DAVAO DEL NORTE
City Government of Tagum
A TOTAL LAND AREA OF 19,580 HECTARES
FIRST CLASS CITY OF THE
NORTE, PHILIPPINES WITH PROVINCE OF DAVAO DEL
2015 POPULATION
GROWTH RATE
BECOME A COMPONENT CITY ON MARCH 7,1998
-
Process Flow-GGIEP
-
STUDIES HAVE SHOWN THAT
BIO -CHAR CAN AID IN:
Nutrient retention and cation
exchange capacity
Decreasing soil acidity
Decreased uptake of soil toxins
Improving soil structure
Nutrient use efficiency
Water-holding capacity
Decreased release of non-CO2
greenhouse gases (CH4, N2O)
Up to 4500 tonnes of CO2
sequestered annually per unit.
-
Air Pollution Control
Ayala Avenue, Makati City, Philippine
ION EXCHANGE SCRUBBER
-
Letter from Global Green
International signed by its
Chief Executive Officer
Alan Matthews
Letter forwarded to the
Local Chief Executive of
the City Government
of Tagum
Documents forwarded to
the Project Facilitator Mr.
Nonito Dela Torre, MBA,
MSERM-Supervising EMS
18 months
communications and
exchanging views and
data gathering
Part of the activities
within the 18 months
period: (a) Endorsement
of the proposal from the
LCE to the 6th City
Council (b) 2
presentations of the
proposed Waste to
Energy Project by GGI
at the committee of the
whole of 6 th City Council
MOA Signing
(September 10, 2013)
Environmental
Compliance Certificate
(ECC) processing
completed on December
9, 2013 METRO PACIFIC
INVESTMENT pledge to
support the WTE project
(May 22, 2014)
On-going Legal
Requirements
Documentation and
Compilation
Ground Breaking
Ceremony
(July 9, 2015)
ON -GOING SITE
DEVELOPMENT
-
DISTANCE: 521 meters
NEW SITE
MATERIAL CONTAINMENT
FACILITY (Area: 1.783 has.)
COORDINATES
7