Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership...
Transcript of Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership...
![Page 1: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/1.jpg)
Tasmanian Irrigation Pty. Ltd.
Tamar Irrigation SchemeCommunity Meeting
Sidmouth Community HallThursday 12 December 2019
![Page 2: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/2.jpg)
Agenda
1. Introductions
SAFETY SHARE
2. Tasmanian Irrigation (TI) overview & next steps
3. Scheme development & Farm WAP’s
4. Questions from the floor
5. Irrigator Representative Committee Overview and Election
6. General discussion and light refreshments
![Page 3: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/3.jpg)
2. TI Overview
Andrew Kneebone
CEO
![Page 4: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/4.jpg)
Who is TI ?
Tasmanian Irrigation Pty. Ltd.
A State Government owned company
Minister: Guy Barnett Chair: Samantha Hogg CEO: Andrew Kneebone
![Page 5: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/5.jpg)
What is TI’s job?• To develop and operate sustainable irrigation schemes in
Tasmania, in partnership with farming communities
• Formerly the TIDB. Tasmanian Irrigation Pty. Ltd. formed in July 2011 under the Irrigation Company Act 2011
• The principal objectives of the Company are – to develop, own and operate irrigation schemes in
Tasmania; and to operate its businesses and activities effectively and
efficiently and in accordance with sound commercial practice.
![Page 6: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/6.jpg)
Sustainability – a must
For a TI scheme to proceed it must be:
• Economically sustainable
• Environmentally sustainable; and
• Socially sustainable
![Page 7: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/7.jpg)
Engineering Standards
TI Projects are designed to ensure:
• 95% reliability of irrigation water supply
• Pipelines with 100+ year lifespan (HDPE)
• Water Storages (Dams) with 200+ year lifespan
• Design focus is on minimising variable costs (power) wherever possible
![Page 8: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/8.jpg)
Current TI Irrigation Schemes• 17 Operating Schemes with a
combined capacity of 154,000ML
• 15 of these schemes have been constructed by TI. Scottsdale Irrigation Scheme currently in construction
• Investigating 10 schemes which forms Tranche 3 including the Tamar Irrigation Scheme
![Page 9: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/9.jpg)
Working in Partnership
Capital Costs
Scheme development (capital) costs are shared between the Community and the Private sector.
Public (Australian and Tasmanian Governments) By funding commitments supported by TI Business Cases
Private (e.g. Irrigators): By purchasing water entitlements –
$1,390/ML OR25% of Capital Expense (CAPEX) whichever is greater
![Page 10: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/10.jpg)
Working in Partnership
• Scheme Management in partnership between TI and the Irrigator Committee
• Ongoing asset ownership and compliance reporting by the Responsible Water Entity (TI)
• Annual costs (fixed and variable) are the responsibility of the Water Entitlement holder
![Page 11: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/11.jpg)
The next steps for Tranche 3
• State Government commitment - $70M
• Australian Government Commitment - $100M
![Page 12: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/12.jpg)
3. Scheme Development
Sven Rand
Project Manager
![Page 13: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/13.jpg)
• Investigating 10 schemes which forms Tranche 3 including the Tamar Irrigation Scheme
TRANCHE 3
TAMAR
![Page 14: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/14.jpg)
• Minimum Tranche 3 scheme size is 3,000ML
TAMAR Irrigation Scheme
![Page 15: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/15.jpg)
Tamar EOI process• Minimum Tranche 3 scheme size
is 3,000ML
• Initial EOI process run early 2018 and with recent re-issue is currently• >100 properties ~8000ML
1000
20002000
3000
![Page 16: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/16.jpg)
Tamar EOI process• Minimum Tranche 3 scheme size
is 3,000ML
• Initial EOI process run early 2018 and with recent re-issue is currently• >100 properties ~8000ML
• Final scheme design will be based on actual water sales
1000
20002000
3000
![Page 17: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/17.jpg)
Tamar Concept• Minimum Tranche 3 scheme size
is 3,000ML
• Initial EOI process run early 2018 and with recent re-issue is currently• >100 properties ~8000ML
• Final scheme design will be based on actual water sales
• South Esk / Meander • Lake Trevallyn pump station
1000
20002000
3000
LakeTrevallyn
INDICATIVE Concept exampleonly
![Page 18: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/18.jpg)
• Minimum Tranche 3 scheme size is 3,000ML
• Initial EOI process run early 2018 and with recent re-issue is currently• >100 properties ~8000ML
• Final scheme design will be based on actual water sales
• South Esk / Meander • Lake Trevallyn pump station
• Mainline(s) to N of Batman
1000
20002000
3000
Tamar ConceptINDICATIVE Concept exampleonly
![Page 19: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/19.jpg)
1000
20002000
3000
• Minimum Tranche 3 scheme size is 3,000ML
• Initial EOI process run early 2018 and with recent re-issue is currently• >100 properties ~8000ML
• Final scheme design will be based on actual water sales
• South Esk / Meander • Lake Trevallyn pump station
• Mainline(s) to N of Batman• Main spur to Lilydale
• Batman booster(?)
Tamar Concept
?
INDICATIVE Concept exampleonly
![Page 20: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/20.jpg)
1000
20002000
3000
• Minimum Tranche 3 scheme size is 3,000ML
• Initial EOI process run early 2018 and with recent re-issue is currently• >100 properties ~8000ML
• Final scheme design will be based on actual water sales
• South Esk / Meander • Lake Trevallyn pump station
• Mainline(s) to N of Batman• Main spur to Lilydale
• Batman booster• Spurs and riparian delivery
Tamar ConceptINDICATIVE Concept exampleonly
![Page 21: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/21.jpg)
1000
20002000
3000
• Minimum Tranche 3 scheme size is 3,000ML
• Initial EOI process run early 2018 and with recent re-issue is currently• >100 properties ~8000ML
• FINAL SCHEME DESIGN WILL BE BASED ON ACTUAL WATER SALES
• South Esk / Meander • Lake Trevallyn pump station
• Mainline(s) to N of Batman• Main spur to Lilydale
• Batman booster• Spurs and riparian delivery
Tamar ConceptINDICATIVE Concept exampleonly
![Page 22: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/22.jpg)
Scheme Concept Design • Lake Trevallyn is the proposed scheme water source
• (South Esk / Macquarie / Meander / Central Highlands)
• Investigation required on specific pump station site.
• Rising main ~8 km from the pump station to a balance tank
• ~112 km of distribution pipeline – HDPE pipe (largely gravity)
• Smaller booster pump stations and pipeline to East of Tamar
• Further work required to confirm demand.
• Aim to complete construction within five years for the 2024/25 irrigation season, sooner if possible.
![Page 23: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/23.jpg)
Scheme Development – Next StepsSubject to community support for TI’s continued investigation for an irrigation scheme in the district:
• Confirm community interest (This meeting)
• Election of an Irrigator Working Group (This meeting)
• Finalisation of EOI’s and ground truthing concept design
• Preferred Option
• Water Sales
• Scheme Business Case
• Detailed Design, permits and approvals and tendering
• Construction (subject to funding)
• Development of Farm Water Access Plans
• Commissioning and operation - WATER USE
![Page 24: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/24.jpg)
Sustainability
Farm Water Access Plans
• Consider soil, water and biodiversity modules within an overall farm plan
• Requirement of public sector funding and aim to ensure that the
application of TI water does not cause any degradation to the land,
waterways or environment
• Are compulsory for all land to which TI water is to be stored or applied
• Percentage are audited annually for compliance
![Page 25: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/25.jpg)
Thank youAny Questions ?
Support?Irrigator Representative Committee?
![Page 26: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/26.jpg)
IRRIGATOR REPRESENTATIVE COMMITTEEThe IRC represents irrigators to exchange information, provide advice and operational feedback to TI on operational matters.
Ideally the IRC members will represent
• Geographic spread of the scheme
• Different agricultural enterprises
• An understanding of the value / opportunities / costs and implementation
issues associated with irrigation (not necessarily an entitlement holder).
Ideally the IRC will comprise
• more than 3, ideally five to six and no more than 9 or 10
![Page 27: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/27.jpg)
Question / ANSWERS
• Nil impact on gorge E-flow• Water will be purchased at cost of
“forgone electricity”• Annual irrigation scheme volume is ~equivalent
to maximum daily throughput of generator. so irrigation potentially represents ~1/365th of maximum power station throughput (0.3%)
![Page 28: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/28.jpg)
Question / ANSWERSOnce off construction contribution• Tranche Three irrigation schemes will involve a once-off irrigator contribution
towards scheme construction of a minimum $1390 per ML or 25% of the total construction costs whichever is greater; the final contribution for the Tamar scheme will be determined by a number of factors.
• Concept estimated at ~$75 million• IF 7500ML uptake therefore ~$10,000 per ML to build• Irrigators pay 25% = $2,500 per ML (once off build cost)
Ongoing annual costs – Annual Fixed charge and Variable Charge• Following the initial construction cost contribution, irrigators will contribute
annual ongoing costs for water, proportional to the water volume used and the applied location for each respective property; and
• Operating costs are determined by a combination of factors including operational pumping costs, administration and maintenance requirements.
• Estimates of up to $235.00 per ML depending on location
![Page 29: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/29.jpg)
Question / ANSWERS
• A person must prove a link to land within a district to receive initial water entitlements. • Purchasers of traded water entitlements do not need to own land.• Water entitlements come in two categories;
1. Irrigation Rights (“IR”): volume of water for use during the irrigation season (ML); and2. Delivery Rights (“DR”): right to have the IR volume delivered at a set flow rate.
generally ML per day, (or a percentage of the scheme capacity)• Allocation trades refer to transfers of the volume (IR) and flow rate (DR) allocations• Tradability within an irrigation district is regulated through the Delivery Right zone
Source
Zone 1 Zone 2Zone 3
Spur A
![Page 30: Tasmanian Irrigation Pty. Ltd....2019/12/12 · Tamar Irrigation Scheme Working in Partnership Capital Costs Scheme development (capital) costs are shared between the Community and](https://reader033.fdocuments.us/reader033/viewer/2022042710/5f6a4eb469c3af5c8f212b1b/html5/thumbnails/30.jpg)
Thanks again - DRIVE SAFELY