Tania Park upgrade 600x900 v2...As part of the ‘Connecting All Through Play’, Stage 1 works will...
1
Tania Park Playground Upgrade As part of the ‘Connecting All Through Play’, Stage 1 works will commence Thursday 7 February and are due to be completed by April 2019. The playground will be closed during this time. The upgrade will include: • A new inclusive playspace which provides a range of equipment for children and their carers. • A main entry that is safe and welcoming with adjacent accessible parking. • Landscaped areas to enhance nature play. • Equipment to include a double bay swing, hurricane swing, wheelchair accessible carousel, shipwreck themed multi-play unit, inclusive slide, talk-tubes, play-hut, balance logs, plus more! Enquiries: Parks & Recreation on 1300 434 434 northernbeaches.nsw.gov.au
Transcript of Tania Park upgrade 600x900 v2...As part of the ‘Connecting All Through Play’, Stage 1 works will...
![Page 1: Tania Park upgrade 600x900 v2...As part of the ‘Connecting All Through Play’, Stage 1 works will ... shipwreck themed multi-play unit, inclusive slide, talk-tubes, play-hut, balance](https://reader033.fdocuments.us/reader033/viewer/2022050410/5f8739ad7afe01070744a884/html5/thumbnails/1.jpg)
Tania Park Playground Upgrade As part of the ‘Connecting All Through Play’, Stage 1 works will commence Thursday 7 February and are due to be completed by April 2019. The playground will be closed during this time.
The upgrade will include:
• A new inclusive playspace which provides a range of equipment for children and their carers.
• A main entry that is safe and welcoming with adjacent accessible parking.
• Landscaped areas to enhance nature play.
• Equipment to include a double bay swing, hurricane swing, wheelchair accessible carousel, shipwreck themed multi-play unit, inclusive slide, talk-tubes, play-hut, balance logs, plus more!
Enquiries: Parks & Recreation on 1300 434 434 northernbeaches.nsw.gov.au