TDHCA Rental Development
Application and Development Process
Getting Ready
• Technical assistance is available from the Multi-family Production Unit
• Contact David Danenfelzer 512-475-3865
• Applications are currently accepted at any time
Application Threshold Reviews
• CHDO qualification
• Organizational review
• Phase 1 Environmental
Application Review ProcessInitial Approvals
• Feasibility assessment – preliminary review done by production staff
• Site review – has TDHCA funded other projects near this site that would constitute undue competition or market impact?
• Project Design – does the design reflect the goals of the agency and the project
• HOME compliance – does application reflect probable compliance with all regs?
Underwriting and Funding Award
• Once initial reviews are completed, application is forwarded to Real Estate Analysis Unit to determine subsidy
• Costs compared to cost database• Budgets reviewed for completeness• Underwriting attempts to reconcile two
conflicting goals:– Provide as little subsidy as possible– Assure the feasibility of the project
Contract Processing
• Read and sign contract• [For CHDO operating funds only,
expenditures may begin.]• Immediately address Relocation notice
requirements• Engage in Environmental and Site and
Neighborhood reviews• Understand LURA implications• Participate in loan closing
Contract Activation
• To be covered
Pre-construction
• At this point pre-construction and acquisition draws only, until . . . .
• Plan review and corrections if necessary• Contractor Eligibility approval• Lead paint inspections• Labor Stds Officer appointment and wage rate
preparation• Preconstruction conference• Notice to proceed
During and After Construction
• Progress inspections
• Accessibility clearance
• Be prepared!
Miscellaneous Information
• http://www.hud.gov/offices/cpd/affordablehousing/programs/home/index.cfm
• Environmental Notice CPD 01-11
• 504 and Fair Housing Notice CPD 00-09 extended by 03-13
Tools for Developers
• http://www.enterprisefoundation.org/resources/ERD/default.asp
• LISC
• Advanced HOME training – ICF
• Housing Development for Nonprofits by Ben Hecht
Underwriting Issues
• Time delay between funding and completion• Cost of compliance• Assure contingencies and reserves are
appropriate– Construction– Replacement– Operating/rent-up– Developer fee– Debt coverage ratio
• Insurance, utilities, utility allowances• Rent increases lag inflation in expenses