TDV evidence of performance 14

10
Tom de Vries [email protected] +61 (0) 408453256 AGM extract. Cobar Consolidated Resources November 2013 – Relevant slides for GM performance

Transcript of TDV evidence of performance 14

Page 1: TDV evidence of performance 14

Tom de Vries [email protected]

+61 (0) 408453256

AGM extract. Cobar Consolidated Resources November 2013 – Relevant slides for GM performance

Page 2: TDV evidence of performance 14

Tom de Vries [email protected]

+61 (0) 408453256

Page 3: TDV evidence of performance 14

Tom de Vries [email protected]

+61 (0) 408453256

Page 4: TDV evidence of performance 14

Tom de Vries [email protected]

+61 (0) 408453256

Below: Despite effort to improve site performance. reducing cost and increasing

output the drop in silver price to May 2014 was over 30%.

Page 5: TDV evidence of performance 14

Tom de Vries [email protected]

+61 (0) 408453256

UME Australia – Underground Production drilling, raiseboring and Workshop

0

100

200

300

400

500

600

700

800

900

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

Me

trre

s d

rille

d p

er

mo

nth

2011 into 2012 Year

UME PERFORMANCE excluding raisbores

Metres drilled

Percusion hours

0

10

20

30

40

50

60

70

Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May

$/M

dri

lled

2011 to 2012

$/metre excluding raisebores

Series1

Series2

Series3

Series4

Page 6: TDV evidence of performance 14

Tom de Vries [email protected]

+61 (0) 408453256

ASX release: Sale of Operation to Joint Venture Partner (Rension Mine, Metals-X)

Page 7: TDV evidence of performance 14

Tom de Vries [email protected]

+61 (0) 408453256

News article demonstrating “Turnaround ” and Cashflow, Includes

evidence of renewed union interest for new EBA. - Renison mine

Page 8: TDV evidence of performance 14

Tom de Vries [email protected]

+61 (0) 408453256

Costerfield Zero base for procedures, reporting, measuring – introduced Philosophy “measure then

manage it”

Include KPI’s other than headline performance indicators

Poorly understood mine, mill and orebody became controllable after measurements

Converted Contractor to owner operate with demonstrated performance improvements

Once KPI’s agreed corporately as well as locally, Managers then self managed by

measurement.

Developed LOM plan and strategy.

505560657075808590

Sb Recovery

Budget

Actual

Page 9: TDV evidence of performance 14

Tom de Vries [email protected]

+61 (0) 408453256

KPI’s for Isa Copper Mine

Above figure – Tonnes per man year.

Above figure – Metres developed per machine per month.

Below figure – LTI Rate for 2001.

0

5,000

10,000

15,000

20,000

25,000

Nov-

00

Dec-

00

Jan-

01

Feb-

01

Mar-

01

Apr-

01

May-

01

Jun-

01

Jul-

01

Aug-

01

Sep-

01

Oct-

01

Nov-

01

Copper Mine Enterprise Copper Stream

D eve lo p m en t M etres

0

2 0

4 0

6 0

8 0

1 0 0

1 2 0

1 4 0

1 6 0

1 8 0

Fe

b

Ma

rch

Ap

ril

Ma

y

Ju

ne

Ju

ly

Au

gu

st

Se

pte

mb

er

Oc

tob

er

No

ve

mb

er

M o n th

Me

tre

s

M etre s /R i g/M on th

C opper M ine LT I C hart

0

5

10

15

20

S ep O c t Nov Dec Jan Feb M ar A pr M ay Jun-

01

Jul-

01

A ug S ep O c t Nov

LTI LTIFR

Page 10: TDV evidence of performance 14

Tom de Vries [email protected]

+61 (0) 408453256

Above figure indicates the size of effort required to change results

Lead Mine Mount Isa Lost Time Injury Frequency Rate

0

10

20

30

40

50

Jul-99

Sep

-99

Nov-9

9

Jan-

00

Mar

-00

May

-00

Jul-00

Sep

-00

Nov-0

0

Jan-

01

Mar

-01

May

-01

Monthly LTI LTIFR

SUMMER

Retrenchments Focus on Supervisors, Training

and worker ownership