Task Story Board
description
Transcript of Task Story Board
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 1
Veridian Engineering
Task Story Board
• A Corde Lane & Brian Roberts Production
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 2
Veridian Engineering
Task Steps
• RPCM– Grasp and actuate Microconical Fixture (MEE)
• ECU– Release Keyway Slot Bolts (BBD)
– Grasp Tether Loop (TLG)
– Release Connector Bolt (RAD)
• APFR– Grasp and rotate Latch Quarter Turn Rings (AQP)
– Release Latch Bolts (BBD)
– Unlock Pitch Lock Knob (AQP)
– Rotate Lower Body Probe (BBD)
– Lock Pitch Lock Knob (AQP)
– Grasp Yoke (TLG)
– Squeeze Detent Levers (APG)
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 3
Veridian Engineering
RPCM - MEE grasps microconical fixture
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 4
Veridian Engineering
RPCM - MEE grasps microconical fixture
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 5
Veridian Engineering
ECU - BBD actuates keyway slot bolt
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 6
Veridian Engineering
ECU - BBD actuates keyway slot bolt
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 7
Veridian Engineering
ECU - RAD on base bolt, TLG on Tether Loop
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 8
Veridian Engineering
ECU - RAD on base bolt, TLG on Tether Loop
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 9
Veridian Engineering
APFR - AQP on Quarter Turn Ring at BP Latch
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 10
Veridian Engineering
APFR - BBD on Boot Plate Latch Bolt
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 11
Veridian Engineering
APFR - BBD releases body latch
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 12
Veridian Engineering
APFR - BBD begins probe rotation
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 13
Veridian Engineering
APFR - BBD completes probe rotation
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 14
Veridian Engineering
APFR - TLG on Yoke, APG on Detent Levers
Space Systems LaboratoryUniversity of Maryland1. Task Story Board 15
Veridian Engineering
APFR - TLG on Yoke, APG on Detent Levers