Senior Design ProjectMECT 4276
Team Members:Robert Maduro (Team Leader)
Adolfo LeyvaRicardo Gonzalez
Luis Avila10/16/2013
Industry Advisor: Wade Armer Justin Shepherd Luis CeballosInstructor: Medhad El Nahas
HeatExchangerLearningApparatus
2
ObjectiveGoals HELA DesignShop VisitTube Layout DetailsCurrent AssignmentsCompletion StatusAcknowledgements
Outline
3
To design and manufacture a heat exchanger learning apparatus to help students understand how a heat exchanger works and the various parameters that affect its performance
Objective
4
Incorporate a heat exchanger laboratory experiment in the Mechanical Engineering Technology Laboratory Curriculum
Include three(3) interchangeable bundles to familiarize students with the internal components of a heat exchanger
Incorporate LabView software to collect and display data
Goals
5
HELA Conceptual Model
Conceptual View
6
7
Materials Acquired
Channel Components
Tube Sheets &Baffl es
U-Tubesfor 3 Bundles
8
9
Heat Exchanger
HELA Shell
10
11
Heat Exchanger
Tack weld of shell
Ready for weld out of shell
12
Tube Layout Details
13
240V 3Phase 30 Amp outlet
120V Single phase 20 Amp outlets
3 phase outlet will be used for heating
elements and pumps
3 phase electric power is efficient & allows 3
phase devices to draw less current than an
equivalent single phase device
Fluids Lab Electric Utilities
14
Finalize User Operation Manual – Adolfo Leyva
Coordinate next shop visit – Robert Maduro
Procurement of electrical & miscellaneous components – Ohmstede
This Week Assignments
Team HELA
Project Planning
Market Research
Proposal (CTR)
Design
Preliminary Design
Modeling
Analysis
Optimization
Construction
Procure Funds
Material Allocation
Mechanical Assembly
Testing
Test Equipment Functionality
Optimize for Experiment
15 PendingIn ProgressCompleted
Project Completion 70%
16
Acknowledgements
• Special Thanks to:
Lucky Osborne – Welding Foreman (Ohmstede)
Curt Robbins – Plant Manger (Ohmstede)
Gordon Taylor – Lab Manager
17
Questions?