Tank Manufaturing Data

7
Job Card For TANK TANK DISCRIPTION BLOWER WORK ORDER NO. DRAWING NO. SUPERVISOR NAME: SAMBHAJI START DATE: 3/3/2015 COMPLETION DATE DESCRIPTION CHECKED Cutting of PPGL/PVC/PPH/CPVC or FRP/FRVE Welding and Carbon Powder on welding joint Tank Shell Height Tank Bottom Flat/Conical/Dished End Tank Top Flat/Conical/Dished End Height of Top/Bottom cone / Flat end Nozzle Fabrication and diameter of nozzles Diameter of Manhole Height of manhole from bottom of shell Diameter of drain nozzle Layer of CSM & WRM on the shell Layer of CSM on the bottom & Top cone Welding of Tank and Nozzles from inside Spark Testing Checking of gasket and bolts installed as per Dwg. Coating of Tank & fixing with all components Flange Fabrication and checking of PCD, OD, No of hole, Dia of hole Marking of Nozzles on shell, bottom, and top with proper orientation, elevation Mounting of Nozzles on shell, bottom, and top with proper orientation, elevation

description

m

Transcript of Tank Manufaturing Data

JOB CARDJob Card For TANKTANK DISCRIPTIONBLOWERWORK ORDER NO.DRAWING NO.SUPERVISOR NAME:SAMBHAJI START DATE:3/3/15COMPLETION DATE

DESCRIPTIONCHECKEDCOUNTER CHECKEDCutting of PPGL/PVC/PPH/CPVC or FRP/FRVEWelding and Carbon Powder on welding jointTank Shell HeightTank Bottom Flat/Conical/Dished EndTank Top Flat/Conical/Dished End Height of Top/Bottom cone / Flat endNozzle Fabrication and diameter of nozzles Flange Fabrication and checking of PCD, OD, No of hole, Dia of holeMarking of Nozzles on shell, bottom, and top with proper orientation, elevationMounting of Nozzles on shell, bottom, and top with proper orientation, elevationDiameter of Manhole Height of manhole from bottom of shellDiameter of drain nozzleLayer of CSM & WRM on the shellLayer of CSM on the bottom & Top coneWelding of Tank and Nozzles from insideSpark TestingChecking of gasket and bolts installed as per Dwg.Coating of Tank & fixing with all components

RAW MATERIALRAW MATERIAL SUMMARYTANK DISCRIPTIONBLOWERWORK ORDER NO.SUPERVISOR NAME:SAMBHAJIDATE:3/3/15DWG. No. REV. Raw Material For TankMaterial TypeTheoretically Calculated QuantityAvailable QuantityPractically used QuantityResinISO Resin

Fiber GlassCSM WRMSurface

Catalyst

Accelerator3%

PPHGL 3mm3mm Sheet

PPHGL 3mm3mm Sheet

PPH for the nozzle Pipe

Nut Bolt Washer INLETOUTLET

GASKETINLET3mm OUTLET3mm

COATING OF TANK

Internal Inspection ReportM/s Bhavi Plast P Ltd Building No. 37 Gala 1,2,3,4 Indian Corporation DaphodeMankoli Naka Bhiwandi ThaneT/F: 022 25366002 , Tel : 022 25366003/4

Internal Inspection Report

ClientTag No : -P.O Ref Description Inspection Authority: -WO No: Date Of Visit: Drawing Ref:Report No & Date: Qty :

Dimension Report

S.NoDescription Required Dimension in mm Measured dimension in mm1Inside circumference2Height of shell 3Total height 4diameter

S.NoNozzle sizeNozzle descriptionorientation measured orientationElevation in mm Proj from shell inside in mm in degreesRequired MeasuredRequired MeasuredMHMANHOLEN1SPAREN2WATER INLETN3OVERFLOWN4DRAIN N5PUMP OUTLETN6LEVEL INDICATORN7LEVEL INDICATORN8PH TRANSMITTER

NOTE :1. Flanges thickness are as per Dwg.2. Nos of holes, PCD, hole diameter of all flanges are as per Dwg. Requirment.

Clients Representative Inspection AuthorityFor Bhavi Plast P Ltd