TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... ·...

17
TCORE - Concourse B Renovation Public Notice Sean Loughran, Planning & Development January 23, 2019

Transcript of TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... ·...

Page 1: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

TCORE - Concourse B Renovation Public NoticeSean Loughran, Planning & DevelopmentJanuary 23, 2019

Page 2: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

Presentation Overview• The Public Notice Requirement

• PDXNext Capital Projects and Terminal Core Redevelopment: Recap

• Concourse B Renovation: Key Benefits, Project Facts, & Renderings

• Project Budget & Minority Contracting

• Concourse B Renovation Public Comment

2

Page 3: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

Airport Plan District - Notification Requirement• When is notice required?

• Part of a City land use review?

• Airside

• Landside

• Development or Alternation

• Mailed public notice

• Public meeting opportunity = PDX CAC

• Application for building permits

• xxx3

Page 4: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

4

Sequence of Events

Public Notice – Concourse B Renovation

Design &

Construction

Ongoing

Design – through summer 2019

Horizon Relocation to Concourse C – fall 2019

Construction – through summer 2021; opening fall 2021

Communication and outreach

Today

Page 5: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

PDXNext Major Capital Projects

Terminal Balancing/Concourse E Extension

Quick Turn Around Facility

Parking Additions & ConRAC

$67MComplete

$282MConstruction underwayComplete late 2021

$215MConstruction underwayComplete mid-2020

Terminal Core/Concourse A & B$950M (Phase 1)Early design Construction start – early 2020Complete late 2024 (est.)

Terminal Core Redevelopment

5

$100M (part of TCORE budget)Final design 2019Construction Complete 2021

Concourse B Redevelopment

Page 6: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

Existing Concourse A & Key Changes• Concourse A constructed as a temporary facility by Horizon in 1988• Built to serve smaller, regional markets• Aircraft size and number of service frequencies have both increased• Level of service has steadily decreased as a result

6

Page 7: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

TCORE Major Project Scope & PhasingPhase 1 - $950M• Western Expansion, including underground utilities• New roof structure• Concourse B Renovation, Concourse A Demolition, Remain

Overnight Parking• Terminal mezzanine relocations

Phase 2• Terminal Core Renovation, including Ticket Lobby• Baggage Claim Improvements

7

Page 8: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

8

Concourse B Renovation & Concourse A Demo

Existing B

B Addition

A Demolition

TriMet Coordination

P1 Garage

Page 9: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

Concourse B Renovation - Interior

Upper level

9

Lower (ground) level

Page 10: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

10

Exterior Rendering

TriMet PlatformConcourse B Addition

Walkway to Aircraft

P1

Ticket Lobby

Rental Car Center (future)

Page 11: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

11

Interior Rendering

Page 12: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

Concourse B Renovation Project Facts• Includes demolition of Concourse A• Renovation of existing Concourse B, including 18,000sf addition• Reconfiguration of ground load operation with 6 aircraft parking

positions and enhanced remain overnight parking• Recommissioning of Gate B4• Improved passenger concessions and amenities

• Requires temporary relocation of current Horizon operation to Concourse C

12

Page 13: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

PDXNext Major Capital Projects

Terminal Balancing/Concourse E Extension

Quick Turn Around Facility

Parking Additions & ConRAC

$67MComplete

$282MConstruction underwayComplete late 2021

$215MConstruction underwayComplete mid-2020

Terminal Core/Concourse A & B$950M (Phase 1)Early design Construction start – early 2020Complete late 2024 (est.)

Terminal Core Redevelopment

13

$100M (part of TCORE budget)Final design 2019Construction Complete 2021

Concourse B Redevelopment

Page 14: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

Concourse B Renovation Key Benefits• Implementation of Airport Futures (Airport Master Plan)• Provides long-term aircraft parking capacity for PDX• Improves availability and configuration of remain overnight parking• Vastly improves the PDX user experience• Provides TriMet ability to double-track in the immediate vicinity and

improve south-side bike and pedestrian access to PDX

14

Page 15: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

South-side Bike and Pedestrian Improvements

15

Page 16: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

16

Budget Summary & Minority Contracting

Concourse B Renovation budget included within overall TCORE project budget of $950M.

*Figures rounded to nearest million

$ 80M$ 10M$ 1M$ 1M$ 1M$ 7M$100M

ConstructionDesignProcurementsProgram Mgmt.PermitsContingencyTotal

Concourse B Renovation* Minority Contracting

• Design goal: 10%• Design progress to date: 6.7%• Construction goal: 20%

Page 17: TCORE - Concourse B Renovation Public Notice Sean Loughran, … CAC TCORE - CCB... · 2019-01-24 · Walkway to Aircraft. P1. Ticket Lobby. Rental Car Center (future) 11. Interior

17

Concourse B RenovationPublic Comment