1007 Sr. Zenaida Conde D.C.

De La Salle University-Manila 2401 Taft Ave., Malate, City of Manila, NCR 1004 Br. Dennis M. Magbanua FSC

De La Salle-Araneta University Victoneta Ave., Malabon City, Third District 1476 Br. Narciso S. Erguiza Jr. FSC

De La Salle-College of Saint Benilde 2544 Taft Ave., Malate, City of Manila, NCR 1004 Br. Dennis M. Magbanua FSC

Don Bosco Technical College - Mandaluyong

736 Gen. Kalentong St., City of Mandaluyong, NCR 1550 Fr. Martin M. Macasaet, SDB

Emilio Aguinaldo College 1113-1117 San Marcelino St., Paco, City of Manila, NCR 1000

Dr. Jose Paulo E. Campos

Eulogio "Amang" Rodriguez Institute of Science and Technology

Nagtahan St., Sampaloc, City of Manila, NCR 1008 Dr. Eduardo S.Caillo

Far Eastern University Nicanor Reyes Sr. St., Sampaloc, City of Manila, NCR 1015

Dr. Michael M. Alba

Page 267: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 23

Table 4: Potential Academe Partners – Manila

Name of Institution Address Head

FEU-East Asia College Dr. Michael M. Alba

FEU-FERN College Sampaguita Ave., Mapayapa Village, Diliman, Quezon City, NCR 1104

Dr. Michael M. Alba

Informatics College Northgate Indo-China Drive, Northgate Cyberzone, Filinvest Corporate City, Alabang, Muntinlupa City 1770

Mr. Daniel A. Ongchoco

Informatics College-Quezon City 29 North Avenue, North EDSA, Diliman, Quezon City, NCR 1104

Mr. Daniel A. Ongchoco

Jose Rizal University 80 Shaw Blvd., City of Mandaluyong, NCR Dr. Vicente K. Fabella

La Consolacion College-Manila 8 Mendiola St., San Miguel, City of Manila, NCR 1005 Sr. Ma. Imelda A. Mora, OSA

Lyceum of Alabang #88 GNT Business Center National Road, Putatan, City of Muntinlupa, NCR 1772

Mr. Danilo V. Ayap

Lyceum of the Philippines University Muralla St., Intramuros, City of Manila, NCR 1002 Atty. Roberto P. Laurel

Manila Central University Epifanio de los Santos Avenue, Kalookan City, NCR 1400 Dr. Aristotle T. Malabanan

Mapua Institute of Technology-Makati 333 Gil Puyat Street Extension, City of Makati, NCR 1200 Dr. Reynaldo B. Vea

Miriam College Katipunan Road, Loyola Heights, Quezon City, NCR 1101 Dr. Maria Rosario O. Lapus

National College of Business and Arts-Fairview

Commonwealth Ave., Regalado, Fairview, Quezon City, NCR 1118

Mr. Cesar C. Meñez

National University 551 M.F. Jhocson Street, Sampaloc, City of Manila, NCR 1008

Mr. Teodoro Jhocson-Ocampo

Navotas Polytechnic College Bangus St., North Bay Boulevard, Navotas City, NCR 1485

Ms. Fransisca S. Roque

New Era University No. 9 Central Ave., New Era, Quezon City Dr. Nilo L. Rosas

Our Lady of Fatima University (Fatima Medical Science Foundation)

120 Mcarthur Highway, City of Valenzuela, NCR 1440 Dr. Caroline S. Enriquez

Our Lady of Fatima University-Quezon City #1 Esperanza St., Hilltop Subdivision, Lagro, Quezon City, NCR 1118

Dr. Caroline S. Enriquez

Pamantasan ng Lungsod ng Marikina Brazil St., Greenhights Subd., Phase I, Concepcion Uno, City of Marikina, NCR

Dr. Dalisay G. Brawner

Pamantasan ng Lungsod ng Muntinlupa NBP Reservation, City of Muntinlupa, NCR Dr. Ellen E. Presnedi

Pamantasan ng Lungsod ng Pasay Pasadeña Street, Pasay City, NCR Ms. Yolanda F. Cruz

Page 268: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Deliverable 4 24

Table 4: Potential Academe Partners – Manila

Name of Institution Address Head

Pamantasan ng Lungsod ng Valenzuela Poblacion II, Malinta, City of Valenzuela, NCR 1440 Regent Dr. Nedena C. Torralba

Philippine Christian University Pedro Gil corner Taft Avenue, Malate, City of Manila, NCR 1004

Dr. Junifen F. Gauuan, Ph.D

Philippine School of Business Administration-Manila

826 R. Papa Street, Sampaloc, City of Manila, NCR 1008 Dr. Jose F. Peralta

Philippine School of Business Administration-Quezon City

1029 Aurora Boulevard, Quezon City, NCR 1109 Atty. Benjamin P. Paulino

Quezon City Polytechnic University 673 Quirino Highway, San Bartolome, Novaliches, Quezon City, NCR 1116

Dr. Salvador M. Enriquez, Jr.

Rizal Technological University - Main Boni Avenue, City of Mandaluyong, NCR Dr. Jesus Rodrigo F. Torres

Rizal Technological University - Pasig M. Eusebio Avenue, San Miguel, Pasig City Dr. Luis E. Castañeda

San Beda College 638 Mendiola Street, San Miguel, City of Manila, NCR 1099

Rev. Fr. Aloysius Ma. A. Maranan

San Sebastian College-Recoletos Claro M. Recto Avenue, Sampaloc, City of Manila, NCR 1000

Rev. Fr. Cristopher C. Maspara, OAR

Santa Isabel College 210 Taft Avenue, Malate, City of Manila, NCR 1000 SR. Josie B. Onag, DC

St. Clare College of Caloocan Old Zabarte Road, Camarin, Kalookan City, NCR 1422 Dr. Clarita G. Adalem

St. Paul University-Manila 680 Pedro Gil Street, Malate, City of Manila, NCR 1004 Sr. Ma. Evangeline Anastacio, SPC

St. Paul University-Quezon City Gilmore Avenue corner Aurora Boulevard, Quezon City, NCR 1100

Sr. Nilda Masirag, SPC

St. Scholastica's College 2560 Leon Guinto St., Malate, City of Manila, NCR 1004 Sr. Mary Frances Dizon, OSB

Technological Institute of The Philippines-Quezon City

938 Aurora Boulevard, Cubao, Quezon City, NCR 1109 Dr. Elizabeth Q. Lahoz

The Philippine Women's University System-Manila

1743 Taft Avenue, Malate, City of Manila, NCR 1004 Dr. Jose Francisco B. Benitez

Trinity University of Asia 275 E. Rodriguez Sr. Blvd., Cathedral Heights, Quezon City, NCR 1102

Dr. Josefina S. Sumaya

The University of Manila Dr. Emily D. de Leon

University of Caloocan City General San Miguel St., Sangandaan, Kalookan City, NCR 1400

Atty. Enrico "Recom" Echiverri

Page 269: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 25

Table 4: Potential Academe Partners – Manila

Name of Institution Address Head

University of Santo Tomas España Boulevard, Sampaloc, City of Manila, NCR 1015 Very Rev. Fr. Herminio V. Dagohoy, O.P.

University of the East-Caloocan Samson Road, Kalookan City, NCR Dr. Ester A. Garcia

University of the East-Manila Claro M. Recto Avenue, Sampaloc, City of Manila, NCR 1008

Dr. Ester A. Garcia

Divine Word College of Laoag General Segundo Avenue, Barangay 12, Laoag City (Capital), Ilocos Norte 2900

Rev. Fr. Reynaldo Jimenez, SVD

Northwestern University Don Mariano Marcos Avenue, Laoag City (Capital), Ilocos Norte 2900

Mr. Caesar I. Agnir

Mariano Marcos State University Caunayan, Batac, Ilocos Norte Dr. Miriam Edulian Pascua

AMA Computer College-Fairview Blk 61 Lot 28-31 Bristol corner Regalado Ave., Fairview, Quezon City, Metro Manila

Mr. Amable C. Aguiluz IX

AMA Computer College-Makati 5486 South Superhighway corner Gen. Tinio St., Bangkal, Makati City, Metro Manila

Mr. Amable C. Aguiluz IX

STI College-Caloocan J.Teodoro St., 10th Avenue, Grace Park, Kalookan City, Metro Manila

Atty. Monico V. Jacob

STI College-Cubao Upper G/Flr Opulent Bldg., EDSA cor, Gen. Roxas St., Araneta Center, Cubao, Quezon City, Metro Manila

Ms. Kimerly Bantad

STI College-Makati 250 Sen Gil Puyat Ave., Makati City, Metro Manila Ms. Karla Foz

STI College-Novaliches G/F Jordan Plains Bldg., Jordan Plains Subd., Quirino Hi-way, Novaliches, Quezon City, Metro Manila

Atty. Monico V. Jacob

STI Education Services Group - Fairview 70 Regalado Ave., North Fairview, Quezon City, Metro Manila

Atty. Monico V. Jacob

STI Education Services Group - Global City University Parkway Drive, Fort Bonifacio Global City, Taguig City, Metro Manila

Atty. Monico V. Jacob

Polytechnic University of the Philippines, Anonas, Santa Mesa, Manila

Anonas, Santa Mesa, Manila Dr. Samuel M. Salvador

St. Mary's University Bayombong, Nueva Viscaya Rev. Fr. Renillo H. Sta.Ana, CICM, Ph.D.

Page 270: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Deliverable 4 26

Table 5: Potential Academe Partners – Northern Luzon

Name of Institution Address Head

Gordon College McArthur Highway, Dau, Mabalacat, Pampanga, Mabalacat, Pampanga 2010

Dr. Arlida M. Pame

Kolehiyo ng Subic Mac Arthur Highway, San Francisco, Mabalacat, Pampanga 2010

Hon. Mayor Jeffrey D. Khonghun

Lyceum of Western Luzon - Zambales St. Jerome Street, Sto. Nino, Lubao, Pampanga 2005 Ms. Josette Y. Perez-Daez

Ramon Magsaysay Technological University-Botolan

City of San Fernando (Capital), Pampanga, City of San Fernando (Capital), Pampanga 2000

Enrico E. Savio

St. Benilde Center for Global Competence San Vidal corner Ponce Street, Bayombong, Nueva Vizcaya 3700

Mr. Joseph Tabirara

AMA Computer College-Tarlac City Maharlika Highway, Science City of Muñoz, Nueva Ecija 3119

Ms. Leda R Amacan

College of the Holy Spirit of Tarlac Maharlika Highway, Cabanatuan City, Nueva Ecija Sister Florencia Tubaña, S.Sp.S.

Dominican College of Tarlac Vallarta Street, Poblacion, San Isidro, Nueva Ecija 3106 Msgr. Florentino F. Cinense, DD, Ph.D.

STI College-City of Tarlac General Tinio Street, Cabanatuan City, Nueva Ecija, Cabanatuan City, Nueva Ecija 3100

Ms. Cecile D. Dela Rosa

Tarlac Christian College Cabanatuan City, Nueva Ecija, Penaflorida, Nueva Ecija Dr. Emmanuel T. Quizon, DD

Quirino State University Afan Salvador Street, Guimba, Nueva Ecija 3115 Dr. Reynaldo P. Villamayor

Quirino State University - Cabarroguis Bitas, Cabanatuan City, Nueva Ecija 3100 Norma O. Lim

AMA Computer College-Angeles City Mabini Extension, Cabanatuan City, Nueva Ecija 3100 Dr. Amable R. Aguiluz V

City College of Angeles Bonifacio Street, San Mateo, Isabela 3318 MR. AVERELL LAQUINDANUM

Santa Rita College of Pampanga Tuguegarao City (Capital), Cagayan Mr. Rustico G. Coronel

St. Mary's Angel College of Pampanga Arranz, Gonzaga, Cagayan Mrs. Susan Ramos

STI College-Angeles City Centro 02, Lasam, Cagayan Mr. Conrado M. Dayrit III

Nueva Vizcaya State University - Main, Bayombong

57 College Avenue, Tuguegarao City (Capital), Cagayan 3500

Dr. Romeo R. Quilang

Saint Mary's University of Bayombong Diversion Road, San Gabriel, Tuguegarao City (Capital), Cagayan 3500

Rev. Fr. Renillo H. Sta. Ana, CICM

Central Luzon State University 212 Cortez Street, Centro East, Ballesteros, Cagayan 3516

Dr. Ruben C. Sevilleja

Page 271: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 27

Table 5: Potential Academe Partners – Northern Luzon

Name of Institution Address Head

Nueva Ecija University of Science and Technology-Atate

McArthur Hi-way, City of Malolos (Capital), Bulacan 3000 Mrs. Analyn Gamit

Nueva Ecija University of Science and Technology-Fort Magsaysay

, Bulacan, Bulacan 3017 Dr. Ernesto Castro

Wesleyan University-Philippines (Cabanatuan)

Barangay Tabe, Guiguinto, Bulacan 3015 Prof. Manuel G. Palomo

Isabela State University-Main (Echague) Thelma T. Lanuza

Our Lady of the Pillar College-Cauayan Exuperio V. Flores, Jr.

University of Perpetual Help System J.P. Rizal St., Balanga City, Bataan 2100 Mr. Manuel Tamayo

Cagayan State University-Andrews Dr. Roger P. Perez

Cagayan State University-Aparri Dr. Simeon Rabanal, Jr.

Lyceum of Aparri Narra Street Tenejero, City of Balanga (Capital), Bataan 2100

Rev. Fr. Joel M. Reyes

Centro Escolar University Macarthur Hi-Way, Abangan Norte, Marilao, Bulacan 3019 Dr. Ma. Cristina D. Padolina

St. Paul University at San Miguel Salangan, San Miguel, Bulacan 3011 Sr. Sonia Milagros Checa, SPC

STI College-Malolos Roman Highway, City of Balanga (Capital), Bataan, City of Balanga (Capital), Bataan 2100

Mr. Kerwin C. Kaw

Bataan Peninsula State University Capitol Compound, City of Balanga (Capital), Bataan, City of Balanga (Capital), Bataan 2100

Dr. Delfin O. Magpantay

Colegio de San Juan de Letran Fr. Tamerlane P. Lana , O.P.

Aurora State College of Technology Dr. Eusebio V. Angara

Aurora State College of Technology-Bazal Evi Q. Fontanos

Aurora State College of Techonolgy-Casiguran

Page 272: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Deliverable 4 28

Table 6: Potential Academe Partners – Southern Luzon

Name of Institution Address Head

AMA Computer College-East Rizal Marcos Hi-Way, Brgy. Mayamot, Antipolo City, Rizal 1870 Domingo V. Bacani Jr.

College of San Benildo-Rizal Sumulong Highway, Brgy. Sta. Cruz, Antipolo City, Rizal 1870

Mr. Rodrigo Ko

La Salle College-Antipolo San Luis, Antipolo City, Rizal 1870 Br. Felipe C. Belleza FSC

Our Lady of Fatima University-Antipolo Km 24 Sumulong Highway, Antipolo City, Rizal 1870 Caroline S. Enriquez, MD, PD

Pamantasang Bayan ng San Mateo Gen. Luna St., San Mateo, Rizal 1850 Ms. Elisa A. Carpio

Roosevelt College Cainta Sumulong Hi-Way, Cainta, Rizal 1900 Mr. Romeo P. dela Paz

Siena College of Taytay E. Rodriguez Avenue, Brgy. San Isidro, Taytay, Rizal 1920 M. Teresa E. Examen, O.P.

University of Rizal System-Angono Ibañez, Angono, Rizal 1930 Gloria P. Sarabia

AMA Computer College-Biñan 32 National Highway Canlalay, Biñan, Laguna 4024 Cherry T. Rojas

Colegio San Agustin-Biñan Southwoods Interechange, Biñan, Laguna 4024 Rev. Fr. Richard L. Pido, OSA

Don Bosco College - Canlubang Jose Yulo Sr. Blvd., Canlubang, Calamba City, Laguna 4028

Rev. Fr. Luisito M. Castaneda, SDB

Immaculate Conception Catholic College , Sta. Cruz, Laguna

La Consolacion College-Biñan Sto. Tomas, Biñan, Laguna 4024 Sr. Angelita M. Baraero, OSA

Lyceum of the Philippines-Laguna Km. 54 National Highway, Calamba City, Laguna 4027 Peter P. Laurel

STI College San Pablo Lopez Jaena St., San Pablo City, Laguna 4000 Reginald F. Robles

STI Colleges of Luzon - Calamba Campus National Highway, Parian, Calamba City, Laguna 4027 Anarose I. Colarina

AMA Computer College-Dasmariñas Governor's Tower 1, Governor's Road Langkaan 1, Dasmariñas, Cavite 4114

Alvin Mateo B. Rodriguez

De La Salle University-Dasmariñas Congressional Ave., Dasmariñas, Cavite 4115 Br. Augustine L. Boquer, FSC, Ed.D.

Far Eastern College - Silang Metrogate, Silang, Cavite

Far Eastern Polytechnic College Sta. Lucia, DBB1, Dasmariñas City, Cavite 4114 Mr. Ben I. Gomez

Immaculada Concepcion (Soldier's Hills) Colleges

Block 5 Phase 2 Soldiers Hills IV, Molino, Bacoor, Cavite 4102

Dra. Angelina Eloisa Molina-Mamon

The Lyceum Of The Philippines - Laguna Lyceum Of The Philippines - Laguna Km. 54 Makiling Calamba City Of Laguna

Lyceum of the Philippines-Cavite General Trias, Cavite Mr. Peter P. Laurel

Polytechnic University of the Philippines in Calauan

PUP Calauan, Laguna Campus, Barangay Kanluran, Calauan, Laguna, Philippines

Samuel M. Salvador, Ed. D

Page 273: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 29

Table 6: Potential Academe Partners – Southern Luzon

Name of Institution Address Head

San Pablo Colleges Hermanos Belen Street, San Pablo City, Laguna 4000 Atty. Vencedor A. Alimario

Olivarez College-Tagaytay E. Aguinaldo Highway, Tagaytay City, Cavite 4120 Dr. Eric L. Olivarez

San Sebastian College-Recoletos de Cavite

Manila Blvd., Sta. Cruz, Cavite City, Cavite 4100 Rev. Fr. Emil Jaruda, OAR

STI College Bacoor Unit 3, Solid Manila Bldg., Tirona Hi-way, Bacoor, Cavite 4102

Ms. Evelyn A. Catubay

STI College-Dasmariñas STI Bldg. N. Guevarra Street Zone 1, Dasmariñas, Cavite 4114

Mr. Arturo B. Lapitan

Technological University of the Philippines-Cavite

CQT Avenue, Salawag, Dasmariñas, Cavite 4114 Dr. Reynaldo A. Jorda

University of Perpetual Help System GMA Campus

Area K., San Gabriel, General Mariano Alvarez, Cavite 4117

Dr. Antonio L. Tamayo

Yaman Lahi Foundation - Emilio Aguinaldo College

Congressional Road East Avenue Burol Main, Dasmariñas, Cavite 4114

Jose Paulo E. Campos

University of Batangas - Lipa , Lipa City, Batangas City Hernando B. Perez

AMA Computer College - Lipa Ayala Highway, Lipa City, Batangas 4217 Dr. Gina D. Ocampo

AMA Computer College-Batangas City National Rd., Batangas City, Batangas 4200 Mr. Melvin Caseda

De La Salle - Lipa J.P. Laurel National Highway, Lipa City, Batangas 4217 Br. Joaquin S. Martinez FSC, D. Min.

Kolehiyo ng Lungsod ng Batangas , Batangas City, Batangas 4200 Mr. Teodulfo Dequito

Kolehiyo ng Lungsod ng Lipa Brgy. Marawoy, Lipa City, Batangas 4217 Atty. Leo S. Latido

La Consolacion College Tanauan A. Mabini Avenue, Tanauan City, Batangas 4232 Sr. Emilia S. Lacuarta, OSA

Lyceum of the Philippines University - Batangas

Capitol Site, Batangas City, Batangas 4200 Peter P. Laurel

STI College-Batangas Noble St. , Batangas City, Batangas 4200 Mr. Wei Hsiung Wu

University Of Perpetual Help System Alabang-Zapote Avenue, Pamplona 3, Dr. Arnaldo S. De Guzman

Page 274: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Deliverable 4 30

Table 6: Potential Academe Partners – Southern Luzon

Name of Institution Address Head

DALTA In Calamba City Las Piñas City, 1740

University Of Perpetual Help System JONELTA In Biñan City

National Hi-Way, Sto. Niño, City Of Biñan, Laguna

University Of Perpetual Help System DALTA In Calamba City

Alabang-Zapote Avenue, Pamplona 3, Las Piñas City, 1740

Dr. Arnaldo S. De Guzman

University Of Perpetual Help System JONELTA In Biñan City

National Hi-Way, Sto. Niño, City Of Biñan, Laguna

University of the Philippines Los Baños University of the Philippines Los Baños College, Laguna

Dr. Portia G. Lapitan

Saint Michael's College Of Laguna Saint Michael's College Of Laguna City Of Biñan 4024 Philippines

Nestor V. Hadi

Pamantasan Ng Cabuyao Pamantasan Ng Cabuyao 1A Katapatan Village, Brgy. Banay-Banay Cabuyao, Laguna

San Pedro College Of Business Administration

KM30, Old National Highway, Brgy. Nueva, San Pedro, Laguna, 4023.

San Pedro College Of Business Administration

KM30, Old National Highway, Brgy. Nueva, San Pedro, Laguna, 4023.

Lourdes B. Abdallah

Malayan Colleges Laguna Pulo Diezmo Road, Cabuyao, Laguna 4025 Dennis H. Tablante, BS ECE, MEP-ECE

Dominican College Of Sta. Rosa Laguna San Lorenzo South, Balibago 4026 Santa Rosa, Laguna

City College Of Calamba Old City Hall Compound, Burgos St, Calamba, Laguna

Canossa College Canossa College, M. L. Quezon Street, Lakeside Park Subdivision, Azcarate Cir, San Pablo City, 4000, Laguna

Laguna Northwestern College (Formerly Laguna Northwestern Institute)

Laguna Northwestern College-San Lorenzo Ruiz Burgos St., Siniloan, Laguna

Laguna Northwestern College-Corinthian Cente

Laguna Northwestern College-Corinthian Center Balibago, Sta. Rosa City, Laguna

Laguna Northwestern College-Pacita Laguna Northwestern College-Pacita Pacita Ave., Pacita Complex San Pedro, Laguna

Laguna University Recs Village, Brgy Bubukal, Sta. Cruz, Laguna DR. Bonifacio E. Umaclap, PME

Saint John Colleges Chipeco Avenue Barangay III City Of Calamba Laguna

Page 275: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 31

Table 6: Potential Academe Partners – Southern Luzon

Name of Institution Address Head

De La Salle University Science And Technology Complex

Laguna Boulevard, LTI Spine Road, Barangays Biñan And Malamig, Biñan City, Laguna

De Asis, Ma. Divina Cortez

Balian Community Balian, Pangil, Laguna, 4018 Pangil, Laguna

International Electronics And Technical Institute Inc. Biñan

C. Mendoza Business Center Nat’l Highway Biñan Laguna

International Electronics And Technical Institute Calamba

Lled Bldg, Pabalan Corner, T. Alonzo Street, Calamba Laguna

Page 276: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Deliverable 4 32

Table 7: Potential Academe Partners – Visayas and Mindanao

Name of Institution Address Head

AMA Computer University-Dumaguete City Martin-Anita Bldg., Cor San Jose and Perdices Sts., Dumaguete City, Negros Oriental 6200

Rolando M. Rosales

Colegio De Sta. Catalina De Alejandria Bishop Epifanio B. Surban St., Dumaguete City, Negros Oriental 6200

Rev. Fr. Thadeu Enrique N. Balongag

Foundation University Dr. Meciano Road, Dumaguete City, Negros Oriental 6200

Dr. Mira D. Sinco

Silliman University Hibbard Avenue, Dumaguete City, Negros Oriental 6200 Dr. Ben S. Malayang

St. Paul University Dumaguete L. Rovira Road, Bantayan, Dumaguete City, Negros Oriental 6200

Sr. Nintha Lucilla N. Baldado, SPC

ABE International Coll of Business and Economics-Bacolod

Luzuriaga Street, Bacolod City, Negros Occidental 6100 Leonora A. De la Cruz

AMA Computer College-Bacolod No. 8 San Agustin Street, Bacolod City, Negros Occidental 6100

Erna Lynn M. Fajarito

Bacolod City College Taculing Road, Bacolod City, Negros Occidental 6100 Dr. Ma. Johanna Ann R. Bayoneta

Colegio San Agustin-Bacolod Benigno S. Aquino Drive, Bacolod City, Negros Occidental 6100

Rev. Fr. Pederito A. Aparece, OSA

La Consolacion College-Bacolod Galo-Gatuslao Streets, Bacolod City, Negros Occidental 6100

Sr. Gavina F. Barrera OSA

Riverside College Dr. Pablo O. Torre Sr. St., , Bacolod City, Negros Occidental 5802

Samuel Z. Lee

STI College-Bacolod 26th Lacson St., , Bacolod City, Negros Occidental 6100 Mr. Francis R. Benedicto

University of Negros Occidental-Recoletos Lizares Avenue, Bacolod City, Negros Occidental 6100 Rev. Fr. Emeterio Buñao, OAR

University of Saint La Salle La Salle Avenue, Bacolod City, Negros Occidental 6100 Br. Raymundo B. Suplido, FSC, PhD

VMA Global College Earl Carol Street, Sum-ag, Bacolod City, Negros Occidental 6100

Dr. Elizabeth O. Salabas

West Negros University Burgos Street, Bacolod City, Negros Occidental 6100 Atty. Monico V. Jacob

Asian College of Science and Technology-Cagayan De Oro

Knights of Columbus Bldg. Capt. Vicente Roa Ext. , Cagayan De Oro City Misamis Oriental 9000

AMA Computer College Sotero Daumar-JR Borja Sts., Cagayan De Oro City, Misamis Oriental 9000

Mr. Peter C. Bacaling

Cagayan De Oro College Max Suniel St., Carmen, Cagayan De Oro City, Misamis Dr. Meliton B. Salazar, Jr.

Page 277: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 33

Table 7: Potential Academe Partners – Visayas and Mindanao

Name of Institution Address Head

Oriental 9000

Capitol University Corrales/Osmeña Streets, Cagayan De Oro City, Misamis Oriental 9000

Atty. Casimiro B. Juarez, Jr.

Liceo De Cagayan University Rodolfo N. Pelaez Boulevard, Kauswagan, Cagayan De Oro City, Misamis Oriental 9000

Mariano M. Lerin, PhD, CPA

Lourdes College General Capistrano Street, Cagayan De Oro City, Misamis Oriental 9000

Sister Ma. Adelaida C. Huiso, RVM

STI Colleges of Mindanao Eagle St., San isidro Village, Kauswagan, Cagayan De Oro City, Misamis Oriental 9000

Colbert G. Rabaya

Xavier University Corrales Avenue, Cagayan De Oro City, Misamis Oriental 9000

Dr. Roberto C. Yap, S.J.

ABE International College of Business and Economics-Iloilo

17 TKT Bldg. Mabini St., Iloilo City, Iloilo 5000 Mary Joan D. Fernandez

AMA Computer College-Iloilo Rizal St., Iloilo City, Iloilo 5000 Renee O. Orale

Cabalum Western College Dr. Fermin Caram, Sr. Avenue, Iloilo City, Iloilo 5000 Johnny C. Cabalum

Central Philippine University Lopez Jaena Street, Jaro, Iloilo City, Iloilo 5000 Dr. Teodoro C. Robles

Colegio de San Jose-Jaro E. Lopez Street, Jaro, Iloilo City, Iloilo City, Iloilo 5000 Ma. Helena Desiree M. Terre, Ph.D.

Colegio del Sagrado Corazon de Jesus General Hughes Street, Iloilo City, Iloilo 5000 Ma. Helena Desiree M. Terre

Iloilo Doctors' College West Avenue, Molo, Iloilo City, Iloilo 5000 Rolando R. Padilla, M.D.

John B. Lacson Foundation Maritime University

M.H. Del Pilar Street, Molo, Iloilo City, Iloilo 5000

John B. Lacson Foundation Maritime University-Arevalo

Sto. Niño Sur,Arevalo, Iloilo City, Iloilo 5000 Atty. Lorna D. Gellada

St. Anne College of Iloilo Cor. M.H. del Pilar &Lopez Jaena Sts., Molo, Iloilo City, Iloilo 5000

Atty. Alma E. Natividad, CPA

St. Paul University of Iloilo General Luna Street, Iloilo City, Iloilo 5000 Sr. Carolina S. Agravante, SPC

St. Therese-MTC Colleges-La Fiesta M. H. del Pilar Street, Iloilo City, Iloilo 5000 Dr. Ma. Teresa S. Sarabia

St. Therese-MTC Colleges-Magdalo Magdalo St., La Paz, Iloilo City, Iloilo 5000 Atty. Arturo A. Sebastian

STI College-Iloilo Mission Road, Iloilo City, Iloilo 5000 Ms. Eileen Grace P. Benedicto

University of Iloilo Rizal Street, Iloilo City, Iloilo 5000 Dr.Meliton B. Salazar, Jr.

Page 278: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Deliverable 4 34

Table 7: Potential Academe Partners – Visayas and Mindanao

Name of Institution Address Head

University of San Agustin General Luna Street, Iloilo City, Iloilo 5000 Raul M. Marchan, O.S.A.

Western Institute of Technology Luna, Iloilo City, Iloilo 5000 Engr. Richard S. Salas

AMA Computer College-Davao 123 Gen. Malvar Street, Davao City, Davao Del Sur 8000 Mr.Ernesto Raphael V. Robillo

Assumption College of Davao J.P. Cabaguio Avenue, Davao City, Davao Del Sur 8000 Sr. Concepcion P. Gasanag, m.a., Ed.D.

Ateneo de Davao University E. Jacinto Street, Davao City, Davao Del Sur 8000 Fr. Joel E. Tabora, S.J.

University of Mindanao Bolton Street, Davao City, Davao Del Sur 8000 Dr. Guillermo P. Torres, Jr.

University of the Immaculate Conception Fr. Selga Street, Davao City, Davao Del Sur 8000 M. Ma. Asumpta M. David, RVM

AMA Computer College-Cebu City Jones Avenue, Cebu City, Cebu 6000 Dr. Amable C. Aguiluz IX

Asian College of Technology Colon St., Brgy. Kalubihan, Cebu City, Cebu 6045 Engr. Rodrigo A. Abellanosa

Cebu Institute of Technology-University Natalio Bacalso Avenue, Cebu City, Cebu 6000 Mr. Gregorio L. Escario

Cebu Technological University - Main R. Palma St., M.J. Cuenco Avenue, Cebu City, Cebu 6000

Dr. Bonifacio S. Villanueva

Saint Paul College Foundation 279 Bulacao, Pardo, Cebu City, Cebu 6000 Randolph M. Libres

Saint Theresa's College of Cebu Don Ramon Aboitiz Street, Cebu City, Cebu 6000 Sister Celeste Ma. Purisima Pe, ICM

Salazar Colleges of Science and Institute of Technology

211 N. Bacalso Avenue, Cebu City, Cebu 6000 Eng'r. Doroteo M. Salazar

Southwestern University Villa Aznar-Urgello St., Cebu City, Cebu 6000 Peter S. Aznar

STI College-Cebu City 40 Salinas Drive,Lahug, Cebu City, Cebu 6000 Ms. Rebecca G. Ancheta

University of Cebu corner Sanciangko Street & Osmeña Boulevard, Cebu City, Cebu 6000

Atty. Augusto W. Go

University of San Carlos P. Del Rosario Street, Cebu City, Cebu 6000 Fr. Dionisio M. Miranda, SVD, MA, STD

University of San Jose-Recoletos Corner P. Lopez & Magallanes Streets, Cebu City, Cebu 6000

Rev. Fr. Enrico Peter A. Silab, OAR

University of Southern Philippines Foundation

Salinas Drive, Lahug, Cebu City, Cebu 6000 Dr. Alicia P. Cabatingan

ABE International College of Business and Economics-Bacolod

Luzuriaga Street, Bacolod City, Negros Occidental 6100

AMA Computer College-Cagayan De Oro City

Daumar-JR Borja Sts., Cagayan De Oro City, Misamis Oriental 9000

Computer College of the Visayas Mabini St., Iloilo City, Iloilo 5000

Page 279: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 35

Table 7: Potential Academe Partners – Visayas and Mindanao

Name of Institution Address Head

De Paul College E. Lopez Sreet, Jaro, Iloilo City, Iloilo 5000

STI-College of Mindanao J.P Laurel Avenue, Davao City, Davao Del Sur 8000

St. Vincent College 210 Jones Avenue, Cebu City, Cebu 6000

Cebu Technological University R. Palma St., M.J. Cuenco Avenue, Cebu City, Cebu 6000

Informatics-Uptown Cebu General Maxilom Avenue, Cebu City, Cebu 6000

St. Paul College Foundation-F. Ramos F. Ramos Corner Junquera St., Cebu City, Cebu 6000

Asian College of Technology-Talisay corner P. del Rosario & Leon Kilat Sts., Brgy. Kalubihan, Cebu City, Cebu

Cebu International School Talamban, Cebu City, Cebu

Divine Mercy Computer College Tanchan Bldg., Colon Street, Cebu City, Cebu 6000

Page 280: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

36 Deliverable 4

DRAFT TRIPARTITE AGREEMENT SCHOOL, IBPAP, UPOU II.

MEMORANDUM OF AGREEMENT

KNOW ALL MEN BY THESE PRESENTS: This agreement made and entered into this _______ day of _________ in the City of ___________ by and among:

(school) , an educational institution duly organized and existing under the laws of the Philippines with principal offices at _________________________________________ herein represented by its President, ___________________________, and hereinafter referred to as “(school initials)”;”

and

The IT-BUSINESS PROCESSING ASSOCIATION OF THE PHILIPPINES, a duly registered private organization operating pursuant to the laws of the Philippines, with office address at 5th Floor, C2 Building, Bonifacio High Street Central, 30th Street cor. 7th Avenue, Bonifacio Global City, Taguig, represented herein by its President and CEO, MR. JOSE MARI MERCADO, hereinafter referred to as “IBPAP”

and

The UNIVERSITY OF THE PHILIPPINES OPEN UNIVERSITY, a government educational institution established, with principal office at, Los Banos, Laguna, represented herein by its Chancellor, DR. GRACE J. ALFONSO, hereinafter referred to as the “UPOU”;

W I T N E S S E T H that:

WHEREAS, “<School Initials>”, cognizant of the pressing need to make its course offerings more attuned to the needs of industry and is ready, willing and able to implement the Service Management Program (SMP) Specialization Track for its BA and IT degree programs, and the Basic English Skills Training (BEST) and Advanced English Pre-employment Training (AdEPT) for its faculty and students to address this need; WHEREAS, IBPAP has articulated the skills and competencies that the BPO and IT industries deem essential to hiring; to this end it has developed a fully implementable online and onsite Service Management Specialization track for the BA and IT degree programs and the BEST and AdEPT for faculty development and student competency strengthening; WHEREAS, UPOU is the pioneer institution in distance and e-learning programs. It is the only distance education institution in Southeast Asia that offers most of its courses online; NOW THEREFORE, for and in consideration of the foregoing premises, the parties to this agreement hereby agree on the following:

Page 281: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 37

1. Responsibilities

1.1. IBPAP undertakes to do or cause the following to be done:

1.1.1. Jointly with the UPOU, conduct a Readiness Assessment to determine the school’s overall preparedness for:

1.2.1.1. Offering the online and onsite Service Management Specialization Track for students enrolled in its BA and IT degree programs;

1.2.1.2. Conducting the Basic English Skills Training and Advanced English Pre-employment Training Classes;

1.2.1.3. Conducting GCAT or Philnits for faculty and GCAT for students

1.2.1.4. Provide the University with a list of the infrastructure requirements attendant to SMP, BEST, AdEPT and GCAT;

1.2.2. Jointly with the UPOU, determine the overall suitability for SMP training and/or BEST and AdEPT training and/or Elites of the faculty nominated in section 1.3.4 below;

1.2.3. Implement a Certification Process for BEST, AdEPT for all teachers who underwent the BEST and AdEPT classes as defined in Annex A hereto;

1.2.4. Implement a Certification Process for SMP for all teachers who underwent the SMP Teachers Training, as defined in Annex B hereto;

1.2.5. Implement a Certification Process for Elites for all teachers who underwent the Elites Teachers Training, as defined in Annex ? hereto;

1.2.6. To make available to the faculty of the SUC all SMP-related courseware, in digital format ,;

1.2.7. To make available all BEST and AdEPT learning materials, in printed and digital format whichever is applicable, to the SUC;

1.2.8. Regularly inform the SUC through Project Reports submitted on a quarterly basis, or more often as the need arises, about the status of implementation of the programs and projects, problems and challenges that may arise in the course of the Project;

1.2.9. Provide for a stipend administration mechanism for teachers who have successfully completed their SMP training and who have subsequently been given a teaching load for SMP subject(s) for AY 2013 - 2014;

1.2.10. Provide for a similar stipend administration mechanism for teachers trained in BEST and AdEPT who are conducting these training classes.

1.2.11. Provide for a similar stipend administration mechanism for teachers trained in ELITES who are conducting these training classes.

1.2.12. Undertakes to provide or assign at least one BPO Industry Partner company to the SUC

Page 282: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

38 Deliverable 4

1.3. “<School Initials>” undertakes to do or cause the following to be done:

1.3.1. Provide IBPAP and UPOU with any and all information the latter requires for the efficient and transparent conduct of its Readiness Assessment;

1.3.2. Designate a qualified Focal Person tasked with coordinating and monitoring any and all activities attendant to the efficient implementation of this Agreement ;

1.3.3. Designate a fulltime qualified IT personnel to support and IT equipment to be used for the delivery of the courses and a sufficient number of proctors to administer the Global Competitiveness Assessment Tool, BEST, Adept as per a testing schedule to be mutually determined at a later;

1.3.4. Select and nominate qualified faculty for training in BEST, AdEPT and the Service Management Specialization, and Elites Track based on a set of criteria provided by IBPAP and UPOU as per Annex C;

1.3.5. Offer the Service Management Specialization Track in their BA and IT degree courses beginning AY 2015 - 2016. In this regard, the University shall secure the Board Approval, Authority to Operate or any similar document needed for this purpose;

1.3.6. Undertake to commit the trained faculty to teach SMP subjects beginning AY 2015 - 2016 to any and all BA and IT classes that the University administration shall designate, subject to existing rules on the matter;

1.3.7. Undertake to commit the trained faculty to teach BEST and AdEPT beginning AY 2015 - 2016 to any and all classes that the University administration shall designate, subject to existing rules on the matter;

1.3.8. Shall endeavor to provide the infrastructure needed to efficiently implement GCAT, BEST, AdEPT and SMP and deliver the course content to the students as effectively as possible. In the event that IBPAP has determined that certain essential infrastructure components are not present, the University shall make arrangements to undertake remedial measures to make sure that the required infrastructure is made available for the delivery of the courses.

1.3.9. Said infrastructure requirements shall include but is not limited to:

1.3.9.1. A room that can be used as a computer laboratory that can accommodate at least 25 computer units conforming to specifications enumerated in the Infrastructure Checklist (Annex D);

1.3.9.2. Telco provisions for Internet connectivity with at least 5 mbps bandwidth upload speed that can be dedicated to specific online testing activities including GCAT administration;

1.3.9.3. An LCD projector with minimum 2500 ansi lumens and screen and any and all peripherals, teaching materials for this purpose;

Page 283: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 39

1.4 UPOU undertakes to do or cause the following to be done:

1.4 Take the lead in conducting the readiness assessment prior to the implementation of the eSMP teachers training and the deployment of the same in the school.

1.5 Conduct assessment/certification for the teachers who have completed the eSMP.

1.6 Make available all course materials of the eSMP courseware online for free.

2. Limitations

2.2. All parties shall keep confidential any and all information on, or related to this Agreement, and shall not release any information, except with the prior approval of all the parties.

2.3. All notices, requests, demands or other communications permitted or required under this MOA shall be in writing and sent by personal delivery, courier, facsimile or electronic transmission. Notices shall be sent to the addresses listed below, or to such other address as either party may specify in writing.

2.4. In case of disputes arising from the implementation of this Agreement, the parties agree to first exhaust all remedies between themselves guided by the proper provisions of the Implementing Guidelines and applicable law, before resorting to court action.

3. Term

3.2. The Memorandum of Agreement shall have a term of two (2) years, subject to mutual extension by the parties for another two (2) years.

3.3. This Agreement may be modified only by written approval of all parties, and shall become valid and effective upon signing by all parties.

4. Capacity and Authorization

The parties herein warrant that they have the authority and power to enter into this agreement.

5. Termination/Dissolution

In case one party violates any the provisions of this Agreement, the other party may terminate the same, and such termination shall take effect after the lapse of thirty (30) days from receipt of the notice of termination by the other party. During the said thirty-day period, the parties shall amicably negotiate to immediately resolve all disputes concerning the implementation of said Agreement, failing which the termination shall take effect after the lapse of said period.

Page 284: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

40 Deliverable 4

IN WITNESS WHEREOF, the parties through their authorized representatives have affixed their signatures this ___ of ___________ 2013. <SCHOOL >

IT-BUSINESS PROCESSING ASSOCIATION OF THE PHILIPPINES

By:

By:

<NAME> President

<Full Name of School>

JOSE MARI MERCADO President & Chief Executive Officer

(Board Res. No.__dated Feb. __, 2013 attached as Annex “H”)

UNIVERSITY OF THE PHILIPPINES OPEN UNIVERSITY

By:

GRACE J ALFONSO, Ph.D. Chancellor

(Per UPOU Resolution No._____dated __________ attached as Annex “G”)

SIGNED IN THE PRESENCE OF:

Page 285: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 41

ACKNOWLEDGEMENT

REPUBLIC OF THE PHILIPPINES) MAKATI CITY )S.S. BEFORE ME, a Notary Public, for and in the City of Makati, Philippines, this ________ day of ___________________ 2013 at _________________, personally appeared the following persons, with their Government Identification cards, personally known to me to be the same persons who executed the foregoing instrument and they acknowledged to me that the same is their free and voluntary act and deed, and that of the corporations or entities herein represented, to wit:

NAME GOVERMENT ID Date & Place Issued

This instrument refers to a Memorandum of Agreement, consisting of six (6) pages including this page on which this Acknowledgement is written. WITNESS MY HAND AND SEAL on the date and at the place first above mentioned. Doc. No. ; Page No. ; Book No. ; Series of 2013. ENCL: ANNEX A - The Infrastructure Checklist ANNEX B - Faculty Selection Criteria ANNEX C - BEST / AdEPT Faculty Certification Process ANNEX D - SMP Faculty Certification Process

Page 286: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

42 Deliverable 4

DRAFT BILATERAL AGREEMENT SCHOOL AND INDUSTRY PARTNER III.

MEMORANDUM OF AGREEMENT KNOW ALL MEN BY THESE PRESENTS: This agreement made and entered into this ____ day of _________, 20155, at Bonifacio Global City, by and between:

_________(school)_________, an educational institution duly organized and existing under Philippine Laws with principal offices at _____________________________________________, herein represented by its President, ______________________, and hereinafter referred to as “(school initials)”,

and

_____company____, a corporation duly organized and existing under Philippine Laws with principal offices at_________________________________, herein represented by its President, _______________________, who is duly authorized for this purpose and hereinafter referred to as (company initials) or the Industry Partner.

W I T N E S S E T H that:

WHEREAS, school offers in its curriculum the Service Management Specialization Track intended to expose its students to the challenges of the IT-BPO industry environment as well as provide business and academe the opportunity to collaborate in the education of future professionals; WHEREAS, under the said program, students of school, also referred to as “Intern or Interns”, are assigned to sponsoring companies where they perform projects, activities and tasks along their lines of specializations on a full-time basis for a period of two (2) trimesters or 1 semester, approximately 6 months; WHEREAS, company desires, and agrees to become a sponsoring company (or Industry Partner) under such terms and conditions as hereinafter agreed by the parties;

Page 287: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 43

NOW THEREFORE, for and in consideration of the foregoing premises, the parties have agreed as follows:

1) Responsibilities - school

1.1 school shall appoint a Point Person for the Service Management Program including the Language Programs (BEST and AdEPT) who will coordinate with the company on the following:

1.1.1 Site Visit and/ or Faculty Immersion Program

1.1.2 Career Orientation

1.1.3 Internship Program

1.2 On the Service Management Internship Program.

1.2.1 school shall request from company its checklist of requirements.

1.2.2 For scheduling and availability purposes, school shall request company to choose its sponsorship of students under any of the following batch schedules: (preferably Second semester of their Senior Year).

1.2.3 After receipt of the Requirements Checklist, school shall provide company with a list of students qualified to undergo Internship, which shall be accompanied by individual Student Fact Sheets.

1.2.4 Upon written advice from company, school shall notify and request the students to report to company for the screening and selection processes.

1.2.4.1 During the internship, school shall monitor the Intern’s attendance and compliance to the prescribed work hours with company.

1.2.4.2 For coordination purposes, school designates its Career and Placement Officer as the point person on its behalf, and who shall act as liaison between the partners.

1.2.5 school shall ensure compliance by its faculty members, personnel, and students participating in the site visits to company premises, immersion, and internship programs (“Participants”) with any and all applicable company requirements, rules and regulations, including but not limited to, confidentiality and information security guidelines. school shall indemnify and hold company harmless for any and all claims and damages resulting from the fault or negligence or omissions of school and/or any Participant.

Page 288: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

44 Deliverable 4

2. Responsibilities of Industry Partner

2.1 As school counterpart, company shall appoint its point person, who shall coordinate with, and act as liaison with school for this partnership program.

2.2 company shall conduct a mutually agreed upon site visit and/or faculty immersion program in accordance with IBPAP prescribed methodology in order to gain better appreciation and understanding of the courses that the faculty shall teach. Incidental and out-of-pocket expenses (e.g. transportation of the faculty and meals) related to the site visit and faculty immersion will be borne by school.

2.3 company shall conduct career orientation at the start of the school year to enlighten the students to choose a career in the IT/BPO. company schedules touch points during the entire school year to further learn about the company and the industry.

2.4 company may, at its option, provide industry practitioners, as “Industry-Professors” or e-tutors, in support of SMP classroom/onine teaching and learning, practices which may be conducted in the following manner:

a. Industry-Professor as Teacher Trainer, following prescribed content and methodology by BPAP, facilitating a minimum of one Teacher Training Conduct per school year;

b. Industry-Professor as Resource Person or e-tutors, providing classroom (virtual or brick and mortar) teaching support by way of:

b.1 Providing additional case studies relevant to the subject matter and essential to Industry practice, in order to provide context and real work examples of the concepts taught; and

b.2 Conducting a number of classes co-teaching with faculty, necessary to enhance subject or topic, the schedules of which are negotiated with faculty handling the class.

c. Industry-Professor as faculty committing to deliver a subject at specific schedules, following prescribed number of units and / or class hours within one semester or term; and

2.5 On the Internship Program:

2.5.1 Upon receipt of the request from school, company shall accomplish and submit the Requirements Checklist to school.

Thereafter, company shall then choose from the list of senior students qualified for Internship submitted by school and, thereafter notify school of the selected students. It is understood and agreed that company shall have the sole discretion and prerogative to select and choose the students who

Page 289: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 45

will undergo the Internship Program through its screening and selection process, in accordance with its requirements and based on its standards/ qualifications or criteria.

2.5.2 Upon the completion of the Intern’s training, company shall issue, through its Human Resources Division, a “Certificate of Completion” showing the number of hours rendered by the Intern, the period covered, the department assigned and other pertinent details relevant to the said internship training.

2.5.3 company may maintain the right to recruit, select, offer jobs to interns; and likewise position the Industry Partner brand to potential future hires.

3. Other Provisions

3.1 The Parties understand and agree that school Interns are not employees of company and therefore no employer-employee relationship exists between them and company. However, company may grant subsidies, allowances or stipends to Interns, at its sole prerogative, in accordance with and subject to the company’s policies, procedures and practices. It is also understood that the Interns are not Students of company, the latter only agreeing to be a sponsor for the activities as described in this Agreement.

Likewise, school interns are subject to the rules and regulations, as well as policies and procedures of company. Upon acceptance of their internship, company shall advise all Interns of these Company rules and regulations and policies and require from each of them their compliance with said rules and regulations.

3.2 In case of any breach by the students of the company rules and regulations, negligently or willfully, school, upon prior written notice from the company shall withdraw or cause the withdrawal of the Intern from the Internship Program under this Agreement, provided that company reserves the right at any time to remove from company premise and/or refuse admission to any Intern for any reasonable cause determined by company in its sole discretion. The withdrawal of the Intern from the Internship Program shall be without prejudice to such other legal rights and remedies that company may have on the Intern as a consequence of such breach of violation nor shall such withdrawal preclude nor bar school from imposing may disciplinary action on the Intern as it may determine by reason of such breach or violation. Any liability, to third parties or otherwise, arising from the violation of this provision shall be the joint and solidary responsibility of the Intern and school to company.

3.3 All Interns shall strictly abide by the principles of confidentiality with respect to any material or confidential information of company. For this purpose, school shall ensure that Interns shall be properly briefed and advised on the prohibition against disclosure of confidential or restricted information acquired during his internship as well as the consequences of such violation. Any liability arising from the violation of this provision on confidentiality shall be the joint and solidary responsibility of the Intern and school to company.

Page 290: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

46 Deliverable 4

3.4 In addition, all Interns shall exercise due diligence and care in handling company equipment, materials, resources or any other company property which they have handled or used in connection with or in the course of their internship with the Company. For this purpose, school shall ensure that Interns shall be properly briefed, reminded and advised on the proper handling and use of company equipment, materials or resources. Any liability arising from any violation of this provision shall be joint and solidary responsibility of the Intern and school to company.

3.5 As an Industry Partner, company shall be entitled to the following: (i) permission to use school name and company logo in the former’s marketing efforts via advertising and promotional campaigns, subject to school prior approval for every event, which shall not be unreasonably withheld; and (ii) free access to the school graduates list for possible hiring, upon prior written request.

3.6 company may, at its sole discretion, commit to one or more of but not limited to the following:

a. Provide for the infrastructure of partner school

b. Students who are a hired agree to a ‘pay-forward scheme’ c. Fund scholarships

d. Engage the alumni of the schools to be campus ambassadors

For possible mechanics to the above, please see Appendix A for sample

4. in no event shall company be liable for any special, indirect, exemplary, incidental, punitive, or consequential damages arising out of or relating to this agreement in any way, including, but not limited to, loss of data, lack of services, or loss of revenues or profits, even if it has been advised, knows or should know of the possibility of the foregoing. company’s maximum liability to school or any third party arising out of or from this agreement for any and all claims (as defined below), and regardless of the form of action will be limited to proven and actual out-of-pocket expenses, which are reasonably incurred by school’s this limitation of liability is not applicable to school obligation to indemnify enabler in connection with this agreement.

For purposes of this Agreement, “Claims” refer to reasonable, proven and actual losses, liabilities, claims, damages, costs, suits, actions, proceedings and expenses (including reasonable attorneys’ fees) solely and directly caused by each party’s performance of its obligation under this Agreement. However, company shall ensure that the Intern/ student-trainee shall be free from any abuses and all forms of discrimination during the training and shall promote their welfare.

Page 291: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 47

5. This Agreement shall have a term of two (2) years, commencing from _______________ and shall be automatically renewed for a similar period unless either party notifies in writing the other of its decision not to renew before the expiration of the term or renewal term, as the case may be. Each party, however, shall have the right to terminate this Agreement for any reason whatsoever, upon prior written notice at least fifteen (15) days before termination date.

IN WITNESS WHEREOF, the parties hereto have signed this Agreement on the date and place first above-written.

<SCHOOL >

<COMPANY

By:

By:

<NAME>

<NAME>

SIGNED IN THE PRESENCE OF:

Page 292: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

48 Deliverable 4

ACKNOWLEDGEMENT

REPUBLIC OF THE PHILIPPINES) MAKATI CITY )S.S. BEFORE ME, a Notary Public, for and in the City of Makati, Philippines, this ________ day of ___________________ 2013 at _________________, personally appeared the following persons, with their Government Identification cards, personally known to me to be the same persons who executed the foregoing instrument and they acknowledged to me that the same is their free and voluntary act and deed, and that of the corporations or entities herein represented, to wit:

NAME GOVERMENT ID Date & Place Issued

This instrument refers to a Memorandum of Agreement, consisting of six (6) pages including this page on which this Acknowledgement is written. WITNESS MY HAND AND SEAL on the date and at the place first above mentioned. Doc. No. ; Page No. ; Book No. ; Series of 2015. ENCL: ANNEX A – Faculty Selection Criteria

Page 293: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 49

DRAFT ENABLER AGREEMENT IBPAP AND BPO CAREER HUB IV.

MEMORANDUM OF AGREEMENT

This agreement is entered by and between: CAREERHUB NETWORK CORP. (BPO Career Hub), a corporation duly organized and registered in the Philippine Securities Exchange Commission with principal office at the Unit 3508, 35/F Robinsons Equitable Tower, ADB Avenue, Ortigas Center, Pasig City, represented in this act by Judy B. Whisenhunt, President, hereinafter referred to as “BCH”.

And IT & Business Process Association of the Philippines, a duly recognized institution of learning under Philippine law with principal address at 5th floor C2 Building High Street Central, 30th Street corner 7th Avenue Bonifacio Global City, Taguig, represented in this act by Jose Mari Mercado, President and CEO – Talent Development, hereinafter referred to as “IBPAP”.

WITNESSETH: That WHEREAS, BCH’s primary purpose is to engage in the business of providing, creating, developing, promoting, maintaining software development, content development and online marketing using the latest information and communication technology (ICT). BCH is an online portal that caters to the Business Process Outsourcing (BPO) and Knowledge Process Outsourcing (KPO) industries committed to helping Filipinos find gainful employment and support Information Technology-Business Process Outsourcing (ITBPO) industry growth of the Philippines; WHEREAS, IBPAP’s mission is to promote the competitive advantages and the growth potential of the Philippines in existing and new areas of outsourcing and support the industry in areas such as offshore marketing, education and training, security and privacy, legislation and public policy, among others.

A. BCH RESPONSIBILITIES: 1. Act as an online enabling member and partner for IBPAP’s Service Management Program

(SMP) and other initiatives related but not limited to its talent development program(s). 1.1. BCH to join IBPAP’s project delivery team during on-site promotion(s), as available and

applicable, with partner State University and Colleges (SUCs) and Higher Education Institutions (HEIs).

1.2. BCH to help provide speakers and other relevant resources, as available and applicable, to SUC/HEIs during IBPAP sponsored or endorsed career fairs and/or similar activities.

2. Provide the existing and/or develop online recruitment and digital marketing facilities, features, and/or services that will promote and operationally support IBPAP’s Service Management Program (SMP).

3. Provide the existing and/or develop online recruitment and digital marketing facilities, features, and/or services that will promote and support the market awareness, talent sourcing and acquisition requirement of its association members and partner associations. 3.1. BCH agrees to implement and extend “member rates” to association members for its

products and services including, but not limited to: Job Posting, Display Ads, Email/SMS Blast, Social Media Management

Page 294: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

50 Deliverable 4

3.2. BCH agrees to refer prospective members to IBPAP as a result of the non-member’s interest to become an active participant to the various programs of the association and its program partners.

4. Provide IBPAP periodic updates and/or reports to the relevant programs implemented during the duration of this agreement. 4.1. IBPAP, in some occasions, may be provided access to reports and/or confidential data in

relation to its compliance to the regulatory requirements of the Commission on Higher Education (CHED) on the Service Management Program (SMP).

B. IBPAP RESPONSIBILITIES:

1. Endorse and promote BCH as an enabling member and partner of IBPAP’s Service

Management Program (SMP) and other initiatives related but not limited to its talent development program(s).

2. Support BCH’s market awareness and acquisition programs, projects, and campaigns that are related to supporting IBPAP’s and the industry’s general growth and development. 2.1. Endorse and promote BCH to its association members and partner associations for the use

of BCH’s online recruitment and digital marketing facilities, products, and services that will support the realization of the association members’ talent awareness, sourcing, and recruitment requirements.

2.2. IBPAP to promote and include BCH in its various promotional channels related to the Service Management Program (SMP).

2.3. Invite and provide industry experts, speakers and/or other relevant resources to career-oriented activities for SUC/HEIs, career fairs and/or similar activities.

3. Provide relevant and important industry updates, information and/or content that will provide significant improvement or effect on the following: 3.1. Scope and terms and conditions of the agreement and partnership that is related but not

limited to IBPAP’s Service Management Program (SMP). 3.2. Product and/or service(s) provided and/or offered by BCH to the association, its members,

and/or partner association.

C. TERM This Agreement shall take effect within one-(1) year from the date of signing. Renewal of the Agreement shall be upon a written agreement by both parties.

D. WARRANTIES AND INDEMNITIES Either BCH or IBPAP shall save and hold each other, its agents and sub-contractors free and harmless from any and all loss and damage (including court costs and attorney’s fees) arising out of, connected with, or as a result of any inconsistency with, failure of, breach by either party of any warranty or representation contained in this Agreement, including, without limitation, any claim by any third party in connection with the foregoing.

E. LIABILITY Neither party shall be held liable to the other in the event that a party is unable to perform any obligation under this Agreement due to any cause outside the party’s reasonable and justifiable control, including acts of God, industrial action, default or failure of a third party, failure of equipment or transmission difficulties, government action, or interruption of services. BCH disclaims any warranty or responsibility that the content(s) will be error free. BCH shall, however, implement sufficient and immediate procedures to ensure accuracy of content(s). IBPAP disclaims liability for any error, omission, or misstatement in or arising from the content(s). IBPAP disclaims any responsibility or warranty to exercise any editorial control over the content(s).

Page 295: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

List of HEIs for University-Industry Partnerships and Draft Partnership Agreements 51

F. INTELLECTUAL PROPERTY BCH shall remain the author and owner of BCH’s web page(s) and any data provided by BCH, including graphics and other data incorporated into and all intellectual property rights to BCH. IBPAP shall remain the author and owner of the IBPAP properties, including web page(s) and logo(s), magazines, posters and other advertising materials incorporated into, and all intellectual property rights created or acquired by IBPAP.

G. CONFIDENTIALITY BCH and IBPAP agree that, during the Term of this Agreement, it will keep confidential and will not disclose to any third party, without the prior written consent of either party, any information related to the details of this Agreement unless such information is required by law to be disclosed.

H. TERMINATION This Agreement can be pre-terminated by either party for just cause if one of either party is unable to comply with its responsibilities and obligation arising hereunder: The terminating party will give the other party a formal written notice of such violation. After receipt of such violation, the violating party shall have thirty-(30) calendar days to remedy said violation. If after 30 calendar days, the violating party has not remedied the problem to the satisfaction of the other party, this Agreement may be terminated by the other party, subject to settlement of accounts / deliverables still owing and due at the time of said pre-termination and payments of actual damages incurred by the other party as a result of violations of this Agreement.

I. OTHER PROVISIONS BCH and IBPAP shall further study what other collaborative arrangements they can enter into in improving and expanding the internship opportunities for students and employment opportunities for jobseekers, in determining, developing, and utilizing new technologies that will improve the sourcing, processing, and acquiring of qualified manpower for employers, and identifying and establishing opportunities for other industry enablers to connect to and productively work with the industry stakeholders This Agreement is the complete and exclusive statement of the agreement between BCH and IBPAP, and supersedes all understandings or prior agreements, whether oral or written, and all representations or other communications between BCH and IBPAP in relation to the subject matter indicated herein. Any variations or additions to this Agreement are only valid if confirmed in writing by both parties.

If any provision of this Agreement is contrary to any applicable law or regulation, all other provisions of this Agreement will, notwithstanding, continue in full force & effect.

Any notice or other communication to be given under this Agreement shall be in writing and shall be served by leaving it or sending it by facsimile or prepaid post to the addresses of the parties specified in this Agreement, or as notified by either party to the other from time to time.

Nothing contained in this Agreement shall be construed as constituting or evidencing any partnership, agency or contract of employment between the parties. The venue of any action between the parties to this Agreement shall be brought solely and exclusively in the proper courts of the City of Pasig. The law applicable to such actions shall be Philippine laws.

Page 296: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

52 Deliverable 4

IN WITNESS HEREOF the parties have hereunto set their hands and seal this ____ day of _____, in the City of Pasig, Republic of the Philippines. CAREERHUB NETWORK CORP. IT & BUSINESS PROCESS

ASSOCIATION OF (BPOCareerHub-BCH) THE PHILIPPINES (IBPAP) JUDY B. WHISENHUNT JOSE MARI MERCADO President President and CEO Signed in the presence of: _________________________ ________________________ (Signature Over Printed Name) (Signature Over Printed Name)

Page 297: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

IT-BPM Industry

Knowledge Hub

Project

Asian Development Bank

Department of Finance

Republic of the Philippines

Deliverable 2, part 2: Knowledge Hub

Business Case and Financial Models

Information Technology and Business Process Association

of the Philippines

Page 298: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

ii

Page 299: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

iii

DRAFT (Aug 26)

Knowledge Hub Business Case and

Financial Models (Deliverable 2, part 2)

TA-8164 PHI: Strengthening Knowledge -Based Economic

and Social Development – 1 BPAP (46234-001)*

Prepared by

Information Technology-Business Process Association of the Philippines Consultant

21 August 2015

Page 300: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

iv

Page 301: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

v

Table of Contents

INTRODUCTION................................................................................................................................................. 1 I. THE IT-BPM KNOWLEDGE HUB ..................................................................................................................... 2 II.

Table 1: Breakdow n Survey Sample Sizes (based on AY 2014) ............................................................. 3 GOALS OF THE KNOWLEDGE HUB .............................................................................................................. 4 III. OBJECTIV ES OF THE KNOWLEDGE HUB ............................................................................................... 5 IV.

Table 2: Target for each KH Revenue Stream, Years 1 to 3 .................................................................... 6 MARKET SIZE AND GROWTH......................................................................................................................... 7 V.A. Target Market Area and Scope...................................................................................................................... 7

Figure 1: Know ledge Hub Implementation Framew ork.............................................................................. 7 Figure 2: Know ledge Hub Market Space .................................................................................................... 8 Figure 3: Hub Participation Value ............................................................................................................... 8

B. Market Size and Potential (A Macroeconomic View ).................................................................................... 9 Figure 4: Demand and Addressable Supply Gap for IT-BPM Sector ........................................................ 9 Table 3: Summary of Enrollments vs. Graduates for Top Programs/Disciplines .................................. 10

C. HEIs and SUCs Market Segment ................................................................................................................ 11 Table 4: Regional Distribution of Higher Education Institutions by Sector, AY 2013-2014 .................. 11 Table 5: List of Respondents for HEI Survey .......................................................................................... 12

D. Individual Market Segment ........................................................................................................................... 17 Figure 5: Addressable Supply for IT-BPM Entry-level Workforce ........................................................... 17

COMPETITION ............................................................................................................................................. 20 VI.A. Business Landscape .................................................................................................................................... 20

Figure 6: Know ledge Hub Reach vs. Function ......................................................................................... 20 B. The Competitors ........................................................................................................................................... 20 THE BUSINESS ........................................................................................................................................... 23 VII.

Table 6: SWOT Matrix .............................................................................................................................. 23 Table 7: KH Value Proposition for Markets ............................................................................................. 24

MARKETING STRATEGY........................................................................................................................... 25 VIII.A. Purpose (Product)......................................................................................................................................... 25 B. Procurement/Partnerships (Place)............................................................................................................... 26

Figure 7: Engagement vs Action for KH Competition .............................................................................. 26 C. Presence (Promotion)................................................................................................................................... 27

Figure 8: Aligned Curriculum Goal for KH Products................................................................................. 27 Figure 9: Sponsored (Infosys) SMP Laboratory in Cav ite State University ............................................ 28 Figure 10: Sample Layout for Sponsored Laborator ies ........................................................................ 29 Figure 11: Internet and Media Architecture for KH Digital Components .............................................. 30 Figure 12: Ex isting SMP Social Media Page ......................................................................................... 31

D. Pivot (People) ............................................................................................................................................... 31 E. Personalization (Pr ice) ................................................................................................................................. 32

Table 8: Services Pricing Table ............................................................................................................... 32 RESOURCES.................................................................................................................................................... 33 IX.A. Capital investments ...................................................................................................................................... 33

Table 9: Cost of Subscriptions and Equipment ....................................................................................... 33 B. Key Staff and Job Functions ........................................................................................................................ 34

Figure 13: KH Organization (Year 1) ...................................................................................................... 34 Figure 14: KH Organization (Year 2 & 3) ............................................................................................... 35

C. Background Details of Key People .............................................................................................................. 38 FINANCIAL ANALYSIS ................................................................................................................................... 41 X.A. Funding Requirement ................................................................................................................................... 41 B. Sources of Funds.......................................................................................................................................... 41

Table 10: Profit and Loss ....................................................................................................................... 41 C. Cash Flow Forecast...................................................................................................................................... 42

Table 11: Cash Flow .............................................................................................................................. 42 D. Break-even.................................................................................................................................................... 42 E. Internal Rate of Return ................................................................................................................................. 42

Table 12: Internal Rate of Return (Break-even) ................................................................................... 43 ANNEX A: FINANCIALS ANNEX B: DETAILED JOB DESCRIPTIONS ANNEX C: SURVEY INSTRUMENT

Page 302: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

vi

Acronyms and Abbreviations

AdEPT Advanced English Proficiency Training ADB Asian Development Bank ASEAN Association of Southeast Asian Nations BA Business Administration BEST Basic English Skills Training BPO Business Process Outsourcing BPM Business Process Management BSBA Bachelor of Science in Business Administration BSIS/IM Bachelor of Science in Information Systems/Information

Management BSIT Bachelor of Science in Information Technology CHED Commission on Higher Education CMO CHED Memorandum Order CSO Civil Society Organizations DOF Department of Finance F&A Finance and Accounting FTE Full-time Employee HEI Higher Educational Institutions HR Human Resource I/A Industry-Academe IBPAP Information Technology–Business Process Association

of the Philippines ICT Information and Communication Technology IP Intellectual Property IT Information Technology IT–BPM Information Technology–Business Process

Management IQuAME Institutional Quality Assurance through Monitoring and

Evaluation IRR Internal Rate of Return KH Knowledge Hub PPP Public-Private Partnership PSIA Philippine Software Industry Association PWD Persons with Disability S&T Science and Technology SMP/eSMP Service Management Program/SMP Online SUC State universities and Colleges TA Technical Assistance T3 Train-the-Trainer (Program) UPOU University of the Philippines-Open University

Page 303: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

1

INTRODUCTION I. This Business Case is the second part of Deliverable 2 entitled: “Proposed IT-BPM Knowledge Hub Business Model and Roadmap” which was submitted by IBPAP to ADB as part of its project deliverables for TA-8164 PHI: Strengthening Knowledge-Based Economic and Social Development–1 BPAP (46234-001) that was submitted on 5 December 2014. Deliverable 2 discusses at length the overall framework and technical model, organizational design and where the hub is envisioned to be between 3 -5 years after implementation. It serves as a roadmap for frameworks, models and activities start ing from its development phase to full operation in the medium to long term. This document will present a snapshot of the developmental and organizational phases from startup through its 3rd year of operation. As discussed in Deliverable 2, the IT and Business Process Management (IT–BPM) industry in the Philippines has attained leadership in establishing a sizeable business process outsourcing (BPO) presence in Southeast Asia. It remains the global leader in the voice market and is expanding at high growth rates in the Finance and Accounting (F&A), health care management. and animation services sectors. Among others, the most important issue facing the industry that will impact on the success of the IT–BPM sector in sustaining its growth continues to be the availability of qualified talent. To address the talent gaps, the IT & Business Process Association of the Philippines (IBPAP) and different government and education sector agencies have partnered in implementing traditional talent development initiatives, including the Service Management Program (SMP). The modest gains of SMP have to be scaled in order to sustain the supply of qualified talent that will meet the industry’s demand. One of the solutions that have been identified to systematically address the skills shortage is the Knowledge Hub (KH). The KH will create an institutional framework for continuously designing, testing and rolling out talent programs, make available to various stakeholders industry information or data including employment opportunities and research results, and development and dramatically align the higher education curriculum with both international standards and labor demand. The proposed Knowledge Hub aims to support the following government, academic, IBPAP and IT–BPM sector goals and initiatives:

(i) address the skills shortage in the IT–BPM industry, (ii) serve as the gateway for knowledge sharing and networking among industry

members, academe, government policy makers and other stakeholders, (iii) enable Public-Private Partnerships (PPP) for Talent Development, (iv) build and sustain Industry-Academe Partnerships, (v) promote industry growth, (vi) reform initiatives in the higher education systems, and programs to produce

suitable graduates to meet the labor demands of high growth industries such as IT-BPM industry, and

(vii) expand reach and scale IBPAP’s talent development programs

For the first three (3) years of operation, most activities shall evolve around building

institutional and organizational aspects of the hub, developing the blended mode of delivery

Page 304: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

2

of the SMP, developing additional complementary pre-SMP curricula such as the

communications, work ethics, technology literacy among others and provision of support to

the Higher Educational Institutions (HEIs) specifically the early SMP/eSMP adapters,

through Teacher training and certification. Providing this support will help establish a solid Knowledge Hub membership pool as the demand for SMP increases overtime.

THE IT-BPM KNOWLEDGE HUB II. The IT–BPM Knowledge Hub seeks to support improvement in the alignment of higher education with the needs of the IT-BPM industry. It will have a central role to play specifically in driving the continuous process for generating and sustaining talent development programs and courses. The IT–BPM KH is intended to house developed industry-designed courses and industry assessment tools including a middle management and leadership program that will be utilized by member higher education institutions (HEI) and training institutions. The KH will also initiate international and national twinning arrangements and support stronger industry-academe linkages. In addition, it shall also serve as the main “touch-point” for anyone: students, professionals, within or outside the industry who wish to be a part of the industry, or know more about the industry. These activities collectively aim to scale up the deployment of cost-effective models for strengthening and delivering HEI programs, improving the flow of talent to the industry, sustaining Knowledge Hub activities and substantially contribute to addressing industry demand for talent. During the early stages of organization and development as it builds some operational capacity and experience, including building networks with the industry, academe, private sector, government and other stakeholders, IBPAP may serve as the virtual or physical base from which the KH will operate. For the first year, in addition to developing its physical and organizational structure, the KH will concentrate its efforts at delivering services that will build its membership size. As the KH becomes operational and the HEIs are able to institutionalize SMP in their curriculum offering, IBPAP is seen to slowly divest from its existing course delivery and deployment function. More importantly, the KH is envisioned to move towards being operationally independent as it strengthens its management and sustains its activities. To ensure its close ties and partnership within the IT–BPM sector, the IBPAP President shall sit as a permanent member of the KH Board of Trustees. Extensive consultations were held with HEIs in March and April to discuss the KH concept

and the HEI’s potential participation.1 A follow-up online survey was deployed in July 2015

to get a better understanding of the HEIs’ appetite to join the KH as well as to identify the

services and products that they expect to get out of any KH membership. The survey

covered over 100 HEIs located nationwide who participated in the ADB project forum

conducted in March and April 2015. Table 1 summarizes the details on the HEI sample size.

1 HEI Forum w as conducted in Metro Manila, Cebu, Los Banos and Clark w hich w as participated in by 287 HEIs.

Page 305: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

3

Table 1: Breakdown Survey Sample Sizes (based on AY 2014)

Sample Figure

Total number of HEIs (including SUCs) 2,374

Number of invited schools to HEI Forum 393

Number of schools responded to invitation 242

Schools which attended HEI Forum (sample) 124

Schools responded to the survey 46

The results of the survey identified the following primary services that need to be supported by the hub in order to build its pool of members: Faculty Training Faculty training/ development is the HEI’s top requirement for implementing SMP in the schools. Majority of the HEIs agree that because SMP is a pioneering program created by the industry, they need to build their teachers and institution’s capability to teach SMP/eSMP. Faculty training will involve training teachers in both content and methods for the five SMP subjects. The school has the option to determine how many teachers to train, however, HEI’s need to send a minimum of five teachers in order for the school to offer the full SMP program to students, HEI’s need to have at least one trained and certified teacher per SMP/eSMP subject. Based on current onsite training experience, all the five subjects require at least 28 days to complete. Certification and Accreditation All schools who intend to offer SMP are required to be certified by IBPAP to teach the course. In the onsite version of SMP, the Commission on Higher Education (CHED) requires a certification from IBPAP. 2 It has developed a pool of Master Trainers who will conduct the on-site certification. In the case of eSMP, IBPAP will do online certification through the UP Open University (UPOU). Membership in the knowledge hub will allow teachers access to a facility onsite or on line for certification. Th is way, the certification process becomes more accessible and efficient. Content and Merchandise

The sale of content and merchandise is a means to allow faculty, student, and developer access to curricular reference materials. As most of those HEIs who intend to implement SMP plan to go on a blended mode, it will necessitate the reproduction of modules and digital materials. Connectivity may vary in each school and striking a balance between what topics may be discussed online or onsite is left to the discretion of the teacher. Printed or digital copied of materials will be readily available to both teachers and students.

2 CHED Memorandum Series 2012 Order Numbers 6 for the BS Business Administration degree, and 34 for the BS Information Technology degree

Page 306: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

4

Partnership/s with IT-BPM Firms Fundamental to the methodology of the SMP is the conduct of IT -BPM firm site visits for teachers and internship for students. Site visits are important because teachers need to fully understand the working environment and the kind of discipline that is required to succeed in the IT-BPM industry. For students, the internship is designed to prepare them for possible employment in the industry. Undergoing the rigors during internship and being able to immediately apply knowledge taught them will make them more competitive compared to other graduates who have not had the opportunity for this kind of exposure. Ideally, partnerships should be forged to build a more sustainable relationship between the supply (HEI) and the demand (IT-BPM firms). As the partnerships allow the schools and employers to meet and get involved in more activities, the better the calibration of the supply side in terms of quality and quantity of their graduates with the requirements of the IT-BPM sector. This will result in better hiring rates at the demand side. Both the school and the student will benefit from the membership to the knowledge hub. Those who satisfactorily pass internship have a solid edge which can get them immediately employed and allow them faster integration into their roles. This will also be favorable for the employer because they will be hiring graduates who are IT -BPM ready and therefore will spend less in recruitment and in training, and get the quality and quantity of talent that they require when they need it.

GOALS OF THE KNOWLEDGE HUB III.

The expected KH outputs are:

(i) increased access to knowledge resources for the IT–BPM designed courses, (ii) enhanced higher education curricula and instruction, and (iii) strengthened partnership between industries and academic institutions.

The long term impact of the KH becomes tangible through a replicable and sustainable system of ICT-enabled knowledge hubs for the improved teaching and learning of IT–BPM industry designed curricula in HEIs.

Page 307: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

5

OBJECTIVES OF THE KNOWLEDGE HUB IV. The mission or purposes of the proposed Knowledge Hub are:

(i) Provide opportunity for business, employment, education, and training to industry member organizations, partners, prospective and current industry talents, and other stakeholders

(ii) Direct prospective talents to prospective employers (iii) Direct prospective and existing talents to educational and training programs and

providers (iv) Provide assessment, certifications, and accreditation services to talents, industry

members and partners (v) Develop prospective and current talents’ potentials into purposeful and rewarding

careers (vi) Promote the services of industry members and partners to the global and local

business community (vii)Support the advocacy campaign of the IT–BPM sector particularly as it relates to IT–

BPM career development, K-12 and its other talent development programs To achieve its mission, the KH will deploy the following foundational building blocks in its operations:

(i) Member’s Competency Promotion Mechanism (i) Assessment, Certification, and Accreditation Delivery Mechanism (ii) Curriculum Development Mechanism (iii) Talent Development Mechanism (iv) Industry Knowledge Management Mechanism

The targets in terms of membership and services to be rendered in the first three years of operation are presented in the Table 2. The percentage targets were derived based on the responses from the 124 HEIs who have signified interest in implementing SMP in their campuses.

Page 308: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

6

Table 2: Target for each KH Revenue Stream, Years 1 to 3 Year 1 Year 2 Year 3

Revenue Streams 50% 125% 200%

Institutional Membership

Schools 62 155 248

CSOs 4 8 16

Individual membership

Students* 9,920 29,760 52,080

Professionals** 500

Membership Services

Teachers***

Training 310 155 248

Content & Merchandise 310 775 1,240

Certification 310 7,750 1,240

Students

Content & Merchandise**** 9,920 29,760 52,080

Internship***** 1,000 2,000.0 12,920

Placement****** 700 1,400 9,044

Advertising 5

Employers' Subscription 62 124 248 * For Year 1, computed as number of HEIs multiplied by two subjects at 40 students to a class for two terms, For Year 2 and 3 computed as number of HEIs multiplied by three subjects at 40 students to a class for two terms. ** Professionals are prospect members who are either already in the IT -BPO industry and are seeking to enhance their skil ls and knowledge or, OFWs who may want to relocate back in Manila and are looking at the possibil ity of joining the IT -BPM industry. *** The computation for the services to be given to teachers is based on the number of HEIs multiplied by the number of SMP subjects to complete the 5SMP Courseware. **** This number assumes that the student members are students enrolled in SMP subjects under the blended mode and is computed based on same assumptions as in footnote 1. ***** It is assumed that there are no internship from HEIs in Years 1 and 2 but IBPAP is considering the existing students from the 17 SUCs of the CHED project who are about to graduate and from HEIs who are already involved in the onsite implementation of SMP. ****** The IBPAP team is in the process of developing a contract with BPO Career Hub to handle the placements of those student members who are seeking employment in the IT -BPO industry. For Year1, this target figure is based on IBPAP’s estimate of the number of completers from existing partner HEI schools implementing SMP. Year 2 figure is based on a 70% hiring rate for the internship number in footnote 5. And Year 3 figure is based on 2 sources of placements, the first is with existing partners and the second is coming from the graduates of the new HEI partners recruited under the KH.

Page 309: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

7

MARKET SIZE AND GROWTH V. A. Target Market Area and Scope Primary and Secondary Markets

The KH implementation framework in Figure 1 describes the hub as a portal for the generation and exchange of knowledge, information and marketing and career opportunities for Human Capital/Talent Development of the IT -BPM industry between its suppliers (HEIs, SUCs, Non-school sources) and employers. These two general areas (supplier and employer) describe the potential target market space for the service offerings of the KH.

Figure 1: Knowledge Hub Implementation Framework

However, it is important to point out that while the schools and employers represent the primary market for KH activities, there exists a secondary market area in the individual components (teachers, students, and professionals) that would make up both schools and employers. While not originally highlighted in the framework, it is emphasized that civil society organizations (CSOs) are also part of the potential primary market that the hub will service. In particular those CSOs that cater to education to employment needs for the particular development sector or community that they touch. These CSOs may not engage directly in academic programs delivery, more often they participate in managing academic as well as employment related functions and advocacy in line with the KH. It is important to note that some of these CSOs provide functionality much like the hub and can act as competitors in the space. However, the thrust is that, because of the close link between the hub and the IT-BPM industry, the KH can serve to complement and strengthen these CSO programs instead of competing with them.

Page 310: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

8

The Figure 2 maps the market space that the KH would likely directly service for its array of services and offerings.

Figure 2: Knowledge Hub Market Space

The institutional as well as individual segments of the target space are contrasted whether it is from a demand view (employers) or supply view (schools). It is critical to understand that, in order for the hub to be efficient and for it to achieve scale in deployment, it will target the HEIs (aggregators) so that it can effectively reach the individuals. Thus, the aggregators (institutions) will be the primary target of hub membership. In actuality however, it is the individuals, who are the end-users of the hub services that are particularly affected when it conducts training, course delivery and certification. Therefore, from an efficiency and membership view, services can only be delivered to the individuals if the particular aggregator (HEI/SUC) is a willing partner and will allow access to the individuals in their particular space to be serviced by hub activities. The mechanism by which the hub will reach a particular individual member: whether teacher, student or professional, will be delivered through the particular aggregator with whom that individual is associated. Membership as Mechanisms for Service Delivery The impact of these hub services to the primary market is better understood by highlighting the real value that schools can derive in participation. Figure 3 provides a summary of the hub input versus derived value from the primary markets.

Figure 3: Hub Participation Value

Page 311: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

9

Along the talent path that individuals will take in an institution, the KH will have corresponding support services with equated values. As the individual progresses through the institution, the value increases or changes. For example, as prospect students, the hub can offer support in terms of career marketing, this can be translated to branding for schools where career marketing activities and school recruitment events are being held. When these potential students do enroll, the KH can offer scholarship opportunities and later do placement for internship. In both circumstances, the school can derive tuition revenue. Finally as students graduate and are absorbed into the workforce, the alumni network that the KH maintains will provide schools access not only to individuals but also serve as potential entry points into activities where its graduates are often hired. The direct value to the school that the hub is able to offer will be discussed further in Section VII for the value proposition. B. Market Size and Potential (A Macroeconomic View) The Philippine Statistics Authority pegs unemployment for 2014 (Jan 2015 marker) at 6.6%; within the same period the underemployment statistic is at 17.5%. In contrast, of those who are employed, around 2.3 Million are Overseas Filipino Workers (OFW) who account for around 8.5% of GDP (US$ 2.3 Billion) and around 1 Million individuals are with the IT -BPM industry who account for around 7% of GDP (US$ 1.3 Billion).3 These employment numbers and their corresponding contribution to domestic product (dollar remittances for OFW, and export revenue for IT-BPM) represent private consumption a substantial subset of which is spent for education. More importantly, it is critical to view growth of the IT -BPM industry demand for talent against the supply at which it is able to absorb. Not only is this significant for the sustained growth of the sector but is also the pivot which the hub is serving.

Figure 4: Demand and Addressable Supply Gap for IT-BPM Sector

Source: IBPAP IT-BPM Industry Roadmap

3 Philippine Statistics Authority Annual Labor Force Survey. https://psa.gov.ph/statistics/survey/labor-

force

Page 312: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

10

The growth of the IT-BPM industry also serves as a good indicator for educational institutions to use for defining their curricular and program offerings. Much like staples programs like Nursing and Allied Medical, Education and Engineering fields, the demand for IT-BPM industry has pushed enrollment for Business and IT courses within the top three spots, outperforming Medical and Allied courses.4 The graduate pool is however, still not enough given the demand illustrated in the Figure 4, in addition, the spectrum of IT-BPM services include a wide array in the creative, legal, medical, and engineering disciplines which have attracted graduates from these fields to work for the IT -BPM industry.

Table 3: Summary of Enrollments vs. Graduates for Top Programs/Disciplines

Programs/Disciplines 2014

Enrollment % 2014

Graduates %

Business Administration and Related 970,558 27% 164,541 29%

Education and Teacher Training 624,254 18% 86,903 15%

Engineering and Technology 424,143 12% 59,399 11%

Information Technology 425,416 12% 72,879 13%

Medical and Allied 228,484 6% 57,427 10%

Others 890,541 25% 123,620 22%

Total 3,563,396 564,769 Source: CHED 2014 Higher Education Data Primer The data is also an indication that the global view for students as a market (secondary markets) are potentially about 1.3 Million for the programs where SMP can be offered (BA and IT) and around 237,420 for potential placements (assuming BA and IT also). Although realistically, the reach of the hub activities will be constrained by the geographic proximity of industry players to the supplying institutions, the above indicative numbers show the scale at which the hub can grow if it can reach and become inclusive to service the whole country. Moreover, as the SMP online courses are being rolled out, access to more remote areas where geographic proximity to demand may not be immediate but othe rwise serviceable either through migration (temporary or permanent), the reach of KH programs can spread more evenly across the countryside. Over the last five years, the Commission on Higher Education (CHED) has strengthened its Institution Quality Assurance through Monitoring and Evaluation (IQuAME) Program which has resulted in the closing or suspension of non-compliant schools and programs.5 While seemingly contracting the market, this move has actually provided a sharper focus for priority programs where tertiary institutions could develop and even excel. The data point for Centers for Development and Excellence (COD/COE) will be decisive in focusing individual schools that the hub will initially approach to become feeders for employers as they have a higher likelihood of readiness to offer SMP.

4 CHED 2014 Higher Education Data Primer. http://www.ched.gov.ph/wp-content/uploads/2014/temp/10-

03/home/Higher%20Education%20Data%202014%20-%20Public%20and%20Private%20HEIs.pdf 5 CHED Roadmap to Public Higher Education Reform, p 12. http://www.ched.gov.ph/wp -content/uploads/2013/07/Roadmap-

for-Public-Higher-Education-Reform1.pdf

Page 313: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

11

C. HEIs and SUCs Market Segment

Higher Education Institutions (HEIs) both public and private will be the primary focus of hub membership activities. It is through these organizations where secondary market activities such as chapter membership and program delivery (training, placement, internship, certification, merchandising and content selling, etc.) are offered and realized. Hence, it is critical to understand the behavior of this segment in terms of becoming members and their openness for third party curriculum offerings (as similar to SMP).

Table 4: Regional Distribution of Higher Education Institutions by Sector, AY 2013-

2014

Source: CHED 2014 Higher Education Data Primer In Table 4, the bulk of HEIs /SUCs are still within areas radiating from the capital as well as established BPO locations like CALABARZON, Clark and Cebu, and the Next Wave locations such as Bacolod, Cagayan de Oro and Davao. All of these areas are poised in terms of supply given the volume of existing schools in the regions these cities are located. The total space that the KH can operate and serve is equal to the number of tertiary educational institutions within the country; however, the subset of schools that the knowledge hub will initially target will be derived from the participants of the recent HEI Forums conducted by IBPAP and the University of the Philippines Open University (UPOU). In conducting the HEI Forum IBPAP and UPOU sent out invitations to HEIs and SUCs from the list of accredited schools of the Commission on Higher Education’s (CHED) website. The list of schools invited to participate were those schools that have a BA and IT course offering as the Service Management Program is anchored on a CHED Memorandum Order (CMO) that specifically provide for the delivery of SMP in these two courses. The list was segmented for the geographic locations (NCR, North Luzon, South Luzon, Visayas and Mindanao) where the HEI Forum will be conducted. The attendees of the HEI Forums conducted in the four geographic areas were schools who expressed interest in participating in the delivery of SMP in their schools.

Page 314: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

12

In order to get a better sense of the primary market that the hub will serve, a survey was conducted among the invited participants of the HEI Forums. These participants are schools that have been sent preliminary briefing materials regarding SMP so they are starting with some knowledge of the fit of the program into their curricular offering. Using the participants of the HEI forum benefitted the research in several ways. First, the participants have expressed interest in the program so the gauge will be whether they are likely to join for a fee and capture input on their desired price point. Second, the participants of the HEI Forum have been briefed of the KH project and the SMP, and are aware of the models and frameworks in place, this will allow them to better understand the values they want to derive from implementing SMP or participating in the hub. Third, because in the forum, participants already had an opportunity to ask questions regarding their concerns on and for the hub and SMP if they respond to the survey, they are already part of the potential target market subset that can be used as first leads when the hub does start to operate. The survey pool was conducted for 124 tertiary education institutions, of which to date, there are 56 respondents from 46 schools. Table 5 lists all the schools that responded to the survey.

Table 5: List of Respondents for HEI Survey 1 AMA Computer College Of Cabanatuan

City, Inc. 24 Mariano Marcos State University

2 Angeles University Foundation 25 National University 3 Arellano University 26 New Era University 4 Asia Pacific College 27 Northwestern University 5 Asia Technological School of Science and

Arts 28 Northwestern University

6 Asian College of Technology International Educational Foundation

29 Pamantasan ng Lungsod ng Muntinlupa

7 Bulacan Polytechnic College 30 Quezon City Polytechnic University (QCPU) 8 Centro Escolar University - Malolos 31 San Carlos College 9 City College of Angeles 32 San Sebastian College-Recoletos - Canlubang 10 City College of San Fernando Pampanga 33 San Sebastian College-Recoletos - Cavite 11 Colegio de San Juan de Letran - Bataan 34 Santa Isabel College 12 College of the Immaculate Conception 35 Santa Rita College 13 De La Salle Lipa 36 Siena College of San Jose Del Monte 14 Don Honorio Ventura Technological State

University 37 STI Cubao

15 FEU Cavite 38 Trace College 16 Ilocos Sur Polytechnic State College 39 University of Batangas 17 Isabela state university 40 University of Cebu Main Campus 18 La Consolacion College Manila 41 University Of The East - Manila 19 Lyceum of the Philippines University -

Laguna 42 University of the Immaculate Conception

20 Lyceum of the Philippines University - Manila

43 University of Perpetual Help System Dalta

21 Malayan Colleges Laguna 44 UPHSD - Molino Campus 22 Manila Central University 45 University of the Philippines Los Banos 23 Mapua Institute of Technology 46 Wesleyan University

Page 315: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

13

Survey Results

The Following are the results for the survey questions that were posted to the respondents:

1. Respondent Profile (Survey Question: Designation of Respondent) The question is designed to determine the level of influence of the point of contact. In particular if the individual would have the capacity to influence decisions to push hub programs in the school. It is not uncommon that smaller institutions have central administration looking after project implementations such as SMP and, similarly, for larger colleges and universities the function of evaluating and implementing programs (such as SMP) is devolved into the schools, colleges or departments. Understanding the respondent profile also gives insight to the KH team who will eventually present and negotiate with the schools how best to pitch for membership and attached services.

The results of the survey show that in many cases the most likely initial point/s of contact will be at the schools’ departments or colleges, which is a critical strategy because these individuals do have some autonomy in terms of pushing for programs that will enhance their unit’s offering. This result can later provide guidance in tuning the language of offerings to one that is best suited for the specific units rather than just central administration.

2. Mode of Participation (Survey Question: Our school is interested to participate in the

Service Management Program (SMP) through the following modes) The question is designed ask the school which of the three delivery modes it will prefer. An online program will be anchored on the delivery of materials from UPOU’s MoDEL online portal for SMP, this model assumes that individuals (students and teachers) sign-up and participate over the internet. An onsite program is a program offering where the five SMP courses are delivered as school term courses. This would assume that the schools are offering classes for students and the teachers have likewise attended face-to-face training for their SMP delivery capability. A blended program assumes that the school will have a mix of delivery methods that allow for both internet as well as –classroom-based delivery of SMP.

Page 316: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

14

A significant number of the respondents have selected a blended delivery, owing to the readiness factors which are discussed in the next survey question. While coming in last among the choices, an on-site program still represents a considerable number for the respondents most likely due to the implications on their IT infrastructure or the familiarity of the model with a mix of large system schools choosing this option.

3. Factors for choice of modality (Survey Question: What factors affect your choice of

mode in offering SMP?) The factors affecting choice of modality provides insights on issues which could affect or impact implementation for the schools. These items are similar challenges encountered in the IBPAP pilot SMP run and CHED funded implementation of SMP6. These are points where support from the participating employers could be raised in order to attract schools to partner in the program.

What is evident is that the highest need is to address faculty and curriculum readiness; both activities are part of the hub offering through the different training and capability programs that the hub has to offer to faculty as well as administrators. Likewise infrastructure and technology rank high which confirms that this area is a particular concern of schools across the board. It is not surprising that executive support is not ranked high because most of the participants have already realized the need and have expressed interest in the program, which was most likely cascaded from central administration.

4. Time frame of offering (Survey Question: We intend to start offering courses in the

Service Management program by) To better understand the staffing and financial investments that the hub will undergo during its startup years, a question on timing of offering was asked. The answers represent a view into the potential readiness, willingness and pace at which implementation for potential member schools can deploy SMP. The hub can leverage on the gaps between terms to allow itself time to develop membership and

6 The Commission on Higher Education provided Php 125 million to IBPAP to implement on-site SMP in 17 state universities and colleges nationw ide over a tw o year period from 2013 -2015. The 17 SUCs include: Batangas State University, Benguet State University, Carlos Hilado Memorial State College, Technological University of the Philippines, Cavite State University, Don Mariano Marcos Memorial State University, Laguna State Polytechnic University, Negros Oriental State University, Northern Iloilo Polytechnic State College, Pangasinan State University, Polytechnic University of the Philippines, Philippine Normal University, Tarlac State University, Technological University of the Philippines, Western Visayas College of Science and Technology, West Visayas State University, and University of South Eastern Philippines

Page 317: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

15

relations within the schools as well as give enough runway for program, capability and curriculum to be injected into an interested party.

Almost half of the respondents are looking at an implementation over the next academic year. This would be an opportunity for the hub to refine its offerings and engage with this schools in sync with a summer or midterm training program to allow their faculty adequate time to prepare for a 1st term course and gauge student interest.

5. Interest gauge (Survey Question: To systematize the transactions for all

stakeholders including Higher Education Institutions (HEIs), IBPAP will build a Knowledge Hub (KH) that could facilitate more efficient services delivery to its members. Will you be willing to join as member of the KH with a fee?) Given the level of interest shown by the number of participants in the HEI Forum, this survey question asks whether the respondents will likely put financial values for the products and services that the hub has to offer. This also serves as an indicator for which schools will need more effort to convince about the value of what the hub has to offer

While majority of the respondents are willing to pay membership fees to avail of hub services almost a fourth of the respondents do not see their organization paying for membership. If set against their response to the second question, it is interesting to see that one out of four schools who answered “No” are looking at an online delivery model.

6. Services profile (Survey Question: What services are you expecting as a member?)

The array of services that schools expect to receive as a member (membership value) is outlined in this survey question for respondents to select. The list is derived from activities that were done during the pilot and CHED-funded implementations of SMP.

Page 318: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

16

In general, all respondents recognized the importance of all of the services and gave high ratings. However, there is greater emphasis put on faculty development, as well as training and certification. Employer partnerships and access to materials rank high in the (this sentence is incomplete!)

7. Price point (Survey Question: How much would you be willing to pay as a member?)

The last question in the survey is to determine price point for annual membership. This operates on the assumption that these institutions are paying similar fees for membership and participation in other organization whether related to regulation (CHED Accreditation) or as access requirement (Subscriptions). The ranges are in Php 25,000 increments for simplicity and lack an option lower than Php 25,000 to reference to ranges imposed by competitors.

While the results are at the lowest ranges, this is far from surprising as membership prices from organizations in the competitor matrix of the hub would actually be priced lower.

The survey was used to gauge the interest of moving the model into a pay scheme, particularly for those that will choose an on-site or blended delivery. Another important point to consider is that the survey is simplified in favor of getting sensibilities of the market through decision makers and champions within the schools. By experience in previous SMP implementation, some schools will require more negotiations and further discussions to roll out SMP into a term offering. There are also some important factors that are currently taking place in the tertiary education landscape, the most immediate being the implementation of K-12. This move by the Department of Education (DepEd) is expected to create a sudden drop in enrollment in tertiary institutions for two years forcing smaller schools or programs to temporarily close or suspend offerings until the student volumes normalize. This presents an opportunity that the hub could leverage on and will be discussed in succeeding sections.

Page 319: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

17

Another trend worth noting is the increasing investments of large business holdings in education, spearheaded by PHINMA, with San Miguel, SM and Ayala groups doing similar acquisitions. As more family-controlled schools are divesting equity in tertiary education institutions, and more businesses conglomerates are buying these shares, the trend may likewise provide an opportunity because some of these holding companies have interests in the IT-BPM space. D. Individual Market Segment The real impacts of hub activities are translated at the individual membership (secondary) segment of its market. These activities are the ones that will directly engage individuals either through program delivery (training, course offerings); content and merchandising (book and training manual sales, SMP branded items); or placement and internship. Individual chapter (local/school) membership is an expected model to be pursued but given the demographics and price point of students, it is not expected to be a major revenue generator and the volume of which is contingent on the number of primary member engagements that the hub can develop and pursue per year.

Figure 5: Addressable Supply for IT-BPM Entry-level Workforce

The secondary market is the primary source of talent supply for the IT-BPM’s talent pool. As the volume of employable tertiary students filter through and shrink from secondary to tertiary education, two of the most alarming losses occur at the point where studen ts will not even consider a career in IT-BPM and the lack of employable skills. These two areas are being addressed by the hub as a primary markets activity in the form of directed campaigns for career options and SMP and enrichment courses (BEST, AdEPT) for upskilling. The 80,000~100,000 annual addressable supply simply cannot keep up with the growth of the demand. At best, where there would be an additional volume of students created due to hub activity, supply needs to reach 250,000~300,000 to meet the demand of the industry.

Page 320: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

18

A similar survey to the one conducted for the primary markets was conducted for the secondary market (students and professionals) to gauge willingness to participate in hub activities, expected services and price points for their entry. The survey, apart from demographics highlighted participation in similar membership organizations as well as gauge awareness of SMP. The survey was designed to check the gamut of services expected upon joining such an organization. This was delivered through the SMP Facebook page which to date has around 75,000 members. The following are the survey questions that were posted to the respondents:

1. Membership in organizations (Survey Question: Are you a current member of a professional organization?) This question gives insight into the reach of potential competitors within the secondary target market. Membership whether for a national or chapter association set against the demographic data questions of the survey can give a view of the extent or reach of potential competitor organizations that are anchored on membership.

2. Product awareness (Survey Question: Are you aware of the Service Management Program (SMP) of IBPAP?) While the survey was conducted using the SMP Facebook page as a Launchpad, there is still a possibility, given the viral nature of social media, that the reach of the survey may not all be students of schools where SMP is currently being implemented. The question is designed to illicit a response as well as create a potential marker for interest that the hub can later follow-up and an individual and a representative population of the school of the respondent.

3. Willingness to participate (Survey Question: Are you willing to become a member of an organization setup to support Service Management Program (SMP) activities in the school?) Similar to the primary market question, this is used to gauge interest in participation. Like the other questions for the secondary markets, comparing this against the demographic data can represent markers for primary target market schools that can be approached given the local demand indicated by the survey.

4. Price point (Survey Question: How much are you willing to pay as membership fee?) Like the price point question for schools, this is designed to gauge the price the secondary market is willing to pay for membership. This will also be used for comparison against the competitor price point evaluation in the succeeding sections. The assumption is that while the students are most likely to answer the survey, the decision for financial considerations are often by parents as levied by schools, this will also help gauge membership value in the next question.

Page 321: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

19

5. Services profile (Survey Question: What services do you expect as a member of such an organization? The final question for the secondary market survey is anchored on the expected services that the hub will provide its individual members. Unlike the services question for the target market these are oriented to address individual activities and can again be used in conjunction with demographic data to determine programs for schools if the demand is present.

These survey questions for the secondary market while designed to better understand the behavior of the secondary markets will be part of succeeding researches for the KH implementation. Due to limitations in time and delivery of the survey, the computations and services described in this plan are based on assumptions derived from the results of the primary markets survey. Moreover, SMP courses are tied to enrollment and therefore partner or participating HEI will more likely compel students to avail of content or merchandise during initial stages of implementation. It is assumed that the ability of HEIs to place their students as reflected by their internship or hiring will create a market that will later drive the demand for the courses on its own.

Page 322: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

20

COMPETITION VI. A. Business Landscape The potential competition of the hub is defined based on the identified services that it will deliver across both primary ad secondary markets. This will also help narrow the price point at which the hub will need to compete against, in particular with membership as these potential competitor entities have the advantage of being in the space earlier than the KH. Figure 5 highlights the key areas where the knowledge hub will participate and deliver services at an institutional, individual or even regulatory level compared to its potential competitors.

Figure 6: Knowledge Hub Reach vs. Function

In identifying the direct competitors of the KH, the question that needs to be answered is: given the limited financial capabilities of the primary and secondary target market, which organization will the markets likely spend their resources on. This assumption is critical because almost all of the players highlighted in the grid have the advantage of having an earlier presence in the market than the hub making the barriers to entry higher. B. The Competitors Membership organizations - The primary anchor of hub activity is in membership. Hub value and services can only be delivered and realized by a target customer through membership, therefore, the hub will compete for a share in the institutional or individual budgets. Professional organizations that have an attached regulatory function as dictated by law (e.g. PRC) have an advantage in particular because membership in these organizations is generally mandatory in order to practice profession.

Page 323: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

21

Perceived Value: Strength in numbers. Membership organizations are able to lobby incentives and deliver value because their numbers represent efficiencies, political capital and strengths that no individual entity would be able to achieve. This is also part of the reason why in sectors where regulation is involved (i.e. professions, certification), the management and regulatory practices are often devolved by the government regulating agencies to membership organizations, a good example is how the Commission on Higher Education (CHED) requires HEIs to be part of a certifying association in order to undergo higher level accreditation and certification. Approach: Since the hub is a startup and relatively unknown compared to established membership associations, it needs to heavily capitalize on its string linkage with the IT-BPM industry. It will utilize its solid industry connections and networks to project its value propositions to the potential members it wants to attract, in this case, tertiary education institution.

Placement companies – Matching internship & career opportunities will be a major function of the hub. Consequently, it will come in direct competition with companies that perform third party recruitment and placement for the employers that the hub serves

Perceived Value: Economies of scale. Companies involved in recruitment and head hunting perform the valuable task of aggregating a pool of candidates to allow interested employers to pursue and hire as they see fit without having to invest considerable resources for each lead. The ability to work with scale, especially in linking potential employers closer to candidates regardless of schools or affiliations has made recruitment firms (in particular, online ones such as Jobstreet) a popular choice for the secondary markets (student and professionals). The traction and existing subscriber base of these companies are a critical link to building the ability of the hub to place its graduates in promised careers. Approach: The KH may explore complementation or “outsourcing” some of the matching/internship function to these firms particularly if it impacts on scale and cost efficiencies. The advantage of the KH is that it has an established pipeline of potential candidates which the private companies need in order to perform matching and placement. In this light, aligning with the hub also increases their scale and efficiency. Developing key placement company partners will be key to both short and long -term sustainability of the hub. Rather than compete with these firms on their core business, partnerships ensure that some profit share can be achieved per program graduate but at the same time establish the hub as a primary source of capable talent among the employers subscribing to the services of these placement companies is both strategic and effective. A strategic alliance/partnership will likewise improve internship program delivery as the work of pushing openings for internship efficiently moves from the employers to the placement firm/s, to the hub and into the school allowing for a more systematic and faster aggregation and a larger pool than what can be accomplished by the hub directly working with employers.

Page 324: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

22

Content providers – While SMP as a product is designed to supplement the existing domains and strengthen the core competencies of students and professionals , like any content sold, will have to fight for “share of wallet” from an individual reach. In contrast to the content and materials for domain fields, the hub as a content developer and provider will sit on the same shelves of any publisher that provides content to the secondary market (individual) it serves.

Perceived Value: Expertise. Much like placement companies, content providers are part of budget and wallet share of the primary and secondary markets. Traditional publishing companies (text book providers) and content subscription services (journals and periodicals) actively campaign and provide sales channels within schools even to the point of supporting faculty directly. This reach is far more than what the hub can compete with and while the hub has a merchandise and content selling function, this is attached to the delivery of the programs rather than as an independent business line in itself. Approach: Similar to placement companies, the best approach is alliance/partnership rather than competition. This allows the hub to unburden itself from the risk of content production but still guarantee a return for every unit or copy sold. Working with a content provider (whether local or international) allows the hub to leverage on the sales capability of these companies to provide the necessary support at the academic level for faculty delivering the courses. Such partnerships also help extend the reach of hub content (SMP and its attached products) beyond the school channel and hopefully into more mainstream retail establishments.

Training providers – The hub will deliver training and development services to members at both institutional and individual members. While not in direct competition with training providers, these organizations provide valuable input in terms of cost, value and demand for learning and development (L&D) activities.

Perceived Value: Reach. There are a number of training companies that already have engagements with the primary market (schools) and have established a presence within their locality. Approach: The training functions of the hub are modeled after the scale implementations for SMP. Both on-site and online channels for training rely heavily on “enablers” that provide the actual training programs drawing from contents originally provisioned by IBPAP through SMP. While the engagement with said enablers tend to be transactional (per delivery), their proximity to members as well as knowledge of local academe culture, and business landscape adds both value and helps reduce program delivery costs. Developing a strong network of local training companies or enablers in key geographic locations ensure the ability of the hub to deliver the highest quality service at the lowest cost possible and more importantly, assures timely access to as many potential HEIs/individuals nationally and overseas.

Page 325: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

23

THE BUSINESS VII. The hub as a business operation has several factors that help or harm its sustainability and capacity to operate, these coming from both internal and external sources. These factors constitute the SWOT Analysis in Table 6.

Table 6: SWOT Matrix Helping Harming

Inte

rnal

Strengths

SMP as a product has already been developed and industry-aligned with a CMO from CHED

SMP materials converted to open courses by UPOU housed with its own LMS

Support of large employer partners and industry association (IBPAP)

Peaking interest from tertiary institutions to implement SMP

Previous SMP implementations providing headway into tertiary institutions

A strong set of enablers (APC, UPOU) Partnership with a placement/recruitment

firm to co-develop career programs for the hub

Weaknesses

Slow update cycles for SMP materials due to lack of developers

Lack of bandwidth and capacity to support demand surges for delivery and implementation of programs

Implementations are tied to current funding opportunity and lack a mechanism to deliver and charge based on demand and value

Career marketing interaction is done primarily at the surface with little engagement at depth within secondary markets

Exte

rnal

Opportunities

Other service industries are looking to replicate IT-BPM industry talent and capability projects

Open spaces in Kto12 curriculum to integrate SMP

More non-voice work in the IT-BPM industry requiring other domain disciplines (i.e. Allied Medical, Engineering)

ASEAN Integration opening new talent markets and supply sources

Threats

Maturing and plateau of demand for IT-BPM talents, higher entry-level, more specialized skills for knowledge work

Kto12 push creating a gap for tertiary level graduates for two years and the dip in college enrollment it will create in succeeding years

Unfavorable view from the general public of IT-BPM careers (dead-end or stopover jobs)

Resurging demand for overseas work

What the SWOT Analysis describes for the KH is that at the core, the strength that the hub can build upon is the strong ties it has with the industry it serves. The work put into developing SMP and its attached products (BEST, AdEPT, GCAT) as well as the online counterpart in eSMP is what sets the offerings of the hub apart from similar competitors/offerings in the educational space. Coupled with the relationship anchored on the membership of IBPAP that allows the hub access to large potential employers and partners provides an edge that resonates with HEIs that are looking to become members. Conversely, the SMP advantage is also its greatest weakness as the update cycle for curricular materials has not been put in place. These updates are critical to maintain relevance and keep with the needs of the industry and more importantly create the necessary alignment for the academic link. The weaknesses identified in Table 6 are

Page 326: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

24

anchored on the lack of focused resource from IBPAP which the KH would be able to fill. When added with structural changes to the education environment such as the implementation of the K to 12 curriculum, these circumstances can create threats to the delivery and implementation of SMP by the KH. Similarly, some negative perception that people generally have of the IT-BPM industry careers most especially the parents have made careers in the industry last-resort options. However as the industry diversifies in the work that is being brought in, more and more opportunities for individuals graduating with degrees other than those of BA and IT related courses are finding opportunities, not as last option jobs but rather as sustainable career trajectories. The K to 12 push also opens spaces for the SMP curriculum to be integrated, allowing for a wider reach for the program. Key to how the KH will present itself as a business to its markets are the value propositions that it presents to these segments. Table 7 encapsulates the pitch per market segment (institutional vs. individual) that the KH performs for every service or function it offers.

Table 7: KH Value Proposition for Markets KH Function School Student Professional

Training Opportunities Develop and Up-skill Faculty

IT-BPM as a Career Choice

Career Advancement

Content & Certification Industry-aligned Boost Employability Remain relevant

Merchandise Co-branding Aspiration Sentimentality

Access to Employer Network

Build Relationships Internship or Recruitment Be part of Alumni Network

Internship & placement Additional revenue stream

Gateway to employment Access to potential recruits

Tuition Revenue SMP as new stream Scholarship opportunity Donor opportunity

Advertisement & Career Marketing

Support enrollment push

Get to know the industry Touch point with the school

It is important to remember that the values here are based on the services described in Section II as supported by the survey for HEIs. Critical to each value proposition is the idea that and institution or individual that has expressed interest in becoming a member will need to translate their choice to participate into a purchase or availing a service. For example, in order to convince schools to participate in internship opportunities and placement of their graduates, they have to realize that it is not just a matter of batch performance but they can realize an additional revenue stream from this activity through the function of one of the hubs strategic partners for recruitment. From a student’s view, participating and even paying for membership opens employment opportunities which can pay for the investment of membership over time. Professionals, especially among recruiters can view the internship program as a way to gauge potential hires on whether they are a fit for the work environment or the demands of the business. For the KH as a business, clearly communicating these propositions will be key to recruiting potential members into the hub, whether from an individual or institutional vantage point.

Page 327: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

25

MARKETING STRATEGY VIII. A. Purpose (Product) The core of the hub offering is anchored on SMP (5 courses) and its ancillary programs (BEST, AdEPT and GCAT). However these products are tied to services that the hub will need to provide its membership namely:

(i) Faculty training - Based on the initial result of the survey conducted with HEIs, faculty training/ development is the first hurdle of implementing SMP in the schools. As SMP is a course that was created by the industry, most, if not all the HEIs agree that they need the knowledge hub to build the SMP set of teachers. Faculty training will involve the training of teachers under the 5 subjects of SMP. The school may or may not send a total of 5 teachers but in order for them to offer the SMP to students, teachers are to undergo training and get certified for each of the subjects. Conservatively and based on the onsite experience, all the 5 subjects necessitate at least 28 days to complete.

(ii) Certification and accreditation - In the onsite version of SMP, the Commission on Higher Education requires a certification from IBPAP and in the case of eSMP, IBPAP will rely on UP Open University for the online certification. All schools who intend to offer SMP are required to be certified by IBPAP to teach the course. In eSMP, membership to the knowledge hub will facilitate online certification.

(iii) Content and Merchandise - The selling of content and merchandise is a means to allow faculty/ student/developer access to curricular materials. As most of those who intend to implement SMP plan to deliver using a blended mode, it will necessitate the reproduction of modules and digital materials. Connectivity may vary in each school and striking a balance of what topics may be discussed online or onsite is left to the discretion of the teacher. Printed/ digital copied of materials will come in handy for both teachers and students.

(iv) Partnership/s with IT-BPM Firms - The SMP course requires site visits for teachers and internship for students. This mandatory feature is important as teachers have to understand the future working environment and the discipline that this working environment will exact from these students when they become employees. For students, it is mentally and psychologically preparing them of a possible employment in the IT-BPM industry. Undergoing the rigors during internship and being able to apply what was taught them will make them more competitive compared to other graduates who have not had this kind of exposure. Ideally, partnerships should be forged to build a more sustainable relationship between the supply (HEI) and the demand (IT-BPM Firms). As the partnerships deepen and allow the schools and employers to interact and get involved in talent development activities where they have common stakes or interests, the higher the chance of improving the hiring rate of students because the schools get more inputs/ feedbacks from prospective employers of their graduates and the firms is able to better position its recruitment processes and programs to facilitate internship and employment.

Page 328: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

26

(v) Support to students for internship and employment - Both the school and the

student will benefit from the membership to the knowledge hub. Those who have satisfactorily passed internship may be hired by the firm. This will also be favorable for the employer as less investment will be needed in fully on-boarding fresh graduates.

B. Procurement/Partnerships (Place) In the modern digital and shared economy, traditional channels are rapidly losing traction and ground to efficient and more agile outfits. Since the hub is both a digital and physical component, the direct competition on both fronts will be difficult to manage. What is key in the strategy is finding shared value for SMP offerings rather than hoisting a competing product. Even in membership, where direct competition will be fierce and value for limited budgets will be scrutinized, the shared value from partnerships with content, training and placement firms will help bolster the ability of the hub to present its membership offerings to potential primary clients.

Figure 7: Engagement vs Action for KH Competition

Transactional engagements with enablers, for example, allow for limited risk without committing to long-term contracts but still provide for quality reviews based on performance. In contrast, a strategic engagement with content providers will benefit not only the delive ry of SMP products but can also help entities with transactional engagements by providing both direct sell and commercially available content at the time of delivery.

Page 329: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

27

C. Presence (Promotion)

The hub offers a host of services and products that are delivered both on-site and online. It also has a social component because its engagement with the secondary market, apart from the actual delivery of courses, is through social media channels. Advertising revenue will be anchored on the digital presence of the hub, therefore, number of users as well as traction of products such as eSMP will be critical in delivering the volumes needed to convince media buyers. There is also a need to establish a footprint within the primary market space not just to increase membership but also to create brand awareness for the hub, SMP as a product and its attached services. This is initiated by either a direct contact for sell events (fora and conferences) or targeted business development activities with HEIs that are of particu lar interest to employers with high talent demand. Sandbox One particular approach that has been proven to be useful in creating traction is a trial subscription. This concept is implemented in the hub through a sandbox. The Sandbox is an option for potential members to try SMP cost-and-risk-free through the eSMP offering of UPOU. This creates an opportunity for faculty and administrators of HEIs who want to evaluate first-hand the content and methods for SMP. It also is a hook to bolster both eSMP subscription and the social media channels. The sandbox also applies for employers evaluating the value of SMP program and how they can utilize the different course offerings as a channel to slipstream their current training, leadership and development, and content modules into the schools to allow for closer linkages. This increases the like hood and interest of a school to sign up as a member knowing that a set of employers can eye them because of their curricular alignment.

Figure 8: Aligned Curriculum Goal for KH Products

Page 330: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

28

Eventually, the sandbox would allow the partnerships between schools and employers to operate beyond the initial hub scope. This creates greater opportunities for the hub to move the relationship model for members from a program delivery into more sustainable customized activities which can be a future source of consulting revenue. SMP Showcase Laboratory Technology, whether as curricular aides or a key part of delivery (i.e. eSMP courses) will play a pivotal role in the conduct of hub services. Program delivery in the on -site and blended modality for SMP subjects are still done over traditional classrooms but heavily supplemented by computer and internet technologies. Courses will require a computer and a connection, even in a fully on-line implementation, where individual course takers access the materials at their own convenience. More importantly, if these individuals want to undergo certification and assessment, they will still need to take their tests in a proctored/regulated environment with a good connection and reliable terminals. Whichever modality is used to deliver SMP, an environment that allows technologies to highlight the way the IT-BPM industry works is essential and serves both an operational (delivery) and aspirational (marketing) function. In the CHED-sponsored implementation of SMP in the 17 State Universities and Colleges (SUCs) part of the delivery package were technology laboratories equipped with computers and connectivity, housed in spaces designed to mimic the corporate training environments of IT-BPM companies. These laboratories were setup in order to:

(i) Provide a segregated space in the campus/es where SMP can be delivered and housed physically, and

(ii) Inspire and introduce students to the environment that they will enter in the IT -BPM space.

The ability to deploy/setup these laboratories also demonstrated the readiness and capability of participating schools. Often, in schools that have little resources to hoist and build additional classrooms, let alone fully equipped laboratories, the presence of a modern, furnished computer classroom environment, sponsored by an employer partner, serves to boost the school’s willingness to invest more to participate in SMP to further strengthening the second purpose stated above.

Figure 9: Sponsored (Infosys) SMP Laboratory in Cavite State University

Page 331: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

29

In order to create a model classroom environment that simulates the IT-BPM industry environment, the hub will house a showcase laboratory that will serve both training and certification needs, as well as become a showroom for potential members during visits and tours. While initially capital intensive because of the fit out and technology requirements, the laboratory can also serve as small meeting and conference space during times when it is not being used for hub program delivery activities such as faculty training or batch certification. The showcase laboratory much like those setup in the SUCs for the CHED-sponsored SMP run will be fitted and setup similar to corporate training venues and will have the following features:

(i) 70~100 square meters of useable floor area (ii) 20~25 computer units (desktops or laptops) for students and instructor (iii) Office productivity software and applications (iv) Projection and display systems (v) Modular furniture (vi) Internet and conferencing capabilities (vii) Fit out for electrical and networks to accommodate additional load and bandwidth

for the laboratory (viii) 2~4 MBps dedicated leased line or 8+ MBps Asynchronous DSL

Figure 10: Sample Layout for Sponsored Laboratories

Figure 10 is a floor plan that illustrates how such a laboratory can be potentially setup. The final laboratory layout and configuration out will be designed based on the actual space selected for the office. The schematics provide an insight into how space utilization and maximization can be achieved for such a showcase laboratory.

Page 332: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

30

Website and Social Media While the showcase laboratory provides a physical space for interaction, a good number of hub activities will be delivered through virtual channels. This will require presence to provide a digital counterpart showcase. The website and social media interfaces of the hub are where members (potential or existing) as well as the general public can learn about the hub and interact with the community it serves. It is a channel to collect feedback and disseminate information on hub activities and programs. The site architecture in Figure 11 illustrates how information moves between online entities which will be part of the hub partnership and infrastructure. The MoDEL implantation of UPOU for example would provide key data elements regarding secondary market participants engaged in both blended and online delivery modes, which are used by placement/recruitment partners when working on internship and career opportunities for the said participants. The placement partners in turn provide their career openings to other website channels to broaden reach. This interaction and fluidity of data movement will be setup as part of the online capabilities of the hub and will be integrated to its corresponding social media channel

Figure 11: Internet and Media Architecture for KH Digital Components

The hub will inherit and integrate existing social media accounts for the Service Management Program. These social media channels already have existing subscribership courtesy of previous implementations for SMP. These channels will provide the early traction needed to convince potential advertisers to partner and place ads with the hub. Interaction in social media is more personal and will therefore provide a better targeted and more granular control for the demographics that such potential advertisers want to engage.

Page 333: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

31

However these qualities will also require more focus and moderation in order to prevent abuse and unwanted content from over running the conversations and interactions. Part of the critical skills required for hub employees will be a level of sophistication and knowledge in operating over social and internet media spaces.

Figure 12: Existing SMP Social Media Page

D. Pivot (People) While the hub is primarily driven by membership, the price point and the corresponding revenues that can be derived from collected fees may not be enough to initially sustain the organization, this is why part of the critical pivot is to convert primary market membership to delivery of program components such as faculty training, certification, internships and content merchandising. These changes necessitate the efficient handover from business development functions into operations. The year 1 startup team is streamlined in that majority of the activities are concentrated on cultivating membership opportunities for HEIs and employer linkages. Most of the program delivery operations are going to be established implementations from the previous SMP projects under IBPAP. However the year 1 influx of new membership will require more human capital to be devoted to managing and monitoring of program components such as training. The skills, financial and operations pivot for the second year will move focus into secondary market transactions which will likewise require greater technology support. The organization pivot is also evident in the fluid transition between digital and physical domains. For example, social media engagement will create the necessary demand and traction that will need to be converted into advertising revenue which can only be done with business development activities with potential advertisers. A similar case is critical to transition participants of online programs into internship or even career placements. While the online space provides relative ease of access, the movement and translation into on -site activities will require devoted human capital as opposed to automated systems.

Page 334: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

32

E. Personalization (Price) The Initial HEI survey inquired on what amount the HEIs were willing to pay. Most if not all responded that they are willing to be members of the knowledge hub with a fee. While the lowest amount (25,000.00) was chosen by most, some respondents added that they prefer a much lower amount. To get a better appreciation of the membership fee figure, a parallel research was conducted by IBPAP to show membership fees being paid by schools in other organizations they are affiliated with. Prices were based on the existing rates being used by IBPAP in deploying the SMP onsite.

Table 8: Services Pricing Table Item Price Basis for Pricing

Institutional Membership

Schools 10,000.00 Price point is pegged from the subset of membership organizations that have academic institutions as members as w ell as associations for regulatory compliance.

Employers 5,000.00 Price point is pegged from the subset of membership organizations that have employers as members

CSOs 5,000.00 Price point is pegged from the subset of membership organizations that have CSOs as members

Individual Membership

Teachers 500.00 The price is compared against professional organizations w hose primary membership is comprised of faculty.

Students 100.00 The price is paralleled w ith professional organizations that have chapter membership in schools.

Professionals (Continuing education for BPO w orkers)

1,000.00 The price is competitive w ith professional membership organizations that have both a regulatory as w ell as industry focus.

Membership Services - Institutional

Faculty Training 28,000.00 This amount is based on the Training fee of Php 1000.00 per day used in the SMP public onsite trainings. The HEIs are projected to produce teachers for 5 subjects for a total of 28 days.

Content & Merchandise 2,000.00 SMP onsite materials cost 1,400.00 and since most schools w ill use the blended mode, an allow ance for digital materials apart from the Module has to be included.

Certif ication 200.00 This amount is just a portion of w hat UPOU w ill require as payment for certif ication.

Membership Services - Students

Content & Merchandise-Students 500.00 Cost of text books for students that w ill also include reproduction of digital materials

Internship 100.00 Processing fee for the hub to be able to assist them for internship

Placement 500.00 A percentage of the fees that the employers w ill have to pay to the BPO Career Hub w here placement of members and graduate students w ill take place.

Advertising 100,000.00 Average cost

Employers' Subscription 10,000.00 This w ill serve as a joining fee for employers w ho w ish to be involved in the hub operations (i.e. internship, hiring). This may be a fee that IBPAP can pay to the KH for members to be able to avail of the KH services.

Page 335: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

33

RESOURCES IX.

The following Resources have been identified to build and operate the Knowledge hub:

A. Capital investments Initially, the Knowledge hub will be nested in the IBPAP facilities. If and when the Knowledge Hub becomes a separate entity from IBPAP anytime within the 3 year -period, a provision to pay for rent has been proposed in this plan. Most of the Knowledge Hub equipment requirement is assumed to be acquired as a premium from subscriptions in order to address the issue on the need for continuous maintenance and updating of equipment given that the Knowledge Hub is very dependent on technology.

Table 9: Cost of Subscriptions and Equipment

Equipment & Subscription

No. of Units Total

Year 1 Year 2 & 3 Number

Internet & Telecoms

E1 Dedicated Leased Line* 1 (retain) 1

Unified Communication Service 6 9 15

Mobile Devices 6 9 15

Software & Services

Productivity Software (MS Office) 6 9 15

Design Suite Package (Adobe Creative Suite) 6 9 15

Financial Software (Accounting and Payroll)* 1 (retain) 1

Communication Suite (Google Apps) 6 9 15

Web Hosting and Domain* 1 (retain) 1

Technology Equipment

Laptop Computers 26 9 35

Laser Printer 2 0 2

Other Office Equipment

Binding and Cutting Equipment 1 1

Presenter 1 2 3

Digital Camera 1 1

LCD Projectors 1 2 3

Digital Recorder 1 2 3

HD Video/ Digital Camera 1 1 * These items are paid as a unit regardless on the number of Users.

Page 336: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

34

B. Key Staff and Job Functions During its organizational year, the staffing will be conservatively kept at a level commensurate to the start-up activities in order to avoid any large cash outlay and while at the same time ensuring operational efficiencies. However, depending on the market response, the staffing pattern may be adjusted to make sure that the demand for KH services is adequately supported at any given time. Based on the initial targets and the amount of activities envisioned for the first year, six (6) key positions are necessary to fill -in. The organizational chart in Figure 13 presents the initial structure of the knowledge hub for year one.

Figure 13: KH Organization (Year 1)

Knowledge Hub Lead The Knowledge Hub (KH) Lead is in charge of overseeing the entire operation of the Hub. The primary responsibility of the KH Lead is to direct the organization, including guiding senior level KH officials towards the achievement of its vision and mission and working towards both internal and external objectives to sustaining the organization’s growth. Among his/her functions in the first year is to seek business development opportunities and be the face of the hub in terms of marketing. As the primary person responsible for the success of the KH business, the KH Lead assures the organization’s relevance to the IT -BPM and Education sectors, the accomplishment of its mission and vision and the accountability to a diverse set of stakeholders that includes students, IT-BPM employees, alumni of the SMP Program and other IT-BPM courses, government senior education policy makers and managers, IT -BPM firms, IT-BPM industry associations, civil society groups, local government and the general public. Specifically, the KH Lead plans and directs all aspects of an organization's operations, policies, objectives, and initiatives, oversees the organization's membership, scholarship and other programs, projects, curriculum development initiatives, marketing, finance and accounting, HR and general administration functions. In addition, this individual is also responsible for strategically managing the KH internal and external clients.

Page 337: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

35

IT and Operations Manager Given that the primary role of the hub in membership and providing membership services, the IT and Operations Manager will focus on setting up both the membership processes that are linked into the IT component of the hub. He will also support the KH Lead in developing and delivering membership services and related activities. As the services expand and diversify, this position maybe split to have a full IT Manager and an Operations Manager. Administrative and Finance Officer During the period when the KH is being set up, the admin and finance officer will work with the Knowledge Hub Lead in setting up the admin and finance systems. The post holder will assume responsibility for financial administration and inputting, systems related to policies and procedures and general administration and tasks.

IT Officer The IT Officer will provide support to the IT and operations manager in terms of setting up the management information system and IT requirements of the Hub. Operationally, her/ his role is to do business analysis, database administration and helpdesk operation. Membership Officer The membership officer will provide support to the IT and Operations Manager in setting up the membership and linkages portal of the hub. Given that membership policies will need to be drafted before the IT processes could be installed, the membership officer will need to work on drafting the initial membership policies and processes. The number of Membership officers is expected to increase with the increase in membership.

Figure 14: KH Organization (Year 2 & 3)

Page 338: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

36

In the second year of operation, the IT and operations manager will focus on the IT part of operations and two (2) managerial positions will be added to focus on the KH membership and the marketing and research activities. Additional Officer level positions shall be opened to handle training, certification, business development, finance and career marketing. The additional key positions to be hired for Year 2 are: Membership Manager Leading and managing the KH membership team, the Membership Manager is responsible for ensuring that a consistently high level of service is provided to members and that the objectives for the team are met/ exceeded, in particular regarding retention and member satisfaction. The post holder will need to ensure all new applications, renewals and re-grades are handled efficiently and effectively, and that the processes to enable this are in place and continually improved. The post holder is responsible for improving the membership processes initially established to efficiently and effectively run the hub’s membership. S/he shall oversee activities pertaining to membership and services to members which include trainings and certification. Marketing and Research Manager The Marketing and Research Manager is a high level thinker who is comfortable finding and analyzing data, making strategic recommendations on their insights, and communicating action plans, next steps, and results with the management team. This position will include the business development and marketing for the hub and will also be responsible for developing the KH brand. Training and Certification Officer The KH Training officer will provide technical support to the Membership Manager in planning, developing, implementing and evaluating training and development programs of the hub including the certification process that entails the conduct of these trainings by members. Career Marketing Officer One of the key activities of the hub is the promotion, placement for, and expansion of opportunities for jobs in the IT-BPM space. As the number of partnerships grows, the ability to connect and monitor activities between employer recruitment and school placement will be a critical function within the hub. The Career Marketing Officer focuses on IT -BPM industry career-related activities by searching for, initiating and managing the employer partnership and work with placement company partners and schools for traditional career activities (job fairs, career talks, company tours and site visits) and well as non-traditional recruitment programs (digital campaigns). Within the schools and in the context of career marketing activities, the Career Marketing Officer will support the Marketing and Research Manager in developing and promoting the KH brand.

Page 339: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

37

Finance Officer As the KH expands its reach to more HEIs, the Administrative and Finance function shall be separated. In the second year, a finance officer shall be hired to allow more focus on the financial requirements of the hub. The Finance Officer reports to the KH Lead and is responsible for preparing financial statements, maintaining cash controls, preparing the payroll and personnel administration, purchasing, maintain ing accounts payable and managing office operations. Failure to provide adequate services may result in lost or misused revenues, inaccurate financial statements and financial hardships for employees, contractors and suppliers if the payroll and/or accounts payables are not processed in an accurate and timely manner. The Finance Officer will also serve as the cost and project accountant. It is expected that funding from donor agencies, sponsors and government will begin to flow beginning year two. Membership Officer This post-holder will provide support to the Membership Manager in recruiting and retaining new and existing members through the delivery of excellent customer service, supporting potential members through the application process and advising existing members with all aspects of their membership. This role will support two teams: Membership and membership Services Team. The proportion of time spent in each team will vary throughout the year depending on priorities and workload. Business Development Officer The Business Development Officer creates and builds client relationships while sponsoring interaction to obtain projects. This role assists in developing and facilitating the proposal process for specific clients/sponsors including budget and pricing development, proposal writing, contract negotiations and client presentations. The detailed job descriptions of the different positions in the KH organization are presented in Annex B.

Page 340: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

38

C. Background Details of Key People The four (4) key management positions are proposed to possess the following qualifications, experience, and training. Knowledge Hub Lead Education

(i) University degree in the field of business administration, finance, management, Information technology, education or related field

(ii) Master’s degree in Business Administration or any related field (iii) A minimum of 5 years in a senior executive management position and 5 years in

direct applicable work experience Knowledge & Experience

(i) 10-15 years’ experience in managerial/operation positions. (ii) Experience working with the government. (iii) Excellent knowledge of business theory, business processes, management,

budgeting, and business office operations. (iv) Good understanding of MIS systems design and functions (v) Proven experience in operations planning, organization, and development. (vi) Superior understanding of project management principles. (vii) Excellent understanding of the organization’s goals and objectives. (viii) Superior ability to analyze and solve business problems. (ix) In-depth knowledge of applicable government education laws and regulation, not -

for-profit rules and regulations and multilateral and bilateral procedures and processes.

(x) Excellent understanding of human resource management principles, practices, and procedures.

(xi) Proven leadership ability. (xii) Ability to set and manage priorities judiciously.

Personal Attributes

(i) Demonstrated competencies in four broad categories: commitment to results, business savvy, leading change and motivating

(ii) Brilliant strategist (iii) Systems thinker with a strong customer/service orientation. (iv) Goal driven and able to translate broad goals into achievable steps (v) Excellent negotiating and leadership skills. (vi) Possesses the ability to identify relevant information and helps transform this

information into individual and organizational knowledge and learning. (vii) Possesses experience in integrating and coordinating diverse areas of

management. (viii) Is action oriented and innovative? (ix) Takes advantage of opportunities, is a self-starter and a team player (x) Consistently displays integrity, models behavior, develops people, and builds teams. (xi) Deals effectively with demanding/challenging situations and designs and

implements interventions to address these. (xii) Effectively manages continuity, change and transition

Page 341: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

39

IT and Operations Manager Education

(i) University degree in the field of business administration, finance, management, Information technology or related field

(ii) A minimum of 3 years in a management position and 3 years in direct applicable work experience

Knowledge and Experience

(i) 3 years’ experience in managerial/operation positions (ii) Experience working with the government. (iii) Superior ability to analyze and solve business problems (iv) In-depth knowledge of applicable government education laws and regulation, not -

for-profit rules and regulations and multilateral and bilateral procedures and processes

(v) A broad understanding of the common user concerns for hardware, software, connectivity and IT infrastructure.

(vi) Excellent grasp of the Microsoft Windows operating environment, Microsoft Office and productivity suites and related network features

(vii) Familiarity with the Google Applications for Business platform and related technologies (Gmail, Drive, Calendar, Site)

(viii) Grasp of Small Office (SO) wired and wireless networking design, protocols and implementations

(ix) Knowledge in database design and implementations, preferably with experience in working with SQL or similar relational databases

(x) The ability to properly communicate and explain to the users, the diagnosis, options and best course of action to be undertaken for his/her IT-concern

Membership Manager Education

(i) University degree in the field of business administration, finance, management, Information technology or related field

(ii) A minimum of 3 years in a management position and 3 years in direct applicable work experience

Knowledge & Experience

(i) 5 years’ experience in managerial/operation positions (ii) Experience working with the government. (iii) Superior ability to analyze and solve business problems (iv) In-depth knowledge of applicable government education laws and regulation, not-

for-profit rules and regulations and multilateral and bilateral procedures and processes

(v) Proven leadership ability (vi) Experience in Training and processes of certification (vii) Ability to set and manage priorities judiciously

Page 342: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

40

Skills (i) Working knowledge of computers in a windows environment (ii) Demonstrate excellent oral and written communication skills (iii) Must be able to function as part of a team (iv) Maintain professional and positive demeanor (v) Proven accuracy and attention to detail

Marketing & Research Manager Education

(i) University degree in the field of business administration, finance, management, Information technology or related field

(ii) A minimum of 3 years in a management position and 3 years in direct applicable work experience

Knowledge and Experience

(i) Minimum 3 years of data analysis experience in market research, quantitative analysis, information systems, product management or other related fields

(ii) Experience in ERP systems (InforSyteline experience a plus) (iii) Experience with CRM systems (iv) Expertise in Microsoft Excel and/or Access (v) Expertise in data analysis software such as Tableau or SPSS (vi) Experience in data modeling (vii) Deep knowledge of web, email, and social media analytics tools (viii) Demonstrated experience capturing and documenting business requirements (ix) Experience writing test and survey plans and coordinating testing (x) Excellent written and verbal communication skills (xi) Excellent organizational skills, with ability to prioritize and manage multiple projects (xii) Self-directed, works well in team environment

Page 343: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

41

FINANCIAL ANALYSIS X.

The financial projections for the hub’s first three years of operation are attached in Annex A. A. Funding Requirement The total project funding requirement is estimated at approximately PHP 22.5 Million. The bulk of the funds will be used towards office fit out (inclusive of laboratory and IT equipment) and working capital in properly staffing and equipping the organization. Included in this amount are funds for operationalizing the KH Strategy and Ecosystem Research and Talent Development Fund estimated at PHP 4.5 Million. These cost items pertain to key investment disbursements that are not directly related to the day-to-day operations of the hub but are necessary to build the strategy and ecosystem by which the hub will contextualize its operations. B. Sources of Funds The sources of funds in terms of operations are membership fees, training and certification fees, share in placement fees, sale of content and merchandise and employers’ subscription in addition to advertising revenues. As this is a start-up social enterprise, the first two years of operation are investment years, characterized by a huge outflow due to the bulk of capitalization in setting up, staffing and equipping the hub. Consequently, for Year 1, direct and indirect costs are projected to be greater than the projected revenues and cash in-flows from other fund sources. Key overhead cost items are payroll and office fit out costs as well as marketing expenses. However there are close to PHP 12 Million in revenues expected to be generated in Year 1, as the projects supply and demand foundations will have been built in the preceding TA, ready to be monetized in terms of scaling affordable student memberships and the need for materials and supporting merchandise comprising 57% of total revenues. By Year 2, standardized processes, student membership growth at tipping point and HEIs smoothly running SMP courses and internships is expected to almost triple revenues to PHP 31.5 Million and double cost of sales to PHP 18.7 Million. This will result in driving significant margin growth to the bottom line as overhead costs are expected to increase by 30% overall in the same period, resulting in a projected profit of PHP 3.2 Million. The results of scaling will be apparent by Year 3 as a critical mass of some 248 HEIs and 46,000 student members will hopefully be generating close to PHP 57.4 Million in revenues without the need for overheads to increase as staffing levels should be maintained as scale increases will be supported by automated MIS processes and activities.

Table 10: Profit and Loss Year 1 Year 2 Year 3

Net Profit/(Loss) (5,070,060.00) 3,284,260.00 19,379,620.00

Page 344: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

42

At these levels of profitability the hub would be able to allocate its surplus towards enhanced product R&D, including adding to the curriculum and other allied subjects as well as to supporting strategic projects for future growth of the KH. C. Cash Flow Forecast The Cash Flow Forecast shows a positive Cash Balance in the first year as negative operating cash flows are augmented by the proposed seed capital from the Asian Development Bank (ADB). Similarly Year 2 shows that Cash Outflows will exceed Cash Inflows from the membership revenue and this shall be augmented by the net cash f low from the previous year. Assuming that revenues from membership are collected 70% of each year, in the third year of operation, the Knowledge Hub will begin to be sustainable and will have enough cash to go into further expansion in year 4.

Table 11: Cash Flow

Year 1 Year 2 Year 3

Opening Cash Balance (A) Nil 10,697,640 6,753,100

ADB Funding (B) 22,500,000 N/A N/A

Total Cash Inflow from Operations 8,358,700 25,658,200 49,611,700

Total Cash Outflow from Operations 20,161,060 29,602,740 37,978,380

Net Cash Flow from Operations (C) (11,802,360) (3,944,540) 11,633,320

Closing Cash Balance (A)+(B)+(C) 10,697,640 6,753,100 18,386,420

More importantly, the one time ADB funding for this project should be sufficient to enable the hub to move forward towards sustainability without the need for additional funding. D. Break-even Breakeven in Year 2 will be achieved at the 130th school mark, assuming that student membership hits 26,000 cumulatively that will also drive merchandise revenues. Significant effort will be required to achieve these targets from implementation starting with 62 schools and almost 10,000 students in Year 1. Scaling expansion after Year 1 and doubling will be possible owing to continued demand for service management trained talents in IT -BPM and other sectors, as well as due to buy-in from pioneer HEIs who have seen successful implementations and KH relationships working in peer schools. E. Internal Rate of Return The Internal Rate of Return (IRR) for this project is estimated at 10% only after 5 years. Key assumptions here include the multiplier on net cash flow growth in Years 4 and 5 by 1.5 times. Until Year 3, IRR continues to be negative as Year 3 will be the first year that operating cash flows are positive.

Page 345: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

43

Table 12: Internal Rate of Return (Break-even)

IRR Calculation Y0 Y1 Y2 Y3 Y4

Net Cash Flows -22,500,000 -11,802,360 -5,902,464 8,851,804 13,277,706

IRR Y2 IRR Y3 IRR Y4

IRR N/A -50% -18%

Remarks From Projections: ADB Investment

From Projections: Net cash flow from operations

From Projections: No IRR as no positive income

From Projections: Net cash flow from operations

Assumption for cash flow growth is 1.5x Y3 net cash flow

If using the breakeven scenario, then IRR is estimated at -50%, -18% for Years 3 and 4 respectively and 1% only after 5 years. If compared to a for profit business, then these low IRRs may be well below typical hurdle rates. For a non-profit social enterprise focusing beyond the bottom line outputs such as talent development, improving service delivery skills, job matching leading to job generation and lowering the unemployment rate however, then these lower hurdle rates may be acceptable as the potential value of the result is much more significant and important than the actual cash flows generated within the project in isolation. Further, not included in the calculation of this rate are the corresponding impacts on local economies of increased consumption by thousands of young professionals entering the work force, their subsequent tax contribution to the Philippine Government and the impact to socio-economic growth.

Page 346: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

1

ANNEXES

A. Financials 1. Financials Analysis 2. Breakeven Scenario 3. Training Costs

B. Detailed Job Descriptions

1. Year 1 Organization Structure 2. Year 2 & 3 Organization Structure

C. Survey Instruments

Page 347: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

2

Page 348: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 3

ANNEX A: Financials

Page 349: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

4 Section 1: Financial Analysis

Section 1: Financial Analysis

Page 350: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 5

Table 1 - 1. General Assumptions for Funding

Year 1 Year 2 Year 3Net Profit/ (Loss) (5,070,060.00) 3,284,260.00 19,379,620.00

Capital InvestmentKH Investment 20,250,000.00 20,250,000.00 20,250,000.00 KH Strategy and Ecosystem Research 2,250,000.00 2,250,000.00 2,250,000.00

Total KH Capital Investment 22,500,000.00 22,500,000.00 22,500,000.00

Return on Investment -23% 15% 86%

Table 1 - 2. KH Project Profit/ Loss Projection Summary

Year 1 Year 2 Year 3

Revenue 11,941,000.00 31,537,000.00 57,358,000.00

Less: Cost of Sales/ Services 9,686,160.00 18,662,040.00 28,387,680.00 Gross Margin 19% 41% 51%

Operating Revenues 2,254,840.00 12,874,960.00 28,970,320.00

Overhead Cost

996,000.00 4,648,000.00 4,648,000.00 1,320,000.00 1,320,000.00 1,320,000.00

1,500,000.00 - - 21,600.00 21,600.00 21,600.00

785,600.00 1,174,700.00 1,174,700.00 120,000.00 120,000.00 120,000.00 192,000.00 192,000.00 192,000.00

1,000,000.00 1,000,000.00 1,000,000.00 120,000.00 144,000.00 144,000.00 235,200.00 470,400.00 470,400.00

Equipment 1,034,500.00 500,000.00 500,000.00 Total Overhead Cost 7,324,900.00 9,590,700.00 9,590,700.00

Net Profit/ (Loss) (5,070,060.00) 3,284,260.00 19,379,620.00

Year 1 Year 2 Year 3Net Profit/ (Loss) (5,070,060.00) 3,284,260.00 19,379,620.00

Office SuppliesMeetings and RepresentationMarketing Local TransportationNational Travel

Account Items

Office RentPayroll

Utilities (Aircon, Light and Subscriptions (internet,

Office Fit-out

Page 351: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

6 Section 1: Financial Analysis

Table 1 - 3. Projected KH Cash Flow

Cash from Operations* 8,358,700.00 22,075,900.00 40,150,600.00

Cash from Receivables** - 3,582,300.00 9,461,100.00

Operating Cash Inflow 8,358,700.00 25,658,200.00 49,611,700.00

KH Investment*** 18,000,000.00 - -

KH Strategy and Ecosystem Research*** 2,250,000.00 - -

TDF Seed Capital*** 2,250,000.00 - -

Total Other Cash Inflows 22,500,000.00 - -

Total Cash Inflow 30,858,700.00 25,658,200.00 49,611,700.00

Less: Cash Outflows

Cost of Sales 9,686,160.00 18,662,040.00 28,387,680.00

Overhead Cost 7,324,900.00 9,590,700.00 9,590,700.00

Operating Cash Outflow 17,011,060.00 28,252,740.00 37,978,380.00

KH Strategy and Ecosystem Research**** 2,250,000.00 - -

TDF Seed Capital**** 900,000.00 1,350,000.00 -

Other Cash Outflows 3,150,000.00 1,350,000.00 -

Total Cash Outflow 20,161,060.00 29,602,740.00 37,978,380.00

Net Cash Flow 10,697,640.00 (3,944,540.00) 11,633,320.00

Cash Balance 10,697,640.00 6,753,100.00 18,386,420.00

Notes:

*70% collected on Revenue for Year 1, Year 2 & Year 3

**30% of Revenue collected for A/R

***Capital Investment components from ADB: KH Investment, KH Strategy and Ecosystem Research, TDF Seed Capital

****Assuming KH Strategy and Ecosystem Research consume on Year 1

****Assuming 40% of TDF Seed capital consumed on year 1; 60% of TDF Seed capital consumed on year 2

IRR Calculation Y0 Y1 Y2 Y3 Y4 Y5

Net Cash Flows (22,500,000.00) (11,802,360.00) (3,944,540.00) 11,633,320.00 17,449,980.00 26,174,970.00

IRR Y2 IRR Y3 IRR Y4 IRR Y5

IRR #VALUE! -40% -9% 10%

Remarks

From Projections:

ADB Investment

From Projections:

Net cash flow from

operations

From Projections:

No IRR as no

positive income

From Projections:

Net cash flow from

operations

Assumption for

cashflow growth is

1.5x Y3 net

cashflow

Assumption for

cashflow growth is

1.5x Y4 net

cashflow

YEAR 1 YEAR 2 YEAR 3

Operational

Other Cash Inflows

Page 352: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 7

Table 1 - 4. Revenues

Revenue Target 10,000,000.00 Yearly

Respondent Data Set 124 Schools

Volume Value Volume Value Volume Value

Membership 3,124,000.00 7,542,000.00 12,976,000.00

Institutional 620,000.00 1,550,000.00 2,480,000.00 Schools 10,000.00 1,000 62 620,000.00 155 1,550,000.00 248 2,480,000.00 Employers 5,000.00 2,000 - - - CSOs 5,000.00 2,000 4 20,000.00 8 40,000.00 16 80,000.00

Individuals 2,484,000.00 5,952,000.00 10,416,000.00 Teachers 500.00 20,000 - - - Students 200.00 50,000 9,920 1,984,000.00 29,760 5,952,000.00 52,080 10,416,000.00 Professionals (Continuing education fo 1,000.00 10,000 500 500,000.00 - -

Membership Services 8,197,000.00 22,445,000.00 41,402,000.00

TeachersTraining 28,000.00 357 62 1,736,000.00 155 4,340,000.00 248 6,944,000.00 Content & Merchandise 2,000.00 5,000 310 620,000.00 775 1,550,000.00 1,240 2,480,000.00 Certification 100.00 100,000 310 31,000.00 7,750 775,000.00 1,240 124,000.00

Students

Content & Merchandise-Students 500.00 20,000 9,920 4,960,000.00 29,760 14,880,000.00 52,080 26,040,000.00 Internship 100.00 100,000 1,000 500,000 2,000 200,000.00 12,920 1,292,000.00 Placement 500.00 20,000 700 350,000.00 1,400 700,000.00 9,044 4,522,000.00

Advertising 100,000.00 100 - - 5 500,000.00

Employers' Subscription 10,000.00 1,000 62 620,000.00 155 1,550,000.00 248 2,480,000.00

Revenue Totals 11,941,000.00 31,537,000.00 57,358,000.00

Year 3

Streams Price Point Sole Source

Year 1 Year 2

Assumptions: 1. Faculty Training is 5 Trainees per School 2. Content and merchandising are: costs of books/manuals to be sold

a. For students are textbooks b. For Teachers are manuals

3. Students=35 students/per term 4. Teachers: SMP has 5 subjects to be taught

Page 353: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

8 Section 1: Financial Analysis

Table 1 - 5. Cost of Services/Direct Cost

Year 1 Year 2 Year 3

1 Payroll 5,976,000.00 8,300,000.00 8,300,000.00

2 Training* 920,160 2,147,040.00 5,827,680.00

3 Contents and Merchandise-Teacher 310,000 775,000.00 1,240,000.00

4 Contents and Merchandise-Student 2,480,000 7,440,000.00 13,020,000.00

Total 9,686,160.00 18,662,040.00 28,387,680.00

Cost Centers

*Training Costs - (separate Annex Section)

Table 1 - 6. Staffing/Human Resource Cost

# Amount # Amount # Amount # Amount

Knowledge Hub Le 1 200,000.00 200,000.00 - - 1 200,000.00 1 200,000.00 Managers-Core 1 100,000.00 100,000.00 - 1 100,000.00 - - Manager-Operatio 2 80,000.00 160,000.00 - - 1 80,000.00 2 160,000.00 Officers 5 40,000.00 200,000.00 1 40,000.00 3 120,000.00 2 80,000.00 2 80,000.00 Staff Support 6 20,000.00 120,000.00 1 20,000.00 3 60,000.00 - 3 60,000.00 Total Month Payrol 15 780,000.00 2 60,000.00 7 280,000.00 4 360,000.00 8 500,000.00 Annual Payroll 10,140,000.00 780,000.00 3,640,000.00 4,680,000.00 6,500,000.00 Benefits 2,808,000.00 216,000.00 1,008,000.00 1,296,000.00 1,800,000.00

Total Annual Staffing Cost 12,948,000.00 996,000.00 4,648,000.00 5,976,000.00 8,300,000.00

Years 2 and 3Years 2 and 3Year 1

Program Operations (Cost of Services)Program Management (Expense)

Positions # Rate/ Month Amount Year 1

Page 354: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 9

Table 1 - 7. Capital Expenditure

Purchased Leased

Line Item Direct Capitalization Cost (Monthly) Y1 Y2&3

Internet & Telecoms

E1 Dedicated Leased Line* 36,000.00 432,000.00 432,000.00

Unified Communication Service 1,500.00 108,000.00 270,000.00

Mobile Devices

Managers 2,000.00 48,000.00 96,000.00

Officers 1,500.00 72,000.00 126,000.00

Staff 1,000.00 0 48,000.00

Software & Services

Productivity Software (MS Office) 15,000.00 3,000.00 18,000.00 45,000.00

Design Suite Package (Adobe Creative S 120,000.00 2,300.00 27,600.00 55,200.00

Financial Software (Accounting and Payro 75,000.00 5,000.00 60,000.00 60,000.00

Communication Suite (Google Apps) 2,500.00 15,000.00 37,500.00

Web Hosting and Domain* 5,000.00 5,000.00 5,000.00

785,600.00 1,174,700.00

Y1 Y2&3

Technology Equipment

Laptop Computers 35,000.00 910,000.00 315,000.00

Laser Printer (2) 36,000.00 72,000.00

LCD Projectors

Other Office Equipment

Binding and Cutting Equipment 10,000.00 10,000.00

Presenter (3 @ 3,000.00) 9,000.00 3,000.00 6,000.00

Digital Camera(1 @ 10000.00) 10,000.00 10,000.00

LCD Projectors (2) 47,000.00 23,500.00 47,000.00

Digital Recorder (3) 18,000.00 6,000.00 12,000.00

HD Video/ Digital Camera 120,000.00 - 120,000.00

Balance of Capex for Purchase 214,000.00 1,034,500.00 500,000.00

Total Subscriptions

Total Cost of Equipment

Assumption:

1. Item is f ixed annual cost 2. Printer: Ideally 5 users/ printer

Page 355: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

10 Section 1: Financial Analysis

Table 1 - 8. Overhead Cost on Office Operations

Office Space 100 Sqm

Yr 1 Year 2 & 3

1 Payroll 996,000.00 4,648,000.00

2 Office Rent (with 1 mtg room) 1,320,000.00 1,320,000.00 Fit-Out 1,500,000.00

3 Utilities (Aircon, Light and Water) 21,600.00 21,600.00

4 Subscriptions (internet, communications…) 785,600.00 1,174,700.00

5 Supplies 120,000.00 120,000.00

6 Meetings and Representation 192,000.00 192,000.00

7 Marketing 1,000,000.00 1,000,000.00 8 Local Transportation 120,000.00 144,000.00 9 National Travel 235,200.00 470,400.00

Total 6,290,400.00 9,090,700.00

# Plus Capex 1,034,500.00 500,000.00

Total Overhead 7,324,900.00 9,590,700.00

Unit Price Monthly

A. Office Rent (with 1 mtg room) 1000 100,000.00

CUSA (Common Use Service Area) 50 5,000.00Parking 5000 5,000.00

Total 110,000.00

B.. Utilities

Aircon 176 17,600.00

Light and Water 40 4,000.00

21,600.00

Operating & admin cost

Computation of

Assumption:

1. Office Space -Assuming that the total w orking space is 75 sq. m; Parking is f ixed cost 2. Utilities - computed on rate per square meter 3. Office Supplies - Assuming that 10k f ixed expense on each month 4. Meetings -Assuming 10 persons given rate on each is Php 200.00, tw ice a w eek. Computed on a

monthly basis.

Page 356: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 11

Table 1 - 9. National Travel Cost Summary Projection

Year 1 Year 2 Year 3

Targeted No. of Schools 62 124 248

No. of Trip on Cebu/Davao 8 16 32

No. of Trip on Luzon 10 20 40

National Travel-Airfare 160,000.00 320,000.00 640,000.00

Per Diem 11,200.00 22,400.00 44,800.00

Land Travel 40,000.00 80,000.00 160,000.00

Accommodation 24,000.00 48,000.00 96,000.00

Total Travel Cost 235,200.00 470,400.00 940,800.00

Assumption:

1. Assuming tw o (2) staff w ill travel for 3 year projections 2. Airfare travel cost is 10,000 for Round Trip Ticket 3. Per Diem Allow ance - Php 700.00 4. Land Travel cost is Php 4,000 per trip 5. Accommodation - Php 1,500 per night

Page 357: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Section 1: Financial Analysis 12

Table 1 - 10. Objectives

Revenue Target 10,000,000.00

Respondent Data Set 124

Year 1 Year 2 Year 3 Computation

50% 125% 200%

Institutional Membership

Schools 62 155 248 Additional 75% on target yearly

CSOs 4 8 16 Double targets every year

Individual membership

Students 9,920 29,760 52,080 Yr: 3 subjects

Professionals 500 (Continuing education for BPO workers)

Membership Services

Teachers

Training 310 155 248 (No. of HEIs x 5 subjects)

Content & Merchandise 310 775 1,240 (No. of HEIs x 5 subjects)

Certification 310 7,750 1,240 (No. of HEIs x 5 subjects)

Students

Content & Merchandise 9,920 29,760 52,080 (No. of HEI x 40 students/class x 2 subjects x 2 terms)

Internship 1,000 2,000.0 12,920 Year 1-2 CHED SUCs; Year 3 ADB HEIs

Placement 700 1,400 9,044 70% of Interns

Advertising 5

Employers' Subscription 62 124 248 Ratio 1:1 (One Employer for every HEI)

Revenue Streams

Page 358: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 13

Section 2: Breakeven Scenario

Page 359: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

14 Section 2: Breakeven Scenario

Table 2 - 1. General Assumptions for Funding

Year 1 Year 2 Year 3Net Profit/ (Loss) (5,070,060.00) - 16,651,157.85

Capital InvestmentKH Investment 20,250,000.00 20,250,000.00 20,250,000.00 KH Strategy and Ecosystem Research 2,250,000.00 2,250,000.00 2,250,000.00

Total KH Capital Investment 22,500,000.00 22,500,000.00 22,500,000.00

Return on Investment -23% 0% 74%

Table 2 - 2. KH Project Profit/ Loss Projection Summary

Year 1 Year 2 Year 3Revenue 11,941,000.00 27,115,880.77 53,113,725.54

Less: Cost of Sales/ Services 9,686,160.00 17,525,180.77 26,871,867.69 Gross Margin 19% 35% 49%

Operating Revenues 2,254,840.00 9,590,700.00 26,241,857.85

Overhead Cost

996,000.00 4,648,000.00 4,648,000.00 1,320,000.00 1,320,000.00 1,320,000.00

1,500,000.00 - - 21,600.00 21,600.00 21,600.00

785,600.00 1,174,700.00 1,174,700.00 120,000.00 120,000.00 120,000.00 192,000.00 192,000.00 192,000.00

1,000,000.00 1,000,000.00 1,000,000.00 120,000.00 144,000.00 144,000.00 235,200.00 470,400.00 470,400.00

Equipment 1,034,500.00 500,000.00 500,000.00 Total Overhead Cost 7,324,900.00 9,590,700.00 9,590,700.00

Net Profit/ (Loss) (5,070,060.00) - 16,651,157.85

Year 1 Year 2 Year 3Net Profit/ (Loss) (5,070,060.00) - 16,651,157.85

Account Items

Office RentPayroll

Utilities (Aircon, Light and Subscriptions (internet,

Office Fit-out

Office SuppliesMeetings and RepresentationMarketing Local TransportationNational Travel

Page 360: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 15

Table 2 - 3. Projected KH Cash Flow

Cash from Operations* 8,358,700.00 18,981,116.54 37,179,607.88

Cash from Receivables** - 3,582,300.00 8,134,764.23

Operating Cash Inflow 8,358,700.00 22,563,416.54 45,314,372.11

KH Investment*** 18,000,000.00 - -

KH Strategy and Ecosystem Research*** 2,250,000.00 - -

TDF Seed Capital*** 2,250,000.00 - -

Total Other Cash Inflows 22,500,000.00 - -

Total Cash Inflow 30,858,700.00 22,563,416.54 45,314,372.11

Less: Cash Outflows

Cost of Sales 9,686,160.00 17,525,180.77 26,871,867.69

Overhead Cost 7,324,900.00 9,590,700.00 9,590,700.00

Operating Cash Outflow 17,011,060.00 27,115,880.77 36,462,567.69

KH Strategy and Ecosystem Research**** 2,250,000.00 - -

TDF Seed Capital**** 900,000.00 1,350,000.00 -

Other Cash Outflows 3,150,000.00 1,350,000.00 -

Total Cash Outflow 20,161,060.00 28,465,880.77 36,462,567.69

Net Cash Flow 10,697,640.00 (5,902,464.23) 8,851,804.42

Cash Balance 10,697,640.00 4,795,175.77 13,646,980.18

Notes:

*70% collected on Revenue for Year 1, Year 2 & Year 3

**30% of Revenue collected for A/R

***Capital Investment components from ADB: KH Investment, KH Strategy and Ecosystem Research, TDF Seed Capital

****Assuming KH Strategy and Ecosystem Research consume on Year 1

****Assuming 40% of TDF Seed capital consumed on year 1; 60% of TDF Seed capital consumed on year 2

IRR Calculation Y0 Y1 Y2 Y3 Y4 Y5

Net Cash Flows (22,500,000.00) (11,802,360.00) (5,902,464.23) 8,851,804.42 13,277,706.62 19,916,559.93

IRR Y2 IRR Y3 IRR Y4 IRR Y5

IRR N/A -50% -18% 1%

Remarks

From Projections: ADB Investment

From Projections: Net cash flow from operations

From Projections: No IRR as no positive income

From Projections: Net cash flow from operations

Assumption for cashflow growth is 1.5x Y3 net cashflow

Assumption for cashflow growth is 1.5x Y4 net cashflow

YEAR 1 YEAR 2 YEAR 3

Operational

Other Cash Inflows

Page 361: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Section 2: Breakeven Scenario 16

Table 2 - 4. Revenues

Revenue Target 10,000,000.00 Yearly

Respondent Data Set 124 Schools

Volume Value Volume Value Volume Value

Membership 3,124,000.00 6,480,931.38 11,763,350.15

Institutional 620,000.00 1,297,364.62 2,480,000.00 Schools 10,000.00 1,000 62 620,000.00 130 1,297,364.62 248 2,480,000.00 Employers 5,000.00 2,000 - - - CSOs 5,000.00 2,000 4 20,000.00 8 40,000.00 16 80,000.00

Individuals 2,484,000.00 5,143,566.77 9,203,350.15 Teachers 500.00 20,000 - - - Students 200.00 50,000 9,920 1,984,000.00 25,718 5,143,566.77 46,017 9,203,350.15 Professionals (Continuing education fo 1,000.00 10,000 500 500,000.00 - -

Membership Services 8,197,000.00 19,337,584.77 38,370,375.38

TeachersTraining 28,000.00 357 62 1,736,000.00 130 3,632,620.92 248 6,944,000.00 Content & Merchandise 2,000.00 5,000 310 620,000.00 649 1,297,364.62 1,240 2,480,000.00 Certification 100.00 100,000 310 31,000.00 6,487 648,682.31 1,240 124,000.00

Students

Content & Merchandise-Students 500.00 20,000 9,920 4,960,000.00 25,718 12,858,916.92 46,017 23,008,375.38 Internship 100.00 100,000 1,000 500,000 2,000 200,000.00 12,920 1,292,000.00 Placement 500.00 20,000 700 350,000.00 1,400 700,000.00 9,044 4,522,000.00

Advertising 100,000.00 100 - - 5 500,000.00

Employers' Subscription 10,000.00 1,000 62 620,000.00 130 1,297,364.62 248 2,480,000.00

Revenue Totals 11,941,000.00 27,115,880.77 53,113,725.54

Year 3

Streams Price Point Sole Source

Year 1 Year 2

Assumptions: 5. Faculty Training is 5 Trainees per School 6. Content and merchandising are: costs of books/manuals to be sold

a. For students are textbooks b. For Teachers are manuals

7. Students=35 students/per term 8. Teachers: SMP has 5 subjects to be taught

Page 362: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 17

Table 2 - 5. Cost of Services/Direct Cost

Year 1 Year 2 Year 3

1 Payroll 5,976,000.00 8,300,000.00 8,300,000.00

2 Training* 920,160 2,147,040.00 5,827,680.00

3 Contents and Merchandise-Teacher 310,000 648,682.31 1,240,000.00

4 Contents and Merchandise-Student 2,480,000 6,429,458.46 11,504,187.69

Total 9,686,160.00 17,525,180.77 26,871,867.69

Cost Centers

*Training Costs - (separate Annex Section)

Table 2 - 6. Staffing/Human Resource Cost

# Amount # Amount # Amount # Amount

Knowledge Hub Lead 1 200,000.00 200,000.00 - - 1 200,000.00 1 200,000.00

Managers-Core 1 100,000.00 100,000.00 - 1 100,000.00 - -

Manager-Operations 2 80,000.00 160,000.00 - - 1 80,000.00 2 160,000.00

Officers 5 40,000.00 200,000.00 1 40,000.00 3 120,000.00 2 80,000.00 2 80,000.00

Staff Support 6 20,000.00 120,000.00 1 20,000.00 3 60,000.00 - 3 60,000.00

Total Month Payroll 15 780,000.00 2 60,000.00 7 280,000.00 4 360,000.00 8 500,000.00

Annual Payroll 10,140,000.00 780,000.00 3,640,000.00 4,680,000.00 6,500,000.00 Benefits 2,808,000.00 216,000.00 1,008,000.00 1,296,000.00 1,800,000.00

Total Annual Staffing Cost 12,948,000.00 996,000.00 4,648,000.00 5,976,000.00 8,300,000.00

Positions # Rate/ Month Amount Year 1 Years 2 and 3Years 2 and 3Year 1

Program Operations (Cost of Services)Program Management (Expense)

Page 363: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

18 Section 2: Breakeven Scenario

Table 2 - 7. Capital Expenditure

Purchased Leased

Line Item Direct Capitalization Cost (Monthly) Y1 Y2&3

Internet & Telecoms

E1 Dedicated Leased Line* 36,000.00 432,000.00 432,000.00

Unified Communication Service 1,500.00 108,000.00 270,000.00

Mobile Devices

Managers 2,000.00 48,000.00 96,000.00

Officers 1,500.00 72,000.00 126,000.00

Staff 1,000.00 0 48,000.00

Software & Services

Productivity Software (MS Office) 15,000.00 3,000.00 18,000.00 45,000.00

Design Suite Package (Adobe Creative S 120,000.00 2,300.00 27,600.00 55,200.00

Financial Software (Accounting and Payro 75,000.00 5,000.00 60,000.00 60,000.00

Communication Suite (Google Apps) 2,500.00 15,000.00 37,500.00

Web Hosting and Domain* 5,000.00 5,000.00 5,000.00

785,600.00 1,174,700.00

Y1 Y2&3

Technology Equipment

Laptop Computers 35,000.00 910,000.00 315,000.00

Laser Printer (2) 36,000.00 72,000.00

LCD Projectors

Other Office Equipment

Binding and Cutting Equipment 10,000.00 10,000.00

Presenter (3 @ 3,000.00) 9,000.00 3,000.00 6,000.00

Digital Camera(1 @ 10000.00) 10,000.00 10,000.00

LCD Projectors (2) 47,000.00 23,500.00 47,000.00

Digital Recorder (3) 18,000.00 6,000.00 12,000.00

HD Video/ Digital Camera 120,000.00 - 120,000.00

Balance of Capex for Purchase 214,000.00 1,034,500.00 500,000.00

Total Subscriptions

Total Cost of Equipment

Assumption:

3. Item is f ixed annual cost 4. Printer: Ideally 5 users/ printer

Page 364: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 19

Table 2 - 8. Overhead Cost on Office Operations

Office Space 100 Sqm

Yr 1 Year 2 & 3

1 Payroll 996,000.00 4,648,000.00

2 Office Rent (with 1 mtg room) 1,320,000.00 1,320,000.00 Fit-Out 1,500,000.00

3 Utilities (Aircon, Light and Water) 21,600.00 21,600.00

4 Subscriptions (internet, communications…) 785,600.00 1,174,700.00

5 Supplies 120,000.00 120,000.00

6 Meetings and Representation 192,000.00 192,000.00

7 Marketing 1,000,000.00 1,000,000.00 8 Local Transportation 120,000.00 144,000.00 9 National Travel 235,200.00 470,400.00

Total 6,290,400.00 9,090,700.00

# Plus Capex 1,034,500.00 500,000.00

Total Overhead 7,324,900.00 9,590,700.00

Unit Price Monthly

A. Office Rent (with 1 mtg room) 1000 100,000.00

CUSA (Common Use Service Area) 50 5,000.00Parking 5000 5,000.00

Total 110,000.00

B.. Utilities

Aircon 176 17,600.00

Light and Water 40 4,000.00

21,600.00

Operating & admin cost

Computation of

Assumption:

5. Office Space -Assuming that the total w orking space is 75 sq. m; Parking is f ixed cost 6. Utilities - computed on rate per square meter 7. Office Supplies - Assuming that 10k f ixed expense on each month 8. Meetings -Assuming 10 persons given rate on each is Php 200.00, tw ice a w eek. Computed on a

monthly basis.

Page 365: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

20 Section 2: Breakeven Scenario

Table 2 - 9. National Travel Cost Summary Projection

Year 1 Year 2 Year 3

Targeted No. of Schools 62 124 248

No. of Trip on Cebu/Davao 8 16 32

No. of Trip on Luzon 10 20 40

National Travel-Airfare 160,000.00 320,000.00 640,000.00

Per Diem 11,200.00 22,400.00 44,800.00

Land Travel 40,000.00 80,000.00 160,000.00

Accommodation 24,000.00 48,000.00 96,000.00

Total Travel Cost 235,200.00 470,400.00 940,800.00

Assumption:

6. Assuming tw o (2) staff w ill travel for 3 year projections 7. Airfare travel cost is 10,000 for Round Trip Ticket 8. Per Diem Allow ance - Php 700.00 9. Land Travel cost is Php 4,000 per trip 10. Accommodation - Php 1,500 per night

Page 366: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 21

Table 1 - 11. Objectives

Revenue Target 10,000,000.00

Respondent Data Set 124

Year 1 Year 2 Year 3 Computation

50% 125% 200%

Institutional Membership

Schools 62 155 248 Additional 75% on target yearly

CSOs 4 8 16 Double targets every year

Individual membership

Students 9,920 29,760 52,080 Yr: 3 subjects

Professionals 500 (Continuing education for BPO workers)

Membership Services

Teachers

Training 310 155 248 (No. of HEIs x 5 subjects)

Content & Merchandise 310 775 1,240 (No. of HEIs x 5 subjects)

Certification 310 7,750 1,240 (No. of HEIs x 5 subjects)

Students

Content & Merchandise 9,920 29,760 52,080 (No. of HEI x 40 students/class x 2 subjects x 2 terms)

Internship 1,000 2,000.0 12,920 Year 1-2 CHED SUCs; Year 3 ADB HEIs

Placement 700 1,400 9,044 70% of Interns

Advertising 5

Employers' Subscription 62 124 248 Ratio 1:1 (One Employer for every HEI)

Revenue Streams

Page 367: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Section 2: Breakeven Scenario 22

Section 3: Training Costs

Page 368: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 23

Summary of Training Revenue & Cost (3 Year Projection) Table 3 - 1.

worst case base case base case base case

Training Revenue 700,000 1,736,000 3,472,000 9,464,000

Trainer Cost:

Trainer Professional Fee 140,000.00 420,000.00 980,000.00 2,660,000.00

Travel 40,000.00 120,000.00 280,000.00 760,000.00

Accommodation 42,000.00 126,000.00 294,000.00 798,000.00

Per Diem 19,600.00 58,800.00 137,200.00 372,400.00

Meals 14,000.00 42,000.00 98,000.00 266,000.00

Total Training Cost (Direct) 255,600.00 766,800.00 1,789,200.00 4,856,400.00

20% PM Cost 153,360.00 357,840.00 971,280.00

Total Training Cost 920,160.00 2,147,040.00 5,827,680.00

Net Training Revenue 444,400.00 815,840.00 1,324,960.00 3,636,320.00

year 1 year 2 year 3

Assumption:

1. Assuming Php28k cost per school on complete SMP Track training 2. Combine BPO101 & 102 Training--10 days; BusCom--6 days; Service Culture--6 days and Systems Thinking--6 days 3. Trainer Prof Fee--Php 5,000.00 4. Round Trip ticket for National Travel f ixed on Php 10,000 5. Accommodation--Php 1,500 per night 6. Per Diem Allow ance--Php 700.00 per day 7. Meals include one (1) lunch and one (1) merienda for the cost of Php 500.00 per day

Page 369: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Section 2: Breakeven Scenario 24

Year 1 Worst Case (25 HEIs) Table 3 - 2.

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) TOTAL

Training Revenue 250,000.00 150,000.00 150,000.00 150,000.00 700,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 163,000.00 93,800.00 93,800.00 93,800.00 444,400.00

Page 370: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 25

Year 1 Base Case (62 HEIs) Table 3 - 3.

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL GRAND TOTAL

Training Revenue 200,000.00 120,000.00 120,000.00 120,000.00 560,000.00 1,120,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00 280,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00 80,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00 84,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00 39,200.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00 28,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00 511,200.00

Net Training Revenue 113,000.00 63,800.00 63,800.00 63,800.00 304,400.00 608,800.00

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

Training Revenue 220,000.00 132,000.00 132,000.00 132,000.00 616,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 133,000.00 75,800.00 75,800.00 75,800.00 360,400.00

CLASS OF 20 TEACHERS

CLASS OF 22 TEACHERS

Page 371: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Section 2: Breakeven Scenario 26

Year 1 Best Case (74 HEIs, 3 Classes) Table 3 - 4.

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

GRAND

TOTAL (3

CLASSES)

Training Revenue 200,000.00 120,000.00 120,000.00 120,000.00 560,000.00 1,680,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00 420,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00 120,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00 126,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00 58,800.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00 42,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00 766,800.00

Net Training Revenue 113,000.00 63,800.00 63,800.00 63,800.00 304,400.00 913,200.00

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

Training Revenue 140,000.00 84,000.00 84,000.00 84,000.00 392,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 53,000.00 27,800.00 27,800.00 27,800.00 136,400.00

CLASS OF 20 TEACHERS

CLASS OF 14 TEACHERS

Page 372: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 27

Year 2 Worst Case (28 HEIs) Table 3 - 5.

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) TOTAL

Training Revenue 150,000.00 90,000.00 90,000.00 90,000.00 420,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 63,000.00 33,800.00 33,800.00 33,800.00 164,400.00

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) TOTAL

Training Revenue 130,000.00 78,000.00 78,000.00 78,000.00 364,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 43,000.00 21,800.00 21,800.00 21,800.00 108,400.00

CLASS OF 15 TEACHERS

CLASS 2 OF 13 TEACHERS

Page 373: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Section 2: Breakeven Scenario 28

Page 374: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 29

Year 2 Base Case (124 HEIs) Table 3 - 6.

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

GRAND

TOTAL (6

CLASSES)

Training Revenue 180,000.00 108,000.00 108,000.00 108,000.00 504,000.00 3,024,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00 840,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00 240,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00 252,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00 117,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00 84,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00 1,533,600.00

Net Training Revenue 93,000.00 51,800.00 51,800.00 51,800.00 248,400.00 1,490,400.00

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

Training Revenue 160,000.00 96,000.00 96,000.00 96,000.00 448,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 73,000.00 39,800.00 39,800.00 39,800.00 192,400.00

CLASS OF 18 TEACHERS

CLASS OF 16 TEACHERS

Page 375: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Section 2: Breakeven Scenario 30

Year 2 Best Case (89 HEIs, 4 Classes) Table 3 - 7.

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

GRAND

TOTAL (3

CLASSES)

Training Revenue 220,000.00 132,000.00 132,000.00 132,000.00 616,000.00 1,848,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00 420,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00 120,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00 126,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00 58,800.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00 42,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00 766,800.00

Net Training Revenue 133,000.00 75,800.00 75,800.00 75,800.00 360,400.00 1,081,200.00

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

Training Revenue 230,000.00 138,000.00 138,000.00 138,000.00 644,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 143,000.00 81,800.00 81,800.00 81,800.00 388,400.00

CLASS OF 22 TEACHERS

CLASS OF 23 TEACHERS

Page 376: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 31

Year 3 Worst Case (31 HEIs) Table 3 - 8.

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) TOTAL

Training Revenue 150,000.00 90,000.00 90,000.00 90,000.00 420,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 63,000.00 33,800.00 33,800.00 33,800.00 164,400.00

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) TOTAL

Training Revenue 160,000.00 96,000.00 96,000.00 96,000.00 448,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 73,000.00 39,800.00 39,800.00 39,800.00 192,400.00

CLASS OF 15 TEACHERS

CLASS OF 16 TEACHERS

Page 377: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Section 2: Breakeven Scenario 32

Page 378: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Annex A: Financials 33

Year 3 Base Case (248 HEIs) Table 3 - 9.

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

GRAND

TOTAL (2

CLASSES)

Training Revenue 180,000.00 108,000.00 108,000.00 108,000.00 504,000.00 9,072,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00 2,520,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00 720,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00 756,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00 352,800.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00 252,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00 4,600,800.00

Net Training Revenue 93,000.00 51,800.00 51,800.00 51,800.00 248,400.00 4,471,200.00

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

Training Revenue 140,000.00 84,000.00 84,000.00 84,000.00 392,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 53,000.00 27,800.00 27,800.00 27,800.00 136,400.00

CLASS OF 18 TEACHERS

CLASS OF 14 TEACHERS

Page 379: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Section 2: Breakeven Scenario 34

Year 3 Best Case (107 HEIs, 5 Classes) Table 3 - 10.

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

GRAND

TOTAL (4

CLASSES)

Training Revenue 210,000.00 126,000.00 126,000.00 126,000.00 588,000.00 2,352,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00 560,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00 160,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00 168,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00 78,400.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00 56,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00 1,022,400.00

Net Training Revenue 123,000.00 69,800.00 69,800.00 69,800.00 332,400.00 1,329,600.00

BPO101 & 102 (10

DAYS)

BUSCOMM (6

DAYS)

SERVICE

CULTURE (6

DAYS)

SYSTEMS

THINKING (6

DAYS) SUB-TOTAL

Training Revenue 230,000.00 138,000.00 138,000.00 138,000.00 644,000.00

Trainer Cost:

Trainer Professional Fee 50,000.00 30,000.00 30,000.00 30,000.00 140,000.00

Travel 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00

Accommodation 15,000.00 9,000.00 9,000.00 9,000.00 42,000.00

Per Diem 7,000.00 4,200.00 4,200.00 4,200.00 19,600.00

Meals 5,000.00 3,000.00 3,000.00 3,000.00 14,000.00

Total Training Cost 87,000.00 56,200.00 56,200.00 56,200.00 255,600.00

Net Training Revenue 143,000.00 81,800.00 81,800.00 81,800.00 388,400.00

CLASS OF 21 TEACHERS

CLASS OF 23 TEACHERS

Page 380: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 35

ANNEX B: Detailed Job Descriptions

Page 381: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

36 Annex B

Year 1 Organization Structure

Page 382: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 37

Chief Executive Officer for the Knowledge Hub

JOB DESCRIPTION 1.0 Overall Responsibilities: The chief executive officer (CEO) ranks as the highest senior executive in charge of overseeing the entire operation of the Knowledge Hub (KH). The primary responsibility of the CEO is to direct the organization, including guiding senior level KH officials towards the achievement of its vision and mission and working towards both internal and external objectives to sustaining the organization’s growth. As the primary person responsible for the success of the KH business, the CEO assures the organization’s relevance to the IT-BPM and Education sectors, the accomplishment of its mission and vision and the accountability to a diverse set of stakeholders that includes students, IT-BPM employees, alumni of the SMP Program and other IT-BPM courses, government senior education policy makers and managers, IT-BPM firms, IT-BPM industry associations, civil society groups, local government and the general public. Specifically, the CEO plans and directs all aspects of an organization's operations, policies, objectives, and initiatives, oversees the organization's membership, scholarship and other programs, projects, curriculum development initiatives, marketing, finance and accounting, HR and general administration functions. In addition, this individual is also responsible for strategically managing the KH internal and external clients. 2.0 Scope of Work

The tasks to be carried out are detailed below:

Task 1 Strategy and Planning Determines the KH values, mission, vision, and short- and long-term goals. Monitor and evaluate the KH relevancy to the IT-BPM and Education sectors, including its,

effectiveness, and the results of its operations. Keep the Board of Directors and IBPAP senior managers and stakeholders fully informed on

the condition of KH and on all the important factors influencing or affecting its operations. Identifies problems and opportunities and addresses them; brings those which are

appropriate to the Board and, facilitates discussion and deliberation. Informs the Board about trends, issues, problems and activities in order to facilitate policy-

making. Recommends policy positions.

Task 2 Management and Administration

Provides general oversight of all KH activities, manages the day-to-day operations, and assures a smoothly functioning, efficient organization.

Assures program quality and organizational stability through development and implementation of standards and controls, systems and procedures, and regular evaluation.

Assures a work environment that recruits, retains and supports quality staff and volunteers. Assures process for selecting, development, motivating, and evaluating staff.

Recommends staffing and financing to the Board. In accordance with Board approval, recruits personnel, negotiates professional contracts, and sees that appropriate salary structures are developed and maintained.

Specifies accountabilities for management and evaluates performance regularly.

Page 383: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

38 Annex B

Task 3 Governance Helps the Board articulate the KH’s own role and accountabilities and helps evaluate

performance regularly. Works with the Board to enable the Board and all senior managers to fulfill their governance

functions Focuses the KH attention on long-range strategic issues. Manages the KH’s due diligence process to assure timely attention to core issues.

Task 4 Legal Compliance

Assures the filing of all legal and regulatory documents and monitors compliance with relevant rules, laws and regulations.

Task 5 Financing

Promotes programs and services that are produced in a cost-effective manner, employing economy while maintaining an acceptable level of quality.

Oversees the fiscal activities of the organization including budgeting, reporting and audit. Works with Board to ensure financing to support short- and long-term goals. Assures an effective fund development program by serving as the chief development officer

or hiring and supervising an individual responsible for this activity. Participates actively in identifying, cultivating and soliciting multilateral/ bilateral donor

prospects. Assures the development and operation of management systems and reports for quality

decision-making.

Task 6 Stake Holder Management

Facilitates the integration of the KH into the IT-BPM and Education sectors by using effective marketing and communications activities.

Acts as an advocate, within the public and private sectors, for issues relevant to the KH, its services and constituencies.

Listens to clients, suppliers, donors and the government at large in order to improve services and generate stakeholder involvement.

Serves as chief spokesperson for the KH, assuring proper representation of the KH in different fora and events.

Initiates, develops, and maintains cooperative relationships with all its organizational constituencies.

Works with a diverse set of stakeholders including legislators, regulatory agencies, suppliers and representatives of the not for- profit sector to promote or advocate on strengthening talent development regulatory policies that support a healthy IT-BPM business environment

Task 7 Risk Management

Define organizational-wide risk management objectives and ensure the implementation of risk management strategies and initiatives within the different areas of operations

Task 8 Accountability

IBPAP and KH senior management, KH clients’ senior management, senior managers of government regulatory agencies and policy making bodies, multilateral and bilateral agencies, IT-BPM senior officials, Industry association heads IT-BPM company representatives, school administrators, deans, faculty, student organizations, HR directors etc.

Page 384: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 39

3.0 Skills Requirement/ Educational Requirements

Formal Education & Certification. University degree in the field of business administration, finance, management, Information

technology or related field Master’s degree in Business Administration or any related field A minimum of 5 years in a senior executive management position and 5 years in direct

applicable work experience Knowledge & Experience

10-15 years’ experience in managerial/operation positions. Experience working with the government. Excellent knowledge of business theory, business processes, management, budgeting, and

business office operations. Good understanding of MIS systems design and functions Proven experience in operations planning, organization, and development. Superior understanding of project management principles. Excellent understanding of the organization’s goals and objectives. Superior ability to analyze and solve business problems. In-depth knowledge of applicable government education laws and regulation, not-for-profit

rules and regulations and multilateral and bilateral procedures and processes. Excellent understanding of human resource management principles, practices, and

procedures. Proven leadership ability. Ability to set and manage priorities judiciously.

Personal Attributes

Demonstrated competencies in four broad categories: commitment to results, business savvy, leading change and motivating

Brilliant strategist Systems thinker with a strong customer/service orientation. Goal driven and able to translate broad goals into achievable steps Excellent negotiating and leadership skills. Possesses the ability to Identify relevant information and helps transform this information

into individual and organizational knowledge and learning. Possesses experience in integrating and coordinating diverse areas of management. Is action oriented and innovative. Takes advantage of opportunities, is a self-starter and a team player Consistently displays integrity, models behavior, develops people, and builds teams. Deals effectively with demanding/challenging situations and designs and implements

interventions to address these. Effectively manages continuity, change and transition

Page 385: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

40 Annex B

Operations Manager

JOB DESCRIPTION

1.0 Overall Responsibilities The Operations Manager will be responsible for data entry, accounts payable, payroll, grant report entry, managing the organizations HR, helping and creating organizational and program budgets in collaboration with the ED and Program Direct, and other misc. tasks. Reporting to the ED and serving as a member of the Management Team along with the ED, Program Director and Development Director, this position's primary responsibility is ensuring organizational effectiveness by providing leadership for the organization's financial functions. Working with the management team, the position also contributes to the development and implementation of organizational strategies, policies and practices. This position will also interact with the Board of Directors. 2.0 Scope of Work

The tasks to be carried out are detailed below:

Task 1 Financial Management Direct annual budgeting and planning process for the organization's annual budget with ED Develop and manage annual budget Oversee monthly and quarterly assessments and forecasts of organization's financial

performance against budget, financial and operational goals. Oversee short and long-term financial and managerial reporting.

Managing day to day processing of accounts receivable and payable using QuickBooks, producing reports as requested.

Reconciling monthly activity, generating year-end reports, and fulfilling tax related requirements.

Assisting Executive Director and Board in creating annual organizational budget and monitoring cash flow.

Managing grantor contracts and reimbursement requests. Maintaining Intersection's archival and administrative files. Administering payroll and employee benefits and organizational insurance. Ensure that Accounting Department requests are resolved and communicated in a timely

manner to internal and external parties. Develop long-range forecasts and maintain long-range financial plans. Develop, maintain and monitor all fundraising and accounting systems and procedures

capturing all pledges, billings and receipts and for the recording of all revenue transactions, recommend and implement improvements to systems.

Prepare annual audit and be a liaison with all outside vendor.

Task 2 Organizational Effectiveness

Manage functions. Increase the effectiveness and efficiency of Support Services through improvements to each

function (HR, IT, Finance) as well as coordination and communication between functions. Drive initiatives in the management team and organizationally that contribute to long-term

operational excellence. Providing consulting services on matters related to fundraising, tax and insurance questions,

and business structure and growth.

Page 386: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 41

Task 3 Organizational Leadership

Contribute to short and long-term organizational planning and strategy as a member of the management team

Task 4 Risk Management Serve as primary liaison to legal counsel in addressing legal issues e.g. copyright, antitrust,

governing instruments, partnerships, licensing etc. Oversee organizational insurance policies.

3.0 Skills Requirement/ Educational Requirements

Commitment to social justice and the mission At least 3 years’ experience in Financial Management Strong background and work experience in Finance Excellent computer skills and proficient in excel, word, outlook, and access Excellent communication skills both verbal and written 3 plus years’ experience in bookkeeping Knowledge of government contract management and +Knowledge and experience in

organizational effectiveness and operations management implementing best practices. Demonstrated leadership and vision in managing staff groups and major projects or

initiatives. Excellent interpersonal skills and a collaborative management style. Budget development and oversight experience A demonstrated commitment to high professional ethical standards and a diverse workplace Knowledge of tax and other compliance implications of non-profit status Excels at operating in an fast pace, community environment Excellent people manager, open to direction and +Collaborative work style and commitment

to get the job done Ability to challenge and debate issues of importance to the organization. Ability to look at situations from several points of view Persuasive with details and facts Delegate responsibilities effectively High comfort level working in a diverse environment

Page 387: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

42 Annex B

Administrative and Finance Manager

JOB DESCRIPTION

1.0 Overall Responsibilities: The Finance and Administration Manager is expected to drive best practices in financial management, human resources management and administrative management within the organization to maximize efficiency and growth. She/he will manage a team of 3 people and oversee financial management, investors’ relations, administration, human resources and compliance activities. 2.0 Scope of Work

The tasks to be carried out are detailed below: Task 1 Manage financial planning and investors relations

Prepare and maintain financial forecasts in consultation with the Executive Director and team leaders (including the annual budget and the medium term business plan)

Manage relationships with investors and support the Executive Director in designing and implementing appropriate financing tools for KH and its members

With support from a financial analyst, design appropriate financial due diligence procedures for members’ projects and perform financial assessment of these projects

Task 2 Manage financial monitoring and reporting

With support from the Finance and Administration Officer, ensure efficient financial monitoring and reporting (including monitoring expenses and revenues, reviewing and upgrading existing procedures, ensuring production of appropriate financial reports for internal and external clients)

With support from the Finance and Administration Officer, ensure high quality accounting (including overseeing day to day accounting, managing the year-end audit process)

Organize and prepare audit and finance committees meetings Task 3 Oversee general administration

With support from the Finance and Administration Officer and from the Compliance and Administration Officer, oversee office management duties

With support from the Finance and Administration Officer, manage the relationship with the information technology contractor

With support from the Compliance and Administration Officer, oversee travel arrangements and monitor travel expenditures

Task 4 Ensure compliance

With support from the Compliance and Administration Officer, ensure compliance with relevant local regulations

With support from the Compliance and Administration Officer, ensure compliance with internal policies, donors and investors’ requirements

Task 5 Manage Human Resources

Manage payroll related activities (including advising team leaders on appropriate salary levels, reviewing KH salary grid, overseeing pay outs to employees)

Develop and manage human resources procedures Support team leaders in relation to recruitment processes and human resources matters

Page 388: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 43

3.0 Skills Requirement/ Educational Requirements

Minimum 5 years in financial and administration management Previous experience in managing relations with investors Master’s degree in Finance or recognized professional certification (such as

CPA,ACCA,CMA, CFA) Knowledge of local accounting practices and relevant laws a plus Strong financial management skills Fluent English with excellent writing and verbal communication skills Excellent Excel skills Strong organizational and leadership skills At ease in working in a small structure, start-up-type, where tasks and responsibilities are in

constant move Able to operate in a multicultural environment High level of autonomy at work, yet with profound team-spirit Adaptive, Patient, resilient and flexible Pro-active and solutions oriented Fast learning and high reactivity Ability to work under time pressure

Page 389: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

44 Annex B

IT Officer

JOB DESCRIPTION

1.0 Overall Responsibilities: Assist technology users in identifying and implementing systems improvements. Administer database platforms and associated systems efficiently and effectively to ensure that The KH is able to meet its business requirements and goals. Provide technical support and advice to other Information Systems Team members and other Technology users. 2.0 Scope of Work

The tasks to be carried out are detailed below: Task 1 Business Analysis

To analyze business processes to ascertain their efficiency and effectiveness in delivering high-quality, value for money customer services

Gather data related to particular business issues and processes Analyze issues and processes Identify, develop and implement options that may resolve or improve the issue Provide a project co-ordination role in liaising with vendors' and staff in the areas of

development, acceptance and implementation of systems Prepare and maintain relevant systems documentation including the creation of Policies and

Procedures Promote the productive use of Information Management Systems throughout KH

Task 2 Database Administration

Provide database administration and support for the corporate systems running on SQL and Universe platforms

Ensure that day-to-day administrative activities are undertaken to maintain databases in a fully operational and stable state Undertake system monitoring and tuning to ensure optimum performance. Apply software upgrades and patches to the corporate systems and to server operating

systems and databases Review and maintain efficient and effective database backup procedures to enable the

provision of successful and accurate backups so that any data can be restored quickly and efficiently.

Maintain adequate security of data by implementing, monitoring and auditing appropriate security policies

Undertake upgrade and conversion projects as required Manage problems escalated to third-party suppliers/providers Actively contribute and participate in all disaster recovery processes Produce reports in line with performance indicators Prepare and maintain relevant systems documentation including the 'creation of policies and

procedures Task 3 Helpdesk Operations

As part of a team, provide a high level of user support through the provision of incident and problem management so that staff can make effective use of systems and equipment

Provide a professional, friendly and customer oriented approach at all times

Page 390: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 45

Task 4 Corporate Responsibilities

Develop and implement effective policies and procedures relating to new and existing information systems

Promote excellence in customer service and in conjunction with the Unit Manager, identify, review and implement strategies to improve service quality and efficiency

Maintain strong team relationships among colleagues and community groups, on a formal and informal basis, across all KH functions

Ensure the security of KH’s property and assets and maintain a commitment to the care of all KH’s property and assets

Participate as directed in training and education to maintain an up to date knowledge of emergency management responses

Provide administration, logistics and specialist support and advice during CEO identified emergency events

Comply with KH policies and procedures Task 5 General Responsibilities

Maintain relevant and up to date knowledge of business and information technology Provide input into, and assist with the implementation of, KH’s IT Strategy Attend relevant training programs approved by the Unit Manager

3.0 Skills Requirement/ Educational Requirements

The position requires skills and knowledge acquired through relevant work experience or the completion of a more formal qualification such as an Information Technology degree or diploma course

Knowledge of the administration MS SQL Server 2008 Experience in the use of PCs, operating systems, applications, network and communication

technologies Experience using SQL language Experience writing SQL reports Experience using process mapping software such as MS Visio Excellent interpersonal and communication skills, in order to establish rapport with internal

customers and to liaise with counterparts within the industry and at all levels within the KH Ability to show understanding and patience in communicating with technology users Ability to encourage staff to exchange views and resolve problems Well-developed investigative, analytical and problem solving skills

Page 391: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

46 Annex B

Membership Officer

JOB DESCRIPTION

1.0 Overall Responsibilities This role will be responsible for recruiting and retaining new and existing members through the delivery of excellent customer service, supporting potential members through the application process and advising existing members with all aspects of their membership. 2.0 Scope of Work

The tasks to be carried out are detailed below: Task 1 Stake Holder Management

Responding to all membership enquiries via email, telephone and letter. Replying to potential member enquiries in a pro-active, helpful, timely, professional and

polite manner, to achieve a successful outcome through converting them to membership. recognizing opportunities for organizational growth, taking ownership or escalating these

where appropriate. Actively encouraging members to upgrade where appropriate. Processing regrades,

applying the defined criteria and making grade recommendations. Supporting recruitment and retention campaigns, taking direction from the Membership

Manager, passing feedback to relevant colleagues as required. Supporting and advising existing members on all aspects of membership, including but not

limited to regrading, benefits, events and resources. Carrying out all activities required to support annual renewals as needed, including but not

limited to preparing datasets, processing payments and making proactive out-bound calls to late payers to meet retention targets.

Task 2 System and Process Improvement

Following agreed processes and procedures; suggesting changes to support continuous improvement. Maintaining accurate and up to date records at all times on the CRM.

Undertaking testing of the system and/or process developments where required.

Task 3 Support to the Membership Team

Working collaboratively with colleagues across the organization on cross-team projects. Achieving and exceeding objectives and targets as agreed with the Membership Manager. Supporting colleagues within the Membership Team as required. Any other activities as directed by the Membership Manager, within reason.

3.0 Skills Requirement/ Educational Requirements

Strong professional pride, committed to helping members and delivering an excellent service.

Excellent communication skills, with the ability to speak clearly, professionally and engagingly on the telephone, and to write grammatically correct, simple, clear and professional emails in accordance with agreed style guides.

Proactive and able to work on own initiative, as well as part of a team. Demonstrating a positive attitude and the ability to influence colleagues and members.

Problem solving and open to change. Able to think outside the box and seek solutions using the resources available.

Strong attention to detail, able to work accurately and effectively. Able to take personal responsibility for managing own workload, multi-tasking where required.

Page 392: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 47

Sees the bigger picture and able to apply it to decision making. Actively demonstrates all aspects of the Behaviors for Success. Able to understand and apply complex business knowledge in an easy to understand

manner. Empathy with the charitable objectives of the organization 5 GCSEs including English and Math’s (or equivalent) Experience using a CRM/EMS database and other common IT systems e.g. Microsoft Word,

Outlook. Customer services experience in a business context (ideally in a membership/sales

environment). Exposure to/involvement in change Exposure to the quality profession/ISO standards Educated to A level (or equivalent)

Page 393: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

48 Annex B

Management Information Officer

JOB DESCRIPTION

1.0 Overall Responsibilities:

The management information systems officer works closely with Information systems Consultant. Together, they review the needs of the IBPAP employees and stakeholders related to information management, data processing and distributed processing for end-users. The management information systems officer establishes budgets for hardware and software. S/he will directly report to the Director for Shared Services.

2.0 Scope of Work

The tasks to be carried out are detailed below:

Task 1 Plan for, develop and implement an MIS System His/ her primary responsibility is for the planning, development and implementation of

hardware, software applications, programming and systems network and integration of a management information system or enterprise network.

The MIS also has personnel, branch and supervisory responsibilities as well as creating plans for the use of telecommunications integration with existing information.

Task 2 Data Standards & Administration of report forms

Carry-out consultation activities with top level IBPAP management, who are the primary user of the system, in building the MIS

Work with the M&E to standardize data collection and administration of report forms. Task 3 Database Management and Maintenance

Handle internal IBPAP data pertinent to external clients Serve as IBPAP’s data security officer Act as the keeper of the Document Management System (DMS)

Task 4 Data Extraction (Periodic & AdHoc) and initial analysis

Work with the M&E in generating interim reports Conduct initial data analysis

3.0 Skills Requirement/ Educational Requirements

The MIS officer must have excellent supervisory skills and must be able to communicate with management and users topics relating to the operation of an MIS system. The individual must also have excellent knowledge of enterprise networks and systems, consisting of mainframe and midrange computers, IT hardware and infrastructure support, microcomputer management, data management and security. Strong problem-solving and analytical skills are needed in this occupation.

The MIS officer must be a highly knowledgeable in information systems theory and configuration. Most MIS officer candidates have a master’s degree or doctorate in information systems management, computer science or information technology. They also have industry certifications in areas of network administration, information systems audit or systems development.

Page 394: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 49

KH Support Staff (4)

JOB DESCRIPTION

1.0 Overall Responsibilities: The Project Assistant shall be tasked to provide finance, technical and administrative support to KH Lead, Managers and Consultants. S/he will be reporting directly to the Administrative and Finance Officer. 2.0 Scope of Work

The tasks to be carried out are detailed below: Task 1 Finance and Contracts

Assist in the setting-up of the BPAP Finance System. Prepare on a regular basis, disbursement documents such as debit, cash voucher’s and

petty cash vouchers and certify the validity and correctness of the financial accounting entries in the database and ensure the completeness of its supporting documents prior to the review of the Finance and Admin Officer.

Process payment of fees to Project Staff and contracted project experts;

Prepare the Monthly Bank Reconciliation;

Prepare Local Field Expense and Activity Expense Summary

Make certain that all the transactions for the month are recorded accurately in the database prior to the review of the ED

Monitor and up-date cash per books

Audit Travel Claims documentations and prepare necessary payment for the request.

Assist in the preparation of the legal documents for the FPMO including MoAs/ MoUs, contracts and amendments;

Maintain accurate, accessible and up-to-date contracts/amendments record-keeping

systems for the project; Task 2 Technical

Conduct Project-related researches pertinent to institutional, financial, economic analyses; Assist in the preparation of presentations and technical handouts pertinent to various

trainings and conferences; Assist in the preparation of regular technical reports such as Project Progress and Financial

Reports; Assist in the establishment and maintenance of Project databases.

Task 3 Administrative

Manage the over-all logistical aspect of the FPMO. Coordinates with the BPAP Admin the logistical requirements of the ED, PCs and PMs

during meetings, travel and hotel arrangements and vehicle requests. Set-up and maintain the filing system of the FPMO. Other tasks that may be assigned from time to time

Page 395: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

50 Annex B

Year 2 &3 Organization Structure

Page 396: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 51

Chief Executive Officer for the Knowledge Hub

JOB DESCRIPTION 1.0 Overall Responsibilities: The chief executive officer (CEO) ranks as the highest senior executive in charge of overseeing the entire operation of the Knowledge Hub (KH). The primary responsibility of the CEO is to direct the organization, including guiding senior level KH officials towards the achievement of its vision and mission and working towards both internal and external objectives to sustaining the organization’s growth. As the primary person responsible for the success of the KH business, the CEO assures the organization’s relevance to the IT-BPM and Education sectors, the accomplishment of its mission and vision and the accountability to a diverse set of stakeholders that includes students, IT-BPM employees, alumni of the SMP Program and other IT-BPM courses, government senior education policy makers and managers, IT-BPM firms, IT-BPM industry associations, civil society groups, local government and the general public. Specifically, the CEO plans and directs all aspects of an organization's operations, policies, objectives, and initiatives, oversees the organization's membership, scholarship and other programs, projects, curriculum development initiatives, marketing, finance and accounting, HR and general administration functions. In addition, this individual is also responsible for strategically managing the KH internal and external clients. 2.0 Scope of Work

The tasks to be carried out are detailed below:

Task 1 Strategy and Planning Determines the KH values, mission, vision, and short- and long-term goals. Monitor and evaluate the KH relevancy to the IT-BPM and Education sectors, including its,

effectiveness, and the results of its operations. Keep the Board of Directors and IBPAP senior managers and stakeholders fully informed on

the condition of KH and on all the important factors influencing or affecting its operations. Identifies problems and opportunities and addresses them; brings those which are

appropriate to the Board and, facilitates discussion and deliberation. Informs the Board about trends, issues, problems and activities in order to facilitate policy-

making. Recommends policy positions.

Task 2 Management and Administration

Provides general oversight of all KH activities, manages the day-to-day operations, and assures a smoothly functioning, efficient organization.

Assures program quality and organizational stability through development and implementation of standards and controls, systems and procedures, and regular evaluation.

Assures a work environment that recruits, retains and supports quality staff and volunteers. Assures process for selecting, development, motivating, and evaluating staff.

Recommends staffing and financing to the Board. In accordance with Board approval, recruits personnel, negotiates professional contracts, and sees that appropriate salary structures are developed and maintained.

Specifies accountabilities for management and evaluates performance regularly.

Task 3 Governance

Page 397: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

52 Annex B

Helps the Board articulate the KH’s own role and accountabilities and helps evaluate performance regularly.

Works with the Board to enable the Board and all senior managers to fulfill their governance functions

Focuses the KH attention on long-range strategic issues. Manages the KH’s due diligence process to assure timely attention to core issues.

Task 4 Legal Compliance Assures the filing of all legal and regulatory documents and monitors compliance with

relevant rules, laws and regulations.

Task 5 Financing

Promotes programs and services that are produced in a cost-effective manner, employing economy while maintaining an acceptable level of quality.

Oversees the fiscal activities of the organization including budgeting, reporting and audit. Works with Board to ensure financing to support short- and long-term goals. Assures an effective fund development program by serving as the chief development officer

or hiring and supervising an individual responsible for this activity. Participates actively in identifying, cultivating and soliciting multilateral/ bilateral donor

prospects. Assures the development and operation of management systems and reports for quality

decision-making.

Task 6 Stake Holder Management Facilitates the integration of the KH into the IT-BPM and Education sectors by using effective

marketing and communications activities. Acts as an advocate, within the public and private sectors, for issues relevant to the KH, its

services and constituencies. Listens to clients, suppliers, donors and the government at large in order to improve services

and generate stakeholder involvement. Serves as chief spokesperson for the KH, assuring proper representation of the KH in

different fora and events. Initiates, develops, and maintains cooperative relationships with all its organizational

constituencies. Works with a diverse set of stakeholders including legislators, regulatory agencies, suppliers

and representatives of the not for- profit sector to promote or advocate on strengthening talent development regulatory policies that support a healthy IT-BPM business environment

Task 7 Risk Management

Define organizational-wide risk management objectives and ensure the implementation of risk management strategies and initiatives within the different areas of operations

Task 8 Accountability

IBPAP and KH senior management, KH clients’ senior management, senior managers of government regulatory agencies and policy making bodies, multilateral and bilateral agencies, IT-BPM senior officials, Industry association heads IT-BPM company representatives, school administrators, deans, faculty, student organizations, HR directors etc.

Page 398: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 53

3.0 Skills Requirement/ Educational Requirements

Formal Education & Certification. University degree in the field of business administration, finance, management, Information

technology or related field Master’s degree in Business Administration or any related field A minimum of 5 years in a senior executive management position and 5 years in direct

applicable work experience Knowledge & Experience

10-15 years’ experience in managerial/operation positions. Experience working with the government. Excellent knowledge of business theory, business processes, management, budgeting, and

business office operations. Good understanding of MIS systems design and functions Proven experience in operations planning, organization, and development. Superior understanding of project management principles. Excellent understanding of the organization’s goals and objectives. Superior ability to analyze and solve business problems. In-depth knowledge of applicable government education laws and regulation, not-for-profit

rules and regulations and multilateral and bilateral procedures and processes. Excellent understanding of human resource management principles, practices, and

procedures. Proven leadership ability. Ability to set and manage priorities judiciously.

Personal Attributes

Demonstrated competencies in four broad categories: commitment to results, business savvy, leading change and motivating

Brilliant strategist Systems thinker with a strong customer/service orientation. Goal driven and able to translate broad goals into achievable steps Excellent negotiating and leadership skills. Possesses the ability to Identify relevant information and helps transform this information

into individual and organizational knowledge and learning. Possesses experience in integrating and coordinating diverse areas of management. Is action oriented and innovative. Takes advantage of opportunities, is a self-starter and a team player Consistently displays integrity, models behavior, develops people, and builds teams. Deals effectively with demanding/challenging situations and designs and implements

interventions to address these. Effectively manages continuity, change and transition

Page 399: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

54 Annex B

IT Manager

JOB DESCRIPTION

1.0 Overall Responsibilities Reporting directly to the Director of Operations the IT Manager will be primarily responsible for the Association’s current IT and communications network and systems, manage a team of four staff, project manage the integration and implementation of the new CRM and website and provide a strategic overview to meet future business and system requirements. 2.0 Scope of Work

Manage the deployment, monitoring, maintenance, development, upgrade, and support of all current IT systems, including ETarget and Exchequer, Websites, PCs, operating systems, databases telephones, software applications, and peripherals.

Project manage the implementation and integration of the planned new CRM and website Communicate regularly with executive management and all users of informat ion services

and systems. Manage and develop IT staff, including, training, evaluation, guidance, discipline. Develop standard operating procedures and best practices, including providing written

protocols and guidance to IT staff and to end-users. Ensure the creation and maintenance of all written documentation, including system and

user manuals, license agreements, and documentation of modifications and upgrades. Oversee provision of IT Support for 100 staff in 5 offices. Keep current with the latest technologies and determine what new technology solutions and

implementations will meet business and system requirements. Manage financial aspects of the IT Department, including purchasing, budgeting, and budget

review. Develop and implement all IT policies and procedures, including those for architecture,

security, disaster recovery, standards, purchasing, and service provision. Negotiate and administer supplier contracts and service agreements.

3.0 Skills Requirement/ Educational Requirements

A Bachelor’s degree in computer science or equivalent education and experience Knowledge of SQL and website technologies

Progressive IT experience, including experience in a multi-office environment. Experience in working with non-profits and/or membership organization’s preferred

Demonstrated ability to lead a team of technical staff, to work with the Executive Management of an organization, and to manage multiple concurrent projects

Excellent verbal and written communication skills

Strong project management, organizational and time management skills

Strong people management skills Excellent problem-solving, analytical and evaluative skills

Page 400: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 55

Marketing and Research Manager

JOB DESCRIPTION

1.0 Overall Responsibilities: The Market Strategy and Insights team is responsible for providing fact/research based insights to help Anthem leaders improve business performance. This position requires the ability to build and maintain productive relationships with other departments, market research experience/skills across a range of methodologies, solid project management and ability to effectively translate research into insights. 2.0 Scope of Work

The tasks to be carried out are detailed below:

Being the key marketing research point of contact within the KH Strong consulting skills with the ability to help internal business partners articulate business

problems/research needs Managing a range of projects (competitive intelligence, market research using both primary

and secondary research) to inform business decisions Excellent communication skills-ability to present complex information concisely Strong project and time management skills and an ability to own, manage and/or collaborate

on multiple projects simultaneously Travel up to 20% of the time

3.0 Skills Requirement/ Educational Requirements

Requires BA/BS or any combination of education and experience, which would provide an equivalent background. .Advanced degree preferred. In a related field a plus

3 - 10 years' relevant years' relevant experience in a market research working on service related or business comparable to health insurance are strong pluses

Excellent communication and interpersonal skills Experience managing market research projects Solid analytical skills Ability to uncover and translate consumer insights into ideas/product concepts Experience and skill in presenting ideas, strategy and plans Competitive analysis/trends analysis experience required General computer skills, must have solid working knowledge of Microsoft Office, and working

knowledge of SPSS Specific experience with business to business customers and translating market research to

impactful insights to grow sales or aid retention of customers (experience with tracking and integrating across studies as well

Page 401: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

56 Annex B

Membership Manager

JOB DESCRIPTION 1.0 Overall Responsibilities Leading and managing the KH membership team, the Membership Manager is responsible for ensuring that a consistently high level of service is provided to our members, customers and other stakeholders, and that the objectives for the team are met/exceeded, in particular regarding retention and member satisfaction. The Membership Manager will need to ensure all new applications, renewals and re-grades are handled efficiently and effectively, and that the processes to enable this are in place and continually improved. To do the role effectively, the post holder will know our members, what they want, what they don’t want, and ensure all we do is always considered from a customer perspective. 2.0 Scope of Work

The tasks to be carried out are detailed below:

Task 1 Leadership and direction to the membership team of the Knowledge Hub

Provide leadership and direction to the membership team (KH). Be accessible and available to support team members with general enquiries. Handle

escalated calls and complaints using judgment and discretion as required, promoting a constructive customer relationship whilst adhering to agreed policies and procedures.

Lead by example, demonstrating excellent enquiry-handling and team-working through taking an active part in team activities. Be a visible and motivating presence for the team and Customer Services as a whole.

Manage the performance of the team members (directly and via the Senior Membership Officers) through structured management and development activities, including regular one-to-one meetings, coaching, performance and development reviews. Ensure all team members have clear objectives and performance indicators, and monitor these to ensure they are achieved. If there are any variances, act on these appropriately with support from HR.

Manage the budget for the team, complying with budget setting and the reforecast timetable as required by the Finance Team.

Liaise with the other managers within the department to maximize customer service levels across teams through a flexible approach to resourcing work. In particular, work closely with the Membership Manager (CQI) to ensure consistency and good communication between teams.

Task 2 Service Delivery Strategy

Devise and implement a strategy for the effective provision of support and services to our KH members throughout the certification process.

Anticipate problems, find solutions and adjust allocations of resources appropriately. Ensure team members acquire best practice in customer service skills, IT skills and a

thorough Appreciation of the CQI, KH and industry knowledge. Identify and flag opportunities to make changes that will improve customer service and lead

to improved efficiency in the team, the department and the organization generally, promote a problem solving and positive team- and customer-focused culture within the team.

Be a proactive member of the Customer Services management team, identify synergies and opportunities for sharing knowledge and best practice, contributing to operational planning, and managing financial processes to required deadlines.

Page 402: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 57

Task 3 Develop the Products and Services

Enable growth of KH membership through developing, optimizing and smooth running of membership services.

Continuously build, develop, share and maintain in-depth product knowledge of the KH products and services in order to provide a knowledgeable response to the team and customers, and thereby providing an added value service.

Working with the Marketing & Business Development Manager (KH), develop and manage KH retention campaigns.

Task 4 Communicate with Internal and External Stakeholders

Ensure effective communications and excellent levels of customer care, especially those focused towards members, are maintained across KH.

Play a key role in working effectively with KH colleagues in other teams and departments to ensure communications are improved, internally and with our members, and take forward ideas for improvement into business as usual.

Manage the use of external contractors to ensure timely and cost-effective reviews of applications, regrades and renewals.

Task 5 Departmental Output Report and Analysis

Produce regular reports including KPIs, analyzing enquiry trends, customer feedback and the impact of marketing initiatives. Pro-actively make suggestions for potential new KH product developments and customer service improvements.

Interpret membership recruitment and retention statistics, review membership research and make recommendations to improve our KH membership services.

3.0 Skills Requirement/ Educational Requirements

Demonstrated ability to plan and implement successfully at team level, with direction provided by the Executive Director.

Excellent customer service and member relationship skills. Commercial awareness and the drive to meet challenging targets; actively seeking

continuous Improvement and the highest standard of work across a team. Proven ability and confidence to establish and maintain effective working relationships with

other departments, current and prospective members, and other key stakeholders. Confidence, communication skills and presentation skills required to represent the

department internally and organization externally. Experience of developing processes to meet business needs – from analysis of need and

development, through to implementation and making changes if needed. Strong written and spoken English, including good report writing skills, and the ability to

communicate professionally, diplomatically and constructively in difficult situations. Able to demonstrate the use of plain English in customer communications and the ability to advise and respond effectively to customers for who English is not their first language.

Excellent complaints management and resolution skills, resulting in positive experience and outcomes for customers.

Ability to inspire others by engaging them in the organization’s vision. Ability to quickly build an in-depth knowledge of the KH products. Initiative and analytical ability to identify and correct organizational failures. Strong conceptual and analytical ability; able to take a broad, long term view and focus into

the detail when required to solve problems. Drive and desire to continually seek improvement and results. Track record of successfully improving customer or member retention.

Page 403: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

58 Annex B

Track record of successfully managing, training, motivating and coaching teams and individuals, ideally in a customer services context.

Commercially astute with experience of writing and presenting business cases; experience of managing budgets.

Experience of using and contributing to the continuous improvement of a CRM or membership database; strong IT skills including experience of using spread sheets.

Educated to degree-level or equivalent.

Page 404: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 59

Business Development Officer

JOB DESCRIPTION

1.0 Overall Responsibilities: The business development officer creates and builds client relationships while sponsoring interaction to obtain projects. This role assists in developing and facilitating the proposal process for specific clients/sponsors including budget and pricing development, proposal writing, contract negotiations and client presentations. 2.0 Scope of Work

The tasks to be carried out are detailed below:

Task 1 Manage Project Portfolio Set-up and maintains the company Profile in various funding agency portals/ sites (i.e. ADB

CMS) Collects all company project-related documents and integrate this to the company Profile

Task 2 Generate Business Proposal and Business Plan

Drafts expressions of interest for Projects that the company would be interested to engage in Formulates the standard/routine proposals; Develops budget and price estimate using standard models Develops new project plans, defining roles and responsibilities and the scope of work for

each project Task 3 Coordinate, Track and Report

Communicates the outcome of the negotiations/proposals focusing on conveying the expectations set forth i.e. clear details, critical timeframes and expectations

Collaborates with the operation/finance group to evaluate project performance and to recommend refinements and improvements of all components of proposals

Tracks and reports on the status of all proposal components

Page 405: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

60 Annex B

IT Officer

JOB DESCRIPTION

1.0 Overall Responsibilities: Assist technology users in identifying and implementing systems improvements. Administer database platforms and associated systems efficiently and effectively to ensure that The KH is able to meet its business requirements and goals. Provide technical support and advice to other Information Systems Team members and other Technology users. 2.0 Scope of Work The tasks to be carried out are detailed below: Task 1 Business Analysis

To analyze business processes to ascertain their efficiency and effectiveness in delivering high-quality, value for money customer services

Gather data related to particular business issues and processes Analyze issues and processes Identify, develop and implement options that may resolve or improve the issue Provide a project co-ordination role in liaising with vendors' and staff in the areas of

development, acceptance and implementation of systems Prepare and maintain relevant systems documentation including the creation of Policies and

Procedures Promote the productive use of Information Management Systems throughout KH

Task 2 Database Administration

Provide database administration and support for the corporate systems running on SQL and Universe platforms

Ensure that day-to-day administrative activities are undertaken to maintain databases in a fully operational and stable state Undertake system monitoring and tuning to ensure optimum performance. Apply software upgrades and patches to the corporate systems and to server operating

systems and databases Review and maintain efficient and effective database backup procedures to enable the

provision of successful and accurate backups so that any data can be restored quickly and efficiently.

Maintain adequate security of data by implementing, monitoring and auditing appropriate security policies

Undertake upgrade and conversion projects as required Manage problems escalated to third-party suppliers/providers Actively contribute and participate in all disaster recovery processes Produce reports in line with performance indicators Prepare and maintain relevant systems documentation including the 'creation of policies and

procedures Task 3 Helpdesk Operations

As part of a team, provide a high level of user support through the provision of incident and problem management so that staff can make effective use of systems and equipment

Provide a professional, friendly and customer oriented approach at all times

Page 406: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 61

Task 4 Corporate Responsibilities

Develop and implement effective policies and procedures relating to new and existing information systems

Promote excellence in customer service and in conjunction with the Unit Manager, identify, review and implement strategies to improve service quality and efficiency

Maintain strong team relationships among colleagues and community groups, on a formal and informal basis, across all KH functions

Ensure the security of KH’s property and assets and maintain a commitment to the care of all KH’s property and assets

Participate as directed in training and education to maintain an up to date knowledge of emergency management responses

Provide administration, logistics and specialist support and advice during CEO identified emergency events

Comply with KH policies and procedures Task 5 General Responsibilities

Maintain relevant and up to date knowledge of business and information technology Provide input into, and assist with the implementation of, KH’s IT Strategy Attend relevant training programs approved by the Unit Manager

3.0 Skills Requirement/ Educational Requirements

The position requires skills and knowledge acquired through relevant work experience or the completion of a more formal qualification such as an Information Technology degree or diploma course

Knowledge of the administration MS SQL Server 2008 Experience in the use of PCs, operating systems, applications, network and communication

technologies Experience using SQL language Experience writing SQL reports Experience using process mapping software such as MS Visio Excellent interpersonal and communication skills, in order to establish rapport with internal

customers and to liaise with counterparts within the industry and at all levels within the KH Ability to show understanding and patience in communicating with technology users Ability to encourage staff to exchange views and resolve problems Well-developed investigative, analytical and problem solving skills

Page 407: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

62 Annex B

Membership Officer

JOB DESCRIPTION

1.0 Overall Responsibilities This role will be responsible for recruiting and retaining new and existing members through the delivery of excellent customer service, supporting potential members through the application process and advising existing members with all aspects of their membership. 2.0 Scope of Work

The tasks to be carried out are detailed below: Task 1 Stake Holder Management

Responding to all membership enquiries via email, telephone and letter. Replying to potential member enquiries in a pro-active, helpful, timely, professional and

polite manner, to achieve a successful outcome through converting them to membership. Recognizing opportunities for organizational growth, taking ownership or escalating these

where appropriate. Actively encouraging members to upgrade where appropriate. Processing regrades,

applying the defined criteria and making grade recommendations. Supporting recruitment and retention campaigns, taking direction from the Membership

Manager, passing feedback to relevant colleagues as required. Supporting and advising existing members on all aspects of membership, including but not

limited to regrading, benefits, events and resources. Carrying out all activities required to support annual renewals as needed, including but not

limited to preparing datasets, processing payments and making proactive out-bound calls to late payers to meet retention targets.

Task 2 System and Process Improvement

Following agreed processes and procedures; suggesting changes to support continuous improvement. Maintaining accurate and up to date records at all times on the CRM.

Undertaking testing of the system and/or process developments where required.

Task 3 Support to the Membership Team

Working collaboratively with colleagues across the organization on cross-team projects. Achieving and exceeding objectives and targets as agreed with the Membership Manager. Supporting colleagues within the Membership Team as required. Any other activities as directed by the Membership Manager, within reason.

3.0 Skills Requirement/ Educational Requirements

Strong professional pride, committed to helping members and delivering an excellent service.

Excellent communication skills, with the ability to speak clearly, professionally and engagingly on the telephone, and to write grammatically correct, simple, clear and professional emails in accordance with agreed style guides.

Proactive and able to work on own initiative, as well as part of a team. Demonstrating a positive attitude and the ability to influence colleagues and members.

Problem solving and open to change. Able to think outside the box and seek solutions using the resources available.

Strong attention to detail, able to work accurately and effectively. Able to take personal responsibility for managing own workload, multi-tasking where required.

Page 408: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 63

Sees the bigger picture and able to apply it to decision making. Actively demonstrates all aspects of the Behaviors for Success. Able to understand and apply complex business knowledge in an easy to understand

manner. Empathy with the charitable objectives of the organization 5 GCSEs including English and Math’s (or equivalent) Experience using a CRM/EMS database and other common IT systems e.g. Microsoft Word,

Outlook. Customer services experience in a business context (ideally in a membership/sales

environment). Exposure to/involvement in change Exposure to the quality profession/ISO standards Educated to A level (or equivalent)

Page 409: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

64 Annex B

Management Information Officer

JOB DESCRIPTION

1.0 Overall Responsibilities:

The management information systems officer works closely with an Information systems Consultant .Together, they review the needs of the IBPAP employees and stakeholders related to information management, data processing and distributed processing for end-users. The management information systems officer establishes budgets for hardware and software. S/he will directly report to the Director for Shared Services.

2.0 Scope of Work The tasks to be carried out are detailed below: Task 1 Plan for, develop and implement an MIS System

His/ her primary responsibility is for the planning, development and implementation of hardware, software applications, programming and systems network and integration of a management information system or enterprise network.

The MIS also has personnel, branch and supervisory responsibilities as well as creating plans for the use of telecommunications integration with existing information.

Task 2 Data Standards & Administration of report forms Carry-out consultation activities with top level IBPAP management, who are the primary user

of the system, in building the MIS Work with the M&E to standardize data collection and administration of report forms.

Task 3 Database Management and Maintenance

Handle internal IBPAP data pertinent to external clients Serve as IBPAP’s data security officer Act as the keeper of the Document Management System (DMS)

Task 4 Data Extraction (Periodic & AdHoc) and initial analysis

Work with the M&E in generating interim reports Conduct initial data analysis

3.0 Skills Requirement/ Educational Requirements

The MIS officer must have excellent supervisory skills and must be able to communicate with management and users topics relating to the operation of an MIS system. The individual must also have excellent knowledge of enterprise networks and systems, consisting of mainframe and midrange computers, IT hardware and infrastructure support, microcomputer management, data management and security. Strong problem-solving and analytical skills are needed in this occupation.

The MIS officer must be a highly knowledgeable in information systems theory and configuration. Most MIS officer candidates have a master’s degree or doctorate in information systems management, computer science or information technology. They also have industry certifications in areas of network administration, information systems audit or systems development.

Page 410: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Detailed Job Descriptions 65

Training Officer

JOB DESCRIPTION

1.0 Overall Responsibilities: Training officers plan, develop, implement and evaluate training and development programs in organizations. 2.0 Scope of Work

The tasks to be carried out are detailed below:

Task 1 Conduct Training Programs

Coordinate a staff training program based on organizational and employee needs Arrange or conduct training courses, which may involve demonstrating equipment, operating

video recorders and cameras, leading group discussions or role-playing activities and employing experts to run sessions

Prepare, administer and conduct training assessments Provide career development sessions for existing staff and conduct induction sessions for

new employees Assist in developing training interventions to meet the needs of internal and external

stakeholders Support learners during training interventions

Task 2 Create and Develop

Use questionnaires and surveys in consultation with managers and staff to analyze training needs as they relate to the goals of the organization and work area

Develop training resources, which may involve preparing notes and visual displays from researched information or their own knowledge

Obtain information on work-related external courses, prepare reports on their suitability and make recommendations on staff attendance at training courses

Task 3 Quality Assurance

Evaluate the effectiveness of training programs using surveys, questionnaires, interviews and by observation, in order to plan future courses or to amend existing ones

Task 4 Document Compile training manuals Maintain learner outcomes in a Learning Management System

3.0 Skills Requirement/ Educational Requirements

able to take initiative tactful and mature aptitude for research good organizational skills Excellent communication and presentation skills.

Page 411: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

66 Annex B

KH Support Staff (4)

JOB DESCRIPTION

1.0 Overall Responsibilities: The Project Assistant shall be tasked to provide finance, technical and administrative support to KH Lead, Managers and Consultants. S/he will be reporting directly to the Administrative and Finance Officer. 2.0 Scope of Work

The tasks to be carried out are detailed below: Task 1 Finance and Contracts

Assist in the setting-up of the BPAP Finance System. Prepare on a regular basis, disbursement documents such as debit, cash voucher’s and

petty cash vouchers and certify the validity and correctness of the financial accounting entries in the database and ensure the completeness of its supporting documents prior to the review of the Finance and Admin Officer.

Process payment of fees to Project Staff and contracted project experts;

Prepare the Monthly Bank Reconciliation;

Prepare Local Field Expense and Activity Expense Summary

Make certain that all the transactions for the month are recorded accurately in the database prior to the review of the ED

Monitor and up-date cash per books

Audit Travel Claims documentations and prepare necessary payment for the request.

Assist in the preparation of the legal documents for the FPMO including MoAs/ MoUs,

contracts and amendments;

Maintain accurate, accessible and up-to-date contracts/amendments record-keeping

systems for the project; Task 2 Technical

Conduct Project-related researches pertinent to institutional, financial, economic analyses; Assist in the preparation of presentations and technical handouts pertinent to various

trainings and conferences; Assist in the preparation of regular technical reports such as Project Progress and Financial

Reports; Assist in the establishment and maintenance of Project databases.

Task 3 Administrative

Manage the over-all logistical aspect of the FPMO. Coordinates with the BPAP Admin the logistical requirements of the ED, PCs and PMs

during meetings, travel and hotel arrangements and vehicle requests. Set-up and maintain the filing system of the FPMO. Other tasks that may be assigned from time to time

Page 412: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Survey Instruments 67

ANNEX C: Survey

Instruments

Page 413: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

68 Annex C

IBPAP Knowledge Hub Survey

Thank you for your interest in the Service Management Program of the IT -Business Process Association Philippines. We are conducting a survey to help gauge the level of participation in, as well as the spectrum of services that will add value to, the program. We would appreciate if you took some time to fill the short survey below. Your answers will be of great help in the design and model of the Knowledge Hub we are building to support the deployment of our talent programs in education institutions. Thank you and have a great day ahead.

* Required Question Name of School/Institution: * ________________________ Job Title: * ____________________________ Designation of Respondent: *

o President o Vice President/Associate Vice President o Dean/Associate Dean o Department Chair o College/School/Department Staff o Faculty o Part-time Lecturer o Other: __________________

Our school is interested to participate in the Service Management Program (SMP) through the following modes: * Please choose one

o Online Program o On-site Program o Blended Delivery (On-line + On-site)

What factors affect your choice of mode in offering SMP? * Please check one or more

o Infrastructure o Connectivity o Curriculum readiness o Faculty readiness o Executive support o Other: __________________

Page 414: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Survey Instruments 69

We intend to start offering courses in the Service Management program by: * Please choose one

o This coming term o Next School Year o Two to three years from now o Other: __________________

To systematize the transactions for all stakeholders including Higher Education Institutions (HEIs), IBPAP will build a Knowledge Hub (KH) that could facilitate more efficient services delivery to its members. Will you be willing to join as member of the KH with a fee? *

o Yes o No

What services are you expecting as a member? * Please choose one or more

o Faculty training/development o Faculty/ Student/Developer access to curricular materials o Support to students for internship and employment o Career marketing for potential enrollees o HEI Partnership/s with IT-BPO Firms o IT-BPM firm site tours and visits o Certification and accreditation o Free or discounted slots for forums and conferences o Access to the pool of publications and materials o Participation in Technical Working Groups for curricular and program content o Other: __________________

How much would you be willing to pay as a member? * Please choose one

o Php 25,000 ~ 49,999 o Php 50,000 ~ 74,999 o Php 75,000 ~ 99,999 o Above 100,000

Page 415: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

70 Annex C

IBPAP Knowledge Hub Students/Professionals Survey The IT-Business Process Association of the Philippines is looking to improve the delivery of its talent initiatives, specifically the Service Management Program (SMP). This survey aims to help define the range of services that will make up the knowledge hub to support SMP. Your inputs are greatly appreciated. * Required Question Name: * ________________________________ eMail Address: * ________________________________ Cellphone Number: ________________________________ I am a: * (Students = currently enrolled or in internship; Professionals = currently working)

o Student o Professional

I am: *

o Male o Female

Age: * __________ Course: * (What is/was your course in school?) ______________________ School/Employer: * ________________________________ Are you a current member of a professional organization? * (Examples PICPA, LFS, etc.)

o Yes I'm a member o I'm a member of the local/school chapter o No

Are you aware of the Service Management Program (SMP) of IBPAP? *

o I have heard of it from my school o I'm currently enrolled in an SMP course o I have seen materials but I want to learn more about SMP o What is SMP?

Page 416: Technical Assistance Consultant’s Report · LMS Learning Management System M&E Monitoring and Evaluation ... is targeting to achieve revenues of $25 billion or about 10% of the

Survey Instruments 71

Are you willing to become a member of an organization setup to support Service Management Program (SMP) activities in the school? *

o Yes o No

How much are you willing to pay as membership fee? *

o Php 0 ~ 99 o Php 100 ~ 199 o Php 200 ~ 299 o above Php 300

What services do you expect as a member of such an organization * (Please choose at least one)

o Access to study guides/course materials o Support for internship o Career/Job opportunities o Conferences and networking meetings o Tours and site visits o Other: __________________