Transcript of Tank Manufaturing Data
JOB CARDJob Card For TANKTANK DISCRIPTIONBLOWERWORK ORDER NO.DRAWING NO.SUPERVISOR NAME:SAMBHAJI START DATE:3/3/15COMPLETION DATE
DESCRIPTIONCHECKEDCOUNTER CHECKEDCutting of PPGL/PVC/PPH/CPVC or FRP/FRVEWelding and Carbon Powder on welding jointTank Shell HeightTank Bottom Flat/Conical/Dished EndTank Top Flat/Conical/Dished End Height of Top/Bottom cone / Flat endNozzle Fabrication and diameter of nozzles Flange Fabrication and checking of PCD, OD, No of hole, Dia of holeMarking of Nozzles on shell, bottom, and top with proper orientation, elevationMounting of Nozzles on shell, bottom, and top with proper orientation, elevationDiameter of Manhole Height of manhole from bottom of shellDiameter of drain nozzleLayer of CSM & WRM on the shellLayer of CSM on the bottom & Top coneWelding of Tank and Nozzles from insideSpark TestingChecking of gasket and bolts installed as per Dwg.Coating of Tank & fixing with all components
RAW MATERIALRAW MATERIAL SUMMARYTANK DISCRIPTIONBLOWERWORK ORDER NO.SUPERVISOR NAME:SAMBHAJIDATE:3/3/15DWG. No. REV. Raw Material For TankMaterial TypeTheoretically Calculated QuantityAvailable QuantityPractically used QuantityResinISO Resin
Fiber GlassCSM WRMSurface
Catalyst
Accelerator3%
PPHGL 3mm3mm Sheet
PPHGL 3mm3mm Sheet
PPH for the nozzle Pipe
Nut Bolt Washer INLETOUTLET
GASKETINLET3mm OUTLET3mm
COATING OF TANK
Internal Inspection ReportM/s Bhavi Plast P Ltd Building No. 37 Gala 1,2,3,4 Indian Corporation DaphodeMankoli Naka Bhiwandi ThaneT/F: 022 25366002 , Tel : 022 25366003/4
Internal Inspection Report
ClientTag No : -P.O Ref Description Inspection Authority: -WO No: Date Of Visit: Drawing Ref:Report No & Date: Qty :
Dimension Report
S.NoDescription Required Dimension in mm Measured dimension in mm1Inside circumference2Height of shell 3Total height 4diameter
S.NoNozzle sizeNozzle descriptionorientation measured orientationElevation in mm Proj from shell inside in mm in degreesRequired MeasuredRequired MeasuredMHMANHOLEN1SPAREN2WATER INLETN3OVERFLOWN4DRAIN N5PUMP OUTLETN6LEVEL INDICATORN7LEVEL INDICATORN8PH TRANSMITTER
NOTE :1. Flanges thickness are as per Dwg.2. Nos of holes, PCD, hole diameter of all flanges are as per Dwg. Requirment.
Clients Representative Inspection AuthorityFor Bhavi Plast P Ltd