Tabel Bab2 Bangunan Air

of 17 /17
7/21/2019 Tabel Bab2 Bangunan Air http://slidepdf.com/reader/full/tabel-bab2-bangunan-air 1/17 Tabel 2.2. Perhitungan Debit Saluran No tersier Debit, Q (m3/dt) sekunder debit primer 1 ST 1 Ka 0.065 2 ST 5 Ka 0.065 3 SS 1Ka 21.469 4 ST 2 Ka 0.065 5 ST 4 Ka 0.065 6 SS 2 Ka 10.735 7 ST 3 Ka 0.065 8 SS 3Ka 5.324 9 ST 1 Ki 0.131 10 ST 8 Ki 0.131 11 SS 4 Ka 2.793 12 ST 2 Ki 0.131 13 ST 7 Ki 0.131 14 SS 1 Ki 1.396 15 ST 3 Ki 0.131 16 ST 6 Ki 0.131 17 s SS 2 Ki 0.698 18 ST 4 Ki 0.131 19 ST 5 Ki 0.131 20 SS 3 Ki 0.349 21 ST 6 Ka 0.065 22 ST 14 Ka 0.131 23 SS 5 Ka 2.880 24 ST 7 Ka 0.065 25 ST 13 Ka 0.065 26 SS 6 Ka 1.396 27 ST 8 Ka 0.131 28 ST 12 Ka 0.131 29 SS 7 Ka 0.785 30 ST 9 Ka 0.065 31 ST 11 Ka 0.131 32 SS 8 Ka 0.349 33 ST 10 Ka 0.065 34 SS 9 Ka 0.087 35 SP 1 ST = petak tersier / efisiensi tersier SS = ST + ST (lihat i ske!a "arin#an iri#asi$/efisiensi sk%ner SS1 = ST + ST (lihat i ske!a "arin#an iri#asi$/efisiensi sk%ner+SS se&el%!n'a S1 = SS5 Ka + SS1 Ka (lihat i ske!a "arin#an iri#asi$/efisiensi pri!er eterangan)

Embed Size (px)

description

da

Transcript of Tabel Bab2 Bangunan Air

  • Tabel 2.2. Perhitungan Debit SaluranNo tersier Debit, Q (m3/dt) sekunder debit primer1 ST 1 Ka 0.0652 ST 5 Ka 0.0653 SS 1Ka 21.4694 ST 2 Ka 0.0655 ST 4 Ka 0.0656 SS 2 Ka 10.7357 ST 3 Ka 0.0658 SS 3Ka 5.3249 ST 1 Ki 0.13110 ST 8 Ki 0.13111 SS 4 Ka 2.79312 ST 2 Ki 0.13113 ST 7 Ki 0.13114 SS 1 Ki 1.39615 ST 3 Ki 0.13116 ST 6 Ki 0.13117 s SS 2 Ki 0.69818 ST 4 Ki 0.13119 ST 5 Ki 0.13120 SS 3 Ki 0.34921 ST 6 Ka 0.06522 ST 14 Ka 0.13123 SS 5 Ka 2.88024 ST 7 Ka 0.06525 ST 13 Ka 0.06526 SS 6 Ka 1.39627 ST 8 Ka 0.13128 ST 12 Ka 0.13129 SS 7 Ka 0.78530 ST 9 Ka 0.06531 ST 11 Ka 0.13132 SS 8 Ka 0.34933 ST 10 Ka 0.06534 SS 9 Ka 0.08735 SP 1

    ST = petak tersier / efisiensi tersierSS = ST + ST (lihat di skema jaringan irigasi)/efisiensi skunderSS1 = ST + ST (lihat di skema jaringan irigasi)/efisiensi skunder+SS sebelumnyaSP1 = SS5 Ka + SS1 Ka (lihat di skema jaringan irigasi)/efisiensi primer

    Keterangan:

  • debit

    28.646

    Efisiensi Tersier = 0.55Efisiensi Sekunder = 0.75Efisiensi Primer = 0.85

  • Tabel 2.3 Perhitungan Dimensi Saluran Sekunder dan Primer dengan pasangan batu kaliNama Saluran b/y m V ijin m/dt) n

    1 2 3 4 5 6SP 1 28.646 10.000 2.000 0.700 0.017 40.923

    SS 1 Ka 21.469 8.000 2.000 0.700 0.017 30.670SS 2 Ka 10.735 5.000 1.500 0.700 0.017 15.335SS 3 Ka 5.324 3.500 1.500 0.700 0.017 7.605SS 4 Ka 2.793 2.500 1.000 0.600 0.017 4.655SS 5 Ka 2.880 2.500 1.000 0.600 0.017 4.800SS 6 Ka 1.396 2.000 1.000 0.550 0.017 2.539SS 7 Ka 0.785 2.000 1.000 0.550 0.017 1.428SS 8 Ka 0.349 1.500 1.000 0.400 0.017 0.873SS 9 Ka 0.087 1.000 1.000 0.300 0.017 0.291SS 1 Ki 1.396 2.000 1.000 0.550 0.017 2.539SS 2 Ki 0.698 2.000 1.000 0.500 0.017 1.396SS 3 Ki 0.349 1.500 1.000 0.400 0.017 0.873

    1 Diketahui 5 Tabel kekasaran Manning2 Tabel De Vos 6 (1)/(4) 10 (6)/(9)3 Tabel De Vos 11 [2*(3)*(7)]+(8)4 Tabel Kecep. Ijin minimum 8 (2)*(7) 12 (6)/(11)

    Q rencana (m3/dt) A (m2)

    9 (8)+{[2*(7)]*[[1+(3)2]0,5]}

    7 {(6)/[(2)+(3)]}0,5

  • Tabel 2.3 Perhitungan Dimensi Saluran Sekunder dan Primer dengan pasangan batu kaliy (m) b (m) P (m) R (m) T (m) D (m) Fr I

    7 8 9 10 11 12 13 141.847 18.467 26.725 1.531 25.854 1.583 0.178 0.000081.751 14.010 21.842 1.404 21.015 1.459 0.185 0.000091.536 7.680 13.218 1.160 12.288 1.248 0.200 0.000111.233 4.317 8.763 0.868 8.016 0.949 0.229 0.000161.153 2.883 6.145 0.757 5.189 0.897 0.202 0.000141.171 2.928 6.240 0.769 5.270 0.911 0.201 0.000140.920 1.840 4.442 0.572 3.680 0.690 0.211 0.000180.690 1.380 3.331 0.429 2.760 0.517 0.244 0.000260.591 0.886 2.557 0.341 2.068 0.422 0.197 0.000190.381 0.381 1.460 0.199 1.144 0.254 0.190 0.000210.920 1.840 4.442 0.572 3.680 0.690 0.211 0.000180.682 1.364 3.294 0.424 2.729 0.512 0.223 0.000220.591 0.886 2.557 0.341 2.068 0.422 0.197 0.00019

    16 Tabel nilai tinggi jagaan

    13 (4)/[9,81*(12)]0,5

    14 {[4]*[5]/[10]2/3}}2

    15 (14)*(10)0,5 m

    b

    1

    y

    fT

  • Tabel 2.3 Perhitungan Dimensi Saluran Sekunder dan Primer dengan pasangan batu kaliI VR f (m)

    15 160.00010 1.0000.00010 0.7500.00012 0.6000.00015 0.6000.00013 0.6000.00012 0.6000.00013 0.5000.00017 0.5000.00011 0.4000.00010 0.3000.00013 0.5000.00014 0.5000.00011 0.400

    f

  • Tabel 2.5. Perhitungan Dimensi Pintu Sorong Bangunan Bagi Primer dan SekunderNo Nama Bangunan Nama Saluran Q rencana

    Bagi Sekunder1 BP 1 SS 1 Ka 21.469

    SS 5 Ka 10.7352 BS 1 Ka SS 2 Ka 5.3243 BS 2 Ka SS 3 Ka 2.7934 BS 3 Ka SS 4 Ka 2.8805 BS 5 Ka SS 6 Ka 1.3966 BS 6 Ka SS 7 Ka 0.7857 BS 7 Ka SS 8 Ka 0.3498 BS 8 Ka SS 9 Ka 0.0879 BS 4 Ka SS 1 Ki 1.39610 BS 1 Ki SS 2 Ki 0.69811 BS 2 Ki SS 3 Ki 0.349

    Tabel 2.6. Perhitungan Dimensi Bangunan Ukur Drempel pada Bangunan Bagi Primer dan SekunderNo Nama Bangunan Nama Saluran Q rencana

    Bagi Sekunder1 BP 1 SS 1 Ka 21.469

    SS 5 Ka 10.7352 BS 1 Ka SS 2 Ka 5.3243 BS 2 Ka SS 3 Ka 2.7934 BS 3 Ka SS 4 Ka 2.8805 BS 5 Ka SS 6 Ka 1.3966 BS 6 Ka SS 7 Ka 0.7857 BS 7 Ka SS 8 Ka 0.349

    (m3/dt)

    (m3/dt)

  • 8 BS 8 Ka SS 9 Ka 0.0879 BS 4 Ka SS 1 Ki 1.39610 BS 1 Ki SS 2 Ki 0.69811 BS 2 Ki SS 3 Ki 0.349

    Tabel 2.7. Perhitungan Dimensi Pintu Crump de Gruyter pada Bangunan Sadap TersierNo Nama Bangunan Nama Saluran Q rencana

    Bagi Tersier1 BS 1 Ka ST 1 Ka 0.065

    ST 5 Ka 0.0652 BS 2 Ka ST 2 Ka 0.065

    ST 4 Ka 0.0653 BS 3 Ka ST 3 Ka 0.0654 BS 4 Ka ST 1 Ki 0.131

    ST 8 Ki 0.1315 BS 1 Ki ST 2 Ki 0.131

    ST 7 Ki 0.1316 BS 2 Ki ST 3 Ki 0.131

    ST 6 Ki 0.1317 BS 3 Ki ST 4 Ki 0.131

    ST 5 Ki 0.1318 BS 5 Ka ST 6 Ka 0.065

    ST 14 Ka 0.1319 BS 6 Ka ST 7 Ka 0.065

    (m3/dt)

  • ST 13 Ka 0.13110 BS 7 Ka ST 8 Ka 0.131

    ST 12 Ka 0.13111 BS 8 Ka ST 9 Ka 0.065

    ST 11 Ka 0.13112 BS 9 Ka ST 10 Ka 0.065

    keterangan:Y1 dari tabel perhitungan dimensi saluran primer dan sekunder kolom yY2 dadi tabel perhitungan dimensi saluran tersier kolom yW bukaan pintu ditentukan sendirih1 ((Q/(Cd*W*B))^2x(1/2*g))+WK w/h1Dh/h1 dilihat dari tabelDh h1 x s

  • Dimensi Pintu SorongY1 (m) Y2 (m) u B saluran (m)1.847 1.751 0.900 14.0101.847 1.171 0.900 2.9281.751 1.536 0.900 7.6801.536 1.233 0.900 4.3171.233 1.153 0.900 2.8831.171 0.920 0.900 1.8400.920 0.690 0.900 1.3800.690 0.591 0.900 0.8860.591 0.381 0.900 0.3811.153 0.920 0.900 1.8400.920 0.682 0.900 1.3640.682 0.591 0.900 0.886

    Keterangan:

    atauQ rencana = tabel dimensi saluran no.1Y1 = tabel dimensi pintu (nama bangunan bagi) & tabel dimensi saluran no.7 Y2 = tabel dimensi pintu (nama saluran sekunder) & tabel dimensi saluran no.7u = koefisien debit = 0,9B saluran = tabel dimensi saluran disesuaikan dengan table perhitungan dimensi (nama saluran sekunder)

    z =Y1 - Y2 0.5a = Q/(u .Bpintu .(2.g.z)) ; g = 9,81 m/s

    Tabel 2.6. Perhitungan Dimensi Bangunan Ukur Drempel pada Bangunan Bagi Primer dan SekunderDimensi Bangunan Ukur Drempel

    P (m) H (m) P' (m) z (m)0.200 1.551 0.300 1.4510.200 0.971 0.300 0.8710.200 1.336 0.300 1.2360.200 1.033 0.300 0.9330.200 0.953 0.300 0.8530.200 0.720 0.300 0.6200.200 0.490 0.300 0.3900.200 0.391 0.300 0.291

    Q = u . B pintu .a . (2.g.z)0,5

    B pintu = lebar pintu sorong antara 0,5 m s/d 1,5 m

  • 0.200 0.181 0.300 0.0810.200 0.720 0.300 0.6200.200 0.482 0.300 0.3820.200 0.391 0.300 0.291

    Tabel 2.7. Perhitungan Dimensi Pintu Crump de Gruyter pada Bangunan Sadap TersierDimensi Pintu Crump de Gruyter

    Y1 (m) Y2 (m) B pintu (m) B saluran (m)1.751 0.330 0.300 0.330

    0.330 0.300 0.3301.536 0.330 0.300 0.330

    0.330 0.300 0.3301.233 0.330 0.300 0.3301.153 0.467 0.300 0.467

    0.467 0.300 0.4670.920 0.467 0.300 0.467

    0.467 0.300 0.4670.682 0.467 0.300 0.467

    0.467 0.300 0.4670.591 0.467 0.300 0.467

    0.467 0.300 0.4671.171 0.330 0.300 0.330

    0.467 0.300 0.4670.920 0.330 0.300 0.330

  • 0.467 0.300 0.4670.690 0.467 0.300 0.467

    0.467 0.300 0.4670.591 0.330 0.300 0.330

    0.467 0.300 0.4670.381 0.330 0.300 0.330

    dari tabel perhitungan dimensi saluran primer dan sekunder kolom ydadi tabel perhitungan dimensi saluran tersier kolom y

  • Dimensi Pintu SorongB pintu (m) z (m) a (m)

    2.000 0.095 1.4181.500 0.676 0.6002.000 0.215 0.7011.500 0.303 0.3491.500 0.080 1.3591.500 0.251 0.2101.000 0.230 0.1940.500 0.099 0.3990.300 0.209 0.0791.500 0.233 0.2261.000 0.238 0.1670.500 0.091 0.433

    B saluran = tabel dimensi saluran disesuaikan dengan table perhitungan dimensi (nama saluran sekunder)

    a = Q/(u .Bpintu .(2.g.z)) ; g = 9,81 m/s

    `

    Dimensi Bangunan Ukur Drempelr (m) L min(m) b (m) F (m) t (m)0.310 3.025 14.010 4.654 0.1000.194 1.894 2.928 2.913 0.1000.267 2.605 7.680 4.008 0.1000.207 2.015 4.317 3.100 0.1000.191 1.859 2.883 2.860 0.1000.144 1.404 1.840 2.160 0.1000.098 0.955 1.380 1.470 0.1000.078 0.762 0.886 1.173 0.100

  • 0.036 0.354 0.381 0.544 0.1000.144 1.404 1.840 2.160 0.1000.096 0.940 1.364 1.447 0.1000.078 0.762 0.886 1.173 0.100

    Keterangan:

    b =Q/1,71 x H^3/2H = Y2 (tabel 2.5) - Pz = H + t ; nilai t = 0,10 mL min = (1,75 x H) + rP = 0,2 m F = 3 x Hr =0,2 x H

    Dimensi Pintu Crump de Gruyterw (m) h1 (m) K=w/h1 Dh/h1(s) Dh (m)0.100 0.375 0.267 0.350 0.1310.100 0.375 0.267 0.350 0.1310.100 0.375 0.267 0.350 0.1310.100 0.375 0.267 0.350 0.1310.100 0.375 0.267 0.350 0.1310.100 1.198 0.083 0.620 0.7430.100 1.198 0.083 0.620 0.7430.100 1.198 0.083 0.620 0.7430.100 1.198 0.083 0.620 0.7430.100 1.198 0.083 0.620 0.7430.100 1.198 0.083 0.620 0.7430.100 1.198 0.083 0.620 0.7430.100 1.198 0.083 0.620 0.7430.100 0.375 0.267 0.350 0.1310.100 1.198 0.083 0.620 0.7430.100 0.375 0.267 0.350 0.131

    Q = 1,71 b . H3/2

  • 0.100 1.198 0.083 0.620 0.7430.100 1.198 0.083 0.620 0.7430.100 1.198 0.083 0.620 0.7430.100 0.375 0.267 0.350 0.1310.100 1.198 0.083 0.620 0.7430.100 0.375 0.267 0.350 0.131

  • Tabel 2.8. Perhitungan Dimensi Bangunan TerjunNama Kode Jenis Bangunan Q b

    Saluran Bangunan (m)1 2 3 4 5

    SS 5 Ka BT 1 Terjun Miring 2.88 2.93 SS 5 Ka BT 2 Terjun Miring 2.88 2.93 SS 5 Ka BT 3 Terjun Miring 2.88 2.93ST 6 Ka BT 5 Terjun Miring 0.07 0.33

    H1 E1 H2 E2 DH(m) (m) (m) (m) (m)11 12 13 14 15

    2.94 264.28 2.94 262.78 1.502.94 262.76 2.94 261.26 1.502.94 261.23 2.94 260.71 0.520.77 259.20 0.77 258.24 0.96

    n Kontrol Yd Lj(m) El.dsr kolam (m) (m)22 23 24 25

    0.21 259.63 5.37 3.330.21 258.11 5.37 3.330.03 257.74 2.92 2.690.03 257.44 8.40 0.69

    (m3/dt)

  • y1 V1 y2 q El. dsr hulu(m) (m/dt) (m) (m)

    6 7 6 8 91.17 0.60 1.17 0.98 261.341.17 0.60 1.17 0.98 259.821.17 0.60 1.17 0.98 258.290.33 0.30 0.33 0.20 258.43

    DZ El. Dasar Vu Yu Fruasumsi kolam (m/dt) (m)

    16 17 18 19 201.712 259.63 5.80 0.17 4.491.712 258.11 5.80 0.17 4.490.890 257.40 4.18 0.24 2.750.990 257.44 4.41 0.04 6.64

    Kontrol USBR 4 :Y2 + n >= 1,1 Yd

    1.20 >= 3.21 OK !

    (m3/dt.m)

  • El. dsr hilir(m)10

    259.84258.32257.77257.47

    Tipe KolamOlak

    21USBR IVUSBR IVUSBR IIIUSBR III

    ptk tersier,Qsalurandimensi saluranbangunan bagibangunan pelengkap