TD/MSD
REVIEW CHARGEAND
AGENDA
Clas12 Torus CCM Production Readiness Review –Dec 4, 2013
![Page 2: TD/MSD REVIEW CHARGE AND AGENDA Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022082821/5697bfc61a28abf838ca73fb/html5/thumbnails/2.jpg)
TD/MSD
Scope of the review
The scope of the review includes an assessment of Quality Assurance Plans and Controls to ensure the quality of the coil winding will perform to the Hall B Torus Specification. The review will focus on a typical series of Quality Assurance Elements critical to quality including the following:
• Project QA/QC Plan and/or Manufacturing Plan• Project Organization Structure, Responsibilities, Supervision, and Oversight• Technician and Staff Training, Qualification, and Training Records• Work Environment• Work Processes including Assembly Travelers, QC Tests, Inspections, and related
procedures including rework and repair• Management and Control of Documents and Records• Calibration Program as applied to Calibrated Measuring and Test Equipment to be
used for the project• Non-Conformance Identification, documentation, and corrective action resolution• Traceability of materials• Product Realization Planning including Storage and control of materials, packaging,
and shipping plans and procedures• Purchasing and Verification of Purchased Products• Control of Purchased Items and Customer Supplied Materials and Equipment• Suspect Counterfeit Items Awareness & Prevention
Detailed version: Review charges
2
![Page 3: TD/MSD REVIEW CHARGE AND AGENDA Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.](https://reader036.fdocuments.us/reader036/viewer/2022082821/5697bfc61a28abf838ca73fb/html5/thumbnails/3.jpg)
TD/MSD
Agenda
• 8:00-8:15 am : Executive session • 8:15-8:40 am : Torus CMM Production Overview (including Project
organization, responsibilities, Supervision and Oversight) - G. Velev• 8: 40-9:40 am : CMM Assembly – A. Makarov• 9:40-10:10 am : System Controls, Equipment, and QA Measurements –
L. Elementi • 10:10-10:25 am Coffee Break • 10:25-11:00 am Visit of the Production Floor• 11:00- 11:40 am Traveler System, Inspections, Rework and Repair – J.
Szal• 11:40-12:10 pm Manufacturing Plan - T.J. Gardner • 12:10-1:00 pm Lunch – FNAL cafeteria• 1:00-14:00 pm Committee Meeting and Question/Answer Session
3