Technical aspects
description
Transcript of Technical aspects
![Page 1: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/1.jpg)
2011. 11. 30
![Page 2: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/2.jpg)
Ⅰ Scopes
Ⅱ Recommendations
Ⅲ Future Works
CONTENTS
2
![Page 3: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/3.jpg)
3
![Page 4: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/4.jpg)
1. Scopes
4
Review of technical issue for implementing the draft guideline on contaminated soil monitoring
Recommendations for future works to improve the legal framework on Vietnam’s contaminated soil monitoring system
Review of draft technical guideline in view of implementation
![Page 5: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/5.jpg)
5
![Page 6: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/6.jpg)
2-1. Organizational issue(1/5) Who(or which organization) conducts this survey?
6
Survey implementation system in Korea
Control Tower
KMOE(Korea Ministry of Environment)
Survey-conducting bodies
Organizations designated by KMOE on the base of legal system
![Page 7: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/7.jpg)
2-1. Organizational issue(2/5)
7
Qualification Criteria for survey-conducting bodies in Korea(minimum)
1) Laboratory area : more than 180 ㎡
2) Technical experts
Grade Numberwith Ph.D degree or P.E. >= 1 person
F.E.(1st Grade) >= 1 personF.E.(2nd Grade) >= 2 people
University or College graduates >= 4 people
![Page 8: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/8.jpg)
2-1. Organizational issue(3/5)
8
3) Equipments(minimum)
Equipment Name QuantityUV/Vis Spectrophotometer 1
Atomic Absorption Spectrophotometer or Inductively Coupled Plasma 1
Purge and Trap 1GC/ECD 1GC/MSD 1GC/FID 1
Ultrasonic Disruptor 1GeoProbe( minimum over 6m of drilling
depth using Direct Push or Rotary) 1
Others If necessary
![Page 9: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/9.jpg)
Contaminated Soil Survey
(a)
(b)
(c)
9
![Page 10: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/10.jpg)
PID
10
![Page 11: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/11.jpg)
2-1. Organizational issue(4/5)
11
Types of survey-conducting bodies in Korea - Local branches of KMOE and other ministry related
to environmental issues - National or public research institutes - Universities or Colleges - Non-profitable private organizations with
qualification * excluding profitable private organizations
Number of certified survey-conducting bodies : 65 (2011.5)
![Page 12: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/12.jpg)
2-1. Organizational issue(5/5)
12
Soil monitoring network Organization
Sampling : Every March and April(Field) or May and June(the other area) Procedure of soil measuring network
Ministry of Environment
7 Local Environment Office
Han River Basin Nakdong River Basin Geum River Basin
Wonju Office Daegu Office Jeonju Office
Youngsan River Basin
Soil sampling0 ~ 15 cm below ground level(Field, Paddy field etc.)
Sampling at the depth of contamination source placed
Record all about sampling(Location number, sampling depth, date etc.)
Analysis and Report the results ※ Samples must be kept for 1 year at laboratories
![Page 13: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/13.jpg)
2-2. Expert training issue(1/2)
13
Running various training systems - regular education program in university(or college) - specialized short-period training programs * KEITI is running two specialized programs 1) ET project : Project to support financially the
experts training program at graduate school 2) Soil & Groundwater expert training program (6 months program) - Implementation of regular expert retraining - Providing the various On-line education programs
(taking a education program through the ubiquitous internet system)
![Page 14: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/14.jpg)
14
![Page 15: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/15.jpg)
2-2. Expert training issue(2/2)
15
Management of NQCS(National Qualification Certification Scheme)
- P.E./F.E.(I)/F.E.(II) - Anyone(without educational degree) can take a
exam if he/she has hands-on experiencesConsideration for cultivating the experts
- Long term, High cost * especially, the experts for field survey and
analysis (needs for development of educational program and
supports from government)
![Page 16: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/16.jpg)
2-3. Other technical issues(1/3)
16
Establishment of implementation system for monitoring
- Planning, Conducting the survey, Analysis, Reporting the survey results, Organizing and Keeping the Data etc.
- Needs for specifying institution or agency’s role in legal system
![Page 17: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/17.jpg)
2-3. Other technical issues(2/3)
17
Establishment of infrastructure for instrumental analysis
- reagent/glasses supply system (i.e., carrier gas in GC analysis)
- Analytical instrument maintenance system - Energy Supplying System - Preparation for SOP(standard operation Procedure)
of each chemical and analytical instrument * Bench marking for ISO system or ASTM * In case of Korea, operating SOP of each chemical
and analytical instrument in legal system
![Page 18: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/18.jpg)
2-3. Other technical issues(3/3)
18
Funding system for contaminated soil monitoring - PPP(Polluter’s Pay Principle) - Financial support of Government (If polluters can not be identified)
![Page 19: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/19.jpg)
19
![Page 20: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/20.jpg)
3-1. Development of cooperation program
Possible areas for developing cooperation program - Experts network for contaminated soil monitoring - Developing pilot study for contaminated soil
monitoring - Support for developing expert-training program - Support for soil contamination management master
plan * Previous conducted project in Vietnam(2007~ 2008):
Air and Water quality, Solid waste, Marine pollution and Mine pollution etc.
20
![Page 21: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/21.jpg)
3-2. Support of environmental R&DKEITI: General institution of national environmental R&D programs
SEC(Soil Environment Center): Implementing soil and groundwater R&D program
- Developing the on-site automated remote monitoring technologies
* Three groundwater monitoring technologies were previously presented in Seoul, Korea (May 2011).
Development of joint R&D program in monitoring area between Korea and Vietnam
21
![Page 22: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/22.jpg)
22
![Page 23: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/23.jpg)
23
![Page 24: Technical aspects](https://reader036.fdocuments.us/reader036/viewer/2022062323/5681679d550346895ddce337/html5/thumbnails/24.jpg)
Thank you
24