Take 5 for Safety
description
Transcript of Take 5 for Safety
Progress on EMS/OSH ObjectivesPhoto of the Week
E. LessardCollider-Accelerator Department
5-17-11
Take 5 for SafetyTake 5 for Safety
Mid-Year Check on EMS/OSH Objectives
Based on the Management Review last October, the following are the ESSHQ objectives and measures established at C-AD for FY11: · Greenhouse Gas Emissions, 3% reduction · Unneeded Materials and Chemicals, 3% reduction · Regulatory, 0 Notices of Violation, 0 Permit Exceedances · 0 Lost Workday Incidence· 0 Total Recordable Incidence
2
Status as of 5-17-11· Greenhouse Gas Emissions, 3% reduction –
- Indirectly, see next slide· Unneeded Materials and Chemicals, 3% reduction –
- C- Line and D line cleanup, some chemicals at 801· 0 Notices of Violation, 0 Permit Exceedances
- 0 Notices of violation from regulators- 0 Spills
· 0 Lost Workday Incidence – - 2 DARTS
+ Injury from truck flip over (lost time)+ Cut finger at TVDG (restricted work)
· 0 Total Recordable Incidence – - 2 Recordable Injuries
+ See above
3
DOE’s Site Sustainability Plan for BNL (GHG Reduction)
Install on-site renewable energy projects Purchase renewable energy credits or carbon offsets as necessary Temperature set-backs; more efficient office equipment Long Island Solar Farm Project (32 MW PV array); install additional ~1 MW
PV array for BNL Solar powered traffic signals and parking lights; solar heating systems for
B30 and B464 Continue acquiring Alternative Fuel Vehicles: 20% CNG and 80% E85 for
all acquisitions Continue installing advanced meters for steam and standard meters for
water Cool roofs have been specified; R-30 has been specified Continue to train more staff; update employee orientation programs to
include sustainability Research cost-effective SF6 leak-detection devices
Improve infrastructure as funding permits Use best management practices for water conservation
4
Photo of the Week - Some rise by sin, and some by virtue fall (William Shakespeare)
5