Timeline
• T2.4 installed in R76 09-11-2010• First inspection on 16-11-2010 after 200k
pulses• Little or no wear/dust seen• Target restarted and run for another 400k• 2nd inspection 23-11-2010• Total pulses at inspection 615k
Run 2 Minimum PositionSome changes seenMin BCD has driftedupwards over time.
Pulse to pulse Variability approx. 0.8mmstill well within what is acceptable for MICE
Thanks to Ed for new DAQ plots
Run 2 AccelerationAcceleration is flat.Variability acceptable.
Note that we think weunderstand difference between old and new DAQacceleration values.