TEAM TEACUP 2006
CAMBODIAN RESTAURANT PROJECT
LOCAL TEAMEXTENDED US TEAM EXTENDED INDIAN TEAM
Jonathan Lee - Team Leader Jonathan Lee - Team Leader Kelum Wick - Quality Kelum Wick - Quality Nick Rudzwick - Communication Nick Rudzwick - Communication Ricardo Viera - DocumentationRicardo Viera - Documentation
Sam Ath Ouch -Team Leader Sam Ath Ouch -Team Leader Ly Chea -Quality Ly Chea -Quality Kimheng Sok -Communication Kimheng Sok -Communication Samvannak Samon -DocumentationSamvannak Samon -DocumentationSovanndara Chheng -LocalizationSovanndara Chheng -Localization
Anushree Dixit -Database Design Anushree Dixit -Database Design Vikrant Arora -Database DesignVikrant Arora -Database Design
RESPONSIBLE BY
Prof. Sopheap Seng Prof. Chanthearith HUONProf. Christelle Scharff
ACADEMIC YEAR: 2005 ~ 2006
OUTLINE1. INTRODUCTION
Project DescriptionExtended team and the software systemFunctional and Non-functional requirements
2. CLIENT ROLESProject MilestonesProcess of the projectSoftware showCompare US and Indian Students softwareTop 10 things to keep client happyTop 10 things make client unhappyTop 10 things making a good client
3. EXPERIENCE IN TEAMWORK
Interaction with PACE studentsDifficulty
4. GLOBAL SOFTWARE DEVELOPMENTOur project & Real lifeComment for the developerPersonal experience
5. CONCLUSION Evaluation of both software
Page 1/20
1. INTRODUCTION | Project Description | Extended team and the software system | Functional & Non-Functional Requirements |
Project Description
June, 2006
Objective:
We would like to have a web-based application that could help usto sell the food online in Phnom Penh with the delivery service.
The users of the software are:
Administrator of the restaurant Managers of the restaurant Receptionists of the restaurant Clients of the restaurant Internet Users ( Lambda Users )
Duration:
Start from : Jan 24, 2006 Until : May, 2006
CAMBODIAN RESTAURANT PROJECT
1. INTRODUCTION | Project Description | Extended team and the software system | Functional & Non-Functional Requirements |
Extended team and the software system
Jonathan Lee Jonathan Lee Team LeaderTeam Leader
Kelum WickQuality Leader
NickRudzwick Communication Leader
Ricardo VieraDocumentation Leader
The CASE-Tools US team used for this project were:
Microsoft Word and PowerPoint for the Documents and Presentation. The Java Programming Language (Servlets) Eclipse and JCreator. Dreamweaver 8 and HTML and WordPad for the website. MYSQL was used in the construction of the databases.
Page 2/20June, 2006
1. INTRODUCTION | Project Description | Extended team and the software system | Functional & Non-Functional Requirements |
Functional & Non-Functional Requirements
– Register (Lambda User)– Place Order (Client)– Check Order Status (Client)– Cancel Order (Client)– Leave and View Feedback (Client, Manager/Admin)– View List of Pending and Completed Orders (Receptionist, Manager)– View Financial and Customer Information (Manager)– Create and delete accounts (Client, Admin)– View Menu (Client, Receptionist/Manager/Admin)– Log in and Log out (Client/Receptionist/Manager/Admin)– Request and View Menu Change (Manager, Admin)– Update Menu (Admin)– Change Profile (Client/Receptionist/Manager/Admin)– View all account information (Admin)
– Website Security (High Priority)– Language Preference (Medium Priority)– Website Layout/Easy to Use Interface (High Priority)– Alert Messages (Medium Priority)
Functional Requirements
Non-Functional Requirements
Page 3/20June, 2006
2. CLIENT ROLES | Project Milestones | Process of the Project | Software show | Compare US and Indian students software |
Project Milestones
Team bonding and initialization of communications (1 week)
Requirements (4 weeks)
Design (4 weeks)
Mid-semester presentations
Implementation (2-3 weeks)
Testing (1-2 weeks)
Presentations (Last week of class)
Page 4/20June, 2006
2. CLIENT ROLES | Project Milestones | Process of the Project | Software show| Compare US and Indian students software |
Requirements Phase
Page 5/20June, 2006
Objective:
Stakeholder Functional & Non-Functional Requirements
Communication:
Confirm about some problems that need to be avoid Answering Questionnaire which was sent by US students Answering mail and discuss in the conference Make sure that the developer understand what is needed Help developer to find out the solution of how the software works
by giving comments
Annex:
URL of the other online restaurants Pictures of the foods, map and logo of the restaurant Menu in PDF format
Post the blog and do the survey Validate the requirements document
2. CLIENT ROLES | Project Milestones | Process of the Project | Software show | Compare US and Indian students software |
Design Phase
Page 6/20June, 2006
Communication: • Answering mail and discuss in the conference• Keep discussing about the points that were not clear
Modification:
• Add some new features to make the software more accurate• Remove some features which were not important• Try to encourage the extended team to share the work that they have done, even though it wasn’t completed yet, in order to make the project go smoothly and correctly
Annex:
Index page (How it looks like) Contact page
Post the blog and do the survey View the design and GUI documents Validate the design document
2. CLIENT ROLES | Project Milestones | Process of the Project | Software show | Compare US and Indian students software |
Testing Phase
Page 7/20June, 2006
Testing: • Test the software of Cambodian Restaurant• Post the bug to share about the points that were not well done enough• Giving the comment about the interface and the quality of the software, how the software should improve• Accept or Reject the software by giving the good points and bad points
Validation:
• US students software• Indian students software• Compare both software
http://rest.tomchuk.com/wiki/CompletedWork/
2. CLIENT ROLES | Project Milestones | Process of the Project | Software show | Compare US and Indian students software |
Software developed by US Students
Page 8/20June, 2006
STRONG POINTS • The interface is acceptable• Most of the features were done well• Good security protection• Good navigator and links• All the page title are clearly shown• Respect the deadline
WEAK POINTS
• Type exception were not done well• The error message was not fulfill• Something which were told in the conference were lack
RESULT
WE ACCEPT THIS SOFTWARE.
http://matrix.csis.pace.edu/~s06-cs389-s11/
2. CLIENT ROLES | Project Milestones | Process of the Project | Software show | Compare US and Indian students software |
Software developed by Indian Students
Page 9/20June, 2006
STRONG POINTS
• The interface is acceptable• Good at database design• Even 2 members in the team, but could provide the software
WEAK POINTS
• Type exception were not done well• The error message was not fulfill• Most of the features were not done well• Security fail• The web page isn’t well organized• Didn’t satisfy the our desire
RESULT
WE REJECT THIS SOFTWARE.
http://csdb.du.ac.in:8090/restaurant_india/
2. CLIENT ROLES | Project Milestones | Process of the Project | Software show | Compare US and Indian students software |
Comparison of both software
Page 10/20June, 2006
Among both software which were done by US and Indian students:
We prefer the software of US students, because the software that had been developed respected what we need. Most of the features and most of the things that we were working together through answering mail and discussing were included
We don’t accept the software of Indian students, it doesn’t mean that they didn’t respect our desire. In fact, we didn’t contact with Indian students, even mail or face to face. We can’t say that they did bad job or anything. The point is that, the security of the software were not done well and there were also many error on some features.
NOTE: Thanks to Indian students anyway for their hard work
2. CLIENT ROLES | Top 10 things to keep client happy |Top 10 things make client unhappy | Top 10 things make a good client |
Top 10 things to keep client happy
Page 11/20June, 2006
Client’s comments were taken in action Provide more service available Show the capacity of hard working and serious about the project Good interaction between developer and client Provide the document necessary of the work that have done Before changing anything about the software, let’s client knows first Find out the good solution to replace the thing that had been changed Respect the deadline of the project Result of the software should adapt with client desire The price of creating the software is suitable
2. CLIENT ROLES | Top 10 things to keep client happy |Top 10 things make client unhappy | Top 10 things make a good client |
Top 10 things make client unhappy
Page 12/20June, 2006
Changing the features of the software without any reasons Not good relationship between clients and developers Incapable of doing the project Quality of the software( Many errors, web page isn’t interesting) Lost contact during the project Misunderstanding the desire of client Not taking serious about develop the project Not respect the deadline of the project Result of the software not adapt with client desire Make client feel that they lost the time and resource
2. CLIENT ROLES | Top 10 things to keep client happy |Top 10 things make client unhappy | Top 10 things make a good client |
Top 10 things make a good client
Page 13/20June, 2006
Good at explaining about the problem and the need Know something about how the project work Providing the resource available Answering the developer’s question as quickly as possible Be patient on waiting for the software Encouraging the developer to work hard Make the developer feel happy when they do good things Giving the comment when they do something not adapt with our desire Be prepare enough time for the developer, so that the developer could
have enough time to correct the bug or to create a new one with some conditions (ex. Reduce the price of the software)
If the client could know something about the informatics
3. EXPERIENCE IN TEAMWORK
Reports
| Interaction with PACE Students |Difficulty|
Page 14/20June, 2006
Number of Mails: Feb =17, Mar = 40, Apr = 24, May = 20
Online Meeting: 6 times (Jan 26, Feb 04, Feb 25, Mar 23, Apr 01, Apr 27)
Website using :
http://www.itc.edu.kh/http://www.csis.pace.edu/~scharff/cs3892006 (Prof scharff webpage)http://teamteacup2006.i8.com/ (webpage for teamteacup)http://blogger.com (website to create the blog)http://restaurantproject2006.blogspot.com/ (Post the blog)http://www.zoomerang.com/survey.zgi?p=U24E9SC4D4D6 (survey)http://www.zoomerang.com/survey.zgi?p=WEB22527X7G588 (survey)http://www.questionpro.com/akira/TakeSurvey?id=402682&rd=4765075 (survey)http://www.csis.pace.edu/~scharff/cs3892006/PASSWORD/FEEDBACK/restaurantdesign.zip ( login: alllogin /password: gsd123/ Feedback)http://www.youtube.com/watch.php?v=jQaHrcwKsoc (video of Thomas Friedman entitled "The other side of outsourcing")http://www.yousendit.com/ ( This service permits us to share files (up to 1GB)http://matrix.csis.pace.edu/~s06-cs389-s11/ (online restaurant website)http://rest.tomchuk.com/wiki/CompletedWork (Bug reports)http://csdb.du.ac.in:8090/restaurant_india/ (Website Indian)
3. EXPERIENCE IN TEAMWORK | Interaction with PACE Students |Difficulty|
Difficulty
Page 15/20June, 2006
The different of geometric time (12hours different)
We don’t have the internet service at home
Few time after school going to the internet café to response the mail
Unaware about the process of the project, What is our responsibility in each phase
Difficult to explain in distance and solve the problem in a short time
Take many days to check, discuss and response mail
4. GLOBAL SOFTWARE DEVELOPMENT | Our Project & Real life | Comment for the developer | Personal experience |
The Quality of our software
Page 16/20June, 2006
Good security is the main point of our software
Most of the features that is needed respect the desire
Medium interface human and machine
Even though we have completed our project successfully with the acceptable result, but it doesn’t mean that we could use this software in public
In reality, our software isn’t completely done yet
The modification of the software is needed
4. GLOBAL SOFTWARE DEVELOPMENT | Our Project & Real life | Comment for the developer | Personal experience |
How to improve our software ?
Page 17/20June, 2006
Though our experience in this project we have notice some main points to improve our software :
• The requirement phase is the most important in the project (Client desire should clarify here, not at the design phase)• In the beginning of the design phase should think about the problem that was not complete in the requirement phase• Good communication skill between client and developer is needed• Division of the duty for each member is also an important thing • Abilities to solve the problems when we face in coding phase • Try to find out the bug as much as possible and correct them immediately• Work more harder to finish the project on time with the result coming
4. GLOBAL SOFTWARE DEVELOPMENT | Our Project & Real life | Comment for the developer | Personal experience |
Experiences of local team
Page 18/20June, 2006
Team Leader related to team work leadership skill
Quality Leader validate the document relationship in the team
Communication Leader communication skill responsible for information distribution
Documentation Leader keep all the documents of the project be sure that all members in the group have the document needed
Localization Leader join team activities test the software
5. CONCLUSION | Evaluation of both software |Gratitude |
Acceptation or Reject the software
Page 19/20June, 2006
As a result of the final phase in our project
• We accept the software that was done by US team• We reject the software that was done by Indian team
5. CONCLUSION | Evaluation of both software |Gratitude |
Gratitude
Page 20/20June, 2006
Professor Sopheap and Professor Scharff Professor Thearith, Professor Longchrea and others Professors Extended team US students and Indian students Local team Cambodian students
Good luck for every body !!!THANKS YOU