1
Tanjung Jati B Coal Fired Power Plant is located on the north shoreline of Java island at a point known as the Muria Peninsula. The total plant area consist 150 hectares within Tubanan Village, Kembang Region, approximately 83 km north east of the city of Semarang, and 25 km north of the town of Jepara, Central Java. The Tanjung Jati Power Plant compliments the existing transmission infrastructure and current power producers; it current facilitates 4x660 MW. Location Jepara Regency, Central Java Province Project Owner PT. Central Java Power (CJP) CJP 100% owned by Sumitomo Corporation Business CJP constructs the power plant and as a lessor, executes a finance lease agreement with PLN as lessee. Operation and maintenance of the power plant are conducted by PLN’s Risk and Control When the lease period expires, the assets will be transferred to PLN Tanjung Jati B Existing Project (Unit 1 & 2) Tanjung Jati B Expansion Project (Unit 3 & 4) The Plant 660.8 MW x 2 units 661.1MW x 2 units COD Unit 1 : October 2006 Unit 2 : November 2006 Unit 3 : October 2011 Unit 4 : January 2012 Funding JBIC JBIC Constructions Turbine Generator Unit: Toshiba Boiler Unit : B & W and Boiler Aux. by Black & Veatch (consortium) Installation by Toshiba Plant System Building & Civil Eng. work by MES (Mitsui Engineering & Shipbuilding Co., Ltd.) Turbine Generator Unit: Toshiba Main Boiler Unit : MHI Boiler Aux. by Black & Veatch Installation by Toshiba Plant System Building & Civil Eng. work by MES (Mitsui Engineering & Shipbuilding Co., Ltd.) Tanjun Jati B Plant Location

description

Sumitomo Project On Tanjung Jati B existing

Transcript of Tanjung Jati - B CFPP

Page 1: Tanjung Jati - B CFPP

Tanjung Jati B Coal Fired Power Plant is located on the north shoreline of Java island at a point known as the Muria Peninsula.

The total plant area consist 150 hectares within Tubanan Village, Kembang Region, approximately 83 km north east of the city of Semarang, and 25 km

north of the town of Jepara, Central Java.

The Tanjung Jati Power Plant compliments the existing transmission infrastructure and current power producers; it current facilitates 4x660 MW.

Location Jepara Regency, Central Java Province

Project Owner PT. Central Java Power (CJP)CJP 100% owned by Sumitomo Corporation

Business CJP constructs the power plant and as a lessor, executes a finance lease agreement with PLN as lessee.Operation and maintenance of the power plant are conducted by PLN’s Risk and ControlWhen the lease period expires, the assets will be transferred to PLN

Tanjung Jati B Existing Project

(Unit 1 & 2)

Tanjung Jati B ExpansionProject

(Unit 3 & 4)

The Plant 660.8 MW x 2 units 661.1MW x 2 units

COD Unit 1 : October 2006Unit 2 : November 2006

Unit 3 : October 2011Unit 4 : January 2012

Funding JBIC JBIC

Constructions Turbine Generator Unit: Toshiba Boiler Unit : B & W and

Boiler Aux. by Black & Veatch (consortium) Installation by Toshiba

Plant System Building & Civil Eng. work

by MES (Mitsui Engineering & Shipbuilding Co., Ltd.)

Turbine Generator Unit: ToshibaMain Boiler Unit : MHI

Boiler Aux. by Black & Veatch Installation by Toshiba

Plant System Building & Civil Eng. work

by MES (Mitsui Engineering & Shipbuilding Co., Ltd.)

Tanjun Jati B – Plant Location