TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft...

15
TAM – Review and Outlook Robert Graham (Eurocontrol) & KarlHeinz Keller (DLR)

Transcript of TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft...

Page 1: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

TAM – Review and Outlook

Robert Graham (Eurocontrol)&

Karl‐Heinz Keller (DLR)

Page 2: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

IDEAS SHAPE THE COURSE OF HISTORY.

‐‐ JOHN MAYNARD KEYNES

Page 3: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

2002: 1st TAM IdeasFuturistic APOC 

Page 4: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

2002: 1st TAM IdeasFuturistic APOC 

Page 5: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

2006:  TAM‐Concept V1.0

Page 6: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

2006:  TAM‐Concept V1.0

Page 7: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

2006ff: Progressing…A‐CDM deployment accelerates

Continuity with TAM R&D within DLR, Eurocontrol and SESAR

Shaping TAM through SESAR – detailed description and requirements ready

Validation with industry prototypes is underway

Airports are deploying: ZHR, DUS, MAD, BER, LHR, CDG, AMS to name a few

Page 8: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

TAM – Expanding the Scope of A‐CDM 

Departure

Transfer

Arrival

Departure

Arrival

Turnaround

Landside

Airside A-CDM

TAM

Air

po

rt M

anag

emen

t Pr

oce

sses

Airport Core Processes

Page 9: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

Information ExchangeCollaboration!? 

Cooperative Airport Management

KPIs basedCooperative Airport 

Management

AirportCollaborativeDecision Making(A‐CDM)

Total AirportManagement(TAM)

PerformanceBased AirportManagement(PBAM)

Concept Evolution

Page 10: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

TAM Concept Elements• Airside and 

LandsideIntegration 

• Airport Processesi.e. landside queuesturn round, snow ..

• Airport OperationsPlan (AOP)

• Integration with the Network(AOP <‐> NOP)

• Airport Operations Control Center (APOC: centralised / de‐centralised)

• Driving Performance: Decision Support Systems in an Airport Performance dashboard.

Page 11: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

www.DLR.de/fl • Folie 11

TAM – a Multidisciplinary Task  

Core Tasks R&D SupportEnvironment

Integrated DecisionSupport Tools forLand‐ and Airside

TAM –Operational Concept

TAM –Cooperation Concept

Validation-Concepts

Simulation-Systems

Validation-Infrastructure

ICT Development

Improve Information

Select / EducateAPOC Operators

Consider EconomicalFramework

Adapt Legal Framework

Page 12: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

“MAY THE DREAMS OF YOUR PAST BE THE REALITY OF YOUR FUTURE”‐‐ AFRICAN PROVERB QUOTE

Page 13: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

For discussion …

• TAM is being deployed in different forms; a threat?HarmonisationHarmonisation

• Building stakeholder trust in the advantages of TAM, provide evidence!BenefitBenefit

• Aligning shared business goals, conforming, sharing information …« Coopetition »« Coopetition »

• What are the best KPI for Airport performance management .. can they be common across airports?Common KPICommon KPI

• Who is the final decision maker in this collaborative environment?Airport DashboardAirport Dashboard

• Conflicting or complementaryNetwork and Airport Performance ..

Network and Airport Performance ..

• Target in RP3?The European Performance Scheme

The European Performance Scheme

Page 14: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

Concluding …Total Airport Management

• will be the successor of A-CDM

• needs a holistic approach towards airport operations optimisation – landside / airside!

• drives performance

• will change stakeholders cultures…

Your cooperation is needed

• participate in the development and validation

• position yourself and take advantage

• support implementation

• shape the future

Con‐clusion

Coop‐erate

Page 15: TAM –Review and Outlook - DLR Portal · 2013. 10. 21. · ‐‐RALPH CHARELL. Title: Microsoft PowerPoint - SESSION 0 - TAM - KELLER GRAHAM - DLR ECTL-print.pptx Author: kell_ka

“IT IS THROUGH COOPERATION, RATHER THAN CONFLICT, THAT YOUR GREATEST SUCCESSES WILL BE DERIVED”

‐‐ RALPH CHARELL