TASMAN HIGHWAY APSLEY RIVER BRIDGE REPLACEMENT
Transcript of TASMAN HIGHWAY APSLEY RIVER BRIDGE REPLACEMENT
State Roads
Department of State Growth
TASMAN HIGHWAY– APSLEY RIVER BRIDGE REPLACEMENT Submission to the Parliamentary Standing Committee on Public Works Version: 2 Date: 18 August 2017
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works Version: 2 Date: 18 August 2017
Document Development History
Build Status
Version Date Author Reason Sections
00
01 23 June 2017 R Cassidy
02 17 August 2017 A Fowler Progress update
Amendments in this Release
Section Title Section Number
Amendment Summary
DA 3.9 Update on approval
Program 4.1 Update on budget and program
Distribution
Copy No Version Issue Date Issued To
10 02 17 Aug 2017 Secretary, PSCPW
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works Version: 2 Date: 18 August 2017
Table of Contents
1 INTRODUCTION ........................................................................................................................................ 1
1.1 BACKGROUND ............................................................................................................................................. 1 1.2 PROJECT OBJECTIVES .................................................................................................................................... 1 1.3 PROJECT LOCATION ...................................................................................................................................... 1 1.4 STRATEGIC CONTEXT OF THE PROJECT .............................................................................................................. 2
2 PROJECT DETAILS ..................................................................................................................................... 4
2.1 PROPOSED WORKS ...................................................................................................................................... 4 2.2 DESIGN SPEED ............................................................................................................................................. 4 2.3 ROAD CROSS SECTION .................................................................................................................................. 4 2.4 DRAINAGE .................................................................................................................................................. 4 2.5 UTILITIES .................................................................................................................................................... 5
3 SOCIAL, ENVIRONMENTAL IMPACTS AND STAKEHOLDER ENGAGEMENT ................................................. 6
3.1 PROPERTY ACQUISITION ................................................................................................................................ 6 3.2 PROPERTY ACCESSES .................................................................................................................................... 6 3.3 NOISE ........................................................................................................................................................ 6 3.4 FLORA AND FAUNA ...................................................................................................................................... 7 3.5 ABORIGINAL HERITAGE ................................................................................................................................. 9 3.6 HISTORIC HERITAGE ASSESSMENT ................................................................................................................... 9 3.7 LANDSCAPE AND VISUAL IMPACTS ................................................................................................................... 9 3.8 STAKEHOLDER ENGAGEMENT ......................................................................................................................... 9 3.9 DEVELOPMENT APPROVALS ........................................................................................................................... 9
4 PROJECT PROGRAM AND COSTS ............................................................................................................ 11
4.1 PROJECT PROGRAM.................................................................................................................................... 11 4.2 ESTIMATE OF POSSIBLE COSTS ...................................................................................................................... 12
5 CONCLUSION .......................................................................................................................................... 13
Appendices
APPENDIX A. STAKEHOLDER CONCERNS
APPENDIX B. PRELIMINARY DESIGN DRAWINGS
Authorisation
Name Signature Date
Authorised by: A Fowler
18 Aug 2017
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 1 of 13
1 Introduction
1.1 Background
The Apsley River Bridge is located approximately 5 kilometres south of Bicheno on the Tasman Highway (Link 42). The bridge was constructed in 1947 and is comprised of 12 simply supported spans with a total length of 146 metres. A detailed structural assessment has been undertaken on the bridge, which found the structure is unacceptable to support current truck, axle and crane loads under normal operating conditions. The Department of State Growth (Department) is therefore planning to replace the bridge to improve safety for road users, and enable continued access for these heavier vehicles.
1.2 Project Objectives
The primary objective of the project is to replace the existing structure with a contemporary bridge designed in accordance with the current Australian Standard 5100-2017: Bridge Design, in particular to take SM1600 loading and have a 100 year design life. The Apsley River Bridge provides an important regional link to the town of Bicheno for freight vehicles, and its replacement will ensure that no load limit will have to be enforced on the bridge due to constraints on the capacity of the structure. Due to the existing horizontal alignment being sub-standard on the western approach to the bridge, where a design speed of approximately 70km/h exists, the replacement bridge is to be constructed on a much improved alignment. Hence the objective of this new alignment will be to meet the requirements for a 100km/h design speed.
1.3 Project Location
Located approximately 5 km south west of Bicheno on the Tasman Highway, the site is on the Apsley River within the Swan - Apsley catchment and is identified in Figure 1. The site is located on the alluvial plains associated with the river and is below the 20 m contour.
Areas surrounding the site are used for rural activities, predominantly grazing, with a hard rock quarry located approximately 500 m from the existing bridge. The Tasman Highway is now marketed as The Great Eastern Drive. It is the major east coast road link and this section links the coastal centres of Bicheno, Coles Bay and Swansea, passing a number of tourist attractions such as vineyards, beaches and national parks. This section is also a popular cyclist route.
The Apsley River corridor contains riparian vegetation which extends along the river banks and over the top of the bank in this location.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 2 of 13
Figure 1: Locality Plan
1.4 Strategic Context of the Project
1.4.1 Alignment with Approved Strategies
The Apsley River Bridge has been identified for replacement by the Department due to its structural deficiency to support current truck, axle and crane loads under normal operating conditions. The current bridge therefore presents a major safety concern to users of this section of the Tasman Highway. In addition to the structural deficiency of the bridge, the road geometry in the immediate vicinity of the bridge has been deemed to be acceptable only for a design speed of 70km/h. This project will incorporate an improvement in the road alignment such that a 100km/h design speed is achieved, consistent with the Tasman Highway in this vicinity. In combination with the new bridge being designed to current Australian Standards, this project will achieve a significant safety improvement for this section of the Tasman Highway.
Tasman Highway
Apsley River Bridge
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 3 of 13
1.4.2 Alignment with Planning Policies and Themes
This bridge replacement and road realignment is consistent with other bridge strengthening and replacements projects recently undertaken by the Department, for the purposes of both safety upgrades and improving accessibility for heavier vehicles to parts of the state road network. The replacement of the Apsley River Bridge will mitigate the need to otherwise enforce load limit restrictions to the bridge, which would have the potential to have a major impact on heavy vehicle operators in the region, and hence local industry. In addition to the freight benefits, wider shoulders and higher bridge barriers shall be constructed to improve the safety for cyclists on this popular tourist route.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 4 of 13
2 Project Details
2.1 Proposed Works
The proposed works for the Apsley River Bridge replacement include:
• Construction of a new 90 metre overall simply supported Super-T bridge structure with three equal 30 metre spans, adopting spill through style abutments. The new bridge shall be situated on a new alignment upstream of the existing bridge;
• A total of 1434 metres of realigned road on both approaches to the bridge, the new road alignment being designed for the specified design speed as described in Section 2.2; and
• Demolition of the existing Apsley River Bridge structure and rehabilitation of the redundant road sections.
Preliminary design drawings for the road realignment and bridge structure are included in Appendix A.
2.2 Design Speed
The design speed for the Highway at the Apsley River Bridge will be increased to 100km/h. While this is above the current design speed in a number of locations on the Tasman Highway, it is consistent with this section of the highway and it is appropriate to position and design a replacement bridge with a 100 year design life to this standard.
2.3 Road Cross Section
Design cross sections have been agreed with the Department in accordance with target widths appropriate to the assigned road category in the State Roads hierarchy including scope for the future. The agreed cross sections for the new road are:
• 3.1m wide traffic lanes throughout;
• 1.4m wide sealed shoulders at the approaches to and departures from the bridge where safety barriers exist;
• 1.0m wide sealed shoulders elsewhere;
• Verges are to be sealed to 0.5m behind the safety barrier where safety barrier is to be installed to reduce maintenance costs and increase safety; and
• 0.5m wide unsealed verges elsewhere. Cross-falls are in accordance with standard guideline practice at 3% with superelevation to match design speed on the horizontal curves.
2.4 Drainage
Table drains have been provided in the design to direct water toward the Apsley River from each direction and on each side of the road. No cross drainage is proposed as all flows gravitate directly to the River. Culverts will be placed under property accesses as necessary. Grassed swales are proposed on the major drains to improve water quality entering the Apsley River.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 5 of 13
Subsoil drainage will be provided where required to ensure the protection of the new road pavement.
2.5 Utilities
Review of information obtained through topographic survey and a Dial Before You Dig query indicates that the following public utilities are located within the Highway Reservation:
• Overhead electricity, owned by TasNetworks, and
• Underground telecommunication cables, owned by Telstra. Consultation with the public utility owners is currently being undertaken regarding the relocation and protection requirements for utilities impacted by the upgrade works.
2.5.1 Overhead Electricity
An overhead electricity line is located parallel to the Highway on the eastern and the western approach to the bridge. The poles are generally positioned in close proximity to the fence line and cross the existing road from the north side of the road to the south side as the road heads east away from the bridge. A number of poles will be relocated as part of the project. There is an overhead crossing of the Highway to the east of the bridge that provides a connection to private property.
2.5.2 Telecommunication Cables
There are telecommunications cables located on the western approach to the bridge, however, these are not affected by the proposed works and are understood to be redundant.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 6 of 13
3 Social, Environmental Impacts and Stakeholder Engagement
3.1 Property Acquisition
Construction of the bridge and associated road realignment will require acquisition to be undertaken on two titles, CT 47296/1 and 32288/1 both are owned by the same owner. In addition, modifications to existing road reserves on both sides of the river will be required. New fencing will be required at the newly created boundary. The road is currently proclaimed as a highway on its existing alignment. The matter of proclamation of the new road alignment may be expected to be dealt with during the detailed design phase of the project.
3.2 Property Accesses
Deviation of the Highway will result in a redundant section of the existing Tasman Highway being abandoned when the new alignment is opened to traffic. The design drawings indicate the rehabilitation of this redundant road, but the exact nature of the treatment required will be finalised in negotiation with the affected landowner. An access to a private road listed as “future road” on The List is used by the quarry to the north of the subject site. The access will be reconstructed to suit the new alignment. Other gates for farm access will be relocated following negotiation with the landowner.
3.3 Noise
The nearest residence is located approximately 2 km away and is in the same ownership as the land that must be acquired for the new bridge and road realignment. Other buildings located 2 km from the site (adjacent the river) are associated with the stockpiling of quarry materials on the same site. The Department uses the Tasmanian State Road Traffic Noise Management Guidelines to manage traffic noise on State Roads. The Guidelines have been endorsed by the Environment Protection Authority (Tasmania). The Department has applied the Guidelines and determined that the project is not an eligible scenario for noise mitigation, being a safety upgrade of an existing road. Notwithstanding this and the nature of the proposed works, the operational noise generated once construction is completed is not considered likely to increase significantly. There will be short term noise associated with construction generated by machinery and safety requirements (reverse beepers), however there will be no impact from this on sensitive uses.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 7 of 13
3.4 Flora and Fauna
The Department engaged Environmental Consulting Options Tasmania (ECOtas) to undertake a flora and fauna habitat assessment of the area around the existing Apsley River Bridge. This was undertaken to ensure that the requirements of the identified ecological values are appropriately considered during further project planning under local, State and Commonwealth government approval protocols. The study area comprised the flood plain of the Apsley River on either side of the existing Apsley River Bridge and adjacent to the Tasman Highway. The topography of the study area is a broad flood plain of the Apsley River, with no significant aspect. The geology is mapped at the 1:250,000 scale as Quaternary-age (Holocene) “sand, gravel and mud of alluvial, lacustrine and littoral origin” (geocode: Qh). Land tenure and other categorisations of the study area comprise of private titles (PID 2976701; title references 47296/1, 36272/1 & 32288/1; 17010 Tasman Highway) and some open areas of water that appear to not have title references. The area falls under the Glamorgan-Spring Bay municipality, with the private titles zoned as Rural Resource under the Glamorgan-Spring Bay Interim Planning Scheme 2015, and the linear road zoned as Utilities, with the following overlays:
• Biodiversity Protection Overlay: most of riverine forest, marked as “Eucalyptus ovata forest and woodland” (TASVEG code: DOV);
• Scenic Landscape Corridor (100 m buffer of major road centreline in rural areas); and
• Waterway and Coastal Protection Area (most of study area). A number of flora species and vegetation types listed under the Tasmanian Threatened Species Protection Act 1995 (TSPA) and, or the Commonwealth Environment Protection and Biodiversity Protection Act 1999 (EPBCA) were identified within the project area.
No evidence of any fauna species listed under either the TSPA or the EPBCA was identified within the project area. However, potential habitat for several species was identified within the project area including Sarcophilus harrisii (Tasmanian devil) [EPBCA: EN; TSPA: e], Dasyurus maculatus subsp. maculatus (spotted-tailed quoll) [EPBCA: VU; TSPA: r] and Prototroctes maraena (Australian grayling) [EPBCA: VU; TSPA: v].
The assessment identified seven vegetation types under the TASVEG mapping units, with three (DOV, WVI and SRE) classified as threatened under Schedule 3A of the Tasmanian Nature Conservation Act 2002 (NCA). The DOV-WVI-SRE mosaic could equate to the threatened ecological community Eucalyptus ovata – Callitris oblonga Forest, listed as Vulnerable on the Commonwealth Environment Protection and Biodiversity Conservation Act 1999, although the limited occurrence of the key required species (Callitris oblonga) means that this classification is tenuous in the present case, despite available documentation and maps recognising the Apsley River Bridge site as supporting the EPBCA-listed entity. There is a proposal before the Commonwealth government to list, as Critically Endangered, a new threatened ecological community, proposed to be named “Tasmanian Forests and Woodlands dominated by Eucalyptus ovata (black gum)”. This community incorporates the TASVEG unit DOV, which was identified within the project area. The proposal to list Black gum is still subject to review and consideration.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 8 of 13
The Department of State Growth sought legal advice from the Department’s Legal Support Area on whether the project should be referred under the EPBCA for the small amount of Black gum required for clearing. Advice received on the 19 June 2017, stated that given the community isn’t listed, then referring the project under the EPBCA is not possible. The Department of State Growth has decided to proceed in accordance with this advice. Table 1 below summarises the key issues identified in the ECOtas report.
Table 1: Flora and Fauna Key Issues
Fauna (TSPA/EPBCA listing status)
Comment
Flora
(TSPA/EPBCA listing status)
Comment Conclusion
Potential habitat for:
Tasmanian Devil
(e/EN)
Spotted tailed quoll (r/VU)
Eastern quoll
(-/EN)
Eastern Barred Bandicoot
(-/VU)Green and Gold Frog
(v/VU)
Australian Grayling
(v/VU)
Swift Parrot
(e/CR)
Limited potential for Tasmanian Devil and spotted-tail quoll dens but no evidence of presence was recorded.
Grayling habitat known from upstream and downstream of project area indicating project an important part of the migratory habitat of the species.
Some mature habitat trees occur within the study area. Minimising impact to mature trees is recommended.
Two flora species listed on TSPA and EPBCA:
Callitris oblonga subsp. oblonga (v/EN) 8 healthy individuals confined to one area.
TASVEG units DOV-WVI-SRE (t/T).
TSPA permit likely requirement.
Offsets unlikely to be required but DPIPWE should be consulted depending on final design and vegetation impact area.
Final impacts are to be quantified post design
Avoid impact to majority of habitat trees where possible
A Permit to take flora will be required prior to construction unless avoidance measures can be implemented.
Another inspection of potential habitat trees identified for removal is recommended to ensure no impacts to potential habitat for threatened fauna species.
Consideration has been given to minimising impact on threatened species during the development of the design. The proposed alignment would require some clearing of Eastern Riparian Scrub, Black Gum and potentially a single Callitris Oblonga. Under state regulations, the Department has an exemption from requiring a Forests Practices Plan under the Nature Conservation Act 2002 to clear listed vegetation, for the purposes of upgrading and maintaining road and bridge infrastructure. Given the scale of the clearing is minor, the Department is confident that impacts to state listed flora can be subsequently managed through permits. It is intended to treat weeds through the incorporation of appropriate weed management clauses into the construction specification.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 9 of 13
3.5 Aboriginal Heritage
There are no sites of Aboriginal Heritage value to be maintained or conserved at the project site. As part of the Contract Management Plan, the contractor will be required to implement an Unanticipated Discovery Plan should any unexpected finds be encountered during construction.
3.6 Historic Heritage Assessment
There are no sites of European Historic Heritage value to be maintained or conserved at the project site.
3.7 Landscape and Visual Impacts
The proposed bridge replacement incorporates changes to the existing Highway alignment over approximately 1434 metres in the vicinity of the Apsley River. This realignment of the highway and construction of the new bridge will result in a minor change of the landscape in the area. Some clearing will be required to facilitate the construction works, it is expected that any construction tracks as well as the original alignment will return over time to form Eastern Riparian Scrub as is current located adjacent to the current bridge.
3.8 Stakeholder Engagement
The Department has undertaken active engagement with key stakeholders, including the Glamorgan Spring Bay Council and the affected landowner. Stakeholder engagement activities undertaken include individual meetings and telephone discussions with the landowner. Public display plans were placed at Bicheno news agency, Council Chambers at Triabunna and the East Coast Heritage Museum in Swansea. The display information includes an address for the Department’s road project webpage http://www.transport.tas.gov.au/road/projects where the plans can be viewed online. This also includes a 1800 phone number which enables the public to contact the Department throughout the life of the project. At this stage, no feedback has been received through the 1800 phone number and there has been no negative feedback from the Council or the affected landowner.
3.9 Development Approvals
The project site is within the area covered by the Glamorgan Spring Bay Interim Planning Scheme 2015. The current highway alignment is zoned Utilities under the Planning Scheme while adjacent land is zoned Rural Resource. Parts of the area are impacted by the following planning scheme overlays:
• The river is covered by a Biodiversity Protection overlay – this extends both sides of the river and will impact on the bridge location in this area
• The area 100 m either side of the existing highway is covered by a Scenic Landscape Corridor overlay, the new bridge and road will also be impacted by this overlay
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 10 of 13
• The wetland and river to the north (upstream) of the existing bridge is covered by the Waterway and Coastal Protection overlay area.
A planning application was lodged with the Glamorgan Spring Bay Council. The application was advertised by Council and no representations were received. The Development Permit was issued with no unusual conditions applied.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 11 of 13
4 Project Program and Costs
4.1 Project Program
The key activities and their completion dates are outlined in Table 2.
Table 2: Project Program
It is noted that 2017-18 and 2018-19 budget allocations may require a delayed Tender and Contract Award timeframe to keep annual expenditure within allocated budgets.
Activity Completion
DA Lodgement May 2017
Preliminary design June 2017
Detailed Design and Preparation of Tender Documents
August 2017
PSCPW approval September 2017
Tender Process September-
October 2017
Land acquisition September 2017
Award of Construction Contract November 2017
Construction Commencement December 2017
Construction Completion February 2019
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 12 of 13
4.2 Estimate of Possible Costs
A cost estimate has been prepared based on the design presented in this report.
Quantities have been taken from the current design model and rates estimated from similar projects and experience. The Department’s standard procedure of preparing P50 and P90 cost estimates has been adopted. The P50 estimate represents a probability of 50% that the project cost will not be exceeded and the P90 represents a 90% probability that the cost will not be exceeded. The inherent risks and contingent risks incorporated in the P50 and P90 cost estimates reflect similar project work, the identified unique aspects of this project and the experienced judgment of the estimator.
The P50 cost estimate is summarised in Table 3.
Table 3: P50 Estimate of Possible Cost
Costs
Scoping and Development Phase $756,832
Delivery Phase (including service relocations, construction and land acquisition)
$8,087,840
Contingencies and escalation $921,328
Total Project P50 Estimate of Cost* $9,766,000
*Total cost inclusive of P50 contingency and cost escalation.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017 Page 13 of 13
5 Conclusion
A new bridge is proposed to replace the existing Apsley River Bridge, inland from Bicheno. The proposed bridge will be located on a new alignment upstream of the existing bridge, necessitating new road approaches and the removal of riparian vegetation. The new alignment addresses the current road geometry deficiencies to achieve the target design speed of 100km/h, and adopts the Department’s target widths for the relevant road category of two 3.1 metre lanes with 1.4 metre sealed shoulders (1.0m distant from the bridge) and 0.5 metre unsealed verges (sealed behind traffic barriers). The proposed new bridge is a 90 metre overall length, simply supported, Super-T structure with three equal 30 metre spans, adopting spill through style abutments. The replacement structure is designed in accordance with the current Australian Standard 5100-2017: Bridge Design, in particular to take SM1600 loading and have a 100 year design life. The new bridge will hence be able to accommodate all traffic using the road on a long term basis, and mitigates the need to otherwise enforce load limit restrictions on the bridge. The overall outcome of the project is a major safety improvement for users of the Tasman Highway in the vicinity of the Apsley River Bridge.
It is recommended that the project be approved to enable the detailed design to be finalised and tendering and then construction to proceed.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017
Appendix A. Stakeholder Concerns
No negative feedback has been received.
Tasman Highway – Apsley River Bridge Replacement, Submission to the Parliamentary Standing Committee on Public Works
Version: 2 Date: 18 August 2017
Appendix B. Preliminary Design Drawings
CONTRACT NO. 2402
DESIGN
-
LINK 42, 5.49
LINK 42, 6.73
REVISION
PRINTED DATECONTRACT No. DRAWING
09-Jun-17, 1:21 PM
Department of State Growth
NAME
NAME
DESIGNED
DESIGN REVIEW
NAME
NAME
SETOUT REVIEW
STRUCTURAL REVIEW
I CERTIFY THESE DRAWINGS HAVE
BEEN PREPARED IN ACCORDANCE
WITH THE BRIEF AND AS DETAILED IN
THE FINAL DESIGN REPORT.
THESE DRAWINGS HAVE BEEN CHECKED,
TAKEN TO SITE AND VERIFIED THAT
THEY ARE APPROPRIATE FOR SITE
CONDITIONS AND CONSTRAINTS.
THE DRAWINGS ARE RECOMMENDED
FOR ACCEPTANCE.
SIGNED DATE
DESIGN MANAGER
(DESIGN ORGANISATION)
SIGNED DATE
(DESIGN ORGANISATION)
PRINCIPAL
THESE DRAWINGS HAVE BEEN PREPARED IN ACCORDANCE WITH THE DESIGN BRIEF
AND PROJECT SCOPE. THE DRAWINGS ARE RECOMMENDED FOR ACCEPTANCE.
SIGNED DATE
PROJECT
MANAGER
SIGNED DATE
ACCEPTED
MANAGER
SIGNED DATE
SIGNED DATESIGNED DATE
SIGNED DATE
SHEET No.
No. of SHEETS
FINISH:
START:
ROAD LINK No.
REGISTRATION NUMBER
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
A0113.021
1000
A
2402 HB17182-C1000
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:21 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
TABLE OF CONTENTS
A0113.021
1001
A
2402
NTS
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1001
TABLE OF CONTENTS
SHEET NUMBER REV DESCRIPTION
1000 A COVER SHEET
1001 A TABLE OF CONTENTS
1002 A PROJECT LEGEND - DRG 1 OF 5
1003 A PROJECT LEGEND - DRG 2 OF 5
1004 A PROJECT LEGEND - DRG 3 OF 5
1005 A PROJECT LEGEND - DRG 4 OF 5
1006 A PROJECT LEGEND - DRG 5 OF 5
1021 A GENERAL ARRANGEMENT - KEY PLAN
1041 A TYPICAL SECTIONS AND DETAILS
1101 A GENERAL ARRANGEMENT PLAN
1102 A GENERAL ARRANGEMENT PLAN
1103 A GENERAL ARRANGEMENT PLAN
1104 A GENERAL ARRANGEMENT PLAN
1105 A GENERAL ARRANGEMENT PLAN
1106 A GENERAL ARRANGEMENT PLAN
1107 A GENERAL ARRANGEMENT PLAN
1108 A GENERAL ARRANGEMENT PLAN
1109 A GENERAL ARRANGEMENT PLAN
1701 A LONGITUDINAL PROFILE MCB0 - DRG 1 O 3
1702 A LONGITUDINAL PROFILE MCB0 - DRG 2 O 3
1703 A LONGITUDINAL PROFILE MCB0 - DRG 3 OF 3
1751 A CROSS SECTIONS (MCB0) - DRG 1 OF 37
1752 A CROSS SECTIONS (MCB0) - DRG 2 OF 37
1753 A CROSS SECTIONS (MCB0) - DRG 3 OF 37
1754 A CROSS SECTIONS (MCB0) - DRG 4 OF 37
1755 A CROSS SECTIONS (MCB0) - DRG 5 OF 37
1756 A CROSS SECTIONS (MCB0) - DRG 6 OF 37
1757 A CROSS SECTIONS (MCB0) - DRG 7 OF 37
1758 A CROSS SECTIONS (MCB0) - DRG 8 OF 37
1759 A CROSS SECTIONS (MCB0) - DRG 9 OF 37
1760 A CROSS SECTIONS (MCB0) - DRG 10 OF 37
1761 A CROSS SECTIONS (MCB0) - DRG 11 OF 37
1762 A CROSS SECTIONS (MCB0) - DRG 12 OF 37
1763 A CROSS SECTIONS (MCB0) - DRG 13 OF 37
1764 A CROSS SECTIONS (MCB0) - DRG 14 OF 37
1765 A CROSS SECTIONS (MCB0) - DRG 15 OF 37
1766 A CROSS SECTIONS (MCB0) - DRG 16 OF 37
1767 A CROSS SECTIONS (MCB0) - DRG 17 OF 37
1768 A CROSS SECTIONS (MCB0) - DRG 18 OF 37
1769 A CROSS SECTIONS (MCB0) - DRG 19 OF 37
1770 A CROSS SECTIONS (MCB0) - DRG 20 OF 37
TABLE OF CONTENTS
SHEET NUMBER REV DESCRIPTION
1771 A CROSS SECTIONS (MCB0) - DRG 21 OF 37
1772 A CROSS SECTIONS (MCB0) - DRG 22 OF 37
1773 A CROSS SECTIONS (MCB0) - DRG 23 OF 37
1774 A CROSS SECTIONS (MCB0) - DRG 24 OF 37
1775 A CROSS SECTIONS (MCB0) - DRG 25 OF 37
1776 A CROSS SECTIONS (MCB0) - DRG 26 OF 37
1777 A CROSS SECTIONS (MCB0) - DRG 27 OF 37
1778 A CROSS SECTIONS (MCB0) - DRG 28 OF 37
1779 A CROSS SECTIONS (MCB0) - DRG 29 OF 37
1780 A CROSS SECTIONS (MCB0) - DRG 30 OF 37
1781 A CROSS SECTIONS (MCB0) - DRG 31 OF 37
1782 A CROSS SECTIONS (MCB0) - DRG 32 OF 37
1783 A CROSS SECTIONS (MCB0) - DRG 33 OF 37
1784 A CROSS SECTIONS (MCB0) - DRG 34 OF 37
1785 A CROSS SECTIONS (MCB0) - DRG 35 OF 37
1786 A CROSS SECTIONS (MCB0) - DRG 36 OF 37
1787 A CROSS SECTIONS (MCB0) - DRG 37 OF 37
1802 A GENERAL ARRANGEMENT
1803 A SECTIONS - SHEET 1 OF 2
1804 A SECTIONS - SHEET 2 OF 2
BICHENO
SWANSEA COLES BAY
FINGAL
ST. MARYS
BICHENO
LAUNCESTON
HOBART
LOCALITY PLANNTS
LOADING BAY-DOCK
ABUTMENT BOTTOM
ABUTMENT BOTTOM POINT
ABUTMENT TOP
ABUTMENT TOP POINT
CAP-PILE
DECK
EXPANSION JOINT
EXPANSION PLATE
HEADSTOCK
PIER-COLUMN
PIER-COLUMN POINT
UNDERNEATH CLEARANCE
WING WALL
DIGITAL CADASTRE (ACCURACY 1.0m)
DIGITISING EXTENT (PHOTO)DP OVERLAY (ACCURACY 0.1m)(CALCULATED FROM DEPOSITED PLAN)EASEMENTFIELD COMPLETIONBOUNDARY (PHOTO) (NF)FIELD SURVEY EXTENT (PHOTO)
LOCAL GOVERNMENT
PARISH
TITLE (ACCURACY 0.02m)
AWNING
AWNING - POINT
BOTTOM OF WALL
BUILDING EAVES
BUILDING WALLS
CEMETERY
CONCRETE SLAB AT GROUND LEVEL
CORNER OF BUILDING AT NS
DOORWAY
TELEPHONE SINGLE CONCRETE PIT
FLOOR LEVEL
GENERAL BUILT-UP AREA
TELEPHONE TRANSMITTER - MOBILE
MISCELLANEOUS STRUCTURE
RETAINING WALL
RUIN
SILO OR TANKS
SPORTING ARENA
STAIRS - OUTSIDE
SWIMMING POOL
TOP OF WALL
ABOVE GROUND JOINING POST
ITS CABLE
OPTICAL FIBRE - ABOVE GROUND
OPTICAL FIBRE - DIGITISED (GIS)
OPTICAL FIBRE - UNDERGROUND)
FENCE LINE
OPTICAL FIBRE CABLE MARKER
OPTICAL FIBRE FIBRE CONDUIT
OPTICAL FIBRE JUNCTION BOX
OPTICAL FIBRE PIT
STD MAIN PIT
TELEPHONE - HOUSE CONNECTION
TELEPHONE - BOX
HEADSTONE
TELEPHONE BOX POINT
TELEPHONE CABLE MARKER
TELEPHONE CONDUIT
TELEPHONE LINE
TELEPHONE LINE - DIGITISED (GIS)
TELEPHONE POLE
PUMP
TELEPHONE SUMP
SAFETY FENCE - PEDESTRIAN
TELEPHONE TRIPLE CONCRETE PIT
TELEPHONE TWIN CONCRETE PIT
CONTOUR - AUX {DECIMETRE}
CONTOUR - AUX {WHOLE METRE}
CONTOUR - INDEX
CONTOUR - INDEX DEPRESSION
CONTOUR - INTER DEPRESSION
CONTOUR - STANDARD-INTER
BIN - LARGE
BOX CULVERT - 225 HIGH
BOLLARD
BUS SHELTER
BUS STOP
FENCE
BOX CULVERT - 750 HIGH
FENCE MANPROOF
FENCE OTHER
FENCE POST-GUIDE POST
FIREPLACE
FLAG POLE
GATE
BOX CULVERT - 2400 HIGH
HISTORICAL POINT OF INTEREST
LARGE SIGN
MAILBOX
PARKING METER
BOX CULVERT - 3600 HIGH
PICNIC TABLE
DISH DRAIN
RUBBISH BIN
DRAIN-TABLE DRAIN
SEAT
SIGN POST
SIGN POST - DOUBLE SIDED
SIGN WITH OUTREACH
WINDMILL
WINDMILL - POINT
BATTER DRAIN / GI FLUME
BOX CULVERT - 150 HIGH
HEADWALL BOTTOM POINT
BOX CULVERT - 300 HIGH
BOX CULVERT - 375 HIGH
BOX CULVERT - 450 HIGH
BOX CULVERT - 600 HIGH
INVERT - 225 DIA
BOX CULVERT - 900 HIGH
BOX CULVERT - 1050 HIGH
BOX CULVERT - 1200 HIGH
BOX CULVERT - 1500 HIGH
BOX CULVERT - 1800 HIGH
INVERT - 750 DIA
BOX CULVERT - 2100 HIGH
INVERT - 1050 DIA
BOX CULVERT - 2700 HIGH
BOX CULVERT - 3000 HIGH
BOX CULVERT - 3300 HIGH
INVERT - 1650 DIA
BOX CULVERT - UNSPECIFIED HEIGHT
INVERT - 1800 DIA
INVERT OF PIPE
DRAINAGE BOX
DRAINAGE - DIGITISED (GIS)
PIPE - 225 DIA
DRAINAGE JUNCTION MANHOLE
DRAINAGE PIT
END OF WINGWALL
FLOOD HEIGHT
GULLY PIT
GULLY PIT POINT
HEADWALL BOTTOM
PIPE - 900 DIA
HEADWALL TOP
HEADWALL TOP POINT
INLET TO SUMP
INVERT - 300 DIA
PIPE - 1200 DIA
INVERT - 375 DIA
INVERT - 450 DIA
INVERT - 525 DIA
INVERT - 600 DIA
INVERT - 900 DIA
INVERT - 1200 DIA
INVERT - 1350 DIA
INVERT - 1500 DIA
INVERT OF SUBSOIL DRAIN OUTLET
KERB INLET
OBVERT OF PIPE
PIPE - 300 DIA
PIPE - 375 DIA
PIPE - 450 DIA
PIPE - 525 DIA
PIPE - 600 DIA
PIPE - 750 DIA
PIPE - 1050 DIA
PIPE - 1350 DIA
AB
AT
BC
BP
●
| | | | | |
AIR
| | | | | |
□□ □ □ □ □ □
AW
CB
FL
▯▯▯▯▯▯▯▯▯
T
T(FO)
TC(FO)
T
T
ITS
T(FO)A
OFC
OJB
OFP
TSP
TB
TC
TDP
TPL
TTM
T(FO)
TC
AJP
| |
|
X
/
//
□ □ □
BUS
FLG
BIN
PUMP
3.3H 3.3H
3.6H 3.6H
?H ?H
600H 600H
750H 750H
900H 900H
300H 300H
375H 375H
450H 450H
1.05H 1.05H
1.8H 1.8H
2.1H 2.1H
2.4H 2.4H
1.2H 1.2H
1.5H 1.5H
2.7H 2.7H
225H 225H
3.0H 3.0H
150H 150H
D
GP
DP
Ø300 Ø300
Ø225 Ø225
Ø600 Ø600
Ø375 Ø375
Ø450 Ø450
Ø525 Ø525
Ø750 Ø750
IN600 Dia
Ø1200 Ø1200
Ø900 Ø900
Ø1050 Ø1050
SW
IN1500 Dia
EW
FH
HWB
HWT
IL
IN225 DiaIN300 DiaIN375 DiaIN450 DiaIN525 Dia
IN900 Dia
IN750 Dia
IN1050 DiaIN1200 DiaIN1350 Dia
IN1800 Dia
IN1650 Dia
IN
SD
OB
Ø1350 Ø1350
D
E BUIL (BUILDINGS & STRUCTURES)
E BDGE (BRIDGE STRUCTURES)
E COMM (COMMUNICATIONS)
E DRAIN (STORMWATER) Continued
E DRAIN (STORMWATER)
E CULT (CULTURAL)
E CONT (PHOTOGRAMMETRY)
E BDYS (BOUNDARIES)
TELEPHONE DISTRUBUTION PILLAR
(AB--)
(PABB)
(AT--)
(PABT)
(PBCP)
(BR--)
(XJ--)
(XP--)
(HS--)
(BC--)
(PBPI)
(UC--)
(WW--)
(BM--)
(DE--)
(BO--)
(BE--)
(NF--)
(FS--)
(BL--)
(BT--)
(AW--)
(PAWN)
(BW--)
(BV--)
(BU--)
(OC--)
(VE--)
(PCBU)
(DO--)
(PFLR)
(OB--)
(LB--)
(OM--)
(RW--)
(OR--)
(OS--)
(OO--)
(SO--)
(OT--)
(TW--)
(PTJP)
I(IT--)
(OA--)
(OZ--)
(OU--)
(POFM)
(OD--)
(POFJ)
(POFP)
(PTMP)
(TY--)
(TX--)
(PTBX)
(PTCM)
(TD--)
(TN--)
(TZ--)
(PTPL)
(PTSP)
(TS--)
(PMPT)
(YQ--)
(Y---)
(Z---)
(ZQ--)
(XQ--)
(X---)
(BI--)
(AC--)
(BH--)
(PBUS)
(FE--)
(FL--)
(FM--)
(FC--)
(POST)
(PFPL)
(PFLG)
(AG--)
(PHST)
(PHIS)
(SI--)
(PMBX)
(PKME)
(TA--)
(PWEP)
(PBIN)
(SF--)
(SE--)
(PSIN)
(PSDS)
(SX--)
(PWML)
(B6--)
(B7--)
(B9--)
(D0--)
(D1--)
(D2--)
(D3--)
(D4--)
(D5--)
(D6--)
(D7--)
(D8--)
(D9--)
(UB--)
(PI18)
(DD--)
(PINV)
(DT--)
(DX--)
(DZ--)
(PDJM)
(DP--)
(PEWW)
(PFHT)
(IP--)
(PGUL)
(HB--)
(PHWB)
(HW--)
(PHWT)
(PI01)
(PILT)
(PI02)
(V2--)
(PI03)
(PI04)
(PI05)
(PI06)
(PI07)
(PI09)
(PI10)
PI12)
(PI13)
(PI15)
(PI16)
IPSDO)
(KI--)
(POBV)
(U1--)
(U2--)
(U3--)
(U4--)
(U5--)
(U6--)
(U7--)
(U9--)
(V1--)
(V3--)
(PTDP)
(PMKE)
(BP--)
(PTSP)
(PTTP)
(OW--)
(DF--)
(B0--)
(B1--)
(B2--)
(B3--)
(B4--)
E BUIL (BUILDINGS & STRUCTURES) Continued E CULT (CULTURAL) Continued
MARKER - ENVIRONMENTAL/OTHER
DP
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:21 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
PROJECT LEGEND - DRG 1 OF 5
A0113.021
1002
A
2402
NTS
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1002
WATER COURSE
WATER LEVEL POINT
CONDUIT
CABLE MARKER
DISTRIBUTION FUSE POINT
LINE - MAJOR TRANSMISSION
POLE - POWER AND LIGHT
PIPE - 1500 DIA
POWER SERVICE PILLAR - UNDERGROUND
PIPE - 1650 DIA
PIPE - 1800 DIA
PIPE - UNSPECIFIED DIAMETER
SUBSOIL DRAIN FLUSH POINT/MARKER
TOP OF CONCRETE JUNCTION BOX
PHOTO CENTRE
CABLE JUNCTION BOX
VERTICAL CONTROL POINT
CABLE MANHOLE
HOUSE CONNECTION
ETHANE PIPELINE
GARDEN LIGHT
HIGH TENSION PYLON
MAIN - HIGH PRESSURE PIPELINE
HOUSE CONNECTION
LIGHT WITH OUTREACH
LINE - DIGITISED
PIPELINE MARKER - HIGH PRESSURE
LINE - MINOR TRANSMISSION
LINE - UNDERGROUND
MAIN SUMP
POLE - LIGHT
POLE - POWER
VALVE BOX
POLE - POWER AND TRANSFORMER
PYLON LEG
STAY ANCHOR POLE
STAY POLE
SUSPENDED LIGHT
TRANSFORMER CABINET
TRANSFORMER CABINET CENTRE
HORIZONTAL CONTROL POINT
MINOR CONTROL POINT
MAIN - DIGITISED (GIS)
MAIN - LOW PRESSURE
MAIN - NYLON
HAZARDOUS SITE
MAIN - POLYETHYLENE
MANHOLE COVER
METER
PIPELINE MARKER
REGULATOR BOX
TEST POINT
VENT PIPE
ENDANGERED COMMUNITY
ENDANGERED ECOLOGICAL COMMUNITY
INDIGENOUS HERITAGEAREA
NON INDIGENOUS HERITAGE SITE
WC
Ø1050 Ø1050
Ø? Ø?
Ø1650 Ø1650
Ø1500 Ø1500
SF
SW
E(OH)
EC
WL
E(U)
E(TL)
EH
EC
EMH
MCP
EJB
EFP
EGL
EP
E
HCP
HP
EG
GH
G
GP
HG
LG
GN
GMH
GPE ELEC
E FOTO (PHOTOGRAMMETRY)
E HERI (HERITAGE)
E LNMK
E MARK (SURVEY MARKS)
E RAIL
ALIGNMENT PIN
RAILWAY CONTROL BOX
BENCH MARK
RAILWAY FORMATION EDGE
BOLT
RAILWAY RAMP
BOUNDARY PEG
RAILWAY SIGNAL
BOUNDARY ARROW
RAILWAY SIGNAL TROUGH
DRILL HOLE AND WING
RAILWAY SIGNAL TROUGH - POINT
DUMPY PEG
RAILWAY STANCHION
G I NAIL
RAILWAY TRACK CENTRE
G I PIPE
MISCELLANEOUS SURVEY MARK
RAILWAY TRACK MONUMENT
NAIL
TOP OF RAIL - POINT
PERMANENT MARK
TOP OF RAILWAY PLATFORM
RM CONCRETE BLOCK
CONTROL MARK
SPIKE
STAR PICKET
BORE HOLE
CAMERA - FLASH UNIT
CHECK STRING
GATIC COVER LID
GOLF COURSE
HIGH PRESSURE OIL PIPELINE
HIGH PRESSURE OIL PIPELINE MARK
HOTSPOT
JOIN LINE (BOUNDARY)
BREAK STRINGS
PARK OR OPEN SPACE
PETROL PUMP
POT HOLE - NULL LEVEL
POT HOLE - WITH RL
RED LIGHT-SPEED-TRAFFIC CAMERA
SEISMIC LINE
SEISMIC TEST SHOT
SERVICE-JUNCTION BOX
STOCK GRID
STOCKPILE
TEST PIT
UNDERGROUND TANK
UNDERGROUND TANK POINT
UNIDENTIFIED POLE
UNIDENTIFIED SERVICE
ARROW - LEFT TURN
ARROW - RIGHT TURN
ARROW - STRAIGHT AHEAD AND LEFT
ARROW - STRAIGHT AHEAD AND RIGHT
BARRIER AND SEPARATION
CHEVRON MARKING LEFT
CHEVRON MARKING RIGHT
CLEARWAY (3x3)
CONTINUITY/EDGE INTERMITTENT (1x3)
DOUBLE BARRIER
LANE (3x6)
LANE/SEPARATION LINE (9x3)
GIVEWAY/HOLDING LINE/JUNCTION CONTINUITY
LANE/SEPARATION (3x9)
PEDESTRIAN CROSSING (SIGNALS)
PEDESTRIAN CROSSING ZEBRA
PEDESTRIAN CROSSING APPROACH (ZIG ZAG)
SEPARATION (3x1)
SEPARATION AND BARRIER
SPEED ZONE - 40km/h
SPEED ZONE - 50km/h
SPEED ZONE - 60km/h
SPEED ZONE - 70km/h
SPEED ZONE - 80km/h
SPEED ZONE - 90km/h
SPEED ZONE - 100km/h
SPEED ZONE - 110km/h
UNBROKEN
TM
40
50
60
70
80
90
100
110
ARROW - STRAIGHT AHEAD
BM
BL
BP
DH
DP
GI
PI
SM
NA
PM
CM
SK
AP
RM
E MISC
UT
FLASH
GAT
HPO
BR
PP
PHOLE
CAM
TS
?P
?
HO
PHOLE
BH
TP
RS
RCB
RS
RST
RTM
RA
TOP OF RAIL
* DENOTES SYMBOL SCALED FOR CLARITY
(V5--)
(V6--)
(V8--)
(UU--)
(PSFP)
(PJBX)
(WC--)
(PWLP)
(PECM)
(ED--)
(PEFP)
(PPLP)
(PEUP)
(PEJB)
(PEMH)
(PVCP)
(HA--)
(PLGN)
(DG--)
(PHTT)
(HG--)
(EY--)
(LI--)
(EZ--)
(UE--)
(UL--)
(EU--)
(EN--)
(PLPL)
(PPPL)
(PGAS)
(PPTR)
(EL--)
(PSAP)
(PSPL)
(PLSU)
(EC--)
(PETC)
(PHCP)
(PMCP)
(PPCN)
(ZG--)
(LG)
(NG--)
(PHAZ)
(YG--)
(PGHL)
(PGMR)
(PGPM)
(PGHM)
(PGRB)
(PGTP)
(PGVP)
(PHEC)
(PHEE)
(PHIA)
(PHNI)
(PAPN)
(PRBX)
(PBMK)
(RF--)
(PBLT)
(RR--)
(PBPG)
(PRSG)
(PSSB)
(RS--)
(PDHL)
(PRCC)
(PDPY)
(PSTR)
(PGIN)
(RT--)
(PGPI)
(PMSM)
(PRTM)
(PNAL)
(PRAL)
(PPMK)
(RP--)
(PRMB)
(PCMK)
(PSKI)
(PSTA)
(PBHX)
(PCFU)
(QQ--)
( PGAT)
(OG--)
(HO--)
(POHM)
(HP--)
(JL)
(PBRK)
(OP--)
(PPET)
(PHNL)
(PHRL)
(PCAM)
(SL--)
(CC--)
(DB--)
(DC--)
(DA--)
(CG)
(LL--)
(CX--)
(CZ--)
(CA--)
(CN)
(S4--)
(S5--)
(S6--)
(S7--)
(S8--)
(S9--)
(S1--)
(S2--)
(PTMX)
(CD--)
(RA--)
(AL--)
(AR--)
AE--)
(AI--)
(BS--)
(CV--)
(CY--)
(CW--)
(SB--)
(AS--)
(PSTS)
(US--)
(SG--)
(OH--)
(PGEO)
(UT--)
(PUTP)
(PPOL)
(PUSR)
E DRAIN (STORMWATER) Continued E GAS E LNMK Continued
STATE SURVEY MARK
TRIG STATION-CONCRETE PILLAR
WATER BOARD PM
SS
TS
WB
(PSSM)
(PTSS)
(PDSM)
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:21 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
PROJECT LEGEND - DRG 2 OF 5
A0113.021
1003
A
2402
NTS
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1003
AP-DH-GI-PIPE OR RMCB
BOLT-DUMPY-NAIL-SPIKE
DEFAULT SURVEY MARK
PEG
PM SSM OR CONTROL MARK
TRIG STATION
SIGNAL DETECTOR
TRAFFIC CONTROL SIGNAL
TRAFFIC LIGHT WITH OUTREACH
TRAFFIC SIGNAL CONTROLLER
TRAFFIC SIGNAL DETECTOR
TRAFFIC SIGNAL JUNCTION BOX
BACK OF KERB
CENTRE OF ROAD
GREY (AUTOCAD COLOUR 8)
DRIVEWAY
WHITE (AUTOCAD COLOUR 7)
EDGE OF FORMATION
YELLOW (AUTOCAD COLOUR 2)
EDGE OF MEDIAN
RED (AUTOCAD COLOUR 1)
EDGE OF PAVEMENT
CYAN (AUTOCAD COLOUR 4)
EDGE OF TRACK
EDGE OF UNSEALED ROAD
FOOTPATH
BOTTOM OF BANK-EMBANKMENT
GUTTER FLOW LINE
BREAKLINE OR RIDGE
LIP LINE
CLIFF-ESCARPMENT
OFFSET CROWN-CROWN
CULTIVATION PASTURE
PRAM RAMP
EDGE OF GARDEN
SAFETY BARRIER GUARD FENCE
FORD
SAFETY BARRIER TYPE F
GRASSLAND
SAFETY BARRIER WIRE ROPE
LAKE
TOP OF KERB
LANDSLIDE-ERODED BANK
TOP OF MEDIAN
NATURAL SURFACE
VEHICULAR TRACK EDGE
NATURAL SURFACE POINT
ORCHARD
HOUSE CONNECTION
RESERVOIR
LAMPHOLE
RIVER OR CREEK EDGE
MAIN
ROCK AREA
MAIN - DIGITISED (GIS)
SPOT HEIGHT
MANHOLE COVER
SWAMP OUTLINE
SEWAGE POND
SWAMP-MARSH
SEPTIC TANK
TIMBER OR SCRUB (DENSE)
VENT PIPE
TIMBER OF SCRUB (MEDIUM)
TIMBER OF SCRUB (SCATTERED)
TOP OF BANK
TOP OF CUTTING
TREE FOLIAGE (TR)
TREE FOLIAGE - 1m SPREAD
TREE FOLIAGE - 2m SPREAD
TREE FOLIAGE - 3m SPREAD
TREE FOLIAGE - 4m SPREAD
TREE FOLIAGE - 5m SPREAD
TREE FOLIAGE - 6m SPREAD
TREE FOLIAGE - 7m SPREAD
TREE FOLIAGE - 8m SPREAD
TREE FOLIAGE - 9m SPREAD
TREE FOLIAGE - 10m SPREAD
TREE FOLIAGE - 12m SPREAD
TREE FOLIAGE - 15m SPREAD
TREE TRUNK - 100mm DIA
TREE TRUNK - 200mm DIA
TREE TRUNK - 300mm DIA
TREE TRUNK - 400mm DIA
TREE TRUNK - 500mm DIA
TREE TRUNK - 600mm DIA
TREE TRUNK - 700mm DIA
TREE TRUNK - 800mm DIA
TREE TRUNK - 900mm DIA
TREE TRUNK - 1000mm DIA
TREE TRUNK - 1200mm DIA
TREE TRUNK - 1500mm DIA
TREE TRUNK - UNSPECIFIED DIAMETER
WATER EDGE-LEVEL (WE)
AIR VALVE
AIR VALVE - RECYCLED
EARTH TERMINAL
EARTH TERMINAL - RECYCLED
FIRE HYDRANT
HOUSE CONNECTION
HYDRANT - RECYCLED
MAIN
MAIN - DIGITISED (GIS)
MAIN - RECYCLED
MAIN MARKER
MAIN MARKER - RECYCLED
METER
METER - RECYCLED
OVERHEAD PIPELINE
STOP VALVE
STOP VALVE - RECYCLED
TAP
TAP - RECYCLED
UNIDENTIFIED PIPELINE
HYDRANT
E STNS
E TOPO Continued E WATRE ROAD
E SEWR
E TCS (TRAFFIC)
E TEXT
E TOPO□X
0
S
S
SP
SLH
SVP
SH
S
RLSTN
TSC
TSD
WO
?P
WR
W
WH
W
AV
WR
WR
FH
WH
WR
WM
WR
WM
WR
SV
WR
TAP
TAPR
PUMP STATIONPUMP
SCOUR VALVE
SCOUR VALVE - RECYCLED
ScV
SR
POINT ON BITUMEN
(SD--)
(PSGL)
(TO--)
(PSCL)
(PSDR)
(PSJX)
(BK--)
(RC--)
(DW--)
(EJ--)
(EM--)
(EP--)
(EK--)
(UR--)
(FP--)
(BB--)
(FI--)
(NB--)
(LP--)
(VC--)
(OF--)
(JC--)
(KR--)
(EG--)
(FG--)
(FO--)
(KJ--)
(JG--)
(FW--)
(WL--)
(KB--)
(VL--)
(TM--)
(NS--)
(VT--)
(PNSS)
(JO--)
(SY--)
(RE--)
(PSLH)
(WR--)
(SM--)
(JR--)
(SZ--)
(PSHT)
(PSMH)
(JW--)
(SP--)
PSWA)
(ST--)
(JD--)
(PSVP)
(JM--)
(JS--)
(TC--)
(CU--)
(TR--)
(PF01)
(PF02)
(PF03)
(PF04)
(PF05)
(PF06)
(PF07)
(PF08)
(PF09)
(PF10)
(PF12)
(PF15)
(PT01)
(PT02)
(PT03)
(PT04)
(PT05)
(PT06)
(PT07)
(PT08)
(PT09)
(PT10)
(PT12)
(PT15)
(PTRE)
(WE--)
(PWAV)
(PRAV)
(PWET)
(PRET)
(PWFB)
(WY--)
(PRHY)
(WM--)
(WZ--)
(RM--)
(PWMM)
(PRMM)
(PWMR)
(PRMR)
(UO--)
(PWSV)
(PRSV)
(PWTP)
(PRTP)
(UP--)
(PWHY)
(PWEP)
(PWCV)
(PRCV)
(PRPB)
(PSSD)
(PSSE)
(PSSA)
(PSSC)
(PSSG)
(PSSF)
TEXT 1.8
TEXT 2.5
TEXT 3.5
TEXT 5.0
TEXT 7.0
*
* DENOTES SYMBOL SCALED FOR CLARITY
E OTHER (uncoded features)WATER COURSE (GIS)WC
STORMWATER (GIS)SW
CONDUIT (GIS)EC
LINE - MAJOR TRANSMISSION (GIS)E(TL)
LINE - MINOR TRANSMISSION (GIS)E(OH)
LINE - UNDERGROUND (GIS)E(U)
TRAFFIC SIGNAL CABLETT
DRAI
DRAI
ELEC
ELEC
ELEC
ELEC
TCS
TRIANGULATION - DTM
E TRIA(TX--)
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:22 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
PROJECT LEGEND - DRG 3 OF 5
A0113.021
1004
A
2402
NTS
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1004
ABUTMENT BOTTOM
BRIDGE DECK
PIER/COLUMN
EASEMENT
DOORWAY
FLOOR LEVEL
RETAINING WALL
STAIRS - OUTSIDE
ABOVE GROUND JOINING POST
ITS CABLE
OPTICAL FIBRE - ABOVE GROUND
OPTICAL FIBRE - UNDERGROUND
OPTICAL FIBRE FIBRE CONDUIT
OPTICAL FIBRE JUNCTION BOX
OPTICAL FIBRE PIT
TELEPHONE CABLE MARKER
TELEPHONE DISTRUBUTION PILLAR
TELEPHONE CONDUIT
TELEPHONE LINE
TELEPHONE POLE
TELEPHONE SINGLE CONCRETE PIT
TELEPHONE TRANSMITTER - MOBILE
TELEPHONE TRIPLE CONCRETE PIT
TELEPHONE TWIN CONCRETE PIT
BIN - LARGE
BOLLARD
BUS STOP
FENCE - GENERAL (POST & WIRE)
FENCE - CHAINWIRE
FENCE - OTHER
FENCE POST-GUIDE POST
GATE
LARGE SIGN
MAILBOX
PARKING METER
RUBBISH BIN
SAFETY FENCE - PEDESTRIAN
SIGN POST
SIGN POST - DOUBLE SIDED
ETHANE PIPELINE
HOUSE CONNECTION
MAIN - HIGH PRESSURE PIPELINE
MAIN - LOW PRESSURE
MAIN - NYLON
MAIN - POLYETHYLENE
MANHOLE COVER
METER
PIPELINE MARKER
PIPELINE MARKER - HIGH PRESSURE
REGULATOR BOX
TEST POINT
VALVE BOX
VENT PIPE
□ □□ □ □ □ □FL
▯▯▯▯▯▯▯▯▯▯
T(FO)
TC(FO)
T
ITS
T(FO)A
OJB
OFP
TC
TDP
TPL
TTM
TC
AJP
X
/
//
□ □ □
BUS
BIN
EG
GH
GP
HG
LG
GN
GMH
GP
HP
D BUIL (BUILDINGS & STRUCTURES)
D BDGE (BRIDGE STRUCTURES)
D COMM (COMMUNICATIONS)
D CULT (CULTURAL)
D GAS
D BDYS (BOUNDARIES)
MAIN - GENERALG
TELEPHONE LINE - REDUNDANTxTx
MAIN - REDUNDANTxGx
CADASTRAL
ROOFLINE
WALL
LIMIT OF CONTRACT
EXTENT OF PROJECT
TELEPHONE LINE - ABOVE GROUNDT(OH)
FENCE - REDUNDANT/REMOVEDx/x
FENCE - SOUND□ □ □ □ □ □
NORTH POINT*
A AMENDMENT
SETOUT POINT
D ANNO (ANNOTATION)
INVERT OF SUBSOIL DRAIN OUTLET
KERB SCUPPER
OBVERT OF PIPE
SD
OB
* DENOTES SYMBOL SCALED FOR CLARITYDYNB DENOTES DYNAMC BLOCK DEFINED
DYNB
STORMWATER PIPE
BOX CULVERT
DISH DRAIN
SURFACE DRAIN
ACCESS PIT
GRATED PIT - KERB
PIPE
SUBSOIL DRAIN FLUSH POINT
TOP OF CONCRETE JUNCTION BOX
SW
SD
SF
SW
D DRAIN (STORMWATER)
BATTER DRAIN
SUBSOIL DRAIN - CLASS 400SS(A)
STORMWATER PIPE - REDUNDANTxSWx
CATCH DRAIN/OPEN DRAIN
SURFACE DRAIN - TYPE 1SD1
SD2
SD3
SD4
SD5
SURFACE DRAIN - TYPE 2
SURFACE DRAIN - TYPE 3
SURFACE DRAIN - TYPE 4
SURFACE DRAIN - TYPE 5
CATCH DRAIN/OPEN DRAIN - LINED>> >>
SUBSOIL DRAIN - CLASS 1000SS(B)
SUBSOIL DRAIN - STRIP DRAINSS(C)
SUBSOIL DRAIN - GENERAL
SIDE ENTRY PIT - KERB
GRATED PIT - V GUTTER
GRATED PIT - OPEN DRAIN
GRATED PIT - TABLE DRAIN
*
*
*
*
*
*
D CHCK (CHECKING)DESIGN CLEAR ZONE (LINE SCALED FOR CLARITY)(HL--)
DESIGN SIGHT LINE (LINE SCALED FOR CLARITY)(----)
DESIGN CONTOUR - INDEX(----)
DESIGN CONTOUR - INTERMEDIATE(----)
TURNING PATH - ANALYSIS PATH
CABLE JUNCTION BOX
CABLE MANHOLE
CONDUIT
DISTRIBUTION FUSE POINT
HIGH TENSION PYLON
HOUSE CONNECTION
LIGHT WITH OUTREACH
LINE - MAJOR TRANSMISSION
LINE - MINOR TRANSMISSION
LINE - UNDERGROUND
POLE - LIGHT
POLE - POWER
POLE - POWER AND LIGHT
POLE - POWER AND TRANSFORMER
POWER SERVICE PILLAR
STAY ANCHOR POLE
STAY POLE
TRANSFORMER CABINET CENTRE
E(U)
E(TL)
E(OH)
EH
EC
EMH
EJB
EFP
EP
D ELECLINE - GENERALE
LINE - REDUNDANTxEx
NOTE THAT SEPARATE LAYERS CAN BE ADDED FOR VEHICLE PATH ANALYSES ASREQUIRED (I.E. FOR DIFFERENT VEHICLE TYPES).PROPRIETARY PRODUCTS AUTOMATICALLY GENERATE LAYERS THAT ARE LINKED BACKTO THE ANALYSIS PATH. THE FOLLOWING ELEMENTS ARE FOR GUIDANCE PURPOSESONLY, AND ARE BASED ON DIER'S STANDARD SETUP FOR AUTOTURN.
VEHICLE NAME COL. 8 CONTINUOUS
VEHICLE OUTLINE COL. 8 CONTINUOUS
TYRES COL. 8 CONTINUOUS
TYRE TREAD COL. 9 CONTINUOUS
PATH ICONS COL. 8 CONTINUOUS
FRONT TYRES COL. 82 HIDDEN
REAR TYRES COL. 12 DASHED
FRONT CLEARANCE COL. 130 CONTINUOUS
REAR CLEARANCE COL. 130 CONTINUOUS
VEHICLE BODY COL. 210 CONTINUOUS
BODY CLEARANCE COL. 130 CONTINUOUS
LOAD (NS) COL. 50 CONTINUOUS
LOAD CLEARANCE (NS) COL. 52 DASHED 2
VEHICLE BODY COL. 241 NET
BODY CLEARANCE (NS) COL. 131 DOTS
GENERAL:
ENVELOPES:
HATCHING:
(NS) DENOTES NOT SHOWN (NORMALLY)
(----)
DYNB SURFACE DRAIN - TYPE A1 (UNLINED)A1 ▻
SURFACE DRAIN - TYPE A2 (LINED)
SURFACE DRAIN - TYPE B1 (UNLINED)
SURFACE DRAIN - TYPE B2 (LINED)
SURFACE DRAIN - TYPE C1 (UNLINED)
SURFACE DRAIN - TYPE C2 (LINED)
A2 ▻▻
B1 ▻
B2 ▻▻
C1 ▻
C2 ▻▻
DYNB
CATCH PIT - TABLE DRAIN*
ENDWALL - PLAIN / MC* DYNB
ENDWALL - SINGLE & MULTI RC [SQUARE]* DYNB
ENDWALL - SINGLE RC [SKEWED]* DYNB
ENDWALL - TWIN RC [SKEWED]* DYNB
ENDWALL - MULTI RC [SKEWED]* DYNB
ENDWALL - DRIVEABLE - TYPE 1* DYNB
ENDWALL - DRIVEABLE - TYPE 2* DYNB
D DRAIN (STORMWATER) ContinuedBATTER DRAIN - SPLASH APRON* DYNB
BATTER DRAIN - ENERGY DISSIPATOR* DYNB
PIPE OUTLET - ENERGY DISSIPATOR [ON LINE]* DYNB
PIPE OUTLET - ENERGY DISSIPATOR [DEFLECTED]* DYNB
SS
> > > >
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:22 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
PROJECT LEGEND - DRG 4 OF 5
A0113.021
1005
A
2402
NTS
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1005
PUMP STATIONPUMP
D RAIL
RAILWAY CONTROL BOX
RAILWAY FORMATION EDGE
RAILWAY SIGNAL
RAILWAY SIGNAL TROUGH
RAILWAY STANCHION
RAILWAY TRACK CENTRE
3 ASPECT LANTERN & PHASE
TRAFFIC SIGNAL CONTROLLER
TRAFFIC SIGNAL JUNCTION BOX
FUEL PIPELINE
SAFETY BARRIER STEEL BEAM
SAFETY BARRIER TYPE F
SAFETY BARRIER WIRE ROPE
MAIN - REDUNDANT
MAIN
MANHOLE COVER
SEWAGE POND
VENT PIPE
UNDERGROUND TANK
AIR VALVE
AIR VALVE - RECYCLED
FIRE HYDRANT
HOUSE CONNECTION
HYDRANT - RECYCLED
MAIN
MAIN - RECYCLED
METER
METER - RECYCLED
OVERHEAD PIPELINE
STOP VALVE
STOP VALVE - RECYCLED
TAP
TAP - RECYCLED
HYDRANT
D WATR
D ROAD
D SEWR
D TCS (TRAFFIC)D MISC
UT
FUEL
RS
RCB
RST
TOP OF RAIL
□X
0
S
SP
SVP
xSx
S
TSC
WO
WR
WH
W
AV
WR
FH
WH
WR
WM
WR
SV
WR
TAP
TAPR
MAIN - REGIONALWM
BARRIER (ONE DIRECTION) PD (B1) & (B1a)
CONTINUITY (C)
BARRIER (BOTH DIRECTIONS) (B2) & (B2a)
HOLDING (HL)
LANE (RURAL) (L)
PEDESTRIAN WALKWAY (W)
SEPARATION (RURAL) (S) & (Sa)
BARRIER (ONE DIRECTION) CD (B1) & (B1a)
CONTINUOUS CONTINUITY (CC) & (CCa)
EDGE (URBAN) (E)
EDGE CONTINUITY (URBAN) (EC)
JUNCTION CONTINUITY (JC)
LANE (TURNOUT LANE) (L2)
LANE (SPECIAL PURPOSE) (L3)
LANE (CONTINUOUS) (LC)
NO STOPPING (NS)
SEPARATION (MEDIAN LANE) (S2)
SEPARATION (SPECIAL PURPOSE) (S3) & (S3a)
SEPARATION (BICYCLE PATHS) (S4)
TURN TRAFFIC SIGNALS (T)
D LNMKARROW - LEFT TURN
ARROW - RIGHT TURN
ARROW - STRAIGHT AHEAD & LEFT
ARROW - STRAIGHT AHEAD & RIGHT
ARROW - STRAIGHT AHEAD
EDGE RURAL (E2)
HOUSE CONNECTIONSH
MAIN - REDUNDANTxWx
SAW CUTSJ
KERB - BACK
EARTHWORKS - BATTER
EARTHWORKS - BENCH
CONTROL LINE - CENTRELINE
CONTROL LINE - FILLET
CONTROL LINE - KERB
DRIVEWAY/ACCESS
EDGE OF LANE SEAL
EDGE OF MEDIAN
EDGE OF SHOULDER (SEALED)
FOOTPATH BACK/FOOTPATH FRONT
EARTHWORKS - HINGE
INTERFACE/JOINT
KERB - INVERT
KERB - LIP LINE/EDGE OF SEAL
OFFSET CROWN
SUBGRADE
TABLE DRAIN
KERB - TOP
EDGE OF VERGE
EDGE OF FORMATION (UNSEALED)
SERVICE TRENCH - TYPE 1TR1
SERVICE TRENCH - TYPE 2TR2
SERVICE TRENCH - TYPE 3TR3
SERVICE TRENCH - TYPE 4TR4
SERVICE TRENCH - TYPE 5TR5
SERVICE TRENCH - TYPE 6TR6
SERVICE TRENCH - TYPE 7TR7
SERVICE TRENCH - TYPE 8TR8
SERVICE TRENCH - TYPE 9TR9
PUMP STATIONPUMP
LINEMARKING IDENTIFICATION CODE
RRPM - WHITE - UNIDIRECTIONAL
RRPM - WHITE - BIDIRECTIONAL
RRPM - YELLOW - UNIDIRECTIONAL
RRPM - YELLOW - BIDIRECTIONAL
RRPM - RED - UNIDIRECTIONAL
RRPM - GREEN - UNIDIRECTIONAL
RRPM - NON REFLECTIVE
*
*
*
*
*
*
*
SILT STOP FENCE - TYPE 1/S1/
SILT STOP FENCE - TYPE 2/S2/
SEDIMENT TRAP|ST|
PRESERVATION FENCE - TYPE 1FP1
PRESERVATION FENCE - TYPE 2FP2
TRAFFIC SIGNAL DETECTOR LOOP
TRAFFIC SIGNAL CONDUITTT
TRAFFIC SIGNAL CABLETT
SCOUR VALVE
SCOUR VALVE - RECYCLED
ScV
SR
IRRIGATION PIPELINEIRR
UTILITY - EXPOSED
BATTER SYMBOL
SLOPE SIGNATURE
ARROW - MERGE (RURAL)
ARROW - MERGE (URBAN)
ARROW - UTURN
B2 E2
* DENOTES SYMBOL SCALED FOR CLARITYDYNB DENOTES DYNAMC BLOCK DEFINED
DYNB
BARRIER (BOTH DIRECTIONS) (B4) & (B4a)
BARRIER (BOTH DIRECTIONS) (B3) & (B3a)
SEPARATION (URBAN) (S1)
LANE (URBAN) (L1)
EDGE CONTINUITY (RURAL) (EC2) & (E2a)
(----)
STOP (SL)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
(----)
-1.000
TRIANGULATION - DESIGN SURFACE
D TRIA
TRIANGULATION - COMBINED DESIGN AND SURVEY
(TD--)
(TC--)
LOUVRED 3 ASPECT LANTERN
3 ASPECT OVERHEAD LANTERN & PHASE
3 ASPECT LANTERN WITH GREEN+YELLOW+REDTURN ARROWS & PHASEGREEN+YELLOW+RED TURN ARROWS & PHASE
GREEN + YELLOW TURN ARROWS & PHASE
GREEN TURN ARROW AND PHASE
GREEN TURN ARROW WITH FULL RED + YELLOWASPECTS AND PHASE
GREEN+YELLOW TURN ARROWS WITH RED ASPECT& PHASEPEDESTRIAN PUSH BUTTON
PEDESTRIAN LANTERN & WALK PHASE
TRAFFIC SIGNAL - WIG WAG LANTERNS
TRAFFIC SIGNAL - LOUVRE
A
A
REDA
RED
YELLOWA
A
A
A
*
*
*
*
*
*
*
*
*
*
*
*
*
A
DYNB
DYNB
DYNB
DYNB
DYNB
DYNB
DYNB
DYNB
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:22 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
PROJECT LEGEND - DRG 5 OF 5
A0113.021
1006
A
2402
NTS
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1006
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
□X
5300
5400
5500
5600
5700
5800
5900
6000 6100
6200
6300
6400
6500
6600
6700 TASMAN HIGHWAY
BICHENO
0 200100
SCALE IN METRES - 1:5000
15050 50
TASMAN HIGHWAY
SWANSEA
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:22 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT - KEY PLAN
A0113.021
1021
A
2402
1:500 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1021
GENERAL ARRANGEMENT - 1101
GENERAL ARRANGEMENT - KEY PLANSCALE - 1:5000 (A3)
GENERAL ARRANGEMENT - 1102
GENERAL ARRANGEMENT - 1103
GENERAL ARRANGEMENT - 1104 GENERAL ARRANGEMENT - 1105
GENERAL ARRANGEMENT - 1106
GENERAL ARRANGEMENT - 1107
GENERAL ARRANGEMENT - 1108
GENERAL ARRANGEMENT - 1109
APSLEY RIVER
APSLEY RIVER
3.13.1 1.41.41.0 1.0
0.5
0.5
3.13.11.00.5 1.0 0.5 2.752.75
3.13.11.00.5 1.0 0.5 2.752.75
VERG
E
SHOU
LDER
LANE
LANE
SHOU
LDER
VERG
E
DRAI
N
DRAI
N
VERG
E
VERG
E
SHOU
LDER
SHOU
LDER
SHOU
LDER
SHOU
LDER
VERG
E
VERG
E
LANE
LANE
LANE
LANE
TABL
E DR
AIN
TABL
E DR
AIN
TABL
E DR
AIN
TABL
E DR
AIN
21
21
41
41
41
41
EMBANKMENT ON BRIDGE APPROACHESSCALE 1:100
FULL DEPTH PAVEMENTSCALE 1:100
TASMAN HIGHWAY OVERLAYSCALE 1:100
150mm CLASS 2150mm CLASS 3100mm CLASS 4
150mm CLASS 2150mm CLASS 3100mm CLASS 4
150mm CLASS 2150mm CLASS 3100mm CLASS 4
EXISTING FENCELINEEXISTINGFENCELINE
EXISTING GROUND
EXISTING GROUND
EXISTING GROUND
REDUNDANT ROAD
STRIPPING
STRIPPING
STRIPPING
MILL OFF EXISTING SEAL AND USEAS EMBANKMENT MATERIAL
PRIME AND SINGLE / SINGLE 10mm SEAL
PRIME AND SINGLE / SINGLE 10mm SEAL
10mm PRIMERSEAL
EXISTING TASMAN HIGHWAY
REMOVE EXISTING PAVEMENTTO PROVIDE FULL DEPTHBASE COURSE DEPTH WHEREREQUIRED
TYPE B MATERIAL
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:22 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
TYPICAL SECTIONS AND DETAILS
A0113.021
1041
A
2402
1:100 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1041
0 42
SCALE IN METRES - 1:100
31 1
EP
EP
EPE(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH)
E(OH)
E(OH)/ / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / /
5300
5320
5340
5360
5380
5400
5420
5440
E(OH) E(OH)
// / / / / / / / / / / /
//
//
//
/
/////////////////
x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x
x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x
TASMAN HIGHWAY
BICHENO
0 2010
SCALE IN METRES - 1:500
155 5
TASMAN HIGHWAY
SWANSEA
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:22 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT PLAN
A0113.021
1101
A
2402
1:500 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1101
JOIN
S - S
HEET
1102
LIMIT
OF
CONT
RACT
MATCH TO EXISTING FORMATIONAT CH 5300 (MCB0)
DESIGN LINE MCB0
REDUNDANT ROAD.TREATMENT AS PERSPECIFICATION
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW TASNETWORKS EASEMENT
EP
EP
E(OH)E(OH)
E(OH)E(OH)
E(OH)
E(OH)E(OH)
E(OH)
E(OH)E(OH)
E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)
/
//
/
/ / / / /
/ / / / / / //
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
5440
5460
5480
5500
5520
5540
5560
5580
5600
5620
E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
//
//
//
/
/
/
/
/
/
/
/
/
/
/
/
/
//
//
/
EP
EP
//
//
/
/
/
/
/
/
/
/
/
/
/
//
/
//
///
x/x x/x x/x x/x x/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/x x/x x/x x/x x/x x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
TASMAN HIGHWAY
BICHENO
0 2010
SCALE IN METRES - 1:500
155 5
TASMAN HIGHWAY
SWANSEA
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:22 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT PLAN
A0113.021
1102
A
2402
1:500 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1102
JOIN
S - S
HEET
1103
JOIN
S - S
HEET
1101
DESIGN LINE MCB0
REDUNDANT ROAD.TREATMENT AS PERSPECIFICATION
NEW TASNETWORKS POLE
NEW TASNETWORKS POLE
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW TASNETWORKS EASEMENT
NEW PROPERTY FENCE LINE
EP
EP
300H
300H
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH) E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
D
D
D
DD
D
//
//
//
//
//
//
//
//
//
/
/
/
/
/
/
/
/
/
/
/
/////////
//
//
//
//
//
//
5620
5640
5660
5680
5700
5720 5740 5760
5780
5800
5820
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)
//
//
//
//
//
//
//
//
//
/
EP
EP
/
//
//
//
//
////////
//
//
//
x/x
x/x
x/x
x/xx/xx/xx/xx/xx/xx/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/xx/x
x/x
TASMAN HIGHWAY
BICHENO
0 2010
SCALE IN METRES - 1:500
155 5
TASMAN HIGHWAY
SWANSEA
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:22 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT PLAN
A0113.021
1103
A
2402
1:500 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1103
JOIN
S - S
HEET
1104
JOIN
S - S
HEET
1102
NEW TASNETWORKS POLENEW TASNETWORKS POLE
REMOVE EXISTING DN300CULVERT AND ENDWALLS
REMOVE EXISTING DN300CULVERT AND ENDWALLS
DESIGN LINE MCB0
REDUNDANT ROAD.TREATMENT AS PERSPECIFICATION
REDUNDANT ROAD.TREATMENT AS PERSPECIFICATION
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW TASNETWORKS EASEMENT
NEW PROPERTY FENCE LINE
EP
EP
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH) E(OH)
E(OH)
E(OH)
D D D D D D D D D D D D DD
DD
DD
DD D D
DD
/ / / / / / / / / / / / / / / / / / / / / / / /
/
/
/
/
/
/
/
/
/
/
//
//
////
////
//
/
□X
□X
□X
□X
□X
□X
□X
□X
/
/
/
/
/
/
/
/
/
/
/
/ / / / / / / / / / /
5800
5820
5840
5860
5880
5900 5920 5940
5960
5980
□X□X
□X□X
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
EP
EP
//////////
/
//
//
//
//
//
/ /
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/xx/x
x/xx/x
x/xx/xx/xx/xx/xx/x
x/xx/x
x/xx/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x x/x x/x x/x x/x x/x x/xx/x
//
//
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x x/x x/x x/x x/x x/x x/xx/x x/x
TASMAN HIGHWAY
BICHENO
0 2010
SCALE IN METRES - 1:500
155 5
TASMAN HIGHWAY
SWANSEA
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:23 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT PLAN
A0113.021
1104
A
2402
1:500 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1104
JOIN
S - S
HEET
1105
JOIN
S - S
HEET
1103
DESIGN LINE MCB0
NEW TASNETWORKS POLE
REMOVE EXISTING W-BEAMSAFETY BARRIER
INSTALL G.R.E.A.T TERMINALTERMINATING AT CH.5960 (MCB0).
REDUNDANT ROAD.TREATMENT AS PERSPECIFICATION
REDUNDANT ROAD.TREATMENT AS PERSPECIFICATION
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW TASNETWORKS EASEMENT
NEW PROPERTY FENCE LINE
NEW TASNETWORKS POLE
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
D
D
D
D
D
D
D
D
/
/
/
/
/
/
/
/
/
/
////
//
//
□X □X□X
□X□X
□X □X □X □X□X
□X□X
□X□X
//
//
/
//
//
//
////
/
/
/
/
5960
5980
6000
6020
6040
6060
6080 6100 6120
6140
6160
0
60
0
20
0
20
□X □X □X □X □X □X □X □X □X□X
□X□X
□X□X
□X
□X□X
□X□X
□X□X □X □X □X □X □X □X □X □X □X □X □X □X □X
□X□X
□X□X
□X□X
□X
□X□X
SWSW
E(OH)E(OH)
E(OH)E(OH)
E(OH)E(OH)
E(OH)
20
40
x/x
x/x
x/x
x/x
x/xEP
/
/
/
/
//
//
/ / / / / / / //
//
//
//
//
//
// / / / /
//
//
//
//
x/xx/xx/xx/x
x/xx/xx/x
x/xx/x
x/x
x/x
x/xx/x
x/xx/x
x/xx/x
x/xx/xx/x
x/x
//
//
//
/
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/xx/x
x/x
x/x
x/xx/x
x/xx/x
x/xx/xx/xx/xx/x
x/x
x/x
x/x
x/x
TASMAN HIGHWAY
BICHENO
0 2010
SCALE IN METRES - 1:500
155 5
TASMAN HIGHWAY
SWANSEA
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:23 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT PLAN
A0113.021
1105
A
2402
1:500 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1105
JOIN
S - S
HEET
1106
JOIN
S - S
HEET
1104
INSTALL G.R.E.A.T. TERMINALTERMINATING AT CH.20 (MCTR)
INSTALL W-BEAM SAFETY BARRIERFROM CH.5960 AND TRANSITIONTO BRIDGE BARRIER
INSTALL ROCK LINING FROMCH.6010 TO CH.6110 (MCB0)
INSTALL ROCK LINING FROMCULVERT OUTLET TO CH.6110 (MCB0)
MATCH TO EXISTING FORMATIONAT CH.65 (MCTT)
DESIGN LINE MCB0
MCTLMC
TTMCTR
INSTALL DN450 STORMWATER WITHTYPE 1 DRIVEABLE ENDWALLS
NEW TASNETWORKS POLE
REMOVE EXISTING W-BEAMSAFETY BARRIER
REDUNDANT ROAD.TREATMENT AS PERSPECIFICATION
REDUNDANT ROAD.TREATMENT AS PERSPECIFICATION
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW TASNETWORKS EASEMENT
NEW PROPERTY BOUNDARY AND FENCE LINE
CONNECT TO EXISTINGTASNETWORKS POLE
EP
E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH)E(OH)
D
D
D
D
//
//
/
/
/
/
/
/
/
/
/
/
/
00
6140
6160
6180
6200
6220
6240
6260
6280
6300
6320
□X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X
□X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X
20
//
//
//
/ / / /
/ / / / / / / / / / / /
/ / / / / /
x/xx/x
x/xx/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
TASMAN HIGHWAY
BICHENO
0 2010
SCALE IN METRES - 1:500
155 5
TASMAN HIGHWAY
SWANSEA
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:23 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT PLAN
A0113.021
1106
A
2402
1:500 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1106
JOIN
S - S
HEET
1107
JOIN
S - S
HEET
1105
APSLEY RIVER
APSLEY RIVER
PROPOSED ALIGNMENT FOR APSLEY RIVERBRIDGE (B6159) REPLACEMENT
REFER TO HB17182-S1800 SERIES FOR DETAIL
INSTALL W-BEAM SAFETYBARRIER FROM CH.20 (MCD1)
INSTALL W-BEAM SAFETY BARRIERFROM CH.5960 AND TRANSITIONTO BRIDGE BARRIER
INSTALL ROCK LINING FROM RIVEROUTFALL TO CH.6360 (MCB0)
INSTALL ROCK LINING FROM RIVEROUTFALL TO CH.6360 (MCB0)
INSTALL W-BEAM SAFETY BARRIERTO CH.6440 (MCB0). TRANSITIONTO W-BEAM FROM BRIDGE.
INSTALL W-BEAM SAFETY BARRIERTO CH.6460 (MCB0). TRANSITIONTO W-BEAM FROM BRIDGE.
DESIGN LINE MCB0
MCD1
MCDK
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW PROPERTY BOUNDARY AND FENCE LINE
EP
EP
375H
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DD
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
/
/
/
/
/
/
/
/E(OH) E(OH) E(OH) E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
//
//
//
//
/
/
/
/
/
/6320 6340 6360 6380 6400 6420 6440 6460
6480
6500
□X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X
□X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X □X
/ / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / //
//
//
// / / /
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/xx/x
x/xx/x
x/xx/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
TASMAN HIGHWAY
BICHENO
0 2010
SCALE IN METRES - 1:500
155 5
TASMAN HIGHWAY
SWANSEA
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:23 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT PLAN
A0113.021
1107
A
2402
1:500 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1107
JOIN
S - S
HEET
1108
JOIN
S - S
HEET
1106
INSTALL ROCK LINING FROM RIVEROUTFALL TO CH.6360 (MCB0)
INSTALL ROCK LINING FROM RIVEROUTFALL TO CH.6360 (MCB0)
INSTALL W-BEAM SAFETY BARRIERTO CH.6440 (MCB0). TRANSITIONTO W-BEAM FROM BRIDGE.
INSTALL W-BEAM SAFETY BARRIERTO CH.6460 (MCB0). TRANSITIONTO W-BEAM FROM BRIDGE.
DESIGN LINE MCB0
INSTALL G.R.E.A.T TERMINAL.TERMINATING AT CH.6460 (MCB0)
INSTALL G.R.E.A.T TERMINAL.TERMINATING AT CH.6440 (MCB0)
REMOVE EXISTING DN375CULVERT AND ENDWALLS
REDUNDANT ROAD.TREATMENT AS PERSPECIFICATION
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW PROPERTY BOUNDARY AND FENCE LINE
E(OH
)
EP
EP
375H
/
/
/
D
D
D
D
D
D
D
D
/
/
/
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
//
/
//
//
/
/
/
//
/
/
/
/
//
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
E(OH)
/
/D
D
D
D
D
0
20
0
6500
6520
6540
6560
6580
6600
6620
6640
6660
6680
/ / / / //
//
//
/
//
//
//
//
/
/
/ / / / //
//
//
//
//
//
//
//
/
/
x/x
x/x
x/xx/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
x/x
TASMAN HIGHWAY
BICHENO
0 2010
SCALE IN METRES - 1:500
155 5
TASMAN HIGHWAY
SWANSEA
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:23 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT PLAN
A0113.021
1108
A
2402
1:500 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1108
JOIN
S - S
HEET
1109
JOIN
S - S
HEET
1107
EXTEND EXISTING DN375 CULVERT ANDINSTALL TYPE 2 DRIVEABLE ENDWALL
INSTALL TYPE 2DRIVEABLE ENDWALL
DESIGN LINE MCB0
CONSTRUCT 3.6m WIDE ACCESSAND SEAL TO FENCE LINE.REFER DESIGN LINE (MCA0).
CONSTRUCT 3.6m WIDE ACCESSAND SEAL TO FENCE LINE.REFER DESIGN LINE MCC0.
INSTALL DN375 STORMWATER WITHTYPE 1 DRIVEABLE ENDWALLS
MCA0
MCC0
REDUNDANT ROAD.TREATMENT AS PERSPECIFICATION
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW PROPERTY BOUNDARY AND FENCE LINE
EP
375H
375H
/ / / / / / / / / / / /
E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH) E(OH)
/////////////
D
D D D D D D D D D D D D D
DDDDDDDDDDDDD
0
20
6680
6700
6720
SD SD SD
SD SD SD
/ / / / / / / / / / /
/ / / / / / / / / / / /
x/xx/xx/xx/xx/xx/xx/xx/xx/xx/xx/x
x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x x/x
TASMAN HIGHWAY
BICHENO
0 2010
SCALE IN METRES - 1:500
155 5
TASMAN HIGHWAY
SWANSEA
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:23 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT PLAN
A0113.021
1109
A
2402
1:500 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1109
JOIN
S - S
HEET
1108
LIMIT
OF
CONT
RACT
CONSTRUCT NEW TABLE DRAINTO EXISTING CULVERT
MATCH TO EXISTING FORMATIONAT CH.6733.5 (MCB0)
DESIGN LINE MCB0
NEW PROPERTY BOUNDARY AND FENCE LINE
NEW PROPERTY BOUNDARY AND FENCE LINE
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:23 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
LONGITUDINAL PROFILE MCB0 - DRG 1 OF 3
A0113.021
1701
A
2402
1:2000 (H); 1:200 (V)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1701
0 84
SCALE IN METRES - 1:200
62 2
0 8040
SCALE IN METRES - 1:2000
6020 20
IP C
H.=5
300.0
00
IP C
H.=5
759.7
82
IP R
L.=22
.912
IP R
L.=28
.008
DATUM 22.000
VERTICAL GEOMETRY
HORIZONTAL GEOMETRY
LEVEL DIFFERENCEDESIGN TO EXISTING
INTERPOLATEDGROUND LEVELS
DESIGN LEVELS
CHAINAGE
GEOMETRY DATA
IS ROUNDED
0.000
-0.02
0
0.032
-0.05
8
-0.03
9
-0.13
3
-0.04
6
0.061
0.002
-0.03
3
0.197
0.207
0.183
0.196
0.244
0.335
0.311
0.200
0.018
-0.07
0
-0.11
4
0.047
0.376
0.207
-0.17
2
-0.01
6
0.123
0.359
22.91
2
23.15
4
23.32
3
23.63
5
23.83
8
24.15
3
24.28
7
24.40
2
24.68
3
24.93
9
24.93
2
25.14
4
25.38
9
25.59
8
25.77
2
25.90
2
26.14
7
26.45
1
26.78
8
26.99
0
27.10
8
26.98
0
26.64
5
26.76
8
27.06
2
26.78
0
26.47
4
26.03
3
22.91
2
23.13
4
23.35
5
23.57
7
23.79
9
24.02
0
24.24
2
24.46
4
24.68
5
24.90
7
25.12
9
25.35
0
25.57
2
25.79
4
26.01
5
26.23
7
26.45
8
26.65
2
26.80
6
26.92
0
26.99
4
27.02
8
27.02
2
26.97
6
26.89
0
26.76
4
26.59
8
26.39
2
5300
5320
5340
5360
5380
5400
5420
5440
5460
5480
5500
5520
5540
5560
5580
5600
5620
5640
5660
5680
5700
5720
5740
5760
5780
5800
5820
5840
L=55m LL=172m
L=546mL=55mR=-500m
R=440m
G=1.1%L=316m
R=-10000mL=287m
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:23 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
LONGITUDINAL PROFILE MCB0 - DRG 2 OF 3
A0113.021
1702
A
2402
1:2000 (H); 1:200 (V)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1702
0 84
SCALE IN METRES - 1:200
62 2
0 8040
SCALE IN METRES - 1:2000
6020 20
IP C
H.=5
985.9
63IP
RL.=
24.01
8
DATUM 15.000
VERTICAL GEOMETRY
HORIZONTAL GEOMETRY
LEVEL DIFFERENCEDESIGN TO EXISTING
INTERPOLATEDGROUND LEVELS
DESIGN LEVELS
CHAINAGE
GEOMETRY DATA
IS ROUNDED
0.359
0.800
1.100
0.762
0.316
0.446
0.402
0.635
0.751
1.051
1.501
2.468
4.212
5.398
5.505
5.872
5.141
5.161
5.502
9.452
9.366
6.710
5.850
4.777
3.111
2.534
2.031
1.367
26.03
3
25.34
5
24.76
0
24.77
2
24.88
3
24.46
7
24.27
4
23.85
5
23.60
3
23.21
6
22.72
9
21.77
6
20.08
7
18.96
2
18.91
5
18.60
8
19.39
8
19.43
8
19.15
8
15.26
7
15.41
3
18.13
0
19.05
0
20.18
4
21.90
8
22.51
3
23.00
6
23.61
8
26.39
2
26.14
6
25.86
0
25.53
4
25.19
9
24.91
2
24.67
6
24.49
0
24.35
3
24.26
7
24.23
1
24.24
5
24.30
0
24.36
0
24.42
0
24.48
0
24.54
0
24.60
0
24.66
0
24.72
0
24.78
0
24.84
0
24.90
0
24.96
0
25.01
9
25.04
8
25.03
7
24.98
6
5840
5860
5880
5900
5920
5940
5960
5980
6000
6020
6040
6060
6080
6100
6120
6140
6160
6180
6200
6220
6240
6260
6280
6300
6320
6340
6360
6380
L=143mL=546mL=131m
L=40mR=440m
R=1600m
G=0.3%L=246m
R=-10000m
R=8000m
R=-10000mL=287m L=165m
L=132m
APSL
EY R
IVER
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:23 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
LONGITUDINAL PROFILE MCB0 - DRG 3 OF 3
A0113.021
1703
A
2402
1:2000 (H); 1:200 (V)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1703
0 84
SCALE IN METRES - 1:200
62 2
0 8040
SCALE IN METRES - 1:2000
6020 20
IP C
H.=6
380.4
39
IP C
H.=6
502.6
33
IP C
H.=6
646.2
32
IP C
H.=6
733.5
33
IP R
L.=25
.201
IP R
L.=23
.957
IP R
L.=24
.517
IP R
L.=24
.279
DATUM 23.000
VERTICAL GEOMETRY
HORIZONTAL GEOMETRY
LEVEL DIFFERENCEDESIGN TO EXISTING
INTERPOLATEDGROUND LEVELS
DESIGN LEVELS
CHAINAGE
GEOMETRY DATA
IS ROUNDED
1.367
0.772
0.279
0.185
0.211
0.369
0.373
0.264
0.291
0.198
0.142
0.123
0.071
0.015
0.014
0.010
-0.00
6
-0.03
7
23.61
8
24.12
3
24.48
4
24.40
8
24.19
3
23.88
9
23.79
2
23.85
6
23.83
5
23.98
3
24.10
8
24.18
2
24.27
3
24.35
3
24.36
2
24.36
1
24.35
6
24.34
9
24.27
9
24.98
6
24.89
5
24.76
4
24.59
3
24.40
3
24.25
9
24.16
4
24.12
0
24.12
5
24.18
1
24.25
0
24.30
5
24.34
4
24.36
8
24.37
7
24.37
1
24.34
9
24.31
2
24.27
9
6380
6400
6420
6440
6460
6480
6500
6520
6540
6560
6580
6600
6620
6640
6660
6680
6700
6720
6734
L=143m L=113mL=163mR=-500m
R=-10000m
R=8000m
R=-26375mL=132m L=113m L=175m
-4.1% -2.4%DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5300.000
IAB0
IEB0
EVB0
CEB0
MCB0
CEBI
EVBI
IEBI
IABI
22.47
5
22.74
422
.798
22.91
2
22.84
122
.731
22.43
2
22.48
622
.056
22.74
422
.800
22.91
2
22.84
222
.734
22.04
622
.508
-6.40
0-5
.755
-3.00
5-2
.738
-0.00
0
2.918
3.521
6.271
6.964
-3.6% -1.6%DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5310.000
IAB0
IEB0
EVB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
22.58
2
22.73
422
.898
23.05
3
22.94
922
.905
22.82
6
22.57
3
22.59
622
.209
22.89
722
.959
23.06
2
23.01
623
.010
22.96
0
22.27
322
.626
-7.08
2-6
.502
-3.75
2-2
.919
-0.00
0
3.009
3.342
3.842
6.592
7.122
-3.0% -0.7%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5320.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
22.68
5
22.81
822
.899
23.00
7
23.15
4
23.03
222
.943
22.85
6
22.69
9
22.70
522
.357
23.04
423
.094
23.11
4
23.20
7
23.18
523
.180
23.13
0
22.44
322
.746
-7.53
8-7
.017
-4.26
7-3
.767
-3.10
0
-0.00
0
3.100
3.767
4.267
7.017
7.471
-3.0% 0.1%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5330.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
22.70
1
22.78
222
.888
23.09
6
23.23
9
23.12
4
22.99
022
.918
22.85
1
22.71
322
.485
23.17
323
.223
23.25
3
23.34
6
23.34
9
23.35
123
.301
22.61
322
.876
-7.69
1-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
7.744
-3.0% 1.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5340.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
22.91
2
22.84
922
.956
23.16
8
23.32
3
23.21
2
23.06
022
.981
22.92
5
22.93
122
.617
23.30
523
.355
23.38
5
23.47
8
23.50
8
23.51
723
.467
22.78
022
.942
-7.81
9-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
7.593
-3.0% 1.8%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5350.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.01
6
22.97
523
.068
23.25
3
23.40
9
23.28
9
23.13
723
.034
23.04
2
23.02
622
.743
23.43
123
.481
23.51
1
23.60
4
23.66
0
23.67
823
.628
22.94
023
.048
-7.77
4-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
7.511
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:24 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 1 OF 37
A0113.021
1751
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1751
0 84
SCALE IN METRES - 1:200
62 2
-3.0% 2.6%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5360.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.03
4
23.13
023
.228
23.48
4
23.63
5
23.50
8
23.35
723
.276
23.13
5
23.03
722
.863
23.55
123
.601
23.63
1
23.72
4
23.80
6
23.83
223
.782
23.09
423
.137
-7.61
1-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.414
-3.3% 3.5%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5370.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.26
6
23.29
323
.375
23.54
2
23.73
9
23.67
2
23.52
323
.443
23.28
2
23.27
422
.966
23.65
323
.703
23.73
6
23.83
7
23.94
5
23.98
023
.930
23.24
223
.281
-7.81
3-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.408
-4.2% 4.3%DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5380.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.34
5
23.37
023
.453
23.61
9
23.83
8
23.81
3
23.68
023
.606
23.38
7
23.34
123
.036
23.72
323
.773
23.81
5
23.94
5
24.07
8
24.12
224
.072
23.38
423
.387
-7.80
8-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
7.355
-5.1% 5.2%DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5390.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.49
6
23.49
323
.503
23.68
0
23.98
6
23.97
4
23.93
123
.857
23.58
7
23.48
723
.100
23.78
723
.837
23.88
8
24.04
6
24.20
6
24.25
724
.207
23.52
023
.586
-7.93
1-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
7.450
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5400.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.70
6
23.71
323
.704
23.77
1
24.15
3
24.19
5
24.17
624
.167
23.98
6
23.70
023
.162
23.85
023
.900
23.96
0
24.14
6
24.33
2
24.39
224
.342
23.65
423
.983
-8.15
6-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.843
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5410.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.87
0
23.89
823
.905
23.92
0
24.30
2
24.42
0
24.40
124
.392
24.21
9
23.85
5
23.26
2
23.95
024
.000
24.06
0
24.24
6
24.43
2
24.49
224
.442
23.75
424
.163
-8.23
9
-7.35
0
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.963
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:24 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 2 OF 37
A0113.021
1752
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1752
0 84
SCALE IN METRES - 1:200
62 2
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5420.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.96
3
23.98
824
.000
24.02
3
24.28
7
24.57
4
24.61
924
.609
24.50
4
23.95
5
23.36
2
24.05
024
.100
24.16
0
24.34
6
24.53
2
24.59
224
.542
23.85
424
.413
-8.23
8
-7.35
0
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.187
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5430.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.03
9
24.12
624
.141
24.17
3
24.23
9
24.69
3
24.73
924
.761
24.76
7
24.01
823
.462
24.15
024
.200
24.26
0
24.44
6
24.63
2
24.69
224
.642
23.95
4
24.72
4
-8.18
3-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.503
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5440.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.12
1
24.23
124
.251
24.29
1
24.40
2
24.70
3
24.87
024
.903
24.98
7
24.09
723
.562
24.25
024
.300
24.36
0
24.54
6
24.73
2
24.79
224
.742
24.05
4
24.97
6
-8.15
2-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.731
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5450.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.30
8
24.37
024
.390
24.43
0
24.55
1
24.70
5
24.81
324
.885
25.11
9
24.29
3
23.66
2
24.35
024
.400
24.46
0
24.64
6
24.83
2
24.89
224
.842
24.15
4
25.17
5
-8.29
6
-7.35
0
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.880
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5460.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.40
0
24.48
124
.503
24.54
1
24.68
3
24.81
4
24.83
224
.853
25.15
4
24.37
9
23.76
2
24.45
024
.500
24.56
0
24.74
6
24.93
2
24.99
224
.942
24.25
4
25.26
6
-8.27
4
-7.35
0
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.867
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5470.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.44
1
24.54
424
.562
24.60
0
24.71
8
24.87
1
24.92
624
.954
25.04
8
24.41
123
.862
24.55
024
.600
24.66
0
24.84
6
25.03
2
25.09
225
.042
24.35
4
25.21
1
-8.17
2-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.634
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:24 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 3 OF 37
A0113.021
1753
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1753
0 84
SCALE IN METRES - 1:200
62 2
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5480.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.54
5
24.71
424
.745
24.80
6
24.93
9
24.93
5
24.97
324
.994
25.10
9
24.49
623
.962
24.65
024
.700
24.76
0
24.94
6
25.13
2
25.19
225
.142
24.45
4
25.20
6
-8.14
9-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.477
-6.0% 6.0%DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5490.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.56
4
24.67
924
.701
24.73
9
24.85
7
24.99
5
25.04
425
.072
25.22
8
24.54
124
.062
24.75
024
.800
24.86
0
25.04
6
25.23
2
25.29
225
.242
24.55
4
25.28
7
-8.06
7-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.449
-6.0% 6.0%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5500.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.56
4
24.67
924
.709
24.76
7
24.93
2
25.07
8
25.12
525
.148
25.26
2
24.55
524
.162
24.85
024
.900
24.96
0
25.14
6
25.33
2
25.39
225
.342
24.65
4
25.29
2
-7.93
9-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.306
-5.1% 5.1%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5510.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.67
7
24.79
724
.818
24.86
0
24.99
0
25.12
0
25.16
225
.183
25.30
3
24.64
524
.300
24.98
825
.038
25.08
9
25.24
6
25.40
3
25.45
425
.404
24.71
7
25.34
7
-7.86
7-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.295
-4.2% 4.2%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5520.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.80
7
24.93
024
.953
24.99
9
25.14
4
25.28
8
25.32
725
.343
25.42
7
24.78
524
.438
25.12
625
.176
25.21
7
25.34
6
25.47
5
25.51
625
.466
24.77
9
25.45
9
-7.87
0-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.369
-3.2% 3.2%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5530.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.04
9
25.17
825
.202
25.25
1
25.39
3
25.48
7
25.51
625
.531
25.61
1
25.02
224
.576
25.26
325
.313
25.34
6
25.44
6
25.54
6
25.57
825
.528
24.84
1
25.64
6
-8.01
8-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.557
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:24 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 4 OF 37
A0113.021
1754
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1754
-2.3% 2.3%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5540.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.11
5
25.22
025
.238
25.27
5
25.38
9
25.50
3
25.53
325
.547
25.62
9
25.09
124
.714
25.40
125
.451
25.47
4
25.54
6
25.61
7
25.64
125
.591
24.90
3
25.66
4
-7.91
6-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.491
-1.4% 1.4%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5550.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.19
4
25.31
225
.332
25.37
2
25.49
5
25.60
0
25.63
425
.650
25.74
3
25.17
524
.852
25.53
925
.589
25.60
3
25.64
6
25.68
9
25.70
325
.653
24.96
5
25.78
6
-7.83
5-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.581
-0.5% 0.5%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5560.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.30
0
25.42
025
.442
25.48
6
25.59
8
25.70
2
25.73
525
.752
25.85
0
25.28
124
.989
25.67
725
.727
25.73
2
25.74
6
25.76
0
25.76
525
.715
25.02
7
25.91
2
-7.78
7-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.677
0.5% -0.5%DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5570.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.44
0
25.54
525
.567
25.60
8
25.72
8
25.84
6
25.88
025
.896
26.00
9
25.42
525
.127
25.81
525
.865
25.86
0
25.84
6
25.83
2
25.82
725
.777
25.08
9
26.04
9
-7.79
7-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.789
1.4% -1.4%DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5580.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.50
2
25.59
025
.609
25.64
9
25.77
2
25.89
7
25.94
825
.974
26.09
5
25.49
325
.265
25.95
326
.003
25.98
9
25.94
6
25.90
3
25.88
925
.839
25.15
2
26.12
6
-7.69
2-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.811
2.3% -2.3%DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5590.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.49
9
25.60
025
.619
25.65
6
25.78
3
25.94
0
25.99
126
.017
26.15
7
25.49
425
.403
26.09
126
.141
26.11
7
26.04
6
25.97
4
25.95
125
.901
25.21
4
26.22
2
-7.48
6-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.862
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:24 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 5 OF 37
A0113.021
1755
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1755
0 84
SCALE IN METRES - 1:200
62 2
3.2% -3.2%DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5600.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.65
4
25.74
625
.762
25.79
6
25.90
2
26.01
2
26.04
726
.065
26.16
3
25.64
925
.541
26.22
826
.278
26.24
6
26.14
6
26.04
6
26.01
325
.963
25.27
6
26.19
4
-7.51
2-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.726
4.2% -4.2%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5610.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.83
2
25.91
925
.935
25.96
6
26.02
3
26.08
0
26.09
926
.108
26.19
4
25.82
625
.679
26.36
626
.416
26.37
5
26.24
6
26.11
7
26.07
626
.026
25.33
8
26.22
2
-7.57
0-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.675
5.1% -5.1%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5620.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.96
0
26.05
126
.068
26.09
1
26.14
7
26.20
3
26.22
026
.228
26.27
7
25.95
325
.817
26.50
426
.554
26.50
3
26.34
6
26.18
9
26.13
826
.088
25.40
0
26.32
0
-7.55
4-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.730
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5630.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.10
7
26.19
326
.207
26.22
6
26.27
5
26.31
9
26.33
326
.340
26.40
8
26.10
025
.954
26.64
226
.692
26.63
2
26.44
6
26.26
0
26.20
026
.150
25.46
2
26.46
1
-7.56
8-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.847
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5640.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.32
7
26.37
926
.388
26.40
7
26.45
1
26.48
3
26.49
426
.499
26.56
5
26.32
026
.054
26.74
226
.792
26.73
2
26.54
6
26.36
0
26.30
026
.250
25.56
2
26.62
7
-7.74
8-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.945
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5650.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.50
5
26.54
726
.552
26.56
1
26.59
0
26.61
9
26.63
026
.635
26.71
3
26.49
526
.154
26.84
226
.892
26.83
2
26.64
6
26.46
0
26.40
026
.350
25.66
2
26.76
6
-7.86
1-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
9.005
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:24 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 6 OF 37
A0113.021
1756
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1756
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5660.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.71
0
26.74
126
.747
26.75
8
26.78
8
26.81
3
26.82
926
.843
26.91
8
26.70
226
.252
26.93
926
.989
26.92
9
26.74
3
26.55
7
26.49
726
.447
25.76
0
26.92
1
-8.02
5-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
9.091
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5670.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.89
0
26.92
526
.931
26.94
3
26.98
2
26.96
1
26.94
926
.955
26.98
9
26.88
026
.338
27.02
627
.076
27.01
6
26.83
0
26.64
4
26.58
426
.534
25.84
6
27.01
3
-8.16
3-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
9.099
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5680.000IA
B0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
27.05
0
27.02
727
.023
27.01
5
26.99
0
27.00
5
27.01
827
.025
27.06
2
27.04
5
26.41
3
27.10
027
.150
27.09
0
26.90
4
26.71
8
26.65
826
.608
25.92
1
27.07
1
-8.29
8
-7.35
0
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
9.074
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5690.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
27.10
9
27.09
527
.092
27.08
4
27.06
0
27.09
4
27.08
927
.086
27.09
3
27.11
4
26.47
5
27.16
327
.213
27.15
3
26.96
7
26.78
1
26.72
126
.671
25.98
3
27.13
4
-8.30
7
-7.35
0
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
9.076
6.0% -6.0%DATUM 26.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5700.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
27.14
8
27.13
327
.130
27.12
4
27.10
8
27.09
5
27.09
127
.089
27.08
1
27.15
6
26.52
6
27.21
427
.264
27.20
4
27.01
8
26.83
2
26.77
226
.722
26.03
4
27.26
5
-8.29
4
-7.35
0
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
9.195
6.0% -6.0%DATUM 26.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5710.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
27.16
6
27.12
527
.118
27.11
1
27.08
3
27.05
3
27.04
527
.042
27.11
7
27.18
0
26.56
5
27.25
227
.302
27.24
2
27.05
6
26.87
0
26.81
026
.760
26.07
3
27.30
1
-8.27
2
-7.35
0
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
9.191
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:24 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 7 OF 37
A0113.021
1757
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1757
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%DATUM 26.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5720.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
27.09
4
27.02
027
.007
26.98
9
26.98
0
26.93
5
26.93
126
.929
27.09
6
27.11
426
.592
27.27
927
.329
27.26
9
27.08
3
26.89
7
26.83
726
.787
26.10
0
27.16
9
-8.13
3-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.953
6.0% -6.0%DATUM 26.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5730.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
27.02
2
26.87
326
.842
26.80
9
26.71
3
26.65
9
26.64
626
.639
27.11
7
27.04
026
.607
27.29
427
.344
27.28
4
27.09
8
26.91
2
26.85
226
.802
26.11
5
27.04
7
-8.00
0-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.747
6.0% -6.0%DATUM 26.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5740.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.75
7
26.70
226
.716
26.74
4
26.64
5
26.44
6
26.38
326
.510
27.03
7
26.77
326
.610
27.29
727
.347
27.28
7
27.10
1
26.91
5
26.85
526
.805
26.11
8
26.97
3
-7.59
4-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.632
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5750.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.98
3
26.87
726
.800
26.76
7
26.62
2
26.47
2
26.51
626
.636
26.96
0
27.00
626
.601
27.28
927
.339
27.27
9
27.09
3
26.90
7
26.84
726
.797
26.10
9
26.92
6
-7.95
8-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.574
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5760.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
27.08
4
26.95
826
.937
26.89
4
26.76
8
26.65
5
26.77
726
.855
26.94
1
27.10
526
.580
27.26
827
.318
27.25
8
27.07
2
26.88
6
26.82
626
.776
26.08
8
26.89
5
-8.13
7-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.559
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5770.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
27.21
5
27.12
027
.094
27.04
9
26.86
8
27.03
8
27.04
827
.053
26.97
2
27.24
0
26.54
8
27.23
527
.285
27.22
5
27.03
9
26.85
3
26.79
326
.743
26.05
6
26.87
6
-8.38
7
-7.35
0
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.579
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:24 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 8 OF 37
A0113.021
1758
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1758
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%DATUM 26.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5780.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
27.24
8
27.17
327
.160
27.13
3
27.06
2
27.03
4
27.05
527
.065
26.95
9
27.27
7
26.50
3
27.19
127
.241
27.18
1
26.99
5
26.80
9
26.74
926
.699
26.01
1
26.84
9
-8.50
9
-7.35
0
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.606
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5790.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.89
0
26.95
726
.960
26.93
7
26.82
4
26.91
8
27.01
227
.059
26.93
7
26.87
726
.447
27.13
427
.184
27.12
4
26.93
8
26.75
2
26.69
226
.642
25.95
5
26.82
4
-7.99
6-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.654
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5800.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.69
6
26.74
126
.750
26.76
9
26.78
0
26.85
3
26.94
326
.989
26.87
8
26.69
826
.378
27.06
627
.116
27.05
6
26.87
0
26.68
4
26.62
426
.574
25.88
6
26.76
0
-7.82
9-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.660
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5810.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.62
1
26.62
826
.629
26.64
2
26.65
4
26.68
9
26.79
926
.853
26.81
8
26.61
926
.298
26.98
627
.036
26.97
6
26.79
0
26.60
4
26.54
426
.494
25.80
6
26.71
0
-7.83
1-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.706
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5820.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.45
3
26.44
126
.449
26.46
4
26.47
4
26.46
4
26.59
926
.667
26.68
5
26.46
126
.206
26.89
426
.944
26.88
4
26.69
8
26.51
2
26.45
226
.402
25.71
4
26.60
6
-7.73
2-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.687
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5830.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.35
3
26.27
326
.244
26.23
8
26.24
9
26.40
2
26.49
926
.539
26.53
3
26.36
126
.102
26.78
926
.839
26.77
9
26.59
3
26.40
7
26.34
726
.297
25.61
0
26.45
0
-7.73
8-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.609
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:25 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 9 OF 37
A0113.021
1759
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1759
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5840.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.31
8
26.20
526
.177
26.12
0
26.03
3
25.81
8
25.84
025
.925
26.32
2
26.33
725
.986
26.67
426
.724
26.66
4
26.47
8
26.29
2
26.23
226
.182
25.49
4
26.25
9
-7.87
6-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.497
6.0% -6.0%
DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5850.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
26.17
6
26.06
326
.041
25.98
5
25.65
1
25.52
7
25.51
125
.590
26.01
2
26.19
725
.858
26.54
626
.596
26.53
6
26.35
0
26.16
4
26.10
426
.054
25.36
6
26.03
5
-7.85
8-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.353
6.0% -6.0%DATUM 25.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5860.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.93
8
25.82
525
.804
25.76
2
25.34
5
25.27
1
25.26
725
.306
25.74
3
25.95
025
.718
26.40
626
.456
26.39
6
26.21
0
26.02
4
25.96
425
.914
25.22
6
25.82
2
-7.69
8-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.243
6.0% -6.0%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5870.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.64
9
25.55
525
.538
25.47
5
25.07
1
25.04
7
25.06
025
.103
25.51
3
25.65
425
.567
26.25
426
.304
26.24
4
26.05
8
25.87
2
25.81
225
.762
25.07
525
.585
-7.48
0-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.116
6.0% -6.0%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5880.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.60
4
25.38
325
.300
25.13
5
24.76
0
24.87
5
24.98
425
.110
25.30
3
25.62
625
.403
26.09
126
.141
26.08
1
25.89
5
25.70
9
25.64
925
.599
24.91
125
.317
-7.68
3-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.958
6.0% -6.0%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5890.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.53
5
25.23
625
.150
24.97
9
24.73
1
25.07
3
25.11
525
.109
24.90
9
25.59
625
.228
25.91
525
.965
25.90
5
25.71
9
25.53
3
25.47
325
.423
24.73
624
.869
-7.90
2-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
7.550
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:25 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 10 OF 37
A0113.021
1760
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1760
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5900.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.34
8
25.09
725
.056
24.94
2
24.77
2
25.00
5
24.99
424
.989
24.79
4
25.48
025
.044
25.73
125
.781
25.72
1
25.53
5
25.34
9
25.28
925
.239
24.55
224
.771
-8.00
4-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.680
6.0% -6.0%
DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5910.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.29
0
25.02
324
.983
24.85
0
24.90
6
24.91
7
24.80
024
.785
24.68
4
25.40
724
.869
25.55
725
.607
25.54
7
25.36
1
25.17
5
25.11
525
.065
24.37
724
.659
-8.15
6-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.772
6.0% -6.0%DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5920.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
25.17
0
24.90
724
.860
24.76
5
24.88
3
24.66
4
24.62
924
.612
24.50
8
25.21
324
.707
25.39
525
.445
25.38
5
25.19
9
25.01
3
24.95
324
.903
24.21
524
.492
-8.10
9-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.765
6.0% -6.0%DATUM 24.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5930.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.99
8
24.74
624
.762
24.79
6
24.73
6
24.50
9
24.47
224
.454
24.36
5
25.03
524
.558
25.24
525
.295
25.23
5
25.04
9
24.86
3
24.80
324
.753
24.06
624
.351
-8.06
5-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
7.778
6.0% -6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5940.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.88
3
24.80
624
.796
24.74
5
24.46
7
24.37
9
24.35
124
.337
24.26
1
24.90
224
.421
25.10
825
.158
25.09
8
24.91
2
24.72
6
24.66
624
.616
23.92
924
.248
-8.07
1-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.828
6.0% -6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5950.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
24.77
7
24.64
324
.561
24.43
1
24.34
4
24.25
8
24.22
424
.210
24.12
0
24.77
624
.297
24.98
425
.034
24.97
4
24.78
8
24.60
2
24.53
024
.480
23.79
324
.104
-8.06
9-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.300
4.800
7.550
8.018
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:25 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 11 OF 37
A0113.021
1761
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1761
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5960.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
IEBI
IABI
24.60
9
24.33
824
.331
24.31
7
24.27
4
24.20
6
24.17
0
24.13
8
24.07
8
24.63
224
.185
24.87
224
.922
24.86
2
24.67
6
24.49
0
24.40
624
.371
24.25
6
23.56
924
.062
-8.02
1-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.500
4.851
6.000
8.750
9.489
6.0% -6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5970.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
IEBI
IABI
24.25
1
24.19
424
.184
24.16
3
24.09
9
24.01
2
23.95
5
23.91
4
23.80
2
24.25
624
.085
24.77
324
.823
24.76
3
24.57
7
24.39
1
24.30
724
.272
24.20
7
23.51
923
.786
-7.60
7-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.500
4.851
5.500
8.250
8.649
6.0% -6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5980.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
IEBI
IABI
24.16
8
24.04
424
.022
23.97
7
23.85
5
23.77
5
23.74
0
23.71
4
23.63
6
24.18
023
.998
24.68
624
.736
24.67
6
24.49
0
24.30
4
24.22
024
.185
24.12
0
23.43
223
.628
-7.62
2-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
8.250
8.543
6.0% -6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 5990.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
IEBI
IABI
24.11
2
23.93
823
.910
23.85
6
23.68
8
23.58
5
23.55
1
23.52
6
23.45
9
24.12
023
.924
24.61
124
.661
24.60
1
24.41
5
24.22
9
24.14
524
.110
24.04
5
23.35
823
.456
-7.64
5-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
8.250
8.396
6.0% -6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6000.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
IEBI
IABI
23.91
0
23.82
023
.799
23.75
1
23.60
3
23.49
8
23.45
7
23.42
8
23.34
5
23.91
223
.862
24.54
924
.599
24.53
9
24.35
3
24.16
7
24.08
324
.048
23.98
3
23.29
623
.343
-7.42
5-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.500
4.851
5.500
8.250
8.320
6.0% -6.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6010.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DJBJ
IABI
23.61
7
23.59
623
.582
23.51
7
23.45
4
23.42
6
23.40
6
23.31
2
23.73
323
.511
23.51
1
24.50
024
.550
24.49
0
24.30
4
24.11
8
24.03
423
.999
23.93
4
23.24
723
.309
-9.50
3-9
.058
-8.55
8
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.500
4.851
5.500
8.248
8.343
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:25 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 12 OF 37
A0113.021
1762
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1762
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6020.000
IAB1
DJB1
DKB1
EVTL
MCTL
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
IABJ
23.43
823
.417
23.40
023
.364
23.23
423
.216
23.10
0
23.05
4
23.02
1
22.82
2
23.60
3
23.15
423
.154
24.46
424
.514
24.45
3
24.26
7
24.08
1
23.99
723
.962
23.89
7
22.76
622
.851
-11.2
34
-10.3
36-9
.836
-4.73
3-4
.221
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
10.02
310
.692
6.0% -6.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6030.000
MCTT
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
IABJ
23.59
9
23.06
023
.024
22.98
9
22.84
2
22.72
722
.714
22.67
2
22.64
1
22.34
2
24.64
9
24.42
9
24.24
3
24.05
7
23.97
323
.938
23.87
3
22.27
022
.409
-15.0
00
-3.10
0
0.000
3.100
4.500
4.851
5.500
11.91
312
.691
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:25 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 13 OF 37
A0113.021
1763
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1763
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%
DATUM 21.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6040.000
IATI
IAB1
DJB1
DKB1
EVTR
MCTR
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
23.25
423
.263
23.02
922
.976
22.91
8
22.72
9
22.59
4
22.55
222
.521
22.52
1
22.21
022
.189
22.02
6
23.24
8
23.23
9
22.79
022
.790
24.39
8
24.49
8
24.41
7
24.23
1
24.04
5
23.96
123
.926
23.86
1
21.77
121
.771
22.15
7
-25.0
00
-13.3
40
-12.4
42-1
1.942
-5.57
9
-4.56
6
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
13.86
014
.360
15.13
2
6.0% -6.0%
DATUM 21.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6050.000
IATI
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
22.88
622
.874
22.67
2
22.65
7
22.61
2
22.51
4
22.41
6
22.37
2
22.34
1
22.23
2
21.87
821
.858
21.66
8
22.92
1
22.90
7
22.46
022
.460
24.40
1
24.50
1
24.41
7
24.23
1
24.04
5
23.96
123
.926
23.86
1
21.37
121
.371
21.82
1
-25.0
00
-14.6
60
-13.7
65-1
3.265
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
15.46
215
.962
16.86
3
6.0% -6.0%
DATUM 20.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6060.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
22.28
722
.303
22.03
9
21.98
7
21.91
4
21.77
6
21.78
3
21.78
8
21.79
2
21.66
2
21.46
921
.452
21.21
9
22.25
8
21.80
921
.809
24.41
5
24.51
5
24.43
1
24.24
5
24.05
9
23.97
523
.939
23.87
5
20.97
020
.970
21.42
1
-17.3
19
-16.4
21-1
5.921
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
14.21
414
.714
15.61
6
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:25 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 14 OF 37
A0113.021
1764
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1764
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%
DATUM 20.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6070.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
21.41
021
.406
21.28
6
21.26
5
21.20
7
21.05
3
21.00
0
21.00
8
21.01
4
20.98
2
20.94
920
.937
20.68
7
21.41
6
20.96
720
.967
24.44
0
24.54
0
24.45
6
24.27
0
24.08
4
24.00
023
.965
23.90
0
20.46
620
.466
20.91
6
-16.1
58
-15.2
60-1
4.760
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
13.74
214
.242
15.14
1
6.0% -6.0%
DATUM 19.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6080.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
20.61
620
.599
20.09
2
20.09
0
20.08
9
20.08
7
20.19
0
20.21
0
20.22
5
20.32
420
.323
20.06
1
20.64
7
20.19
720
.197
24.47
0
24.57
0
24.48
6
24.30
0
24.11
4
24.03
023
.995
23.93
0
19.85
319
.853
20.30
3
-15.4
46
-14.5
46-1
4.046
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
13.65
414
.154
15.05
4
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:25 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 15 OF 37
A0113.021
1765
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1765
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%
DATUM 18.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6090.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
19.42
819
.358
19.07
9
19.16
4
19.20
7
19.31
3
19.39
7
19.43
5
19.46
3
19.65
319
.636
18.65
5
19.54
819
.114
19.11
4
24.50
0
24.60
0
24.51
6
24.33
0
24.14
4
24.06
024
.025
23.96
0
19.17
619
.176
19.62
1
-17.6
40-1
6.772
-16.2
72
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
15.06
815
.568
16.45
9
6.0% -6.0%
DATUM 18.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6100.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
19.13
819
.127
18.86
8
18.84
9
18.87
9
18.96
2
19.03
9
19.06
7
19.08
7
18.71
318
.673
18.38
0
19.17
4
18.72
618
.726
24.53
0
24.63
0
24.54
6
24.36
0
24.17
4
24.09
024
.055
23.99
0
18.17
918
.179
18.62
3
-18.5
04
-17.6
08-1
7.108
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
17.12
217
.622
18.51
0
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:25 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 16 OF 37
A0113.021
1766
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1766
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%
DATUM 18.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6110.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
19.25
019
.204
18.94
9
18.96
1
18.97
8
18.96
3
18.92
8
18.91
0
18.89
3
18.66
418
.664
18.66
3
18.46
8
19.38
2
18.67
318
.673
24.56
0
24.66
0
24.57
6
24.39
0
24.20
4
24.12
024
.085
24.02
0
18.12
318
.123
18.66
3
-19.1
92
-17.7
74-1
7.274
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
17.29
417
.794
18.87
3
6.0% -6.0%
DATUM 18.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6120.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
19.33
919
.307
19.00
8
18.99
5
18.97
3
18.91
5
18.91
1
18.92
0
18.92
7
18.93
818
.931
18.91
6
18.81
9
19.44
3
18.62
118
.621
24.59
0
24.69
0
24.60
6
24.42
0
24.23
4
24.15
024
.115
24.05
0
18.07
518
.075
18.91
1
-19.5
82
-17.9
38-1
7.438
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
17.45
017
.950
19.62
2
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:25 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 17 OF 37
A0113.021
1767
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1767
0 84
SCALE IN METRES - 1:200
62 2
6.0% -6.0%
DATUM 18.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6130.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
19.42
319
.395
19.07
6
19.09
6
19.12
4
19.17
2
19.17
6
19.17
3
19.17
1
19.10
019
.101
19.10
4
18.93
2
19.62
6
18.56
918
.569
24.62
0
24.72
0
24.63
6
24.45
0
24.26
4
24.18
024
.145
24.08
0
18.02
718
.027
19.10
5
-20.2
16
-18.1
02-1
7.602
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
17.60
618
.106
20.26
1
6.0% -6.0%
DATUM 17.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6140.000IA
B1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
19.16
919
.119
19.05
4
19.00
3
18.88
0
18.60
8
18.42
4
18.67
0
18.91
2
19.10
819
.108
19.09
7
18.91
7
19.32
9
18.51
718
.517
24.65
0
24.75
0
24.66
6
24.48
0
24.29
4
24.21
024
.175
24.11
0
17.97
917
.979
19.09
7
-19.8
90
-18.2
66-1
7.766
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
17.76
218
.262
20.49
7
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:26 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 18 OF 37
A0113.021
1768
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1768
0 84
SCALE IN METRES - 1:200
62 2
5.2% -5.2%
DATUM 17.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6150.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
19.21
519
.220
19.27
9
19.27
8
19.27
7
19.25
3
18.90
3
18.74
5
18.63
2
18.71
718
.755
18.92
5
18.76
5
19.12
2
18.41
318
.413
24.64
6
24.74
6
24.67
3
24.51
0
24.34
7
24.27
424
.239
24.17
4
17.93
017
.930
18.91
5
-19.8
84
-18.4
66-1
7.966
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
17.98
718
.487
20.45
7
4.5% -4.5%
DATUM 17.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6160.000IA
B1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
19.30
119
.305
19.40
7
19.41
1
19.41
6
19.39
8
19.35
9
19.34
1
19.33
2
18.94
618
.958
19.00
4
18.91
5
19.28
6
18.36
218
.362
24.64
2
24.74
2
24.67
9
24.54
0
24.40
0
24.33
724
.302
24.23
7
17.88
217
.882
19.01
2
-20.4
08
-18.5
61-1
8.061
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
18.21
118
.711
20.97
0
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:26 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 19 OF 37
A0113.021
1769
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1769
0 84
SCALE IN METRES - 1:200
62 2
3.7% -3.7%
DATUM 17.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6170.000
IAB1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBJ
DJBJ
IABJ
19.38
119
.371
19.38
7
19.39
4
19.40
4
19.42
6
19.44
1
19.42
9
19.42
2
19.12
519
.099
19.01
5
18.88
9
19.39
7
18.31
118
.311
24.63
9
24.73
9
24.68
6
24.57
0
24.45
4
24.40
124
.366
24.30
1
17.83
317
.833
18.97
9
-20.8
27
-18.6
55-1
8.155
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
18.43
718
.937
21.22
9
3.0% -3.0%
DATUM 17.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6180.000IA
B1
DJB1
DKB1
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
MCDK
DJBJ
IABJ
19.79
219
.800
19.42
2
19.43
1
19.44
4
19.43
8
19.41
4
19.40
4
19.39
6
18.91
618
.892
18.83
6
18.70
4
19.75
3
18.29
318
.293
24.63
5
24.73
5
24.69
3
24.60
0
24.50
7
24.46
524
.430
24.36
5
17.78
417
.784
18.79
5
-21.6
02
-18.6
84-1
8.184
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
18.66
219
.162
21.18
5
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:26 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 20 OF 37
A0113.021
1770
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1770
0 84
SCALE IN METRES - 1:200
62 2
3.0% -3.0%
DATUM 17.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6190.000
IAD1
DJD1
DKB1
IADJ
EXAA
BGB0
ESB0
CEB0
MCB0
CEBI
ESBI
EXAA
EVBI
IAD2
MCDK
DJDK
IADK
20.25
220
.234
19.55
8
19.54
9
19.52
7
19.46
7
19.40
8
19.38
9
19.38
1
18.57
518
.536
18.50
5
17.90
9
20.37
7
18.26
018
.260
20.06
4
24.66
424
.730
24.76
5
24.72
3
24.63
0
24.53
7
24.49
524
.420
24.39
5
18.64
6
17.55
017
.546
18.13
3
-23.0
45
-18.8
10-1
8.310
-14.7
01
-5.51
0-4
.851
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
5.249
5.500
18.41
8
20.72
521
.261
22.54
1
3.0% -3.0%
DATUM 15.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6200.000
IAD1
DJD1
MCD1
IADJ
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
20.17
620
.145
19.33
5
19.30
3
19.25
8
19.15
8
19.05
8
18.93
5
18.84
5
15.90
1
15.61
7
20.50
3
18.19
018
.189
19.92
8
24.69
5
24.79
5
24.75
3
24.66
0
24.56
7
24.52
524
.490
24.42
5
-23.4
50
-18.8
23-1
8.318
-14.7
91
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:26 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 21 OF 37
A0113.021
1771
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1771
0 84
SCALE IN METRES - 1:200
62 2
3.0% -3.0%
DATUM 14.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6210.000
IAD1
DJD1
MCD1
IADJ
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
19.24
919
.197
18.58
6
18.53
3
18.45
9
17.01
0
16.17
4
15.87
7
15.66
5
14.76
4
14.85
4
19.51
2
18.07
318
.069
18.99
6
24.72
5
24.82
5
24.78
3
24.69
0
24.59
7
24.55
524
.520
24.45
5
-17.6
62
-14.2
69-1
3.672
-11.4
25
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
3.0% -3.0%
DATUM 14.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6220.000
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
16.41
1
16.05
5
15.49
0
15.26
7
15.30
4
15.31
2
15.24
4
14.81
8
15.95
6
24.75
5
24.85
5
24.81
3
24.72
0
24.62
7
24.58
524
.550
24.48
5
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:26 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 22 OF 37
A0113.021
1772
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1772
0 84
SCALE IN METRES - 1:200
62 2
3.0% -3.0%
DATUM 15.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6230.000
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
15.30
0
15.26
1
15.26
5
15.31
9
15.37
3
15.39
7
15.42
1
15.77
7
17.29
3
24.78
5
24.88
5
24.84
3
24.75
0
24.65
7
24.61
524
.580
24.51
5
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
3.0% -3.0%
DATUM 15.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6240.000
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
15.31
0
15.28
5
15.26
6
15.41
3
15.53
4
15.58
8
15.62
7
17.67
9
18.32
7
24.81
5
24.91
5
24.87
3
24.78
0
24.68
7
24.64
524
.610
24.54
5
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:26 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 23 OF 37
A0113.021
1773
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1773
0 84
SCALE IN METRES - 1:200
62 2
3.0% -3.0%
DATUM 15.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6250.000
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
15.34
3
15.32
9
15.31
0
15.30
7
15.84
6
16.18
3
16.42
4
18.77
8
18.95
2
24.84
5
24.94
5
24.90
3
24.81
0
24.71
7
24.67
524
.640
24.57
5
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
3.0% -3.0%
DATUM 15.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6260.000
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
15.67
9
15.82
8
16.72
1
18.13
0
18.52
9
18.66
7
18.73
1
18.92
8
19.26
2
24.87
5
24.97
5
24.93
3
24.84
0
24.74
7
24.70
524
.670
24.60
5
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:26 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 24 OF 37
A0113.021
1774
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1774
0 84
SCALE IN METRES - 1:200
62 2
3.0% -3.0%
DATUM 15.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6270.000
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
18.80
6
18.82
6
18.84
6
18.88
1
18.91
1
18.92
5
18.93
5
19.19
9
19.58
9
24.90
5
25.00
5
24.96
3
24.87
0
24.77
7
24.73
524
.700
24.63
5
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
3.0% -3.0%
DATUM 16.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6280.000
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
18.96
8
18.98
5
19.00
7
19.05
0
19.08
4
19.09
8
19.11
7
19.53
9
20.03
1
24.93
5
25.03
5
24.99
3
24.90
0
24.80
7
24.76
524
.730
24.66
5
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:26 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 25 OF 37
A0113.021
1775
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1775
0 84
SCALE IN METRES - 1:200
62 2
3.0% -3.1% -2.9%
DATUM 18.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6290.000
EVB0
ESB0
CEB0
MCB0
EXAB
CEBI
ESBI
BGBI
EXAB
DKBK
DJBK
IABK
19.08
3
19.10
5
19.18
5
19.36
1
19.53
7
19.61
6
19.67
3
20.07
4
20.43
9
24.96
5
25.06
5
25.02
3
24.93
0
24.87
0
24.83
7
24.79
524
.760
24.69
2
19.76
919
.769
20.21
7
-5.50
0
-4.50
0
-3.10
0
0.000
1.970
3.100
4.500
4.851
5.515
15.35
215
.852
16.74
8
3.0% -3.0%
DATUM 18.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6300.000
IAB2
DJB2
DKB2
EXAB
BGB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
19.85
8
19.91
3
19.99
0
20.18
4
20.37
8
20.46
5
20.51
1
20.74
5
20.95
9
19.13
3
18.68
918
.689
24.99
425
.060
25.09
5
25.05
3
24.96
0
24.86
7
24.82
524
.790
24.72
5
20.34
920
.349
20.79
6
-19.5
00
-18.6
12-1
8.112
-5.51
0-4
.851
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
14.25
214
.752
15.64
6
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:26 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 26 OF 37
A0113.021
1776
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1776
0 84
SCALE IN METRES - 1:200
62 2
2.1% -3.0%
DATUM 19.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6310.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
20.87
5
20.94
2
20.99
4
21.10
7
21.22
0
21.27
1
21.30
8
21.52
0
21.52
0
19.99
9
19.55
819
.558
24.98
6
25.08
6
25.05
6
24.99
0
24.89
7
24.85
524
.820
24.75
5
21.10
121
.101
21.55
0
-17.7
39
-16.8
57-1
6.357
-5.50
0
-4.50
0
-3.10
0
0.000
3.100
4.500
4.851
5.500
13.47
213
.972
14.87
1
1.3% -3.0%
DATUM 20.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6320.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
21.65
2
21.71
3
21.80
0
21.90
8
21.95
6
21.97
7
21.99
3
22.01
6
21.97
0
21.02
4
20.57
920
.579
24.97
6
25.07
6
25.05
8
25.01
9
24.92
6
24.88
424
.848
24.78
4
21.55
221
.552
22.00
2
-15.6
85
-14.7
95-1
4.295
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
13.25
613
.756
14.65
5
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:27 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 27 OF 37
A0113.021
1777
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1777
0 84
SCALE IN METRES - 1:200
62 2
0.4% -3.0%
DATUM 21.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6330.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
22.26
3
22.26
7
22.27
3
22.28
7
22.28
9
22.29
0
22.29
1
22.29
3
22.26
8
22.02
7
21.57
721
.577
24.95
7
25.05
7
25.05
1
25.03
8
24.94
5
24.90
324
.868
24.80
3
21.83
821
.838
22.28
8
-14.6
27
-13.7
26-1
3.226
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
13.40
713
.907
14.80
6
-0.4% -3.0%
DATUM 21.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6340.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
22.47
4
22.48
0
22.49
1
22.51
3
22.53
6
22.53
9
22.54
1
22.54
7
22.54
9
22.44
4
21.99
421
.994
24.92
8
25.02
8
25.03
4
25.04
8
24.95
5
24.91
324
.877
24.81
3
22.11
122
.111
22.56
1
-14.7
25
-13.8
25-1
3.325
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
13.60
514
.105
15.00
4
-1.3% -3.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6350.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
22.71
3
22.72
0
22.72
8
22.74
6
22.74
3
22.74
1
22.74
4
22.75
2
22.80
9
22.61
6
22.16
522
.165
24.88
9
24.98
9
25.00
7
25.04
7
24.95
4
24.91
224
.877
24.81
2
22.34
322
.343
22.79
3
-15.6
19
-14.7
18-1
4.218
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
13.96
614
.466
15.36
6
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:27 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 28 OF 37
A0113.021
1778
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1778
0 84
SCALE IN METRES - 1:200
62 2
-2.1% -3.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6360.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
22.96
4
22.97
3
22.98
7
23.00
6
23.00
0
22.99
8
22.99
622
.995
23.04
0
22.88
1
22.22
022
.220
24.84
0
24.94
0
24.97
0
25.03
7
24.94
4
24.90
224
.867
24.80
2
22.57
222
.572
23.02
2
-17.8
03
-16.4
81-1
5.981
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
14.41
914
.919
15.82
0
-3.0% -3.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6370.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
23.23
2
23.24
0
23.25
1
23.27
4
23.29
5
23.29
223
.291
23.29
0
23.29
4
23.16
2
22.27
322
.273
24.78
1
24.88
1
24.92
3
25.01
6
24.92
3
24.88
124
.846
24.78
1
22.82
822
.828
23.28
0
-17.8
11
-16.0
33-1
5.533
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
13.31
313
.813
14.71
8
-3.0% -3.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6380.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
23.56
9
23.58
2
23.59
5
23.61
8
23.57
323
.560
23.55
1
23.54
2
23.48
4
23.44
3
22.32
822
.328
24.75
1
24.85
1
24.89
3
24.98
6
24.89
3
24.85
124
.816
24.75
1
22.87
822
.878
23.47
9
-17.9
22
-15.6
92-1
5.192
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
12.99
213
.492
14.69
5
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:27 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 29 OF 37
A0113.021
1779
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1779
0 84
SCALE IN METRES - 1:200
62 2
-3.0% -2.1%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6390.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
23.87
5
23.88
9
23.90
9
23.88
3
23.84
223
.838
23.81
7
23.80
3
23.66
7
23.70
1
22.38
222
.382
24.71
0
24.81
0
24.85
2
24.94
5
24.88
0
24.85
124
.816
24.75
1
22.92
722
.927
23.68
2
-17.9
54
-15.3
15-1
4.815
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
12.79
713
.297
14.80
7
-3.0% -1.2%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6400.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
24.09
2
24.10
8
24.13
6
24.12
3
24.11
5
24.10
8
24.10
1
24.09
5
24.06
4
23.86
7
22.43
822
.438
24.66
0
24.76
0
24.80
2
24.89
5
24.85
8
24.84
124
.806
24.74
1
22.97
822
.978
24.06
5
-17.7
49
-14.8
89-1
4.389
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
12.55
013
.050
15.22
4
-3.0% -0.3%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6410.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
24.26
6
24.29
2
24.32
9
24.34
924
.346
24.34
4
24.34
6
24.34
7
24.36
1
23.98
2
22.49
422
.494
24.59
9
24.69
9
24.74
1
24.83
4
24.82
5
24.82
124
.786
24.72
1
23.03
023
.030
24.35
6
-17.3
98
-14.4
22-1
3.922
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
12.26
412
.764
15.41
7
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:27 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 30 OF 37
A0113.021
1780
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1780
0 84
SCALE IN METRES - 1:200
62 2
-3.0% 0.6%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6420.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
24.37
8
24.40
5
24.44
2
24.47
824
.484
24.50
6
24.51
1
24.51
5
24.44
3
24.11
4
22.55
022
.550
24.52
9
24.62
9
24.67
1
24.76
4
24.78
3
24.79
124
.756
24.69
1
23.08
023
.080
24.42
3
-17.0
45
-13.9
16-1
3.416
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
11.94
412
.444
15.12
9
-3.0% 1.5%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6430.000
IAB2
DJB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
24.40
1
24.41
2
24.43
1
24.45
0
24.47
1
24.51
1
24.52
9
24.54
0
24.41
3
24.22
3
22.60
622
.606
24.44
8
24.54
8
24.59
0
24.68
3
24.73
0
24.75
124
.716
24.65
1
23.13
023
.130
24.39
3
-16.6
05
-13.3
71-1
2.871
-5.50
0
-4.50
0
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
11.58
412
.084
14.61
1
-3.0% 2.4%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6440.000
IAB2
DKB2
EVB0
BGB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
24.35
7
24.37
5
24.39
324
.397
24.40
8
24.41
2
24.41
3
24.40
1
24.34
2
24.28
7
22.65
9
24.30
8
24.42
324
.458
24.50
0
24.59
3
24.66
7
24.70
124
.666
24.60
1
23.18
023
.180
24.32
3
-15.0
37
-12.5
96
-6.00
0
-4.85
1-4
.500
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
11.18
411
.684
13.97
0
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:27 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 31 OF 37
A0113.021
1781
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1781
0 84
SCALE IN METRES - 1:200
62 2
-3.8% 3.3%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6450.000IA
B2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
DJBK
IABK
24.31
124
.308
24.30
624
.306
24.30
6
24.29
3
24.27
2
24.27
5
24.26
6
24.35
3
22.71
3
24.28
324
.333
24.37
8
24.49
4
24.59
6
24.64
324
.607
24.54
3
23.23
023
.230
24.24
6
-13.5
40
-11.0
81
-4.80
0-4
.300
-3.10
0
-0.00
0
3.100
4.500
4.851
5.500
10.75
011
.250
13.28
2
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:27 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 32 OF 37
A0113.021
1782
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1782
0 84
SCALE IN METRES - 1:200
62 2
-4.5% 4.2%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6460.000
IAB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
BGBI
EVBI
DKBK
IABK
24.22
3
24.22
024
.220
24.21
9
24.21
8
24.19
3
24.11
3
24.10
6
24.10
5
24.10
9
24.11
4
24.22
6
22.76
8
24.16
924
.219
24.26
4
24.40
3
24.53
3
24.59
224
.557
24.44
2
23.28
0
24.11
8
-12.3
88
-10.2
03
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.500
4.851
6.000
10.64
8
11.90
5
-5.3% 5.1%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6470.000
IAB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
DKBK
IABK
24.01
3
24.01
0
24.00
924
.009
23.99
4
23.97
1
23.96
4
23.96
323
.963
23.96
0
23.96
0
24.02
0
22.82
2
24.05
924
.109
24.16
2
24.32
5
24.48
3
24.54
424
.494
23.33
1
23.96
0
-11.3
46
-9.55
0
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.300
4.800
9.451
10.39
3
-6.0% 6.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6480.000IA
B2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
DKBK
IABK
23.91
9
23.91
6
23.90
123
.893
23.88
2
23.88
9
23.89
7
23.89
923
.900
23.87
7
23.86
8
23.92
3
22.87
6
23.96
324
.013
24.07
3
24.25
9
24.44
5
24.50
524
.455
23.38
223
.862
-10.5
16
-8.94
7
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
8.891
9.611
-6.0% 6.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6490.000
IAB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
DKBK
IABK
23.86
0
23.85
7
23.83
923
.834
23.83
1
23.82
5
23.81
9
23.81
723
.816
23.81
1
23.81
1
23.86
3
22.93
0
23.90
923
.959
24.01
9
24.20
5
24.39
1
24.45
124
.401
23.43
323
.857
-9.91
6
-8.51
7
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
8.473
9.109
-6.0% 6.0%
DATUM 22.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6500.000
IAB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
DKBK
IABK
23.84
923
.847
23.83
723
.833
23.82
3
23.79
2
23.76
0
23.75
223
.774
23.79
8
23.68
1
23.85
3
22.98
3
23.86
823
.918
23.97
8
24.16
4
24.35
0
24.41
024
.360
23.48
423
.654
-9.44
5
-8.14
1
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
8.105
8.360
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6510.000
IAB2
DKB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
DJBK
IABK
23.83
123
.831
23.82
723
.827
23.82
6
23.82
2
23.81
4
23.81
623
.816
23.70
4
23.81
4
23.83
3
23.03
7
23.84
023
.890
23.95
0
24.13
6
24.32
2
24.38
224
.332
23.53
423
.887
-9.00
4
-7.81
1
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.791
8.320
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:27 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 33 OF 37
A0113.021
1783
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1783
0 84
SCALE IN METRES - 1:200
62 2
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6520.000
IAB2
DJB2
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
DKBK
IABK
23.74
123
.741
23.77
823
.787
23.80
3
23.85
6
23.79
1
23.67
923
.683
24.05
524
.095
23.74
4
23.09
1
23.82
423
.874
23.93
4
24.12
0
24.30
6
24.36
624
.316
23.58
524
.134
-8.51
1
-7.53
1
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.523
8.346
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6530.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
DKBK
IABK
23.78
2
23.82
123
.828
23.84
2
23.96
1
23.81
1
23.93
024
.019
24.22
8
23.76
8
23.13
3
23.82
023
.870
23.93
0
24.11
6
24.30
2
24.36
224
.312
23.62
5
24.26
6
-8.30
2
-7.35
0
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.310
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6540.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.74
1
23.79
523
.805
23.82
1
23.83
5
24.10
0
24.19
324
.218
24.27
0
23.72
423
.142
23.82
923
.879
23.93
9
24.12
5
24.31
1
24.37
124
.321
23.63
4
24.23
3
-8.22
3-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.249
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6550.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.75
5
23.83
223
.841
23.87
2
23.86
2
24.22
5
24.27
724
.302
24.22
9
23.72
923
.163
23.85
123
.901
23.96
1
24.14
7
24.33
3
24.39
324
.343
23.65
524
.189
-8.19
7-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
8.151
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6560.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.64
5
23.82
523
.885
23.81
5
23.98
3
24.26
6
24.28
624
.268
24.12
5
23.62
023
.197
23.88
523
.935
23.99
5
24.18
1
24.36
7
24.42
724
.377
23.68
924
.062
-7.98
4-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.909
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6570.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.58
5
23.64
823
.660
23.70
3
24.06
5
24.24
1
24.21
024
.194
23.92
6
23.56
923
.234
23.92
223
.972
24.03
2
24.21
8
24.40
4
24.46
424
.414
23.72
623
.908
-7.85
2-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.622
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:27 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 34 OF 37
A0113.021
1784
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1784
0 84
SCALE IN METRES - 1:200
62 2
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6580.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.50
4
23.58
223
.598
23.73
1
24.10
8
24.18
2
24.15
124
.125
23.84
8
23.50
523
.267
23.95
424
.004
24.06
4
24.25
0
24.43
6
24.49
624
.446
23.75
923
.845
-7.70
7-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
7.478
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6590.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.51
9
23.59
323
.631
23.85
2
24.15
2
24.15
4
24.09
324
.044
23.85
1
23.50
923
.296
23.98
424
.034
24.09
4
24.28
0
24.46
6
24.52
624
.476
23.78
823
.869
-7.66
9-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.471
-6.0% 6.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6600.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.50
9
23.65
623
.704
23.93
6
24.18
2
24.13
8
24.03
723
.982
24.03
1
23.49
323
.321
24.00
924
.059
24.11
9
24.30
5
24.49
1
24.55
124
.501
23.81
324
.036
-7.60
8-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
7.684
-5.1% 5.1%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6610.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.57
8
23.68
823
.737
23.92
7
24.22
8
24.12
6
23.98
923
.922
23.87
1
23.57
523
.380
24.06
824
.118
24.16
8
24.32
6
24.48
4
24.53
524
.485
23.79
823
.883
-7.64
2-7
.350
-4.60
0-4
.100
-3.10
0
-0.00
0
3.100
4.100
4.600
7.350
7.477
-4.2% 4.2%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6620.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.59
0
23.71
923
.790
23.98
6
24.27
3
24.14
4
24.01
023
.944
23.91
2
23.58
423
.435
24.12
324
.173
24.21
4
24.34
4
24.47
4
24.51
624
.466
23.77
923
.933
-7.57
3-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.581
-3.3% 3.3%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6630.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.67
3
23.77
323
.846
24.05
3
24.31
7
24.18
1
24.06
824
.017
23.97
9
23.66
723
.486
24.17
424
.224
24.25
6
24.35
8
24.46
0
24.49
324
.443
23.75
624
.013
-7.62
0-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.735
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:27 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 35 OF 37
A0113.021
1785
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1785
0 84
SCALE IN METRES - 1:200
62 2
-3.0% 2.4%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6640.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.72
2
23.85
623
.936
24.11
6
24.35
3
24.20
8
24.11
924
.081
24.07
9
23.72
223
.507
24.19
524
.245
24.27
5
24.36
8
24.44
2
24.46
624
.416
23.72
924
.117
-7.67
2-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
7.931
-3.0% 1.5%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6650.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.74
8
23.94
124
.018
24.16
3
24.36
7
24.22
2
24.13
324
.099
24.11
8
23.74
823
.514
24.20
124
.251
24.28
1
24.37
4
24.42
1
24.43
624
.386
23.69
824
.164
-7.70
2-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.048
-3.0% 0.6%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6660.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.79
1
23.95
724
.018
24.14
2
24.36
2
24.21
5
24.15
924
.131
24.07
9
23.80
123
.516
24.20
424
.254
24.28
4
24.37
7
24.39
5
24.40
124
.351
23.66
424
.116
-7.77
7-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.028
-3.0% -0.3%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6670.000
IAA0
EVA0
MFA1
ESB0
CEB0
MCB0
CEBI
ESBI
23.82
823
.819
24.03
324
.072
24.15
9
24.36
1
24.17
6
24.12
924
.121
24.05
1
23.80
823
.796
24.05
4
24.25
3
24.28
3
24.37
6
24.36
6
24.36
3
-11.0
01-1
0.429
-7.56
9
-4.10
0
-3.10
0
0.000
3.100
4.100
-3.0% -1.2%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6680.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.79
8
24.03
924
.080
24.17
7
24.36
1
24.15
1
24.07
324
.038
24.02
9
23.78
723
.510
24.19
824
.248
24.27
8
24.37
1
24.33
3
24.32
124
.271
23.58
424
.100
-7.76
5-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.123
-3.0% -2.1%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6690.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.77
5
23.96
724
.020
24.14
8
24.35
5
24.16
0
24.10
324
.072
24.03
7
23.78
123
.501
24.18
924
.239
24.26
9
24.36
2
24.29
7
24.27
624
.226
23.53
824
.082
-7.76
9-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.166
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:28 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 36 OF 37
A0113.021
1786
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1786
0 84
SCALE IN METRES - 1:200
62 2
-3.0% -3.0%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6700.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.80
2
23.96
524
.027
24.15
4
24.35
6
24.20
2
24.05
223
.986
24.03
8
23.77
923
.489
24.17
624
.226
24.25
6
24.34
9
24.25
6
24.22
624
.176
23.48
9
24.12
2
-7.78
6-7
.350
-4.60
0-4
.100
-3.10
0
0.000
3.100
4.100
4.600
7.350
8.300
-3.0% -3.3%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6710.000
IAB0
IEB0
EVB0
ESB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.79
7
24.05
824
.106
24.17
0
24.35
5
24.17
524
.073
23.99
9
24.00
9
23.77
823
.481
24.16
924
.219
24.24
0
24.33
3
24.23
124
.208
24.15
8
23.47
1
24.07
7
-7.49
7-7
.052
-4.30
2-3
.802
-3.10
0
0.000
3.100
3.802
4.302
7.052
7.961
-3.0% -3.5%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6720.000
IAB0
IEB0
EVB0
CEB0
MCB0
CEBI
ESBI
EVBI
IEBI
IABI
23.81
1
24.07
6
24.17
7
24.34
9
24.18
024
.120
24.04
6
23.97
4
23.79
823
.474
24.16
1
24.22
3
24.31
2
24.20
724
.192
24.14
2
23.45
523
.988
-7.10
6-6
.621
-3.87
1
-2.96
7
0.000
2.991
3.395
3.895
6.645
7.444
-3.4% -3.8%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6730.000
IAB0
IEB0
EVB0
CEB0
MCB0
CEBI
EVBI
IEBI
IABI
23.80
7
24.10
624
.186
24.30
4
24.17
124
.091
23.86
4
23.85
323
.443
24.13
024
.191
24.28
8
24.17
924
.105
23.41
823
.905
-6.83
3-6
.217
-3.46
7-2
.834
0.000
2.882
3.407
6.157
6.886
-3.6% -3.9%
DATUM 23.0
STRING LABEL
DESIGN LEVELS
DESIGN OFFSET
INTERPOLATEDGROUND LEVELS
CH. 6733.533
IAB0
IEB0
EVB0
CEB0
MCB0
CEBI
EVBI
IEBI
IABI
23.80
2
24.11
724
.177
24.27
9
24.16
624
.094
23.83
2
23.84
823
.432
24.11
924
.179
24.27
9
24.16
824
.094
23.40
723
.865
-6.69
9-6
.075
-3.32
5-2
.787
0.000
2.844
3.234
5.984
6.671
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:28 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
CROSS SECTIONS (MCB0) - DRG 37 OF 37
A0113.021
1787
A
2402
1:200 (A3)
MGA ZONE 55 A.H.D.
L.ALLEN
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-C1787
0 84
SCALE IN METRES - 1:200
62 2
//
//
/ / / /
/ / / / / / / / / / / / /
/ / / / / /
x/x
x/x
x/x
x/x
x/x
x/x
x/x
D
D
/
/
/
/
/
/
/
/
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:28 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
GENERAL ARRANGEMENT
A0113.021
1802
A
2402
1:500
MGA ZONE 55 A.H.D.
J.WILLIAMS
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-S1802
BICHENO
SWANSEA
PLANSCALE 1:500
TASMAN HIGHWAY
APPROACH SLABAPPROACH SLAB
W-BEAM SAFETY BARRIER WITHTHRIE-BEAM TRANSITION,TYPICAL
FLOW
BRIDGE CENTRELINE (MCB0)
ABUTMENT AWITH WINGWALL
ABUTMENT BWITH WINGWALL
1500 DIA PIER COLUMNSPILE CAP,TYPICALRIVER BED PROFILE,
APPROXIMATE
PIER CROSSHEAD,TYPICAL
1.51
1.51
A-
ELEVATION1:500
A-
11803
6300
6200
℄ PIER 1 ℄ PIER 2℄ ABUTMENT A ABUTMENT B ℄
LARGE DIAMETER ROCKSTONE PITCHING EROSIONPROTECTION
600 DIA CHS PILES
0 2000010000
SCALE IN MILLIMETRES - 1:500
150005000 5000
RL 20.900 (100 YEAR ARI) RL 21.300 (INFERRED HISTORICAL FLOOD)
REGULAR PERFORMANCELEVEL BARRIERPIER 1 PIER 2 ABUTMENT BABUTMENT A
90035
30065 2966829648
246.017m STRAIGHT - MEASURED ALONG ROAD DESIGN LINE (MCB0)0.3 %
VCTCH 6068.526RL 24.266
VCTCH6314.543RL 25.004
R=8000mSAG CURVE
R=10000mCREST CURVE
21804
EXPANSION JOINT EXPANSION JOINT
EDGE OF BANK EDGE OF BANK
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:28 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
SECTIONS - SHEET 1 OF 2
A0113.021
1803
A
2402
1:100
MGA ZONE 55 A.H.D.
J.WILLIAMS
R.CASSIDY
A PRELIMINARY DESIGN R.C 09/06/2017
HB17182-S1803
0 40002000
SCALE IN MILLIMETRES - 1:100
30001000 1000
SECTION1:100
11802
1400 3100LANE
3100LANE
1400
3% FALL
BRID
GE C
ENTR
ELIN
E (M
CB0)
SHOULDER SHOULDER
4 No. 1500 DEEP PRECASTSUPER TEE BEAMS
PIER CROSSHEAD
1200 DIA PIER COLUMNS
PILE CAP
40 ASPHALT OVER200 MIN. DECK SLAB
1400 HIGH MEDIUM PERFORMANCELEVEL BARRIER TO ALSO SUITCYCLISTS
RIVER BED,APPROXIMATE
RL 21.300 (INFERRED HISTORICAL FLOOD)APSLEY RIVER
600 DIA CHS PILES
RL 20.900 (100 YEAR ARI)APSLEY RIVER
℄ PIER 1
PIER CROSSHEAD
1200 DIA PIER COLUMNS
NOTE:1. FOR GENERAL NOTES REFER TO SHEET 1801.
PILE CAP
RIVER BED,APPROXIMATE
600 DIA CHS PILES
2-
SECTION1:100
2-
PIER SKIRT
ELASTOMERICBEARING
PIER SKIRT
PRINTED DATECONTRACT No.
SCALES
This sheet may be prepared using colour and may be incomplete if copied
Department of State Growth
DateInitialsAmendment DescriptionNo.
SHEET No.DRAWING
REGISTRATION NUMBER
REVISION
09-Jun-17, 1:28 PM
A3 original
DESIGNED
REVIEWED
TASMAN HIGHWAY (A0113)
APSLEY RIVER (LILLA VILLA) BRIDGE (B6159)
BRIDGE REPLACEMENT
SECTIONS - SHEET 2 OF 2
A0113.021
1804
A
2402
1:100
MGA ZONE 55 A.H.D.
J.WILLIAMS
R.CASSIDY
A PRELIMINARY DESIGN R.C. 09/06/2017
HB17182-S1804
0 40002000
SCALE IN MILLIMETRES - 1:100
30001000 1000
SECTION1:100
11802
1400 3100LANE
3100LANE
1400
3% FALL
BRID
GE C
ENTR
ELIN
E (M
CB0)
SHOULDER SHOULDER
PIER CROSSHEAD
1200 DIA PIER COLUMNS
PILE CAP
40 ASPHALT OVER200 MIN. DECK SLAB
REGULAR PERFORMANCELEVEL BARRIER
GROUND LEVEL,APPROXIMATE
RL 21.300 (INFERRED HISTORICAL FLOOD)APSLEY RIVER
600 DIA CHS PILES
RL 20.900 (100 YEAR ARI)
NOTE:1. FOR GENERAL NOTES REFER TO SHEET 1801.
APSLEY RIVER
4 No. 1500 DEEP PRECASTSUPER TEE BEAMS
ELASTOMERICBEARING