Target #3 mechanical design - CERN

24
n_TOF target #3 Production readiness review Final mechanical design Marc Timmins EN/MME, Vincent Maire EN/MME 29 th of May 2019 M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Transcript of Target #3 mechanical design - CERN

n_TOF target #3 Production readiness review – Final mechanical design

Marc Timmins EN/MME, Vincent Maire EN/MME29th of May 2019

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Outline

2

• Mechanical design overview

• Target core and anti-creep structure

• Target vessel and moderators

• Carrier frame

• Target piping work

• Instrumentation

• Design vs Safety requirements

• Conclusions

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Mechanical design overview

3M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

4

Target core and anti-creep structure

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Target core and anti-creep structure

5

Core

178kg

550kg

Total: 1440kg

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

6

Target core and anti-creep structure

Restricted

area

Anti-creep structure

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Anti creep plate

7

IEDR 2018 PRR 2019

• More cooling efficient (direct

contact of N2 on Pb.

• Easier to produce (Only one part,

no extrusion, predicted less

deformation thanks to symmetric

design. See protoype in next talk

N2

flow

Target core and anti-creep structure

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

PbPbPbPb

8

Target core and anti-creep structureAnti-creep structure

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Target vessel and moderators

9

Gap 2.5mm

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

H. Moderator with bi-metallic transition

V. Moderator without Bi-metallic transition

10

Target vessel and moderators

Vertical moderator supportVessel

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

11

Target vessel and moderatorsBimetallic transition

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

12

Target vessel and moderatorsH. moderator

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

• Withstand 2.5barg (see Laurene’s talk)

• Limited deformations <1mm (see Laurene’s talk)

• Limited Al. seen by the beam (no more than current target)

• Limit number of welds to increase robustness (Insert machined from a bulk)

13

Target vessel and moderatorsH. moderator – Inlet/outlet nozzle

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

14

Target vessel and moderatorsV. moderator

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

15

Target vessel and

moderators

Pb wedge

V moderator

Moderator

cup

gap

2.5mmWall thickness

4mm

Closing weld

(no pressure)

Pb 47kg

Lead wedge

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Carrier frame

16

1550 mm

830 mm

626 mm

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Carrier frame

17

Lifting

hoist

Lifting

bar

Grip hooks

for lifting bar

Survey target

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Carrier frame

18

Gap: 15 mm

Gap: 30 mm

Pool

Existing positioning pins

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

19

Target piping

work

2.7

m

In Situ

welding

Disconnection

area

Flexible

pipes

Flexible

pipes

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

20

Instrumentation

2x3 thermo-

couples

type K.

Probe

tips

Feedthrough

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Design vs Safety requirements

21

N2 Vessel <= 0.5barg (out of scope)

Water in moderators = 2.5barg (CAT. SEP)

CAT. SEP (Sound Engineering

Practices)

However

Category 1 recommendations will be applied due to a highly radioactive environment,

with difficult access.

1. Design: All welded joints are checked against pressure vessel standards (See

Laurene’s talk)

2. Manufacturing: Material certificates, raw material inspection, weld book (certified

process + certified welders)

3. Inspection: 100% visual & PT, 100% x-ray wherever possible. (See Marc’s talk)

4. Leak & pressure tests (See Marc’s talk)

5. Full tractability record

Conclusions

22

• Functional design completed.

• 80% of 2D drawings completed.

• Fine tuning production processes.

• Prototypes and tests completed or launched.

• Challenging manufacturing operations, but no

showstoppers.

M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

Thankyou for your attention

Questions ?

Back-up slide

24M. Timmins & V. Maire n_TOF target #3 PRR 29-05-2019

N_TOF target 2 (current)