TBTS Test Program & Schedule G. Riddone 05.02.2008.

download TBTS Test Program & Schedule G. Riddone 05.02.2008.

If you can't read please download the document

description

G. Riddone, CLEX layout TL2 TBL – decelerator reserved space two-beam exp. area CALIFES probe-beam linac Space reserved for ITB – Instrumentation Test Beam line

Transcript of TBTS Test Program & Schedule G. Riddone 05.02.2008.

TBTS Test Program & Schedule G. Riddone G. Riddone, Content Two-beam test phases Structures tests Layout Status of the procurement Module tests Schedule Conclusions G. Riddone, CLEX layout TL2 TBL decelerator reserved space two-beam exp. area CALIFES probe-beam linac Space reserved for ITB Instrumentation Test Beam line G. Riddone, Two-beam test phases Structure tests Phase 1: test with PETS only Power generation Phase 2: test with PETS and accelerating structures Two beam operation CLIC module Phase 1: 8 accelerating structures with wakefield monitors Phase 2: 6 accelerating structures and 1 quadrupole G. Riddone, Structure test Phase 1 G. Riddone, Structure test Phase 1 Layout for first PETS which will be done with PETS with no damping material. Connection to cooling circuit and vacuum studied 4 holes at 45 degrees to allow for the implementation of the on-off mechanism Same tank for recirculation and PETS on-off G. Riddone, Structure test Phase 1 TL2 TBL PETS assembly ready to be inserted in the tank PETS in the tank with all infrastructure PETS on tank internal supports G. Riddone, Tank for PETS and AS Mechanical calculations: EDMS# Technical specification: EDMS# Drawings for tank, internal components and flanges all finalized: available in CDD CLIAVACU Handling system studied Alignment/positioning strategy agreed with TS/SU +/ Tanks under manufacturing in Pakistan (two units allowing for fast replacement): 1 unit: March 08 2 unit: June 2008 Mechanical calculations: under way Tanks under manufacturing in Pakistan: 1 unit: Aug 2008 PETS AS G. Riddone, PETS Assembly procedure studied in detailed: horizontal assembly method on dedicated assembly test Status of the procurement Test sample: successfully manufactured Couplers: under production two firms selected to minimize risk of failure expected at CERN in February 08 (first set from UNITEK already finished) PETS bars: under production also in this case two firms selected expected at CERN in May GHz, octant sample, length = 0.2 m, IMP First prototype rod bar finished shipped on 11.02 G. Riddone, RF components Prototype x-band directional coupler received in Dec 2007 G. Riddone, Structure test Phase 2 Accelerating structure PETS G. Riddone, CLIC module Module with only acc. structures Module with main beam quadrupole and acc. structures G. Riddone, CLIC module in CTF3 G. Riddone, Test program G. Riddone, Conclusions Layout for phase 1 studied RF components ordered and so far procurement under schedule PETS tanks being manufactured in Pakistan: first unit completed in March 08 PETS couplers end bars ordered (two firms selected) Installation for phase 1 from May-June 2008