TBL as a 12 GHz power source, overview and first results from commissioning

23
TBL as a 12 GHz power TBL as a 12 GHz power source, overview and source, overview and first results from first results from commissioning commissioning IWLC 2010 workshop Steffen Döbert, BE-RF Current status of TBL Current status of TBL Status of series production Status of series production First results form First results form commissioning commissioning What’s next ? TBL upgrade What’s next ? TBL upgrade

description

TBL as a 12 GHz power source, overview and first results from commissioning. Current status of TBL Status of series production First results form commissioning What’s next ? TBL upgrade. TBL vs CLIC. - PowerPoint PPT Presentation

Transcript of TBL as a 12 GHz power source, overview and first results from commissioning

Page 1: TBL as a 12 GHz power source, overview and first results from commissioning

TBL as a 12 GHz power TBL as a 12 GHz power source, overview and source, overview and

first results from first results from commissioningcommissioning

IWLC 2010 workshop Steffen Döbert, BE-RF

Current status of TBLCurrent status of TBL

Status of series productionStatus of series production

First results form commissioningFirst results form commissioning

What’s next ? TBL upgradeWhat’s next ? TBL upgrade

Page 2: TBL as a 12 GHz power source, overview and first results from commissioning

TBL vs CLICTBL vs CLIC

PETS are designed to produce nominal CLIC power of 135 MW for nominal 28 A CTF3 current

Page 3: TBL as a 12 GHz power source, overview and first results from commissioning

TBL statusTBL status

Beam line including PETS prototype installedBeam line including PETS prototype installed all Quads on movers, all Quads on movers, BPM’s with new read out electronics, BPM’s with new read out electronics, diagnostic section with emittance meter and diagnostic section with emittance meter and timetime resolved spectrometer resolved spectrometer

First commissioning and measurements First commissioning and measurements performedperformed PETS qualified and found consistent up to 20 PETS qualified and found consistent up to 20 MWMW beam matching and transport performed beam matching and transport performed end of line spectrometer tested end of line spectrometer tested BPM resolution measured BPM resolution measured Magnet movers tested Magnet movers tested

Page 4: TBL as a 12 GHz power source, overview and first results from commissioning

TBL in CLEXTBL in CLEX

Page 5: TBL as a 12 GHz power source, overview and first results from commissioning

TBL commissioningTBL commissioning

Page 6: TBL as a 12 GHz power source, overview and first results from commissioning

Klystron Drive beam

RF power out

RF power in

Drive beam

RF power out

ASTA (SLAC)CTF3 (CERN + Collaborations)

Two beam test stand (CERN + Collaborations)Objective: to understand the limiting factors for the PETS ultimate performce Objective: to demonstrate design rf parameters at the

output of the PETS

Test beam line (CERN + Collaborations)Objective: to demonstrate the beam transportation without looses and ~ 50% deceleration.

PETS testingPETS testing

I. Syratchev

What matters is the output section !

Page 7: TBL as a 12 GHz power source, overview and first results from commissioning

PETS, beam driven PETS, beam driven testtest TBL TBL

20 MW power produced with a 10A beam according to predictions, form factor 0.9

-100 0 100 200 300 400 500-1

0

1

2

3

4

5

6

7

8

9

Time (ns)R

F p

ower

(M

W)

Pout left

Pout right

Pref leftPref right

P predict

Page 8: TBL as a 12 GHz power source, overview and first results from commissioning

PETS, power PETS, power productionproduction

0 100 200 300 400 500 600 7000

2

4

6

Time (ns)

RF

pow

er (

MW

)

Pout left

Pout rightP predict

0 100 200 300 400 500 600 700-40

-30

-20

-10

0

10

Time (ns)

RF

pha

ses

(deg

)

PETS is a very sensitive diagnostics for the longitudinal beam structure,

IQ-detectors used for power measurements

Page 9: TBL as a 12 GHz power source, overview and first results from commissioning

PETS, power PETS, power productionproduction

stabilitystability

Current stability ~ 1.3%; P ~ I2

Measured current stability in the CTF3 linac 9x10-

4

Page 10: TBL as a 12 GHz power source, overview and first results from commissioning

PETS, power PETS, power productionproduction

position correlationposition correlation

Offset: -5 mm;h -3 mm;v 0 mm; +2 mm;v +5 mm;h

Page 11: TBL as a 12 GHz power source, overview and first results from commissioning

Status of series Status of series productionproduction

Well defined program to produce next 8 tanksWell defined program to produce next 8 tanks

3 by CIEMAT, 5 by CERN 3 by CIEMAT, 5 by CERN

Pacing item is the PETS itselfPacing item is the PETS itself

First set of 8 received (last week)First set of 8 received (last week)

At CERN we prepared for clean room assemblyAt CERN we prepared for clean room assembly

Hope to have 4 tanks installed in January,Hope to have 4 tanks installed in January,

8 tanks in summer 2011, 16 in 2012 8 tanks in summer 2011, 16 in 2012

India and BINP both made PETS prototypes as India and BINP both made PETS prototypes as

wellwell

(option for second series) (option for second series)

Page 12: TBL as a 12 GHz power source, overview and first results from commissioning

Status of series Status of series productionproduction

First conform PETS bar for series production

Page 13: TBL as a 12 GHz power source, overview and first results from commissioning

Status of series Status of series productionproduction

First conform PETS bar for series production

Page 14: TBL as a 12 GHz power source, overview and first results from commissioning

Status of series Status of series productionproduction

SiC dampers for HOM installed on a PETS bar

SiC prepared for baking at 950 deg C

Page 15: TBL as a 12 GHz power source, overview and first results from commissioning

Status of series Status of series productionproduction

Two PETS bar’s from India

Page 16: TBL as a 12 GHz power source, overview and first results from commissioning

Status of series Status of series productionproduction

Several couplersbrazed and cold tested at CERN

Series in production

11.5 11.6 11.7 11.8 11.9 12 12.1 12.2 12.3 12.4 12.5-70

-60

-50

-40

-30

-20

-10

(dB

)

Frequency (GHz)

11.5 11.6 11.7 11.8 11.9 12 12.1 12.2 12.3 12.4 12.5-40

-35

-30

-25

-20

-15

-10

-5

0

frequency (GHz)

(dB

)

S11

S12

Page 17: TBL as a 12 GHz power source, overview and first results from commissioning

Plans for Plans for completion and completion and

feasibility feasibility demonstrationdemonstration

Goal to have 4 tanks installed in January 2011Goal to have 4 tanks installed in January 2011

Demonstration with 8 until summer 2011, Demonstration with 8 until summer 2011,

>30% deceleration >30% deceleration

Complete TBL with 16 PETS in 2012Complete TBL with 16 PETS in 2012

Perform full experimental program afterwardsPerform full experimental program afterwards

>50% deceleration >50% deceleration

Detailed program, see talks in DB working Detailed program, see talks in DB working

groupgroup

Page 18: TBL as a 12 GHz power source, overview and first results from commissioning

Plans for TBL Plans for TBL beyond 2012beyond 2012

Upgrade TBL to a test facility relevant for Upgrade TBL to a test facility relevant for

CLIC TDR work CLIC TDR work

12 GHz power production for structure 12 GHz power production for structure

conditioningconditioning

Working experience with a real deceleratorWorking experience with a real decelerator

Beam dynamics studies, pulse shaping, Beam dynamics studies, pulse shaping,

feedbacks, etcfeedbacks, etc

What can be done ? What is reasonable ?What can be done ? What is reasonable ?

Page 19: TBL as a 12 GHz power source, overview and first results from commissioning

Plans for TBL Plans for TBL beyond 2012beyond 2012

TBL versus klystrons, additional value of TBL

Klystron Klystron TBL+ TBL+

Rep rate (Hz) 50 100 10 5

slots 2 2 1 1

Number of units 2 2 16 8

hours/day 24 24 24 12

days/year 300 300 300 180

Rf-pulses/year 5E+09 1E+10 4E+09 3E+08

TBL: Test of PETS and structure possible Closer to CLIC situationLess flexible for frequent changes in the set up

28 A needed for 135 MW/PETS20 A for 70 MW/PETS15 A for 70 MW/ for two PETS

Page 20: TBL as a 12 GHz power source, overview and first results from commissioning

Plans for TBL Plans for TBL beyond 2012beyond 2012How could it look like

Page 21: TBL as a 12 GHz power source, overview and first results from commissioning

Plans for TBL Plans for TBL beyond 2012beyond 2012

Possible scenario to be studied further

TBL seem not ideal for around the clock TBL seem not ideal for around the clock

conditioningconditioning

facility (klystrons seem more suited) facility (klystrons seem more suited)

But, TBL is a unique facility for conditioning But, TBL is a unique facility for conditioning

R&DR&D

specific to CLIC specific to CLIC

Create a limited number of testing slots (4-8) Create a limited number of testing slots (4-8)

to do this kind of experiments, limited run timeto do this kind of experiments, limited run time

Page 22: TBL as a 12 GHz power source, overview and first results from commissioning

Plans for TBL Plans for TBL beyond 2012beyond 2012

What can be done with TBL+

Develop conditioning scenario for CLICDevelop conditioning scenario for CLIC

conditioning with beam / use of ON/OFF mechanism of PETS conditioning with beam / use of ON/OFF mechanism of PETS

precondition with klystron and then with beamprecondition with klystron and then with beam

conditioning of PETSconditioning of PETS

Test bed for PETS development, ON/OFF, Test bed for PETS development, ON/OFF,

new designs, etc new designs, etc

Power production as a function of beam Power production as a function of beam

parametersparameters

alignment, stability, pulse shape, phase stability, beam loses, alignment, stability, pulse shape, phase stability, beam loses,

failure modesfailure modes

Continue decelerator beam dynamics studiesContinue decelerator beam dynamics studies

Page 23: TBL as a 12 GHz power source, overview and first results from commissioning

ConclusionConclusion

TBL commissioning ongoing, feasibility TBL commissioning ongoing, feasibility

demonstration can be started in 2011 with 8 PETS demonstration can be started in 2011 with 8 PETS

and finished with 16 in 2012and finished with 16 in 2012

TBL+ - upgrade useful as a facility dedicated to TBL+ - upgrade useful as a facility dedicated to

conditioning experiments, essential for CLIC TDR conditioning experiments, essential for CLIC TDR

phasephase

Working horse conditioning facility based on Working horse conditioning facility based on

klystrons is needed in addition to support the klystrons is needed in addition to support the

structure developmentstructure development