Taining Compleate Latter
Transcript of Taining Compleate Latter
-
8/14/2019 Taining Compleate Latter
1/1
MULTAN ELECTRIC POWER COMPAN
132 KV GRID STATION KHANEWAL
To,The Principal,
GOVT. College of Technology
..
No.___________ Dated: _____________
Subject: 12 weeks training of B.Tech (Pass) Electronics.
It is certified that
1. Mr. MUDASUR S/O ASHFAQ AHMAD SHAHID
Is student of B-Tech (Pass) Electronics under the college roll no . and reference n
GPI//09/. has been complete 12 weeks training program. He completes his training
at 132 KV Grid Station .. from 02-12-2009 to 02-03-2010. During this period we found
him that he takes keen interest in his job which was assigned to him.
Signature of A. Resident Engineer