Teams / Modules Diagram Video Bank Learning Management System Admin & Reporting Dashboards; REIL &...
-
Upload
hortense-robbins -
Category
Documents
-
view
216 -
download
0
Transcript of Teams / Modules Diagram Video Bank Learning Management System Admin & Reporting Dashboards; REIL &...
![Page 1: Teams / Modules Diagram Video Bank Learning Management System Admin & Reporting Dashboards; REIL & Value-Added Scores Data Analysis ; Role-Based Management.](https://reader036.fdocuments.us/reader036/viewer/2022082517/56649e115503460f94afd68c/html5/thumbnails/1.jpg)
Teams / Modules Diagram
Video BankLearning Management System
Admin & ReportingDashboards; REIL & Value-Added ScoresData Analysis ; Role-Based Management
Verification of Rosters/ScoresSee RDSS Set-up (on placement)
Student/Teacher Link Automated
Course MappingHR & Payroll Generate a PAR, report.
Incentives for teachersETL/SOA…On placement; Real-time
Educator Goal Plan Scheduling System – Calendar
Evaluation of results, Support plan for teacher, Evaluator needs to approve,
Template for Goal Plans
Assessment SystemItem Bank
Field Test DeliveryAssessment Delivery
Verification Tool
Team CMCESA: Al,
Laurie, Anabel, Lori R.
ADE: Barry, Rich, Bilal
Team BMCESA: Anabel, Candace, Lori S.
ADE: Loren, Michelle
Observation Tool Instructional Coach
Curriculum Resources
Content Management SystemLessons, Resources, Standards
(Low Priority)
Team AMCESA: Al
Lori R., AnabelADE: Bilal, Joe,
Tara
Project Mgr.
ADE: Jolene
Requirements PhaseProcess / Deliverable Management
![Page 2: Teams / Modules Diagram Video Bank Learning Management System Admin & Reporting Dashboards; REIL & Value-Added Scores Data Analysis ; Role-Based Management.](https://reader036.fdocuments.us/reader036/viewer/2022082517/56649e115503460f94afd68c/html5/thumbnails/2.jpg)
ScheduleFeb 2-3 Feb 6-10 Feb 13-17 Feb 20-24 Feb 27-Mar 2 Mar 5-9 Mar 12-16
Process Overview Templates Definition Manage Deliverables Manage Deliverables Manage Deliverables Manage Deliverables Manage Deliverables Manage DeliverablesJolene
Manage Deliverables
Student Teacher Link Align Use Cases Capture/Document Baseline Draft
Al, Lori R. ADE Review MCESA Baseline SignoffBilal, Joe, Tara 1st Draft
MCESA Review
*Observation Tool: Align Use Cases Interview ADE Review MCESA Review
Instructional Coach Capture/Document 1st Draft Baseline Draft
Al, Lori R. ADE Review MCESA Baseline SignoffBilal, Joe, Tara 1st Draft
Curriculum Resources Align Use Cases Interview 1st Draft Baseline Draft
Anabel, Lori R. Capture/Document MCESA Review MCESA Baseline Signoff Joe, Tara ADE Review
Assessment System Align Use Cases Capture/Document MCESA Review MCESA Baseline Signoff
Anabel, Candace ADE Review Baseline DraftLoren, Michelle 1st Draft
*Educator Goal Plan Align Use Cases Interview Interview ADE Review MCESA Review Baseline Draft
Anabel, Lori S. Capture/Document Capture/Document 1st Draft MCESA Baseline SignoffLoren, Michelle
Video Bank Align Use Cases Capture/Document Baseline Draft
Professional Learning ADE Review MCESA Baseline Signoff
Al, Laurie K 1st DraftBarry, Rich MCESA Review
Admin & Reporting Align Use Cases Interview Interview 1st Draft MCESA Review MCESA Baseline Signoff
Al, Anabel, Lori R. Capture/Document Capture/Document Baseline DraftBarry, Rich, Bilal ADE Review
*See Risk List
![Page 3: Teams / Modules Diagram Video Bank Learning Management System Admin & Reporting Dashboards; REIL & Value-Added Scores Data Analysis ; Role-Based Management.](https://reader036.fdocuments.us/reader036/viewer/2022082517/56649e115503460f94afd68c/html5/thumbnails/3.jpg)
Project Summary
Schedule
• Phase Begin• Feb 2
• Phase End• Mar 16
• 31 Days
Resources
• MCESA = 504 Hrs• Kristine = 42 Hrs (Signoff)• Lori R. = 138 Hrs• Al = 132 Hrs• Anabel = 140 Hrs• Lori S. = 36 Hrs• Laurie = 6 Hrs• Candace = 6 Hrs
• ADE = 1,984 Hrs• Bilal Chaudhry• Joe Frost• Barry Harris• Tara Sprouse• Rich Schnettler• Loren Sucher• Michelle Udvare• Jolene Newton
Deliverables
• BRDs (Functional/Non Functional Reqs., User Case, Process & Data Flow, Integration Points, Possible Short / Long Term Solutions)• Video Bank• Student/Teacher Link• Observation Tool –
Instructional Coach• Admin & Reporting• Educator Goal Plan
Tool• Assessment System• Curriculum Resources
• Issue/Risk/Watch List
![Page 4: Teams / Modules Diagram Video Bank Learning Management System Admin & Reporting Dashboards; REIL & Value-Added Scores Data Analysis ; Role-Based Management.](https://reader036.fdocuments.us/reader036/viewer/2022082517/56649e115503460f94afd68c/html5/thumbnails/4.jpg)
Risks / AssumptionsRisks
• MCESA Resource Availability• (See Est. Resource Hours –
Slide 3.)• TIF Conference Feb 6-10
• Anabel, Lori• MIS Conference 13-27
• Anabel, Al (1 day each) • MCESA signoff process mitigated
by defining process and receiving approval from executives
• Observation Tool: Instructional Coach Rubrics not complete – dependency for BRD
• Educator Goal Plan: Field feedback expected Feb 17th to complete BRD
Assumptions
• Plan approval expected Feb 3• MCESA Baseline Signoff is 6
hours per person per module (Kristine, Lori R., Anabel, Al)
• Program Alignment of requirements to MCESA or AELAS is not included in Requirements Phase, but should be planned and scoped following this project.
• Build/Buy decisions are not included in Requirements Phase
• MCESA Baseline Signoff ends Requirements Phase - changes to requirements will be considered in subsequent phases based on executive leadership