Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

40
Team Leader : Pradip Sahu Utility Lead Team Members : KV Satyanarayana: Plant PM Lead

Transcript of Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

Page 1: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

Team Leader : Pradip Sahu Utility LeadTeam Members : KV Satyanarayana: Plant PM Lead

Page 2: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

Our Purpose & Mission

Purpose

Mission

Empower people to snack right

Lead the future of snacking around the world by offering

the right snack for the right moment made the right way

Page 3: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

Our Power Brands

Multi Category Mega Site Expandable To ~300,000 Tons p.a.

PHASE 1

2016

Chocolates

57000MTA

30000MTA Crumb

PHASE 2

20XX

Chocolates

54000MTA

PHASE 3

20XX

Biscuits

45000MTA

PHASE 4

20XX

TBD

PHASE 5

20XX

TBD

3

ENVISAGED MULTI CATEGORY MEGA SITE - MONDELEZ SRICITY

CDM Plain 16 KT

CDM Inclusion 24 KT

Tang – 24 KT

Crumb Atom – 22 KTCrumb TR – 9 KT

Page 4: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

PEOPLE SNAPSHOT

Leadership Capability

o Personal resourcefulness

o 80 % coverage for SG 5+ on B@MB and

Powerful Conversations

o Team Effectiveness

o 100 % IL6S Council Team

o PLT workshop to strengthen common

purpose & relationships

Diversity

o Sustained 50 % diversity

o Key infrastructure enablers – Vacuum lifters,

Community Living, Feminine hygiene, Creche

o Well being & engagement programs

o Regular & periodic assessment for impact

through OPM.

SCBPPS* with Phase progression

o Structured accelerated program for

TM’s to transition to leadership roles in

an accelerated manner.

o Benchmarked with sites & SME’s

across Mdlz globally to design best fit

framework for Sricity

*Skill and contribution based progression and pay system

Page 5: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

One Vision-CompellingBusiness Need (CBN)

High Performance Work Culture (HPWS)

Manufacturing system Driving Continuos Improvement Mindset ( IL6S)

SITE STRATEGY-LOSS ELIMINATION

Page 6: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

START OF THE JOURNEY

Page 7: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

2018

2019

2020

Year of Innovation

Year of Validation

Year of Innovation

2017

Year of Optimization

2021

Gold Certified

Site Selection & Planning

Innovation in Design

Material Conservation

Indoor Environmental

Health & Occupational

Hazards

Energy & Water Conservation

Journey Towards Best In Class

ENERGY JOURNEY

Year of BIC

Page 8: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

ENERGY CONSUMPTION VS PRODUCTION 2017-2020

31

53

15

00

33

47

87

70

39

44

96

26

22

96

11

30

19

13

40

00

28

45

20

00 49

19

10

00

30

73

10

00

2017 2018 2019 2020

Energy (Kwh) Final Product (kg)

Page 9: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

9

Power (kwh) Thermal Energy (kcal)

Energy Management System

100% Engagement

OrganizationalStructure

Daily Data Analysis by focused groups

Monthly Progress Monitoring by Dedicated Site Team

Metering

64 Power Monitors15 Water Meters10 Steam Meters

Personalized Access Control

ENERGY MAPPING

78%

3%

7%

6%6%

C&C

Paddle drier

Tang

De-areator

T-Loss

DAILY LOAD : 48000 KCAL/DAY

5%

8%

3%

2%

22%49%

11%

16K Power (KWH)

LOF Power (KWH)

TANG Power (KWH)

UL power (KWH)

C&M (KWh)

Utility (KWH)Chiller,CDA

Miscillenaeous (KWH)

DAILY LOAD -117522 KWH/Day

Page 10: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

SPECIFIC ENERGY CONSUMPTION 2017-2020

0

500000

1000000

1500000

2000000

2500000

3000000

3500000

4000000

JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER

ELECTRICITY CONSUMPTION (KWH) 2017-2020

2017 2018 2019 2020

Reasons for varying in consumption :

1. Production number has got increased YOY. Which is 61 % over last three year.2. Line adding equipment for increasing capacity of Line.3. 14% Increased on Power VS Production increased 61 % over three year.

14%

Page 11: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

SPECIFIC THERMAL ENERGY CONSUMPTION 2017-2020

0

500000

1000000

1500000

2000000

2500000

JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER

THERMAL ENERGY (KCAL)2017-2020

2017 2018 2019 2020

Reasons for varying in consumption :

1. Production number has got increased YOY. Which is 61 % over last three year.2. Consumption is varying based on production 3. Flu Gas we are not able to use, due to less load , Which is impacting less recovery.4. Steam distribution loss as pipe size is higher than what we are using currently.

27%

Page 12: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

JOURNEY SO FAR AND INTERNAL BENCHMARK

3.5 KL/Ton2018 5.7 GJ/Ton

2019 4.08 GJ/Ton

2020 (YTD) 4.05 GJ/Ton 2 KL/Ton

2.4 KL/Ton

Y-O-Y Reduction

Overall Reduction 44 % 88.1%

16.8 KL/Ton2017 7.2 GJ/Ton

ENERGY BIC : 3 GJ/T

Page 13: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

ROAD MAP TO BEST IN CLASS IN MONDELĒZ GLOBALRoad Map

2018 2019 2020 2021 2022

GJ/T 5.7 4.08 4.05 3.3

BIC 3 3

GE (%) 80 85 85 88

Key ProjectsCooling optimization

Heat pump Magnetic Resonators Scale Bio Remover for CT

Desuperheater utilisation

Solar PV Cogged Belts AI pumps for chilling Plant

Lighting Solar Concentrator VFD for Chiller Process Pumps Heat Pump (2)

Paddle Drier SOPT - 4 nos EC fans 2 MW Solar PV

3DTracer Heat Less Vapouriser Flash Steam Recovery System

Compressor PHE Heat Recovery from Compressor

Smart Air Unit 80 % Utilization of Desuperheater

VFD for Coling Fan at Chiller

Elimination of Heater bank from Dehumidifiers

Energy Manager for Compressor

LNG replacement of LPG fuel

Page 14: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

20.8% Reduction

14% Reduction

Energy Thermal Energy

2018: YEAR OF INNOVATION

210

130

40

147

110 2

6

2017 YTD Volumes OptimisedCooling

De -Superheater

SolarConcentrator

Solar PV Water ProcessOptimisation

2018 YTDTarget

DVE - $/ton

Page 15: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

ENERGY

2018

• ANNUAL COST SAVING (INR): 11,16,000• CAPEX (INR): 30,000• OPEX (INR): NA• PAYBACK (years): 2 Months

Internal Lighting (kWh)

-32%

External lighting (kWh)

-61%

Page 16: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

2019: YEAR OF INNOVATION

33% Reduction

15% reduction

Energy

Thermal Energy

YTD 2019 YTD 2019

2.5

10.3

0.75

2.8

12.1

0.8 1.6 0.8 0.2 0.2 1.3 2.4 1.2 0.04 4 0.402468

101214

PROJECTS PLAN 2019 (INR MM)

Actual Target

Page 17: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

ENERGY

2019

Page 18: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

33% Reduction

Thermal Energy

Energy

33% Reduction

15% reduction

YTD 2020 YTD 2020

2020: YEAR OF INNOVATION

2.19

0.20

1.40

0.16 0.46

0.98

0.55 0.31

0.67

0

0.5

1

1.5

2

2.5

Magneticresonators

Cogged belts EC fans Desuperheater Flash steamrecovery

Energymanager forcompressors

Seal Cooling Rain waterharvesting

VFD for chillingplant process

pumps

Project planned In 2020

Series1 Series2

Page 19: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

ENERGY

2020

0

5

10

15

20

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

S/F Ratio & o2 – 2019 Average

Steam to fuel Ratio ( Avg) Flu Gas (o2) %

15 S/F Ratio o2- 8 %

16

.5 17

16

.5

6 6.2

6

M A R A P R I L M A Y

Total Cost for supply & installation

of MR. 200000 INR

Qty of fuel saved per day 132 Kgs

Total fuel saved per year 47520 Kgs

Cost of Fuel Saved per year 2005344 INR

Savings from March 2020 to May

2020 512477 INR

Payback 0.10 Year

Expected fuel savings achieved

through magnetic ressonators 3 %

Page 20: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

V BELT DETAILS

FAN MOTORPully Ratio 1 1.6

RPM 8751467 At 50Hz

RPM Ratio 0.59 1

DIA335mm 200mm

COGGED BELT

FAN MOTOR

Pully Ratio 1 1.04

RPM 7901050At35Hz

RPM RATIO 0.74 1

DIA 320 305

Cogged Belts Saving

Parameter Number Units

Avg power consumed per day with existing V Belt & pulley (6

Units)1296 KWH

KWH consumed when replaced with Cogged belt (6 units)

972 KWH

KWH Saved per Day 324 KWH

KWH saved Per Year 106920 KWH

cost saved per year 646866 INR

cost spent for cogged belt supply & Installation 200000 INR

2020: HVAC PROJECT

Page 21: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

HVAC PROJECT

Parameter Number UnitsPower Consumption of 16K

AHU per year124320

KWH

KWH cost per year 752136 INRPower consumption with EC+

fan 78120 KWH

Net Power Saving Per year 46200 KWH

Cost saved per year 279510 INRCost Spent for EC+ fans Supply

& installation 575000.0 INR

Payback 2.06 Years

AHU – Blower EC Fans

AHU ECBlue Centrifuge Fan

MakeZECO

Make

ZIEHL -ABEGG

AIR QTY (CFM) 22000 AIR QTY (CFM) 22000

Coil Brine Type EC Fan

FilterEU-4/7

Model

GR50C-ZID.GL.CR

Static Pressure 100 TOTAL QTY 4 NOS

FAN RPM 1445 MOTOR KW 4.02

MOTOR KW 14.8 TOTAL KW 9.3

Amps 33.2 Amps 15.5

Page 22: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

VFD CHILLING PLANT PUMPS

Problem Statement :1. Chilled Water Process Pumps : 90KWH each2. Running in Star delta with full 50Hz3. 3888 KWH unit consumption per day

Analysis :1. Power consumption analyzed 2. Flow requirement also verified3. Project Duration : Nov 2019 ( 30 Days)

Savings :1. Currently VFD Connected 2. Process pumps are running in 45Hz with

81KWH3. Power consumption : 3456 KWH/Day4. Savings per Annum : 7.1 Lakhs

Page 23: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

FLASH STEAM RECOVERY PROJECT

Flash Steam 3000kgHWS Design 50 M3/HrHWS Actual 16 M3/Hr Steam Requirements 3 TonsFuel Saved /Day 187.5Cost Saved /Day 7875

Page 24: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

PROJECT SUMMERY

Year No of Proposals Investments(INR MM) Savings (INR MM)

2017-18 16 10 18.86

2018-19 14 115.9 16.39

2019-2020 15 22.1 11.44

2020-2021 9 55.1 32.59

Sl No Project Details Investments Savings Payback (Year)

1

3DTracer, Cooling

optimization, Deuperheater

Utilization, Lighting reduction 1018.86 2

2Solar PV, Solar Concentrator,

SOPT, Heat Less Vaporiser, 115.916.39 7.2

3Compresser PHE, Smart

Air Unit, VFD at Cooling

Fan, Flash Jet Pump22.1

11.44 2.9

4EC Fans, Magnetic

Resonator, Cogged Belt,

VFD for Chiller pumps.55.1

32.59 2.1

Page 25: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

RENEWABLE ENERGY

Page 26: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

UTILIZATION OF RENEWABLE ENERGY SOURCES

9000 kwh Renewable energy generation, utilization and 8.1% of Overall Energy

TechnologyType of Energy

Onsite /OffsiteInstalled Capacity (MW)

Generation (Million KWH)

% Of overall Electrical Energy

Solar PV Electrical Onsite 2 MW 0.009 8.1

TechnologyType of Energy

Installed Capacity (Million Kcal)

Usage (Million Kcal)

% Of Overall thermal energy

Solar Concentrator

Thermal 0.175 0.125 71.43

Page 27: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

#DoItrightRecycling carton waste to make

sustainable stationery!

Turned into notebooks

That Grow into exotic plantS!

Carton Waste

WASTE UTILIZATION AND MANAGEMENT

Page 28: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

WASTE UTILIZATION AND MANAGEMENT

Flash Steam UtilizationEarlier flash steam use to vent out, Which

we have thought to utilize for our hot water skid. which helped us to reduce 3T

STEAM everyday.

Heat extract from return Chilled WaterWe have heat pump, Which takes water from chiller return water line and give lesser temperature water , Where it

reduces load from Chiller.

Page 29: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

2017 2018 2019

31.5kT 31.5kT 34.9kT

Mondelez Global Publishes the impact Report (attached) that talks about the GHG

emissions Scope 1, Scope 2 and Scope 3 Disclosures.

•Include Scopes included : Key Raw material , Packaging, manufacturing and others ( Scope

1 , Scope 2 and Scope 3) (Refer attached report)

•Absolute Emissions and Emissions intensity of last three years to be included

Mondelez India did an assessment of the Scope 1, Scope 2 and Limited Scope 3 emission in

2019.

The site uses Natural Gas and Grid Sourced Electricity are the highest contributors to the

emissions. The Grid emission is calculated at 227. kg/GJ CO2 emission

Sricity plant was commissioned in 2016 and ramped up to its capacity over a period of three

years. Hence an increase in emission may be noted.

GHG INVENTORISATION

Page 30: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

Target (short term/ long term) for CO2 emission reduction and action plan :

Type of waste 2017 2018 2019 Disposal Method

Production Waste 242 228 433 Animal Feed

Carbon waste 354 507 447 Upcycling/Recycling

Other waste incinerated with Energy recovery 91 93 45

Incinerated with energy recovery

Metal /Plastic waste 47 141 207 Sold to Recycler/Dismantler

•The plan is to target the highest Carbon emission source that is grid electricity and move to Renewable

Energy Sources through Power purchase.

•Natural Gas which is the second highest contributor cannot be switched to Biomass due to regulatory

constraints. Hence energy efficiency initiatives to reduce Natural gas consumption are in place.

•The target is to reduce E2E carbon emissions by 10% 2025.The site has a goal to maximize the

Renewable energy.

•Waste utilization in last three years

The waste disposal hierarchy is followed before discarding any waste ( Reduce, reuse, Upcycle,

Incinerate with energy recovery, Incinerate)

Hazardous waste is disposed as per the regulatory norms.

Page 31: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

GREEN PURCHASE POLICY:• There is no Green Purchase policy as it in embedded in the

sustainability goals and referred as Sustainable ingredients ( refer attached report)

• a. Information on Projects implemented : Cocoa Life program in India to sustainably source Cocoa ( without deforestation), 100% RSPO certified palm oil sourcing.

• b. Information on Evaluation done : To help us keep learning and improving, we engage two independent third-parties, Ipsos and FLOCERT, to measure and verify that we are accomplishing what we set out to do.

• c. Information on Investment Benefits achieved: Currently 60% of cocoa is sourced through cocoa life .Cocoa is sold by the farmers in the open market and Mondelez purchases it from them.

Page 32: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

ENERGY EFFICIENCY / AWARENESS TRAINING

SMALL GROUP ACTIVITIES (SGA)

SUSTAINABILITY COUNCIL MORALE

• Formation of a Sustainability council which undertakes weekly meeting with-

• Members from all departments

• Reviewing projects

• Identifying and discussing new opportunities

• With the agenda of

• Brainstorming on variousalternatives

• Getting alignement from all stakeholders

• Solve chronic issues which needattention

• Morale is kept high by-

• Holding regular competitions

• Rewarding hard work and right behaviors.

• Strong R&R Program

Page 33: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

TEAM WORK & EMPLOYEE INVOLVEMENT & MONITORING

Project Tracking MOMDMS Report1

5

2.5 3.9

2018 2019 2020

CAPEX ( CRS)

1% of total turnover

Page 34: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

DIGITAL DISPLAY AT SHOP FLOOR

Page 35: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

SKILL MATRIX

Page 36: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

LATEST TECHNOLOGY :

ROBOTIC AUTO STORAGE AND RETRIVAL SYSTEM

ROBOTIC PACKING MACHINE IINTEGRATED DIGITAL FACTORY

BUMS SYSTEM EMS SYSTEM CONTROL TOWER

Page 37: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

RESULT ACHIEVED

157%

2017 2018 2019

PRODUCTION 19134 28452 49191

1913428452

49191

0

20000

40000

60000PRODUCTION

3112167032008413

35971266

28000000

30000000

32000000

34000000

36000000

38000000

2017 2018 2019

ELECTRICITY

1796077

15235251359366

0

600000

1200000

1800000

2400000

2017 2018 2019

LPG

32%

61%

13%

Page 38: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

LONG TERM VISION ON EE

• Fuel reduction plan: LNG as a natural gas , required support on how it is safe to use..

• Required more ideas on reusages of energy ( Thermal )

• Waste recovery : Biogas project for small quantity food waste.

Page 39: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

EXTERNAL RECOGNITIONS

Yield achieved for 2018 was 99.02% against target of 9Gold 8.7%

0 TIR on line in 2018

Manufacturing Excellence “Gold Award”

Sustainability 4.0 Award

“CII EHS Excellence ” award & 5 Star rating for demonstrating best HSE Practices across site

“CII Best Energy Saving ideas awards”

Clinched 3rd Position in Southern India

“CII Kaizen awards”

Excellence energy management unit , CII at 2019 Hydrabad,

Page 40: Team Leader : Pradip Sahu Utility Lead Team Members : KV ...

2018 SUCCESS

Mondelēz India Foods Ltd (Formerly Cadbury India Ltd.)Site : Sricity

KV Satyanarayana – 9160003596 ( [email protected] )Pradip Sahu – 9908706871 ([email protected])