Property Services, Professionally Delivered
Property Services One provider for a Building, Fabric & Maintenance service
Moves & Changes
Fire Risk Assessment
Refurbishment & Upgrades
Planned Maintenance
Property Fit-Out
Reactive Maintenance
Mechanical & Electrical
Painting & Decorating
Property Services Across Sectors Axis has been delivering Property Services for 30 years
Commercial Retail Heritage
Public Sector Education Housing
A Trusted Provider This is just a selection of our recent clients
About Axis Big enough to deliver. Small enough to care
Established
1986
Ownership
Family
Turnover
£135m
Staff
850+
Offices
11
Credit Rating
AAAA
Values Led
8 Values
Fleet
350+
Why Axis?
Experience We understand the needs of
our clients and can deliver in
your environment and to
your standards.
Your Business Continuity
Financial security
means a project
started with Axis
can be finished
with Axis.
Success We’ve been helping
companies like yours impress
their clients for over 30
years.
Established Resources
A workforce that’s able to
respond to a client’s needs.
Ownership We absorb our client’s
targets and objectives
like they are our own.
Strong, financially stable family business.
Heritage Detailed Restoration and Refurbishments
Lincoln’s Inn – Phase II Chancery Lane, London
Grade I & II listed properties Cyclical repairs Specialist stone masonry work Painting Gold Leaf Internal & external decoration Roof Replacement Façade work
Internal and external refurbishment
£1.2m Value
24 Week Duration
In result of our strong relationship with The Honourable Society of Lincoln’s Inn, we were further commissioned to work on a
new project which included internal and external refurbishment, high level access installation, and roofing works.
Due to the sensitivity of the surrounding environment and the
nature of the business within occupied buildings, we consciously adhered to the operational and specific working hours on site.
Royal Hospital Chelsea London
Grade I listed property Joinery and masonry repairs Marble restoration, gold leaf Painting, French polishing Brass reinstatement
Internal and External Repairs, Restoration and Redecoration
£500,000 Value
26 Week Duration
The project involved reinstating and preserving the building’s many notable features. Before beginning, we carried out thorough research to ensure
that we only used materials, applications and craftsmanship that were right for a period restoration.
No detail was too small for us.
Gray’s Inn – The Dolls House London
Grade II listed property Structural roof repairs Metalwork & stonework Sash window repair & restoration Painting
Internal and external refurbishment and repair
£150,000 Value
10 Week Duration
Our specialist heritage team ensured that all repairs were completed in keeping with the eighteenth century building’s
traditional design style, whilst materials were carefully selected in order to protect the building’s original features
from the effects of pollutants and climatic weathering.
Public Sector Working inside high security environments.
Streatham London
Asbestos removal Demolition Site clearance Mechanical and Electrical services Air conditioning Rewiring Fire and Security Systems New shop fronts New facilities Full internal and external redecorations Floorcoverings
To strip out and fully convert a two storey High Street shop
£500,000 Value
20 Week Duration
Anti attack reception counter’s with automated
security screens were installed. New Mechanical
and Electrical Services throughout included; new incoming utilities supplies for gas, electric’s, water
and telecommunications. Air Conditioning works focused on extract and
fresh air ventilation, central heating and heat
recovery. Rewiring included fire and
security systems and a new building management
system. Staff facilities works
included kitchenettes, shower rooms, male and female WCs and changing
rooms.
Cobalt Square London
In occupation work New walls & ceilings New office space Upgrade of electrics Mechanical services New floorcoverings Full redecoration Security vetted team working within restricted and sensitive areas
Refurbishment and reorganisation, 5 office floors, staff restaurant and specialist workshops.
£900,000 Value
16 Week Duration
We worked in occupancy with the staff during the 16 week project.
The vast space within Cobalt Square was completely restructured to maximise the building potential
whilst promoting open plan working.
Our team had to go through a rigorous vetting process to ensure they passed the criteria set by the Metropolitan Police, to permit them to work inside the building. This
included 24/7 maximum security areas, which required a sensitive and flexible approach from the workmen.
Marlowe House Sidcup, Greater London
Commercial refit Repairs and decorations Fabric installation Mechanical and engineering Floors, ceilings and walls Fire compartmentation
Refurbishment, moves and changes.
£500,000 Value
12 Week Duration
The Metropolitan Police place a lot of importance on the fitness and training of their officers and when they wanted to install a high-end gym and dojo in their training facility at Marlowe House, they knew they could trust us to do it right.
Once the space had been taken back to a shell, we were able to get started on design and installation elements,
including fire compartmentation of the rooms and ceiling, mechanical and electrical features, rewiring, LED lighting, air
conditioning and ventilation.
Southwark Police Station
Asbestos removal Wall, floor and tile renewal Partition construction Redecorations Mechanical and electrical
maintenance
Refurbishment, moves and changes.
£75,000 Value
4 Week Duration
Axis converted unused office space into purpose built visa application centres for the Metropolitan Police, complete with a new entrance, waiting area, application
processing stations and functional office. The project was delivered on a short turnaround of four weeks and in a busy, live police environment where over 1,000
officers and support staff work. Asbestos removal was required along with the demolition of walls and ramps, prior to stripping flooring, tiles and the
ceiling in the 890sq ft. space. Once gutted, the area had a new electrical system designed, installed and commissioned. New air conditioning and ventilation was also installed. A protected entrance was constructed, comprising of secure entry
system, heavy duty furniture and reformed concrete steps.
Education Inspiring the future
Woodside Primary Croydon
Mechanical and electrical works Drainage works Structural alterations Decorative works Flooring
Installation of new reception area
£180,000 Value
12 Week Duration
Axis completed construction of a steel framed conservatory-style entrance to the reception area as well as various mechanical and electrical services. We surveyed the drainage system and redirected it to take it away from the slab and then broke
up the existing slabs and laid groundwork's for the conservatory. We made structural alterations to the front of the building and internal walls to facilitate the new reception area as the original and entrance were relocated, which involved:
removing the original doors and windows, bricking up the openings they left behind, as well as removing the existing concrete ramp and handrails.
Kingston University Penrhyn Road Campus
Central heating works Electrical work Washroom upgrades Sanitary fittings Interior refurbishment
Interior refurbishment
£658,000 Value
12 Week Duration
Interior refurbishment and improvements of the four storey Sopwith Building included, the male, female and disabled washrooms, communal corridors and
common areas, together with new flooring and suspended ceiling. New lighting, electrical rewiring, central heating, plumbing, air conditioning, sanitary fittings and replacement fire doors updated the working facilities, where added new
cosmetic fittings made way for modern carpet and sanitary ware, creating an improved work and study environment for staff and students – all emphasised by a
new LED lighting system fitted with motion sensor switches.
Greenwich University
New fume cupboard installed Suspended ceilings Flooring Plumbing Redecoration
Science laboratory upgrade
£85,000 Value
4 Week Duration
To add to our portfolio of Project work within the
education sector, Axis has undertaken extensive
refurbishment works to the Nelson Laboratory and surrounding rooms at
Greenwich University’s Medway Campus. The
programme of refurbishment and the scope of works within
the Science Lab and surrounding rooms, were all
carried out and fitted within a ‘Specialist Specification’ and
included: internal redecorations, floor renewal, a new suspended ceiling, and the removal and renewal of the existing fume cupboards
and disused piping. Minor electrical adaptations were
carried out with relevant NICEIC Certificates issued.
Commercial Improve and Enhance your work environment
Credit Suisse Canary Wharf, London
On-Site dedicated team 24/7 365 maintenance Office refurbishments Mechanical & electrical Moves & changes Minor works & capital projects Bespoke services Managed storage Gas services Heating, Ventilation & AC
One of Canary Wharf’s largest property portfolios.
Over 18 years ago, Axis attended a maintenance call from Credit Suisse to fix a squeaky door. Since then, we’ve grown organically with our
Fortune 500 client, absorbing their many Fabric Service requirements to continually support the changing needs of their business and building.
“Axis’ team move around the building and carry out their work with the minimum of disruption.
They adopt our corporate culture and working practices into the way they conduct themselves and manage
interactions with some of the most senior (and demanding) people in the organisation.”
Queen Victoria St London
Renewal of washrooms Replacement of floor & ceilings Upgrading showers Cycle storage area construction Redecoration Installation of partition walls Mechanical & electrical works
Internal refurbishment and renewal of washrooms
£250,000 Value
12 Week Duration
New cubicles installed which included modern vanity units and sanitary ware. Painting and decorating completed the high-end finish.
Refurbishments included, new flooring, ceiling and lighting, installation of partition walls.
Works were phased across the floors and scheduled out-of-hours to reduce disruption to the numerous
financial organisations that remained occupying the 9,000 m2 office
building.
Moves & Changes
Moving office – whether to a different floor, a different building, or even a different Country – is never just about moving desks. At Axis, we’ve helped banking institutions adapt quickly to market conditions, high-end brands create environments that wow their customers, and corporate landlords create more workstations within the same space.
Working around times that suit your business.
Our service provides office changes from basic reorganisation through to the planning and execution of large-scale moves. Our strategic management approach
ensures everything from space-planning, logistics and storage through to IT equipment testing and deep cleaning
are in place before the first box is packed – this direct control ensures business continuity for our clients.
Such attention to detail is one of the many reasons why we’ve worked with Credit Suisse for 18 years as an
in-house facility, providing nearly 5,000 moves in one year alone. In one project we moved 400 people onto the tenth floor of their Canary Wharf offices over two
weekends.
Retail Showcase your products powerfully
Swarovski
Design & development Full decommission and strip out Levelling of floor Installation of ceiling Store refurbishment and fit out Mechanical & electrical
installation
Full store fit out
£115,000 Value
16 Week Duration
Canary Wharf, Tonbridge & Chelmsford
Chelmsford’s architectural and historic significance meant that Axis had to work
closely with the City Council’s conservation specialists in order to ensure that the
appearance of the store was in keeping with the character of the local area. Our Design and Development Manager took
the lead on this aspect of he project, successfully coordinating with both the Council and Swarovski to guarantee that
the appearance of the store met the requirements of both parties.
The Watch Gallery Selfridges
Project Management Design & development Full decommission and strip out Levelling of floor Installation of ceiling Manufacture & installation Store refurbishment and fit out Mechanical & electrical installation
Complete refurbishment and fit out
4 Week Duration
As an approved contractor for many high profile brands Axis was commissioned to design and
develop a range of watch displays for both back wall and free standing displays, keeping a very
modern open plan approach. Axis took the whole project from start to finish and stripped
out the existing area to make ready for the new current fixtures.
KJHKJNKLJKLHK Our
Kenneth Cole Home House of Fraser, Nationwide
15 House of Fraser stores Shop in shop Visual Merchandising Graphics Display design Manufacture Installation
High-end fashion label, Axis designed fixtures
3 Week Duration
Our design team worked closely with House of Fraser to develop a concept that ultimately incorporated a full-height
iconic New York skyline combined with the inclusion of exposed brick work, steel stanchions and simple lacquered metal fixtures. Delivery and installation took place within fifteen stores over a three week period across the UK to
coincide with the launch.
A Responsible Partner
We aim to make a positive lasting difference through our corporate strategy, working practices and CSR initiatives.
Employment & apprentices Sustainability focus Supporting community causes Mentoring & education
As a partner, we help our clients fulfil their corporate social responsibilities and gain alliance and support from the communities they work within.
The Axis Foundation Our registered charity aims to improve the lives and prospects of vulnerable, disadvantaged and disabled members of our society.
Supporting Providing a Hand-Up Caring in Communities Improving Lives
Giving back is in our DNA. We’ve tried to focus on the areas where we are active by supporting small and meaningful causes. In our first six years we gifted £500,000.
Accreditations Your property and people in safe hands
Public Liability
15m Contractors All Risk
2m Employers Liability
10m Professional Indemnity
5m
48
“Axis care for the building as if it’s their own asset, this delivers good supplier behaviour and drives good decision making.”
Ownership
“More often than not, it’s fixed before we even notice it’s broken.”
Proactive Approach
“Axis’ team move around the building and carry out their work with the minimum of disruption. They adopt our corporate culture and working practices into the way they conduct themselves and manage interactions with some of the most senior (and demanding) people in the organisation.”
Tradesmen in Pinstripes
What our clients say We value long-term relationships
“I’ve always been impressed by their commitment to health and safety, demonstrated by investment in training, vigilant supervision and ensuring appropriate equipment is provided.”
Impeccable Health & Safety Record
“Axis’ ability to mobilise large numbers of skilled tradesmen and experienced managers in a very short space of time.”
Scale and scope to turn up or down the resource
Thank You Please do ask if there is anything
else you would like to know
Tony Mantle
Divisional Manager
Mobile: 07966 261 857
Single Contact A dedicated contact for all your property needs