Tax Invoice - RA Bill 1
-
Upload
saurabh-kumar-sharma -
Category
Documents
-
view
5 -
download
1
description
Transcript of Tax Invoice - RA Bill 1
![Page 1: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/1.jpg)
TAX INVOICE DATED: 01-10-2015 BILL NO.: RA BILL - 01
Name of work : Construction of Assam House, New Delhi
M/s SBP Commercial (P) Ltd.,
Plot No. 1, Assam House, Near Chanakya Puri Police Station,
Delhi
(Sub: RA BILL - 01 )
Dear Sir,
Please find the details of work executed along with the attached measurement sheet
Sl.No.Description of Item Unit Quantity Unit PriceAmount (INR)
1 Nos. 1.000 2,524,440 2524440
Total Basic Cost 2524440
Total Basic Amount of RA Bill 01 (A) 2,524,440
Service Tax @ 14% of (A) 353,422
Total Landed Cost inclusive of tax 2,877,862
In Words: INR Twenty Eight Lakhs Seventy Seven Thousand Eight Hundred Sixty Two Only
For M/s Neenv Infrastructures (P) Ltd.Dated: 01st October 2015
RA BILL - 01 as per enclosed Measurement Sheet
![Page 2: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/2.jpg)
Please find the details of work executed along with the attached measurement sheet
Amount (INR)
In Words: INR Twenty Eight Lakhs Seventy Seven Thousand Eight Hundred Sixty Two Only
![Page 3: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/3.jpg)
RA BILL - 04 Summary Sheet of Civil Works at M/s Prayag Polymers (P) Ltd., Bhiwadi
A) RCC Shell - Terrace Floor/Mumty/Lift Machine Room
4 RCC in column - M25 988.13 cft 67.50 66698.44
4 RCC in Slab/Beam 1290.86 cft 52.50 67770.12
5 Shuttering with ply 6007.17 sqft 44.00 264315.52
6 Tor Steel approximate consumptio 26.23 MT 8775.00 230168.25
8 Brickwork in 1:6 (230 Thk.) 4354.90 cft 56.50 246052.01
9 Brick Bat Coba - Hall 1 13125.00 sqft 21.00 275625.00
Brick Bat Coba - Hall 2 13125.00 sqft 21.00 275625.00
10 Internal Plaster 12747.00 sqft 10.00 127470.00
Total Amount (A) 1553724.33
B) Exterior & Elevation Work
1 Brickwork in Face in 1:4 10606.12 sqft 27.50 291668.18
2 External Plaster 42696.85 sqft 12.00 512362.17
4 Exterior Paint - Snowcem 29600.00 sqft 2.50 74000.00
5 Exterior Paint - Rustic Texture 10700.00 sqft 10.00 107000.00
Total Amount (B) 985030.35
C) Finishing Item - After Structure
1 Kotah Stone Floor Laying - approx 69807.00 sqft 8.00 558456.00
2 MS Door Window Fabrication/Fixin 18737.80 Kg 12.00 224853.60
15 Granite Cladding on Column 924.00 sqft 18.00 16632.00
15 Granite Cladding on Wall - Stairs/P 5253.13 sqft 18.00 94556.34
15 Granite on Steps/Landing/Slab 2851.48 sqft 18.00 51326.64
15 Granite on Riser 1568.48 rft 18.00 28232.64
15 Top of Wall Fixing - Granite 704.00 rft 18.00 12672.00
15 Granite - Toilet Slab 242.50 sqft 18.00 4365.00
15 Granite - Moulding 1361.00 rft 18.00 24498.00
Total Amount (C) 1015592.22
![Page 4: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/4.jpg)
Value of RA Bill 04 = (A+B+C) 3554346.90
All Raw Material Consumed at Site supplied by M/s Prayag Polymers (P) Ltd. free of cost
Total Basic Amount of RA Bill 4 3,554,347
For M/s Neenv Infrastructures Pvt. Ltd.
Dated: 27-03-2015
![Page 5: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/5.jpg)
![Page 6: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/6.jpg)
All Raw Material Consumed at Site supplied by M/s Prayag Polymers (P) Ltd. free of cost
![Page 7: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/7.jpg)
BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd., Bhiwadi
Sl.NoDescription of Item Nos. L W H Quantity UnitA Terrace Floor
4 RCC in Column in M-25In Grid 17 (G to A)Pedestal - C7 1.000 1.000 1.500 4.000 6.000Pedestal - C2 2.000 1.000 1.500 4.000 12.000Pedestal - C3A 2.000 1.000 1.500 4.000 12.000Pedestal - C3 1.000 1.000 1.500 4.000 6.000In Grid 16 (D to A)Pedestal - C9 3.000 1.500 1.500 4.000 27.000Pedestal - C3 1.000 1.000 1.500 4.000 6.000In Grid 15 (G to E)Pedestal - C8 2.000 1.000 1.500 4.000 12.000In Grid 13&14 (G to A)Pedestal - C1 2.000 1.000 1.000 10.000 20.000Pedestal - C4 1.000 1.000 1.500 10.000 15.000Pedestal - C3 1.000 1.000 1.500 10.000 15.000Pedestal - C8 1.000 1.000 1.500 10.000 15.000Pedestal - C11 3.000 1.500 1.500 4.000 27.000Pedestal - C4 1.000 1.000 1.500 4.000 6.000In Grid 12 (G to A)Pedestal - C2 1.000 1.000 1.500 4.000 6.000Pedestal - C4A 1.000 1.000 1.500 4.000 6.000Pedestal - C9 1.000 1.500 1.500 4.000 9.000Pedestal - C10 2.000 1.500 1.500 4.000 18.000Pedestal - C11 1.000 1.500 1.500 4.000 9.000In Grid 11 (G to A)Pedestal - C2 1.000 1.000 1.500 4.000 6.000Pedestal - C4A 1.000 1.000 1.500 4.000 6.000Pedestal - C9 1.000 1.500 1.500 4.000 9.000Pedestal - C10 2.000 1.500 1.500 4.000 18.000Pedestal - C11 1.000 1.500 1.500 4.000 9.000In Grid 10 (G to A)Pedestal - C2 1.000 1.000 1.500 4.000 6.000Pedestal - C4A 1.000 1.000 1.500 4.000 6.000Pedestal - C9 1.000 1.500 1.500 4.000 9.000Pedestal - C10 2.000 1.500 1.500 4.000 18.000Pedestal - C11 1.000 1.500 1.500 4.000 9.000In Grid 8 & 9 (G to A)Pedestal - C2 (double set) 4.000 1.000 1.500 10.000 60.000Pedestal - C3 (double set) 2.000 1.000 1.500 10.000 30.000Pedestal - C3A (double set) 4.000 1.000 1.500 10.000 60.000Pedestal - C7 (double set) 2.000 1.000 1.500 10.000 30.000In Grid 6 & 7 (G to A)Pedestal - C1 1.000 1.000 1.000 10.000 10.000Pedestal - C2 1.000 1.000 1.500 4.000 6.000Pedestal - C3 1.000 1.000 1.500 10.000 15.000
![Page 8: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/8.jpg)
BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd., Bhiwadi
Pedestal - C4A 1.000 1.000 1.500 10.000 15.000Pedestal - C8 1.000 1.000 1.500 10.000 15.000Pedestal - C9 1.000 1.500 1.500 4.000 9.000Pedestal - C10 1.000 1.500 1.500 10.000 22.500Pedestal - C11 1.000 1.500 1.500 4.000 9.000Pedestal - C10 1.000 1.500 1.500 4.000 9.000In Grid 5 (G to A)Pedestal - C2 1.000 1.000 1.500 4.000 6.000Pedestal - C4 1.000 1.000 1.500 4.000 6.000Pedestal - C6 1.000 1.000 1.500 4.000 6.000Pedestal - C9 3.000 1.500 1.500 4.000 27.000Pedestal - C10 1.000 1.500 1.500 4.000 9.000In Grid 3 & 4 (G to A)Pedestal - C4 1.000 1.000 1.500 4.000 6.000Pedestal - C5 1.000 1.000 1.500 15.500 23.250Pedestal - C6 3.000 1.000 1.500 15.500 69.750Pedestal - C9 3.000 1.500 1.500 4.000 27.000Pedestal - C12 1.000 1.500 1.500 15.500 34.875In Grid 2 (G to A)Pedestal - C13 2.000 1.500 1.500 4.000 18.000Pedestal - C14 1.000 1.500 1.500 4.000 9.000Pedestal - C15 1.000 1.500 1.500 4.000 9.000Pedestal - C15 1.000 1.500 1.500 15.500 34.875Pedestal - C16 1.000 1.500 1.500 15.500 34.875In Grid 1 (G to A)Pedestal - C13 5.000 1.500 1.500 4.000 45.000Pedestal - C15 1.000 1.500 1.500 4.000 9.000
988.125 cft5 RCC in Slab/Beam in M-25
In Beam Mumty near Grid 6-7Beam B-12 2.000 14.750 1.000 2.000 59.000do 1.000 6.250 0.750 2.000 9.375Beam B-11 1.000 6.250 0.750 2.000 9.375Beam B-7 1.000 22.000 1.000 2.000 44.000Beam B-23 1.000 20.500 0.750 2.000 30.750Beam B-21 1.000 20.000 1.000 2.000 40.000Beam B-20 1.000 19.000 1.000 2.000 38.000Mumty near Grid 13-15Beam B-13 1.000 11.000 1.000 2.000 22.000
1.000 8.000 0.750 2.000 12.000Beam B-11 1.000 8.000 0.750 2.000 12.000Beam B-9 1.000 11.500 0.750 2.000 17.250Beam B-8 1.000 9.000 1.000 2.000 18.000Beam B-27 1.000 21.000 1.000 2.000 42.000Beam B-25 1.000 19.500 0.750 2.000 29.250Beam B-21 1.000 19.750 1.000 2.000 39.500
![Page 9: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/9.jpg)
BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd., Bhiwadi
Mumty near Grid 2-4Beam B-16 1.000 17.500 1.000 2.000 35.000Beam B-18 1.000 18.000 0.750 2.000 27.000Beam B-19 1.000 17.500 0.750 2.000 26.250Beam B-1 1.000 12.375 0.750 2.000 18.563
1.000 9.000 0.750 2.000 13.500Beam B-3 1.000 9.000 0.750 2.000 13.500Beam B-4 1.000 22.375 1.000 2.000 44.750In SlabMumty near Grid 6-7 1.000 6.250 13.000 0.500 40.625do 1.000 6.250 8.000 0.500 25.000do 1.000 14.750 21.750 0.500 160.406Chajja 1.000 24.542 1.500 0.500 18.406Mumty near Grid 13-15 1.000 11.500 21.500 0.500 123.625do 1.000 8.000 12.500 0.500 50.000do 1.000 8.000 8.250 0.500 33.000Chajja 1.000 22.500 1.500 0.500 16.875Mumty near Grid 2-4 1.000 12.875 18.750 0.500 120.703do 1.000 9.000 9.250 0.500 41.625do 1.000 9.000 9.000 0.500 40.500Chajja 1.000 25.375 1.500 0.500 19.031
### cft7 Shuttering
In Grid 17 (G to A)Pedestal - C7 1.000 1.000 1.500 4.000 20.000Pedestal - C2 2.000 1.000 1.500 4.000 40.000Pedestal - C3A 2.000 1.000 1.500 4.000 40.000Pedestal - C3 1.000 1.000 1.500 4.000 20.000In Grid 16 (D to A)Pedestal - C9 3.000 1.500 1.500 4.000 72.000Pedestal - C3 1.000 1.000 1.500 4.000 20.000In Grid 15 (G to E)Pedestal - C8 2.000 1.000 1.500 4.000 40.000In Grid 13&14 (G to A)Pedestal - C1 2.000 1.000 1.000 10.000 80.000Pedestal - C4 1.000 1.000 1.500 10.000 50.000Pedestal - C3 1.000 1.000 1.500 10.000 50.000Pedestal - C8 1.000 1.000 1.500 10.000 50.000Pedestal - C11 3.000 1.500 1.500 4.000 72.000Pedestal - C4 1.000 1.000 1.500 4.000 20.000In Grid 12 (G to A)Pedestal - C2 1.000 1.000 1.500 4.000 20.000Pedestal - C4A 1.000 1.000 1.500 4.000 20.000Pedestal - C9 1.000 1.500 1.500 4.000 24.000Pedestal - C10 2.000 1.500 1.500 4.000 48.000Pedestal - C11 1.000 1.500 1.500 4.000 24.000In Grid 11 (G to A)
![Page 10: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/10.jpg)
BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd., Bhiwadi
Pedestal - C2 1.000 1.000 1.500 4.000 20.000Pedestal - C4A 1.000 1.000 1.500 4.000 20.000Pedestal - C9 1.000 1.500 1.500 4.000 24.000Pedestal - C10 2.000 1.500 1.500 4.000 48.000Pedestal - C11 1.000 1.500 1.500 4.000 24.000In Grid 10 (G to A)Pedestal - C2 1.000 1.000 1.500 4.000 20.000Pedestal - C4A 1.000 1.000 1.500 4.000 20.000Pedestal - C9 1.000 1.500 1.500 4.000 24.000Pedestal - C10 2.000 1.500 1.500 4.000 48.000Pedestal - C11 1.000 1.500 1.500 4.000 24.000In Grid 8 & 9 (G to A)Pedestal - C2 (double set) 4.000 1.000 1.500 10.000 200.000Pedestal - C3 (double set) 2.000 1.000 1.500 10.000 100.000Pedestal - C3A (double set) 4.000 1.000 1.500 10.000 200.000Pedestal - C7 (double set) 2.000 1.000 1.500 10.000 100.000In Grid 6 & 7 (G to A)Pedestal - C1 1.000 1.000 1.000 10.000 40.000Pedestal - C2 1.000 1.000 1.500 4.000 20.000Pedestal - C3 1.000 1.000 1.500 10.000 50.000Pedestal - C4A 1.000 1.000 1.500 10.000 50.000Pedestal - C8 1.000 1.000 1.500 10.000 50.000Pedestal - C9 1.000 1.500 1.500 4.000 24.000Pedestal - C10 1.000 1.500 1.500 10.000 60.000Pedestal - C11 1.000 1.500 1.500 4.000 24.000Pedestal - C10 1.000 1.500 1.500 4.000 24.000In Grid 5 (G to A)Pedestal - C2 1.000 1.000 1.500 4.000 20.000Pedestal - C4 1.000 1.000 1.500 4.000 20.000Pedestal - C6 1.000 1.000 1.500 4.000 20.000Pedestal - C9 3.000 1.500 1.500 4.000 72.000Pedestal - C10 1.000 1.500 1.500 4.000 24.000In Grid 3 & 4 (G to A)Pedestal - C4 1.000 1.000 1.500 4.000 20.000Pedestal - C5 1.000 1.000 1.500 15.500 77.500Pedestal - C6 3.000 1.000 1.500 15.500 232.500Pedestal - C9 3.000 1.500 1.500 4.000 72.000Pedestal - C12 1.000 1.500 1.500 15.500 93.000In Grid 2 (G to A)Pedestal - C13 2.000 1.500 1.500 4.000 48.000Pedestal - C14 1.000 1.500 1.500 4.000 24.000Pedestal - C15 1.000 1.500 1.500 4.000 24.000Pedestal - C15 1.000 1.500 1.500 15.500 93.000Pedestal - C16 1.000 1.500 1.500 15.500 93.000In Grid 1 (G to A)Pedestal - C13 5.000 1.500 1.500 4.000 120.000Pedestal - C15 1.000 1.500 1.500 4.000 24.000
![Page 11: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/11.jpg)
BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd., Bhiwadi
In Beam Mumty near Grid 6-7Beam B-12 2.000 14.750 1.000 2.000 143.075do 1.000 6.250 0.750 2.000 28.750Beam B-11 1.000 6.250 0.750 2.000 27.813Beam B-7 1.000 22.000 1.000 2.000 106.700Beam B-23 1.000 20.500 0.750 2.000 94.300Beam B-21 1.000 20.000 1.000 2.000 94.000Beam B-20 1.000 19.000 1.000 2.000 92.150Mumty near Grid 13-15Beam B-13 1.000 11.000 1.000 2.000 53.350
1.000 8.000 0.750 2.000 36.800Beam B-11 1.000 8.000 0.750 2.000 35.600Beam B-9 1.000 11.500 0.750 2.000 52.900Beam B-8 1.000 9.000 1.000 2.000 43.650Beam B-27 1.000 21.000 1.000 2.000 101.850Beam B-25 1.000 19.500 0.750 2.000 86.775Beam B-21 1.000 19.750 1.000 2.000 95.788Mumty near Grid 2-4Beam B-16 1.000 17.500 1.000 2.000 84.875Beam B-18 1.000 18.000 0.750 2.000 80.100Beam B-19 1.000 17.500 0.750 2.000 80.500Beam B-1 1.000 12.375 0.750 2.000 56.925
1.000 9.000 0.750 2.000 41.400Beam B-3 1.000 9.000 0.750 2.000 40.050Beam B-4 1.000 22.375 1.000 2.000 108.519In SlabMumty near Grid 6-7 1.000 6.250 13.000 81.250do 1.000 6.250 8.000 50.000do 1.000 14.750 21.750 320.813Chajja 1.000 24.542 1.500 0.500 50.583Mumty near Grid 13-15 1.000 11.500 21.500 247.250do 1.000 8.000 12.500 100.000do 1.000 8.000 8.250 66.000Chajja 1.000 22.500 1.500 0.500 46.500Mumty near Grid 2-4 1.000 12.875 18.750 241.406do 1.000 9.000 9.250 83.250do 1.000 9.000 9.000 81.000Chajja 1.000 25.375 1.500 0.500 52.250
### sqft8 Brickwork - 230 Thk. In 1:6
In Super StructureIn Grid 17 (A-G) 1.000 96.000 0.750 4.000 288.000In Grid 9&8 (A-G) 2.000 96.000 0.750 4.000 576.000In Grid A(17-4) 1.000 182.584 0.750 4.000 547.752In Grid G(17-2) 1.000 202.459 0.750 4.000 607.377Mumty - Grid 6&7 2.000 20.500 0.750 10.500 322.875
![Page 12: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/12.jpg)
BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd., Bhiwadi
2.000 22.000 0.750 10.500 346.500Mumty - Grid 13&15 2.000 21.000 0.750 10.500 330.750
2.000 20.000 0.750 10.500 315.000Mumty near Grid 2-4 1.000 13.000 0.750 15.500 151.125
1.000 9.000 0.750 15.500 104.6253.000 17.500 0.750 15.500 610.3131.000 22.330 0.750 15.500 259.586
Deduct Mumty Doors 4.000 5.000 0.750 7.000 -105.000### cft
For M/s Neenv Infrastructures (P) Ltd.Dated: 27-03-2015
![Page 13: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/13.jpg)
BILL OF QUANTITIES FOR EXTERIOR ELEVATION - Prayag Polymers (P) Ltd., Bhiwadi
Sl.NoDescription of Item Nos. L W H Quantity UnitA Exterior & Elevation
East Side - BrickworkBox - U Type 4.000 2.250 45.160 406.440Edge of Box 8.000 1.000 45.160 361.280Box - E Type 3.000 2.500 45.160 338.700Edge of Box 6.000 1.000 45.160 270.960Front Top of U 2.000 24.000 5.500 264.000Front Top of E 1.000 23.000 7.500 172.500South Side - BrickworkBox - U Type 8.000 2.250 45.160 812.880Edge of Box ### 1.000 45.160 722.560Box - E Type 3.000 2.500 45.160 338.700Edge of Box 6.000 1.000 45.160 270.960Front Top of U 4.000 25.000 5.500 550.000Front Top of E 1.000 24.000 7.500 180.000Mumty Near South East 1.000 22.160 60.490 1340.458Less Area at 00 Level 1.000 7.250 52.660 -381.785Less Area at 00 Level 1.000 3.000 52.660 -157.980Mumty Near South East 1.000 24.083 60.490 1456.781Less Area at 00 Level 1.000 7.500 52.660 -394.950Less Area at 00 Level 1.000 3.000 52.660 -157.980Box - Single Type 1.000 2.250 52.660 118.485Edge of Box 2.000 1.000 52.660 105.320North Side - BrickworkBox - U Type 6.000 2.250 45.160 609.660Edge of Box 8.000 1.000 45.160 361.280Box - I Type 3.000 3.500 52.660 552.930Edge of Box 6.000 1.000 45.160 270.960Front Top of U 3.000 23.660 8.000 567.840Mumty Near North West 1.000 24.830 65.490 1626.117Less Area at 00 Level 0.000 7.250 52.660 0.000
### sqft
East Side - PlasterFull Length of Building 1.000 106.000 52.660 5581.960Edge of U Box 8.000 1.000 45.160 361.280Edge of E Box 5.000 1.000 45.160 225.800Front Top of U 2.000 24.000 1.000 48.000
4.000 5.500 1.000 22.0002.000 19.500 1.000 39.000
Front Top of E 1.000 23.000 1.000 23.0002.000 7.500 1.000 15.0002.000 7.750 1.000 15.500
South Side - PlasterFull Length of Building 1.000 251.000 52.660 ###Extra for Double Height Portio 1.000 34.000 5.000 170.000
![Page 14: Tax Invoice - RA Bill 1](https://reader036.fdocuments.us/reader036/viewer/2022082616/5695d3851a28ab9b029e38da/html5/thumbnails/14.jpg)
BILL OF QUANTITIES FOR EXTERIOR ELEVATION - Prayag Polymers (P) Ltd., Bhiwadi
Extra for Mumty 1.000 22.160 7.830 173.513do 1.000 24.083 7.830 188.570Edge of U Box ### 1.000 45.160 722.560Edge of E Box 5.000 1.000 45.160 225.800Front Top of U 4.000 25.000 1.000 100.000
8.000 5.500 1.000 44.0004.000 19.500 1.000 78.000
Front Top of E 1.000 24.000 1.000 24.0002.000 8.250 1.000 16.5002.000 8.250 1.000 16.500
West Side - PlasterFull Length of Building 1.000 105.000 57.660 6054.300Edge of Shaft Box 8.000 1.000 57.660 461.280North Side - PlasterFull Length of Building 1.000 251.000 52.660 ###Extra for Double Height Portio 1.000 34.000 5.000 170.000Extra for Mumty 1.000 24.083 12.830 308.985Edge of U Box ### 1.000 45.160 541.920Edge of I Box ### 1.000 52.660 526.600Front Top of U 3.000 2.660 1.000 7.980
6.000 8.000 1.000 48.0003.000 17.160 1.000 51.480
### sqft
For M/s Neenv Infrastructures (P) Ltd.Dated: 27-03-2015